Sintering machine grate bars
By adopting a split design and a scraper cleaning mechanism, the problems of high grate maintenance costs and low ventilation efficiency are solved, enabling individual replacement of grate bars and effective cleaning of air ducts, thereby improving the operating efficiency and quality of the sintering trolley.
Patent Information
- Application Number
- CN202522218242.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-21
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-10-21
AI Technical Summary
The existing sintering trolley grate bars need to be replaced as a whole when they are worn or damaged, resulting in high maintenance costs. In addition, fine particles of ore are prone to adhering during high-temperature sintering, causing blockage of the air duct and reducing ventilation efficiency.
The grate structure adopts a split design, which is connected by connectors to form the main body of the installation. The slider and the slide rail cooperate to achieve individual replacement. A swing rod and scraper are set in the flow guide cavity to clean the attached mineral material, and the inclined beams enhance the stability.
It enables the individual replacement of damaged grate bars, reducing maintenance costs, and prevents air duct blockage by scraping, thereby improving ventilation efficiency and sintering quality.
Smart Images

Figure CN224984566U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of metallurgy, and in particular to grating bars for sintering trolleys. Background Technology
[0002] In the metallurgical industry, sintering is an important process, and the sintering trolley is one of the key pieces of equipment for carrying and transporting ore. A sintering trolley typically consists of a car body and grates laid on it. As a crucial component of the sintering trolley, the grates' primary function is to ensure the uniform dispersion of the ore during the high-temperature sintering process. The rational design of the grates is essential for improving the quality and efficiency of sintered products.
[0003] There is currently a Chinese patent document CN202222499687.0 regarding an improved grate bar, comprising a grate bar body. The grate bar body includes an integrally formed first grate bar, a second grate bar, and a third grate bar. The first, second, and third grate bars are fixedly connected as a single unit by end beams and positioning pads. The first and third grate bars are symmetrically arranged on both sides of the second grate bar. The grate bar body is fixed to the trolley beams on both sides via the first and third grate bars. This utility model has a simple structure and novel design. The grate bars have been redesigned, with the original three grate bars integrated into one piece, which strengthens the connection between the grate bars and increases the interaction force between the central beams. In addition, the vertical dimension of the middle grate bar of the three integrated grate bars is reduced, which reduces the installed weight of the grate bars on each trolley, reduces the total weight of the trolley, reduces the operating load, and makes the high-temperature airflow from top to bottom through the grate bars more unobstructed, which can effectively prevent the deformation of the guide ribs and the breakage and detachment of the central beam.
[0004] However, the above-mentioned patent has certain defects in use. Since the three grate bars are integrally formed, the whole thing needs to be replaced when any one of the grate bars is worn or damaged, resulting in high maintenance costs. In addition, fine ore particles are easy to adhere to the inner wall of the air guide channel during high-temperature sintering. Long-term accumulation will reduce the cross-sectional area of the air duct, resulting in a decrease in ventilation efficiency.
[0005] To address these issues, a grate bar for sintering trolleys is proposed here. Utility Model Content
[0006] In order to overcome the shortcomings of high replacement and maintenance costs and low ventilation efficiency in the existing technology, this utility model provides a grate bar for sintering table.
[0007] This utility model is achieved using the following technical solution: A sintering trolley grate bar includes: a first grate bar and a second grate bar. The first grate bar and the second grate bar are connected by a connector to form an installation body. Connecting blocks are symmetrically arranged on both sides of the connector. A slide rail is provided in the connecting block. The side wall of the connection end of the first grate bar and the second grate bar is provided with a slider that is adapted to the slide rail. The slider slides along the slide rail. The connector has a flow guide cavity in the middle of both sides, and a swing rod is inside the flow guide cavity. One end of the swing rod is hinged to the connecting block, and multiple scraper blades are evenly distributed on the swing rod.
[0008] As a preferred embodiment of this utility model, it also includes a trolley body, on which an installation beam for inserting and installing the main body is provided. An upper beam is provided above the first and second grate bars, and a lower beam is provided below the first and second grate bars. The upper beam matches the upper end of the installation beam, and the lower beam cooperates with the lower end of the installation beam.
[0009] As a preferred embodiment of this utility model, the top and bottom of the mounting beam are both inclined surfaces, so that the upper beam strip and the lower beam strip are respectively in contact with the top and bottom surfaces of the mounting beam.
[0010] As a preferred embodiment of this utility model, the connector, the first grate bar and the second grate bar are provided with corresponding insertion holes, and multiple insertion holes are provided. The multiple insertion holes are symmetrically distributed, and fasteners are inserted into the insertion holes.
[0011] As a preferred embodiment of this utility model, a flow guide is provided in the middle of the first grate bar and the second grate bar. The flow guide is elongated and runs through the grate bar, and is connected to the flow guide cavity.
[0012] In a preferred embodiment of this utility model, the fastener is specifically a bolt.
[0013] As a preferred embodiment of this utility model, the upper surfaces of the first and second grate bars are downwardly concave arc-shaped surfaces.
[0014] Compared with existing technologies, the advantages of this utility model are: 1. The first and second grate bars are connected by connectors to form the main installation body, realizing separate assembly. When a grate bar is damaged, it can be replaced individually, effectively reducing maintenance costs. The connector has built-in slide rails and sliders for easy installation.
[0015] 2. After the first grate bar and the second grate bar are installed through the connector, the swing arm and the scraper can swing freely in the guide cavity with the vibration of the trolley. The scraper then moves back and forth in the guide cavity to clean the fine mineral material attached to the inner wall in real time, preventing the accumulation and blockage of the air duct.
[0016] 3. The top and bottom surfaces of the mounting beams are inclined to ensure a tight fit between the upper and lower beam strips, thereby enhancing structural stability. Attached Figure Description
[0017] Figure 1 This is a structural diagram of the trolley of this utility model; Figure 2 This is an assembly structure diagram of the mounting beam and mounting body of this utility model; Figure 3 This is a structural diagram of the main installation body of this utility model; Figure 4 This is an exploded view of the main installation body of this utility model; Figure 5 This is a cross-sectional view of the connector structure of this utility model; Figure 6 This is a structural diagram of the first and second grate bars of this utility model; In the diagram: 1. Connector; 11. First grate bar; 12. Second grate bar; 2. Connecting block; 21. Slide rail; 22. Swing rod; 23. Scraper; 200. Guide cavity; 3. Slider; 31. Guide port; 4. Upper beam bar; 41. Lower beam bar; 5. Insertion hole; 51. Fastener; 6. Trolley body; 61. Mounting beam. Detailed Implementation
[0018] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present utility model. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present utility model without creative effort are within the protection scope of the present utility model.
[0019] Example: Please see Figures 1-6 A sintering trolley grate bar includes: a first grate bar 11 and a second grate bar 12. The first grate bar 11 and the second grate bar 12 are connected by a connector 1 to form an installation body. Connecting blocks 2 are symmetrically arranged on both sides of the connector 1. A slide rail 21 is provided in the connecting block 2. The side wall of the connection end of the first grate bar 11 and the second grate bar 12 is provided with a slider 3 that is adapted to the slide rail 21. The slider 3 is slidably connected along the slide rail 21.
[0020] In this embodiment, specific reference is made. Figure 3 and Figure 4 as well as Figure 6The first grate bar 11 and the second grate bar 12 are separate components. The first grate bar 11 and the second grate bar 12 are connected by a connector 1 to form the main body of the grate bar installation. The connector 1 is located between the first grate bar 11 and the second grate bar 12. The first grate bar 11 and the second grate bar 12 are symmetrically arranged with the connector 1 as the center. Connecting blocks 2 are provided on both sides of the connecting block 2, that is, on the end faces that contact the first grate bar 11 and the second grate bar 12. The connecting block 2 has a slide rail 21 inside. The slide rail 21 is specifically an L-shaped groove structure. The end faces of the first grate bar 11 and the second grate bar 12 are provided with sliders 3. The sliders 3 are specifically L-shaped installation structures. The sliders 3 and the slide rail 21 cooperate with each other to achieve guiding insertion. When a grate bar is damaged, it can be replaced individually, effectively reducing maintenance costs. During installation, simply align the slider 3 with the slide rail 21 and slide it in along the slide rail 21 to complete the quick assembly, greatly improving installation efficiency.
[0021] The connector 1 has a flow guide cavity 200 in the middle of both sides, and a swing rod 22 is provided in the flow guide cavity 200. One end of the swing rod 22 is hinged to the connecting block 2, and multiple scraper blades 23 are evenly distributed on the swing rod 22.
[0022] In this embodiment, specific reference is made. Figure 5 as well as Figure 4 There are two flow guide cavities 200, which are symmetrically distributed on both sides of the middle of the connector 1. The connecting block 2 is specifically set on both sides of the flow guide cavity 200. The swing rod 22 is hinged on both sides of the connecting block 2. Inside the flow guide cavity 200, the swing rod 22 can rotate and swing freely along the hinge point. The swing rod 22 is evenly distributed with scraper blades 23. There is a small gap between the scraper blades 23 and the inner wall of the flow guide cavity 200. It can swing with the airflow or material flow. The flow guide cavity 200 is specifically an arc-shaped channel structure. When the trolley body 6 is running, it will vibrate or be impacted by materials. At this time, the swing rod 22 swings in the flow guide cavity 200. The swing rod 22 and the scraper blades 23 can swing freely with the vibration of the trolley. The scraper blades 23 reciprocate in the flow guide cavity 200 to clean the fine mineral particles attached to the inner wall in real time and prevent the accumulation from causing the air duct to be blocked.
[0023] Specifically, it also includes a trolley body 6, on which an installation beam 61 for inserting and installing the main body is provided. An upper beam 4 is provided above the first grate bar 11 and the second grate bar 12, and a lower beam 41 is provided below the first grate bar 11 and the second grate bar 12. The upper beam 4 matches the upper end of the installation beam 61, and the lower beam 41 cooperates with the lower end of the installation beam 61.
[0024] The top and bottom of the mounting beam 61 are both inclined surfaces, so that the upper beam strip 4 and the lower beam strip 41 are respectively in contact with the top and bottom surfaces of the mounting beam 61.
[0025] In this embodiment, the trolley body 6 is provided with a mounting beam 61, which is specifically a side trapezoidal mounting beam 61. The top and bottom of the mounting beam 61 are both inclined surfaces. See reference for details. Figure 2 The first grate bar 11 and the second grate bar 12 are provided with an upper beam bar 4 above and a lower beam bar 41 below. The upper beam bar 4 is wider than the lower beam bar 41, and the upper beam bar 4 and the lower beam bar 41 are integrally formed with the grate bars. The bottom end of the upper beam bar 4 is an inclined surface, which matches the inclined surface of the top of the mounting beam 61. The top end of the lower beam bar 41 is also an inclined surface, which fits with the inclined surface of the bottom of the mounting beam 61. When the mounting body is inserted into the mounting beam 61, the inclined surfaces of the upper beam bar 4 and the lower beam bar 41 fit tightly with the inclined surfaces of the top and bottom of the mounting beam 61, respectively, forming a stable wedge-shaped fit structure, making the connection more stable and improving the overall connection rigidity.
[0026] Specifically, the connector 1, the first grate bar 11 and the second grate bar 12 are provided with corresponding insertion holes 5. There are multiple insertion holes 5, which are symmetrically distributed. Fasteners 51 are inserted into the insertion holes 5.
[0027] In this embodiment, the connector 1, the first grate bar 11 and the second grate bar 12 are provided with corresponding insertion holes 5. During the installation process, when the first grate bar 11 and the second grate bar 12 are installed with the connector 1, the insertion holes 5 are aligned with each other. At this time, the fasteners 51 are inserted to tighten them, and the installation body is locked and fixed as a whole. The fasteners 51 are specifically pins, which facilitate quick disassembly and maintenance.
[0028] Specifically, a flow guide 31 is provided in the middle of the first grate bar 11 and the second grate bar 12. The flow guide 31 is elongated and is connected to the flow guide cavity 200.
[0029] In this embodiment, specific reference is made. Figure 5 A guide port 31 is provided in the middle of the first grate bar 11 and the second grate bar 12. Multiple guide ports 31 are provided. The multiple guide ports 31 are elongated and inclined. The guide ports 31 are connected to the guide cavity 200. When the trolley body 6 is running, the airflow and material are more evenly distributed inside the trolley, and the swing arm 22 and scraper 23 swing freely. While cleaning fine ore particles, the ventilation efficiency and sintering quality are effectively improved.
[0030] Specifically, the upper surfaces of the first grate bar 11 and the second grate bar 12 are downwardly concave arc-shaped surfaces.
[0031] In this embodiment, the arc-shaped surface facilitates the uniform distribution of stress and, in conjunction with the inclined mounting beam 61, tightly fixes the mounting body to the trolley body 6, thereby improving the overall structural stability and vibration resistance.
[0032] The principle of this utility model is as follows: the first grate bar 11 and the second grate bar 12 are connected by a connector 1 to form an installation body, realizing a split assembly. When a grate bar is damaged, it can be replaced individually, effectively reducing maintenance costs. During installation, the first grate bar 11 and the slider 3 on the grate bar are aligned with the slide rail 21 and slid in along the slide rail 21. The insertion holes 5 are aligned with each other. At this time, fasteners 51 are inserted to secure it. The installation body is then formed after installation.
[0033] The installed main body is placed on the installation beam 61 of the trolley body 6, so that the inclined surfaces of the upper beam 4 and the lower beam 41 are respectively matched with the inclined surfaces of the top and bottom of the installation beam 61, forming a stable wedge structure. During the operation of the trolley body, vibration or material impact will occur. At this time, the swing rod 22 swings in the guide cavity 200. The swing rod 22 and the scraper 23 can swing freely with the vibration of the trolley. The scraper 23 reciprocates in the guide cavity 200 to clean the fine mineral material attached to the inner wall in real time, preventing the accumulation and blockage of the air duct. The upper surfaces of the first grate bar 11 and the second grate bar 12 are downward concave arc surfaces.
[0034] In this embodiment, the arc-shaped surface facilitates the uniform distribution of stress and, in conjunction with the inclined mounting beam 61, tightly fixes the mounting body to the trolley body 6, thereby improving the overall structural stability and vibration resistance.
[0035] The principle of this utility model is as follows: the first grate bar 11 and the second grate bar 12 are connected by a connector 1 to form an installation body, realizing a split assembly. When a grate bar is damaged, it can be replaced individually, effectively reducing maintenance costs. During installation, the first grate bar 11 and the slider 3 on the grate bar are aligned with the slide rail 21 and slid in along the slide rail 21. The insertion holes 5 are aligned with each other. At this time, fasteners 51 are inserted to secure it. The installation body is then formed after installation.
[0036] The installed main body is placed on the mounting beam 61 of the trolley body 6, so that the inclined surfaces of the upper beam 4 and the lower beam 41 are respectively matched with the inclined surfaces of the top and bottom of the mounting beam 61, forming a stable wedge structure. During the operation of the trolley body, vibration or material impact will occur. At this time, the swing arm 22 swings in the guide cavity 200. The swing arm 22 and the scraper 23 can swing freely with the vibration of the trolley. The scraper 23 reciprocates in the guide cavity 200 to clean the fine mineral material attached to the inner wall in real time and prevent the accumulation from causing the air duct to be blocked.
[0037] The above description is only a preferred embodiment of the present utility model, but the protection scope of the present utility model is not limited thereto. Any equivalent substitutions or changes made by those skilled in the art within the technical scope disclosed in the present utility model based on the technical solution and its improved concept should be covered within the protection scope of the present utility model.
Claims
1. Sintering trolley grate bars, including: The first grate bar (11) and the second grate bar (12) are characterized in that: the first grate bar (11) and the second grate bar (12) are connected by a connector (1) to form an installation body. The connector (1) is provided with connecting blocks (2) on both sides. The connecting blocks (2) are provided with slide rails (21). The connecting end sidewalls of the first grate bar (11) and the second grate bar (12) are provided with sliders (3) that are adapted to the slide rails (21). The sliders (3) are slidably connected along the slide rails (21). The connector (1) has a flow guide cavity (200) in the middle of both sides. There is a swing rod (22) in the flow guide cavity (200). One end of the swing rod (22) is hinged to the connecting block (2). Multiple scraper blades (23) are evenly distributed on the swing rod (22).
2. The grate bar for sintering trolley according to claim 1, characterized in that: It also includes a trolley body (6), on which an installation beam (61) for inserting and installing the main body is provided. An upper beam (4) is provided above the first grate bar (11) and the second grate bar (12), and a lower beam (41) is provided below the first grate bar (11) and the second grate bar (12). The upper beam (4) matches the upper end of the installation beam (61), and the lower beam (41) cooperates with the lower end of the installation beam (61).
3. The grate bar for sintering trolley according to claim 2, characterized in that: The top and bottom of the mounting beam (61) are both inclined surfaces, so that the upper beam strip (4) and the lower beam strip (41) are respectively attached to the top and bottom surfaces of the mounting beam (61).
4. The grate bar for sintering trolley according to claim 1, characterized in that: The connector (1), the first grate bar (11) and the second grate bar (12) are provided with corresponding insertion holes (5). There are multiple insertion holes (5), which are symmetrically distributed. Fasteners (51) are inserted into the insertion holes (5).
5. The grate bar for sintering trolley according to claim 1, characterized in that: A flow guide (31) is provided in the middle of the first grate bar (11) and the second grate bar (12). The flow guide (31) is long and narrow and is connected to the flow guide cavity (200).
6. The grate bar for sintering trolley according to claim 4, characterized in that: The fastener (51) is specifically a bolt.
7. The grate bar for sintering trolley according to claim 1, characterized in that: The upper surfaces of the first grate bar (11) and the second grate bar (12) are concave arc surfaces.