Industrial smelting furnace wall jacketed waste heat recovery device
By using the positioning mechanism and connecting components of the jacketed waste heat recovery device, the problems of complex connection and poor sealing performance of existing devices are solved, and rapid connection and efficient heat recovery are achieved.
Patent Information
- Application Number
- CN202522573396.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-04
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-04
AI Technical Summary
Existing waste heat recovery devices are complex to connect and disassemble, their sealing performance is affected by installation deviations, and their flue gas filtration and purification effects are poor.
It adopts a jacketed structure, which enables quick connection and disassembly through positioning mechanism and connecting components. It uses sealing ring and positioning block to ensure airtightness, and sets multiple arc-shaped flow pipes in the jacket to increase the heat recovery area.
It simplifies the connection process, improves installation and maintenance efficiency, ensures sealing performance, and enhances heat recovery efficiency.
Smart Images

Figure CN224984603U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of waste heat recovery technology, and more specifically, to a jacketed waste heat recovery device for industrial smelting furnace walls. Background Technology
[0002] Industrial smelting furnaces are the heart of modern industry. They are core equipment that extracts and refines the desired metals or alloys from ores or metal raw materials through high-temperature physicochemical reactions. They are widely used in the steel, non-ferrous metals (copper, aluminum, zinc, lead, etc.) and ferroalloy industries such as ferrosilicon and calcium carbide.
[0003] During operation, gas-fired boilers experience significant heat loss from flue gas exhaust, making it necessary to recover and utilize the waste heat. However, various waste heat recovery devices on the market still have various problems, such as low efficiency and poor filtration and purification of flue gas, which have significant limitations.
[0004] A search revealed that Chinese patent CN217520304U discloses a waste heat recovery device for gas-fired boilers. This device uses a gas collecting pipe to continuously introduce high-temperature gas from the outside into the housing, heating the condensate sprayed by the spray mechanism. This allows for the full utilization of the boiler's waste heat. The high-temperature gas inside the collecting pipe is cooled by the condensate and then filtered through the filter plates and screens inside the filter chamber before being discharged. This method achieves both waste heat recovery and ensures the cleanliness of the discharged gas, making it highly practical and effective.
[0005] In actual use, the above-mentioned waste heat recovery device for gas boilers usually relies on bolt tightening or flange docking when connecting to the connecting pipe. This requires repeatedly tightening multiple bolts, and all fasteners must be completely loosened during disassembly. The connection process is relatively complicated, and the sealing performance will be affected by installation deviations after disassembly and installation. Utility Model Content
[0006] In order to overcome the above-mentioned defects of the prior art, the present invention provides a jacketed waste heat recovery device for industrial smelting furnace walls to solve the problems mentioned in the background art.
[0007] To achieve the above objectives, this utility model provides the following technical solution: An industrial smelting furnace wall-jacketed waste heat recovery device includes a smelting furnace, a water tank is provided on one side of the smelting furnace, a temperature sensor is installed on the water tank, a circulation pump is installed on the water tank, the input end of the circulation pump is connected to a water pumping pipe connected to the water tank, the output end of the water tank is connected to a delivery pipe, a return pipe for recirculation is connected to the smelting furnace, and a connecting component is provided on the outside of the smelting furnace. The connecting assembly includes a jacket sleeved on the outside of the smelting furnace. Two connecting pipes are connected to one side of the jacket. Connectors are provided at the connection points of the two connecting pipes to one end of the conveying pipe and one end of the return pipe, respectively. The smelting furnace is equipped with a positioning mechanism. The connecting component includes a first connecting plate fixedly connected to the ends of the conveying pipe and the return pipe, respectively. A first sealing ring with a conical cross-section is fixedly connected inside the first connecting plate. A threaded rod is threadedly connected to the first sealing ring. A turntable with an insertion hole is fixedly connected to one end of the threaded rod. A limiting rod for limiting the position is threadedly connected to the outside of the threaded rod. The connecting component also includes a second connecting plate fixedly connected to the two connecting pipes, respectively. A second sealing ring adapted to the first sealing ring is fixedly connected to the inside of the second connecting plate. A groove adapted to the side of the limiting rod is opened on one side of the second connecting plate. A connecting shell is fixedly connected to one side of the second connecting plate. A pin adapted to the insertion hole of the turntable is slidably connected inside the connecting shell. A washer is fixedly connected to the outside of the pin. A telescopic spring is fixedly connected to one end of the washer.
[0008] By adopting the above technical solution, the delivery pipe and return pipe can be quickly connected to the two connecting pipes respectively, and good sealing performance can be maintained while quickly connecting.
[0009] As a further description of the above technical solution: the positioning mechanism includes three positioning pins fixedly connected to the outside of the jacket, a support ring that can support the jacket is fixedly connected to the outside of the smelting furnace, three positioning blocks that are adapted to the outside of the positioning pins are fixedly connected to the top of the support ring, and connecting bolts are threaded inside the positioning blocks and the support ring. Two diversion rings that can divert flow are fixedly connected inside the jacket, and multiple arc-shaped flow pipes are connected between the two diversion rings. The multiple flow pipes are distributed in a ring inside the jacket with the center point of the jacket as the center.
[0010] By adopting the above technical solution, positioning and limiting can be provided for the installation of the jacket, so as to facilitate maintenance and repair.
[0011] The technical effects and advantages of this utility model are as follows: 1. By setting up a connecting component, compared with the existing technology, the connection between the first connecting plate and the second connecting plate can be completed by rotating the turntable, and good sealing performance can be maintained after connection. This simplifies the connection process with the connecting pipe and allows for quick disassembly and reassembly during equipment maintenance or repair, thereby improving installation and maintenance efficiency. 2. By setting up a positioning mechanism, compared with the existing technology, the jacket can be quickly fitted onto the outside of the smelting furnace by using the limiting and positioning of three positioning blocks, making the connection process more precise and allowing for quick disassembly, which further facilitates maintenance and repair. At the same time, the multiple annularly distributed arc-shaped flow pipes inside the jacket increase the contact area between the water flow and the jacket wall, allowing more heat to be recovered per unit time, which helps to improve heat recovery efficiency. Attached Figure Description
[0012] Figure 1 This is a schematic diagram of the overall structure of this utility model.
[0013] Figure 2 This is a schematic diagram of the rear structure of the smelting furnace of this utility model.
[0014] Figure 3 This is a schematic diagram of the support ring and smelting furnace structure of this utility model.
[0015] Figure 4 This is a schematic diagram of the jacket structure of this utility model.
[0016] Figure 5 This is a schematic diagram of the connection between the first connecting plate and the second connecting plate of this utility model.
[0017] Figure 6 This is a schematic diagram of the second connecting disk structure of this utility model.
[0018] Figure 7 This is a schematic diagram of the first connecting disk structure of this utility model.
[0019] Figure 8 This is a schematic diagram of the support ring structure of this utility model.
[0020] Figure 9 For the present utility model Figure 5 Enlarged view of the structure of part A in the middle.
[0021] The attached diagram is labeled as follows: 1. Smelting furnace; 2. Water tank; 3. Circulating pump; 4. Pumping pipe; 5. Conveying pipe; 6. Return pipe; 7. Jacket; 8. Diverting ring; 9. Flow pipe; 10. Connecting pipe; 12. First connecting plate; 13. First sealing ring; 15. Threaded rod; 16. Turntable; 17. Limiting rod; 18. Second connecting plate; 19. Second sealing ring; 20. Connecting shell; 21. Pin; 22. Gasket; 23. Telescopic spring; 24. Support ring; 25. Positioning block; 26. Connecting bolt; 27. Positioning pin. Detailed Implementation
[0022] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention.
[0023] The embodiments disclosed in this application are as follows: Figure 1-9 The industrial smelting furnace wall jacketed waste heat recovery device shown includes a smelting furnace 1, a water tank 2 is provided on one side of the smelting furnace 1, a temperature sensor is installed on the water tank 2, a circulation pump 3 is installed on the water tank 2, the input end of the circulation pump 3 is connected to a water pumping pipe 4 connected to the water tank 2, the output end of the water tank 2 is connected to a conveying pipe 5, a return pipe 6 for return flow is connected to the smelting furnace 1, and a connecting component is provided on the outside of the smelting furnace 1. The connecting assembly includes a jacket 7 sleeved on the outside of the smelting furnace 1. Two connecting pipes 10 are connected to one side of the jacket 7. Connectors are provided at the connection points of the two connecting pipes 10 to one end of the conveying pipe 5 and one end of the return pipe 6, respectively. A positioning mechanism is installed on the smelting furnace 1. The connecting parts include a first connecting plate 12, which is fixedly connected to the ends of the conveying pipe 5 and the return pipe 6 respectively. A first sealing ring 13 with a conical cross section is fixedly connected inside the first connecting plate 12. A threaded rod 15 is threadedly connected to the first sealing ring 13. A turntable 16 with a socket is fixedly connected to one end of the threaded rod 15. A limiting rod 17 for limiting is threadedly connected to the outside of the threaded rod 15. The connecting parts also include a second connecting plate 18, which is fixedly connected to the two connecting pipes 10 respectively. A second sealing ring 19 that matches the first sealing ring 13 is fixedly connected to the inside of the second connecting plate 18. A groove that matches the side of the limiting rod 17 is opened on one side of the second connecting plate 18. A connecting shell 20 is fixedly connected to one side of the second connecting plate 18. A pin that matches the socket of the turntable 16 is slidably connected inside the connecting shell 20. 21. A gasket 22 is fixedly connected to the outside of the pin 21. A telescopic spring 23 is fixedly connected to one end of the gasket 22. After aligning the first connecting plate 12 and the second connecting plate 18, the limiting rod 17 follows the first connecting plate 12 and is inserted into the groove of the second connecting plate 18. The limiting rod 17 can be moved by rotating the turntable 16. The limiting rod 17 fits into the groove to fix the first connecting plate 12 and the second connecting plate 18. The pin 21 is inserted into the hole on the turntable 16 to limit the turntable 16, so as to maintain the stability of the limiting rod 17. This simplifies the connection process with the connecting pipe. After the first connecting plate 12 and the second connecting plate 18 are connected, the second sealing ring 19 can wrap around the outside of the first sealing ring 13 and be tightly connected to the first sealing ring 13, so as to maintain good sealing performance after connection.
[0024] Reference Figure 2 , 4As shown in Figure 8, the positioning mechanism includes three positioning pins 27 fixedly connected to the outside of the jacket 7. A support ring 24 that can support the jacket 7 is fixedly connected to the outside of the smelting furnace 1. Three positioning blocks 25 that are adapted to the outside of the positioning pins 27 are fixedly connected to the top of the support ring 24. The positioning blocks 25 and the support ring 24 are both threaded with connecting bolts 26. Two diversion rings 8 that can divert water are fixedly connected inside the jacket 7. Multiple arc-shaped flow pipes 9 are connected between the two diversion rings 8. The multiple flow pipes 9 are distributed in a ring inside the jacket 7 with the center point of the jacket 7 as the center. The multiple arc-shaped flow pipes 9 are distributed in a ring inside the jacket 7, so that when the water flows into the jacket 7, it can increase the contact area with the inside of the jacket 7, so as to better recover the heat transferred to the jacket 7 and help improve the heat recovery efficiency. At the same time, the three positioning blocks 25 can provide positioning for the installation of the jacket 7, so as to make the connection process more precise and allow quick disassembly, thereby further improving the maintenance efficiency during maintenance.
[0025] Working principle of this utility model: This utility model designs a jacketed waste heat recovery device for industrial smelting furnaces, the specific structure of which is shown in the attached instruction manual. Figure 1-9 As shown, in this technical solution, through the cooperation between various structures, when it is necessary to recover the waste heat generated when the smelting furnace 1 is in use, firstly, the jacket 7 is put on the outside of the smelting furnace 1, then the three positioning pins 27 on the jacket 7 are aligned with the positioning blocks 25. The three positioning blocks 25 can provide positioning for the installation of the jacket 7, and the positioning pins 27 and the positioning blocks 25 are connected by the connecting bolts 26, thereby fixing the jacket 7 to the smelting furnace 1. Then, the return pipe 6 and the conveying pipe 5 are connected to the two connecting pipes 10 respectively. Align the first connecting plate 12 with the second connecting plate 18, insert the limiting rod 17 into the groove on the second connecting plate 18, and pull one end of the pin 21 so that the pin 21 can compress the telescopic spring 23 inside the connecting housing 20 through the washer 22. Then rotate the turntable 16, which can drive the threaded rod 15 to rotate. The threaded rod 15 can drive the limiting rod 17 to move in the groove through the thread, so that the limiting rod 17 contacts the groove, so that the first connecting plate 12 and the second connecting plate 18 can be connected through the limiting rod 17. Then release the pin 21. The return force of the telescopic spring 23 can push the pin 21 to move, so that the pin 21 can be inserted into the socket on the turntable 16, thereby limiting the position of the turntable 16. When the first connecting plate 12 is connected to the second connecting plate 18, the first sealing ring 13 can be stuck inside the second sealing ring 19. The first sealing ring 13 and the second sealing ring 19 are tightly connected so that the first sealing ring 13 and the second sealing ring 19 can provide sealing conditions at the connection. The second sealing ring 19 can wrap around the outside of the first sealing ring 13, thereby improving the sealing performance of the connection. Subsequently, the circulation pump 3 is started by an external control device. The circulation pump 3 draws water from the water tank 2 through the water pipe 4 and delivers it to the diversion ring 8 at the bottom of the jacket 7 through the delivery pipe 5. The diversion ring 8 diverts the water flow into multiple flow pipes 9. Utilizing the arc shape of the multiple flow pipes 9, the water can flow spirally upward inside the jacket 7 to increase the residence time inside the jacket 7, thereby better absorbing the heat transferred by the jacket 7. The water is then delivered to the return pipe 6 through the upper diversion ring 8, and then flows back to the water tank 2, realizing the circulation of water flow. The heat collection effect is achieved through the circulation of water flow. The temperature sensor can monitor the heat inside the water tank 2 so that the water inside the water tank 2 can be discharged in time to realize the recovery and utilization of waste heat.
[0026] In the accompanying drawings of the embodiments disclosed in this utility model, only the structures involved in the embodiments of this utility model are shown. Other structures can be referred to with ordinary design. In the absence of conflict, the same embodiment and different embodiments of this utility model can be combined with each other. All contents not described in detail in the specification are existing technologies known to those skilled in the art, and the model parameters of each electrical appliance are not specifically limited; conventional equipment can be used. Electrical control components not mentioned in this technical solution are existing technologies and are therefore not shown in the figures and will not be described here. In conclusion, the above are merely preferred embodiments of this utility model and are not intended to limit this utility model. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this utility model should be included within the protection scope of this utility model.
Claims
1. A jacketed waste heat recovery device for an industrial smelting furnace, comprising a smelting furnace (1), characterized in that: A water tank (2) is provided on one side of the smelting furnace (1). A temperature sensor is installed on the water tank (2). A circulation pump (3) is installed on the water tank (2). The input end of the circulation pump (3) is connected to a water pumping pipe (4) connected to the water tank (2). The output end of the water tank (2) is connected to a conveying pipe (5). A return pipe (6) for reflux is connected to the smelting furnace (1). A connecting component is provided on the outside of the smelting furnace (1). The connecting assembly includes a jacket (7) sleeved on the outside of the smelting furnace (1). Two connecting pipes (10) are connected to one side of the jacket (7). Connectors are provided at the connection points of the two connecting pipes (10) to one end of the conveying pipe (5) and one end of the return pipe (6), respectively. The smelting furnace (1) is equipped with a positioning mechanism; The connector includes a first connecting plate (12) that is fixedly connected to the ends of the delivery pipe (5) and the return pipe (6), and a first sealing ring (13) with a conical cross section is fixedly connected inside the first connecting plate (12). The first sealing ring (13) is threaded with a threaded rod (15), one end of which is fixedly connected to a turntable (16) with an insertion hole, and the outer side of the threaded rod (15) is threaded with a limiting rod (17) for limiting. The connector also includes a second connecting plate (18) fixedly connected to the two connecting pipes (10) respectively. The inner side of the second connecting plate (18) is fixedly connected to a second sealing ring (19) that is compatible with the first sealing ring (13). A groove that is compatible with the side of the limiting rod (17) is opened on one side of the second connecting plate (18). A connecting shell (20) is fixedly connected to one side of the second connecting plate (18). A pin (21) that is compatible with the socket of the turntable (16) is slidably connected inside the connecting shell (20). A washer (22) is fixedly connected to the outside of the pin (21). A telescopic spring (23) is fixedly connected to one end of the washer (22).
2. The industrial smelting furnace wall jacketed waste heat recovery device according to claim 1, characterized in that: The positioning mechanism includes three positioning pins (27) fixedly connected to the outside of the jacket (7), and a support ring (24) that can support the jacket (7) is fixedly connected to the outside of the smelting furnace (1).
3. The industrial smelting furnace wall jacketed waste heat recovery device according to claim 2, characterized in that: The top of the support ring (24) is fixedly connected to three positioning blocks (25) that are adapted to the outside of the positioning pin (27). The positioning blocks (25) and the support ring (24) are both threaded with connecting bolts (26).
4. The industrial smelting furnace wall jacketed waste heat recovery device according to claim 1, characterized in that: The jacket (7) is internally connected to two diversion rings (8) that can divert flow. Multiple arc-shaped flow channels (9) are connected between the two diversion rings (8). These multiple flow channels (9) are clamped together. The center point of the sleeve (7) is the center of the circle, and the ring is distributed inside the sleeve (7).
Citation Information
Patent Citations
Waste heat recovery device of gas-fired boiler
CN217520304U
