A device for clearing a water-filled blast hole in surface blasting
By using the linkage mechanism between the insert and the slot and the bolt locking design, the compatibility problem of the existing device under different blast hole diameters is solved, and the versatility and stability of the open-pit blasting water-bearing blast hole clearing device are improved, ensuring clearing efficiency and safety.
Patent Information
- Application Number
- CN202522767776.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-26
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-26
AI Technical Summary
Existing open-pit blasting water-bearing borehole removal devices cannot form a suitable sealing fit in boreholes of different diameters, resulting in water backflow and device shaking, which affects removal efficiency and stability.
The water collection cylinder is conveniently assembled and fixed by using a plug-in and slot-slot connection and linkage mechanism, through the linkage of the movable rod and spring. It can adapt to different size installation requirements, and the connection stability is enhanced by locking the movable rod in the snap-fit state with bolts.
It achieves flexible adaptation to water collection cylinders of different sizes, improves the versatility of the device and the connection stability between the pull rope and the water collection cylinder, avoids loosening and displacement, and ensures cleaning efficiency and safety.
Smart Images

Figure CN224984735U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of blast hole cleaning technology, specifically a device for cleaning water-bearing blast holes in open-pit blasting. Background Technology
[0002] The open-pit blasting water-bearing borehole removal device is a specialized piece of equipment used in open-pit blasting operations to remove accumulated water and small amounts of impurities from boreholes. Its core function is to solve problems such as explosives becoming damp and ineffective due to water accumulation, and unstable detonation, thereby ensuring the safety and effectiveness of blasting operations.
[0003] Currently, among existing technologies, Chinese patent CN221173165U discloses a drainage device for water-bearing blast holes in open-pit mines. This device uses a rotating hanging ring to move the water collection pipe downwards. When a floating block comes into contact with the accumulated water, the floating block will lift a butterfly-shaped baffle to collect the water. After collection, the hanging ring is rotated in the opposite direction to bring the water collection pipe out of the water surface, thus achieving the goal of draining the accumulated water in the open-pit mine cavity through the water collection pipe. However, in actual use, the diameter of the water collection pipe is a fixed specification, which cannot form a suitable sealing fit with blast holes of different diameters. When the diameter of the blast hole is larger than the diameter of the water collection pipe, a large gap will be formed between the two, which not only easily causes the accumulated water to flow back into the blast hole, causing construction hazards, but also causes the water collection pipe to shake significantly during operation, thus seriously affecting the water collection efficiency and device stability. In view of this, we propose a water-bearing blast hole removal device for open-pit blasting. Utility Model Content
[0004] The main objective of this invention is to provide a device for clearing water-bearing blast holes in open-pit blasting, which can solve the problems mentioned in the background art.
[0005] To achieve the above objectives, this utility model proposes a device for clearing water-bearing blast holes in open-pit blasting, comprising a frame, an auxiliary mechanism on the frame, a connecting plate fixedly connected to the frame, a lifting wheel below the connecting plate, a fixing plate fixedly connected to the frame, a winch on the fixing plate, a handle on the side wall of the winch, and a pull rope between the lifting wheel and the winch.
[0006] Preferably, a connecting plate is fixedly connected below the pull rope, and a movable column is slidably connected to the connecting plate, with a slot provided on the movable column.
[0007] Preferably, a second connecting plate is fixedly connected below the connecting plate, and an insert block is fixedly connected to the side wall of the second connecting plate.
[0008] Preferably, the plug is connected to a connecting plate three, both the connecting plate three and the connecting plate two are provided with plug holes, the side wall of the connecting plate three is provided with a slot, and the connecting plate three is fixedly connected to a water collection cylinder.
[0009] Preferably, a sliding groove is provided below the connecting plate, a sliding plate is slidably connected to the sliding groove, a connecting block is fixedly connected to the side wall of the sliding plate, a plug rod is fixedly connected to the connecting block, a plug hole is provided on the plug rod, and a connecting rod is hinged to the connecting block.
[0010] Preferably, the end of the connecting rod away from the first connecting block is hinged to the second connecting block, and the upper part of the second connecting block is fixedly connected to the movable column.
[0011] Preferably, a second fixing plate is fixedly connected to the two side walls of the connecting plate, a movable rod is slidably connected to the second fixing plate, a square plate is fixedly connected above the movable rod, and the square plate and the second fixing plate are connected by a spring. A bolt is threaded and fitted below the movable rod. By moving the movable rod with the square plate, the insertion block of the second connecting plate is precisely inserted into the slot of the third connecting plate. The downward movement of the movable column causes the second connecting block to move downward in tandem. Under the coordinated action of the sliding groove, the sliding plate, and the connecting rod, the insertion rod can be driven to quickly insert into the insertion hole. After releasing the square plate, the spring... The spring's elastic return causes the movable rod to engage with the insertion hole of the connector rod, enabling quick positioning and fixation of connecting plate two and connecting plate three. This facilitates the convenient assembly of the pull rope and the water collection cylinder. Simultaneously, through the insertion and engagement of the plug and slot and the adjustment of the linkage mechanism, it can flexibly adapt to the installation and fixing requirements of water collection cylinders of different sizes, thereby enhancing the versatility of the device. The limiting design of the bolt screwed into the bottom of the movable rod effectively locks the movable rod in its engaged state, preventing loosening and displacement after assembly, and significantly improving the stability and reliability of the connection between the pull rope and the water collection cylinder.
[0012] This utility model provides a device for clearing water-bearing blast holes in open-pit blasting. It has the following beneficial effects: (1) The open-pit blasting water-bearing blast hole clearing device moves the movable rod by the square plate, and then accurately inserts the plug of the second connecting plate into the slot of the third connecting plate. With the movement of the movable column, the second connecting plate moves down in linkage. Under the coordinated action of the slide, the sliding plate and the connecting rod, the plug rod can be driven to quickly insert into the plug hole. After the square plate is released, the spring elastically resets and drives the movable rod to engage with the plug hole of the plug rod, realizing the quick positioning and fixing of the second connecting plate and the third connecting plate, thereby completing the convenient assembly of the pull rope and the water collection cylinder. At the same time, through the plug-in cooperation of the plug and the slot and the adjustment of the linkage mechanism, it can flexibly adapt to the installation and fixing requirements of water collection cylinders of different sizes, thereby enhancing the versatility of the device.
[0013] (2) The open-pit blasting water-bearing blast hole clearing device can effectively lock the movable rod in a locking state by screwing the bolt into the bottom of the movable rod, avoiding loosening and displacement after assembly, and significantly improving the stability and reliability of the connection between the pull rope and the water collection cylinder. Attached Figure Description
[0014] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on the structures shown in these drawings without creative effort.
[0015] Figure 1 This is a schematic diagram of the overall three-dimensional structure of the present invention; Figure 2 This is a schematic diagram of the three-dimensional structure of part of the device of this utility model. Figure 1 ; Figure 3 This utility model Figure 2 Schematic diagram of the structure of region A in the middle; Figure 4 This is a schematic diagram of the three-dimensional structure of part of the device of this utility model. Figure 2 .
[0016] Explanation of icon numbers: 1. Frame; 2. Auxiliary mechanism; 21. Connecting plate one; 22. Lifting wheel; 23. Winch; 24. Handle; 25. Fixing plate one; 26. Pull rope; 27. Connecting disc; 28. Movable column; 29. Connecting plate two; 210. Slide groove; 211. Slide plate; 212. Connecting block one; 213. Connecting rod; 214. Insert rod; 215. Insert block; 216. Connecting block two; 217. Water collection cylinder; 218. Connecting plate three; 219. Groove; 220. Slot; 221. Square plate; 222. Fixing plate two; 223. Movable rod; 224. Spring; 225. Bolt.
[0017] The realization of the purpose, functional features and advantages of this utility model will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Detailed Implementation
[0018] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0019] Please see Figures 1-4This utility model proposes a device for clearing water-bearing blast holes in open-pit blasting, including a frame 1, an auxiliary mechanism 2 on the frame 1, the auxiliary mechanism 2 including a connecting plate 21, the connecting plate 21 being fixedly connected to the frame 1, a lifting wheel 22 being provided below the connecting plate 21, a fixing plate 25 being fixedly connected to the frame 1, a winch 23 being provided on the fixing plate 25, a handle 24 being provided on the side wall of the winch 23, and a pull rope 26 being provided between the lifting wheel 22 and the winch 23.
[0020] In this embodiment of the utility model, in order to enable the auxiliary mechanism 2 to operate better, specifically, a connecting plate 27 is fixedly connected below the pull rope 26, a movable column 28 is slidably connected to the connecting plate 27, the movable column 28 is provided with a slot 219, a connecting plate 29 is fixedly connected below the connecting plate 27, an insert block 215 is fixedly connected to the side wall of the connecting plate 29, the insert block 215 is inserted into a connecting plate 3 218, both the connecting plate 3 218 and the connecting plate 29 are provided with insertion holes, and the side wall of the connecting plate 3 218 is provided with a slot 2. 20. A water collection cylinder 217 is fixedly connected to the connecting plate 3 218. A sliding groove 210 is provided below the connecting plate 27. A sliding plate 211 is slidably connected to the sliding groove 210. A connecting block 1 212 is fixedly connected to the side wall of the sliding plate 211. A plug rod 214 is fixedly connected to the connecting block 1 212. A plug hole is provided on the plug rod 214. A connecting rod 213 is hinged to the connecting block 1 212. A connecting block 216 is hinged to the end of the connecting rod 213 away from the connecting block 1 212. The upper part of the connecting block 216 is fixedly connected to the movable column 28.
[0021] Furthermore, a fixed plate 222 is fixedly connected to the side wall of the connecting plate 29. A movable rod 223 is slidably connected to the fixed plate 222. A square plate 221 is fixedly connected above the movable rod 223. The square plate 221 and the fixed plate 222 are connected by a spring 224. A bolt 225 is threaded and fitted below the movable rod 223. By moving the movable rod 223 with the square plate 221, the insertion block 215 of the connecting plate 29 is precisely inserted into the slot 220 of the connecting plate 3 218. With the movable column 28 moving down, the connecting block 216 moves down in conjunction. Under the coordinated action of the slide groove 210, the sliding plate 211, and the connecting rod 213, the insertion rod 214 can be driven to quickly insert into the insertion hole. After the square plate 221 is released, the spring 224 elastically returns to its original position, causing the movable rod 223 to engage with the insertion hole of the insertion rod 214, thus realizing the connection between the connecting plate 29 and the connecting plate 218. The quick positioning and fixing of the three 218 components facilitates the convenient assembly of the pull rope 26 and the water collection cylinder 217. Simultaneously, the insertion and engagement of the insert block 215 and the slot 220, along with the adjustment of the linkage mechanism, allows for flexible adaptation to the installation and fixing requirements of water collection cylinders 217 of different sizes, thereby enhancing the device's versatility. The limiting design of the bolt 225 screwed into the bottom of the movable rod 223 effectively locks the movable rod 223 in a snap-fit state, preventing loosening and displacement after assembly, significantly improving the stability and reliability of the connection between the pull rope 26 and the water collection cylinder 217. The aforementioned lifting wheel 22, winch 23, and handle 24 are similar in principle and achieve the same effect as those mentioned in Chinese Patent No. CN221173165U (A Drainage Device for Water-Bearing Blasting Holes in Open-Pit Mines), and are existing publicly available technical means in this field, which will not be elaborated upon here.
[0022] In this invention, during use, the square plate 221 is used to move the movable rod 223 upwards. Then, the insert block 215 on the side wall of the connecting plate 29 is aligned with the slot 220 on the connecting plate 3 218 and inserted. Next, the movable column 28 is slid downwards. The downward movement of the movable column 28 causes the connecting block 216, which is fixedly connected to it, to also move downwards. With the cooperation of the sliding groove 210, the sliding plate 211, and the connecting rod 213, the insertion rod 214 is driven to be inserted into the insertion hole. After insertion, the square plate 221 is released. Under the elastic reset action of spring 224, the movable rod 223 will be reset, thereby locking the movable rod 223 into the insertion hole of the plug rod 214, thus completing the position fixation between connecting plate 29 and connecting plate 3 218, and thus completing the fixation between the pull rope 26 and the water collection cylinder 217. Then, the bolt 225 is screwed into the bottom of the movable rod 223, thereby limiting the movable rod 223, thus ensuring the stability of the fixation between the pull rope 26 and the water collection cylinder 217, and adapting to the installation and fixation of water collection cylinders 217 of different sizes.
[0023] The above description is only a preferred embodiment of the present utility model and does not limit the patent scope of the present utility model. All equivalent structural transformations made under the inventive concept of the present utility model using the contents of the present utility model specification and drawings, or direct / indirect applications in other related technical fields, are included within the patent protection scope of the present utility model.
Claims
1. An open pit blasting aqueous borehole cleaning device comprising a frame (1), characterized in that: The frame body (1) is provided with an auxiliary mechanism (2), the auxiliary mechanism (2) includes a connecting plate one (21), the connecting plate one (21) is fixedly connected on the frame body (1), the connecting plate one (21) below is equipped with lifting wheel (22), the frame body (1) is fixedly connected with fixed plate one (25), the fixed plate one (25) is equipped with winch (23), the winch (23) side wall is equipped with handle (24), the lifting wheel (22) and winch (23) between be equipped with pull rope (26).
2. An open cut blasting aqueous borehole purging device according to claim 1, characterised in that: The pull rope (26) below is fixedly connected with the connecting disc (27), the connecting disc (27) is slidably connected with the movable column (28), the movable column (28) is equipped with the notch (219).
3. An open cut blasting aqueous borehole purging device according to claim 2, characterised in that: The connecting disc (27) below is fixedly connected with the connecting plate two (29), the connecting plate two (29) side wall is fixedly connected with the plug-in block (215).
4. An open cut blasting aqueous borehole purging device according to claim 3, characterised in that: The plug-in block (215) is inserted with the connecting plate three (218), the connecting plate three (218) and the connecting plate two (29) are all equipped with the plug-in hole, the connecting plate three (218) side wall is equipped with the insertion groove (220), the connecting plate three (218) is fixedly connected with the water collecting cylinder (217).
5. An open pit blasting aqueous borehole purging device according to claim 2, characterized in that: The connecting disc (27) below is equipped with the sliding groove (210), the sliding groove (210) is slidably connected with the sliding plate (211), the sliding plate (211) side wall is fixedly connected with the connecting block one (212), the connecting block one (212) is fixedly connected with the plug-in rod (214), the plug-in rod (214) is equipped with the insertion hole, the connecting block one (212) is hingedly connected with the connecting rod (213).
6. An open cut blasting aqueous borehole purging device according to claim 5, characterised in that: The connecting rod (213) is hingedly connected with the connecting block two (216) away from the connecting block one (212), the connecting block two (216) top is fixedly connected with the movable column (28).
7. An open pit blasting aqueous borehole purging device according to claim 3, characterized in that: The connecting plate two (29) side wall is fixedly connected with the fixed plate two (222), the fixed plate two (222) is slidably connected with the movable rod (223), the movable rod (223) top is fixedly connected with the square plate (221), the square plate (221) and the fixed plate two (222) are connected through the spring (224), the movable rod (223) below is equipped with the screw bolt (225) of screw thread cooperation.
Citation Information
Patent Citations
Water-containing blast hole drainage device for strip mine
CN221173165U