Abstract
Description
[0001] The invention relates to a method for insulation monitoring of an electrical system operated with a direct supply voltage, which has a first insulation resistance between the positive active conductor and earth and a second insulation resistance between the negative active conductor and earth as well as a functional earthing between the negative active conductor and earth by means of an earthing resistance (functional earthing path).
[0002] Furthermore, the invention relates to an insulation monitoring arrangement according to the invention which implements the method according to the invention.
[0003] When there are increased requirements for the operational, fire, and contact safety of electrical systems, an ungrounded power supply system is used, also known as an isolated network (French: "Isole Terre" - IT) or an IT power supply system. In this type of power supply system, the active components are separated from the earth potential - from earth. The advantage of these networks is that in the event of an insulation fault, the function of the connected electrical loads is not impaired, since the ideally infinite insulation resistance value between an active conductor of the network and earth prevents a closed circuit from forming. The network can therefore continue to operate even after an initial insulation fault.
[0004] The resistance of the unearthed power supply system to earth (insulation resistance - in the event of a fault also insulation fault resistance or fault resistance) must therefore be constantly monitored, since a possible further fault on another active conductor would create a fault loop and the resulting fault current, in conjunction with an overcurrent protection device, would result in the system being switched off and operational downtime.
[0005] Particularly in electrical systems powered by an ungrounded AC power supply system and operated with a DC supply voltage via an AC / DC rectifier, there is a risk that DC stray currents will pass through metallically conductive system components and insulation resistance paths into electrolytically conductive system foundations. Unprotected metallic components located in an electrolytic environment, such as steel reinforcements in a concrete foundation or buried metallic devices, are exposed to corrosion caused by DC stray currents from power supply systems. In reinforced concrete structures, the material erosion occurring in the reinforcing steel can weaken the structural integrity or cause leaks in buried pipelines.
[0006] In particular, this also applies to hydrogen electrolysis plants, where electrolytically conductive current paths via a consumption water connection of the electrolyzer or a parasitic electrolytically conductive current path can cause stray currents in the electrolytic substrate, which, depending on the nominal DC voltage at the electrolyzer and the magnitude of the (electrolytic) insulation resistance paths, can shorten the service life of the electrical system.
[0007] Insulation monitoring is particularly important with regard to limiting DC stray currents and the associated risks of electrocorrosion.
[0008] In hydrogen electrolysis systems, some manufacturers are able to design the electrical system in such a way that the parasitic electrolytic current paths only have very high resistance to ground. Insulation resistance values of well over 100Ω / V DC nominal voltage are achievable.
[0009] The DC stray currents occurring at this level are usually uncritical and do not lead to a shortened service life of the system.
[0010] Where this is not possible due to design constraints, system manufacturers are switching to connecting the negative active conductor (negative pole) to earth potential on the DC side of the electrical system with a low-resistance earthing resistor. This functional earthing does not change the potential (electrolytic) current flow through the first insulation resistance between the positive active conductor and earth. However, a portion of this current no longer flows through the second insulation resistance located between the negative active conductor and earth, but rather through the earthing resistor of the functional earthing, which is connected in parallel with the second insulation resistance.
[0011] The aim is to design the metallic current path via the earthing resistance with such a low resistance that the remaining potential DC stray current component via the second insulation resistance does not lead to a reduced service life of the electrical system due to electrocorrosion.
[0012] However, determining the insulation resistance in connection with the functional earthing represents a problem for the system operator, since this functional earthing creates a low-resistance connection between the negative active conductor of the electrical system and earth.
[0013] It is well known that attempts are made to estimate the insulation condition of the electrical system using a DC current measurement or a DC differential current measurement on the AC side of the rectifier. However, since load currents in the kA range sometimes occur, particularly in hydrogen electrolyzers, this DC current measurement or DC differential current measurement on the AC side cannot be implemented with the required accuracy according to the state of the art to detect unwanted fault currents below the range of a few hundred mA.
[0014] According to the state of the art, it is also possible for functional grounding to be established via a so-called GFDI (Ground Fault Detector Interrupter), which briefly disconnects the functional grounding at specific intervals, for example, daily before commissioning of the electrical system, to enable insulation monitoring. A disadvantage of this solution is the GFDI's required high-impedance disconnector, which must be designed for the full DC nominal voltage. Another disadvantage is that largely continuous insulation monitoring is not possible throughout the entire operating cycle of the electrical system.
[0015] For IT systems earthed with a functional earthing resistance and with continuous insulation monitoring, the published patent application DE 10 2011 084 219 A1 shows a method and a device for determining an actual insulation resistance, whereby the functional earthing resistance is determined during the initial test of the IT system, a determination of a total insulation resistance is carried out during the continuous insulation monitoring and the actual insulation resistance is determined from the functional earthing resistance and the total insulation resistance during operation of the IT system.
[0016] Disclosed DE 10 2016 110 455 A1 discloses a surge protector for inverters, wherein an inverter module comprises a current transformer; a DC power source; a controllable switch for disconnecting DC input lines; a surge arrester; and an inverter monitoring device. A control system for the controllable switch is operatively connected to the inverter monitoring device to disconnect the controllable switch in response to a signal from the inverter monitoring device.
[0017] German Patent Application DE 10 2020 121 593 A1 describes a device for electrolysis from photovoltaically generated direct current power. The device comprises an electrolyzer, a DC-DC converter, and at least one PV sub-generator with insulation monitoring. The device makes it possible to supply an electrolyzer with electrical power from a PV sub-generator, whereby a ground fault in the PV sub-generator can be detected by monitoring the fault current and leads to the shutdown of the affected PV sub-generator.
[0018] Another common solution is to implement functional grounding via a monitored resistance grounding of the negative active conductor to earth. This is where the NGR (Neutral Ground Resistor) monitoring solution, which is widely used in the US market, comes in. However, the disadvantage is that, depending on the expected power consumption of the electrical system, a separate control cabinet is required for the NGR. Depending on the magnitude of the stray current and the resistance value, the voltage drop across the NGR can be in a range (> 1 V DC) where stray current corrosion cannot be prevented.
[0019] The present invention is therefore based on the object of developing a method and an arrangement implementing this method, which enable reliable insulation monitoring for an electrical system operated with a direct supply voltage and having a functional earthing.
[0020] This object is achieved, with reference to a method, by measuring an earthing current flowing in the path of the functional earthing by means of a DC current measuring device, measuring the DC supply voltage by means of a voltage measuring device, calculating the first insulation resistance from the DC supply voltage divided by the earthing current by means of a computing unit, wherein during operation of the electrical system the condition applies that the second insulation resistance is at least one hundred times greater than the earthing resistance.
[0021] The basic idea of the present invention is to install a (highly sensitive - see below) DC current measuring device in the functional earthing path, which detects the earth current flowing through the earthing resistance, and simultaneously to measure the DC supply voltage by means of a voltage measuring device.
[0022] The first insulation resistance is then calculated by dividing the DC supply voltage by the earth current in a calculation unit.
[0023] In principle, therefore, the most accurate determination of only the first insulation resistance is of interest, since the vast majority of the stray current flows through the low-ohm earthing resistance due to the functional earthing parallel to the second insulation resistance—and not through the second insulation resistance parallel to it. The only constraints on the second insulation resistance are its relative size to the earthing resistance.
[0024] To prevent electrocorrosion, it is important that the DC voltage between the negative active conductor and ground, i.e., the DC voltage drop across the grounding resistance, is so small that no corrosion processes are initiated at the potential point for electrocorrosion, namely the path across the second insulation resistance—in the case of the hydrogen electrolysis plant, an electrolytically conductive current path via a service water connection of the electrolyzer. Experience has shown that this is ensured if this DC voltage drop is significantly below 1V (DC).
[0025] Simulation results show that insulation monitoring with determination of the first insulation resistance is sufficiently accurate if the condition applies during operation of the electrical system that the second insulation resistance is at least 100 times greater than the earthing resistance.
[0026] In a further embodiment, an anti-parallel diode circuit with a bypass switch connected in parallel to the anti-parallel diode circuit is arranged in the functional earthing path in series with the earthing resistor, which bypass switch cyclically changes between a high-resistance open state and a low-resistance closed state, wherein (across the anti-parallel diode circuit) a diode voltage is measured by means of a further voltage measuring device, in the closed state the first insulation resistance is calculated from the supply DC voltage divided by the earthing current and the second insulation resistance is calculated by dividing a diode voltage change between the two states and a grounding current change between the two states by means of the computing unit.
[0027] Since manufacturers of functionally earthed electrical systems are often unable to assess whether the condition for sufficiently accurate insulation monitoring - namely that the second insulation resistance is at least one hundred times the earthing resistance - can be met during operation and thus the implemented functional earthing actually protects against electrocorrosion caused by stray DC currents, the second insulation resistance is calculated to check this condition.
[0028] To this end, a combination of antiparallel diodes with a bypass switch connected in parallel is inserted into the functional grounding path on the DC side of the functionally grounded electrical system, in series with the grounding resistor. DC decoupling by means of the antiparallel diode connection prevents the occurrence of high reverse voltages that could potentially destroy parallel components with just one diode.
[0029] Both the diodes and the bypass switch must be designed for the expected maximum ground current. The DC voltage drop across the antiparallel diode circuit (diode voltage) is measured.
[0030] The bypass switch is preferably implemented using a very low-resistance semiconductor switch. The resistance of the bypass switch when switched on should be at most equal to the earthing resistance.
[0031] The bypass switch is now controlled to cyclically switch between a high-impedance open state and a low-impedance closed state. The dwell times for the open / closed states are selected so that the measured variables ground current, ground current change, diode voltage, diode voltage change, and DC supply voltage can be measured with sufficient accuracy.
[0032] During the closed state of the bypass switch, in which the diode circuit is short-circuited, the first insulation resistance is calculated - as already stated in claim 1 - from the supply DC voltage divided by the earth current.
[0033] In addition, after each period with the bypass switch open and closed, the diode voltage change between the two states as well as the earth current change between the two states are cyclically recorded and used to calculate the second insulation resistance from the quotient of the diode voltage change and the earth current change.
[0034] As an alternative to the previously described embodiment with anti-parallel diode circuit and bypass switch, in a further embodiment an anti-parallel diode circuit without a parallel-connected bypass switch is inserted into the functional earthing path in series with the earthing resistance, wherein the first insulation resistance is calculated from the supply DC voltage divided by the earthing current by means of the computing unit.
[0035] Simulation results show that even without determining the second insulation resistance, the condition that the second insulation resistance is one hundred times greater than the earth resistance is sufficiently fulfilled even if the DC voltage drop across the anti-parallel diode circuit is significantly above one percent of the diode forward voltage.
[0036] From this, it can be deduced that the bypass switch can be dispensed with and the diode voltage dropping across the anti-parallel diode circuit can be used in such a way that this diode voltage is monitored to ensure that the measured voltage value is significantly above one percent of the diode forward voltage.
[0037] In this case, it is assumed that the calculation of the first insulation resistance from the supply DC voltage divided by the earth current is sufficiently accurate.
[0038] Advantageously, the earth current measured by the DC current measuring device is recorded in a range of less than 100mA.
[0039] The DC current measuring device must be designed so that the earth current can be measured with high sensitivity in the mA range below 100 mA during normal operation of the electrical system.
[0040] Furthermore, a DC fault current is detected by means of a DC fault current measuring device installed in the functional earthing path.
[0041] In addition, all versions can be equipped with supplementary fault protection to ensure rapid shutdown of the electrical system if a DC fault current that could endanger personnel or the system occurs in the functional path. For this purpose, a DC fault current measuring device is installed in the functional earthing path.
[0042] In contrast to the highly sensitive DC current measuring device for measuring the earth current, the DC fault current measuring device for detecting the DC fault current must be designed for the significantly higher fault current that occurs in the event of a fault (earth fault).
[0043] Without this additional fault protection, the functional grounding path would have to have an extremely low loop impedance to quickly and reliably trip an existing overcurrent protective device. This would require all elements in the functional grounding path to be designed for such high currents—in the range of several hundred A up to the kA range.
[0044] With this additional fault protection, however, the electrical system can be switched off quickly and reliably even with significantly smaller fault currents in the single-digit ampere range.
[0045] The components in the functional earthing path can be made smaller and are therefore easier and more cost-effective to obtain.
[0046] The DC fault current is preferably detected by means of a DC fault current measuring device designed as a modular residual current device.
[0047] The design of the DC residual current measuring device as a (DC-sensitive) modular residual current device (MRCD) makes it possible to detect imminent fault currents at an early stage using the DC-sensitive residual current monitoring integrated in the MRCD and, in conjunction with an external switching element, to switch off the electrical system within a standardized time.
[0048] The method according to the invention for insulation monitoring proves to be particularly advantageous when the electrical system operated with the DC supply voltage is a hydrogen electrolysis system.
[0049] In the course of the shift towards renewable energies as the basis for hydrogen production, the method according to the invention can be used very efficiently in conjunction with the operation of hydrogen electrolysis plants, since the electrolytically conductive consumption water pipe system poses particular challenges for monitoring the insulation resistance.
[0050] The claimed structural features of the insulation monitoring arrangement according to the invention carry out the corresponding method steps of the insulation monitoring method according to the invention. Thus, the technical effects achieved with the method and the resulting advantages also apply equally to the insulation monitoring arrangement.
[0051] Further advantageous design features emerge from the following description and the drawings, which explain a preferred embodiment of the invention using examples.
[0052] They show: Fig. 1 the formation of electrocorrosion by a stray DC current in a hydrogen electrolysis plant; Fig. 2 the hydrogen electrolysis plant with a functional earthing; Fig. 3 an insulation monitoring arrangement according to the invention for the functionally earthed hydrogen electrolysis plant; Fig. 4 Simulation result of the calculated first insulation resistance as a function of the second insulation resistance; Fig. 5 an insulation monitoring arrangement according to the invention with anti-parallel diode circuit and bypass switch; Fig. 6 an insulation monitoring arrangement according to the invention with antiparallel diode circuit without bridging switch and Fig. 7 the insulation monitoring arrangement according to Fig. 6 with a DC residual current measuring device.
[0053] Fig. 1 shows the formation of electrocorrosion by a DC stray current I S in an electrical system 2 using the example of a hydrogen electrolysis system 2 with a PEM (proton exchange membrane) electrolyzer.
[0054] The PEM electrolyzer is powered by a three-phase AC network 3 and is connected to the positive active conductor L via an AC / DC rectifier. + and the negative active conductor L - connected. Between the positive active conductor L + and earth PE is the insulation state of the hydrogen electrolysis plant 2 by a first insulation resistance R iso1 marked, accordingly, between the negative active conductor L - and earth PE a second insulation resistance R iso2 The insulation resistances R iso1 and R iso2can thus form an electrolytically conductive current path via the consumption water connection of the PEM electrolyzer as well as a parasitic current path consisting of metallically conductive parts and an electrolytically conductive substrate (e.g. the concrete foundation).
[0055] In this circuit, a DC stray current I flows S which can lead to electrical corrosion in the electrolytically conductive (concrete) floor.
[0056] Fig. 2 shows the hydrogen electrolysis plant 2 with a functional earthing via an earthing resistance R E .
[0057] The negative active conductor L- is connected via the earthing resistance R E connected to earth PE. Since this earth resistance R E compared to the parallel insulation resistance R iso2 is made much lower-resistance, the majority of the stray current I S as earth current I Evia the functional earthing path. As a result, the now low stray current component via the second insulation resistance R iso2 the risk of corrosion is significantly reduced.
[0058] Fig. 3 shows an insulation monitoring arrangement 10 according to the invention for the functionally grounded hydrogen electrolysis plant 2.
[0059] For this purpose, a DC current measuring device 14 is provided in the functional earthing path, which measures the current across the earthing resistance R E flowing earth current I E recorded. To measure the DC supply voltage U DC There is a voltage measuring device 12 between the positive active conductor L + and the negative active conductor L - . Calculating the first insulation resistance R iso1 is carried out in a computing unit 20. According to Ohm's law, by dividing the DC supply voltage U DC by the earth current IE the first insulation resistance Riso1=UDClE.
[0060] The insulation monitoring arrangement 10 according to the invention thus comprises as main components the voltage measuring device 12, the DC current measuring device 14 and the computing unit 20 for evaluating the measured values and for calculating the first (and the second) insulation resistance R iso1 (R iso2 ).
[0061] During operation of the hydrogen electrolysis plant 2, the condition must be met that the second insulation resistance R iso2 is at least a hundred times greater than the earth resistance R E , so that the stray current component, which may cause corrosion, can be conducted via the second insulation resistance R iso2 is low.
[0062] Fig. 4 shows a simulation result of the calculated first insulation resistance R iso1 depending on the second insulation resistance R iso2 .
[0063] In practice, it is difficult for many manufacturers of functionally earthed hydrogen electrolysis plants 2 to assess whether the condition is met that the second insulation resistance R iso2 is many times greater than the earth resistance R E and thus whether the implemented functional earthing actually protects against electrocorrosion caused by a DC stray current I S protects.
[0064] To check this condition, a constant first insulation resistance R iso1 of 100kΩ and a constant earth resistance R E of 10mΩ the second insulation resistance R iso2 in a range from 10mΩ to 1kΩ in the simulation and the respective value of the first insulation resistance R iso1 from the nominal DC voltage U DC and the earth current I E as calculated above.
[0065] From the Fig. 4 it can be seen that the desired value of 100kΩ of the first insulation resistance R iso1 with a second insulation resistance value of R iso2 =1Ω is reached. The condition can therefore be that the second insulation resistance R iso2 (=1Ω) a hundred times greater than the earth resistance R E (=10mΩ).
[0066] Fig. 5 shows an insulation monitoring arrangement 10 according to the invention with anti-parallel diode circuit 16 and bypass switch 18.
[0067] The insulation monitoring arrangement 10 according to the invention in this embodiment additionally comprises the anti-parallel diode circuit 16 with a further voltage measuring device 12 and the bypass switch 18. In the path of the functional earthing, the anti-parallel diode circuit 16 is connected in series with the earthing resistance R EThe bypass switch 18 is connected in parallel with the antiparallel diode circuit 16. The bypass switch 18 is cyclically switched between a high-impedance open state and a low-impedance closed state via control signals from the computing unit 20.
[0068] In the closed state of the bypass switch 20, the diode circuit 16 is short-circuited, so that - as described above - with a low earth resistance R E the first insulation resistance R iso1 from the DC supply voltage U DC divided by the earth current I E results.
[0069] The second insulation resistance R iso2 is determined by dividing the voltage change ΔU D between the two states and the current change ΔI E calculated between the two states Riso2=ΔUDΔlE.
[0070] Fig. 6 shows, in a further embodiment, an insulation monitoring device 10 according to the invention with an anti-parallel diode circuit 16 without a bypass switch 18.
[0071] Simulation results show that even without determining the second insulation resistance R iso2 it can be assumed that the condition that the second insulation resistance R iso2 a hundred times greater than the earth resistance R E is fulfilled when the DC voltage drop U D across the antiparallel diode circuit 16 is significantly above one percent of the diode forward voltage. In this case, the bypass switch 18 can be omitted in this optimized embodiment, and the DC voltage drop U D across the anti-parallel diode circuit 16, it is then monitored that this voltage value is still significantly above one percent of the diode forward voltage.
[0072] In this case, it is assumed that the calculation of the first insulation resistance R iso1 from the division of the DC nominal voltage U DC by the earth current I E follows with sufficient accuracy.
[0073] Fig. 7 shows the insulation monitoring according to the invention Fig. 6 with a DC residual current measuring device 30.
[0074] In order to ensure rapid shutdown of the electrical system 2 in the event of a DC fault current I flowing in the functional earthing path F To achieve this, an additional DC residual current measuring device 30 is installed in the functional earthing path.
[0075] While the DC current measuring device 14 has the task of measuring the earth current I E In order to measure the fault current as sensitively as possible during normal operation, the additional DC fault current measuring device 30 is used for a significantly higher fault current I F designed.
[0076] Preferably, the DC residual current measuring device 30 is designed as a DC-sensitive modular residual current device (MRCD).
Claims
[1] Method for insulation monitoring of a device connected to a direct supply voltage (U DC ) operated electrical installation (2), which has a first insulation resistance (R iso1 ) and between the negative active conductor (L-) and earth (PE) a second insulation resistance (R iso2 ) and a functional earthing between the negative active conductor (L-) and earth (PE) by means of an earthing resistor (R E ), comprising the process steps: Measuring an earth current flowing in the functional earth path (I E ) by means of a DC current measuring device (14), Measuring the DC supply voltage (U DC ) by means of a voltage measuring device (12), Calculate the first insulation resistance (R iso1 ) from the DC supply voltage (U DC ) divided by the earth current (I E) by means of a computing unit (20), wherein during operation of the electrical installation (2) the condition applies that the second insulation resistance (R iso2 ) at least a hundred times greater than the earth resistance (R E ) is. [2] Method according to claim 1, characterized by , that in the path of the functional earthing in series with the earthing resistance (R E ) an anti-parallel diode circuit (16) is arranged with a bridging switch (18) connected in parallel to the anti-parallel diode circuit (16), which bridging switch changes cyclically between a high-resistance open state and a low-resistance closed state, wherein a diode voltage (U D ) is measured by means of a further voltage measuring device (12), In the closed state, the first insulation resistance (Riso1) from the DC supply voltage (U DC ) divided by the earth current (I E) is calculated and the second insulation resistance (R iso2 ) by dividing a diode voltage change (ΔU D ) between the two states and a change in the earth current (ΔI E ) between the two states is calculated by means of the computing unit (20). [3] Method according to claim 1, characterized by that in the path of the functional earthing in series with the earthing resistance (R E ) an anti-parallel diode circuit (16) without a parallel-connected bypass switch (18) is arranged, wherein the first insulation resistance (R iso1 ) from the DC supply voltage (U DC ) divided by the earth current (I E ) is calculated by means of the computing unit (20). [4] Method according to one of claims 1 to 3, characterized by that the earth current (I E ) is detected in a range smaller than 100mA. [5] Method according to one of claims 1 to 4, characterized by that a DC fault current (I F ) is detected by means of a DC residual current measuring device (30) installed in the functional earthing path. [6] Method according to claim 5, characterized by that the DC fault current (I F ) is detected by means of a DC residual current measuring device (30) designed as a modular residual current device. [7] Application of the insulation monitoring method according to one of claims 1 to 6, characterized by that the DC supply voltage (U DC ) operated electrical installation (2) is a hydrogen electrolysis installation. [8] Insulation monitoring arrangement (10) for a device connected to a DC supply voltage (U DC ) operated electrical system, which has a first insulation resistance (R iso1) and between the negative active conductor (L-) and earth (PE) a second insulation resistance (R iso2 ) and a functional earthing between the negative active conductor (L-) and earth (PE) by means of an earthing resistor (R E ), with a DC current measuring device (14) for measuring an earth current (I E ), a voltage measuring device (12) for measuring the supply DC voltage (U DC ), a computing unit (20) which is designed to calculate the first insulation resistance (R iso1 ) from the DC supply voltage (U DC ) divided by the earth current (I E ), whereby during operation of the electrical installation (2) the condition applies that the second insulation resistance (R iso2 ) at least a hundred times greater than the earth resistance (R E ) is. [9] Insulation monitoring arrangement (10) according to claim 8, characterized bythat in the path of the functional earthing in series with the earthing resistance (R E ) an anti-parallel diode circuit (16) is arranged with a bridging switch (18) connected in parallel to the anti-parallel diode circuit (16), which bridging switch changes cyclically between a high-resistance open state and a low-resistance closed state, wherein the computing unit (20) is designed to calculate the first insulation resistance (R iso1 ) from the DC supply voltage (U DC ) divided by the earth current (I E ) in the closed state and to calculate the second insulation resistance (R iso2 ) by dividing the voltage change (ΔU D ) between the two states and the current change (ΔI D ) between the two states. [10] Insulation monitoring arrangement (10) according to claim 8, characterized by that in the path of the functional earthing in series with the earthing resistance (R E) an anti-parallel diode circuit (16) is arranged, wherein the computing unit (20) is designed to calculate the first insulation resistance (R iso1 ) from the DC supply voltage (U DC ) divided by the earth current (I E ). [11] Insulation monitoring arrangement (10) according to one of claims 8 to 10, characterized by that the DC current measuring device (14) is highly sensitive for detecting the earth current (I E ) in the range of less than 100mA. [12] Insulation monitoring arrangement (10) according to one of claims 8 to 11, characterized by , a DC fault current measuring device (30) installed in the functional earthing path for detecting a DC fault current (I F ). [13] Insulation monitoring arrangement (10) according to claim 12, characterized by that the DC residual current measuring device is designed as a modular residual current device. [14] Use of the insulation monitoring arrangement (10) according to one of claims 8 to 13, characterized by that the electrical system (2) is a hydrogen electrolysis system.
Citation Information
Patent Citations
Method and apparatus for determining an actual insulation resistance in IT systems with a functional earth resistance
DE102011084219A1
Overvoltage protection for inverters
DE102016110455A1
PHOTOVOLTAIC-POWERED ELECTROLYSIS
DE102020121593A1
Cited By
Methods and devices for minimizing a corrosion-prone DC protective conductor current
DE102024133671A1