METHOD AND DEVICE FOR HANDLING TIRES

DE502017016447D1Inactive Publication Date: 2024-10-17HARBURG FREUDENBERGER MASCHINENBAU GMBH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
DE502017016447
Authority / Receiving Office
DE · DE
Patent Type
Patents
Current Assignee / Owner
Priority Date
2016-06-14
Filing Date
2017-05-18
Publication Date
2024-10-17
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing tire handling devices are limited by fixed gripping tool distances, restricted movement kinematics, and the need for separate loading and unloading devices, leading to inefficiencies in space usage, safety concerns, and increased production time.

Method used

A handling device with at least two integrated gripping tools and a dual pivot point system, allowing for both loading and unloading functions from a single device, which reduces space requirements and enhances movement flexibility, enabling efficient handling of tires from a single direction.

Benefits of technology

This solution reduces the need for separate handling spaces, decreases production time by approximately 10%, and improves economic efficiency by allowing simultaneous handling from a single spatial direction, thereby optimizing tire production processes.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader
Need to check novelty before this filing date? Find Prior Art

Description

[0001] The invention relates to a handling device for tires, comprising at least one boom, wherein the at least one boom is fixed to a receptacle with a first boom pivot point in such a way that pivoting of the at least one boom relative to the receptacle is supported and that the at least one boom has a second boom pivot point, so that at least one gripping tool is coupled to the at least one boom and at least one second gripping tool is coupled to the second boom pivot point and that the at least two gripping tools are pivotable relative to at least one boom pivot point.

[0002] Furthermore, the invention relates to a method for realizing a loading and unloading cycle with tires of a tire vulcanizing machine.

[0003] The production of a tire, for example, for vehicles such as cars or motorcycles, is an extremely complex process consisting of numerous manufacturing and processing steps. This is due to the complex tire structure, which consists of a considerable number of different individual components. In addition, these numerous components must be bonded together under pressure and temperature, a process known as vulcanization. The vulcanization process also plays a crucial role in determining the material and grip properties of the finished tire.

[0004] Not only the finished tire, the end product of the tire manufacturing process, but also the green tire itself is a highly complex component consisting of numerous semi-finished elements. Due to the multi-layered structure, the individual components must first be assembled before any vulcanization process. This means that the tire components are separated to the correct size and fed to a carcass drum located within a tire building machine with precise location, position, and orientation. In this way, the green tire is manufactured and prepared for vulcanization.

[0005] Many tire components are available as sheet-like and / or sheet-shaped semi-finished products: various rubber compounds and rubber-based composite materials, textile fabrics or textile cords, steel belt fabrics, and rubber-coated bead cores. To feed these sheet-like and / or sheet-shaped semi-finished products to the carcass drum, layer servers are sometimes used within a tire building machine.

[0006] Due to the considerable number of production steps, production facilities are located in large halls and include suitable machinery, equipment, and handling equipment for each individual production step. These production lines or production centers are complemented by prestream and downstream equipment for preparing tire components or for post-processing and packaging the finished tires. Transport facilities are also provided to facilitate material flows in and for tire manufacturing facilities.

[0007] Typically, green tires are produced by tire building machines and initially stored in a warehouse. From this warehouse, which essentially serves as a kind of initial buffer for the subsequent manufacturing process, the green tires are then removed continuously or discontinuously as needed and transported to the tire curing presses for vulcanization.

[0008] In production halls with large production capacities, tire curing presses are often arranged in rows next to each other, separated by accessible paths. The green tires are often fed into the curing press using transport equipment, often using rails installed in an upper area of ​​the hall. Controlled transport and holding devices move along the rails. According to a variant of a well-known production process, the rails run above the curing presses, and the green tires are lowered into the tire curing press area via holding devices mounted on chains.

[0009] These often automated transport systems for green tires, which run on rails below the hall ceiling, transport the green tires from a buffer station to the tire vulcanizing machines. The transport trolleys travel on rails to the respective heating station and load the green tire station of the tire vulcanizing machine. The green tire station is located at hall floor level and thus usually at the same height as the tire vulcanizing machines. For safety reasons, a large safety scanner field is required, as a tire is quickly and automatically lowered from above to floor level using a gripping device. This safety scanner field requires a large hall area and makes access to the respective tire vulcanizing machine difficult. Every malfunction must be acknowledged manually and interrupts the supply to other tire vulcanizing machines.

[0010] According to another design of the handling equipment, corresponding transport rails serve as a travel base for the loading systems and feed devices above the travel paths adjacent to the tire vulcanizing machines and production stations corresponding to the tire manufacturing steps. The green tires to be vulcanized are positioned by handling equipment equipped with pivoting arms and / or other positionable arms, particularly longitudinal booms. Due to the significantly shorter longitudinal booms compared to the transport equipment provided in the hall ceiling area, transport equipment above the travel paths is considerably stiffer and thus a more precisely controllable handling system, with which very high accuracy can be achieved.

[0011] A frequently required post-vulcanization treatment process can be achieved by selectively cooling the finished tire, which is subject to residual heat, and optionally applying internal pressure. Since the finished tire, which is subject to residual heat, is structurally unstable and highly sensitive, particularly stringent requirements are placed on the handling devices used to remove the tire from the treatment chamber of the tire vulcanizing machine and to transport or insert it into the post-vulcanization facility. Therefore, handling devices are equipped with suitable gripping tools that can grip and pick up even the sensitive tires. Gripping tools of this design are complex and expensive.

[0012] Handling devices, which are also referred to as loaders or unloaders due to their function within the tire manufacturing process and in relation to the treatment area of ​​the tire vulcanizing machine, must move the tire or green tire to be handled over distances in all spatial directions and, if necessary, change the tire orientation.

[0013] Furthermore, movements and orientation changes must be carried out as quickly as possible in order to keep the required handling and transport times to a minimum and to minimize the overall process time of tire production.

[0014] Positioning accuracy with minimal positional and / or orientation deviations may also be part of the requirements spectrum of handling devices. This may be necessary, for example, when loading or inserting the green tire into the tire mold, the container, or the treatment room.

[0015] Positioning precision is also required when the finished tires, which are subject to residual heat, are placed in the post-cure inflator or the post-cure device for post-treatment purposes, for example in order to place the finished tire with its tire bead in the exact position on the tire plate.

[0016] Handling devices are often formed by a cantilever attached to a base. The cantilever is connected to the base at one end via a joint and typically has a gripping tool at the other end. The jointed attachment of the cantilever to the base supports pivoting relative to the base.

[0017] The disadvantage of these designs is that the achievable travel distances of the gripping tools are defined, fixed and significantly limited by the cantilever length.

[0018] Another problem with handling devices of this type is the limited kinematics of movement. If the degrees of freedom of movement of the gripping tool-carrying cantilever or boom are realized through a joint, the boom can only be pivoted around this pivot point. As a result, the gripping tools can only move along a circular arc.

[0019] Due to the existing travel distances and the circular movement patterns of the handling devices or gripping tools, these devices must be positioned adjacent to the tire vulcanizing machine in order to reach the treatment area with the gripping tools and insert the green tires or remove the finished tires. Therefore, the handling range cannot usually be extended to a second or more tire vulcanizing machines.

[0020] Another disadvantage of known handling devices is that separate handling devices are often required for loading and unloading. This is often due to the different design of the gripping tools for loading and unloading. The distances typically covered in this context are also often a contributing factor.

[0021] The consequence of the separate handling devices for loading and unloading is that handling areas must be provided on the tire vulcanizing machine for at least two handling devices, which are usually arranged in two spatial directions. This requires more space overall and requires that the respective handling areas be secured with regard to personal safety and occupational health and safety.

[0022] DE 39 18 209 A1 already discloses a handling device for tires, which comprises a boom with a first boom center of gravity. The boom is secured to a support in such a way that pivoting of the boom relative to the support is supported. The boom also has a second boom center of gravity, so that a gripping tool is coupled to the boom. A second pivoting gripping tool is also used.

[0023] DE 34 43 947 A1 describes another handling device for tires. DE 10 2011 011 423 A1 describes a handling device for tires that has a boom with a first boom pivot point and a second boom pivot point. Both a first gripping tool and a second gripping tool are arranged on the boom. The gripping tools are coupled with respect to their pivoting movements.

[0024] It is an object of the invention to provide a handling device for tires which at least partially reduces the aforementioned disadvantages and supports a cost-effective overall construction.

[0025] To achieve this, the teaching of the invention proposes a handling device according to patent claim 1 and a method for implementing a loading and unloading cycle of a tire vulcanizing machine with tires according to patent claim 14.

[0026] The invention recognizes that the integration of at least two gripping tools into a handling device opens up the possibility of implementing both the loading and unloading functions in and with one handling device. In this way, the aforementioned disadvantages of previously used handling devices can be at least partially reduced.

[0027] Another advantage of combining the loader and unloader in one handling device is that only one handling area is required for both handling tasks. This not only reduces the handling space that needs to be secured, but also the overall required production space and / or, for example, the production area required within a machine shop.

[0028] If the handling device according to the invention is integrated into a transport and feeding equipment preferably provided on the hall ceiling and above the production machine level, it is also possible to completely dispense with a handling space that must be secured for work and personnel, since this is then located above and outside the reach of people.

[0029] In addition to the actual reduction in space and / or area, another significant advantage is the integration of both handling functions into a single handling area. This makes it possible to implement the handling functions from exactly one spatial direction relative to the tire vulcanizing machine.

[0030] The handling device according to the invention also supports a significant speed advantage. The increased speed and the associated reduction in the total handling time required can reduce tire production time and thus increase the yield and efficiency of the plant. The functional property of the inventive teaching that accounts for this is the at least partial, quasi-dual use of at least a portion of the pivoting movement for both loading and unloading. The achievable time savings amount to approximately 10% compared to the use of separate loaders and unloaders.

[0031] The structural implementation of the handling device according to the invention provides at least one first boom with a first boom pivot point. The first boom pivot point forms the coupling point to a receptacle, which can serve as the base of the handling device and can optionally be moved in one spatial direction, for example, supplemented by a carriage. This creates a preferably linear degree of freedom, which supports the possibility of approaching working points at different working levels or room heights.

[0032] The linear degree of freedom can also be implemented alternatively or additively in other components of the handling device.

[0033] The boom also has a second boom pivot point, which forms the coupling point to the at least two gripping tools. The degree of freedom of the second boom pivot point can be linear in nature, but is preferably rotary. If the second boom pivot point is equipped with a rotational degree of freedom, it is possible to set the rotation axis either a) parallel to or in line with the boom centre line or b) in any axis not parallel to the boom centre line.

[0034] It is also possible and provided for in a further embodiment c) to extend the degree of freedom of movement to a plurality of spatial and / or rotational directions and in this way to support a multidirectional degree of freedom.

[0035] For example, the degrees of freedom of movement according to embodiments a) and b) can be achieved by a suitably arranged rotary or cardan joint; the realization within the framework of a multi-directional degree of freedom is possible, for example, by means of ball joints.

[0036] The arrangement of the at least two gripping tools can vary depending on the degree of freedom of the second boom pivot point: Firstly, with degrees of freedom according to a) and / or b), it is possible to arrange the gripping tools as a sandwich. This is advantageous due to the space-saving arrangement. Secondly, the at least two gripping tools can be attached to at least one tool arm that is coupled to the second boom pivot point of the boom.

[0037] A further embodiment of the handling device according to the invention with four gripping tools is conceivable which is suitable for carrying out loading and unloading handling tasks for two adjacently arranged tire vulcanizing machines.

[0038] The design variant of at least two gripping tools fixed to the end of a tool arm is shown in the figures. They show: Figure 1 shows a plan view of a schematic representation of the handling device (30), and Figure 2 shows a plan view of a schematically represented area of ​​a tire manufacturing plant with a tire vulcanizing machine (100), a handling device (30) and a transport device (60), and Figure 3 shows a plan view of a schematically represented area of ​​a tire manufacturing plant with two tire vulcanizing machines (100), two handling devices (30) and two transport devices (60).

[0039] Figure 1shows a top view of a schematic representation of the handling device (30) in a highly simplified schematic diagram. The at least one boom (36) is coupled to a receptacle (35) via a first boom pivot point (36') or is supported thereon. The receptacle (35) can be designed as a base (35') and have a preferably linear degree of freedom, so that different working planes can be approached. For example, a carriage (35") can provide the linear degree of freedom - the carriage (35") and base (35') are not shown.

[0040] The first boom pivot point (36') provided at the end of the boom (36) preferably supports a pivoting movement about a vertical axis, thus enabling the boom (36) to pivot in a horizontal plane. The pivoting movement kinematics centered on the first boom pivot point (36') preferably follow a circular arc and can achieve pivoting paths of up to 360 degrees. However, due to the spatial conditions adjacent to a tire vulcanizing machine (100), the pivoting path is often limited to 90 to 180 degrees.

[0041] The second boom pivot point (36"), which is provided opposite the first boom pivot point (36') and preferably also at the end, couples the at least two gripping tools (30') to the boom (36) with a degree of freedom of movement. The second boom pivot point (36") is preferably designed analogously to the first boom pivot point (36') and preferably also supports a pivoting movement about a vertical axis, so that pivoting of the at least two gripping tools (30') relative to the boom (36) in a horizontal plane can be realized.

[0042] The at least two gripping tools (30') can each be arranged at the end of a tool arm (39) - in this case, the tool arm (39) is practically interposed between the gripping tools (30') and the coupling point in the form of the second boom pivot point (36"). In Figure 1In the embodiment shown, the implementation is symmetrical, but other asymmetrical situations can also be created, particularly by selecting the coupling point off-center of the tool arm (39). The symmetrical design shown is advantageous because exactly one working point (300) can be approached with both gripping tools (30') without corrective pivoting movements of the boom (36).

[0043] The pivoting movement kinematics BK2,3 of the at least two gripping tools (30') relative to the boom (36) around the second boom pivot point (36") is circular and can realize pivoting paths of up to 360 degrees. In the symmetrical design shown, the circular arc paths of the gripping tools (30') are both concentric and congruent. In the case of an asymmetrical implementation, the circular path movements of the gripping tools (30') are also concentric, but the circular path diameters differ according to the center offset of the second boom pivot point (36") to the tool arm (39).

[0044] The gripping tools (30') are preferably coupled to the tool arm (39) by means of a gripping tool holder (38). It can be provided that the gripping tool holders (38) also support a degree of freedom of movement. This degree of freedom of movement is preferably identical in design and spatial orientation to that of the second boom pivot point (36").

[0045] The gripping tools (30') can be constructed in the same way and designed in such a way that handling and gripping tasks can be carried out for both green tires (200') and finished tires (200).

[0046] A variant of the handling device (30) according to the invention provides that the gripping tools (30') are adapted to the handling tasks for green tires (200') and for finished tires (200), since the mechanical properties and the sensitivity of green tires (200') and finished tires (200) differ considerably.

[0047] From the perspective of the tire vulcanizing machine (100), with its core element formed by the treatment chamber (110), this chamber is loaded with green tires (200') and, after tire vulcanization, unloaded with finished tires (200). According to this nomenclature, one speaks of loading gripping tools (34) and unloading gripping tools (32).

[0048] Figure 2 comprises a plan view of a schematically illustrated area of ​​a tire manufacturing plant with a tire vulcanizing machine (100), a handling device (30) and a transport device (60) in schematic form.

[0049] The handling device (30) is arranged in one spatial direction relative to the tire vulcanizing machine (100) and is thus able to provide all handling functions in the form of loading and unloading from one direction of the tire vulcanizing machine (100).

[0050] Particularly preferred is the handling device (30) arranged at the rear of the tire vulcanizing machine (100), so that the accessibility of the front is fully supported. An additional or alternative advantage of this relative arrangement of the tire vulcanizing machine (100) and handling device (30) relative to each other and / or the integration of all handling functions in one handling device (30) is that only one handling space is required. Since handling spaces must predominantly be secured with personal protection measures, the invention reduces this effort. In the illustrated embodiment of the Figure 2 This effort is therefore at least halved.

[0051] In order to be able to approach the various working points (300) of the treatment chamber (110) of the tire vulcanizing machine (100), the transport device (60) and the green part stand or magazine (302), the boom (36) pivots about the first boom pivot point (36') and / or the tool arm (39) pivots about the second boom pivot point (36"), so that the respective gripping tools (30') can be positioned in the required positions or working points (300). The pivoting movements about the two boom pivot points (36', 36") can take place sequentially and / or at least partially in parallel.

[0052] The sequence of handling functions for loading and unloading as well as transport and removal are functionally implemented as follows: A green tire (200') is placed in the green tire stand (302) in position 4 by the additional handling equipment (not shown). The green tire stand (302) pivots the green tire (200') from position 4 to position 3 by implementing a feed movement BK3,4. Position 3 is the working point (300) that can be approached by both the green tire stand (302) and the handling device (30).

[0053] The handling device (30) preferably pivots in a spatial plane level deviating from position 3 and / or position 4 in such a way that a gripping tool (30', 34) is moved into a congruent parallel plane of the working point (300) of position 3. Once this positioning is completed, the handling device (30) preferably moves by linear movement into the spatial plane level of position 4. The linear movement is made possible by the degree of freedom of the holder (35) designed as a base (35') with a slide (35"). Also in Figure 2 The carriage (35") and base (35') are not shown.

[0054] The gripping tool (30', 34) grips the green tire (200') offered by the green tire stand (302) at the working point (300) of position 3. The then empty green tire stand (302) then pivots from position 3 back to position 4 along the feed movement BK3,4. After reaching position 4, the green tire stand (302) is ready to be reloaded with a green tire (200') by the additional handling equipment.

[0055] In the next handling step, the handling device (30) with the gripped green tire (200') moves from the spatial level of position 4 to the spatial level of position 1. The approach point (300) in position 1 corresponds to the working level of the treatment chamber (110) of the tire vulcanizing machine (100).

[0056] If the tire vulcanizing machine (100) is in a handling state because the treatment chamber (110) is open, the handling device (30) pivots with the gripping tool (30' 32) from position 2 to position 1 at the room height level of the working plane (300) of the treatment chamber (110). The pivoting movement is preferably a circular arc kinematics along the path BK1,2.

[0057] In position 1, the gripping tool (30, 32) grips the finished tire (200) with residual heat and then pivots from position 1 to position 2. Once position 2 is reached, the finished tire (200) is placed on a transport device (60) which is provided for transporting the tire (200) along a transport movement direction (60').

[0058] After placing the finished tire (200) on the transport device (60) and the situation-dependent position of the handling device (30) as in Figure 2As illustrated, the gripping tool (30', 34) with gripped green tire (200') is moved along the pivoting path BK2,3 from position 3 to position 2. The movement kinematics BK2,3 here is circular arc-shaped and has a pivoting path that corresponds approximately to a radian measure of 180 degrees.

[0059] The gripping tool (30', 34) with the gripped green tire (200') is pivoted from position 2 along the pivoting path BK1,2 to position 1 and thus into the working point (300) of the treatment chamber (110) of the tire vulcanizing machine (100). The gripping tool (30', 34) then deposits the green tire (200') in position 1 and then pivots along the pivoting path BK1,2 from position 1 to position 2.

[0060] The subsequent final handling step of a complete loading and unloading cycle is the realization of the circular arc-shaped swivel path BK2,3 within the radian amount PI, so that the Figure 2shown location and position arrangement is present, but with empty gripping tools (30', 32, 34) without tires (200, 200').

[0061] Figure 3 illustrates further possible uses and embodiments of the invention using a plan view comprising a schematically illustrated area of ​​a tire manufacturing plant with two tire vulcanizing machines (100), two handling devices (30) and two transport devices (60).

[0062] Figure 3 practically shows the duplicated situation according to Figure 2 , that is to say a handling device (30) for all required loading and unloading handling functions is assigned to a tire vulcanizing machine (100) and realizes the handling functions from one side, preferably the rear of the tire vulcanizing machine (100).

[0063] However, the invention also recognizes that, under suitable conditions, a handling device (30) arranged preferably centrally and symmetrically to the tire vulcanizing machines (100) can combine all of the aforementioned handling functions for both tire vulcanizing machines (100).

[0064] The conditions are met if the tire vulcanization cycle time within the tire vulcanization machines (100) is both identical and offset in time from one another, and the handling time required for a complete handling cycle is at least not significantly longer than the tire vulcanization time of the tire vulcanization machines (100).

[0065] If a handling device (30) with two gripping tools (30', 32, 34) is used, it is also a prerequisite that in both tire vulcanizing machines (100) tire dimensions are processed that can be gripped with the gripping tools (30', 32, 34).

[0066] In the case of a handling device (30) for two tire curing presses (100), the invention provides a pivoting capacity of the at least one boom (36) about the first boom pivot point (36') of preferably 1 ¾ of 180 degrees.

[0067] If significantly different tire dimensions are to be processed in the two tire vulcanizing machines, the invention provides a handling device (30) for all handling tasks of both tire vulcanizing machines (100), which has four gripping tools (30', 32, 34) with gripping jaw widths adapted in pairs to the different tire dimensions. To position the respective gripping tools (30', 32, 34) for different tire dimensions, a further rotational degree of freedom is introduced into the gripping tool holders (38) by means of a rotary joint, which pivots the gripping tools (30', 32, 34), arranged as a sandwich and thus in pairs, in their working plane between the handling cycles for each tire vulcanizing machine (100).

Claims

1. Handling device (30) for tires (200, 200'), comprising at least one extension arm (36), wherein the at least one extension arm (36) is fixed with a first extension arm pivot point (36') to a receptacle (35) in such a way that pivoting of the at least one extension arm (36) relative to the receptacle (35) is supported and that the at least one extension arm (36) has a second extension arm pivot point (36"), so that at least one gripping tool (30', 32, 34) is coupled to the at least one extension arm (36) and at least one second gripping tool (30', 32, 34) is coupled to the second extension arm pivot point (36"), and in that the at least two gripping tools (30', 32, 34) are pivotable relative to at least one extension arm pivot point (36', 36"), wherein the coupling of the at least two gripping tools (30', 32, 34) to the second extension arm pivot point (36") comprises a tool arm (39), wherein the at least two gripping tools (30', 32, 34) are each coupled via a gripping tool receptacle (38) and wherein the coupling of the gripping tools (30', 32, 34) is effected in such a way that a pivoting along a movement kinematics BK 2,3 of at least one gripping tool (30', 32, 34) is supported, characterized in that the movement kinematics BK 2,3 of the at least two gripping tools (30', 32, 34) are concentric relative to each other or congruent.

2. Handling device (30) for tires (200, 200') according to claim 1, characterized in that the movement kinematics BK 2,3 is arc-shaped.

3. Handling device (30) for tires (200, 200') according to claim 2, characterized in that the movement kinematics BK 2,3 can be used to implement a movement path which corresponds to the radian measure of up to 360 degrees.

4. Handling device (30) for tires (200, 200') according to claim 1, characterized in that the handling device (30) has at least one linear degree of freedom which is not parallel to the swivel plane, so that the gripping tools (30', 32, 34) can be moved to different spatial height levels.

5. Handling device (30) for tires (200, 200') according to claim 4, characterized in that the at least one linear degree of freedom is supported by the receptacle (35) and / or an extension arm pivot point (36', 36") and / or a gripping tool (38).

6. Handling device (30) for tires (200, 200') according to claim 1, characterized in that the at least two gripping tools (30', 32, 34) are coupled to the second extension arm pivot point (36") in such a way that loading and unloading handling functions can be implemented by the handling device (30) for at least one tire vulcanizing machine (100).

7. Handling device (30) for tires (200, 200') according to claim 1, characterized in that the length dimensioning of the extension arm (36) and / or its swivel path capacity supports a handling space which comprises working points in the tire vulcanizing machine (100) and a transport device (60) and a raw material stand (302).

8. Handling device (30) for tires (200, 200') according to claim 1, characterized in that the dimensioning of the size of the handling device (30) supports pivoting movements of the at least two gripping tools (30', 32, 34) between the positions 1, 2 and 3.

9. Handling device (30) for tires (200, 200') according to claim 1, characterized in that the pivoting movements take place along a movement kinematics BK 1,2 and / or the movement kinematics BK 2,3.

10. Handling device (30) for tires (200, 200') according to claim 1, characterized in that four gripping tools (30', 32, 34) are coupled to the second extension arm pivot point (36").

11. Handling device (30) for tires (200, 200') according to claim 10, characterized in that each two gripping tools (30', 32, 34) are arranged in pairs as a sandwich.

12. Handling device (30) for tires (200, 200') according to claim 1, characterized in that at least one gripping tool (30') is used as an unloading gripping tool (32) with gripping properties optimized for finished tires (200).

13. Handling device (30) for tires (200, 200') according to claim 1, characterized in that at least one gripping tool (30') is used as a loader gripping tool (34) with gripping properties optimized for tire blanks (200').

14. Method for realizing a loading and unloading cycle of a tire vulcanizing machine (100) with tires (200, 200') with a handling device (30) according to one of the preceding claims, comprising the handling steps i. Positioning of a first gripping tool (30', 34) in a position 3, ii. Gripping of a previously prepared tire blank (200') with the first gripping tool (30', 34) positioned in position 3, iii. Pivoting the handling device (30) about a first extension arm pivot point (36'), so that a second gripping tool (30', 32) is pivoted from a position 2 to a position 1, iv. Gripping the finished tire (200) in the treatment chamber (110) of the tire vulcanizing machine (100), v. Pivoting the handling device (30) about the first extension arm pivot point (36'), so that the second gripping tool (30', 32) with the gripped finished tire (200) is pivoted from position 1 to position 2, vi. Placing the finished tire (200) on a transport device (60), vii. Pivoting at least one of the gripping tools (30', 32, 34) about the second extension arm pivot point (36") between position 2 and position 3, so that the gripped tire blank (200') is positioned in position 2, viii. Pivoting the handling device (30) about the first extension arm pivot point (36'), so that the first gripping tool (30', 34) with the gripped tire blank (200') is pivoted from position 2 to position 1, ix. Placing the tire blank (200') into the treatment chamber (110) of the tire vulcanizing machine (100), x. Pivoting the handling device (30) about the first extension arm pivot point (36'), so that the first gripping tool (30', 34) is pivoted from position 1 to position 2.

15. Method for the realization of a loading and unloading cycle of a tire vulcanizing machine (100) with tires (200, 200') according to claim 14 characterized by a further handling step xi. Pivoting at least one of the gripping tools (30', 32, 34) about the second extension arm pivot point (36") between position 2 and position 3, so that the gripped tire blank (200') is positioned in position 2.

16. Method for implementing a loading and unloading cycle of a tire vulcanizing machine (100) with tires (200, 200') according to claim 14, characterized in that method steps i. and / or iii. and / or v. and / or vii. and / or viii. and / or x. are carried out within a room height level deviating from a room height level of method steps ii. and / or iv. and / or vi. and / or ix.

17. Method for implementing a loading and unloading cycle of a tire vulcanizing machine (100) with tires (200, 200') according to claim 14, characterized in that the method step iii. and / or v. and / or viii. and / or x. takes place along the movement kinematics BK 1,2.

18. Method for implementing a loading and unloading cycle of a tire vulcanizing machine (100) with tires (200, 200') according to claim 14 or 15, characterized in that the method step vii. and / or xi. takes place along the movement kinematics BK 2,3.

19. Production plant for manufacturing tires comprising at least one tire vulcanizing machine (100) and at least one transport device (60) and at least one blank stand (203) and at least one handling device (30) according to any one of claims 1 to 13.