AI Technical Summary

Technical Problem

Existing methods for controlling synchronous machines, particularly in sensorless configurations, face challenges in accurately determining electrical phase currents due to noise issues caused by temporal jumps in switching signals during duty cycle changes, especially under high motor voltages and varying duty cycles.

Method used

The method involves generating center-centered or non-center-centered pulse width modulated switching signals for half-bridges to ensure a sufficient minimum measurement period, avoiding temporal jumps by shifting switching signal edges based on duty cycle ratios, allowing for noise-optimized 1-shunt current measurements.

Benefits of technology

This approach enables noiseless operation of synchronous machines by preventing undesirable jumps in phase current curves, even under high electrical motor voltages and varying duty cycles, improving control accuracy without requiring additional hardware.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader
Need to check novelty before this filing date? Find Prior Art

Description

[0001] The invention relates to a method for operating an electrical synchronous machine. The invention further relates to a device for operating an electrical synchronous machine. The invention further relates to a computer program product and a computer-readable storage medium. State of the art

[0002] Permanent-magnet synchronous motors are known for driving fans, such as radiator fans in the automotive sector. Sensorless control of synchronous motors is also known, i.e., control without the use of a rotor position sensor. The rotor position is then determined from the induced electrical voltage (BEMF, back electromotive force) of the synchronous motor.

[0003] For the control or regulation of electrical synchronous machines, knowledge of the electrical phase currents of the synchronous machines is often required. The electrical phase currents are required, for example, as an input variable for sensorless rotor angle estimation methods or for control methods.

[0004] In a cost-optimized solution, the electrical phase currents are determined via only one shunt in the common ground or supply path of half-bridges ("1-shunt current measurement").

[0005] DE 10 2015 202 693 A1 discloses a method for determining the phase current in an electrical multi-phase system.

[0006] DE 10 2011 003 897 A1, from which the invention is based, and DE 10 2205 062 759 each disclose a method and a device for current measurement. Disclosure of the invention

[0007] It is an object of the present invention to provide a method for improved operation of a synchronous machine.

[0008] The object is achieved according to a first aspect with a method for operating an electrical synchronous machine, comprising the steps: Generating center-centered pulse-width modulated switching signals for switching elements of half-bridges, wherein two of the switching elements are each connected to form a half-bridge, wherein second switching elements of each half-bridge are controlled complementarily to first switching elements of each half-bridge, provided that this provides a sufficient minimum measurement duration during which the switching signals of switching elements of two half-bridges are at different potentials;Otherwise: generating pulse-width modulated switching signals for the switching elements of the half-bridges which deviate from the centering at least far enough to provide a sufficient minimum measuring duration, the switching signals of the switching elements being designed in such a way that time jumps corresponding to the minimum measuring duration in the switching signals of the switching elements are avoided, carrying out a 1-shunt current measurement within the provided minimum measuring duration (TM ), wherein in the event that at least two switching signals of the first switching elements (T1, T3, T5) have a defined large different duty cycle, in the event of a change in the size ratios of the switching signals during a transition from one switching cycle to the next, the switching signals are designed in such a way that the 1-shunt current measurements are carried out in each case at alternating edges of the switching signals.

[0009] In this way, noise-optimized operation of the sensorless controlled synchronous machine with specifically non-centered control signals can be achieved because time jumps by the measurement duration in the phase signals are avoided.

[0010] Preferably, the synchronous machine's operation covers a scenario in which high electrical motor voltages occur due to significant differences in the duty cycles of the control signals. In this case, too, very quiet operation of the synchronous machine can be supported.

[0011] The object is achieved according to a second aspect with a device for operating an electrical synchronous machine, comprising: a generating device for generating center-centered pulse-width modulated switching signals for switching elements of half-bridges, wherein two of the switching elements are each connected to form a half-bridge, wherein second switching elements of each half-bridge are controlled complementarily to first switching elements of each half-bridge, provided that this provides a sufficient minimum measuring duration during which the switching signals of switching elements of two half-bridges are at different potentials, Otherwise: for generating pulse-width modulated switching signals for the switching elements of the half-bridges which deviate from the center-centering at least so far that a sufficient minimum measuring duration is provided;wherein the switching signals of the switching elements can be formed by means of the generating device in such a way that temporal jumps in the switching signals of the switching elements are avoided in accordance with the minimum measuring duration, a measuring device (220) for carrying out a 1-shunt current measurement, wherein a defined minimum measuring duration (TM ) is provided by means of the switching signals of the switching elements (T1 ...T6), during which two switching signal signals of a half-bridge are at different potentials, ; wherein, in the event that at least two switching signals of the first switching elements (T1, T3, T5) have a defined large different duty cycle, in the event of a change in the size ratios of the switching signals during a transition from one switching cycle to the next, the switching signals are formed such that the 1-shunt current measurements are carried out in each case at alternating edges of the switching signals.

[0012] Preferred embodiments of the method for operating an electrical synchronous machine are the subject of dependent claims.

[0013] A preferred development of the method provides that in the case that two switching signals from different switching elements have a similar duty cycle during the 1-shunt current measurement on the positive switching edges, the switching signals of the switching elements with the larger duty cycle are shifted to the left, and the switching signal of the switching element with the smaller duty cycle is shifted to the right.

[0014] A further preferred development of the method is characterized in that, in the case where two switching signals from different switching elements have a similar duty cycle during the 1-shunt current measurement on the negative switching edges, the switching signals of the switching elements with the larger duty cycle are shifted to the right, and the switching signal of the switching element with the smaller duty cycle is shifted to the left.

[0015] A preferred development of the method provides that, in the event that the switching signals of the first switching elements have a defined, similar duty cycle, the rising edges of the three switching signals of the first switching elements, at which the 1-shunt current measurement is performed, are fixed in their temporal sequence relative to one another and are designed such that the minimum measurement duration between the switching signals of the first switching elements is provided, wherein the 1-shunt current measurement is performed at rising edges of the switching signals of the first switching elements in the first half of the PWM period. In this way, a scenario in the operation of the synchronous machine is taken into account which realizes a low motor power or speed due to small differences in the duty cycles.

[0016] A further preferred development of the method is characterized in that, in the event that the switching signals of the first switching elements have a defined, similar duty cycle, the falling edges of the three switching signals of the first switching elements, at which the 1-shunt current measurement is performed, are fixed in their temporal sequence relative to one another and are designed such that the minimum measurement duration between the switching signals of the first switching elements is provided, wherein the 1-shunt current measurement is performed at falling edges of the switching signals of the first switching elements in the second half of the PWM period. In this way, a similar scenario as described above is provided for the synchronous machine, wherein in this case the 1-shunt current measurement is performed at falling edges of the switching signals.

[0017] A further preferred embodiment of the method is characterized in that the duty cycles of the three switching signals of the switching elements are similar, and the difference in the duty cycles of the three switching signals is preferably less than approximately 20% to approximately 30%. In this way, the method can be applied to a variety of different switching signal configurations. Preferably, the differences in the duty cycles of the three switching signals are small (i.e., up to approximately 20-30% difference in the duty cycles) or the electrical motor voltage amplitude ("total duty cycle") is max. approximately 20-30%. Advantageously, an absolute value of the duty cycles of the three switching signals is irrelevant; e.g., the three duty cycles could be 60%, 70%, or 80%; the method would also function advantageously in these cases, since the maximum difference in the duty cycles would be only 20%.

[0018] A further preferred embodiment of the method is characterized in that, if at least two switching signals of the first switching elements have a defined, large difference in the duty cycle, the difference in the duty cycle is greater than approximately 25% to approximately 100%. A further preferred embodiment of the method provides that the method is carried out for a permanently excited or separately excited synchronous machine. In this way, the method can be advantageously used for synchronous machines with different constructions.

[0019] The invention, along with further features and advantages, is described in detail below with reference to several figures. Identical or functionally equivalent elements are designated by the same reference numerals. The figures are intended, in particular, to clarify the principles essential to the invention.

[0020] Disclosed device features result analogously from corresponding disclosed method features, and vice versa. This means, in particular, that features, technical advantages, and embodiments relating to the method for operating an electrical synchronous machine result from corresponding embodiments, features, and technical advantages relating to the device for operating an electrical synchronous machine, and vice versa.

[0021] Furthermore, the invention relates to a computer program product comprising instructions which cause the device according to the invention for operating an electrical synchronous machine to carry out the method according to the invention.

[0022] Furthermore, the invention relates to a computer-readable storage medium on which the computer program product according to the invention is stored.

[0023] In the figures shows: Figs. 1 and 2 are schematic diagrams for explaining the operation of a conventional 1-shunt current measurement of an electrical synchronous machine; Figs. 3 - 5 are schematic signal diagrams for explaining the operation of an electrical synchronous machine; Fig. 6 is a diagram for explaining sector changes when operating an electrical synchronous machine; Figs. 7 - 8 are timing diagrams with control signals according to a conventional method for operating an electrical synchronous machine; Figs. 9 - 10 are schematic diagrams of a first embodiment of a method for operating an electrical synchronous machine; Figs. 11 - 12 are schematic diagrams of a further embodiment of a method for operating an electrical synchronous machine; Fig. 13 is a flowchart of a proposed method for operating an electrical synchronous machine; and Fig.14A basic block diagram of a proposed device for operating an electrical synchronous machine. Description of embodiments

[0024] Fig. 1 shows a schematic circuit diagram of a conventional device for operating an electrical synchronous machine, wherein the synchronous machine is controlled by means of pulse-width modulated electrical control signals. The device preferably comprises three half-bridges with switching elements T1...T6, which generate the aforementioned control signals for the phase windings of the synchronous machine.

[0025] This is shown below as an example for a 3-phase system with the three phase connections U, V, W and a B6 bridge configuration with three half-bridges T1-T2, T3-T4, T5-T6 or a shunt R in the ground path of the half-bridges.

[0026] In order to be able to deduce the three phase currents from the electrical shunt current IR, the six electronic switching elements T1...T6 of the B6 bridge must have a defined switching pattern. For example, in switching pattern 1 of Fig. 1 the electrical shunt current IR corresponds to the phase current U. In circuit pattern 2 of Fig. 2 the electrical shunt current IR corresponds to the negative electrical phase current W.

[0027] The generation of the three electrical phase voltages U, V and W is typically carried out by means of pulse width modulation (PWM), whereby center-centered PWM control signals are preferably, but not exclusively, used for this purpose.

[0028] Fig. 3shows an example of a switching pattern of the three high-side switches T1, T3, T5 during a PWM period with center-centered PWM generation and the resulting electrical shunt current IR . In order to determine the three electrical phase currents during a PWM period, the electrical shunt current IR must be measured in two different switch positions (one of the three high-side switches closed or two of the three high-side switches closed). In the example of Fig. 3 This would be possible in zones II and III, or in zones V and VI. This allows two of the three electrical phase currents to be determined directly by measuring the shunt current IR, whereby the third electrical phase current can then be calculated using the electrical node rule.

[0029] To measure the electrical shunt current IR, both switching patterns (one of the three high-side switches T1, T3, T5 closed or two of the three high-side switches T1, T3, T5 closed) must be present for a minimum duration. If the duty cycles on at least two of the three phases are similar, a single-shunt current measurement is therefore not possible without further measures. In the following example, a single-shunt current measurement would not be possible because the duty cycles on the switching elements T3 and T5 are too similar, as shown in Fig. 4 is recognizable.

[0030] To enable a single-shunt current measurement in such cases, the two switching edges on at least one of the three half-bridges T1-T2, T3-T4, T5-T6 must be shifted in time. In the following example, the phase currents can be determined using a single-shunt current measurement after shifting the switching edges on the switching elements T3, T5, as shown in Fig. 5 is recognizable.

[0031] The direction in which the edges of the PWM switching signals are shifted is typically determined based on the magnitude ratio of the duty cycles on the three phases. Fig. 6 shows the magnitude of the duty cycles for the three phases U, V, and W using a vector diagram. During a so-called "sector change," the direction in which the switching signals are shifted is typically also changed. However, this results in a jump in the position of the switching edges during the minimum measurement period TM, and as a result, an often undesirable jump in the electrical phase current waveforms. Depending on the application, these jumps in the electrical phase currents can be critical with regard to the noise behavior of the application with the electrical synchronous machine.

[0032] The following example of Fig. 7shows the resulting switching patterns before and after a sector change, where before the sector change the condition: TV W > TV V > TV U with: TV W Duty cycle W TV V Duty cycle V TV U Duty cycle U applies and after the sector change the condition: TVV>TVW>TVU

[0033] Due to the jumps in the switching signals generated in this way, each with a minimum measuring duration TM, an alternating phase current is generated, causing an undesirable noise level.

[0034] It is therefore proposed to arrange the phases of the switching signals in such a way that the aforementioned jumps no longer occur.

[0035] Fig. 9The right-hand diagram shows a first embodiment of the proposed method; the left-hand diagram represents the switching signals without the modification according to the invention. It can be seen that the duty cycles of the three switching signals are similar, with the difference in the duty cycles of the three switching signals preferably being less than approximately 20% to approximately 30%. In this case, the rising edges of the three switching signals are fixedly positioned during a sector change, thus providing the minimum measurement duration TM for performing the 1-shunt current measurement.

[0036] This is also shown in the right-hand illustration of Fig. 10 the case in which the edges within the individual switching signals change only insignificantly, resulting in a quiet running of the synchronous machine. As a result, the three switching signals in the right-hand diagrams of the Figures 9 and 10 no longer centered.

[0037] From Fig. 9 on Fig. 10 The same sector change is realized as in the conventional process of Fig. 7 on Fig. 8 .

[0038] Not shown in the figures is the case where the aforementioned fixing of the switching signals is related to the falling edges of the signals, so that in this case too, no significant, noise-causing jumps occur within the individual PWM switching signals.

[0039] Fig. 11 and Fig. 12 shows a further embodiment of the proposed method, in which case there is a large difference between the duty cycles of at least two PWM switching signals, so that the method of Fig. 9 and Fig. 10 would not be applicable. In this case, when changing sectors, ie when moving from Fig. 11 on Fig. 12 The PWM switching signals are designed or arranged in such a way that the measurement is carried out alternately on the rising edges (right illustration of Fig. 11) or after the sector change at the falling edges (right representation of Fig. 12 ). In this case, too, it can be seen that the switching signals, as shown in the right-hand diagram, do not exhibit any significant jumps, thus generating a smooth phase current curve.

[0040] As a result, in this variant, the three switching signals in the right-hand representations of the Figures 11 and 12 defined as deviating from center-centeredness.

[0041] As a result, this corresponds to a design that is particularly used for medium and high electrical motor voltage amplitudes, whereby the position of the switching edges is shifted according to the size ratio of the duty cycles on the three half-bridges, if a 1-shunt current measurement would not be possible with the original (unchanged) switching patterns.

[0042] During each sector change, a measurement of the shunt current IR is performed on the positive switching edges and the negative switching edges, respectively. This procedure ensures that the position of the switching edges remains unchanged during the sector change, which advantageously prevents jumps in the switching edges and thus in the phase current waveforms.

[0043] If, when measuring the electrical shunt current IR on the positive switching edges, two switching signals from different phases exhibit a similar duty cycle, the switching signals are shifted to the left on the phase with the larger duty cycle and to the right on the phase with the smaller duty cycle. If, when measuring the electrical shunt current IR on the negative switching edges, two phases exhibit a similar duty cycle, the switching signals are shifted to the right on the phase with the larger duty cycle and to the left on the phase with the smaller duty cycle.

[0044] In the following example according to Fig. 12 becomes when changing sectors: TV W > TV V > TV U The system switches from measuring the phase current on the positive switching edges to measuring the phase current on the negative switching edges. The position of the switching edges remains unchanged.

[0045] Advantageously, the proposed method requires no additional hardware but can be implemented entirely in software, with suitable algorithms being programmed into a microcontroller. This supports easy adaptation and modification of the method.

[0046] The proposed method can be advantageously implemented for both permanent magnet and separately excited synchronous machines.

[0047] The proposed method was described using a three-phase synchronous machine as an example, but it should be noted that the proposed method can also be used for single-, two-, four-, five- and multi-phase synchronous machines.

[0048] The proposed method was described using high-side switches T1, T3, and T5 as an example. However, it goes without saying that the method can also be implemented using low-side switches T2, T4, and T6.

[0049] Fig. 13 shows a basic sequence of a proposed method for operating an electrical synchronous machine.

[0050] In a step 100, center-centered pulse-width modulated switching signals for switching elements T1...T6 of half-bridges are generated, wherein two of the switching elements T1...T6 are each connected to form a half-bridge, wherein second switching elements T4...T6 of each half-bridge are controlled complementarily to first switching elements T1...T3 of each half-bridge, provided that this provides a sufficient minimum measuring duration TM during which the switching signals of switching elements T1...T6 of two half-bridges are at different potentials.

[0051] Otherwise, in a step 110, pulse-width-modulated switching signals are generated for the switching elements T1...T6 of the half-bridges, which deviate from the centering at least to such an extent that a sufficient minimum measurement duration TM is provided, wherein the switching signals of the switching elements T1...T6 are formed in such a way that time jumps corresponding to the minimum measurement duration TM in the switching signals of the switching elements T1...T6 are avoided, and wherein a 1-shunt current measurement is carried out within the provided minimum measurement duration TM.

[0052] Fig. 14shows a basic block diagram of a device 200 for operating an electrical synchronous machine. A generating device 210 is visible for generating center-centered, pulse-width-modulated switching signals for the switching elements T1 ... T6 (not shown) of half-bridges (not shown). Two of the switching elements T1 ... T6 are each connected to form a half-bridge, with second switching elements T4 ... T6 of each half-bridge being controlled complementarily to first switching elements T1 ... T3 of each half-bridge. The generating device is functionally connected to a measuring device 220 for performing a 1-shunt current measurement. The switching signals of the switching elements T1 ... T6 are used to provide a defined minimum measurement duration TM, during which two switching signals of a half-bridge are at different potentials. The switching signals of the switching elements T1 ... T6 are used to measure the switching signals of the switching elements T1 ...T6 can be designed in such a way that temporal jumps in the switching signals of the switching elements T1 ... T6 are avoided in accordance with the minimum measuring duration TM.

[0053] The person skilled in the art can also implement embodiments of the invention that have not been disclosed or have only been partially disclosed without deviating from the essence of the invention.

[0054] A temporal jump occurs when there is a change from one PWM clock cycle to the next from a left shift to a right shift, or vice versa. Preferably, the switching signals should change only slightly from one PWM clock cycle to the next and should not exhibit large, i.e., temporal jumps. The shifting of the switching signals should preferably be deviated from the center to the right or left to obtain sufficient measurement time. In particular, switching from one PWM clock cycle to the next from a left shift to a right shift, or vice versa, should be avoided.

[0055] The voltage vector generated by the three half bridges lies within a hexagon according to Figure 6 During operation of a synchronous electric machine, the voltage vector typically rotates. A sector change means that the voltage vector moves from one sector of the hexagon to another.

[0056] In known methods, the PWM shift is changed in two half-bridges with each sector change: one half-bridge shifts from left to right, the other half-bridge shifts in the opposite direction. This causes noise, particularly due to time jumps, and is remedied by the invention.

Claims

1. Method for operating an electric synchronous machine, comprising the steps of: - generating centred pulse-width-modulated switching signals for switching elements (T1 ...T6) of half-bridges, wherein in each case two of the switching elements (T1 ...T6) are connected to one half-bridge, wherein second switching elements (T4...T6) of each half-bridge are controlled in a complementary manner to first switching elements (T1 ...T3) of each half-bridge if a sufficient minimum measurement duration (TM) is therefore provided, during which the switching signals of switching elements (T1 ...T6) of two half-bridges are at different potentials; - otherwise: - generating pulse-width-modulated switching signals for the switching elements (T1...T6) of the half-bridges which deviate at least so far from the centring that a sufficient minimum measurement duration (TM) is provided, wherein the switching signals of the switching elements (T1 ...T6) are formed in such a way as to avoid time jumps corresponding to the minimum measurement duration (TM) in the switching signals of the switching elements (T1 ...T6), - carrying out a 1 -shunt current measurement within the minimum measurement duration (TM) provided, characterized in that, in the event that at least two switching signals of the first switching elements (T1, T3, T5) have a defined largely different duty cycle, in the event that the proportions of the switching signals change during a transition from one switching cycle to the next, the switching signals are formed in such a way that the 1-shunt current measurements are in each case carried out at alternating edges of the switching signals.

2. Method according to Claim 1, wherein, in the event that two switching signals of different switching elements (T1, T2, T3) have a similar duty cycle in the 1-shunt current measurement at the positive switching edges, the switching signals of the switching elements (T1, T2, T3) with the larger duty cycle are shifted to the left and the switching signal of the switching element (T1, T2, T3) with the smaller duty cycle is shifted to the right.

3. Method according to either of the preceding claims, wherein, in the event that two switching signals of different switching elements (T1, T2, T3) have a similar duty cycle in the 1-shunt current measurement at the negative switching edges, the switching signals of the switching elements (T1, T2, T3) with the larger duty cycle are shifted to the right and the switching signal of the switching element (T1, T2, T3) with the smaller duty cycle is shifted to the left.

4. Method according to one of the preceding claims, wherein, in the event that the switching signals of the first switching elements (T1, T3, T5) have a defined similar duty cycle, rising edges of the three switching signals of the first switching elements (T1, T3, T5), at which the 1-shunt current measurement is carried out, are fixed in their chronological sequence relative to one another and are formed in such a way that the minimum measurement duration (TM) is provided between the switching signals of the first switching elements (T1, T3, T5), wherein the 1-shunt current measurement is carried out at rising edges of the switching signals of the first switching elements (T1, T3, T5) in the first half of the PWM period.

5. Method according to one of the Claims 1 to 3, wherein, in the event that the switching signals of the first switching elements (T1, T3, T5) have a defined similar duty cycle, falling edges of the three switching signals of the first switching elements (T1, T3, T5), at which the 1-shunt current measurement is carried out, are fixed in their chronological sequence relative to one another and are formed in such a way that the minimum measurement duration (TM) is provided between the switching signals of the first switching elements (T1, T3, T5), wherein the 1-shunt current measurement is carried out at falling edges of the switching signals of the first switching elements (T1, T3, T5) in the second half of the PWM period.

6. Method according to Claim 4 or 5, wherein the duty cycles of the three switching signals of the switching elements (T1, T3, T5) are similar and the difference in the duty cycles of the three switching signals is preferably smaller than approximately 20% up to approximately 30%.

7. Method according to one of the preceding claims, wherein, in the event that at least two switching signals of the first switching elements (T1, T3, T5) have a defined largely different duty cycle, the difference in the duty cycle is greater than approximately 25% up to approximately 100%.

8. Method according to one of the preceding claims, wherein the method is carried out for a permanently excited or for a separately excited synchronous machine.

9. Device (200) for operating an electric synchronous machine, comprising: - a generating unit (210) for generating centred pulse-width-modulated switching signals for switching elements (T1 ...T6) of half-bridges, wherein in each case two of the switching elements (T1 ...T6) are connected to one half-bridge, wherein second switching elements (T4...T6) of each half-bridge are controlled in a complementary manner to first switching elements (T1 ...T3) of each half-bridge if a sufficient minimum measurement duration (TM) is therefore provided, during which the switching signals of switching elements (T1 ...T6) of two half-bridges are at different potentials, - otherwise: for generating pulse-width-modulated switching signals for the switching elements (T1... T6) of the half-bridges which deviate at least so far from the centring that a sufficient minimum measurement duration (TM) is provided; wherein, by means of the generating unit (210), the switching signals of the switching elements (T1... T6) can be formed in such a way as to avoid time jumps in the switching signals of the switching elements (T1... T6) corresponding to the minimum measurement duration, - a measuring unit (220) for carrying out a 1-shunt current measurement, wherein, by means of the switching signals of the switching elements (T1 ...T6), a defined minimum measurement duration (TM) is provided during which two switching signals of a half-bridge are at different potentials, characterized in that, in the event that at least two switching signals of the first switching elements (T1, T3, T5) have a defined largely different duty cycle, in the event that the proportions of the switching signals change during a transition from one switching cycle to the next, the switching signals are formed in such a way that the 1-shunt current measurements are in each case carried out at alternating edges of the switching signals.

10. Computer program product comprising commands which cause the device (100) for operating an electric synchronous machine (200) according to Claim 9 to carry out the method according to one of Claims 1-8.

11. Computer-readable storage medium on which the computer program product according to Claim 10 is stored.