SYSTEM AND METHOD FOR PERFORMING AN ENTRY CONTROL FOR A RAIL VEHICLE
Patent Information
- Application Number
- DE502020009247
- Authority / Receiving Office
- DE · DE
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-06-19
- Publication Date
- 2024-10-02
- Estimated Expiration
- 2040-06-19
AI Technical Summary
Rail vehicles cannot efficiently transition through ETCS Level 2 gaps without registration at either RBC, leading to operational delays, increased energy consumption, and wear due to unsuitable vehicle classification, which is costly to resolve with new signal boxes.
Implement a system where a rail vehicle's suitability for ETCS Level 2 is checked in one area and 'frozen' for use in another, allowing timely route adjustments and preventing unsuitable vehicles from entering, using a higher-level control system to manage route settings across gaps.
This approach minimizes travel delays and infrastructure costs by ensuring timely route adjustments and maintaining high route capacity, even in gap areas, without requiring new signal boxes.
Description
[0001] The present invention relates to a system and method for carrying out an entry check for a rail vehicle.
[0002] High-traffic railway lines in Europe are increasingly being equipped with standardized cab signaling according to ETCS Level 2. Level 2 is one of three possible main configurations of the new European Train Control System (ETCS). With ETCS Level 1, the light signals positioned along the track still determine the driver's authorization to drive. The permitted speeds, braking curves, and any location information are transmitted as so-called standardized ETCS telegrams by transponders (balises, line conductors) located in the track. These are received by a vehicle antenna as the transponder passes over the track, evaluated by the on-board unit (OBU), and displayed on the ETCS display in the driver's cab.The electrical energy required to transmit ETCS telegrams is provided inductively to the transponder by a telepowering signal (the so-called 27 MHz lobe) emitted by the front of the train. A distinction is made between fixed data balises and transparent data balises. While fixed data balises provide only precise location information, for example, for the odometry of the rail vehicle, transparent data balises transmit data on train authorization, braking curves, speed profiles, etc., and can also receive status data emitted by the vehicle antenna and transmit it to train dispatch.
[0003] On a train line equipped with ETCS Level 2, any light signals still present on the track are no longer required for train operation. All data required for the journey is transmitted to the on-board unit via the transponders and / or a track control center (so-called Radio Block Center RBC). Data relevant for operation is also sent in the reverse direction to the RBC. A proprietary mobile radio network operated by the infrastructure manager, such as GSM-R, is used for communication between the on-board unit and the RBC. However, with ETCS Level 2, the requested route is still set in fixed blocks, which the vehicle requests from the RBC. Train integrity is also still ensured by block-by-block train protection devices, for example axle counting systems and / or track circuits.
[0004] With ETCS Level 3, the block-by-block route setting is eliminated, and self-locating the vehicle, for example, via GPS, is provided. Permission to proceed is granted via the so-called moving block, in which the distance to the train ahead is dynamically determined depending on the permitted speed, the braking distance, and a predefined safety margin.
[0005] However, in order to operate on a section equipped with ETCS Level 2, for example, the rail vehicle must be approved for standardized cab signaling and have on-board equipment compatible with the trackside equipment. In other words, this means that a vehicle must be suitable for an ETCS Level 2 section to be able to operate on it. An unsuitable vehicle could block the ETCS Level 2 section, with corresponding operational consequences.
[0006] To prevent an unsuitable vehicle from entering an ETCS L2 section, the ETCS L2 section can be executed with an entry check. The entry check checks at a suitable distance before the ETCS L2 section whether the vehicle is suitable for the ETCS L2 section and prevents the automatic setting of further routes for unsuitable vehicles. To perform the entry check, the vehicle must be registered with the RBC. For economic and / or technical reasons, railway lines are not equipped with ETCS L2 throughout, which creates ETCS L2 gaps. During the ETCS L2 gap, the vehicle is not registered with any RBC for a certain period of time (neither the RBC of the section being left nor the RBC of the future section), meaning that no entry check can be performed during this time. Furthermore, the two RBCs do not communicate with each other due to the ETCS L2 gap.Thus, the vehicle is categorized as unsuitable per se, especially for the RBC of the future section. This usually results in routes being set late, depending on the extent of the ETCS L2 gap, the topology, and the condition of the vehicle, resulting in delays as well as increased energy consumption and wear.
[0007] To solve this problem, longer travel times could be accepted and / or the ETCS L2 gap could be closed by deploying a new interlocking system. However, both solutions have obvious disadvantages in terms of line capacity and costs.
[0008] The document DRAEGER U: "ETCS AND THE TRANSITION TO THE NATIONAL TRAIN PROTECTION SYSTEMS OF DB AG," SIGNAL UND DRAHT: SIGNALLING & DATACOMMUNICATION, EURAILPRESS, DE, Vol. 96, No. 11, November 1, 2004 (2004-11-01), pages 6-15, analyzes several transitions between ETCS and the national system. On a line with ETCS-LZB-ETCS-LZB, each transition is analyzed separately using beacons to switch from one train protection system to the other.
[0009] The present invention is therefore based on the object of specifying a system and a method for carrying out an entry check for a rail vehicle, in which it is possible, on the one hand, to keep the travel times as short as possible and, on the other hand, to avoid increased investment costs in new signal boxes in gap sections.
[0010] This object is achieved according to the invention by a system according to claim 4 and a method according to claim 1 for carrying out an entry check for a rail vehicle which travels from a first area equipped with a first train protection regime, such as ETCS L2, via an intermediate area equipped with a second train protection regime, into a second area which is also equipped with the first train protection regime (ETCS L2), in which: a) an on-board unit located on the rail vehicle exchanges data with a first train protection instance for the first area regarding the suitability of this on-board unit for the first train protection regime, before and / or while the rail vehicle is in the first area; b) a control system higher than this train protection instance checks whether the on-board unit is suitable for this first train protection regime; c) in the event of a positive check, the suitability of the on-board unit for the first train protection regime is frozen in the higher-level control system for the second area until the on-board unit starts exchanging data with the second train protection instance when approaching the second area during and / or after passing through the intermediate area.
[0011] In this way, it is possible to continue the suitability of the rail vehicle for the first train protection regime after its check in the first area, even beyond the gap area, for entry into the second area. This means that the suitability of the rail vehicle for the first train protection regime can be frozen until the rail vehicle has been registered again with a corresponding train protection authority at the second train protection authority in the second area. Therefore, the suitability for the second area is already checked in the first area. The result of the check for the second area is frozen and can thus be used as a criterion for the automatic setting of further routes. This means that routes can also be set in a timely manner while the rail vehicle is in a gap area.This means that trains do not have to decelerate unnecessarily before entering the second zone from the gap, which would otherwise result in operational delays and increased energy consumption and wear. Because trains no longer have to decelerate, train headway and line capacity can be kept as high in the gap as if the gap did not exist at all. Furthermore, this solution is significantly cheaper for the infrastructure manager than replacing an existing interlocking to close the gap equipped with the second train protection system.
[0012] The entry control, which controls the setting of routes, takes place in the higher-level control system and not at the level of the train protection authorities. The train protection authorities simply forward the information from the vehicles for entry control to the control system. The train protection authorities only check whether a vehicle is suitable for their own area. If the vehicle is not suitable for the ETCS L2 area, for example, the vehicle will not be authorized to continue driving and will not be able to continue, possibly blocking other trains. The entry control in the higher-level control system is designed to prevent precisely this problem in advance, so that the vehicle can be stopped at a suitable location.
[0013] The two train protection instances do not communicate across the gap. The higher-level control system, which performs the higher-level entry control, assesses suitability for the second train protection instance based on communication with the first assurance instance. At the discretion of the entry control, a vehicle may be suitable for the first train protection instance. Suitability for the first train protection regime (ETCS L2) therefore does not automatically mean that the vehicle is suitable for a specific train protection instance.Although the suitability test is therefore performed specifically for each area, suitability in the first area at least allows for the setting of routes, even while the vehicle is in the gap area, and suitability for the security instance of the second area, at least with regard to the possibility of setting routes, could actually only be determined in the second area. The present invention therefore postulates – until proven otherwise – suitability for the second area after the determination of the vehicle's suitability for the first area.
[0014] A particularly advantageous embodiment of the present invention results in view of the ETCS migration projects currently being implemented and still to be implemented throughout Europe, if the first train protection regime is implemented with a driver's cab signaling without track-side driving aspect signaling, such as ETCS L2, and the first and second train protection instances are implemented as Radio Block Centers (RBC).
[0015] Effectively, the first train control regime can be implemented in accordance with European Train Control System Level 2, whereby the second train control regime does not have to be compatible with this first train control regime, as is generally the case with the old train control systems currently still in widespread use.
[0016] Preferred embodiments of the present invention are explained in more detail below with reference to the drawings. Figure 1 shows a schematic representation of a rail vehicle traveling in a first area, which is registered with a first radio block center and has a first set route; Figure 2 shows a schematic representation of the rail vehicle traveling in a gap area adjoining the first area, which is no longer registered with the first radio block center and has a second set route; and Figure 3 shows a schematic representation of the rail vehicle entering the second area adjoining the gap area, which is registered with a second radio block center and has a third route already set upon entry into the second area.
[0017] The present invention will now be explained using the example of a train protection system based on the European Train Control System Level 2 (ETCS L2) in accordance with the European standards EN 50128 and EN 50129, and the rules derived therefrom that define the interfaces and behavior of a Radio Block Center (RBC). In principle, the invention is suitable for all train protection systems in which a gap leads to a temporary interruption of the continuity of a modern train protection system with driver's cab signaling.
[0018] As in Figure 1As shown, a rail vehicle LOK is located in a first track section 2 - hereinafter referred to as ETCS L2-1 - on a route 4 set for its journey with a travel authorization that currently extends to the end of the set route 4 with a Movement Authority MA. During its journey through the first track section 2, the rail vehicle LOK, and in particular the on-board unit (OBU) of the rail vehicle, is in constant contact with a first ETCS route control center (Radio Block Center RBC1) via a railway-specific mobile radio connection (GSM-R) and exchanges data relevant to the journey of the rail vehicle LOK. In addition, the on-board computer logs in to the first ETCS route control center RBC1 upon its first contact with the first ETCS route control center RBC1.The control system higher up the RBC1 then immediately checks whether the rail vehicle, and in particular the on-board computer in this case, is ETCS L2-compatible. Only once this compatibility has been determined can route 4 be set and the MA issued. The determination of suitability by the first ETCS route control center RBC1 primarily affects the communication between the ETCS route control center RBC and the vehicle. If the vehicle is not suitable, it will not be granted a driving permit. However, the interlocking system can set routes at any time, even for unsuitable vehicles. The first ETCS route control center RBC1 cannot, however, issue an MA to unsuitable vehicles, even though the route for the vehicle has been set by the interlocking system.It is the task of the higher-level entry control to prevent routes from being automatically set for unsuitable vehicles.
[0019] The first ETCS track control center RBC1 is an essential component of the European Train Control System (ETCS) in Levels 2 and 3. Its task is to control and monitor the rail vehicle LOK in the first track section 2; accordingly, the second ETCS track control center RBC2 is responsible for a second track section 6, also called ETCS L2-2 here. The ETCS track control centers RBC1 and RBC2 receive the necessary information from one or more associated interlocking systems, a higher-level control system 8 with integrated entry control, and from the rail vehicle LOK via position reports. They use this information to generate ETCS movement authorizations (Movement Authority MA), which they send to the rail vehicle LOK via radio (usually GSM-R).
[0020] Like the first and second ETCS track control centres RBClm RBC2, most RBCs generally have the following functions (non-exhaustive list): i) Generation of travel permissions ii) Receiving a train within an RBC area iii) Receiving a train when entering an RBC area iv) Handing over a train to a neighbouring RBC area v) Exit of a train from the RBC area vi) Running in different ETCS modes, for example Full Supervision (FS), On Sight (OS), Staff Responsible (SR), Shunting (SH) or Reversing (RV) vii) Providing chaining information viii) Switching between different ETCS modes ix) Announcing a radio hole x) Evaluating potentially dangerous situations and commanding emergency stops xi) Initial allocation of a route to a train xii) Tracking the train xiii) Acquisition of diagnostic information (e.g.Indications of missing beacons from the trains) xiv) Setting up temporary speed restrictions xv) Joining and splitting trains xvi) Sending the national values to the train xvii) Monitoring the radio connection xviii) Determining the safety reactions in the event of certain fault situations on the train xix) Stopping case assessment .
[0021] In the present case, the rail vehicle LOK leaves the first track section 2 as its journey progresses and enters an ETCS gap area 10, which in Figure 2shown schematically. This ETCS gap area 10 has not been upgraded to be ETCS L2-compatible and may, for example, still be equipped with an old proprietary national train protection system, such as ZUB121 in Switzerland or INDUSI in Germany. When traveling through this ETCS gap area 10, a second route 12 has been set for the rail vehicle by the signal box, while the first route 4 (shown here only as a dashed line) has already been canceled. The train driver drives the rail vehicle LOK here according to the information signaled along the line. While traveling in this ETCS gap area 10, there is no connection between the first ETCS track control center RBC1 and the rail vehicle LOK. In principle, each of the areas 2, 10, 6 can have one signal box each.These interlockings are connected to the higher-level control system 8; in addition, the interlockings for the first area 2 and the second area 6 are connected to the RBC assigned to them.
[0022] This situation now leads to the fact that the rail vehicle LOK, upon leaving the ETCS gap area 10 before entering a subsequent second track section 6 with ETCS L2 track equipment, must register with the second ETCS track control center RBC2 responsible for this second track section 6. The higher-level control system assigned to this RBC2 must then determine whether the rail vehicle LOK or its on-board computer is ETCS L2-compatible. This situation is in Figure 3shown schematically. In the current state of the art, this very situation disadvantageously results in the rail vehicle LOK having to slow down, which leads to increased energy consumption and delays as well as unnecessary wear and tear. Route 14 can therefore only be set once the suitability of the vehicle has been assessed as positive by the entry control. With the current state of the art, this check can only be carried out once the vehicle has been registered with the RBC2, which leads to a delayed setting of route 14. Consequently, the train headway is also extended, which leads to a reduction in line capacity. Suitability must be determined by the higher-level entry control of the higher-level control system, since the entry control is responsible for preventing routes for unsuitable vehicles.The second ETCS track control center, RBC2, also checks suitability and denies an unsuitable vehicle a MA. However, this is operationally disadvantageous, as the vehicle would stop at an undesirable location and block the track.
[0023] The present invention solves this problem by "freezing" the suitability of the rail vehicle LOK for the area of the second ETCS route control center RBC2 beyond the ETCS gap area 10, as determined in the area of the first ETCS route control center RBC1, and reusing it for setting the additional routes in the higher-level control system. Routes that the rail vehicle LOK already requests when traveling through the ETCS gap area 10 for the second ETCS L2 track section 6 can be set immediately, even if the rail vehicle LOK has not yet registered with the second ETCS route control center RBC2 and is then administered there. This is Figure 2 schematically shown by transmitting a symbolic data block "ETCS L2 - LOK" with a check mark from the first ETCS track control center RBC1 via the interlocking / control system 8 to the second ETCS track control center RBC2.
[0024] As in Figure 3 As shown, with the arrival of the communication from the rail vehicle LOK at the second ETCS track control center RBC2, the Figure 2 Beyond the third route 14 shown, additional routes 14' are set within the second area. The rail vehicle LOK can thus enter the second ETCS L2 track section 6 without delay, keeping operating costs low, headway short, and thus line capacity correspondingly high.
[0025] Thus, the entry check carried out in the first ETCS L2 track section 2 for the second ETCS track control center RBC2 for the rail vehicle LOK is also sufficient when the rail vehicle LOK enters the second ETCS track section 6, even though the rail vehicle LOK must temporarily pass through an ETCS gap area 10 in which there is no connection to one of the first or second ETCS track control centers RBC1 or RBC2 responsible for the first and second track sections 2 or 6 for the duration of this passage.
Claims
1. Method for performing entry control for a rail vehicle (LOK), which runs from a first region (2), which is equipped with a first train protection system (ETCS L2), via an intermediate region (10), which is equipped with a second train protection system, into a second region (6), which is also equipped with the first train protection system (ETCS L2), in which: a) a vehicle device located on the rail vehicle carries out a data exchange with a first train protection instance for the first region (2) with regard to a suitability of said vehicle device for the first train protection system, before and / or while the rail vehicle is located in the first region; b) a control system (8) at a higher level than the first train protection instance (RBC1) checks whether the vehicle device is suitable for said first train protection system (ETCS L2); characterised in that c) in the event of a positive check, the suitability of the vehicle device for the first train protection system (ETCS L2) is frozen until the vehicle device, during and / or after travel through the intermediate region (10), establishes a data exchange with a second train protection instance (RBC2) on approach to and / or when arriving at the second region (6).
2. Method according to claim 1, characterised in that the first train protection system (ETCS L2) is designed with a driver's cab signalling without trackside aspect signalling and the first and second train protection instance are designed as radio block centres (RBC).
3. Method according to claim 1 or 2, characterised in that the first train protection system is designed according to European Train Control System Level 2, wherein the second train protection system is not compatible with the first train protection system.
4. System for performing entry control for a rail vehicle (LOK), which runs from a first region (2), which is equipped with a first train protection system (ETCS L2), via an intermediate region (10), which is equipped with a second train protection system, into a second region (6), which is also equipped with the first train protection system (ETCS L2), comprising: a) a vehicle device, which is suitable for being located on the rail vehicle, and is configured to carry out a data exchange with a first train protection instance for the first region with regard to a suitability of said vehicle device for the first train protection system, before and / or while the rail vehicle is located in the first region; b) a control system, which is at a higher level than said train protection instance and is configured: b1) to check whether the vehicle device is suitable for said first train protection system; and characterised in that the control system is configured: b2) in the event of a positive check, to freeze the suitability of the vehicle device for the first train protection system in the higher-level control system for the second region, until the vehicle device, during and / or after travel through the intermediate region, establishes a data exchange with a second train protection instance on approach to the second region.
5. System according to claim 4, characterised in that the first train protection system (ETCS L2) is designed with a driver's cab signalling without trackside aspect signalling and the first and second train protection instance are designed as radio block centres (RBC).
6. System according to claim 4 or 5, characterised in that the first train protection system is designed according to European Train Control System Level 2, wherein the second train protection system is not compatible with the first train protection system.