Method for installing a temporary shoring tower

The method of installing collective protection on shoring towers using tubular barrels and telescopic rails addresses the lack of top-level safety in shoring towers, enhancing worker safety and construction efficiency by providing comprehensive protection without individual harnesses.

EP3901394B1Active Publication Date: 2024-09-25FORMA SRL
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
EP2021165199
Authority / Receiving Office
EP · EP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2020-04-26
Filing Date
2021-03-26
Publication Date
2024-09-25
Estimated Expiration
2041-03-26

AI Technical Summary

Technical Problem

Shoring towers in construction lack collective protection at the top, which has deterred workers from using them similarly to scaffolding, as existing methods rely on individual protection measures like harnesses, posing a risk of falls during assembly.

Method used

A method for mounting collective protection on a temporary shoring tower involves assembling guardrails with tubular barrels and telescopic rails at the top, allowing a single operator to install the protection by sliding and locking the rails into place, providing comprehensive safety without the need for individual harnesses.

Benefits of technology

This method enables safe assembly of shoring towers with collective protection, enhancing worker safety by eliminating the reliance on individual harnesses and allowing operators to work confidently on the platform, thereby improving safety and efficiency in construction processes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure IMGF0001
    Figure IMGF0001
  • Figure IMGF0002
    Figure IMGF0002
  • Figure IMGF0003
    Figure IMGF0003
Patent Text Reader

Abstract

The shoring tower has several levels, with a top level (53) intended to temporarily support a work and circulation platform (14) serving as formwork. A collective fall protection system is installed on each lower level below the top level (53). From the lowest level, which is directly below the top level (53), the formwork (14) for the top level (53) and a temporary collective fall protection system (15) for this top level (53) are erected for the installation of the formwork (14). The collective fall protection system for the top level can be installed by a single operator.
Need to check novelty before this filing date? Find Prior Art

Description

DOMAINE TECHNIQUE

[0001] In the field of construction and public works, known as BTP, we are used to erecting temporary structures, i.e. either scaffolding or shoring towers.

[0002] Scaffolding, i.e., temporary structures for working at height, is primarily designed so that operators, mounted and positioned on it, can easily work on an existing structure, whether it be modified or restored. Operators work from the scaffolding. Scaffolding is equipped with collective protection elements that serve both the assemblers and the users.

[0003] A shoring tower is a temporary structure for absorbing stress. It differs from scaffolding in that it is designed so that, at its top, tower assembly operators create a platform for other operators to work on or walk on, serving as a concrete slab formwork. As a platform, one can therefore consider a formwork or deck, consisting of a series of beams on which plywood boards are placed, onto which a concrete slab is then poured. One may also wish to dispense with the beams and pour the concrete onto a formwork comprising only a prefabricated plate or panel.

[0004] As with the assembly of the shoring tower, it is essential that the operators responsible for creating the formwork are protected and do not risk falling from the top of the tower.

[0005] While during the assembly of the shoring tower, the operators are protected by collective protection elements, i.e. by guardrails, at the top of the tower, until today, the operators protected themselves individually.

[0006] Personal protection involves the use of a harness and / or harness that the operator attaches to a rope - called a "lifeline" in the construction industry - or to a ballast securely attached to the temporary structure.

[0007] The use of a harness is a constraint that the applicant wanted to eliminate. DE 10 2010 000472 A1 discloses a method having the characteristics of the preamble of claim 1. PRÉSENTATION DE L'INVENTION

[0008] To this end, the invention of the present application, according to claim 1, relates first of all to a method of assembling a temporary shoring tower of several floors, with a top floor, intended to temporarily support a working and circulation platform, serving as formwork, method according to which collective protection is installed on each lower floor below the top floor, method characterized by the fact that, from the last floor intended to be just below the top floor, the formwork of the top floor and temporary collective protection of this top floor are mounted for the installation of the formwork.

[0009] The inventive step involved in the method of the present application lies in the audacity of having dared to propose installing collective protection at the top of a shoring tower for users of the platform, directly from the shoring tower to benefit from the protection provided by the elements of the tower.

[0010] While this could be done on scaffolding, there was always a reluctance to do so on a shoring tower, which has the particularity of not being connected to any existing structure. A shoring tower is an isolated structure, and this is what has always dissuaded construction workers from wanting to work on shoring towers as well as on scaffolding.

[0011] In the preferred implementation of the method of the invention, to mount the collective protection of the top floor, comprising tubular shafts, with a slide in each shaft, and telescopic rails, the shafts are hooked at the top of the tower, at least one rail is hooked to the two slides in the low position, of the two shafts of each pair of adjacent shafts, said two slides are raised, one after the other, in their shafts and they are locked there in the guardrail position.

[0012] It should be noted that a single operator is sufficient to install collective protection.

[0013] It should also be noted that the rails must be telescopic since the slides are lifted one after the other. After lifting the first slide, the two ends of the rails are therefore at different heights, before being horizontal after lifting the second slide.

[0014] Advantageously, two rails are attached to the two slides of each pair of adjacent barrels.

[0015] The shoring tower has a polygonal horizontal section, and a shaft is attached to each corner post of the top floor.

[0016] It may be interesting to assemble several elementary shoring towers side by side and then assemble them into the said temporary shoring tower supporting the said platform formwork, precisely to constitute a larger formwork surface.

[0017] The method of the invention has been presented but the invention obviously also concerns a temporary shoring tower with collective protection of the top floor mounted according to the method of the invention. PRESENTATION DES FIGURES

[0018] The invention will be better understood with the aid of the following description of the preferred implementation of the method of the invention for erecting a temporary shoring tower, on which [ Fig. 1 ] There figure 1 is a perspective view of the tower, after a first phase of the assembly of the collective protection on one side of the tower, the two slides in the low position; [ Fig. 2 ] There figure 2 is a perspective view of the tower of the figure 1 , one of the two slides in the high position; [ Fig. 3 ] There figure 3 is a perspective view of the tower of the figure 1 , the two slides in the high position and the top floor in place; [ Fig. 4 ] There figure 4 is a perspective view of the shaft of one of the wings of the tower of the figure 1 And [ Fig. 5 ] There figure 5 is a front view of the guardrail mounted on the collective protection part of the tower of the figure 3 .

[0019] It should be noted that the figures set out the invention in detail for implementing the invention, said figures can of course be used to better define the invention where appropriate. DESCRIPTION DETAILLEE DE L'INVENTION

[0020] The temporary shoring tower shown in the drawing, here with a square horizontal section, comprises, in this case again, four floors 1-4 all provided with collective protection, consisting of guardrails 5, on the four sides.

[0021] It goes without saying that the invention applies equally well to towers having only one floor below the top floor which will be discussed below and to towers of another polygonal horizontal section.

[0022] The construction of the tower at the level of these four lower floors and its railings will not be developed, being conventional and therefore perfectly known to those skilled in the art. It should only be specified that it comprises peripheral corner posts 6-9 in one or more elements, rails 10, integral parts of the railings, fixed to the posts by means of rosettes and clamps referenced together 11 in the figures. Other means of assembly can obviously be envisaged by those skilled in the art.

[0023] It will be noted that floors 1 and 3 of the tower of figures 1-3 have a light platform capable of supporting an erector 12, as is the case with platform 13 of the third floor 3.

[0024] The lower floors 1-4 of the shoring tower having been erected, the erector 12 will erect the top floor 53, with its platform 14 and the temporary collective protection 15 of this top floor ( figures 2 , 3), in this case peripheral protection.

[0025] A guardrail 16 is thus mounted at the top of the tower at the periphery of the summit floor on each side of the tower, between two adjacent posts of the tower between posts 7 and 8 on the figures 2 And 3 .

[0026] More particularly, and in the example illustrated, each guardrail comprises two identical tubular shafts 17, 18 and two identical rails 19, 20.

[0027] A shaft 17, 18 is attached to a post of the tower, in a standard manner, by two clamps 21, 22, at the end of two fingers 23, 24 fixed to the shaft and attached to rosettes of the posts 7, 8 by means of keys 25, 26, respectively.

[0028] In each barrel 17, 18 is slidably mounted a slide 27 whose position in the barrel is determined here by a captive pin 28 of the prop type, one strand 29 of which is introduced into one of the holes 30 drilled in the slide. Members 31 for hooking the rails are fixed to the slide 27. These are rosettes shaped to receive clamps 32 fixed to the ends of the rails 19, 20 and secured to the rosettes 31 by keys 33 ( figure 5 ).

[0029] A support 34 is also fixed on the slides 17, 18 to hold a plinth 35 there. The rails 19, 20 are sliding since they must be able to be positioned at a determined height, on the one hand, and the slides of the two barrels of the same guardrail are mounted one after the other, the temporary collective protection being installed by a single fitter.

[0030] The sliding rails can be extended over a specific range of lengths, they are equipped with a system to prevent them from opening and the two tubes of the rails sliding inside each other can not turn inside each other thanks to perfectly conventional means.

[0031] The installation of a guardrail 16 for collective protection of the summit floor will now be discussed.

[0032] From the top floor 3, intended to be just below the summit floor 53, the fitter 12 assembles the collective protection 15, guardrail 16, by guardrail then the formwork of the platform 14.

[0033] To assemble each guardrail 16, the fitter 12 hooks the two peripheral tubular shafts 17, 18 with the clamps 21, 22 and the keys 25, 26. He then hooks, with the slides 27 in the low position, the rails 19, 20 to the rosettes 31 of the slides using the clamps 32 and the keys 33 ( figure 1 ). Then he lifts a first slide 27 of the barrel 18 to the desired height, the rails 19, 20 then deploying ( figure 2 ), before lifting the second slide 27 of the barrel 17 to the same height ( figure 3 ).

[0034] Then the fitter 12 locks the slides 27 of the two barrels 17, 18 in the guardrail position using the pins 28.

[0035] Fitter 12 therefore fitted guardrails 16 alone.

Claims

1. Method for installing a temporary multi-stage (1-4) shoring tower, with a top floor (53), intended to temporarily support a working and circulation platform (14), serving as formwork, method according to which a collective protection (5) is installed, on each lower floor (1-4) below the top floor (53), the method being characterised by the fact that, from the last floor (4) intended to be immediately below the top floor (53), the formwork (14) of the top floor (53) and a temporary collective protection (15) of this top floor (53) are installed for the installation of the formwork (14).

2. Method for installing according to claim 1, wherein to install the collective protection (15) of the top floor (53), comprising tubular shafts (17, 18), with a slide (27) in each shaft, and telescopic guardrails (19, 20), the shafts (17, 18) are attached at the tower head, at least one guardrail (19; 20) is attached to the two slides (27) in the low position, from the two shafts (17, 18) of each pair of adjacent shafts, said two slides (27) are lifted, one after the other, into their shafts (17, 18) and are locked therein in the guardrail position (16).

3. Method for installing according to claim 2, wherein the guardrails (19, 20) are telescopic.

4. Method for installing according to one of claims 2 and 3, wherein two guardrails (27) are attached to the two slides (27) of each pair of shafts (17, 18).

5. Method for installing according to one of claims 1 to 4, wherein, the shoring tower having a horizontal, polygonal cross-section, a shaft (17; 18) is attached to each peripheral corner post (6-9) of said last floor (4).

6. Method for installing according to one of claims 1 to 5, wherein several elementary shoring towers are installed side by side then assembled into said temporary shoring tower supporting said platform formwork (14).

7. Method for installing according to claim 2, wherein a toeboard (35) is attached to the slides (17, 18).

8. Method for installing according to claim 2, wherein the slides (27) of the shafts (17, 18) are locked in the guardrail position using pins (28).

Citation Information

Patent Citations

  • Scaffolding and methods for assembling or disassembling such scaffolding

    DE102010000472A1

  • Assembly procedure with safety of the tube towers for support of formwork or tables of formwork, adapter coupled at the end of the telescopic manipulator of loads of a tractor vehicle, and tower of tube resultant.

    ES2360550A1

  • Balustrade for scaffolding of building, has articulated fixation finger cooperating with bush of vertical frame to permit pivoting of balustrade around horizontal axis while placing balustrade

    FR2887574A1

  • Safety fork for use in top of post of safety shoring tower, has assembly space assembling column of barrier at support height to assure void front protection, where assembly space is laterally formed with respect to support surface

    FR2965286A1

  • Safety handrail for assembling and disassembling prefabricated scaffolding

    JP2002188282A