Screeding structure for a sidewalk, small and area paver

The dual screed system in the peel-off construction efficiently addresses the inefficiencies of single-screed systems by using a second screed to pre-compensate for uneven surfaces, resulting in faster and more precise subgrade preparation.

EP4438812A1Inactive Publication Date: 2024-10-02HEIDE FLAECHENFERTIGER GMBH
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
EP2023165086
Authority / Receiving Office
EP · EP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-29
Publication Date
2024-10-02
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Current peel-off constructions for pavements and surface pavers require multiple passes and extensive processing time to achieve the desired target height and quality of the subgrade due to the use of a single pull-off screed.

Method used

A dual screed system is introduced, comprising a first screed for pre-compacting, distributing, and leveling, and a second screed that compensates for uneven surfaces before the final removal, allowing for efficient pre-compaction and reduction of processing time.

Benefits of technology

This dual screed system significantly increases working speed, minimizes tolerances, and achieves time savings by allowing for a single operation to complete the necessary surface preparation, eliminating the need for multiple passes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure IMGAF001_ABST
    Figure IMGAF001_ABST
Patent Text Reader

Abstract

A screeding structure (1) for a sidewalk, small-scale and surface paver (2), comprising at least one first plank, shield, rod and / or flat screeding slab (10) designed to pre-compact, pre-distribute, screed and / or level material applied to a substrate, wherein the first screeding slab (10) comprises at least one screed blade (100) aligned in the working direction (AR) of the screeding structure (1), wherein the screed blade (100) forms a working plane (AE) of the first screeding slab (10), wherein the screeding structure comprises at least one second screeding slab (11) positioned in front of and spaced apart from the first screeding slab (10) in the working direction (AR) and aligned substantially parallel to the first screeding slab (10), the working plane (AZ) formed by the second screeding slab (11) being below the working plane (AE) of the first screed board (10) is arranged and / or can be arranged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical field

[0001] The present invention relates to a screeding device for a sidewalk, small and surface paver according to the preamble of claim 1. State of the art

[0002] Screed systems for sidewalk, small-scale, and surface pavers are known from the prior art. These screed systems typically comprise a plank, shield, rod, and / or flat screed board designed to pre-compact, pre-distribute, screed, and / or level material applied to a substrate. Such a screed board regularly features a screed blade aligned in the working direction of the screed system, which forms a working plane for the screed board.

[0003] A disadvantage of such screeding systems is that they are currently equipped with only a single screed board for removing bulk materials from surfaces. This necessitates multiple screeding passes (two or even more) to achieve the desired target height and sufficient quality of the finished surface. This results in long processing times and tolerances in the surface being prepared. Description of the invention

[0004] The present invention is based on the objective of eliminating the aforementioned disadvantages and creating a leveling device which allows the material applied to a substrate to be pre-compacted, pre-distributed, leveled and / or smoothed with the least possible effort and time required.

[0005] According to the invention, the aforementioned problem is solved in accordance with the preamble of claim 1 in conjunction with the characterizing features. Advantageous embodiments and further developments of the puller design according to the invention are specified in the dependent claims. Brief description of the drawings

[0006] Further objectives, features, advantages and application possibilities of the puller construction according to the invention will become apparent from the following description of an exemplary embodiment with reference to the drawings.

[0007] The drawings show Fig. 1 the pull-off construction according to the invention in an advantageous embodiment in a perspective view; Fig. 2 the inventive screeding mechanism on a sidewalk, small and surface paver as in Fig. 1 in side view; Fig. 3 the second screed board in a perspective view. Implementation of the invention

[0008] As from Fig. 1 As can be seen, the screeding device 1 according to the invention for a sidewalk, small and surface paver 2 comprises at least one first plank-, shield-, rod- and / or flat-shaped screeding slab 10, which is designed to pre-compact, pre-distribute, screed and / or level material applied to a substrate. The first screeding slab 10 (so-called main slab) comprises at least one screeding blade 100 aligned in the working direction AR of the screeding device 1, by which a working plane AE of the first screeding slab 10 is formed.

[0009] The screeding construction 1 is characterized according to the invention in that it comprises at least one second screeding plank 11 (e.g. a pre-screeding pipe plank) which is positioned in front of the first screeding plank 10 in the working direction AR and spaced apart from it and is oriented essentially parallel to the first screeding plank 10, the working plane AZ of which formed by the second screeding plank 11 is arranged and / or can be arranged below the (lower) working plane AE of the first screeding plank 10.

[0010] A second screed board 11 is understood to be essentially parallel, its longitudinal axis LZA being on average less than 15° deviates from the longitudinal axis LEA of the first screed board 10.

[0011] The addition of a second screed board 11, in conjunction with the first screed board 10, upgrades the screed construction 1 to an extremely efficient double or dual board system.

[0012] The second screed board 11 compensates for uneven surfaces and fluctuating substrates in advance by forcibly filling holes and depressions of the first screed board 10 before the actual final screeding with the screed knife 100, thus making a second pass over the surfaces unnecessary.

[0013] The advantages of the invention are a significant increase in working speed and a reduction of the mean value / tolerances to a minimum. By installing – practically two – installation layers in a single operation, enormous time savings can also be expected.

[0014] In a particularly advantageous embodiment of the invention, the second puller blade 11 is mounted on the puller assembly 1 in a height-adjustable manner. For this purpose, a height-adjustable element 110 or a guide can preferably be provided on the puller assembly 1, on which the second puller blade 11 and / or its retaining elements 111 are arranged or formed in a height-adjustable manner.

[0015] Another advantageous embodiment of the invention provides, according to the Fign. 1 and 2 Provided that the second screed board 11 is pivotably mounted on the screeding structure 1 in and against the working direction AR. For this purpose, the second screed board 11 can preferably be rotatably, pivotally, or tiltably attached to supports of the screeding structure 1 by means of its (upwardly projecting) retaining elements 111.

[0016] Another advantageous embodiment of the invention provides that the second pull-off plank 11 - which in this embodiment is pivotably mounted - is fixed in a defined position on the pull-off construction 1 by means of at least one rope-, chain- or band-like fastening means 12 spaced apart in the working direction AR from the second pull-off plank 11.

[0017] In a further particularly preferred embodiment of the invention, the puller construction 1 comprises at least one device 13 for generating a vibration or oscillation by means of which the second puller plank 11 on the puller construction 1 can be moved into at least one vibration or oscillation oriented transversely to the longitudinal axis LZA of the second puller plank 11.

[0018] Such a device 13 can be pneumatically or hydraulically configured and include means for generating a vibration or oscillation. However, it is also possible that the device 13 includes at least one electric drive for generating a vibration or oscillation.

[0019] In a further embodiment of the invention according to Fig. 3 A mounting container 130 for a - preferably hydraulic - device 13 is provided on the second screed 11.

[0020] Another aspect of the invention provides that holding blocks 112 are arranged on the holding elements 111 to reduce vibrations to the driver's seat as effectively as possible.

[0021] Furthermore, reversibly arranged extensions 113 can be provided on the second screed board 11 to widen the working surface. These can be, for example, attachable, screwable, or otherwise reversibly arranged on one or both sides of the second screed board 11. List of reference numbers

[0022] 1. Screed-off structure 2. Sidewalk, small-scale, and surface pavers 10. First screed (main screed) 11. Second screed (pre-screed pipe screed) 12. Cable, chain, or belt-like fastening device 13. Device for generating vibration or oscillation 100. Screed blade of the first screed 110. Height adjustment element of the second screed 111. Holding elements of the second screed 112. Holding blocks for reducing vibrations to the operator's platform 113. Reversibly arranged extensions of the second screed for widening the working area 130. Mounting container for a hydraulic device AE. Working plane of the first screed AR. Working direction AZ. Working plane of the second screed LEA. Longitudinal axis of the first screed LZA. Longitudinal axis of the second screed

Claims

1. A screed construction (1) for a pavement, small-scale, and surface finisher (2), comprising at least one first plank-, shield-, rod-, and / or sheet-shaped screed (10) designed to pre-compact, pre-distribute, screed, and / or level material applied to a subsurface, wherein the first screed (10) comprises at least one screed blade (100) aligned in the working direction (AR) of the screed construction (1), wherein a working plane (AE) of the first screed (10) is formed by the screed blade (100), characterized in that the screeding structure (1) comprises at least one second screeding screed (11) which is arranged upstream of the first screeding screed (10) in the working direction (AR) and at a distance from the latter (10) and is aligned substantially parallel to the first screeding screed (10), the working plane (AZ) of which, formed by the second screeding screed (11), is arranged and / or can be arranged below the working plane (AE) of the first screeding screed (10).

2. Pull-off construction (1) according to claim 1, characterized in that the second screed (11) is mounted on the screed structure (1) in a height-adjustable manner.

3. Pull-off construction (1) according to claim 2, characterized in that a height adjustment element (110) or a guide is provided on the screed construction (1), on which the second screed (11) and / or its holding members (111) are arranged or designed to be height adjustable.

4. A screed construction (1) according to any one of the preceding claims, wherein the second screed beam (11) is pivotably mounted on the screed construction (1) in and against the working direction (AR).

5. Pull-off construction (1) according to claim 4, characterized in that the second screed (11) is fixed in a defined position on the screed structure (1) by means of at least one rope-, chain- or band-like fastening means (12) fastened at a distance from the second screed (11) in the working direction (AR).

6. Pull-off construction (1) according to one of the preceding claims, characterized in that it comprises at least one device (13) for generating a vibration or oscillation, by means of which the second screed (11) on the screed structure (1) can be set into at least one vibration or oscillation oriented transversely to the longitudinal axis (LZA) of the second screed (11).

7. Pull-off construction (1) according to claim 6, characterized in that the device (13) is pneumatically or hydraulically designed and comprises means for generating a vibration or oscillation.

8. Pull-off construction (1) according to claim 6, characterized in that the device (13) comprises at least one electric drive for generating a vibration or an oscillation.

Citation Information

Patent Citations

  • Finisher and process for applying surface layers

    EP0750070A1

  • Road construction finisher for simultaneous double paving - comprises two hoppers conveyors tables spreaders blades vibrators compactor to lay two different surfacing mixes simultaneously

    FR2697036A1

  • Screed arrangement for a road paver

    US20230071527A1

  • Method of paving

    US4073592A