AI Technical Summary
Modern semiconductor circuit breakers lack an effective method to determine or estimate the maximum short-circuit current, which is crucial for ensuring safe operation and compliance with energy supply company requirements, such as a minimum short-circuit breaking capacity of 6 kA in German household installations.
An electronic circuit breaker, specifically a semiconductor circuit breaker, determines current and voltage measurement values to calculate or estimate the line impedance of the supply line by briefly interrupting the circuit to record sufficient data without affecting the load, using existing components like electronic switching elements, voltage, and current measuring devices, and processing units, and displays the results to operators for comparison with target values.
Enables accurate estimation of the maximum short-circuit current, allowing the circuit breaker to switch to a safety mode if the expected current exceeds its breaking capacity, ensuring safe operation and compliance with regulatory standards.
Smart Images

Figure 1.1
Abstract
Description
[0001] Description
[0002] Method for operating an electronic circuit breaker, electronic circuit breaker and electrical system with an electronic circuit breaker
[0003] The invention relates to a method for operating an electronic circuit breaker, an electronic circuit breaker and an electrical system with an electronic circuit breaker.
[0004] Modern semiconductor circuit breakers (SCCBs for short, sometimes also Solid State Circuit Breakers (SSCBs for short; SCCBs will be used below for short) are capable of switching off electrical circuits much more quickly in the event of a short circuit than conventional miniature circuit breakers (MCBs for short). SCCBs also have a nominal breaking capacity or short-circuit breaking capacity. This is the current value at which an MCB or SCCB can still safely switch off in the event of a short circuit. For example, this current value is between 3 kA and 15 kA for 230 / 400 V household installations. Energy suppliers in Germany require a short-circuit breaking capacity of at least 6 kA.
[0005] As is well known, the short-circuit breaking current or rated breaking capacity is a multiple of the rated current of the MCB or SCCB. Typical rated currents in consumer circuits in 230 / 400 V household installations are, for example, 10 A, 16 A, or 32 A.
[0006] The object of the present invention is to provide a method by which the actually expected maximum short-circuit current can be determined or at least estimated. This object is achieved by a method having the features of independent patent claim 1, by an electronic circuit breaker with means for implementing the inventive method, and by an electrical system having such a circuit breaker.
[0007] Advantageous further developments of the present invention are specified in the subclaims.
[0008] One advantage of the invention is that a circuit breaker according to the invention, in particular a semiconductor miniature circuit breaker (SCCB), determines current and voltage measured values for calculating or at least estimating a line impedance of the supply line of the supply circuit. The circuit breaker interrupts the supply of the load circuit just long enough to record a sufficient number of measured values without this interruption affecting the load. This exploits the fact that loads designed according to the relevant standards tolerate brief interruptions without causing malfunctions of the load. The interruption preferably lasts no longer than 20 ms, particularly preferably no longer than 10 ms, but can also be limited to 2 ms.
[0009] Preferably, the calculation of line impedance is performed by processing units already present in modern SCCBs. Alternatively, the measured values are transmitted to a higher-level device for evaluation.
[0010] In this case, it is advantageous to use components that are already present in modern circuit breakers, particularly in SCCBs, such as the electronic switching element, which switches quickly compared to the mechanical switching element, the voltage measuring device(s) and the current measuring device(s) of the SCCB, i.e. apart from the control means or processing units, which can be implemented, for example, in software or firmware, preferably no adjustments need to be made to the SCCB.
[0011] The measured line impedance can be displayed to an operator or installer, who can then compare it with a target value and initiate appropriate measures in the event of unacceptable deviations. The display can be provided by a display unit on the SCCB itself and / or by a display on a device connected wirelessly or wired to the SCCB. This can be, for example, a permanently installed device in the electrical system or a portable device, such as a portable diagnostic device or a smartphone.
[0012] From the determined or estimated value for the line impedance, the operator or installer can determine the expected maximum short-circuit current. In exemplary embodiments, this step can be part of the automated method according to the invention, in which the SCCB and / or the higher-level device determines a maximum expected current increase in the event of a short circuit in the load circuit from the line impedance, which is displayed to the operator or installer instead of and / or in addition to the line impedance.
[0013] If the maximum expected current increase in the event of a short circuit in the load circuit exceeds the short-circuit switching capacity of the SCCB or a threshold value derived from it, for example 80% of the short-circuit switching capacity, it can be put into a safety mode, for example switching off, and a corresponding error message can be output to the operator or installer.
[0014] In the following, embodiments of the present invention are explained in more detail with reference to drawings.
[0015] Therein: Fig. 1 shows a basic circuit diagram of a circuit breaker according to an embodiment of the present invention; Fig. 2 shows an equivalent circuit diagram for a circuit with a circuit breaker according to an embodiment of the present invention;
[0016] Fig. 3A is a simplified equivalent circuit diagram of the supply side of the circuit according to Fig. 2;
[0017] Fig. 3B a further simplification of Fig. 3A;
[0018] Fig. 4 shows a simplified flow diagram of an embodiment of the method according to the invention; and Fig. 5 shows an exemplary curve of current and voltage of a circuit breaker during execution of an embodiment of the method according to the invention.
[0019] Fig. 1 shows a schematic diagram of a circuit breaker 100, in particular a semiconductor miniature circuit breaker (SCCB), according to an embodiment of the present invention. The SCCB 100 has mains-side or supply-side terminals 101 and 102 as well as load-side terminals 103 and 104. Without limiting the generality, the neutral conductor of the exemplary AC system extends between terminals 102 and 104, and the neutral conductor extends between terminals 101 and 103.
[0020] The SCCB 100 has at least one mechanical switching contact. In the example shown, the SCCB 100 has two mechanical switching contacts 111, 112, which can galvanically isolate the input terminals 101, 102 from the output terminals 103, 104 for both conductor paths L and N. In the example shown, the two switching contacts 111, 112 are coupled and combined to form a two-pole mechanical disconnect switch 110.
[0021] In addition to the (electro-)mechanical switching element 110, the SCCB 100 has an electronic switching element or a power semiconductor element 120, which is preferably arranged in the L-conductor path and has a mains-side pole 121, a load-side pole 122 and a control input 123.
[0022] The electronic switching element 120 is controlled by a control element 130 via a signal line 134 via the control input 123, in particular switched on and off depending on an operating state predetermined by the control element 130. The control element 130 can be, for example, a microcontroller. In embodiments of the invention, it can also be provided that the microcontroller 130 also controls the mechanical switching element 110 (not shown). In other embodiments, it can be provided that the mechanical switching element 110 is controlled by a separate, electronic or electromechanical control element (not shown), which in turn can be coupled to the control element 130.
[0023] The control element 130 receives signals or measured values from sensors or measuring devices of the SCCB 100, which is indicated in the illustration in Fig. 1 by arrows 131, 132, 133. For the sake of clarity, the illustration of any necessary signal conversions has been omitted, since the corresponding mechanisms are well-known to the responsible specialist.
[0024] In the illustrated embodiment, the SCCB 100 has means 140 for determining the (alternating) voltage ul applied to the mains-side terminals 101, 102, from which a value representing the time-dependent voltage ul is supplied to the control element 130 via the relationship 131.
[0025] Furthermore, the SCCB 100 preferably has means 150 for determining the voltage u2 dropped across the electronic switching element 120. From these, a value representing the time-dependent voltage u2 is supplied to the control element 130 via the relationship 132. In the preferred embodiment, the control element 130 can determine a time-dependent voltage u3 at the output terminals 103, 104 by simple, true-to-sign addition or subtraction of the values for u1 and u2. Expressed in the form of an equation, the following applies to the illustrated embodiment: u3 = u1 - u2.
[0026] In other embodiments, the voltage u3 can be determined directly by corresponding measuring means arranged at the output terminals (not shown), in which case the means 140 or 150 can be dispensed with in some cases.
[0027] Finally, the exemplary SCCB 100 has means 160 for determining the current i flowing through the SCCB 100, which are preferably arranged in the conductor L connected by the power semiconductor 120. The means 160 supply a value representing the time-dependent current i to the control element 130 via the relationship 133.
[0028] The remaining functionality of the controller 130 is explained in more detail below in connection with Fig. 4 and Fig. 5.
[0029] Fig. 2 shows a greatly simplified equivalent circuit with a consumer or load circuit 200, which is connected to a supply circuit 300 via an SCCB 100. The representation of the SCCB 100 has also been greatly simplified and reduced to the representation of the mains-side terminals 101, 102, the load-side terminals 103, 104, and the switching devices 120, 111 in the L path. The previously mentioned voltages ul, u2, and u3, as well as the current i, are also shown for clarity. The mains voltage u0 is also shown.
[0030] The load circuit 200 has the following elements, starting from the load-side L terminal 103 of the SCCB 100: a first resistive line component 211 with the value R3 / 2, a first inductive line component 221 with the value L2 / 2, a load 230 with the value R2, a second inductive line component 222 with the value L2 / 2, and a second resistive line component 212 with the value R3 / 2. The supply circuit 300 has a mains-side voltage source 330, which feeds the arrangement shown in Fig. 2 via a supply line. The supply line has a first resistive line component 311 with the value R1 / 2 and a first inductive line component 321 with the value L1 / 2 in the L path. The N-path has a second inductive line component 322 with the value Ll / 2 and a second resistive line component 312 with the value Rl / 2.
[0031] With a view to further simplification (cf. Fig. 3), it has already been assumed for the sake of simplicity that the ohmic components 311, 312 and the inductive components 321, 322 for the forward and return lines in the supply circuit 300 are each approximately equal and therefore each correspond to approximately half of the total line resistance RI and the total line inductance L1 between the line-side terminals 101, 102 of the SCCB 100 and the line-side voltage source 330.
[0032] Fig. 3A shows a further simplified equivalent circuit of the supply circuit 300 between the mains-side terminals 101, 102 of the SCCB 100 and the source 330. The resistive and inductive line components 311, 312, 321, 322 shown in Fig. 2 have been combined to form a resistive line component 310 with value RI and an inductive line component 320 with value L1. Thus, for the purposes of further consideration, the resistive line component RI, the inductive line component L1, and the source 330 form the simplified supply circuit 300 through which the current i flows. The source 330 supplies the time-dependent voltage uO, while the time-dependent voltage ul is applied to the mains-side terminals 101, 102 of the SCCB 100. The time-dependent voltages u4 and u5 drop across the components RI and L1. Expressed as an equation, this results in: uO = u4 + u5 + ul.
[0033] For further consideration, the simplified equivalent circuit diagram from Fig. 3A was simplified even further, Fig. 3B. The voltages u0 and ul were combined to form ux, where: ux = u0 - ul and ux = u4 + u5.
[0034] An advantageous embodiment of the method according to the invention is explained below with reference to Fig. 4. The method starts in step 410, for example, in response to a request generated by an operator, if the following conditions are met: the electronic switching element 120 of the SCCB 100 is switched on and the mechanical switching element 110 is closed, ie, the load circuit 200 is switched on and there is no fault (e.g., short circuit or overload) in the load circuit 200.
[0035] In step 420, the system waits until the time-dependent current i reaches a minimum value, because the method functions better the higher the current at the time of the intended switch-off (see step 430). For example, the current i can be measured over several cycles of the input AC voltage to determine the current maximum flowing current, and the system skips to step 430 when at least 80% of the maximum current is flowing. If no current is currently flowing, for example because there is no active load on the consumer circuit, and / or if the peak value of the current is below a definable threshold, for example below 1A, the method is terminated (step 425), and a corresponding (error) message is output to the operator. The operator can, for example, be prompted to connect a minimum load to the consumer circuit and then restart the method.
[0036] In exemplary embodiments, particularly when an (estimated) value for the line impedance is not needed promptly, but a suitably high current can be awaited, the method remains in step 420 until such a current event occurs, for example, a switch-on process (inrush) of a capacitive load. Additionally or alternatively, an operator can be prompted in step 420 to connect or (briefly) activate such a load.
[0037] If a sufficiently high current value was reached in step 420, the electronic switching element 120 of the SCCB is switched off in step 430. Referring to Fig. 5, this is time t0.
[0038] In step 440 (at time t1 in Fig. 5), a current value il of the current i flowing in the supply circuit 300 is determined, and preferably simultaneously or at least approximately simultaneously, a voltage value u11 of the voltage ul applied to the input side of the SCCB 100 is determined. These values u11 and il are stored in a memory (not shown). For the SCCB 100 shown in the example in Fig. 1, the respective instantaneous values for ul and i at time t1 are determined using the measuring devices explained above in connection with Fig. 1.
[0039] In embodiments of the present invention, the detection of ul and i can also occur at different times. This is useful, for example, if the SCCB 100 has a (single) voltage measuring device that is first connected to the lines L and N to determine an instantaneous value for ul, and then to the terminals of a measuring resistor or shunt (not shown) integrated into the path L to determine the voltage drop across this measuring resistor, from which the controller 130 then calculates, for example, an instantaneous value for the current i.
[0040] In step 450, a check is carried out to determine whether the time since the electronic switching element 120 of the SCCB was switched off in step 430 is still below a configurable maximum time tmax. This configurable time is selected such that it is less than or equal to a time for brief supply interruptions that can be tolerated by loads designed in accordance with standards, for example tmax = 20 ms, preferably tmax = 10 ms, and in special embodiments also tmax = 2 ms. If the aforementioned condition is violated, ie the time since switch-off is greater than tmax, the method continues with step 470. If the aforementioned condition is met, ie the time since switch-off is less than or equal to tmax, the method continues with step 460.
[0041] As an alternative to checking in step 450 whether the time since switching off the electronic switching element 120 of the SCCB in step 430 is still below the configurable maximum time tmax,
[0042] In step 460, a check is carried out to determine whether a predeterminable number of values for ul and i have been determined. In preferred embodiments, the minimum number of values is 2 values for i and one value for ul. In further embodiments, for example, 3, 4, 5, 6, 7 or 8 values can be used, particularly for i, but also for ul. In general, the higher the processing speed of the control unit, the more values can be recorded, which subsequently enables a plausibility check of the values and / or filtering such as smoothing and / or interpolation at specific times and / or the suppression of transient processes in calculation step 470.
[0043] In embodiments of the invention, instead of checking in step 450 whether the time since switching off the electronic switching element 120 of the SCCB in step 430 is still below the configurable maximum time period tmax, the predeterminable number of values for i and the measuring interval can be selected such that the product of the number and the measuring interval is less than tmax. For example, in the case of tmax = 10 ms, up to 9 measured values can be recorded with a measuring interval of 1 ms without having to worry about exceeding tmax, taking into account a safety margin. If the predeterminable number of values has not yet been reached, the program returns to step 440 and a new determination of instantaneous values for i and optionally for ul is carried out. This is indicated by way of example in Fig. 5: at time t2, a value i2 is determined as described above for il. Optionally, another value u12 is also determined for ul.
[0044] In embodiments of the invention, it is assumed for simplicity that ul changes immediately after switching off and then remains constant while the current i decreases. Based on this simplifying assumption, it may be sufficient to determine only one value for ul as long as the current i has not yet fallen to zero. It is possible, but not necessary, to determine this value simultaneously with one of the current measurements.
[0045] If the predeterminable number of value pairs is reached and / or the maximum time tmax for switching off the electronic switching element 120 is reached, the repetition is terminated and the process continues with step 470.
[0046] In step 470, the electronic switching element 120 of the SCCB 100 is switched on, unless this is prevented by parallel processes for safety reasons, for example, because a short circuit has been detected in the load circuit 200 in the meantime. Referring to Fig. 5, the electronic switching element 120 is switched on at time t4.
[0047] For the calculations described below, a measured value for ul is required, which allows a conclusion to be drawn about the mains voltage uO (see Fig. 3A). If one considers a short or very short time period (microseconds up to a maximum of a few milliseconds) immediately before switch-off in step 430, a quasi-stationary state can be assumed, ie uO and i are regarded as constant, u5 is close to zero (because i is constant). RI is assumed to be small and u4 is therefore regarded as negligible, so that immediately before switch-off in step 430 u1 ≈ u0 applies. This means that a voltage measured value u10, which approximately corresponds to the mains voltage u0, can be determined shortly before switch-off in step 430, for example as a sub-step of step 430, before switch-off.
[0048] Alternatively, u10 can be determined when the steady state, characterized by i = 0, is reached after switching off, see Fig. 5, for example, at time t3. Here, a better approximate value for u0 can be determined, since u4 = 0 due to i = 0. However, it is possible that the current i does not fall to zero within tmax, so that there is no time t3 at which i = 0 applies.
[0049] In exemplary embodiments, the following procedure can therefore be followed: in step 430, before switching off, a value for ul is first measured, which is then stored as an approximate value u10 for u0. The method with steps 430, 440, 450, 460 is then carried out, and in one of the steps it is checked whether the current i has fallen to zero without tmax being reached. As soon as i = 0 has been reached, or shortly thereafter, a new measurement of ul is carried out and used as the new value for u10 instead of the previously determined approximate value for the further method. In other words, before switching off, an approximate value for u10 is determined, which is then used if the current does not fall to zero, and which is replaced by a better measured value if the current falls to zero within tmax.
[0050] Subsequently, in step 470, the line impedance L1 of the supply or mains line between the circuit breaker 100 and the (imaginary) mains voltage source 330, voltage values u10, u11 or u12 (or the mean value of u11 and u12 and further voltage values) and the current measurement values i1, i2 as well as their time interval Δt = t2 - t1 are at least approximately calculated. In preferred exemplary embodiments, Δi = i2 - il and ux = u11 - u10 are first calculated for this purpose. Subsequently, based on the simplified equivalent circuit diagram according to Fig. 3B, an approximate value for di / dt is determined using the relationship di / dt = Δi / Δt and finally the desired approximate value for L is determined using the relationship L1 = ux / (di / dt). In this case, the voltage drop across RI is again considered negligible.
[0051] Using the values i1, i2 determined by multiple, here double, execution of step 440 as well as the values u10 and u11, the following equation results for the preferred embodiment: L1 = (u11 - u10) / ((i2-i1) / (t2-t1)
[0052] Using L1 and the peak value u0,max of the mains voltage, the maximum expected current increase in the case of a load-side short circuit can then be determined: di / dt = u0,max / L1
[0053] From this current increase di / dt, the maximum current reached before the SCCB safely shuts down can be determined. To do this, it is simply necessary to multiply the constant dt,SCCB, known for the respective SCCB type, by the current increase di / dt. Expressed as an equation: imax = di / dt * dt,SCCB
[0054] Expressed with the value determined for L1, the result is: imax = u0,max / L1 * dt,SCCB
[0055] The constant dt,SCCB is composed of the time required by the SCCB to detect a short circuit (and, for example, to distinguish it from a switch-on operation) and the time required to subsequently switch off the semiconductor switch 120, and is typically 0.2 to 2 microseconds.
[0056] This calculation can also be carried out by the SCCB and / or the higher-level device and displayed to an operator qualitatively (for example as a red / green color display after comparison with a limit value determined by a standard or otherwise, such as the short-circuit breaking capacity of 6kA mentioned above) and / or quantitatively.
[0057] After calculating and outputting or providing the parameters L1 and / or di / dt and / or imax, the method ends with step 480. Of course, it is possible to restart the method upon appropriate operator input. In exemplary embodiments, it is possible to run the method automatically several times in succession and to calculate an average before outputting the parameters in order to obtain a better estimate.
[0058] Optionally, the described method can be supplemented or modified to detect capacitances C in the supply network (see Fig. 2). Referring to Fig. 5, the decrease in current i after switching off at time t0 will be significantly flatter in the presence of a capacitance C, ie, the term resulting from two measured values for i:
[0059] ((i2-i1) / (t2-t1)) will be significantly larger in magnitude than due to the (usually very low) line inductances L1. In calculation step 470, it can optionally be checked whether this term exceeds a threshold value, for example a maximum value expected for supply lines that have a maximum length and a maximum inductance per unit length. If, in step 470, the decision can be made that a calculation of L1 is not possible. This is signaled to the operator or made available for signaling to the operator, if necessary together with a note that there are 300 capacitances in the supply circuit. The operator can then investigate whether these capacitances are desired or undesired.
[0060] As already explained, it is of course possible to improve the reliability of the estimate by using additional pairs of values in modifications to the method described above. The estimate is based, among other things, on the assumption that in the very short time intervals considered, the decrease in current i after switching off at t0 is linear and that voltage u0 does not change, or at least not significantly, during this time (i.e., that the alternating current system 100, 200, 300 is quasi-stationary, i.e., can be regarded as a direct current system while accepting minor errors). The evaluation of additional measured values for i and / or ul then makes it possible to exclude measured values from consideration for which the aforementioned assumptions turn out not to apply through comparison with the other pairs of values or interpolation, for example in the case of transient phenomena or interference coupled into the line.
[0061] As already mentioned, it is possible to have the method described above carried out entirely by a controller 130, for example a microcontroller, of a modern SCCB 100 and to transmit the results to a display device of the operator via a wireless or wired interface. The display device can be, for example, a mobile device such as a smartphone that can be coupled to the SCCB 100 via Bluetooth or another short-range radio technology. The software running on this mobile device can be designed such that the operator initiates the method through a user input, which is then transmitted to the SCCB 100. Alternatively, it can be provided that the SCCB 100 merely transmits the measured values and the mobile device performs the calculations.
Claims
Patent claims 1. Method for operating an electronic protective switch (100) which couples a load circuit (200) to be protected to a supply circuit (300) and has a mechanical switching element (110) and an electronic switching element (120) connected in series therewith, comprising the following steps: a) switching off the load circuit (200) by means of the electronic switching element (120); b) acquiring at least two time-separated current measurements (il, i2) for a current (i) flowing through the protective switch after switching off; c) acquiring at least two time-separated voltage values (u10, u11, u12) of a voltage applied to the supply-side terminals (101, 102) of the protective switch (100), at least one of which after switching off;d) Re-energizing the load circuit (200) by the electronic switching element (120), wherein a time interval between switching off and switching on is selected such that a load (230) supplied by the load circuit is not affected by the interruption of the power supply; e) Calculating a line impedance (L1) of a supply line of the supply circuit (300) and / or calculating a value for a maximum expected current rise in the event of a short circuit in the load circuit from the voltage values (u10, u11, u12) and the current measurements (il, i2) and their time interval.
2. Method according to claim 1, wherein f) the circuit breaker is placed in a safety mode when the line impedance (L1) falls below a threshold value and / or the maximum expected current rise in the event of a short circuit in the load circuit exceeds a short-circuit breaking capacity of the circuit breaker or a threshold value derived from the short-circuit breaking capacity.
3. Method according to one of the preceding claims, wherein g) it is determined from the voltage values (u10, u11, u12) and the current measurement values (il, i2) whether the supply circuit has a capacitive component (C).
4. Method according to one of the preceding claims, wherein steps b) and c) are performed simultaneously or almost simultaneously and pairs of current and voltage values are recorded.
5. Method according to any of the preceding claims, wherein some or all of the calculation steps e), f) and / or g) are performed by the electronic circuit breaker (100).
6. Method according to any one of claims 1 to 4, wherein some or all of the calculation steps e, f) and / or g) are performed by a higher-level device, wherein the current measurement and / or voltage values required for the respective calculation are transmitted wirelessly or via wired connections from the circuit breaker (100) to the higher-level device.
7. Method according to one of the preceding claims, wherein the switching off occurs when the instantaneous value (i) of the current flowing through the circuit breaker exceeds a threshold value, preferably corresponding to a peak value of the current.
8. Method according to one of the preceding claims, wherein one of the determined voltage values is an instantaneous value (u10) of the voltage (ul) applied to the supply-side terminals (101, 102) of the circuit breaker (100) at the time of switching off.
9. Method according to one of the preceding claims, wherein the switching off takes place during a switching-on process of a load with a high inrush current.
10. Method according to one of the preceding claims, wherein the switching on occurs no later than 20 ms, preferably no later than 10 ms, and in particular no later than 2 ms after the switching off.
11. Electronic circuit breaker (100) comprising voltage measuring means (140, 150), current measuring means (160) and a processing unit (130) programmed to perform the method according to one of the preceding claims.
12. Electrical installation comprising one or more protective switches (100) according to claim 11 and a device that can be connected wirelessly or via a wire to the protective switch(es) (100) for determining and / or displaying the maximum expected current increase in the event of a short circuit in the load circuit (200).