Elevator construction arrangement and method
Patent Information
- Authority / Receiving Office
- EP · EP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-09
- Publication Date
- 2026-03-18
AI Technical Summary
The existing methods for constructing elevators in high-rise buildings require additional work and logistics due to the need for prefabricated guide rails with accurate mounting holes, which complicates the process and increases material management and delivery complexities, especially during the 'jump' phase of elevator installation.
The proposed solution involves on-site perforation of mounting holes for guide rails and rope suspenders, allowing for flexible modification of the jump plan and reducing the need for additional materials, using simple recyclable tools and drilling from the roof of the elevator car or installation platform.
This approach simplifies the installation process, reduces material needs, and shortens construction time, enabling elevators to be completed and handed over to customers more quickly with improved site logistics and reduced logistical complexities.