Storage facility for liquefied gas
The storage installation addresses weld fatigue in liquefied gas tanks by using a metal connecting strip with spaced attachment devices to relieve buckling stress, ensuring durable seals and insulation continuity.
Patent Information
- Application Number
- FR2021014393
- Authority / Receiving Office
- FR · FR
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-12-23
- Publication Date
- 2024-09-27
- Estimated Expiration
- 2041-12-23
Smart Images

Figure 00000024_0000 
Figure 00000024_0001 
Figure 00000025_0000
Abstract
Description
Title of the invention: Storage installation for liquefied gas Technical field
[0001] The invention relates to the field of storage installations for liquefied gas comprising a sealed and thermally insulating tank with a sealed membrane. In particular, the invention relates to the field of sealed and thermally insulating tanks for the storage and / or transport of liquefied gas at low temperature, such as tanks for the transport of Liquefied Petroleum Gas (also called LPG) having for example a temperature between -50°C and 0°C, or for the transport of Liquefied Natural Gas (LNG) at approximately -162°C at atmospheric pressure. These tanks can be installed on land or on a floating structure. In the case of a floating structure, the tank can be intended for the transport of liquefied gas or for receiving liquefied gas used as fuel for the propulsion of the floating structure. Technological background
[0002] Document FR2549575 describes a sealed and thermally insulating tank integrated into the load-bearing structure of a ship, comprising a secondary thermally insulating barrier, a secondary sealing membrane, a primary thermally insulating barrier and a primary sealing membrane. The tank comprises a plurality of tank walls assembled together. The sealing membranes each comprise a plurality of parallel strakes. Each strake comprises a flat central portion extending in a first direction and two raised edges arranged on either side of the flat central portion and projecting towards the inside of the tank relative to the central portion. The strakes are thus juxtaposed in a repeated pattern and welded together at the raised edges.
[0003] The sealing membranes are fixed to the supporting structure in the corners of the tank using connecting rings. Each connecting ring is therefore fixed on the one hand to the supporting structure and on the other hand to the sealing membranes in order to allow the transfer of forces between the membranes and the hull of the ship.
[0004] The connecting ring makes it possible in particular to absorb the tensile and compressive forces resulting from thermal contraction, from the deformation of the hull linked for example to the bending of the ship beam, and from the filling state of the tanks. Indeed, such waterproofing membranes, commonly called tensioned membranes, do not have zones in the first direction making it possible to absorb the tensile and compressive forces unlike a corrugated membrane.
[0005] In this type of structure, the sealing membranes are interrupted at the level of an opening in order, for example, to allow the passage of loading / unloading lines.
[0006] In order to maintain the watertightness of the tank, in particular of the primary waterproofing membrane, connection zones are provided at this opening. Summary
[0007] The invention is based on the observation that during phenomena causing tensile and compressive forces on the sealing membranes, the connection zones may be subjected to significant cyclical compressive and tensile forces, in particular at the welds, which may lead to fatigue failure of the sealing in these zones.
[0008] One idea underlying the invention is to improve the resistance to stresses of the sealing membrane at the connection zones.
[0009] According to one embodiment, the invention provides a storage facility for liquefied gas comprising a metal supporting structure and a sealed and thermally insulating tank arranged in the supporting structure, the tank comprising at least one metal sealing membrane defining an internal storage space and at least one thermally insulating barrier, the thermally insulating barrier being placed between the sealing membrane and the supporting structure, the supporting structure comprising an upper supporting wall, the tank comprising at least one ceiling wall fixed to the upper supporting wall, in which the thermally insulating barrier of the ceiling wall comprises juxtaposed insulating blocks, wherein the ceiling wall sealing membrane comprises a plurality of parallel strakes extending in a first direction, each strake comprising a flat central portion resting on an upper surface of the insulating blocks and two raised edges projecting towards the inside of the tank relative to the central portion, the strakes being juxtaposed in a second direction in a repeated pattern and welded together in a sealed manner at the raised edges, the second direction being perpendicular to the first direction, the ceiling wall being interrupted locally so as to delimit a loading / unloading opening intended to be crossed by loading / unloading pipes, said loading / unloading opening interrupting at least one said strake of the sealing membrane of the ceiling wall, wherein the tank comprises a cover arranged in the loading / unloading opening, the cover comprising a metal sealing wall and a thermal insulation structure located between the sealing wall and the upper load-bearing wall, the cover being fixed to the upper load-bearing wall, wherein a metal connecting strip extending in the second direction connects the sealing wall of the cover to the interrupted sealing membrane in order to ensure continuity of the seal between the sealing wall of the cover and the sealing membrane of the ceiling wall, the metal connecting strip having a first end edge extending in the second direction and a second end edge opposite the first end edge, the first end edge of the metal connecting strip being welded to the sealing wall of the cover and the second end edge of the metal connecting strip being welded to the sealing membrane of the ceiling wall, wherein the thermally insulating barrier of the ceiling wall and the thermal insulation structure of the cover comprise support elements together forming a support assembly which support the sealing membrane of the ceiling wall,the sealing wall of the cover and the metal connecting strip, wherein the metal connecting strip is attached to the support assembly using at least one first fastening device and at least one second fastening device, the at least one first fastening device being located near the first end edge and the at least one second fastening device being located near the second end edge.
[0010] The expression "near the end edge" here means that the fastening device is located closer to the end edge than to the middle of the connecting strip taken in the first direction.
[0011] Thanks to these characteristics, the resistance to forces in the connection zone located between the sealing wall of the cover and the sealing membrane has been reinforced, in particular at the welds. Indeed, during the compression and then tensile forces subjected to the sealing membrane, the metal connecting strip may be caused to buckle, thus stressing the welds in bending. The first fixing device and the second fixing device thus make it possible to relieve the welds by locating any buckling of the metal connecting strip away from the welds.
[0012] According to embodiments, such a storage facility may comprise one or more of the following features.
[0013] According to one embodiment, anchoring wings anchored to the insulating blocks and parallel to the first direction are arranged between the juxtaposed strakes to retain the sealing membrane on the thermally insulating barrier.
[0014] According to one embodiment, the support elements are constituted by plates.
[0015] According to one embodiment, each insulating block comprises at least one support element, the flat central portion of the strakes resting on an upper surface of the support element of the insulating blocks.
[0016] According to one embodiment, the thermal insulation structure of the cover comprises at least one support element, the metal sealing wall resting on an upper surface of the support element of the thermal insulation structure.
[0017] According to one embodiment, the first end edge of the metal connecting strip is overlap welded to the sealing wall of the cover and the second end edge of the metal connecting strip is overlap welded to the sealing membrane of the ceiling wall.
[0018] According to one embodiment, the storage installation comprises a plurality of first fastening devices spaced from each other in the second direction and / or a plurality of second fastening devices spaced from each other in the second direction.
[0019] According to one embodiment, the first fastening devices are aligned in the second direction and / or the second fastening devices are aligned in the second direction.
[0020] Thus, the first fixing devices and the second fixing devices thus make it possible to relieve the welds extending in the second direction by locating any buckling of the metal connecting strip at a distance from the welds.
[0021] According to one embodiment, the storage installation comprises a first metal covering element arranged on the at least one first fixing device, the first metal covering element being welded in a sealed manner to the metal connecting strip, and / or a second metal covering element arranged on the at least one second fixing device, the second metal covering element being welded in a sealed manner to the metal connecting strip.
[0022] According to one embodiment, the first metal covering element extends in the second direction, the first metal covering element being arranged on a portion, preferably all, of the first fixing devices.
[0023] According to one embodiment, the second metal covering element extends in the second direction, the second metal covering element being arranged on a portion, preferably all, of the second fixing devices.
[0024] According to one embodiment, the storage facility comprises a plurality of first metal covering elements and / or a plurality of second metal covering elements, each first fixing device and / or each second fixing device being covered by one of the first metal covering elements or one of the second metal covering elements. metals respectively.
[0025] Thus, the metal covering elements make it possible to improve the sealing of the metal connecting strip at the crossing of the fixing devices by covering the fixing devices in a sealed manner.
[0026] According to one embodiment, the fixing, carried out by the at least one first fixing device and the at least one second fixing device, is chosen from screwing, nailing and riveting.
[0027] Thus, the first fastening device and the second fastening device are formed for example from a nail, a screw or a rivet. Preferably, the first fastening device and the second fastening device are identical.
[0028] According to one embodiment, said metal connecting strip is flat in a normal state in which said metal connecting strip does not undergo any compressive force.
[0029] According to one embodiment, the portion of the support assembly disposed under the metal connecting strip comprises a groove extending in the second direction, the groove being located in the first direction between the at least one first fastening device and the at least one second fastening device.
[0030] According to one embodiment, the groove is made at the junction between two adjacent support elements so as to extend in the first direction over a portion of said two adjacent support elements.
[0031] According to one embodiment, the groove extends in the first direction on a single support element.
[0032] According to one embodiment, said groove comprises a bottom, and a portion of the metal connecting strip is spaced in a thickness direction by a non-zero distance from the bottom of said groove, so that the metal connecting strip can deform by buckling in the groove following a compressive force in the first direction.
[0033] The thickness direction is perpendicular to the first direction and the second direction.
[0034] According to one embodiment, the sealing membrane of the ceiling wall comprises a connecting angle extending in the second direction to sealably separate the thermally insulating barrier from the thermal insulation structure of the cover, the connecting angle comprising a first wing and a second wing connected to the first wing, the first wing being welded to said at least one strake interrupted by the opening and the second wing being connected to the upper load-bearing wall.
[0035] According to one embodiment, the second end edge of the metal connecting strip is welded to the first wing of the connecting angle.
[0036] According to one embodiment, the insulating blocks comprise an end insulating block adjacent to the cover in the first direction.
[0037] According to one embodiment, the first wing of the connecting angle is fixed to the end insulating block, for example by screwing, nailing, riveting or gluing.
[0038] According to one embodiment, the first wing of the connecting angle is fixed, for example by welding, to a fixing plate rigidly fixed to the upper surface of the end insulating block.
[0039] According to one embodiment, the metal connecting strip is fixed to the end insulating block at the second end edge, for example by screwing, nailing, riveting or gluing.
[0040] According to one embodiment, said at least one strake interrupted by the opening is welded, preferably by overlapping, to the metal connecting strip.
[0041] According to one embodiment, said at least one strake interrupted by the opening is welded to the fixing plate on which the first wing of the connecting angle is fixed.
[0042] According to one embodiment, the sealing membrane of the ceiling wall, the sealing wall of the cover and the connecting strip are made of an iron and nickel alloy having a thermal expansion coefficient of between 0.5.106 and 2.106 K1. It is also possible to use iron and manganese alloys whose expansion coefficient is typically of the order of 7.106 K1.
[0043] According to one embodiment, the supporting structure comprises a rear cofferdam wall and a front cofferdam wall located on either side of the tank in the first direction, the loading / unloading opening being formed near the rear cofferdam wall, the connecting strip being arranged between the cover and the front cofferdam wall.
[0044] According to one embodiment, the metal connecting strip is a first connecting strip, and the storage facility comprises a second connecting strip disposed between the cover and the rear cofferdam wall.
[0045] According to one embodiment, the sealing membrane is a primary sealing membrane intended to be in contact with the liquefied gas, the thermally insulating barrier is a primary thermally insulating barrier and in which the tank further comprises, in a thickness direction from the outside to the inside of the tank, a secondary thermally insulating barrier fixed to the supporting structure, and a metallic secondary sealing membrane arranged between the secondary thermally insulating barrier and the primary thermally insulating barrier.
[0046] According to one embodiment, the connecting angle is a connecting angle primary connection, the secondary sealing membrane comprises a secondary connecting angle for sealingly separating the secondary thermally insulating barrier from the thermal insulation structure of the cover, the secondary connecting angle comprising a first wing and a second wing connected to the first wing, the first wing of the secondary connecting angle being welded to at least one strake of the secondary sealing membrane interrupted by the opening and the second wing of the secondary connecting angle being welded to the upper load-bearing wall.
[0047] According to one embodiment, the second wing of the primary connecting angle is welded to the second wing of the secondary connecting angle.
[0048] Such a storage facility may be a land-based storage facility, for example for storing LNG, or a floating, coastal, or deep-water structure, including a LNG carrier, a floating storage and regasification unit (FSRU), a floating production and remote storage unit (FPSO), and others. Such a facility may also serve as a fuel tank in any type of vessel.
[0049] According to one embodiment, the aforementioned storage installation is produced in the form of a floating structure, in which said supporting structure is constituted by a double hull of the floating structure and in which the first direction is a longitudinal direction of the floating structure.
[0050] The second direction is a transverse direction of the floating structure.
[0051] According to one embodiment, the floating structure is a ship for transporting a cold liquid product.
[0052] According to one embodiment, the invention also provides a transfer system for a cold liquid product, the system comprising the aforementioned ship, insulated pipes arranged to connect the tank installed in the hull of the ship to a floating or land-based storage facility and a pump for driving a flow of cold liquid product through the insulated pipes from or to the floating or land-based storage facility to or from the tank of the ship.
[0053] According to one embodiment, the invention also provides a method for loading or unloading such a ship, in which a cold liquid product is conveyed through insulated pipes from or to a floating or land-based storage facility to or from the ship's tank. Brief description of the figures
[0054] The invention will be better understood, and other objects, details, characteristics and advantages thereof will appear more clearly during the following description of several particular embodiments of the invention, given solely by way of illustration. illustrative and not limiting, with reference to the attached drawings.
[0055] [Fig. 1] [Fig.l] is a schematic view of a ship having a storage facility.
[0056] [Fig.2] [Fig.2] is a partial schematic sectional view of a storage facility comprising a cover according to one embodiment, said view corresponds to detail II of [Fig.l].
[0057] [Fig.3] [Fig.3] is a partial perspective view from the inside of a ceiling wall according to a first embodiment, in an area near the cover, in which a metal connecting strip located around the cover has been omitted.
[0058] [Fig.4] [Fig.4] is a partial perspective view of the ceiling wall of [Fig.3], in an assembled state before welding of the covering elements.
[0059] [Fig.5] [Fig.5] is a partial perspective view of the ceiling wall of [Fig.3], in an assembled state after welding of the covering elements.
[0060] [Fig.6] [Fig.6] is a sectional view along the VLVI direction of [Fig.4], showing in particular the metal connecting strip on a support plate.
[0061] [Fig.7] [Fig.7] is a sectional view along the same sectional plane as [Fig.6] for a ceiling wall according to a second embodiment, after welding of the covering elements.
[0062] [Fig.8] [Fig.8] is a schematic cutaway representation of a LNG carrier tank and a loading / unloading terminal for this tank. Description of the embodiments
[0063] By convention, we will call "on" or "above" or "upper" a position located closer to the inside of the tank and "under" or "below" or "lower" a position located closer to the supporting structure of the ship, whatever the orientation of the tank wall relative to the Earth's gravity field.
[0064] It should be noted that Figures 3 to 7 are shown in an inverted orientation relative to their actual position in a storage facility.
[0065] [Fig.l] shows a methane tanker 70 for the storage and transport of liquefied gas. However, the invention is not limited to this type of vessel.
[0066] Thus, the ship 70 shown in [Fig.l] comprises a storage facility 1 comprising four tanks 71 arranged in the supporting structure 2 formed by the internal hull of the ship 70 and fixed thereto. Each tank 71 is polyhedral in shape and comprises a plurality of tank walls assembled together so as to form an internal space 3, and comprises in particular a ceiling wall 4, a rear cofferdam wall 5 and a front cofferdam wall 6. The front 6 and rear 5 cofferdam walls are spaced apart in the longitudinal direction L of the ship 70 and are fixed in the upper part to the ceiling wall 4. For the proper functioning of these tanks 71, a loading / unloading opening 7 is provided formed in the ceiling wall 4 in order to pass gas loading / unloading pipes through it. The ceiling wall 4 is fixed to an upper load-bearing wall 8 of the supporting structure 2. The upper load-bearing wall 8 is provided with orifices, not shown, allowing the loading / unloading pipes to pass through the supporting structure 2.
[0067] The loading / unloading opening 7 serves as a penetration point for various LNG handling equipment known elsewhere.
[0068] [Fig. 2] schematically represents the dihedral formed by the assembly of the ceiling wall 4 with the rear cofferdam wall 5. The loading / unloading opening 7 is provided in the ceiling wall 4 near the rear cofferdam wall 5.
[0069] The multi-layer structure of the ceiling wall 4 will be described more particularly below.
[0070] The multi-layer structure of the ceiling wall 4 of a sealed and thermally insulating tank 71 for storing a liquefied gas, such as liquefied natural gas (LNG), successively comprises, in the thickness direction, from the outside to the inside of the tank, a secondary thermally insulating barrier 10 retained on the upper load-bearing wall 8, a secondary sealing membrane 11 resting on the secondary thermally insulating barrier 10, a primary thermally insulating barrier 12 resting on the secondary sealing membrane 11 and a primary sealing membrane 13 resting on the primary thermally insulating barrier 12 and intended to be in contact with the liquefied natural gas contained in the tank 71.
[0071] The secondary thermally insulating barrier 10 comprises a plurality of secondary insulating blocks 14 which are anchored to the upper load-bearing wall 8 by means of anchoring devices (not shown). The secondary insulating blocks 14 have a generally parallelepiped shape and are for example arranged in parallel rows in the longitudinal direction L and in the transverse direction T perpendicular to the longitudinal direction L.
[0072] The secondary sealing membrane 11 of the ceiling wall 4 comprises a continuous layer of metal strakes 15 with raised edges. The strakes 15 thus comprise a flat central portion 16 resting on the secondary insulating blocks 14 of the secondary thermally insulating barrier 10 and also comprise two raised edges 17 arranged on either side of the flat central portion 16 in the transverse direction T and projecting towards the inside of the tank relative to the central portion 16. The strakes 15 are welded by their raised edges 17 to parallel welding supports which are fixed in grooves provided on the surface of the blocks secondary insulators 14 in contact with the secondary sealing membrane 11. The strakes 15 are, for example, made of Invar ®: that is to say an alloy of iron and nickel whose coefficient of expansion is typically between 1.2.106 and 2.106 K1.
[0073] The primary thermally insulating barrier 12 of the ceiling wall 4 comprises a plurality of primary insulating blocks 18 which are anchored to the upper load-bearing wall 8 by means of anchoring devices (not shown). The primary insulating blocks 18 have a generally parallelepiped shape. Furthermore, they may have dimensions substantially identical to or different from those of the secondary insulating blocks 14. The primary insulating blocks 18 are positioned in alignment with the secondary insulating blocks 14, or offset relative to them in one or both of the longitudinal L and transverse T directions.
[0074] The secondary insulating blocks 14 and the primary insulating blocks 18 can be produced in different ways. For example, all or some of them are produced in the form of a box comprising a bottom plate, a cover plate 22 and load-bearing webs extending, in the thickness direction, between the bottom plate and the cover plate 22 and delimiting a plurality of compartments filled with an insulating filling, such as perlite, glass wool or rock wool.
[0075] In another embodiment, all or some of the secondary insulating blocks 14 and the primary insulating blocks 18 comprise a bottom plate, a cover plate 22 and one or more layers of insulating polymer foam sandwiched between the bottom plate, the cover plate and bonded thereto. The insulating polymer foam may in particular be a polyurethane-based foam, optionally reinforced with fibers.
[0076] In another embodiment, the secondary thermally insulating barrier 10 and / or the primary thermally insulating barrier 12 comprises secondary insulating blocks 14 and / or primary insulating blocks 18 having at least two different types of structure, for example the two aforementioned structures, depending on their area of implantation in the tank. Examples of such a structure are provided in publication WO-A-2019077253.
[0077] The primary sealing membrane 13 comprises a continuous sheet of metal strakes 15 with raised edges which are for example of the same nature as the strakes 15 of the secondary sealing membrane 11. The strakes 15 of the primary sealing membrane 13 are welded by their raised edges 17 to parallel welding supports which are fixed in grooves formed on the surface of the primary insulating blocks 18 in contact with the primary sealing membrane 13.
[0078] The secondary 11 and primary 13 waterproofing membranes are fixed to the supporting structure 2 in particular at the angle formed between the ceiling wall 4 and the wall of rear cofferdam 5 using a connecting ring 55 according to the known technique. The connecting ring 55 is therefore fixed on the one hand to the supporting structure 2 and on the other hand to the sealing membranes 11, 13 in order to allow the transfer of forces between the sealing membranes 11, 13 and the supporting structure 2.
[0079] In order to delimit the loading / unloading opening 7, the ceiling wall 4 is interrupted locally in order to allow the loading / unloading pipes to pass through. Thus, the sealing membranes 11, 13 and the thermally insulating barriers 10, 12 are interrupted all around the loading / unloading opening 7, as shown in [Fig.2].
[0080] In order to ensure continuity of the sealing and insulation, the tank 71 comprises a cover 19 arranged in the loading / unloading opening 7. The cover 19 comprises a metal sealing wall 20 and a thermal insulation structure 21 located between the metal sealing wall 20 and the upper load-bearing wall 8. The cover 19 is fixed to the upper load-bearing wall 8. The metal sealing wall 20 provides continuity of the sealing with the primary sealing membrane 13 of the ceiling wall 4 while the thermal insulation structure 21 provides continuity of the insulation.
[0081] The thermal insulation structure 21 may comprise one or more insulating cover blocks, produced for example in the form of a box comprising a bottom plate, a cover plate and load-bearing webs extending, in the thickness direction, between the bottom plate and the cover plate and delimiting a plurality of compartments filled with an insulating lining, such as a rigid insulating foam. The insulating cover block comprises passage holes (not shown) allowing the loading / unloading pipes to pass through.
[0082] The sealing wall 20 of the cover 19 comprises a plurality of flat metal plates 23 welded to each other. The sealing wall 20 further comprises a plurality of cover orifices (not shown) intended to be traversed by the loading / unloading pipes. The storage installation 1 further comprises a metal connecting strip 24 for connecting in a sealed manner the sealing wall 20 of the cover and the primary sealing membrane 13 of the ceiling wall 4, as visible in FIGS. 4 to 7. The metal connecting strip is thus welded using welds 26 to both the sealing wall 20 of the cover 19 and the primary sealing membrane 13 of the ceiling wall 4. The metal connecting strip 24 will be described in detail later in relation to these figures.
[0083] The primary thermally insulating barrier 12 of the ceiling wall 4 and the thermal insulation structure 21 of the cover 19 comprise a support assembly formed from a plurality of support plates 27 and cover plates 22 of the primary insulating blocks 18, 39. The support assembly makes it possible to support the membrane primary sealing 13 of the ceiling wall 4, the sealing wall 20 of the cover 19 and the metal connecting strip 24.
[0084] The support plates 27 are thus located in line with the sealing wall 20 of the cover 19 and in line with the metal connecting strip 24 in order to play the same support role as the cover plate 22 of the primary insulating blocks 18, 39 for the primary sealing membrane 13.
[0085] The primary sealing membrane 13 is capable of transmitting to the metal connecting strip 24 compressive and tensile forces linked to the work of the primary sealing membrane 13. These forces are particularly significant at the front longitudinal end edge 25 of the loading / unloading opening 7, which is the edge of the loading / unloading opening 7 located between the cover 19 and the front cofferdam wall 6 in the longitudinal direction L.Indeed, due to the placement of the cover 19 close to the rear cofferdam wall 5, the longitudinal dimension of the primary sealing membrane 13 between the cover 19 and the front cofferdam wall 6 is much greater than the longitudinal dimension of the primary sealing membrane 13 between the cover 19 and the rear cofferdam wall, which results in greater forces at the front longitudinal end edge 25 during deformation of the hull or thermal contraction. In addition, these forces on the front longitudinal end edge 25 are particularly significant due to the orientation of the primary sealing membrane 13. Indeed, the primary sealing membrane 13 is oriented so that the flat central portion 16 of the strakes 15 extends in the longitudinal direction L of the ship 70. Thus, no zone for absorbing the tensile and compressive forces is provided in this direction.
[0086] These compressive and tensile forces can thus be caused to work the welds 26 cyclically. In addition, during these cycles, the metal connecting strip 24 can be caused to buckle, thus subjecting the welds 26 to bending. In order to relieve the welds 26, it is provided to move any buckling away from the welds 26.
[0087] Figures 3 to 5 illustrate the ceiling wall 4 at the front longitudinal end edge 25 of the loading / unloading opening 7 at different stages of the assembly of the metal connecting strip 24 according to a first embodiment. Indeed, [Fig.3] more specifically illustrates the ceiling wall 4 before the assembly of the metal connecting strip 24. [Fig.4] shows the ceiling wall 4 after welding the metal connecting strip 24 and fixing it using fixing points. Finally, [Fig.5] illustrates the ceiling wall 4 after covering the fixing points.
[0088] The storage facility 1 comprises a plurality of fixing brackets se- secondary metal brackets 28 juxtaposed in the transverse direction T along the front longitudinal end edge 25 of the loading / unloading opening 7. Thus, the plurality of secondary fixing supports 28 extends parallel to the metal connecting strip 24.
[0089] Each secondary fixing support 28 has a secondary seat 29 extending in the longitudinal direction L which is welded to a secondary foot 30, the secondary foot 30 being anchored to the upper load-bearing wall 8 for example by welding. The secondary foot 30 is in the embodiment illustrated in Figures 3 to 6, produced in the form of an H-section beam (section shape in the thickness direction). Other section shapes can also be used provided that they provide a sufficient moment of inertia in the longitudinal direction L.
[0090] The secondary thermally insulating barrier 10 comprises secondary end insulating blocks 34. Each secondary end insulating block 34 is interposed between two adjacent secondary supports 28 in the transverse direction T. The secondary thermally insulating barrier 10 also comprises stop beams 41 extending in the transverse direction T and positioned on the upper surface of the secondary end insulating blocks 34 and in the vicinity of secondary seats 29 of two adjacent secondary supports 28. Each stop beam 41 is held in position using one or more stop devices 42 fixed to one or more secondary seats 29, as visible in [Fig. 3]. A metal secondary fixing plate 35 is fixed to the stop beam 41, for example by screwing or riveting.
[0091] The secondary sealing membrane 11 comprises a row of strakes 15 in the transverse direction T interrupted by the front longitudinal end edge 25 of the opening 7. These strakes 15 interrupted by the opening 7 are welded to the secondary metal fixing plate 35.
[0092] The secondary sealing membrane 11 also comprises a secondary metal connecting angle 36 extending in the transverse direction T. The secondary connecting angle 36 comprises a first secondary wing 37 and a second secondary wing 38 connected to the first secondary wing 37 and forming an angle therewith. The first secondary wing 37 is welded to the secondary metal fixing plate 35. The second secondary wing 38 is welded to the upper load-bearing wall 8 via an anchoring plate 40 and is located between the cover 19 and the secondary supports 28. The assembly of the strakes 15 interrupted by the opening 7, the secondary fixing plates 35, and the secondary connecting angles 36 make it possible to ensure a stop of the secondary sealing membrane 11 at the front longitudinal end edge 25 while maintaining the continuity of the seal, in particular with respect to the cover 19.
[0093] The space between the thermal insulation structure 21 of the cover 19 and the secondary connecting angle 36 is filled with insulating lining 53 sandwiched by plywood plates 54 in the longitudinal direction. The plywood plates 54 thus form a support for the secondary connecting angles 36 and, for primary connecting angles 49 which will be described later, as well as for the support plates 27 supporting in particular the sealing wall 20 of the cover 19 and the metal connecting strip 24. The insulating lining 53 is positioned in the extension of the secondary thermally insulating barrier 10, but also in the extension of the primary thermally insulating barrier 12. Thus, a continuity of insulation is achieved between the thermal insulation structure 21 of the cover 19 and the thermally insulating barriers 10, 12.
[0094] As seen in [Fig.3], similarly to the secondary thermally insulating barrier 10, the primary thermally insulating barrier 12 comprises primary end insulating blocks 39. The lower surface of the primary end insulating blocks 39 rests on the stop beams 41, the primary end insulating blocks 39 are adjacent to each other in the transverse direction T.
[0095] The primary sealing membrane 13 also comprises a primary metal connecting angle 49 extending in the transverse direction T. The primary connecting angle 49 comprises a first primary wing 50 and a second primary wing 51 connected to the first primary wing 50 and forming an angle therewith. The first primary wing 50 is fixed to an upper surface of the end primary insulating blocks 39, for example by screwing or riveting. The second primary wing 51 is continuously welded to the second secondary wing 38 of the secondary connecting angle 36 and is located between the cover 19 and the end primary insulating blocks 39.
[0096] The primary sealing membrane 13 comprises a row of strakes 15 in the transverse direction T interrupted by the front longitudinal end edge 25 of the opening 7. As illustrated in [Fig.3], the end portions of these strakes 15 interrupted by the opening 7 are continuously welded to the first primary wing 50 in the transverse direction T.
[0097] Alternatively, the first primary wing 50 may be welded to a primary fixing plate, not shown, rigidly fixed to the upper surface of the end primary insulating blocks 39. The end portions of the strakes 15 interrupted by the opening 7 are then continuously welded to the primary fixing plate in the transverse direction T.
[0098] In the first embodiment illustrated in Figures 3 to 6, the support plates 27 formed in line with the front longitudinal end edge 25 comprise a groove 43 extending in the transverse direction T so that this groove 43 is located in the longitudinal direction L between the sealing wall 20 of the cover 19 and the primary connecting angle 49. The metal connecting strip 24 is thus arranged above the groove 43 and is aligned with it in the transverse direction T, as visible in [Fig. 6]. In the embodiment shown, the groove 43 is made at the junction between two adjacent support plates 27 so as to extend in the longitudinal direction L over a part of said two adjacent support plates 27. The walls of the groove 43 can be inclined so that the dimension in the thickness direction E of the groove 43 increases until it reaches a maximum substantially in the middle of the groove 43 in the longitudinal direction L. The maximum of this dimension can for example be 10 mm.The groove 43 may also have a dimension in the longitudinal direction L of the order of 200 mm.
[0099] Thus, in a normal state in which the primary sealing membrane 13 is not stressed in compression for example, the metal connecting strip 24 is flat and distant in the thickness direction from the bottom of the groove 43. Conversely, in the event of buckling of the metal connecting strip 24 and due to the pressure greater than atmospheric pressure which prevails in the tank, the metal connecting strip 24 is caused to take on the shape of the groove 43.
[0100] As mentioned previously, [Fig.4] illustrates the attachment of the metal connecting strip 24.
[0101] The metal connecting strip 24 has a first end edge 31 extending in the transverse direction T and a second end edge 32 opposite the first end edge 31. The first end edge 31 is welded, via a weld 26, in the transverse direction T to the end edges of the flat plates 23 of the sealing wall 20 of the cover 19 and the second end edge 32 is welded, via a weld 26, in the transverse direction T on the first primary wing 50 of the primary connecting angle 49, making it possible to achieve sealing between the primary sealing membrane 13 of the ceiling wall 4 and the sealing wall 20 of the cover 19.
[0102] As seen in [Fig.4], the metal connecting strip 24 has first orifices 44 and second orifices 45. The first orifices 44 are spaced apart from each other and aligned in the transverse direction T, the second orifices 45 being formed parallel to the first orifices 44. These orifices 44, 45 allow the metal connecting strip to be passed through by fixing devices 46, 47 in order to be fixed to the support plates 27.
[0103] Thus, in order to move the possible buckling of the metal connecting strip 24 away from the welds 26, the storage installation 1 comprises first devices fixing devices 46 passing through the first orifices 44 and second fixing devices 47 passing through the second orifices 45 making it possible to fix the metal connecting strip 24 to the support plates 27. It is further advantageously provided that the first orifices 44 are located near the first end edge 31 and that the second orifices 45 are located near the second end edge 32.
[0104] The first fixing devices 46 and the second fixing devices 47 are illustrated in [Fig. 6]. In this embodiment, the first fixing devices 46 and the second fixing devices 47 are screws fixed in a support plate 27 and the screw head of which presses the metal connecting strip 24 against the support plate 27 supporting it. In addition, as visible in [Fig. 6], the fixing devices 46, 47 frame the groove 43. The fixing devices 46, 47 can however be produced differently, for example using nails or rivets.
[0105] The assembly of the strakes 15 of the primary sealing membrane 13 interrupted by the opening 7, of the primary connecting angle 49, of the metal connecting strip 24 and of the sealing wall of the cover 20 makes it possible to ensure the continuity of the sealing in the longitudinal direction L.
[0106] [Fig. 5] shows in particular the metal connecting strip 24 after covering the orifices 44, 45 and the fixing devices 46, 47.
[0107] Indeed, in order to improve the sealing of the assembly, a first elongated covering element 57 extending in the transverse direction T is arranged on the alignment of the first fixing devices 46 so as to cover them. In the same way, a second elongated covering element 58 is arranged on the alignment of the second fixing devices 47 so as to cover them. The first covering element 57 and the second covering element 58 are then welded to the metal connecting strip 24. In addition, other covering strips can be arranged on welding zones between two flat plates, for example at the junction between two metal flat plates 23 of the metal sealing wall 20.
[0108] In another embodiment not shown, the elongated covering elements 57, 58 can be replaced by individual covering elements each covering one of the fixing devices 46, 47.
[0109] [Fig.7] shows a second embodiment which differs from the first embodiment in that the support plates 27 formed in line with the front longitudinal end edge 25 do not have a groove 43. Thus, the upper surface of the support plates 27 formed in line with the front longitudinal end edge 25 is flat.
[0110] Thus, in the second embodiment and in a normal state in which the primary sealing membrane 13 is not stressed in compression for example, the metal connecting strip 24 is flat and is supported by the support plates 27. Conversely, in the event of buckling of the metal connecting strip 24, the metal connecting strip 24 is caused to undulate towards the inside of the tank at a distance from the welds 26, so that locally the connecting strip 24 is no longer supported by the support plates 27.
[0111] By way of example, the metal connecting strip 24 may have a dimension in the longitudinal direction L equal to approximately 450 mm. The first orifices 44 and the second orifices 45 may be located in the longitudinal direction L at a distance of approximately 80 mm respectively from the first end edge 31 and the second end edge 32. The first covering elements 57 and the second covering elements 58 may have a dimension in the longitudinal direction L of between 50 and 80 mm.
[0112] The metal connecting strip 24 and its attachment have been described in relation to the front longitudinal end edge 25. However, and analogously, this arrangement is also applicable to the rear longitudinal end edge.
[0113] With reference to [Fig.8], a cutaway view of an LNG carrier ship 70 shows a sealed and thermally insulating tank 71 of generally prismatic shape mounted in the double hull 72 of the ship. The wall of the tank 71 comprises a primary sealing membrane intended to be in contact with the LNG contained in the tank, a secondary sealing membrane arranged between the primary sealing membrane and the double hull 72 of the ship, and two thermally insulating barriers arranged respectively between the primary sealing membrane and the secondary sealing membrane and between the secondary sealing membrane and the double hull 72.
[0114] In a manner known per se, loading / unloading pipes 73 arranged on the upper deck of the ship can be connected, by means of appropriate connectors, to a maritime or port terminal to transfer a cargo of LNG from or to the tank 71.
[0115] [Fig. 8] shows an example of a marine terminal comprising a loading and unloading station 75, an underwater pipeline 76 and an onshore installation 77. The loading and unloading station 75 is a fixed offshore installation comprising a mobile arm 74 and a tower 78 which supports the mobile arm 74. The mobile arm 74 carries a bundle of insulated flexible pipes 79 which can be connected to the loading / unloading pipes 73. The orientable mobile arm 74 adapts to all sizes of LNG carriers. A connecting pipeline (not shown) extends inside the tower 78. The loading and unloading station 75 allows the loading and unloading of the LNG carrier 70 from or to the onshore installation 77. The latter comprises liquefied gas storage tanks 80 and pipelines connecting pipes 81 connected by the underwater pipe 76 to the loading or unloading station 75. The underwater pipe 76 allows the transfer of liquefied gas between the loading or unloading station 75 and the onshore installation 77 over a long distance, for example 5 km, which makes it possible to keep the LNG carrier 70 at a great distance from the coast during loading and unloading operations.
[0116] To generate the pressure necessary for the transfer of the liquefied gas, pumps on board the ship 70 and / or pumps equipping the onshore installation 77 and / or pumps equipping the loading and unloading station 75 are used.
[0117] Although the invention has been described in connection with several particular embodiments, it is quite obvious that it is in no way limited thereto and that it includes all the technical equivalents of the means described as well as their combinations if these fall within the scope of the invention.
[0118] The use of the verb “comprise”, “comprendre” or “include” and its conjugated forms does not exclude the presence of other elements or other steps than those stated in a claim.
[0119] In the claims, any reference sign in parentheses cannot be interpreted as a limitation of the claim.
Claims
Claims
1. Storage installation (1) for liquefied gas comprising a metal supporting structure (2) and a sealed and thermally insulating tank (71) arranged in the supporting structure, the tank comprising at least one metal sealing membrane (11, 13) defining an internal storage space (3) and at least one thermally insulating barrier (10, 12), the thermally insulating barrier being placed between the sealing membrane and the supporting structure, the supporting structure comprising an upper supporting wall (8), the tank (71) comprising at least one ceiling wall (4) fixed to the upper supporting wall (8), in which the thermally insulating barrier (10, 12) of the ceiling wall comprises juxtaposed insulating blocks (14, 18), in which the sealing membrane (11, 13) of the ceiling wall (4) comprises a plurality of parallel strakes (15) extending in a first direction (L),each strake (15) comprising a flat central portion (16) resting on an upper surface of the insulating blocks (14, 18) and two raised edges (17) projecting towards the inside of the tank relative to the central portion (16), the strakes (15) being juxtaposed in a second direction (T) according to a repeated pattern and welded together in a sealed manner at the raised edges, the second direction being perpendicular to the first direction, the ceiling wall (4) being interrupted locally so as to delimit a loading / unloading opening (7) intended to be crossed by loading / unloading pipes, said loading / unloading opening (7) interrupting at least one said strake (15) of the sealing membrane (11, 13) of the ceiling wall (4), in which the tank comprises a cover (19) arranged in the loading / unloading opening (7),the cover (19) comprising a metal sealing wall (20) and a thermal insulation structure (21) located between the sealing wall (20) and the upper load-bearing wall (8), the cover (19) being fixed to the upper load-bearing wall (8), wherein a metal connecting strip (24) extending in the second direction (T) connects the sealing wall (20) of the cover (19),
2.
3. to the sealing membrane (11, 13) interrupted in order to ensure continuity of the seal between the sealing wall (20) of the cover (19) and the sealing membrane (11, 13) of the ceiling wall (4), the metal connecting strip having a first end edge extending in the second direction and a second end edge opposite the first end edge, the first end edge of the metal connecting strip (24) being welded to the sealing wall (20) of the cover (19) and the second end edge of the metal connecting strip (24) being welded to the sealing membrane (11, 13) of the ceiling wall (4), wherein the thermally insulating barrier (10, 12) of the ceiling wall (4) and the thermal insulation structure (21) of the cover (19) comprise support elements (27) together forming a support assembly which support the sealing membrane (11, 13) of the ceiling wall (4),the sealing wall (20) of the cover (19) and the metal connecting strip (24), wherein the metal connecting strip (24) is attached to the support assembly using at least one first attachment device (46) and at least one second attachment device (47), the at least one first attachment device (46) being located near the first end edge and the at least one second attachment device (47) being located near the second end edge, and in which the metal connecting strip (24) is able to move between two positions, a first position in which said metal connecting strip (24) is flat when it is not subjected to any compressive force, and a second position distinct from the first position following a compressive force. Storage facility (1) according to claim 1, wherein the storage facility comprises a plurality of first fastening devices (46) spaced from each other in the second direction (T) and a plurality of second fastening devices (47) spaced from each other in the second direction (T). Storage facility (1) according to claim 1 or claim 2, wherein the storage facility comprises a first metal covering element (57) arranged on the at least one first fastening device (46), the first metal covering element (57) being welded in a sealing manner to the metal connecting strip (24), and a second metal covering element (58) arranged on the at least one second fastening device (47), the second metal covering element (58) being welded in a sealed manner to the metal connecting strip (24).
4. Storage installation (1) according to one of claims 1 to 3, wherein the part of the support assembly (27) arranged under the metal connecting strip (24) comprises a groove (43) extending in the second direction (T), the groove (43) being located in the first direction (L) between the at least one first fixing device (46) and the at least one second fixing device (47), a portion of the metal connecting strip (24) being spaced in a thickness direction (E) by a non-zero distance from a bottom of said groove (43), so that the metal connecting strip (24) can deform by buckling in the groove (43) following a compressive force in the first direction (L).
5. Storage facility (1) according to claim 4, wherein the groove (43) is provided at the junction between two adjacent support elements (27) so as to extend in the first direction (L) over a portion of said two adjacent support elements (27).
6. Storage installation (1) according to one of claims 1 to 5, wherein the sealing membrane (13) of the ceiling wall (4) comprises a connecting angle (49) extending in the second direction (T) to sealably separate the thermally insulating barrier (10, 12) from the thermal insulation structure (21) of the cover (19), the connecting angle (49) comprising a first wing (50) and a second wing (51) connected to the first wing, the first wing (50) being welded to said at least one strake interrupted by the opening and the second wing (51) being connected to the upper load-bearing wall (8).
7. Storage facility (1) according to claim 6, wherein the second end edge of the metal connecting strip (24) is welded to the first wing (50) of the connecting angle (49).
8. Storage installation (1) according to one of claims 1 to 7, in which the sealing membrane (13) of the ceiling wall, the sealing wall (20) of the cover (19) and the connecting strip (24) are made of an iron and nickel alloy having a coefficient of thermal expansion of between 0.5.10 6 and 2.106 K1.
9. Storage facility (1) according to one of claims 1 to 8, in which the supporting structure (2) comprises a cofferdam wall rear (5) and a front cofferdam wall (6) located on either side of the tank in the first direction (L), the loading / unloading opening (7) being formed near the rear cofferdam wall (5), the connecting strip (24) being arranged between the cover (19) and the front cofferdam wall (6).
10. A storage facility (1) according to claim 9, wherein the metal connecting strip (24) is a first connecting strip, and the storage facility comprises a second connecting strip (24) disposed between the cover (19) and the rear cofferdam wall (5).
11. Storage facility (1) according to one of claims 1 to 10, wherein the sealing membrane is a primary sealing membrane (13) intended to be in contact with the liquefied gas, the thermally insulating barrier is a primary thermally insulating barrier (12) and wherein the tank further comprises, in a thickness direction from the outside to the inside of the tank, a secondary thermally insulating barrier (10) fixed to the supporting structure (2), and a metallic secondary sealing membrane (11) arranged between the secondary thermally insulating barrier (10) and the primary thermally insulating barrier (12).
12. Storage facility (1) according to claim 11, wherein the primary sealing membrane (13) of the ceiling wall (4) comprises a primary connecting angle (49) extending in the second direction (T) for sealingly separating the primary thermally insulating barrier (12) from the thermal insulation structure (21) of the cover (19), the primary connecting angle (49) comprising a first wing (50) and a second wing (51) connected to the first wing, the first wing (50) being welded to said at least one strake interrupted by the opening and the second wing (51) being connected to the upper load-bearing wall (8), and wherein the secondary sealing membrane (11) comprises a secondary connecting angle (36) for sealingly separating the secondary thermally insulating barrier from the thermal insulation structure of the cover,the secondary connecting angle comprising a first wing (37) and a second wing (38) connected to the first wing, the first wing (37) of the secondary connecting angle being welded to at least one strake of the secondary sealing membrane (11) interrupted by the opening and the second wing (38) of the secondary connecting angle being welded to the upper load-bearing wall, (8).
13. Storage facility (1) according to claim 12, wherein the second wing (51) of the primary connecting angle (49) is welded to the second wing (38) of the secondary connecting angle.
14. Storage installation (1) according to one of claims 1 to 13 produced in the form of a floating structure, in which said supporting structure is constituted by a double hull (72) of the floating structure and in which the first direction is a longitudinal direction (L) of the floating structure.
15. Storage facility (1) according to the preceding claim, in which the floating structure is a ship (70) for transporting a cold liquid product.
16. A transfer system for a cold liquid product, the system comprising a storage facility according to claim 15, insulated pipes (73, 79, 76, 81) arranged to connect the tank (71) installed in the hull of the ship to an external floating or land-based storage facility (77) and a pump for driving a flow of cold liquid product through the insulated pipes from or to the external floating or land-based storage facility to or from the tank of the ship.
17. A method of loading or unloading a storage facility according to claim 15, wherein a cold liquid product is conveyed through insulated pipes (73, 79, 76, 81) from or to an external floating or land-based storage facility (77) to or from the vessel's tank (71).