IAB donor, control method, program, and control device
Patent Information
- Application Number
- JP2021182058
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2021-11-08
- Publication Date
- 2024-11-13
- Estimated Expiration
- 2041-11-08
AI Technical Summary
In Integrated Access and Backhaul (IAB) systems, setting appropriate communication paths to relay user equipment (UE) communication is crucial, especially considering the limitations on the number of UEs each relay device can handle based on radio quality and processing capacity.
A control device determines whether to change the communication route by adjusting the connection destination of relay devices based on the number of connected terminals, ensuring that the number of UEs does not exceed the allowable capacity of each relay device, thereby optimizing the communication path.
This approach allows for appropriate setting of communication paths, preventing overload and maintaining a good communication environment for UEs by ensuring that the number of connected UEs does not exceed the allowable capacity of each relay device.
Abstract
Description
Technical field
[0001] The present invention relates to technology for setting relay communication paths. [Background technology]
[0002] In the 3rd Generation Partnership Project (3GPP), the standardization of IAB (Integrated Access and Backhaul) that integrates access lines and backhaul lines is in progress (see Patent Document 1). In IAB, radio resources used for access lines between base stations and user equipments (UEs) are also used for backhaul lines. For example, in the IAB, millimeter-wave band radio resources such as the 28 GHz band may be used. By using IAB, the relay device (IAB node) can relay communication between the base station device (IAB donor) and the terminal device by wireless line, compared to the case of using wired line such as optical fiber. area coverage can be expanded at low cost. [Prior art documents] [Patent document]
[0003] [Patent document 1] Japanese Patent Publication No. 2018-525874 [Outline of the invention] [Problems to be solved by the invention]
[0004] In IAB, it is important that the communication path is properly set to relay the UE's communication. [Means for solving the problem]
[0005] A control device according to an aspect of the present invention is a control device for a wireless communication system including a relay device that relays communication between a base station and a terminal, and is configured to have the base station as a starting point and a first relay device. Connected to a relay device included in the first communication path in a first communication path including a second relay device directly connected to the first relay device downstream from the first relay device determining means for determining whether or not to change the first communication route based on the number of terminals connected to the second relay device; setting means for changing a connection destination from the first relay device to the third relay device or the base station and setting a second communication path.
Effect of the invention
[0006] ADVANTAGE OF THE INVENTION According to this invention, the communication path for relaying the communication of UE can be set appropriately. [Brief description of the drawing]
[0007]
Figure 1
Figure 2
[0008] Hereinafter, embodiments will be described in detail with reference to the accompanying drawings. In addition, the following embodiments do not limit the invention according to the scope of claims. Although multiple features are described in the embodiments, not all of these multiple features are essential to the invention, and multiple features may be combined arbitrarily. Furthermore, in the accompanying drawings, the same or similar configurations are denoted by the same reference numerals, and redundant description is omitted.
[0009] (System configuration) FIG. 1 shows a configuration example of a wireless communication system according to this embodiment. This wireless communication system is a relay communication system based on IAB (Integrated Access and Backhaul) specified in the cellular communication standards of the 3rd Generation Partnership Project (3GPP). IAB includes IAB donor 102 and IAB donor 108 connected to core network 101 . The IAB donor 102 and the IAB donor 108 have functions as base station devices and establish radio connections with terminal functions (mobile termination) of IAB nodes. Then, the IAB donor 102 and the IAB donor 108 perform settings by BAP (Backhaul Adaptation Protocol) to enable the IAB node to function as a relay device. For example, an IAB node 103 and an IAB node 105 are connected to the IAB donor 102, and a communication path via the IAB donor 102 and the IAB node 103 and a communication path via the IAB donor 102 and the IAB node 105 are set. Also, an IAB node 109 is connected to the IAB donor 108, and a communication path via the IAB donor 108 and the IAB node 109 is set.
[0010] Note that an IAB node may connect with other IAB nodes that are directly or indirectly connected to an IAB donor. In this case, the communication between the IAB node and the IAB donor will be through other IAB nodes. For example, IAB node 104 can establish a connection and establish a communication path with IAB donor 102 through IAB node 103 . Similarly, IAB node 106 can establish a connection with IAB donor 102 through IAB node 105 , and IAB node 110 can connect with IAB donor 108 through IAB node 109 . Further, IAB node 107 may connect to IAB node 104 to establish a communication path to IAB donor 102, for example. Note that the IAB node 107 may be configured to be simultaneously connectable to the IAB node 106 and the IAB node 105 in addition to the IAB node 104 using dual connectivity, for example.
[0011] In this embodiment, when viewed from one IAB node, a node that is directly connected to the core network 101 from the IAB node on the established communication path is called a parent node. A node that is directly connected to the IAB node on the side away from the core network 101 on the communication path is called a child node. For example, the parent node of IAB node 104 is IAB node 103 and the child node of IAB node 104 is IAB node 107 . Similarly, from the perspective of IAB node 109, IAB donor 108 is the parent node and IAB node 110 is the child node. As described above, in the wireless communication system according to the present embodiment, a tree-structured relay network is formed starting from the IAB donor.
[0012] Note that IAB nodes (and IAB donors in some cases) perform not only backhaul line communications, but also access line communications. For example, the IAB node uses an antenna for the backhaul line and a common or separately prepared access line antenna to form a cell, establish an access line with the terminal (UE), and provide communication services. offer. For example, IAB node 104 forms cell 111 , IAB node 106 forms cell 112 , and IAB node 107 forms cell 113 . Note that other IAB nodes (and possibly IAB donors) can similarly form cells to establish connections with UEs and provide communication services. Also, each IAB node (and possibly an IAB donor) may form multiple pre-determined beams or form an appropriate beam for each UE to communicate. Note that each IAB node receives data (control data and user data) addressed to the currently connected UE from the parent node and transmits the data to the UE. Similarly, the IAB node forwards data received from connected UEs to the parent node. Thereby, communication is performed between the IAB donor functioning as a base station apparatus and the UE. IAB donors and IAB nodes may provide access circuits in the same frequency band as the frequency band used for the backhaul circuit, or provide access circuits in a frequency band different from the frequency band used for the backhaul circuit. may provide.
[0013] An IAB node can switch between connected IAB donors or other IAB nodes. In one example, an IAB node can switch a connection destination node when a radio link failure (Backhaul Radio Link Failure, BH RLF) occurs in a radio link with another connection destination node. For example, when a BH RLF occurs, the IAB node can search for and connect to other connectable IAB nodes or IAB donors, and newly establish a communication path by the IAB. As a result, even if the radio quality of the backhaul line by the IAB becomes insufficient for some reason, it is possible to continue providing communication services to the UEs that are currently connected. Note that BH RLF is just an example, and communication paths may be switched for other reasons. An IAB node, for example, like a normal handover, when the radio quality between other IAB nodes that are not connected is better than the radio quality between connected parent nodes by a predetermined level or more The communication path may be changed according to a predetermined event such as.
[0014] Here, each IAB node is limited in the number of UEs it can handle, for example, based on the radio quality in the communication path to the IAB donor connected via the parent node and the processing capability of the IAB node itself. is assumed. For example, if the radio quality is insufficient in part of the communication path, the number of UEs that can be handled is smaller than when the radio quality is good. In addition, the number of UEs that can be handled also varies depending on the amount of physical resources such as baseband processing and RF processing. Note that the “number of UEs that can be handled” here includes the total number of UEs connected to child nodes and downstream. That is, the upstream IAB node connected at a position close to the IAB donor in the communication path is connected not only to the communication of the UE connected to its own device, but also to the downstream IAB node such as a child node It is necessary to relay the communication for the UE as well. Therefore, even if the number of UEs directly connected to the IAB node does not exceed the number of connections allowed in the device itself, depending on the number of UEs connected to the downstream IAB node , it may be unable to provide communication services to the UE. For this reason, in this embodiment, a control device such as an IAB donor or a control node in the core network 101 determines a communication path to be set in consideration of the allowable number of UEs accommodated in each IAB node. Below, the case where this control device is an IAB donor will be described. Note that the “permissible capacity” of an IAB node refers to the maximum number of UEs connected to the IAB node and the total number of UEs connected to child nodes or downstream nodes. In addition, the allowable number of accommodated units here may be, in one example, the number of units that may not be able to communicate with sufficient quality due to the number of UEs exceeding that number being connected, and communication will not be possible immediately. can be set to a number that is not In addition to or instead of the allowable number of accommodated devices, the communication route may be determined based on other criteria such as allowable total throughput and allowable bandwidth. That is, the communication path may be determined so that the sum total of throughput and bandwidth required for communication of UEs connected to each IAB node and its downstream IAB nodes does not exceed the allowable amount.
[0015] (Device configuration) FIG. 2 shows an example hardware configuration of an IAB donor (control device). The IAB donor has, for example, a control unit 201, a storage unit 202, a wireless communication unit 203, an antenna control unit 204, and an antenna 205. Note that these configurations are examples, and the IAB donor (control device) may further include other hardware configurations, or may not include at least part of the configuration shown in FIG. Also, the IAB donor (control device) may further include components not included in FIG. For example, the IAB donor has a wireless communication unit 203, an antenna control unit 204, and an antenna 205, but if a control device placed in the core network 101 is used, instead of these hardware, a wired communication unit or An interface for that may be included.
[0016] The control unit 201 includes one or more processors such as a CPU (Central Processing Unit) and an MPU (Micro Processing Unit). Note that the control unit 201 may include an FPGA (Field Programmable Gate Array), a DSP (Digital Signal Processor), an ASIC (Application Specific Integrated Circuit), and the like. The control unit 201 can be configured, for example, to execute a computer program stored in the storage unit 202 to control the entire apparatus of the IAB donor and execute processing described later. The storage unit 202 includes one or more of memory such as ROM (read only memory) and RAM (random access memory), HDD (hard disk drive), SSD (solid state drive) and other mass storage devices. . Note that these are only examples, and the storage unit 202 can have any device configuration capable of storing information. The storage unit 202 is configured to store, for example, a computer program corresponding to control processing executed by the control unit 201, and various types of information used for the control processing (cell information, connection terminal information, IAB routing information, etc.). be.
[0017] The wireless communication unit 203 executes various processes related to cellular communication such as LTE (Long Term Evolution) conforming to the 3GPP standard and the fifth generation (5G) cellular communication standard. The wireless communication unit 203 includes, for example, a circuit for control processing for executing communication processing such as a baseband chip or an RF (radio frequency) chip. The antenna control unit 204 transmits the electric signal generated by the radio communication unit 203 as a radio signal, detects the radio signal coming from outside the IAB donor, and controls the antenna 205 to obtain the electric signal. Antenna control section 204, for example, determines antenna weights so as to form a beam toward a destination device such as an IAB node, and uses the antenna weights for signals transmitted from antenna 205 and signals received at antenna 205. can be applied to any signal Antenna 205 includes one or more antenna elements designed to transmit radio waves in a frequency band corresponding to the radio communication system to which radio communication unit 203 conforms and to receive radio waves in that frequency band from the outside. It is an antenna composed of Note that the antenna 205 can be configured to form a beam having a high gain in a predetermined direction and a low gain in other directions using a plurality of antenna elements. In addition, the control for the beam formation can be performed by the antenna control unit 204 .
[0018] Next, with reference to FIG. 3, a functional configuration example of the IAB donor (control device) will be described. The IAB donor (control device) includes, for example, a signal transmission unit 301, a signal reception unit 302, a data storage unit 303, a connection control unit 304, an RRC processing unit 305, a notification signal control unit 306, a UE connection count confirmation unit 307, a connection destination It has a determination unit 308 and a connection destination notification unit 309 . Note that these functional units are examples, and some of the functions may be omitted, or functions different from those shown in FIG. 3 may be added. Furthermore, one functional unit may be prepared by integrating two or more functions shown in FIG. 3, or the function shown as one functional unit in FIG. 3 may be divided into a plurality of functional units. may The functional units shown in FIG. 3 can be implemented by the control unit 201 executing a program stored in the storage unit 202, for example. Also, at least part of the functions may be implemented using dedicated hardware such as functions pre-installed in the wireless communication unit 203, for example. Also, some functions may be realized through cooperation between IAB donors and IAB nodes.
[0019] The signal receiving unit 301 and the signal transmitting unit 302 execute processing for transmitting and receiving radio signals to and from the UE in compliance with cellular communication standards such as 3GPP LTE and 5G. The data storage unit 303 executes processing for storing and holding software (computer program) executed by the IAB donor, routing information of the IAB, information regarding the UE being connected, and the like. In addition, the data storage unit 303 can store general information related to communication control such as PLMN (Public Land Mobile Network Identity), which is an identifier for identifying communication carriers. The connection control unit 304 performs processing related to connection and disconnection of the UE to and from the cellular network, such as radio resource control (RRC) message communication between the UE and the core network. The RRC processing unit 305 executes RRC processing such as requesting establishment and release of an RRC connection. RRC processing unit 305, when the first IAB node under the control is handed over to another IAB donor or a second IAB node under the control of another IAB donor, the UE connected to the first IAB node can send a message for handover to. In addition, the RRC processing unit 305 is connected to the first IAB node even when the first IAB node is handed over from another IAB donor or a second IAB node under its control and connected to the own device. UE for handover. That is, when the connected IAB node connects to another IAB donor, the UE connected to the IAB node also changes the connection destination IAB donor. Perform processing to release the connection. In addition, the RRC processing unit 305 establishes an RRC connection of the UE connected to the first IAB node when the unconnected first IAB node is handed over to the device or the second IAB node under its control Execute the process for
[0020] The broadcast signal control unit 306 periodically transmits broadcast signals such as a synchronization signal (SS) and a physical broadcast channel (PBCH) to the surroundings using predetermined frequency resources for each cell provided by the own device. Note that the annunciation signal control unit 306, for example, determines radio resources to be used for SS / PBCH transmission in each of the IAB nodes connected under its control, and transmits an annunciation signal using those radio resources. controllable. UEs and MTs of IAB nodes existing within the reach of the notification signal can recognize IAB donors existing around the device or IAB nodes connected to the IAB donors based on the notification signal. . Based on the received notification signal, the UE and the MT of the IAB node can execute connection processing to surrounding IAB donors and other IAB nodes.
[0021] A UE connection number confirmation unit 307 confirms the number of UEs connected to each of the IAB node currently connected to the own device and other IAB nodes connected downstream thereof. UE connection number confirmation unit 307, in the procedure when the UE is connected to each IAB node, for example, based on the identifier of the communication path included in the signal transmitted from the IAB node, to which IAB node the UE is connected. can recognize. Then, the UE connection count confirmation unit 307 stores the number of UEs connected to each IAB node in the data storage unit 303, and confirms the number of UEs connected to each IAB node based on the stored information. can do. Note that the UE connection count confirmation unit 307 can acquire the allowable number of accommodated UEs in each IAB node when establishing a connection and a communication path with each IAB node, and store it in the data storage unit 303 . Then, the UE connection number checking unit 307 can identify the IAB nodes included in each communication path in setting the establishment of the communication path. For this reason, the UE connection number confirmation unit 307 calculates the total number of UEs connected to each IAB node included in a certain communication path and the IAB node downstream thereof, and the total number is allowed. It is possible to determine whether or not the number of accommodation units has been exceeded.
[0022] Connection destination determination unit 308, for the IAB node included in the communication path to which the new UE is connected, when the number of UEs connected to the IAB node and other downstream IAB nodes exceeds the allowable accommodation number , determines the connection destination of the IAB node on the communication path. For example, the connection destination determination unit 308 can determine to switch the connection destination of the IAB node to which the UE is connected or the connection destination of the upstream IAB node. For example, the connection destination determination unit 308 establishes a new communication path by connecting the IAB node to which the UE is connected to another IAB node. determine whether to Then, when a new communication path can be set without the number of IAB nodes exceeding the allowable accommodation number, the connection destination determination unit 308 selects the connection destination of one of the IAB nodes so as to set the new communication path. You can decide to change. The connection destination notification unit 309 notifies the IAB node whose connection destination is to be changed, which has been determined by the connection destination determination unit 308, that the connection destination should be changed and information indicating the IAB node of the connection destination after the change. I do.
[0023] (Communication processing flow) Next, an example of the flow of processing executed in the wireless communication system described above will be described. In the following description, only the IAB donor 102 and the IAB nodes 103 to 107 in the system of FIG. 1 will be focused on. IAB node 107 is connected to IAB node 104, and a communication path including IAB donor 102, IAB node 103, IAB node 104, and IAB node 107 is formed. It is also assumed that another communication path including IAB donor 102, IAB node 105 and IAB node 106 is formed.
[0024] <Processing example 1> In this processing example, a case will be described where the number of UEs that can be accommodated in each IAB node (that is, the maximum total number of UEs connected to each IAB node and other downstream IAB nodes) is set. In addition, in this processing example, the IAB node 104 can be connected to the IAB node 105 in addition to the IAB node 103, and the IAB node 107 can be connected to the IAB node 105 or the IAB node 106 in addition to the IAB node 104. shall be Also, the IAB node 106 is connectable to the IAB node 103 in addition to the IAB node 105 . Note that devices that can be connected to each IAB node are specified in advance based on the results of measurement of the surrounding wireless environment, for example, by the MT of each IAB node. This can be done in the same manner as the conventional process of determining the cell to be measured for the UE.
[0025] Each IAB node can accommodate 12 IAB nodes 103, 8 IAB nodes 104, 20 IAB nodes 105, 12 IAB nodes 106, and 5 IAB nodes 103. . Further assume that there are four UEs connected in the cell 111 formed by the IAB node 104 and six UEs connected in the cell 112 formed by the IAB node 106 . It is also assumed that there are four UEs currently connected in the cell 113 formed by the IAB node 107, and that UE 121 is about to connect. In addition, the IAB node 104 has four UEs connected in its own device, and there are also four UEs connected to the IAB node 107 connected downstream, so the UEs accommodated by the IAB node 104 The total number of units is 8. On the other hand, since the IAB node 107 does not have any other IAB nodes connected downstream, only four UEs that are being accommodated are connected to the IAB node 107 itself. A table summarizing this information is shown in FIG.
[0026] Here, when a further UE 121 is connected to the IAB node 107, the number of UEs accommodated by the IAB node 103 and the IAB node 104 is nine, and the number of UEs accommodated by the IAB node 107 is five. . In this case, the number of UEs being accommodated in the IAB node 107 does not exceed the allowable accommodation number, but the number of UEs being accommodated in the IAB node 104 exceeds the allowable accommodation number. Therefore, the IAB donor 102 can determine whether to switch the destination of the IAB node 107 . That is, since the number of UEs accommodated by the IAB node 104 exceeds the allowable accommodation number, the connection destination of the IAB node (here, the IAB node 107) connected to the child node of the IAB node 104 or its downstream side is changed. is determined. In this processing example, the IAB node 107 determines whether or not the connection to the IAB node 106 or the IAB node 105, which are connection destination candidates other than the currently connected IAB node 104, should be changed. According to FIG. 4, the IAB node 106 has a permissible accommodation capacity of 12 units and currently accommodates 6 UEs. Here, when the IAB node 107 to which the UE 121 is connected is connected, the number of UEs being connected to the IAB node 107 at that time is 5, so the number of UEs being accommodated by the IAB node 106 is 11. It fits within the allowable accommodation number. In addition, the number of allowable accommodation units of the IAB node 105 is 20, and the number of UEs currently accommodated is 6. Similarly, even if the IAB node 107 connects to the IAB node 106, the UEs currently accommodated is within the allowable accommodation number. Similarly, even if the IAB node 107 connects to the IAB node 105, the number of UEs being accommodated is within the allowable accommodation number. As such, IAB donor 102 may decide to switch IAB node 107 to either IAB node 106 or IAB node 105 .
[0027] Note that the IAB donor 102 may decide to increase the number of connection destinations of the IAB node 107 instead of switching the connection destination when the IAB node 107 supports dual connectivity. That is, IAB donor 102 may decide that IAB node 107 connects to IAB node 106 and IAB node 105 while maintaining connection with IAB node 104 . In this case, the IAB donor 102 uses, for example, either path 1 via the IAB node 104 or path 2 via the IAB node 106 or IAB node 105 for each UE connected to the IAB node 107. can decide whether to communicate. Note that this is an example, and the UE and the route do not have to be fixedly associated. For example, a predetermined percentage of UE communications connected to IAB node 107 may be conducted using path 2 . For example, the IAB donor 102 may decide to communicate with 3 UEs on path 1 and communicate with 2 UEs on path 2, and share the configuration information with the IAB node 107 . In this case, for example, the number of UEs accommodated by the IAB node 104 may be counted as three, and the number of UEs accommodated by the IAB node 106 or IAB 105 may be counted as two.
[0028] An example of the flow of processing in a wireless communication system will be described with reference to FIG. To simplify the explanation, it is assumed that the IAB node 107 can be connected to either the IAB node 104 or the IAB node 106, and the connection to the IAB node 105 is not considered. First, starting from the IAB donor 102, a first communication path including the IAB donor 102, the IAB node 103 and the IAB node 104, and a second communication path including the IAB donor 102, the IAB node 105 and the IAB node 106 is formed (S501). establishing a connection and establishing a communication path between the IAB donor 102 and the IAB node 103 and establishing a connection and establishing a communication path between the IAB node 103 and the IAB node 104 for the first communication path; is done. Also, for the second communication path, establishing a connection and establishing a communication path between the IAB donor 102 and the IAB node 105 and establishing a connection and a communication path between the IAB node 105 and the IAB node 106 is set. With the first communication path and the second communication path thus formed, IAB node 107 connects to IAB node 104 in order to connect to the first communication path. The IAB node 107, for example, receives broadcast signals (synchronization signals and physical broadcast channels, SS / PBCH) coming from the IAB node 104 and the IAB node 106 (S502, S503).
[0029] The IAB node 107 establishes downlink synchronization based on the synchronization signal and acquires basic information of the system through the PBCH. Here, it is assumed that the IAB node 107 has decided to connect to the IAB node 104 based on, for example, the reception strength of the broadcast signal. In this case, IAB node 107 executes a random access procedure (RACH process) with IAB node 104 (S504). That is, the IAB node 107 establishes uplink synchronization by transmitting a random access preamble to the IAB node and receiving a random access response containing information specifying transmission timing. Then, the IAB node 107 establishes connection in the RRC layer (S505), and becomes ready for communication with the IAB node 104. FIG. Then, the IAB donor 107 executes a communication route setting process by BAP with the IAB donor 102, whereby the IAB donor 102, the IAB node 103, the IAB node 104, and the IAB node 107 are connected in this order. A communication path is established (S506). The detailed procedures for establishing a connection and setting a communication path are the same as those for establishing a connection and setting a communication path for a normal IAB node, so descriptions thereof will be omitted here. By completing this setting, the IAB donor 102 can manage the communication path including the IAB node 107 . Also, with this setting, the IAB node 107 can function as a relay device that relays the communication of the IAB donor 102, and can establish a connection with the UE.
[0030] After that, for example, after four UEs are connected to the IAB node 107, the UE 121 enters the cell 113 formed by the IAB node 107 and establishes a connection with the IAB node 107 (S507). Note that the UE 121 executes connection processing with the IAB donor 102 via the IAB node 107 when actually establishing connection. At this time, the IAB node 107 transfers data including identification information for identifying the communication path between the IAB node 107 and the IAB donor 102 . Thus, IAB donor 102 can recognize that UE 121 connects to IAB node 107 . The IAB donor 102 determines whether the communication path currently associated with the IAB node 107 through the connection of the UE 121 includes an IAB node in which the number of accommodated UEs exceeds the allowable number of accommodated UEs. Then, if there is a first IAB node in which the number of UEs being accommodated exceeds the allowable accommodation number, the IAB donor 102 switches the connection destination of the second IAB node downstream from the IAB node. judge. Then, the IAB donor 102, for example, as described above, determines that the connection destination of the IAB node 107 is the IAB node 106, and transmits to the IAB node 107 a connection destination switching instruction including the information on the connection destination. (S509). The connection destination information can be, for example, a cell identifier configured by the IAB node 106. FIG.
[0031] When the IAB node 107 receives the connection destination switching instruction from the IAB donor 102, based on the instruction, the IAB node 107 executes RACH processing to establish synchronization with the IAB node 106 (S510), and establishes an RRC connection. (S511). Note that IAB node 107 can disconnect from IAB node 104 at this time. That is, the MT of the IAB node 107 can perform handover to switch destination IAB nodes. After that, the IAB node 107 executes communication route setting processing by BAP with the IAB donor 102, thereby connecting the IAB donor 102, the IAB node 105, the IAB node 106, and the IAB node 107 in this order. A route is established (S512). By performing such processing, there will be no IAB nodes that can accommodate more UEs than the allowable accommodation number, so it is possible that some IAB nodes will be overloaded and the communication quality will be insufficient. can be prevented.
[0032] In the above example, whether or not to change the connection destination of the IAB node 107 has been described, but when the IAB node 107 supports dual connectivity, the connection destination may be added. That is, for an IAB node that can connect to two or more connection destinations in parallel, the connection destination may be changed or the connection destination may be added.
[0033] Next, the flow of processing executed by the IAB donor 102 in S509 will be explained using FIG. The processing in FIG. 6 can be implemented by the control unit 201 of the IAB donor 102 executing a program stored in the storage unit 202, for example. Note that this is only an example, and predetermined hardware on which the processing of FIG. 6 is implemented may be used.
[0034] When connecting with UE 121 via IAB node 107, IAB donor 102 receives UE connection information indicating that UE 121 is connected to IAB node 107 (S601). Then, when the UE 121 is connected to the IAB node 107, the IAB donor 102, among the IAB nodes included in the communication path to which the IAB node 107 belongs, is an IAB node that accommodates the number of UEs exceeding the allowable accommodation number. exists (S602). If such an IAB node does not exist (NO in S602), the IAB donor 102 terminates the process as it is, accepts the connection of UE 121 with the current communication path, and communicates with UE 121 via the IAB node 107. communicate. On the other hand, if such an IAB node exists (YES in S602), the IAB donor 102 performs initial settings for selecting a connection destination (S603). In the initial settings, for the IAB node whose connection destination is to be changed, the number of connection switching destination candidates is set to "N", and the connection switching destination candidates are sorted in order of radio wave intensity (wireless quality), n=1 From the second candidate, the following processing is executed. Here, IAB node 106 is the only candidate for switching the connection of IAB node 107 . That is, according to the information in FIG. 4, the IAB node 107 is connectable to the IAB node 104 and the IAB node 106, and is currently connected to the IAB node 104 among them. Therefore, the IAB node 106 is the only connection destination candidate after the change. Therefore, when N=1 is set and the connection destination of the IAB node 107 is changed to the IAB node 106, all UEs can be accommodated in the communication path between the IAB node 107 and the IAB donor 102. is determined.
[0035] The IAB node whose connection destination is changed can be the IAB node 107 connected to the UE 121, but the child IAB node of the IAB node accommodating UEs exceeding the allowable accommodation number and the IAB node downstream thereof can be either In this case, if there are multiple IAB nodes whose connection destinations are changed, it is decided to switch the connection destination of one of the IAB nodes by executing the processing after S603 for each of the multiple IAB nodes. can be As an example, it may be decided to preferentially switch the connection destination of the IAB node on the downstream side.
[0036] In S604, the IAB donor 102 determines that the allowable capacity of the IAB node that is a candidate for the n-th connection switching destination for the IAB node 107 exceeds the allowable capacity according to the switching of the connection destination of the IAB node 107. Determine whether or not That is, the IAB donor 102 determines whether or not the number of UEs currently accommodated by the switching destination candidate is equal to or greater than the sum of the number of UEs currently accommodated by the switching destination candidate and the number of UEs currently accommodated by the IAB node 107. (S604). Then, when the number of UEs exceeding the allowable accommodation number is to be accommodated (NO in S604), the IAB donor 102 decides not to connect the IAB node 107 to the switching destination candidate. Then, the IAB donor 102 increments the parameter n and shifts to processing regarding the next switching destination candidate (S608). At this time, if the parameter n exceeds N, which is the number of switching destination candidates, and there is no next switching destination candidate (YES in S609), the IAB donor 102 ends the process. On the other hand, if there is a candidate for the next switching destination (NO in S609), the IAB donor 102 returns the process to S604 and performs the determination process described above. If it is determined in S609 that the next switching destination candidate does not exist, the switching destination of the connection of the IAB node 107 is not changed, and the number of UEs being accommodated by the IAB node 104 exceeds the allowable accommodation number. state is maintained. For this reason, the IAB donor 102 causes the UEs connected to the IAB node 104 or the IAB node 107 to be handed over to another IAB node so that the number of UEs being accommodated by the IAB node 104 does not exceed the allowable accommodation number. can be In such a case, the UEs connected to the IAB node 104 or the IAB node 107 may be notified that the current communication path accommodates more UEs than the allowable number of accommodated UEs.
[0037] In response to the switching of the connection destination of the IAB node 107, if the number of UEs accommodated in the switching destination candidate does not exceed the allowable accommodation number (YES in S604), the IAB donor 102 selects the parent node of the candidate. The same process is performed for . First, the IAB donor 102 determines whether or not there is a parent node among the candidates for switching the connection of the IAB node 107 (S605). Here, if there is no parent node in the connection switching destination candidate, even if the connection destination of the IAB node 107 is changed to the switching destination candidate, the number of UEs being accommodated in the changed communication path is the allowable accommodation number. There will be no IAB nodes exceeding . Therefore, the IAB donor 102 notifies the IAB node 107 to connect to the candidate IAB node to switch to (S610), and ends the process. Also, the IAB node 107 changes the connection destination according to the notification. On the other hand, if there is a parent node in the switching destination candidate (YES in S605), the IAB donor 102, when the IAB node 107 connects to the candidate, the number of UEs being accommodated in the parent node is equal to the allowable accommodation number. (S606). Then, if the number of UEs being accommodated in the parent node does not exceed the allowable number of accommodated UEs (YES in S606), the IAB donor 102 makes the same determination in a further parent node of the parent node (S607). By repeating this procedure, it is confirmed that the number of UEs being accommodated does not exceed the allowable accommodation number in all of the plurality of IAB nodes included in the communication path to which the candidate of the switching destination of the connection of the IAB node 107 belongs. be able to. Then, when the number of UEs being accommodated by one of the IAB nodes in the communication path exceeds the allowable number of accommodated UEs by connecting the IAB node 107 to the switching destination candidate, the IAB donor 102 (NO in S606), It determines not to connect the IAB node 107 to the candidate. In this case, the IAB donor 102 changes the connection switching destination candidate (S608) and repeats the same processing as described above.
[0038] For example, the IAB node 106 is a candidate for switching the connection of the IAB node 107 . Then, according to FIG. 4, the IAB node 106 accommodates 6 UEs before the IAB node 107 is connected. When the IAB node 107 connects to the IAB node 106, the IAB node 106 also accommodates 5 UEs connected to the IAB node 107, so the number of UEs being accommodated is 11. Become. Since the number of UEs being accommodated does not exceed 12, which is the allowable accommodation number of the IAB node 106 (YES in S604), the IAB node 105, which is the parent node of the IAB node 106, is subsequently processed. (S606). The number of UEs currently being accommodated in the IAB node 105 is 6, and when the IAB node 107 connects to the IAB node 106, the number of UEs being accommodated will be 11. Then, the number of UEs being accommodated does not exceed 20, which is the allowable accommodation number of the IAB node 105 (YES in S606). Here, the IAB node 105 is connected to the IAB donor 102 and there is no parent IAB node (NO in S605). Therefore, even if the IAB node 107 connects to the IAB node 106, it can be confirmed that the number of UEs being accommodated does not exceed the allowable accommodation number in all the IAB nodes included in the communication path of the connective. Thereby, the IAB donor 102 can decide to switch the connection destination of the IAB node 107 from the IAB node 104 to the IAB node 106 .
[0039] Note that IAB donor 102 may decide to have IAB node 107 connect with IAB node 106 while maintaining a connection with IAB node 104 . The IAB donor 102 can then designate some UEs to have their communications go through the IAB node 106 . IAB donor 102 may also allow some of IAB node 107's communications to occur through IAB node 106 without specifying the UE. In this case, the IAB donor 102 may send an instruction to the IAB node 107 to transfer some UE communications to the IAB node 106 in uplink communications.
[0040] As described above, the IAB donor 102 considers the allowable accommodation number of UEs set in each IAB node, and based on the relationship between the allowable accommodation number and the number of UEs currently accommodated, establishes a communication path. can be set appropriately. According to this, it is possible to suppress an excessive increase in the communication processing load due to an increase in the number of UEs connected to the IAB node, and it is possible to provide communication services to the UE using a communication path with a good communication environment. become able to.
[0041] <Processing example 2> In the processing example 1, the case where the allowable number of UEs to be accommodated is individually set in advance for each IAB node has been described. In this processing example, the flow of processing when the allowable accommodation number of each IAB node is set according to the number of hops from the IAB donor will be described. That is, in this processing example, the allowable number of accommodated IAB nodes is not determined in advance, and the allowable accommodated number is determined according to the number of hops from the IAB donor when the communication path is established. Note that the number of hops is counted such that an IAB node that is directly connected to an IAB donor is 1 hop, and an IAB node that is connected to another IAB node that is connected by that 1 hop is 2 hops. In this processing example, setting is made so that the larger the number of hops, the smaller the number of allowable accommodation units. That is, the closer the IAB node is connected to the IAB donor on the communication path, the larger the number of allowable nodes that can be accommodated. This is because the IAB node farthest from the IAB donor only needs to process the communication of the UE directly connected to that IAB node, but the closer the IAB node is to the IAB donor, the UE connected to the IAB node on the downstream side. This is because it is necessary to process the communication between the When the allowable capacity is determined in this way, the IAB node can increase the allowable capacity by connecting to a higher upstream IAB node or IAB donor. For this reason, for example, in a certain IAB node, if the number of UEs being accommodated by the IAB node exceeds the allowable number of accommodation, by switching the connection destination to the IAB node or IAB donor on the upstream side, the number of UEs being accommodated The number of UEs can be less than or equal to the allowable accommodation number.
[0042] FIG. 7 shows the relationship between the number of hops and the number of allowable accommodation units in this processing example. Here, the allowable accommodation number of the first IAB node wirelessly connected with the IAB donor is set to 12, and the allowable accommodation number of the second IAB node wirelessly connected with the first IAB node is 8. is set to Also, the allowable number of accommodated third IAB nodes wirelessly connected to the second IAB node is set to four. In the example of FIG. 1, the allowable number of IAB nodes 103 and 105 directly connected to the IAB donor 102 is set to 12, and the number of IAB nodes 104 and 106 connected to those IAB nodes is set to 12. The number of allowed accommodation is set to 8. Also, since the IAB node 107 is connected to the IAB node 104, the allowable accommodation number is set to four.
[0043] Here, as shown in FIG. 1, 4 UEs are connected to the IAB node 104, 6 UEs to the IAB node 106, and 4 UEs to the IAB node 107, and UE 121 is newly connected to the IAB node 107. . Here, when the IAB node 107 is connected to the IAB node 104, the allowable number of UEs to be accommodated is four. In this processing example, in such a case, the IAB node 107 switches the connection destination to the IAB node 105, for example. By directly connecting the IAB node 107 to the IAB node 105, the number of hops to the IAB donor 102 becomes 2 hops, so the allowable accommodation number can be increased to eight. By doing so, even if the number of connected UEs increases due to the connection of UE 121, the IAB node 107 can keep the number of currently accommodated UEs below the allowable number of accommodated UEs.
[0044] An example of the flow of processing in this case will be described with reference to FIG. The processing in FIG. 8 can also be realized by executing a program stored in the storage unit 202 by the control unit 201 of the IAB donor 102, for example, similarly to the processing in FIG. Note that this is only an example, and predetermined hardware on which the processing of FIG. 8 is implemented may be used. S801-S803 are the same as S601-S603 in FIG.
[0045] In S804, the IAB donor 102 identifies the allowable number of UEs to be accommodated when the IAB node that switches connection destinations connects to the n-th connection switching destination candidate, and the number of currently accommodated UEs is reduced to that number. It is determined whether the number of units to be accommodated is equal to or less than the allowable accommodation number. For example, the IAB donor 102 manages information indicating how each IAB node is connected and what communication paths have been established. For this reason, the IAB donor 102 sets the allowable accommodation number corresponding to the number of hops obtained by adding 1 to the number of hops from the candidate IAB donor 102 to which the connection of the IAB node 107 is switched. can be specified as the number of allowable accommodation units. Here, the IAB node 105 and the IAB node 106 exist as candidates for switching the connection of the IAB node 107 currently connected to the IAB node 104 . Here, when the IAB node 107 is connected to the IAB node 106, there is no change in the number of hops before and after switching the connection destination. Therefore, the IAB donor 102 may determine that the IAB node 106 is inappropriate as the switching destination of the connection of the IAB node 107 . On the other hand, the IAB donor 102 can specify that when the IAB node 107 connects to the IAB node 105, the number of hops is reduced by 1 from before switching the connection, so the number of allowable capacity increases. Then, since the number of UEs accommodated by the IAB node 107 (5 units) does not exceed the allowable accommodation number (8 units) when the connection destination is switched to the IAB node 105, the IAB donor 102 It can be determined that it is appropriate as a connection switching destination. The IAB donor 102 thus identifies, at S804, a suitable other IAB node to switch the connection of the IAB node 107 to.
[0046] As described above, the IAB donor 102 determines that the IAB node 105 is suitable as a connection switching destination candidate (YES in S804). In this case, the IAB donor 102 subsequently determines whether or not the number of UEs accommodated when the IAB node 107 is connected to the candidate IAB node 105 exceeds the allowable accommodation number (S806). Then, this determination is repeated for IAB nodes on the upstream side of the IAB node determined to be suitable as a candidate in S804. Then, if there is no IAB node that accommodates the number of UEs exceeding the allowable accommodation number in the communication path when the IAB node 107 switches the connection, the IAB donor 102 selects the IAB node 107 as the candidate IAB node. can be determined by connecting to Note that the processing of S805-S810 is the same as that of S605-S610 in FIG.
[0047] As described above, the IAB donor 102 can set a communication path so that the number of UEs not exceeding the allowable number of UEs corresponding to the number of hops of the IAB node is accommodated. According to this, it is possible to suppress an excessive increase in the communication processing load due to an increase in the number of UEs connected to the IAB node, and it is possible to provide communication services to the UE using a communication path with a good communication environment. become able to. In the above example, the connection switching destination of the IAB node 107 is the IAB node 105, but if the IAB node 107 is connectable to the IAB node 103, the connection switching destination is the IAB node 103. 103 may be used. Also in this case, since the number of hops of the IAB node 107 is changed from 3 to 2, the number of UEs accommodated by the IAB node 107 can be reduced to the allowable accommodation number or less. Also, in one example, when the IAB node 104 is connectable to the IAB donor 102, the connection destination of the IAB node 104 is changed to the IAB donor 102 in response to the number of UEs exceeding the allowable accommodation number being accommodated in the IAB node 107. You can switch.
[0048] Note that the allowable accommodation number in this processing example may be fixedly set as shown in FIG. 7, or may be set dynamically. For example, assume that the number of allowed capacity of the first IAB node directly connected to the IAB donor is set to M1, and the number of UEs expected to be connected to each IAB node is set to L. do. Then, when the number of second IAB nodes directly connected to the first IAB node is K1, the allowable accommodation number M2 of the second IAB nodes can be calculated as (M1-L) / K1 (units). Also, if the number of third IAB nodes directly connected to the second IAB node is K2, the allowable number of accommodated third IAB nodes M3 is calculated as (M2-L) / K2 (units). sell. For example, it is assumed that the allowable number of UEs accommodated by the first IAB node is 30, and the number of UEs expected to be directly connected to each IAB node is 6. Here, if there is one second IAB node directly connected to the first IAB node, the allowable number of accommodated second IAB nodes is (30−6) / 1=24. On the other hand, if the number of the second IAB nodes is two, the allowable capacity of the second IAB nodes is (30-6) / 2=12, and if the number of the second IAB nodes is three, The allowable capacity of the second IAB node is (30-6) / 3=8. Note that the IAB donor may set the allowable accommodation number of each IAB node according to the total number of IAB nodes connected under the directly connected IAB node. For example, downstream of the first IAB node directly connected to the IAB donor, the second IAB node directly connected to the first IAB node is K1, and the third IAB node directly connected to the second IAB node is K1. K2 IAB nodes exist. In this case, the number of UEs that should be directly connected to each IAB node is calculated by dividing the number of UEs that can be accommodated by the first IAB node by (K1+K2), resulting in a value P1=M1 / (K1+K2). can be Then, the value P1 becomes the allowable accommodation number in the third IAB node. Also, when K2 third IAB nodes are connected to the second IAB node, the allowable accommodation number of the second IAB nodes is (K2+1)×P1 (units). This is the sum of K2×P1, the number of UEs to be accommodated via the third IAB node, plus P1 directly connected at the second IAB node. Thus, the allowed capacity may be statically preset or dynamically set according to various criteria.
[0049] Note that when the allowable accommodation number is dynamically determined, a change in the connection destination of the IAB node 107 may change the allowable accommodation number of each IAB node at the changed connection destination. For this reason, the connection destination of the IAB node 107 can be determined so that there is no IAB node that exceeds the allowable accommodation number due to the change.
[0050] Further, in each of the processing examples described above, when the number of UEs to be accommodated in any of the IAB nodes included in the communication path when the connection destination of the IAB node 107 is changed exceeds the allowable accommodation number, the IAB It was explained that node 107 should not be connected to the communication path. However, for example, after changing the connection destination of the IAB node 107, by changing the connection destinations of other IAB nodes included in the communication path in the changed connection destination, the accommodation of each IAB node in the communication path The number of UEs may not exceed the allowable accommodation number. Also, for example, when another IAB node is connected as a child node of the IAB node 104 to which the IAB node 107 is connected, whether or not to change the connection destination of the other IAB node is determined as described above. can be determined.
[0051] Also, in the above processing example, an example in which the allowable accommodation number is set for each IAB node individually or for the number of hops in the communication path of each IAB node has been described, but this is not the only case. can't For example, the number of allowable accommodation units may be set for each communication path. For example, in the configuration of FIG. 1, the allowable accommodation number for the communication path including the IAB node 103, the IAB node 104 and the IAB node 107, and the allowable accommodation number for the communication path including the IAB node 105 and the IAB node 106 are can be set. Then, when a UE is newly connected to one of the IAB nodes, whether the total number of UEs accommodated in the communication path including that IAB node exceeds the allowable accommodation number set for that communication path is determined. Then, when the number of UEs being accommodated exceeds the allowable accommodation number, the IAB donor 102 identifies the second IAB node to switch the connection of the first IAB node to which the UE is newly connected, A first IAB node may be instructed to connect to a second IAB node. Note that, when the IAB donor 102 instructs switching of the connection destination for any IAB node, it updates the information regarding the communication path managed in its own device.
[0052] In the above processing example, assuming that the IAB node 107 switches the connection before the IAB node 107 switches the connection destination, the number of UEs accommodated in each IAB node is allowed. An example of confirming that the number of units accommodated is not exceeded has been described. However, it is not limited to this. For example, after the IAB node 107 switches connection destinations, it may be confirmed that the number of UEs accommodated in each IAB node does not exceed the allowable number of accommodated UEs. After the switching, the child node information of the connected IAB node is changed. Then, the connection information update notification at that time is received by the IAB donor, and the IAB donor can execute determination processing as to whether or not the number of UEs being accommodated has exceeded the allowable accommodation number in each IAB node. Then, when the number of UEs being accommodated exceeds the allowable number of accommodated UEs, connection destination switching processing of at least some of the IAB nodes can be executed.
[0053] In the above explanation, IAB donors do not consider the number of allowable accommodation units and the number of UEs currently accommodated. A case in which the number of UEs is considered has been described. On the other hand, for example, an IAB donor's DU (Distributed Unit) may be treated as an IAB node directly connected to the IAB donor in the above description. That is, an IAB donor's CU (Central Unit) may be treated as a base station, and an IAB donor's DU may be treated as an IAB node directly connected to the IAB donor. In one example, the IAB node 103 and the IAB node 105 of FIG. 1 may be composed of DUs of IAB donors.
[0054] As described above, in the present embodiment, in the IAB relay communication system, the load of each relay device (IAB node) does not excessively increase beyond the maximum load allowed in the relay device. A communication path can be set as follows. This makes it possible to relay communication between the base station (IAB donor) or core network and the terminal (UE) in a sufficiently favorable environment. In the above-described embodiment, the relay communication system by IAB has been described, but the above discussion can be applied to a wireless relay communication system in which communication between a base station and a terminal is wirelessly relayed by a relay device. For example, the above discussions are applicable to relaying communications between access points and stations in wireless LANs (Local Area Networks). Also, each of the above discussions applies to, for example, fifth generation (5G) cellular communication systems, but may also be applied to long term evolution (LTE) and generation cellular communication systems after 5G.
[0055] The present invention supplies a program that implements one or more functions of the above-described embodiments to a system or device via a network or a storage medium, and one or more processors in the computer of the system or device reads and executes the program. It can also be realized by processing to It can also be implemented by a circuit (for example, ASIC) that implements one or more functions.
[0056] The invention is not limited to the embodiments described above, and various modifications and variations are possible without departing from the spirit and scope of the invention. Accordingly, the claims are appended to make public the scope of the invention. [Description of symbols]
[0057] 102: IAB donor, 103-107: IAB node, 201: control unit, 202: storage unit, 307: UE connection count confirmation unit, 308: connection destination determination unit, 309: connection destination notification unit
Claims
1. A wireless communication system using IAB (Integrated Access and Backhaul) technology defined by the Third Generation Partnership Project (3GPP), comprising at least one IAB node that relays communication between a core network and a terminal, and an IAB donor that relays communication between the IAB node and the core network, An IAB donor comprising a determination means for determining the number of terminals connected to an IAB node subordinate to said IAB donor based at least on communication with said subordinate IAB node.
2. A determination means for determining whether to change a communication path based at least on a number of terminals connected on a first communication path including the IAB donor, a first IAB node subordinate to the IAB donor, and a second IAB node subordinate to the first IAB node; a setting means for changing a connection destination of the second IAB node to a third IAB node constituting a communication path different from the first communication path when the determining means determines that the communication path should be changed, and for setting a second communication path for relaying communication between the second IAB node and a terminal subordinate to the second IAB node and the IAB donor via the third IAB node; 2. The IAB donor of claim 1, further comprising:
3. An IAB donor as described in claim 2, characterized in that an allowable number of terminals is set for each of the IAB nodes subordinate to the IAB donor, and when the total number of terminals connected to the first IAB node and the number of terminals connected to one or more IAB nodes connected downstream of the first IAB node in the first communication path exceeds the allowable number set for the first IAB node, the determination means determines to change the communication path.
4. The determination means further determines the connection destination after the change, 4. The IAB donor according to claim 3, wherein the determination means determines to connect the second IAB node to the third IAB node when, in each of one or more IAB nodes including the third IAB node included in the second communication path that will be formed when the second IAB node is connected to the third IAB node before the second IAB node is connected to the third IAB node, a total number of terminals connected to the IAB node and a number of terminals connected to another IAB node connected downstream of the IAB node does not exceed the allowable accommodation number set for the IAB node.
5. The IAB donor described in Claim 3, characterized in that the determination means determines whether or not the allowable capacity has been exceeded in each of the IAB nodes included in the second communication path after the second communication path is set by the setting means, and does not make such determination before the second communication path is set.
6. An IAB donor as described in any one of claims 3 to 5, characterized in that the allowable capacity is set based on the number of hops from the IAB donor to an IAB node in a communication path.
7. The determination means further determines the connection destination after the change, 7. The IAB donor according to claim 6, wherein, when a total number of terminals connected to the second IAB node and a number of terminals connected to an IAB node connected downstream of the second IAB node on the first communication path exceeds the allowable accommodation number set for the second IAB node, the determination means selects, as the third IAB node, an IAB node that reduces the number of hops of the second IAB node from among IAB nodes constituting a communication path different from the first communication path, and determines to connect the second IAB node directly below the selected third IAB node.
8. An IAB donor as described in any one of claims 3 to 5, characterized in that the allowable capacity is set based on the number of IAB nodes connected downstream from the IAB donor.
9. The determination means further determines the connection destination after the change, 9. The IAB donor according to claim 3, further comprising a notification means for, when the determination means determines that there is no IAB donor or IAB node to be a connection destination after the change such that the total number related to the IAB node does not exceed the allowable capacity number set for the IAB node, notifying the terminal connected to the first IAB node or the second IAB node of information indicating that the number of terminals connected exceeds the allowable capacity number.
10. The determination means further determines the connection destination after the change, 3. The IAB donor according to claim 2, wherein an allowable number of terminals is set for each communication path, and when a total number of terminals connected to a relay device included in the first communication path exceeds the allowable number of terminals, the determination means determines to change the first communication path by changing the connection destination of the second IAB node to a third IAB node on a second communication path different from the first communication path.
11. A wireless communication system using IAB (Integrated Access and Backhaul) technology defined by the Third Generation Partnership Project (3GPP), the wireless communication system including at least one IAB node that relays communication between a core network and a terminal, and an IAB donor that relays communication between the IAB node and the core network, comprising:
2. A method for controlling a network comprising: determining a number of terminals connected to an IAB node subordinate to the IAB donor based at least on communication with the subordinate IAB node. determining whether to change a communication path based at least on a number of UEs (User Equipment) connected on a first communication path including the IAB donor, a first IAB node subordinate to the IAB donor, and a second IAB node subordinate to the first IAB node; when it is determined that the communication path is to be changed, changing a connection destination of the second IAB node to a third IAB node constituting a communication path different from the first communication path, and setting a second communication path for relaying communication between the second IAB node and a terminal subordinate to the second IAB node and the IAB donor via the third IAB node; The method of claim 11, further comprising:
13. A program for causing a computer to function as an IAB donor described in any one of claims 1 to 10.
14. A control device for a wireless communication system including a relay device that relays communication between a base station and a terminal, comprising: A control device comprising: a specifying means for specifying the number of terminals currently connected to a subordinate relay device of said control device based at least on communication with the subordinate relay device.
15. A determination means for determining whether to change a communication path based on at least a number of terminals connected to a first communication path including the base station, a first relay device subordinate to the base station, and a second relay device subordinate to the first relay device; a change means for changing a connection destination of the second relay device to a third IAB node constituting a communication path different from the first communication path when the determination means determines that the communication path should be changed; 15. The control device of claim 14 further comprising:
16. The control device described in claim 14 or 15, characterized in that the control device is a control device located within a core network to which the base station is connected via a backhaul line.
17. The control device according to claim 14, wherein the base station is an IAB donor using Integrated Access and Backhaul (IAB) technology defined by the 3rd Generation Partnership Project (3GPP).
