Schedule adjustment system and schedule adjustment method
Patent Information
- Application Number
- JP2022034450
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2022-03-07
- Publication Date
- 2024-11-14
- Estimated Expiration
- 2041-11-24
AI Technical Summary
Conventional scheduling systems face challenges in efficiently adjusting meeting schedules without double-booking high-priority schedules while allowing double-booking of low-priority schedules, especially when dealing with participants who are not system members and schedules that can be adjusted based on individual preferences or company policies.
A schedule adjustment device and method that includes an adjustment condition setting unit and a schedule adjustment unit, which set and adjust meeting schedules by designating participants, exclusion keywords, and considering reserved times, allowing for the exclusion of low-priority schedules and determination of free schedules based on input conditions, and utilizing external calendar systems to manage and display candidate schedules for selection.
Enables easy and efficient scheduling of meetings without double-booking high-priority schedules while allowing double-booking of low-priority schedules, reducing the time and effort required for manual adjustments and ensuring accurate schedule registration in external calendar tools.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
[Technical Field]
[0001] The present invention relates to a schedule adjustment device, a schedule adjustment method, and a program. [Background technology]
[0002] Conventionally, scheduling a business meeting has been a very tedious and time-consuming process, requiring numerous steps such as checking the schedules of each participant and reserving a venue.
[0003] Regarding confirmation of the schedules of the participants, since many business people nowadays manage their schedules using calendar tools provided on the Internet, it is conceivable to refer to such calendar tools.
[0004] In relation to calendar tools, for example, Patent Document 1 describes a schedule information sharing method including the steps of: a step in which a plurality of applicants who apply for distribution of schedule information and a plurality of users who use the distributed schedule information, who are members of a system for distributing and sharing schedule information via the Internet, each register as a member; a step in which a scheduler that manages schedules executes the following steps, in which the applicants publish and distribute the schedule information to the users; a step in which the users register targets to which they wish to receive the published schedule information; and a step in which, based on the registered desired targets of distribution of the users, the related schedule information is synchronized and preset in the calendars of all user terminals. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] Japanese Patent Application Publication No. 2019-219831 Summary of the Invention [Problem to be solved by the invention]
[0006] The technology described in Patent Document 1 allows multiple users who are members of the system to share schedule information with each other, and can be used to arrange meeting dates. However, even when using this system, the schedules of participants in meetings, etc., may be updated and changed from moment to moment. Furthermore, if meeting participants include non-members of the system, it is necessary to check the schedules of these non-members individually, making it difficult to arrange meeting dates without overlapping the existing schedules of each participant with the meeting date, i.e., without double-booking.
[0007] In addition, traditionally, meeting dates are determined from among the participants' available schedules, but even if some participants are required to attend a meeting that is being scheduled (high priority), they may not be able to decide on a date for the high-priority meeting because they have existing plans that are lower priority than the meeting (for example, a meeting that can be missed depending on the situation, a meeting that can be easily rescheduled because only close internal members are attending, or a date that is reserved for personal work time).
[0008] The present invention has been made in consideration of the current situation, and aims to make it possible to easily adjust meeting schedules without double-booking with existing schedules of higher priority, while allowing double-booking with existing schedules of lower priority. [Means for solving the problem]
[0009] The present application includes a number of means for solving at least part of the above problems, examples of which are as follows.
[0010] In order to solve the above problem, a schedule adjustment device according to one aspect of the present invention includes an adjustment condition setting unit that sets adjustment conditions for a meeting, and a schedule adjustment unit that adjusts the meeting schedule based on the adjustment conditions, wherein the adjustment condition setting unit sets the adjustment conditions including designation of participants and excluded keywords in response to input from an adjustment initiator, and the schedule adjustment unit excludes from the required attendance schedule existing plans of the participants in schedule information managed by an external system those existing plans whose information about the existing plans includes the excluded keywords, and regards the remaining existing plans as the required attendance plans, and regards dates where no required attendance plans exist as the required attendance plans. When the other party to the coordination accesses the coordination meeting based on the access information notified to the other party by the coordination initiator, the external system references the schedule information of the participant managed by the external system, extracts the free dates of the participant that satisfy the coordination conditions as candidate dates, displays a schedule adjustment screen showing the extracted candidate dates on a second terminal device used by the other party to the coordination meeting, determines a meeting date from the candidate dates in response to a selection operation of the other party to the schedule adjustment screen, and registers the determined meeting date in the schedule information of the participant managed by the external system.
[0011] A schedule adjustment device according to another aspect of the present invention includes an adjustment condition setting unit that sets adjustment conditions for a meeting, and a schedule adjustment unit that adjusts a meeting schedule based on the adjustment conditions, wherein the adjustment condition setting unit sets the adjustment conditions including designation of participants and excluded schedules in response to input from an adjustment initiator, and the schedule adjustment unit excludes from existing schedules of the participants in schedule information managed by an external system those existing schedules that the adjustment initiator has designated as the excluded schedules, considers the remaining existing schedules to be the required attendance schedules, and considers dates on which no required attendance schedules exist to be available schedules for the participants. When the other party to the coordination accesses the coordination partner based on the access information notified to the other party by the coordination initiator, the external system refers to the schedule information of the participant managed by the external system, extracts the available dates of the participant that satisfy the coordination conditions as candidate dates, displays a schedule adjustment screen showing the extracted candidate dates on a second terminal device used by the other party to the coordination partner, determines a meeting date from the candidate dates in response to a selection operation of the other party to the schedule adjustment screen, and registers the determined meeting date in the schedule information of the participant managed by the external system.
[0012] The adjustment condition setting unit can set the adjustment conditions, including the specification of the reserved time before and after the schedule, according to the input of the adjustment initiator, and the schedule adjustment unit can determine, as an available schedule for the participant, a schedule on which there is no required attendance schedule and which excludes the reserved time before and after the required attendance schedule.
[0013] The adjustment condition setting unit can set the existing schedule designated by the adjustment initiator from the displayed list of the existing schedules of the participants as the excluded schedule.
[0014] The schedule adjustment unit determines a second candidate date in response to input by the adjustment initiator on the schedule editing screen and issues the access information. When the other party accesses the schedule based on the access information, the schedule adjustment unit references the schedule information of the participant to extract a third candidate date that is the available date of the participant that satisfies the adjustment conditions and is within the range of the second candidate dates, displays the schedule adjustment screen showing the extracted third candidate date on the second terminal device, determines a meeting date from the third candidate dates in response to a selection operation by the other party on the schedule adjustment screen, and registers the determined meeting date in the schedule information of the participant managed by the external system.
[0015] The schedule adjustment unit can refer to the schedule information of the participants managed by the external system, extract the available dates of the participants that satisfy the adjustment conditions as first candidate dates, and display the schedule editing screen for editing the extracted first candidate dates on a first terminal device used by the adjustment initiator.
[0016] The adjustment condition setting unit can set the existing schedule of the participant specified by the adjustment initiator on the schedule editing screen as the excluded schedule.
[0017] The adjustment condition setting unit displays a template creation screen for creating an adjustment condition template on a first terminal device used by the adjustment initiator, and can register the adjustment condition template that can be repeatedly used to adjust the schedule of different meetings, and the access information corresponding to the adjustment condition template, in accordance with the adjustment initiator's specifications on the template creation screen.
[0018] The participant may be the coordination initiator himself or a member of an organization to which the coordination initiator belongs.
[0019] When multiple participants are specified as the adjustment conditions, the schedule adjustment unit, in response to the person being adjusted accessing the schedule adjustment unit based on the access information, can refer to the schedule information of all participants managed by the external system and extract the available dates common to all participants that satisfy the adjustment conditions as the candidate dates.
[0020] When multiple participants are specified as the adjustment conditions, the schedule adjustment unit, in response to the person being adjusted accessing the schedule adjustment unit based on the access information, can refer to the schedule information of all participants managed by the external system and extract the available date of at least one of all participants that satisfies the adjustment conditions as the candidate date.
[0021] The adjustment condition setting unit can set the adjustment conditions including the venue to be used for the meeting in accordance with input from the adjustment initiator, and when the adjustment partner accesses based on the access information, the schedule adjustment unit can refer to the schedule information for each of the participants and the venue managed by the external system, extract as the candidate dates free dates that are common to the free dates of the participants that satisfy the adjustment conditions and free dates of the venue where no existing appointments exist, display the schedule adjustment screen showing the extracted candidate dates on the second terminal device, determine the meeting date from the candidate dates in accordance with a selection operation of the adjustment partner on the schedule adjustment screen, and register the determined meeting date in the schedule information for each of the participants and the venue managed by the external system.
[0022] A schedule adjustment method according to yet another aspect of the present invention includes an adjustment condition setting step of setting adjustment conditions for a meeting, and a schedule adjustment step of adjusting the meeting schedule based on the adjustment conditions, wherein the adjustment condition setting step sets the adjustment conditions including designation of participants and excluded keywords in response to input from an adjustment initiator, and the schedule adjustment step excludes, from existing plans of the participants in schedule information managed by an external system, existing plans whose information about the existing plans includes the excluded keywords, and regards the remaining existing plans as the required attendance plans, and adjusts the schedule for which no required attendance plans exist. as available dates for the participants, and when the other party to be coordinated accesses the other party to be coordinated based on the access information notified to the other party by the coordination initiator, the external system refers to the schedule information of the participants managed by the external system, extracts the available dates of the participants that satisfy the coordination conditions as candidate dates, displays a schedule adjustment screen showing the extracted candidate dates on a second terminal device used by the other party to be coordinated, determines a meeting date from the candidate dates in accordance with a selection operation of the other party to be coordinated on the schedule adjustment screen, and registers the determined meeting date in the schedule information of the participants managed by the external system.
[0023] A program according to yet another aspect of the present invention causes a computer to function as an adjustment condition setting unit that sets adjustment conditions for a meeting, and a schedule adjustment unit that adjusts a meeting schedule based on the adjustment conditions, wherein the adjustment condition setting unit sets the adjustment conditions including designation of participants and excluded keywords in response to input from an adjustment initiator, and the schedule adjustment unit excludes, from existing plans of the participants in schedule information managed by an external system, existing plans whose information about the existing plans includes the excluded keywords, and regards the remaining existing plans as required attendance plans, and adjusts plans for which no required attendance plans exist. When the other party to the coordination accesses the coordination site based on the access information notified to the other party by the coordination initiator, the external system references the schedule information of the participant managed by the external system, extracts the available dates of the participant that satisfy the coordination conditions as candidate dates, displays a schedule adjustment screen showing the extracted candidate dates on a second terminal device used by the other party to the coordination site, determines a meeting date from the candidate dates in response to a selection operation of the other party to the schedule adjustment screen, and registers the determined meeting date in the schedule information of the participant managed by the external system.
[0024] A schedule adjustment method according to yet another aspect of the present invention includes an adjustment condition setting step of setting adjustment conditions for a meeting, and a schedule adjustment step of adjusting the meeting schedule based on the adjustment conditions, wherein the adjustment condition setting step sets the adjustment conditions including designation of participants and excluded events in response to input from an adjustment initiator, and the schedule adjustment step excludes, from existing events of the participants in schedule information managed by an external system, existing events designated as excluded events by the adjustment initiator from required attendance events, and regards the remaining existing events as required attendance events, and adjusts dates in which no required attendance events exist as required attendance events. When the other party to the coordination accesses the coordination schedule based on the access information notified to the other party by the coordination initiator, the external system references the schedule information of the participant managed by the external system, extracts the available schedule of the participant that satisfies the coordination conditions as a candidate schedule, displays a schedule adjustment screen showing the extracted candidate schedule on a second terminal device used by the other party to determine a meeting date from the candidate schedule in accordance with a selection operation of the other party to the schedule adjustment screen, and registers the determined meeting date in the schedule information of the participant managed by the external system.
[0025] A program according to yet another aspect of the present invention causes a computer to function as an adjustment condition setting unit that sets adjustment conditions for a meeting, and a schedule adjustment unit that adjusts a meeting schedule based on the adjustment conditions, wherein the adjustment condition setting unit sets the adjustment conditions including designation of participants and excluded events in response to input from an adjustment initiator, and the schedule adjustment unit excludes from the required attendance schedules existing events of the participants in schedule information managed by an external system those existing events designated as the excluded events by the adjustment initiator, and regards the remaining existing events as the required attendance schedules, and adjusts dates in which no required attendance schedules exist for the participants. When the other party to the coordination accesses the coordination system based on the access information notified to the other party by the coordination initiator, the external system references the schedule information of the participants managed by the external system, extracts the available dates of the participants that satisfy the coordination conditions as candidate dates, displays a schedule adjustment screen showing the extracted candidate dates on a second terminal device used by the other party to the coordination system, determines a meeting date from the candidate dates in response to a selection operation of the other party to the schedule adjustment screen, and registers the determined meeting date in the schedule information of the participants managed by the external system. [Effects of the Invention]
[0026] According to the present invention, it is possible to easily adjust the schedule of a meeting without double-booking with an existing schedule of a higher priority, while allowing double-booking with an existing schedule of a lower priority.
[0027] Problems, configurations, and effects other than those described above will become apparent from the following description of the embodiments. [Brief explanation of the drawings]
[0028] [Figure 1] FIG. 1 is a diagram showing an example of the configuration of a schedule adjustment system according to an embodiment of the present invention. [Figure 2] FIG. 2 is a diagram showing examples of member information, user information, adjustment condition template information, and schedule adjustment information. [Figure 3]FIG. 3 is a sequence diagram illustrating an example of processing performed by the schedule adjustment system at the time of user registration. [Figure 4] FIG. 4 is a sequence diagram illustrating an example of a schedule adjustment process performed by the schedule adjustment system. [Figure 5] FIG. 5 is a diagram showing an example of a display of the condition setting screen. [Figure 6] FIG. 6 is a diagram showing an example of a display of the condition setting screen. [Figure 7] FIG. 7 is a diagram showing a display example of the exclusion schedule designation screen. [Figure 8] FIG. 8 is a diagram showing a display example of the schedule editing screen. [Figure 9] FIG. 9 is a diagram showing a display example of the schedule editing screen. [Figure 10] FIG. 10 is a diagram showing a display example of the schedule adjustment screen. [Figure 11] FIG. 11 is a diagram showing a display example of the schedule adjustment screen. [Figure 12] FIG. 12 is a diagram showing a display example of the schedule confirmation screen. [Figure 13] FIG. 13 is a diagram showing a display example of the schedule notification screen. [Figure 14] FIG. 14 is a sequence diagram illustrating an example of the adjustment condition template creation process. [Figure 15] FIG. 15 is a diagram showing a display example of the template list screen. [Figure 16] FIG. 16 is a diagram showing a display example of the template creation screen. [Figure 17] FIG. 17 is a diagram showing a display example of the template creation screen. [Figure 18] FIG. 18 is a sequence diagram illustrating another example of the schedule adjustment process performed by the schedule adjustment system. DETAILED DESCRIPTION OF THE INVENTION
[0029] An embodiment of the present invention will be described below with reference to the drawings. In all drawings illustrating an embodiment, identical components are generally designated by the same reference numerals, and repeated description thereof will be omitted. It goes without saying that, in the following embodiments, components (including element steps, etc.) are not necessarily essential unless otherwise specified, or unless they are clearly considered essential in principle. It goes without saying that when terms such as "consisting of A," "made of A," "having A," or "including A" are used, they do not exclude other elements, unless otherwise specified, or unless it is clearly considered that only that element is included. Similarly, in the following embodiments, when referring to the shape, positional relationship, etc. of components, etc., it is intended to include those that are substantially similar or similar to those shapes, etc., unless otherwise specified, or unless it is clearly considered otherwise in principle.
[0030] <Schedule Adjustment System 10 According to an Embodiment of the Present Invention> FIG. 1 shows an example of the configuration of a schedule adjustment system 10 according to one embodiment of the present invention.
[0031] The schedule adjustment system 10 is for supporting the adjustment of meeting schedules. The schedule adjustment system 10 includes a schedule adjustment device 20, an external system 30, and terminal devices 40A, 40M, and 40X, which are connected via a network 11.
[0032] The network 11 is a two-way communication network such as the Internet or a mobile phone communication network.
[0033] The schedule adjustment device 20 adjusts the schedule of a meeting with the other party X in response to a request from the adjustment initiator A. The meeting is expected to be attended by the adjustment initiator A, members B, C, D, etc. (including the member manager M of the organization to which the adjustment initiator A belongs) of the organization (such as a company; a corporate member, as described below) to which the adjustment initiator A belongs, and the other party X. However, in this specification, the "participants" of the meeting are defined as the people who actually participate in the meeting, including the adjustment initiator A and the members of the organization to which the adjustment initiator A belongs, and the other party X who participates in the meeting is not included in the "participants" (will not be referred to as a "participant").
[0034] The external system 30 refers to a system that widely provides a calendar tool 31 as a web application to general consumers, corporations, etc., for a fee or free of charge. For example, Google Calendar (trademark) or Microsoft Outlook (trademark) can be used as the calendar tool 31. The calendar tool 31 holds schedule information 311 in which the activity schedule of the user of the calendar tool 31 and the reservation status of meeting venues available to the user are registered. In other words, the external system 30 manages the schedule information 311 in which the activity schedule of the user of the calendar tool 31 and the reservation status of meeting venues available to the user are registered.
[0035] The terminal device 40A used by the adjustment initiator A is a general computer such as a personal computer or smartphone that can be connected to the schedule adjustment device 20 via the network 11. Similarly, the terminal device 40M used by the member manager M and the terminal device 40X used by the adjustment partner X are general computers. The terminal device 40A corresponds to the first terminal device of the present invention, and the terminal device 40X corresponds to the second terminal device of the present invention.
[0036] In this embodiment, the coordination partner X who will be participating in the meeting operates the terminal device 40X, but in reality, the terminal device 40X may be operated by a representative (secretary, etc.) of the coordination partner X. Also, the coordination initiator A may select multiple participants from among those who belong to the same organization (corporate member, described later) as the coordination initiator A, and coordinate the schedule on behalf of the multiple participants.
[0037] Furthermore, although FIG. 1 illustrates only one coordination partner X as a coordination partner participating in the conference, there may be multiple coordination partners.
[0038] The adjustment initiator A is a member of a company or the like that has completed member registration and user registration (registration of information necessary to enable the schedule adjustment function in the schedule adjustment device 20 to be usable) with the schedule adjustment device 20. Hereinafter, a company or the like that has completed member registration with the schedule adjustment device 20 will be referred to as a corporate member. Furthermore, among members that belong to a corporate member (company or the like), members that have a user account with the schedule adjustment device 20 will be defined as users. It is essential that the adjustment initiator A be a user. Therefore, hereinafter, the adjustment initiator A may be referred to as user A. Note that user registration with the schedule adjustment device 20 can be performed by individuals, not just companies or the like. In that case, an individual that has completed user registration will be referred to as an individual member. An individual member and a user can be considered to be the same thing.
[0039] Members B, C, D, etc. who belong to the same corporate member as the adjustment initiator A may be users, but this is not essential.
[0040] It is assumed that members belonging to a corporate member of the schedule adjustment device 20 manage their own schedules using a calendar tool 31 provided by an external system 30. It is also assumed that corporate members of the schedule adjustment device 20 manage the reservation status of conference rooms, reception rooms, spare rooms, etc. that are available to members as meeting venues using the calendar tool 31 provided by the external system 30.
[0041] Therefore, in this case, the calendar tool 31 is assumed to hold schedule information 311 in which the schedules of coordination initiators A, etc. who may be participants in the meeting, and the reservation status of meeting venues that can be used by coordination initiators A, etc. are registered.
[0042] The adjustment partner X may be, but is not required to be, a user of the schedule adjustment device 20. The adjustment partner X may also use the calendar tool 31, but is not required to be. The adjustment partner X may also use a calendar tool provided by a different vendor from the calendar tool 31 used by the adjustment initiator A.
[0043] The schedule adjustment device 20 includes functional blocks of a processing unit 21, a storage unit 22, and a communication unit 23. The schedule adjustment device 20 is made up of a general computer such as a server computer that includes a processor such as a CPU (Central Processing Unit), a memory such as a DRAM (Dynamic Random Access Memory), a storage such as an HDD (Hard Disk Drive) or an SSD (Solid State Drive), input devices such as a keyboard, a mouse, and a touch panel, an output device such as a display, and a communication module such as a NIC (Network Interface Card) (none of which are shown).
[0044] The processing unit 21 is realized by a computer processor. The processing unit 21 has the following functional blocks: an authentication unit 211, an adjustment condition setting unit 212, and a schedule adjustment unit 213. These functional blocks are realized by the computer processor executing a predetermined program loaded into memory. However, some or all of these functional blocks may be realized as hardware using an integrated circuit or the like.
[0045] The authentication unit 211 accepts member registration, for example, by the member manager M using the terminal device 40M, and creates member information 221. In addition, the authentication unit 211 creates user information 222 in response to the first login by a user, for example, by the adjustment initiator A using the terminal device 40A, if predetermined conditions are met.
[0046] Furthermore, the authentication unit 211 accesses the external system 30 via the network 11, and performs authentication processing using an administrator authority account included in the member information 221 held in the storage unit 22 and a user account included in the user information 222 corresponding to the adjustment initiator A (user A) (both shown in FIG. 2), according to a protocol such as OAuth. However, it is sufficient to use the administrator authority account and the user account for the first authentication processing; for the second and subsequent authentication processing, the administrator authentication information (access token, etc.) and user authentication information (access token, etc.) (both shown in FIG. 2) sent from the external system 30 when the first authentication processing is completed can be used.
[0047] The adjustment condition setting unit 212 displays a condition setting screen on the terminal device 40A for setting adjustment conditions consisting of multiple items necessary for adjusting the schedule of a meeting, sets adjustment conditions in accordance with input from the adjustment initiator A on the condition setting screen, and registers the adjustment conditions in the schedule adjustment information 224 corresponding to the adjustment initiator A, which is held in the storage unit 22. The items of the adjustment conditions will be described later.
[0048] The schedule adjustment unit 213 refers to the schedule information 311 of the meeting participants (which may or may not include the adjustment initiator A) managed by the external system 30, and extracts the available dates of the participants that meet the set adjustment conditions as the first candidate date.
[0049] Here, in this embodiment, a participant's available schedule refers to a schedule for which it can be determined that a new meeting schedule can be added, based on the result of considering whether the participant's existing schedule in the schedule information 311 is a schedule that requires attendance.
[0050] If neither the method of specifying an exclusion keyword (described in detail below; hereinafter referred to as the first additional determination method) nor the method of specifying an exclusion schedule (described in detail below; hereinafter referred to as the second additional determination method) is adopted as a method for determining whether a schedule is available, all of the participant's existing schedules are considered to be required schedules, and dates for which the participant does not have required schedules are determined to be available schedules for the participant.
[0051] In addition, when at least one of the first and second additional determination methods is specified, some of the participant's existing schedules are excluded from the required attendance schedules, the remaining existing schedules are regarded as the participant's required attendance schedules, and dates where the participant does not have required attendance schedules are determined to be the participant's available schedules.
[0052] Specifically, when the first additional determination method is adopted and the second additional determination method is not adopted, existing schedules of the participant whose subject line contains the excluded keyword specified by the coordination initiator A are excluded from the required schedules, and the remaining existing schedules are considered to be required schedules for the participant, and dates on which the participant does not have required schedules are determined to be available dates for the participant.
[0053] When the second additional determination method is adopted and the first additional determination method is not adopted, the participant's existing schedule designated as an excluded schedule by the adjustment initiator A is excluded from the required attendance schedule, the remaining existing schedule is regarded as the participant's required attendance schedule, and the dates on which the participant's required attendance schedule does not exist are determined to be the participant's available dates.
[0054] When both the first and second additional determination methods are adopted, existing schedules of the participant whose subject includes the exclusion keyword set by the coordination initiator A and existing schedules of the participant designated as excluded schedules by the coordination initiator A are excluded from the required attendance schedules, the remaining existing schedules are regarded as required attendance schedules for the participant, and dates on which the participant does not have required attendance schedules are determined to be available dates for the participant.
[0055] The exclusion keywords can be entered by the coordination initiator A on the condition setting screen 500 (FIG. 6). Possible exclusion keywords include, for example, "* Absence allowed" and "* Schedule change allowed." A corporate member company or the like has an internal rule that when a member (coordination initiator A, member manager M, member B, C, D, etc. in this embodiment) registers an appointment in the calendar tool 31, if the appointment has a low priority and can be absent depending on the situation, the appointment will be registered with the exclusion keyword "* Absence allowed" in the subject line. Furthermore, for example, if the appointment is attended only by close internal members and the date can be easily changed, the appointment will be registered with the exclusion keyword "* Schedule change allowed" in the subject line.
[0056] Note that, as the exclusion keywords, phrases such as "* Absence is allowed" or "* Date change is allowed" as well as specific symbols or characters may be used. Also, instead of or in addition to including the exclusion keywords in the subject of the appointment, the exclusion keywords may be registered in other fields, such as the remarks or explanation (memo) of the appointment. In this case, the first additional determination method may determine whether or not the exclusion keywords are included in other fields, such as the remarks or explanation (memo) of the appointment, in addition to the subject of the appointment.
[0057] The excluded schedule can be designated by the adjustment initiator A on the excluded schedule designation screen 550 (FIG. 7). More specifically, this will be described later with reference to FIG.
[0058] After extracting the first candidate schedule, the schedule adjustment unit 213 displays a schedule editing screen on the terminal device 40A for editing the first candidate schedule, and determines a second candidate schedule in response to an editing operation on the schedule editing screen by adjustment initiator A. The second candidate schedule is also registered in the schedule adjustment information 224 corresponding to adjustment initiator A. If adjustment initiator A does not edit the first candidate schedule, the first candidate schedule and the second candidate schedule will be the same.
[0059] As a variant, instead of determining the second candidate date by editing the first candidate date, the extraction of the first candidate date may be omitted, and the second candidate date may be determined by the adjustment initiator A selecting a date and time on a calendar on a specified screen displayed on the terminal device 40A by the schedule adjustment unit 213, for example.
[0060] Furthermore, the schedule adjustment unit 213 issues an adjustment URL (Uniform Resource Locator) for the adjustment partner X to access the schedule adjustment screen. However, there are cases where the adjustment URL is not issued by the schedule adjustment unit 213, but is instead designated by the adjustment initiator A (details will be described later). The adjustment URL may be issued as text or as an image such as a QR code. The issued adjustment URL is sent by the adjustment initiator A to the adjustment partner X by email or the like. The adjustment URL corresponds to the access information of the present invention.
[0061] Furthermore, when the adjustment partner X accesses the adjustment URL using the terminal device 40X, the schedule adjustment unit 213 again references the participant's schedule information 311 managed by the external system 30 at that time, and extracts a third candidate date that is an available date of the participant that satisfies the set adjustment conditions and is within the range of the second candidate date. Then, the schedule adjustment unit 213 displays a schedule adjustment screen showing the third candidate date on the terminal device 40X.
[0062] By extracting a third candidate date, even if there is a change in the participant's schedule between the time the adjustment URL is issued and the time adjustment partner X accesses it, it is possible to prevent double bookings from occurring.
[0063] Furthermore, the schedule adjustment unit 213 allows the coordination partner X to select a meeting date from the third candidate dates displayed on the schedule adjustment screen, and registers the meeting date confirmed on the schedule confirmation screen in the participant schedule information 311 managed by the external system 30, as well as in the schedule adjustment information 224 corresponding to the coordination initiator A stored in the storage unit 22. Note that even during the short time between the coordination partner X selecting a meeting date from the third candidate dates displayed on the schedule adjustment screen and the confirmation on the schedule confirmation screen, the participants' schedules may change. Therefore, the schedule adjustment unit 213 may perform a final check immediately before the meeting date is confirmed on the schedule confirmation screen to ensure that the selected meeting date is available for participants who meet the coordination conditions. If the selected meeting date is no longer available for participants who meet the coordination conditions, a message such as "The specified time slot is booked. Please select again" may be displayed on the terminal device 40X, and the operation may be returned to the schedule adjustment screen. This further prevents double bookings.
[0064] The memory unit 22 is realized by a computer memory and storage. The memory unit 22 holds member information 221, user information 222, adjustment condition template information 223, and schedule adjustment information 224. Note that the memory unit 22 may store information, data, etc. other than the various types of information described above.
[0065] The communication unit 23 is realized by a communication module of a computer. The communication unit 23 connects to the external system 30, the terminal devices 40A, 40M, 40X, etc. via the network 11 to communicate various data and information.
[0066] Note that some or all of the above-described functional blocks constituting the schedule adjustment device 20 may be realized by hardware such as integrated circuits. Furthermore, the schedule adjustment device 20 may be realized by multiple computers, in which case the above-described functional blocks may be distributed across the multiple computers.
[0067] Next, FIG. 2 shows an example of member information 221, user information 222, adjustment condition template information 223, and schedule adjustment information 224 stored in the storage unit 22.
[0068] The member information 221 consists of information about corporate members who have completed member registration with the schedule adjustment device 20. The member information 221 also includes information about corporate members that is added when the corporate member registers for use with the schedule adjustment device 20. Specifically, the member information 221 includes a member account, an administrator authority account, administrator authentication information, basic information, member information, and venue information.
[0069] The member account is information that allows a member manager M or the like of a corporate member (such as a company) to log in to the schedule adjustment device 20. The administrator authority account is information that allows a member manager M or the like of a corporate member (such as a company) to access the external system 30 with administrator authority. It is desirable that the member account is the same as the administrator authority account (for example, the email address of the member manager M or the like), but they may be different. If the member account and the administrator authority account are the same, registration of the administrator authority account for the member information 221 can be omitted.
[0070] The administrator authentication information is an access token or the like obtained from the external system 30 as a successful result of the authentication process when the authentication unit 211 of the schedule adjustment device 20 uses an administrator authority account to perform authentication processing on the external system 30 for the first time. After obtaining the administrator authentication information, the authentication unit 211 can perform authentication processing on the external system 30 more quickly using the administrator authentication information without using an administrator authority account.
[0071] The basic information includes the name of the corporate member (company name, etc.). The basic information is recorded at the time of member registration and can be changed after member registration. The member information includes the names of members belonging to the corporate member (company, etc.) and a list of user accounts for accessing the external system 30. The member information is obtained from the external system 30 and recorded, assuming that members of the corporate member who may be participants on the coordination initiator A's side are already using the calendar tool 31.
[0072] The venue information is a list of names of venues such as conference rooms, reception rooms, spare rooms, etc. that corporate members can use for meetings, as well as venue identification IDs in the external system. The venue information is obtained and recorded from the external system 30, assuming that the schedules of all venues required for scheduling are already managed by the calendar tool 31.
[0073] Note that the member information and venue information can be obtained in part or in whole from the external system 30 only when the external system 30 is accessed using an administrator account; for example, it cannot be obtained when an account without administrator privileges is used instead of an administrator account, or when the external system 30 is accessed as a user account with privileges equivalent to those of an administrator account (however, it may be possible to obtain some of it).
[0074] The user information 222 consists of information about users who are members of a corporate member and have completed registration to use the schedule adjustment device 20. When each user logs in to the schedule adjustment device 20 for the first time, the user information 222 is created when the authentication process with the external system 30 is successful and it is confirmed that the user is included in the member information of the member information 221, and the user information 222 is associated with the member information 221.
[0075] The user information 222 includes a user account, user authentication information, and user basic information.
[0076] The user account is information that allows a user such as the adjustment initiator A to log in to the schedule adjustment device 20. It is desirable that the user account be the same as the account that the user uses to access the external system 30, but they may be different. The following description will be given on the assumption that the user account is the same as the account that the user uses to access the external system 30.
[0077] The user authentication information is an access token or the like obtained from the external system 30 as a successful result of the authentication process when the authentication unit 211 uses a user account to perform authentication processing on the external system 30 for the first time. After obtaining the user authentication information, the authentication unit 211 can perform authentication processing on the external system 30 more quickly using the user authentication information without using a user account.
[0078] The user basic information includes the user's name and the like, and is read and recorded from the member information of the membership information 221 based on the user account when the user first logs in to the schedule adjustment device 20. The user basic information recorded in the user information 222 may be editable by the user himself / herself.
[0079] The adjustment condition template information 223 includes adjustment conditions specified in advance by the user depending on the purpose of the meeting (which may include, but are not required to include, exclusion keywords and planned exclusion IDs), an adjustment URL, behavior control information when the schedule is confirmed (such as the subject to be registered in the schedule information 311 of participants, etc.), and screen display information (such as the name of the adjustment condition template (for example, for the first interview for new graduate recruitment, etc.) and a description, etc.).
[0080] Note that the adjustment condition template information 223 is created by a user and is therefore associated with the user information 222, but for example, the adjustment condition template information 223 may be associated with the membership information 221 so that the adjustment condition template information 223 can be shared among users who belong to the corporate member corresponding to the membership information 221. Also, an adjustment condition template created by a user may be made available to other users.
[0081] The schedule adjustment information 224 is associated with the user information 222 corresponding to each user and is created for each meeting in which the user initiates the adjustment. Note that, considering that a user other than the user who created the adjustment condition template may adjust the schedule using the adjustment condition template, the schedule adjustment information 224 may be directly associated with the member information 221 of the corporate member to which the user belongs.
[0082] The schedule adjustment information 224 records the adjustment URL, adjustment conditions (which may include, but are not required to include, exclusion keywords and exclusion schedule IDs), candidate dates (such as second candidate dates), information about the person being adjusted (such as email addresses and timing of sending notification emails), the confirmed date and location of the meeting (or the web conference URL in the case of a web conference), comments, etc.
[0083] <Processing at the time of user registration by schedule adjustment system 10> Next, FIG. 3 is a sequence diagram illustrating an example of processing performed by the schedule adjustment system 10 during usage registration.
[0084] It is assumed that a calendar tool 31 provided by an external system 30 is used to manage the schedules of members of the corporate member to which the coordination initiator A and the member manager M belong and the availability of meeting venues, and that the external system 30 already manages the member information and venue information recorded in the member information 221. The external system 30 is also assumed to supply at least one of the member information and venue information recorded in the member information 221 to the schedule coordination device 20 in response to a request from the schedule coordination device 20 accessed using an administrator privileged account (or administrator authentication information).
[0085] First, when the member manager M uses the terminal device 40M to apply for member registration with the schedule adjustment device 20 via the network 11 (step S1), the authentication unit 211 of the schedule adjustment device 20 creates member information 221 and records it in the storage unit 22 (step S11). However, the created member information 221 here includes only the member account and basic information, and does not include the administrator authority account, administrator authentication information, member information, or venue information.
[0086] Next, the member manager M inputs an administrator authority account for the external system 30 and requests authentication processing from the schedule adjustment device 20 (step S2), and then the authentication unit 211 performs authentication processing for the external system 30 using the administrator authority account (step S12).
[0087] As a modified example, steps S1 and S11 may be executed after steps S2 and S12 are executed.
[0088] As a result of the successful authentication process in step S12, external system 30 sends administrator authentication information (access token, etc.) to schedule adjustment device 20, and then authentication unit 211 registers the administrator authority account and the administrator authentication information in member information 221 created and recorded in step S11 (step S13). Note that OAuth, for example, can be used for the authentication process, and by temporarily having member administrator M input a password to external system 30 without going through authentication unit 211, the administrator authority account input by member administrator M is authenticated by external system 30. The same applies to the authentication process for other persons, such as adjustment initiator A.
[0089] Next, the authentication unit 211 connects to the external system 30 using the administrator authentication information of the member information 221, and acquires the member information and venue information of the corporate member to which the member administrator M belongs, which are managed by the external system 30 (step S14). Next, the authentication unit 211 registers the member information and venue information acquired in step S14 in the member information 221 created and recorded in step S11 (step S15).
[0090] After that, when the adjustment initiator A logs in to the schedule adjustment device 20 for the first time using his / her own user account via the network 11 using the terminal device 40A (step S31), the authentication unit 211 of the schedule adjustment device 20 confirms the existence of member information 221 in which member information including the user account of the adjustment initiator A is registered, and acquires the name of the adjustment initiator A (basic user information) from the member information (step S16). Next, the authentication unit 211 performs authentication processing on the external system 30 using the user account of the adjustment initiator A (step S17).
[0091] Then, as a result of the successful authentication process in step S17, user authentication information (access token, etc.) is sent from the external system 30 to the schedule adjustment device 20, and then the authentication unit 211 creates user information 222 corresponding to the adjustment initiator A, associates it with the member information 221 confirmed in step S16, and records it in the storage unit 22, and registers the user account of the adjustment initiator A, the user authentication information, and the user basic information acquired in step S16 in the user information 222 (step S18). This completes the process at the time of user registration.
[0092] According to the process at the time of user registration described above, the member information 221 of the corporate member to which the adjustment initiator A belongs is associated with the user information 222 of the adjustment initiator A. From this point on, even if the member manager M is not logged in to the schedule adjustment device 20, as long as the user, adjustment initiator A, is logged in to the schedule adjustment device 20, the schedule adjustment unit 213 of the schedule adjustment device 20 can refer to and update, for example, via a WebAPI (Application Programming Interface), the schedule information 311 stored in the external system 30, in which the plans of the adjustment initiator A and members B, C, D, etc. who belong to the same corporate member as the adjustment initiator A are registered, as well as the schedule information 311 in which the plans of meeting venues (conference rooms, etc.) that can be used by the adjustment initiator A and members B, C, D, etc. who belong to the same corporate member as the adjustment initiator A are registered.
[0093] In the above-described process at the time of user registration, it is assumed that member information 221 of the corporate member exists, and user information of a user belonging to the corporate member is generated. As a modified example, if the organization to which the individual belongs is not a corporate member and member information 221 does not exist, an individual may log in to the schedule adjustment device 20 and create user information 222, and then the individual may perform a new authentication process on the external system 30 using an administrator-authorized account, whereby the individual is considered to be a corporate member, the individual's user account is considered to be a member account, and member information 221 associated with the individual is generated based on the individual's user information 222. In this case, the individual who has become a corporate member has an administrator-authorized account, and is therefore able to obtain member information and venue information of the organization to which the individual belongs from the external system 30.
[0094] In addition, in this embodiment, the member information and venue information obtained from the external system 30 are registered in the member information 221 stored in the memory unit 22, but the member information and venue information may not be registered in the member information 221, and may be obtained from the external system 30 each time it is necessary to refer to the member information and venue information.
[0095] Furthermore, in this embodiment, the member information and venue information are obtained using an administrator authority account on the external system 30. However, if it is difficult to use the administrator authority account on the external system 30 due to security considerations or the like, the member information and venue information may be registered in the schedule adjustment device 20 without using the administrator authority account on the external system 30. For example, the member information and venue information may be registered directly in the schedule adjustment device 20 by the member administrator M or the user of the corporate member uploading data containing the member information and venue information to the schedule adjustment device 20, or by directly entering the information into a usage registration screen displayed on the terminal device 40M or 40A by the schedule adjustment device 20. Furthermore, without using an administrator authority account, the member administrator M or the user of the corporate member may use the user account authority of the user account of the corporate member to obtain only the member information and venue information that can be obtained from the external system 30 from the external system 30 and register it in the schedule adjustment device 20.
[0096] <Schedule Adjustment Processing by Schedule Adjustment System 10> Next, FIG. 4 is a sequence diagram illustrating an example of schedule adjustment processing by the schedule adjustment system 10. As shown in FIG.
[0097] First, the adjustment initiator A uses the terminal device 40A to log in to the schedule adjustment device 20 via the network 11 (step S101). Then, in response to the login of the adjustment initiator A, the authentication unit 211 of the schedule adjustment device 20 performs authentication processing on the external system 30 using the user account (or user authentication information) included in the user information 222 corresponding to the adjustment initiator A held in the storage unit 22 (step S111).
[0098] Next, the adjustment condition setting unit 212 of the schedule adjustment device 20 displays a selection screen (not shown) on the terminal device 40A for selecting either "custom adjustment" or "template use" as the schedule adjustment method (step S112), and then the adjustment initiator A selects the schedule adjustment method on the selection screen (step S102). In this case, the explanation will continue assuming that the adjustment initiator A selects custom adjustment.
[0099] <If "Custom Adjustment" is selected as the schedule adjustment method> Next, the adjustment condition setting unit 212 of the schedule adjustment device 20 displays a condition setting screen 500 (FIGS. 5 and 6) on the terminal device 40A for setting adjustment conditions (which may include, but are not required to include, exclusion keywords and exclusion schedules) (step S113).
[0100] Figures 5 and 6 are examples of the condition setting screen 500 displayed on the terminal device 40A, where Figure 5 shows the upper part of the condition setting screen 500, and Figure 6 shows the lower part of the condition setting screen 500 that is displayed by scrolling downward from the upper part shown in Figure 5.
[0101] As shown in FIG. 5, the condition setting screen 500 has an input field 501 for entering the meeting subject, a radio button 502 for selecting whether to adjust the meeting location, a radio button 503 for selecting whether to allow the person adjusting the meeting location to change the specified meeting location, a radio button 504 for selecting the workplace, a location other than the workplace, or a web conference as the meeting location, and an input field 505 for entering the name, address, etc. of the meeting location.
[0102] Input field 505 is provided when "Workplace" or "Location other than workplace" is selected with radio button 504. Also, when "Web conference" is selected with radio button 504, radio buttons (not shown) for selecting a video call application to be used for the Web conference as the meeting method (means) are provided instead of input field 505. Also, when "Do not adjust" is selected with radio button 502, only a comment input field (not shown) is provided instead of radio buttons 503 and 504 and input field 505.
[0103] Furthermore, as shown in FIG. 6, the condition setting screen 500 has a selection input field 511 for entering the required time for the meeting, a selection input field 512 for entering the reserved time before and after the meeting, a selection input field 513 for entering the extraction period for candidate dates in year, month, and day format, a selection input field 514 for entering the available meeting time slots, a check box 515 for instructing the adoption of the first additional determination method (a method of specifying an exclusion keyword) as the method for determining whether to add available dates, an input field 516 for entering an exclusion keyword when the check box 515 is checked (when the first additional determination method is used), a check box 517 for instructing the adoption of the second additional determination method (a method of individually specifying an exclusion schedule) as the method for determining whether to add available dates, a detailed settings button 518 for transitioning to the exclusion schedule designation screen 550 (FIG. 7) for specifying an exclusion schedule when the check box 517 is checked (when the second additional determination method is used), and a selection input field 519 for selecting and specifying one or more venues to be used for the meeting from a list of venues based on the venue information in the member information 221.
[0104] Here, the reserved time before and after the meeting, which is input in selection input field 512, refers to time for travel to the venue, preparation work, dismantling work, breaks, etc. When reserved times before and after the meeting are set, the reserved times before and after the meeting must be reflected in the participant's available dates. Specifically, for example, if a participant's required attendance schedule is from 12:00 to 13:00, and the previous reserved time is set to 30 minutes and the subsequent reserved time is set to 60 minutes, then the reserved time after the meeting is 11:00 to 12:00, the required attendance schedule is 12:00 to 13:00, and the reserved time before the meeting is 13:00 to 13:30, and the combined time period of 11:00 to 13:30 is a date during which no other meeting schedules can be scheduled, and the remaining dates are the participant's available dates.
[0105] The selection input field 514 may be configured to allow input of different meeting times for different days of the week and for different holidays.
[0106] When checkbox 515 is checked, i.e., when the first addition determination method is adopted, it becomes necessary to input one or more exclusion keywords into input field 516, and an additional determination of available dates is made using the exclusion keywords input into input field 516. Multiple exclusion keywords can be input into input field 516 by separating them with, for example, a line break, a comma ",", or a comma ",". Note that when multiple exclusion keywords are input, existing events whose subject includes one or more of the multiple input exclusion keywords are excluded from required attendance events.
[0107] The advanced settings button 518 becomes operable when the checkbox 517 is checked, i.e., when the second addition determination method is adopted. When the advanced settings button 518 is operated, the screen transitions to the excluded schedule designation screen 550 (FIG. 7), and an additional determination of available dates is made based on the specified excluded schedule. Note that when the checkbox 517 is checked, it is necessary to designate one or more excluded schedules on the excluded schedule designation screen 550.
[0108] 7 shows an example of the display of an excluded schedule designation screen 550. The excluded schedule designation screen 550 is used by adjustment initiator A to designate excluded schedules that are not considered required attendance schedules among existing schedules. The excluded schedule designation screen 550 is provided with an input field 551 for designating a calendar (schedule information 311) to be searched for existing schedules, an input field 552 for inputting search keywords to narrow down the existing schedules, a search button 553 for instructing to start searching for existing schedules, and an excluded schedule confirmation button 555 for confirming the specified existing schedule from the listed existing schedules as an excluded schedule.
[0109] In input field 551, the calendar to be searched can be specified by selecting it from the calendars existing in calendar tool 31. In input field 552, multiple search keywords can be entered by separating them with, for example, a line break, a comma ",", or the like. When multiple search keywords are entered, existing plans within the extraction period of the candidate schedule whose subject includes one or more of the entered search keywords are searched for. Also, it is not necessary to enter a search keyword in input field 552. In this case, all existing plans that meet the extraction period of the candidate schedule are searched for from the calendar to be searched specified in input field 551, without narrowing down the search results using the search keyword.
[0110] When adjustment initiator A specifies a calendar to be searched in input field 551, enters a search keyword in input field 552, and operates search button 553, existing plans registered in the calendar to be searched are searched for that contain the search keyword in their subject line. However, instead of or in addition to the subject line of the existing plan, existing plans that contain the search keyword in other fields, such as remarks or explanations (memos) of the existing plan, may also be searched for. A list of the searched existing plans is then displayed on exclusion plan specification screen 550.
[0111] Each of the listed existing schedules has a check box 554. Adjustment initiator A can designate any of the existing schedules listed on the exclusion schedule designation screen 550 by checking the check box 554 of the existing schedule, and then operate the exclusion schedule confirmation button 555 to confirm the designated existing schedule as an exclusion schedule.
[0112] For example, as shown in the figure, when adjustment initiator A specifies his / her own (participant A's) calendar as the search target in input field 551, enters the search keyword "(internal)" in input field 552, and operates search button 553, the adjustment condition setting unit 212 refers to participant A's calendar (schedule information 311) managed by external system 30, searches for existing plans of participant A within the candidate date extraction period that contain the search keyword "(internal)" in the subject line, and displays a list of these plans on the excluded schedule specification screen 550. Then, when adjustment initiator A specifies two of the five existing schedules displayed in the list, namely, "Headquarters Manager Meeting (Internal)" from 14:00 to 15:00 on Monday, December 21st, and "Sales Meeting (Internal)" from 10:00 to 12:00 on Wednesday, December 23rd, and operates the "Confirm Excluded Schedule" button 555, the two specified existing schedules are confirmed as excluded schedules, and the adjustment condition setting unit 212 records the schedule IDs on the calendar tool 31 for the two confirmed excluded schedules in the schedule adjustment information 224 as excluded schedule IDs.
[0113] In the figure, repeating schedules (such as department meetings every Monday) are displayed all together in one row, but it may be possible to select whether to display them all together or to display each individual schedule included in the repeating schedule on a separate row. Also, when repeating schedules are displayed all together, if the check box 554 corresponding to the repeating schedule is checked, each individual schedule included in the repeating schedule may be additionally displayed with a check box attached, and each individual schedule may be designated as an excluded schedule on a schedule-by-schedule basis.
[0114] Returning to Figure 6, when the check boxes 515 and 517 are not checked for the participant's available schedule, i.e., when neither the first nor the second addition determination method is adopted, the schedule adjustment unit 213 regards all of the participant's existing schedules as required attendance schedules, and determines as the participant's available schedules those schedules on which the participant does not have any required attendance schedules, excluding the reserved time before and after the required attendance schedules.
[0115] When check box 515 is checked and check box 517 is not checked, that is, when the first additional determination method is adopted and the second additional determination method is not adopted, the schedule adjustment unit 213 excludes the participant's existing schedules whose subject includes the excluded keyword from the required attendance schedules, regards the remaining existing schedules as the participant's required attendance schedules, and determines as the participant's available schedules the schedules on which the participant does not have any required attendance schedules and which exclude the reserved time before and after the required attendance schedules.
[0116] When check box 515 is not checked and check box 517 is checked, that is, when the first additional determination method is not adopted and the second additional determination method is adopted, the schedule adjustment unit 213 excludes the existing schedule of the participant specified as the excluded schedule from the required attendance schedule, considers the remaining existing schedule as the required attendance schedule of the participant, and determines the schedule that does not have the required attendance schedule of the participant and that excludes the reserved time before and after the required attendance schedule of the participant as the available schedule of the participant.
[0117] If both check boxes 515 and 517 are checked, i.e., if both the first and second additional determination methods are adopted, the schedule adjustment unit 213 excludes the participant's existing schedules whose subject includes the excluded keyword and the participant's existing schedules designated as excluded schedules from the participant's required attendance schedules, and regards the remaining existing schedules as the participant's required attendance schedules, and determines as the participant's available schedules the schedules on which the participant does not have any required attendance schedules and which exclude the reserved time before and after the participant's required attendance schedules.
[0118] The selection input fields 511 to 514, 519, check boxes 515, 517, and input field 516 are displayed with the schedule adjustment information 224 associated with the user information 222 corresponding to the adjustment initiator A referenced, and the adjustment conditions of the meeting for which the adjustment initiator A was the most recent adjustment initiator are reflected. This reduces the effort required for the adjustment initiator A to input the adjustment conditions. The adjustment initiator A may specify whether or not to automatically reflect the adjustment conditions of the most recent meeting in the selection input field 511, etc. Alternatively, one or more patterns of adjustment conditions may be registered in advance, and the adjustment conditions may be easily reflected by specifying and calling one of the patterns. Alternatively, the adjustment conditions may be easily reflected by copying the adjustment conditions (information other than the extraction period for candidate dates) of the adjustment condition template information 223 that has already been registered.
[0119] Furthermore, the condition setting screen 500 is provided with a selection input field 520 for selecting and specifying one or more participants (which may or may not include coordination initiator A) on the coordination initiator A's side from a list of members based on the member information in the member information 221, a radio button 521 for selecting the meeting participation conditions for the participants specified in the selection input field 520, an input field 522 for omitting the input of an email address by coordination partner X on the schedule confirmation screen 900 (Figure 12), a check box 523 for selecting whether or not to register the meeting schedule privately, and a candidate date extraction button 524 for confirming each input item and instructing the extraction of candidate dates for the meeting.
[0120] If multiple participants are specified in selection input field 520 and all of the specified participants need to participate in the meeting, then "All participants must participate" can be selected using radio button 521. If multiple participants are specified in selection input field 520 and it is sufficient for at least one of the specified participants to participate, then "Only one person must participate" can be selected using radio button 521. If only one participant is entered in selection input field 520, then "All participants must participate" is automatically selected in radio button 521, but if there is only one participant, then all subsequent operations, such as extracting candidate dates, will be the same regardless of whether "All participants must participate" or "Only one person must participate" is selected.
[0121] When multiple participants are entered in the selection input field 520 and "All participants attend" is selected using radio button 521, the schedule information 311 of all participants is referenced, and dates that are available for all participants who meet the adjustment conditions are extracted as candidate dates. Conversely, when multiple participants are entered in the selection input field 520 and "Only one person will attend" is selected using radio button 521, the schedule information 311 of all participants is referenced, and dates that have at least one free date among the free dates of each participant who meets the adjustment conditions are extracted as candidate dates.
[0122] Returning to Fig. 4, when the adjustment initiator A inputs each item of the adjustment conditions on the condition setting screen 500 displayed on the terminal device 40A and operates the candidate schedule extraction button 524 (step S103), in response to this operation, the adjustment condition setting unit 212 of the schedule adjustment device 20 creates new schedule adjustment information 224 in association with the user information 222 of the adjustment initiator A, stores this in the storage unit 22, and registers the set adjustment conditions in the schedule adjustment information 224 (step S114).
[0123] In this case, for example, as shown in Figures 5 to 7, the adjustment conditions are: the subject of the meeting is "New product negotiation with Mr. / Ms. XX of XX Trading Company", the meeting location is "Adjust", the change of the specified meeting location by the adjustment partner is "Acceptable", the meeting location is "XX Trading Company" which is different from the work location, the required time for the meeting is "60 minutes", the time to reserve before and after the meeting is "30 minutes", the extraction period for candidate dates is 8 business days from "December 16, 2020" to "December 25, 2020", the available time slot is "09:30-18:00", the additional determination method for available dates is both the first and second additional determination methods, and the excluded keyword is "※ Absent" The following explanation will continue assuming that the following dates are set to "Yes", the excluded dates are the "Headquarters Manager Meeting (Internal)" from 14:00 to 15:00 on Monday, December 21st, and the "Sales Meeting (Internal)" from 10:00 to 12:00 on Wednesday, December 23rd, the venue is "Not specified", the participants entered are "Coordination initiator A and members B and C who belong to the same corporate member (hereinafter collectively referred to as participants A, B, and C)", the meeting participation conditions for the entered participants are "Participate by all", the email address of the person being coordinated is "Not entered", and the registration of the meeting schedule is set to "Public".
[0124] Next, the schedule adjustment unit 213 reads out the adjustment conditions registered in the schedule adjustment information 224 of the adjustment initiator A from the memory unit 22, and refers to the participant's schedule information 311 managed by the external system 30 to extract the participant's available dates that currently satisfy the adjustment conditions as the first candidate dates (step S115).
[0125] Specifically, in this case, because both the first and second addition determination methods are used, existing events of participants whose subject lines contain the exclusion keyword and existing events of participants designated as excluded events are excluded from the required attendance events, and the remaining existing events are considered required attendance events for the participants. Furthermore, because multiple participants A, B, and C are designated and "All Attend" is selected using radio button 521, the schedule information 311 of each participant A, B, and C is referenced, and a common available date for participants A, B, and C that meets the adjustment conditions (a time period from 9:30 to 18:00 on business days between December 16, 2020, and December 25, 2020, with no required attendance events, excluding 30 minutes of free time after the meeting before the required attendance event and 30 minutes of free time before the meeting after the required attendance event from the available time for the meeting, and further, a time period in which 60 minutes of meeting time can be reserved) is extracted as the first candidate date. Conversely, if "Only one person will participate" is selected using radio button 521, the available date for at least one of participants A, B, and C who meets the adjustment conditions will be extracted as the first candidate date. The same applies when extracting the second and third candidate dates, which will be described later.
[0126] Next, the schedule adjustment unit 213 causes the terminal device 40A to display the schedule editing screen 600 (FIGS. 8 and 9) showing the first candidate schedule (step S116).
[0127] 8 shows an example of the display of the schedule editing screen 600 when the subject of the participant's existing schedule does not include an exclusion keyword. The case where the subject of the participant's existing schedule includes an exclusion keyword will be described later with reference to FIG.
[0128] The schedule editing screen 600 displays a candidate schedule period frame 601, a calendar 602 displayed in a grid with the date on the horizontal axis and the time on the vertical axis, and a candidate schedule list 605 in which the first candidate schedules are listed by day. The schedule editing screen 600 also has a URL issue button 606 and a back button 607.
[0129] Candidate date period frame 601 represents the period in which the first candidate date exists among the candidate date extraction periods input in selection input field 513 of condition setting screen 500 .
[0130] On the calendar 602, based on the participant schedule information 311 managed by the external system 30, an existing schedule frame 604 showing the schedules of each participant for the display period on the calendar 602 is displayed in different colors to distinguish it from the first candidate schedule frame 603. This allows the coordination initiator A to edit the first candidate schedule while checking the participants' existing schedules. Note that if there are multiple participants, the names of the participants may be displayed in the existing schedule frame 604 or the existing schedule frame 604 may be color-coded to distinguish which of the multiple participants has an existing schedule.
[0131] In the candidate schedule list 605, the first candidate schedules are displayed in a list by day.
[0132] Adjustment initiator A can edit the first candidate schedule slot (extend, shorten, exclude part of, or exclude all) using a pop-up screen (not shown) that appears when the first candidate schedule slot 603 on the calendar 602 is selected. For example, by selecting the slot from 10:30 to 15:30 on Thursday, December 17, the start time of 10:30 or the end time of 15:30 can be moved earlier or later on the pop-up screen that appears. Furthermore, the adjustment initiator A can exclude a portion of the slot, for example, 12:00 to 13:00 on the same day, from the first candidate schedule, or the entire slot (the entire slot from 10:00 to 15:30) from the first candidate schedule. The edited results of the first candidate schedule on the calendar 602 are immediately reflected in the candidate schedule list 605. The first candidate schedule may be edited by dragging and dropping or other operations on the screen in response to the operation of an input device (mouse, touch panel, etc.) provided on the terminal device 40A. The same applies to other screen operations on the terminal devices 40A and 40X.
[0133] The adjustment initiator A can also edit the first candidate schedule in the candidate schedule list 605.
[0134] The URL issue button 606 is a button for confirming the editing result of the first candidate schedule (second candidate schedule) by the adjustment initiator A in the calendar 602 and issuing an adjustment URL for the other party to access the schedule adjustment screen. The back button 607 is a button for returning to the condition setting screen 500.
[0135] Next, FIG. 9 shows an example of the display of the schedule editing screen 600 when an exclusion keyword is included in the subject of an existing schedule of a participant.
[0136] Specifically, as shown in Figure 8, the subject of Participant A's existing appointment, "Lunch Meeting," which took place on Wednesday, December 16th from 11:00 to 13:00, contains the exclusion keyword "*Can attend." This means that the existing appointment is excluded from Participant A's required appointments, and the same determination of available dates is made as if the existing appointment did not exist, with 09:30 to 16:00 becoming the first candidate date for that day.
[0137] 9, to make it clear that the 9:30 to 16:00 time slot on Wednesday, December 16th is the first candidate date, the time slot from 9:30 to 16:00 on that day is displayed in the same color as the other first candidate date slots 603. However, since there is an existing event "Lunch Meeting *Can be Absent" from 11:00 to 13:00 on the same day, the first candidate date slot 603 is displayed next to the existing event slot 604 with the subject line written on it for the 11:00 to 13:00 time slot on the same day to make it clear that although there is an existing event, it is the first candidate date.
[0138] Furthermore, the adjustment initiator A can designate an existing schedule corresponding to the existing schedule slot 604 as an excluded schedule on a pop-up screen that is displayed by selecting the existing schedule slot 604 on the calendar 602 of the schedule editing screen 600 (FIG. 8 or FIG. 9). That is, the adjustment initiator A can designate an existing schedule as an excluded schedule not only on the excluded schedule designation screen 550 (FIG. 7). Note that even when an excluded schedule is designated on the schedule editing screen 600, the adjustment condition setting unit 212 records the schedule ID of the existing schedule designated as an excluded schedule as an excluded schedule ID in the schedule adjustment information 224 corresponding to the adjustment initiator A, just as when an excluded schedule is designated on the excluded schedule designation screen 550 (FIG. 7). Furthermore, the schedule adjustment unit 213 again determines available schedules for the time period surrounding the excluded schedule based on adjustment conditions including the excluded schedule. Specifically, the available schedule is determined again for a time period obtained by adding together three types of time periods: the time period of the excluded schedule, the time periods of the reserved times before and after the excluded schedule that were excluded from the available schedule in accordance with the excluded schedule before it was specified, and the time period of the first candidate schedule slot 603 that is adjacent to the excluded schedule or the reserved times before and after the excluded schedule, and the re-determined available schedule is re-displayed as the first candidate schedule slot 603 for the added time period.
[0139] Furthermore, when adjustment initiator A extends the first candidate schedule slot 603 on the calendar 602 of the schedule editing screen 600, if the time slot of the first candidate schedule overlaps with an existing schedule, the existing schedule is added to the excluded schedule. Also, when the first candidate schedule slot 603 is extended, if it becomes impossible to secure time before or after the first candidate schedule and the existing schedule, the existing schedule is added to the excluded schedule. Note that when an excluded schedule is added as a result of extending the first candidate schedule slot 603, the excluded schedule is added to the adjustment conditions, and further, the extended time slot is added to the first candidate schedule slot 603.
[0140] For example, if coordination initiator A selects the first candidate date slot of 10:30-15:30 on Thursday, December 17th in calendar 602 on schedule editing screen 600 and attempts to extend the first candidate date slot by moving the start time of that slot earlier from 10:30 to 10:00 in the pop-up screen that appears when that slot is selected, since the "30 minutes" of reserved time before the meeting cannot be secured, the existing schedule "Interview with Participant B" from 09:00-10:00 on the same day is added to the excluded schedule, and the extended time period of 10:00-10:30 is added to the first candidate date slot 603. As another example, if the first candidate schedule is extended by delaying the end time of the first candidate schedule slot for the same day from 15:30 to 17:00, the extended first candidate schedule slot 603 overlaps with an existing schedule "Interview with Participant B" from 16:00 to 17:00 on the same day, so the existing schedule is added to the excluded schedules, and the extended time period from 15:30 to 17:00 is added to the first candidate schedule slot 603. Then, the schedule ID of the existing schedule added to the excluded schedules is recorded by the adjustment condition setting unit 212 as an excluded schedule ID in the schedule adjustment information 224 corresponding to adjustment initiator A.
[0141] In addition, if an existing schedule is added to the excluded schedule by extending the first candidate schedule slot 603 on the calendar 602, a speech bubble or the like with the text "Added to the excluded schedule" may be displayed pointing to the existing schedule slot 604 that was added to the excluded schedule immediately after the extension operation so that the adjustment initiator A, who is performing the operation, can understand that the excluded schedule has been added.
[0142] When specifying excluded schedules using the schedule editing screen 600, the adjustment initiator A can specify the excluded schedules individually more quickly and easily than when using the excluded schedule specification screen 550.
[0143] Returning to Figure 4, on the schedule editing screen 600 displayed on the terminal device 40A, coordination initiator A edits the first candidate schedule as necessary and operates the URL issue button 606 (step S104). Next, the schedule adjustment unit 213 of the schedule adjustment device 20 issues an adjustment URL and registers the adjustment URL and the second candidate schedule in the schedule adjustment information 224 (created in step S114) corresponding to coordination initiator A (step S117). In this case, because the subject of the existing appointment from 11:00 to 13:00 on Wednesday, December 16th contains an exclusion keyword, the schedule editing screen 600 of Figure 9 is displayed on the terminal device 40A, and the following explanation will continue assuming that coordination initiator A has further edited the schedule editing screen 600 of Figure 9 to exclude 15:00 to 16:00 on Wednesday, December 16th from the first candidate schedule.
[0144] Next, the schedule adjustment unit 213 causes the terminal device 40A to display the issued adjustment URL and a message instructing the terminal device 40A to transmit the adjustment URL to the adjustment partner (step S118).
[0145] In response to the message, the adjustment initiator A then copies the adjustment URL displayed on the terminal device 40A, pastes it into an email or the like, and sends it to the terminal device 40X of the adjustment partner X (step S105).
[0146] Next, when the adjustment partner X who has received the adjustment URL accesses the adjustment URL using the terminal device 40X (step S131), the schedule adjustment unit 213 of the schedule adjustment device 20 reads out from the memory unit 22 the adjustment conditions and the second candidate date registered in the schedule adjustment information 224 of the adjustment initiator A corresponding to the adjustment URL, and refers to the participant's schedule information 311 managed by the external system 30 to extract a third candidate date that is an available date for the participant that satisfies the adjustment conditions at the current time (a date that does not have any mandatory attendance schedules and that excludes the reserved time before and after the mandatory attendance schedules) and is within the range of the second candidate date (step S119).
[0147] In this case, suppose that between the time the adjustment URL was issued and the time adjustment partner X accessed the schedule, a required event was added to participant A's schedule information 311 for Thursday, December 17th, from 1:00 PM to 2:00 PM, with no excluded keywords in the subject line. In this case, the third candidate date is the second candidate date minus the period from 12:30 PM to 2:30 PM on Thursday, December 17th, which takes into account the 30 minutes of available time before and after the meeting. In other words, the "available time before and after" adjustment condition also applies to the events of participants added after the adjustment URL was issued.
[0148] Next, the schedule adjustment unit 213 displays the schedule adjustment screen 700 (FIG. 10) on the terminal device 40X (step S120).
[0149] 10 shows an example of the display of a schedule adjustment screen 700. The schedule adjustment screen 700 is a screen for the coordination partner X to confirm the location of the meeting. The schedule adjustment screen 700 displays the meeting location (venue name, address, etc.) entered by the coordination initiator A in the input field 505 of the condition setting screen 500 (FIG. 5), as well as a MAP button 701 for displaying the meeting location on a map. Furthermore, the schedule adjustment screen 700 is provided with radio buttons 702 for selecting whether or not the meeting location specified by the coordination initiator A is acceptable, an input field 703 for entering a reply comment to the coordination initiator A, and a date selection button 704. However, the radio button 702 can be selected by the coordination partner X only if the coordination initiator A selects "Allow location change by coordination partner" using radio button 503 on the condition setting screen 500 (FIG. 5). Therefore, if the coordination initiator A selects "Do not allow the coordination partner to change the location" using radio button 503 on the condition setting screen 500, the coordination partner X cannot choose whether or not the meeting location specified by the coordination initiator A is acceptable.
[0150] If the meeting place displayed on the schedule adjustment screen 700 is not inconvenient, the person making the arrangements X may select "OK with the above location" using radio button 702 and operate the date selection button 704. Conversely, if the meeting place displayed on the schedule adjustment screen 700 is inconvenient, the person making the arrangements X may select "Change location" using radio button 702. In response to the selection of "Change location," an input field (not shown) is additionally displayed on the schedule adjustment screen 700 for the person making the arrangements X to input the new meeting place (place name, address, building name, floor number, etc.), and the person making the arrangements X may input the new meeting place in the input field and operate the date selection button 704.
[0151] If the coordination initiator A selects "Do not coordinate meeting place" using the radio button 502 on the condition setting screen 500, the display and input fields for the meeting place will not be displayed.
[0152] Furthermore, if the schedule initiator A selects "Web Conference" using the radio button 504 on the condition setting screen 500, the schedule adjustment screen 700 displays a message indicating that a web conference will be held instead of a meeting location, and the name of the video call application to be used for the web conference as the meeting method (means), and the explanation displayed in the radio button 702 changes to, for example, "OK with the above" and "Change" (not shown). If the video call application displayed on the schedule adjustment screen 700 is not inconvenient, the schedule adjustment partner X can select "OK with the above" using the radio button 702 and operate the schedule selection button 704. Conversely, if the video call application displayed on the schedule adjustment screen 700 is inconvenient, the schedule adjustment partner X can select "Change" using the radio button 702. If "Change" is selected, the schedule adjustment partner X can enter, for example, "I'm not using the first video call application, so please use the second video call application" in the comment input field and operate the schedule selection button 704.
[0153] When the adjustment partner X operates the schedule selection button 704 on the schedule adjustment screen 700, the schedule adjustment screen 800 (FIG. 11) is displayed on the terminal device 40X.
[0154] 11 shows an example of a schedule adjustment screen 800 displaying the third candidate schedule. The schedule adjustment screen 800 displays a calendar 801 in a grid format with the date on the horizontal axis and the time on the vertical axis, and a candidate schedule list 803 in which the third candidate schedule is listed by day. The schedule adjustment screen 800 also has an inconvenient button 804 and a confirmation screen button 805.
[0155] On the calendar 801, the third candidate schedule slot 802 is displayed in a different color, etc., so that it can be distinguished from the other slots. Note that, unlike the calendar 602 on the schedule editing screen 600 (FIG. 8 or 9), the calendar 801 does not display the participants' existing schedules. This makes it possible to protect the privacy of the participants from the coordination partner X.
[0156] The candidate date list 803 displays the duration of the meeting and a third candidate date listed by day.
[0157] The person X who is to make the arrangement can select a meeting date by selecting one of the third candidate date slots 802 in the calendar 801. If a slot longer than the required time of the meeting, "60 minutes," is selected, a pop-up screen (not shown) is displayed. The person X who is to make the arrangement can decide the meeting date by selecting the required time, "60 minutes," within the time of the selected slot on the pop-up screen.
[0158] The Inconvenient button 804 is a button to be operated when the third candidate schedule displayed on the schedule adjustment screen 800 is inconvenient. When the adjustment partner X operates the Inconvenient button 804, the adjustment initiator A is notified that the proposed candidate schedule is inconvenient. In this case, the adjustment initiator A will change the adjustment conditions and execute the schedule adjustment process again.
[0159] The confirmation screen button 805 is a button for confirming the decided meeting date. When the coordinating partner X operates the confirmation screen button 805, the terminal device 40X displays a schedule confirmation screen 900 (FIG. 12) for the coordinating partner X to confirm the decided meeting date selected from the third candidate date.
[0160] In this case, the following explanation will be continued assuming that the coordination partner X has decided on the meeting date from 11:00 to 12:00 on Thursday, December 17th on the schedule adjustment screen 800.
[0161] 12 shows an example of the display of a schedule confirmation screen 900. The schedule confirmation screen 900 displays a calendar 901 in a grid format with the date on the horizontal axis and the time on the vertical axis, and meeting details 903.
[0162] In calendar 901, meeting schedule frame 902 selected and decided by coordination partner X himself / herself on schedule adjustment screen 800 is displayed in a different color, etc., so that it can be distinguished from other frames. Meeting details 903 display the date and meeting location (in this case, Thursday, December 17th, 11:00-12:00 ○× Business...). Note that if coordination partner X selects "Change location" using radio button 702 on schedule adjustment screen 700 (FIG. 10) and enters the new venue in input field 703, meeting details 903 displays the location name, address, building name, floor number, etc. entered by coordination partner X as the new meeting location. Furthermore, if coordination partner X has entered a comment on schedule adjustment screen 800, the comment is displayed in meeting details 903.
[0163] The schedule confirmation screen 900 also has an input field 904 for the person to be coordinated, X, to enter his / her email address, a check box 905 for setting the timing of sending an email to notify the person of the meeting, a back button 906 for returning to the schedule adjustment screen 800, and a confirm button 907 for confirming the content displayed on the schedule confirmation screen 900.
[0164] Returning to FIG. 4, on the schedule confirmation screen 900 (FIG. 12) displayed on the terminal device 40X, when the adjustment partner X enters his / her email address in the input field 904 and presses the Confirm button 907 (step S132), the schedule adjustment unit 213 refers to the participants' schedule information 311 managed by the external system 30 and performs a final confirmation that the meeting date confirmed on the schedule confirmation screen 900 is a currently available date for the participants that satisfies the adjustment conditions and is within the range of the second candidate dates (step S121). If the confirmed meeting date is no longer available because the participants have made plans or no longer satisfies the adjustment conditions, a message such as "The specified time is booked. Please select again" is displayed on the terminal device 40X, and the process returns to step S119, where adjustment partner X can start over with his / her operation on the schedule adjustment screen 800. On the other hand, if it is finally confirmed that the confirmed meeting date is a free date for the participants that meets the adjustment conditions and is within the range of the second candidate date, the terminal device 40X will display a schedule notification screen 1000 (Figure 13) showing the meeting date and other information confirmed by the adjustment partner X himself (step S122).
[0165] FIG. 13 shows a display example of a schedule notification screen 1000. The schedule notification screen 1000 displays the confirmed meeting date, location, comments from coordination initiator A, and the like. The schedule notification screen 1000 also has a calendar tool registration button 1001 and a schedule application registration button 1002. If coordination partner X is using the calendar tool 31, he or she can register the confirmed meeting schedule in the calendar tool 31 as coordination partner X's own schedule by operating the registration button 1001. Furthermore, coordination partner X can register the confirmed meeting schedule in a schedule management application program (for example, Outlook (trademark)) that he or she is using by operating the registration button 1002.
[0166] Returning to FIG. 4 , if the final confirmation in step S121 confirms that the confirmed meeting date is a date available for the participants that satisfies the coordination conditions and is within the range of the second candidate dates, the schedule adjustment unit 213 registers the planned meeting with coordination partner X in the participant schedule information 311 managed by the external system 30. The schedule adjustment unit 213 also registers the email address of coordination partner X, the timing of sending the notification email, the date and time of the meeting, the location, etc. in the schedule adjustment information 224 (created in step S114) corresponding to coordination initiator A held in the storage unit 22 (step S123). Note that if the meeting is a Web conference, the schedule adjustment unit 213 issues a Web conference URL instead of the location and registers it in the schedule adjustment information 224. Note that whether the schedule adjustment unit 213 issues a Web conference URL depends on the setting of coordination initiator A.
[0167] In this case, participants A, B, and C are specified in the selection input field 520 on the condition setting screen 500 (FIG. 6), and "All participants participate" is selected in the radio button 521, so the schedule adjustment unit 213 registers a meeting schedule with the coordination partner X in the schedule information 311 of each of participants A, B, and C, which is managed by the external system 30. Conversely, if "Only one person participates" is selected in the radio button 521, the meeting schedule with the coordination partner X may be registered in the schedule information 311 of all participants A, B, and C who have free dates on the confirmed meeting date, or one person may be selected from among those who have free dates on the confirmed meeting date, and the meeting schedule with the coordination partner X may be registered in the schedule information 311 of the selected person. Note that the selection of participants may be performed by the schedule adjustment unit 213 according to a predetermined rule, or the coordination initiator A may select the participants.
[0168] Next, the schedule adjustment unit 213 sends a notification email to the email address designated by the other party X to notify them of the meeting, according to the sending timing selected by the other party X himself (step S124).
[0169] However, in this embodiment, it is assumed that the coordination partner X receives the email on the terminal device 40X, and an arrow from the schedule coordination device 20 to the terminal device 40X is illustrated in step S124, but the coordination partner X may receive the notification email from the schedule coordination device 20 on an electronic device other than the terminal device 40X. This completes the schedule coordination process by the schedule coordination system 10.
[0170] In the explanation up to this point, coordination initiator A has not specified the venue for the meeting, but if a venue is specified in selection input field 519 on condition setting screen 500 (Fig. 6), a first candidate date and a third candidate date can be extracted so that they are also available dates at the venue. Note that for available dates at the venue, no determination is made as to whether or not the subject of the schedule contains an excluded keyword, and dates with no existing schedules are extracted.
[0171] Specifically, for example, if only "Conference Room 1" is specified as the venue, in step S115, the schedule adjustment unit 213 reads out the adjustment conditions registered in the schedule adjustment information 224 of the adjustment initiator A from the storage unit 22, and refers to the schedule information 311 of the participants and the first conference room managed by the external system 30, to extract a first candidate date that is currently available for both the participants and the first conference room and that satisfies the adjustment conditions. Also, in step S119, the schedule adjustment unit 213 reads out the adjustment conditions and the second candidate date registered in the schedule adjustment information 224 of the adjustment initiator A that corresponds to the accessed adjustment URL from the storage unit 22, and refers to the schedule information 311 of the participants and the first conference room managed by the external system 30, to extract a third candidate date that is currently available for both the participants and the conference room and that satisfies the adjustment conditions and is within the range of the second candidate date. Furthermore, in step S123, the schedule adjustment unit 213 may register the plan for the meeting with the adjustment partner X in the schedule information 311 of each of the participants and the first conference room, which are managed by the external system 30.
[0172] For example, if two rooms, "Conference Room 1 and Conference Room 2," are specified as the venue, in step S115, the schedule adjustment unit 213 reads out the adjustment conditions registered in the schedule adjustment information 224 of the adjustment initiator A from the memory unit 22, and refers to the schedule information 311 of the participants and the first and second conference rooms managed by the external system 30, and extracts a first candidate date that is currently available for the participants, is available for at least one of the first and second conference rooms, and satisfies the adjustment conditions.
[0173] In step S119, the schedule adjustment unit 213 reads from the storage unit 22 the adjustment conditions and the second candidate dates registered in the schedule adjustment information 224 of the adjustment initiator A corresponding to the accessed adjustment URL, and references the schedule information 311 of the participants and the first and second conference rooms managed by the external system 30 to extract a third candidate date that is currently available for participants who meet the adjustment conditions, that has availability for at least one of the first and second conference rooms that meets the adjustment conditions, and that is within the range of the second candidate date. Furthermore, if two rooms, the first and second conference rooms, are available in the confirmed meeting schedule, one of the first or second conference rooms is selected, and the meeting schedule with the adjustment partner X is registered in the schedule information 311 of the selected venue. The venue may be selected by the schedule adjustment unit 213 according to a predetermined rule, or the venue may be selected by the adjustment initiator A. Then, in step S123, the schedule adjustment unit 213 may register the plan for the meeting with the adjustment partner X in the schedule information 311 for each participant and selected venue managed by the external system 30.
[0174] According to the schedule adjustment process described above, a meeting date for one or more participants and the adjustment partner X can be easily and efficiently set without double-booking with an existing schedule of a higher priority, while allowing double-booking with an existing schedule of a lower priority for the participants.
[0175] Furthermore, the schedule adjustment process allows the confirmed meeting dates and the like to be registered in the calendar tool 31 used by the participants, thereby eliminating the need for manual schedule registration in the calendar tool 31, which was previously required.
[0176] Furthermore, according to the schedule adjustment process, the adjustment partner X can change the meeting location or meeting method designated by the adjustment initiator A.
[0177] In addition, from the perspective of coordination initiator A, the work from extracting candidate dates to sending them to coordination partner X can be completed in a short time (for example, about 30 seconds), and after sending the candidate dates to coordination partner X, all the important work involved in schedule coordination can be completed automatically, not only by deciding on the date but also by adjusting the meeting location or method and registering the schedule, all with just a wait. This makes it possible to significantly reduce the effort involved in schedule coordination.
[0178] <If "Use template" is selected as the method for scheduling> Next, we will explain the case where coordination initiator A selects "use template" as the schedule adjustment method. When using a template, coordination initiator A selects an adjustment condition template that he or she has created in advance and copies the adjustment URL that he or she has specified in advance, which allows the adjustment URL to be sent to adjustment partner X more quickly than with custom adjustment. Note that other users may specify and edit the adjustment condition template that coordination initiator A has created in advance, or copy the adjustment URL so that it can be used for schedule adjustment.
[0179] A user such as the adjustment initiator A can create an adjustment condition template in advance depending on the purpose of the meeting, for example, for the first interview for new graduates, the second interview for new graduates, the final interview for new graduates, or for sales inquiries.
[0180] In the case of custom scheduling, the scheduling conditions are set each time a meeting is scheduled, but the scheduling conditions template can be used repeatedly to schedule different meetings.
[0181] <Adjustment condition template creation process> FIG. 14 is a sequence diagram illustrating an example of the adjustment condition template creation process.
[0182] The adjustment condition template creation process goes through steps S101, S111, S112, and S102 similar to the schedule adjustment process shown in Fig. 4. Then, in step S102, when adjustment initiator A selects "use template" as the schedule adjustment method, the adjustment condition setting unit 212 of the schedule adjustment device 20 then refers to adjustment condition template information 223 associated with the user information 222 corresponding to adjustment initiator A, and causes the terminal device 40A to display a template list screen 1100 (Fig. 15) showing a list of adjustment condition templates that adjustment initiator A can use (step S141).
[0183] FIG. 15 shows an example of a template list screen 1100 displayed on the terminal device 40A.
[0184] The template list screen 1100 is provided with a new creation button 1101 and a template list 1102 showing a list of adjustment condition templates available to adjustment initiator A. The template list 1102 displays, for each template, a management name, a description, an adjustment URL, an edit button 1103, and a URL copy button 1104.
[0185] The new creation button 1101 is a button for instructing to move to a template creation screen 1200 (FIGS. 16 and 17) where a new adjustment condition template can be created. The edit button 1103 is a button for instructing to move to a screen (not shown, similar to the template creation screen 1200) where an adjustment condition template that has already been created can be edited. The URL copy button 1104 is a button for instructing to copy an adjustment URL.
[0186] Returning to Fig. 14, when the adjustment initiator A operates the new creation button 1101 on the template list screen 1100 displayed on the terminal device 40A (step S151), the adjustment condition setting unit 212 then causes the terminal device 40A to display a template creation screen 1200 (step S142).
[0187] 16 and 17 show display examples of the template creation screen 1200. Fig. 16 shows the upper part of the template creation screen 1200, and Fig. 17 shows the lower part of the template creation screen 1200 that is displayed by scrolling the upper part shown in Fig. 16 downward.
[0188] As shown in FIG. 16, the template creation screen 1200 has an input field 1201 for inputting the template's management name, an input field 1202 for inputting the template's description, an input field 1203 for the user to specify the adjustment URL, a check box 124 for specifying the company name / school name, name, and email address as input items for adjustment partner X, and an input field 1206 for inputting the subject of the appointment when it is registered in the calendar tool 31 after the date has been confirmed.
[0189] Furthermore, as shown in FIG. 17, the template creation screen 1200 has a selection input field 1210 for inputting the required time for the meeting, a selection input field 1211 for inputting the available time before and after the meeting, a selection input field 1212 for inputting the extraction period of the candidate dates, a selection input field 1213 for selecting and inputting the method for calculating the number of days to be extracted for the extraction period (for example, calculation by business days, calculation by calendar days, etc.), an input field 1214 for specifying the available meeting time slots for each day of the week and public holiday (box 1215 indicates the time slots specified as available meeting time slots), a check box 1216 for instructing the adoption of the first additional determination method (method of specifying an exclusion keyword) as the method for determining whether to add available dates, and an input field for inputting an exclusion keyword when the check box 1216 is checked (when the first additional determination method is adopted). 1217, a check box 1218 for instructing the adoption of the second additional determination method (a method for individually specifying excluded schedules) as the method for determining whether to add available dates, a detailed settings button 1219 for transitioning to the excluded schedule designation screen 550 (Figure 7) for specifying excluded schedules when the check box 1218 is checked (when the second additional determination method is adopted), a selection input field 1220 for selecting and specifying one or more venues to be used for the meeting from a list of venues based on the venue information in the member information 221, a selection input field 1221 for selecting and specifying one or more participants from a list of members based on the member information in the member information 221, a radio button 1222 for selecting the meeting participation conditions for the participants specified in the selection input field 1221, and a save button 1223 for instructing the saving of the input content.
[0190] As can be seen from the fact that the template creation screen 1200 is provided with check boxes 1216, 1218, input field 1217, and advanced settings button 1219 similar to check boxes 515, 517, input field 516, and advanced settings button 518 on the condition setting screen 500 (Figure 6), even when using an adjustment condition template, additional determination of participants' available dates can be made, just as in the case of custom adjustment described above.
[0191] Note that the selection input field 1212 on the template creation screen 1200 for inputting the extraction period for candidate dates does not require the selection of a specific date, as in the selection input field 513 for a similar purpose on the condition setting screen 500 (FIG. 6) that supports custom adjustment. Instead, to allow for versatility, the start timing of the extraction period starting from the date and time the adjustment partner accessed the adjustment URL (the next day in the case of the same figure) and the period from the start timing (10 days in the case of the same figure) can be specified. Therefore, the adjustment condition template can be used repeatedly to adjust the schedule of different meetings.
[0192] Returning to Fig. 14, when the adjustment initiator A finishes inputting each item of the adjustment conditions on the template creation screen 1200 displayed on the terminal device 40A and operates the save button 1223 (step S152), the adjustment condition setting unit 212 then creates adjustment condition template information 223, registers the adjustment conditions and adjustment URL set on the template creation screen 1200, and records the adjustment condition template information 223 in association with the user information 222 of the adjustment initiator A in the storage unit 22 (step S143). This completes the process of creating an adjustment condition template.
[0193] <Schedule adjustment process using adjustment condition template> Next, FIG. 18 is a sequence diagram illustrating another example of schedule adjustment processing using an adjustment condition template.
[0194] This other example goes through steps S101, S111, S112, S102, and S141 similar to the adjustment condition template creation process shown in Fig. 14. Then, in step S141, adjustment initiator A selects one of the templates on template list screen 1100 (Fig. 15) displayed on terminal device 40A, operates URL copy button 1104 to copy the adjustment URL, pastes it into an email or the like, and sends it to terminal device 40X of adjustment partner X (step S161).
[0195] The process from this point onwards is the same as that from step S131 onwards in the schedule adjustment process shown in FIG. 4, so a description thereof will be omitted.
[0196] However, in this case, in step S119, since there is no first candidate date and no second candidate date that is an edit of the first candidate date by adjustment initiator A, it is sufficient to extract the participant's currently available dates that satisfy the adjustment conditions as the third candidate date. Here, with regard to the participant's available dates, if the check boxes 1216 and 1218 are not checked in the adjustment conditions of the selected template, that is, if neither the first nor the second addition determination method is adopted, the schedule adjustment unit 213 regards all of the participant's existing schedules as required attendance schedules and determines as the participant's available dates dates that do not contain any required attendance schedules for the participant and that exclude the reserved time before and after the required attendance schedules.
[0197] When check box 1216 is checked and check box 1218 is not checked, that is, when the first additional determination method is adopted and the second additional determination method is not adopted, the schedule adjustment unit 213 excludes the participant's existing schedules whose subject includes the excluded keyword from the required attendance schedules, and considers only the remaining existing schedules as the participant's required attendance schedules, and determines as the participant's available schedules the schedules on which the participant does not have any required attendance schedules and which exclude the reserved time before and after the participant's required attendance schedules.
[0198] When check box 1216 is not checked and check box 1218 is checked, that is, when the first additional determination method is not adopted and the second additional determination method is adopted, the schedule adjustment unit 213 excludes the participant's existing schedule designated as the excluded schedule from the required attendance schedule, regards the remaining existing schedule as the participant's required attendance schedule, and determines the schedule that does not contain the participant's required attendance schedule and excludes the reserved time before and after the participant's required attendance schedule as the participant's available schedule.
[0199] When both check boxes 1216 and 1218 are checked, that is, when both the first and second additional determination methods are adopted, the schedule adjustment unit 213 excludes the participant's existing schedules whose subject includes the excluded keyword and the participant's existing schedules designated as excluded schedules from the required attendance schedules, and regards the remaining existing schedules as the participant's required attendance schedules, and determines the schedules that do not contain the participant's required attendance schedules and that exclude the reserved time before and after the participant's required attendance schedules as the participant's available schedules.
[0200] Also, in this case, instead of or in addition to input field 904 for inputting an email address, the schedule confirmation screen 900 (FIG. 12) displayed in step S132 has input fields (input field for inputting company name / school name, input field for inputting name) corresponding to the items selected in check boxes 1204 as input fields for the adjustment partner on the template creation screen 1200 (FIG. 16). Furthermore, in this case, the subject to be registered in the participant's schedule information 311 in step S123 can be generated by combining fixed wording with the company name / school name, name, etc. input by adjustment partner X in the input fields corresponding to the items selected in check boxes 1204.
[0201] According to another example of the schedule adjustment process described above (when the use of an adjustment condition template is selected), in addition to the same effects and advantages as the schedule adjustment process in Figure 4 (when custom adjustment is selected), the adjustment initiator A only needs to select an adjustment condition template and send the adjustment URL, which significantly reduces the effort required of the adjustment initiator A compared to the case of custom adjustment.
[0202] In addition, when it comes to business scheduling, the participants, venue, time period, etc. are more or less fixed for each situation (type of meeting), such as interviews, sales visits, visitors, web conferences, etc. Therefore, if you create and register a template for scheduling for each situation in advance, you can instantly send the scheduling URL to the person you are scheduling with, X, simply by selecting the template.
[0203] Furthermore, the adjustment condition template can be used repeatedly, and the adjustment URL corresponding to the adjustment condition template is fixed. For example, by adding a link to the adjustment URL after the inquiry form on the company's homepage, schedule adjustments can be made without the need to send the adjustment URL to the adjustment partner X.
[0204] In addition, by including the adjustment URL in a mass email or the like, the adjustment URL can be sent to multiple adjustment partners X at the same time.
[0205] The schedule adjustment device of this embodiment typically prepares various operation screens as web pages, for example, and can display them on the web browser of the terminal device. However, this is not limited to this. For example, a dedicated application with various operation screens may be installed on the terminal device. In this case, the schedule adjustment device can display various operation screens in the dedicated application of the terminal device simply by transmitting to the terminal device some of the content to be displayed on the various operation screens (data such as candidate schedules). In other words, the schedule adjustment device of the present invention can also include various aspects that can display screens on the terminal device.
[0206] The present invention is not limited to the above-described embodiments and modifications, and various other modifications are possible. For example, the above-described embodiments and modifications have been described in detail to clearly explain the present invention, and the present invention is not necessarily limited to those having all of the described configurations. Furthermore, it is possible to replace a part of a modification with another modification, or to combine modifications.
[0207] Furthermore, some or all of the above-described configurations, functions, processing units, processing means, etc. may be implemented in hardware, for example, by designing them as integrated circuits. Furthermore, the above-described configurations, functions, etc. may be implemented in software by a processor interpreting and executing a program that implements each function. Information such as programs, tables, and files that implement each function may be stored in memory, a storage device such as a hard disk or SSD, or a storage medium such as an IC card, SD card, or DVD. Furthermore, the control lines and information lines shown are those considered necessary for explanation, and do not necessarily represent all control lines and information lines in the product. In reality, it can be assumed that almost all components are interconnected. [Explanation of symbols]
[0208] 10. Schedule adjustment system, 11. Network, 20. Schedule adjustment device, 21. Processing unit, 211. Authentication unit, 212. Adjustment condition setting unit, 213. Schedule adjustment unit, 22. Storage unit, 221. Member information, 222. User information, 223. Adjustment condition template information, 224. Schedule adjustment information, 23. Communication unit, 30. External system, 31 ···Calendar tool, 311···Schedule information, 40A, 40M, 40X···Terminal device, 500···Condition setting screen, 550···Exclusion schedule specification screen, 600···Schedule editing screen, 700···Schedule adjustment screen, 800···Schedule adjustment screen, 900···Schedule confirmation screen, 1000···Schedule notification screen, 1100···Template list screen, 1200···Template creation screen
Claims
1. A schedule adjustment system in which a schedule adjustment device, a first terminal device used by an adjustment initiator, and a second terminal device used by an adjustment partner are connected via a network, and which adjusts a meeting schedule based on adjustment conditions related to the meeting, the first terminal device displays an adjustment initiator operation screen for the adjustment initiator and receives an input from the adjustment initiator; the second terminal device displays a adjustment partner operation screen for the adjustment partner and receives an input from the adjustment partner; The schedule adjustment device is Set the adjustment conditions including designation of participants and excluded keywords according to the input of the adjustment initiator; Among existing plans of the participant in schedule information managed by a calendar tool, existing plans whose information about the existing plans includes the excluded keyword are excluded from required attendance plans, and the remaining existing plans are regarded as required attendance plans, and dates on which no required attendance plans exist are determined as available dates for the participant; When the other party accesses the coordination meeting based on the access information notified to the other party by the coordination initiator, the coordination tool refers to the schedule information of the participant managed by the calendar tool, and extracts the free dates of the participant that satisfy the coordination conditions as candidate dates; displaying a schedule adjustment screen showing the extracted candidate dates on the second terminal device as the adjustment partner operation screen, and determining a meeting date from the candidate dates in response to a selection operation of the adjustment partner on the schedule adjustment screen; The determined meeting date is registered in the schedule information of the participants managed by the calendar tool. Scheduling system.
2. A schedule adjustment system in which a schedule adjustment device, a first terminal device used by an adjustment initiator, and a second terminal device used by an adjustment partner are connected via a network, and which adjusts a meeting schedule based on adjustment conditions related to the meeting, the first terminal device displays an adjustment initiator operation screen for the adjustment initiator and receives an input from the adjustment initiator; the second terminal device displays a adjustment partner operation screen for the adjustment partner and receives an input from the adjustment partner; The schedule adjustment device is Set the adjustment conditions including the designation of participants and those to be excluded according to the input of the adjustment initiator; Among existing plans of the participant in the schedule information managed by a calendar tool, the existing plans designated by the adjustment initiator as the excluded plans are excluded from the required attendance plans, the remaining existing plans are regarded as the required attendance plans, and dates on which the required attendance plans do not exist are determined as available dates for the participant, When the other party accesses the coordination meeting based on the access information notified to the other party by the coordination initiator, the coordination tool refers to the schedule information of the participant managed by the calendar tool, and extracts the free dates of the participant that satisfy the coordination conditions as candidate dates; displaying a schedule adjustment screen showing the extracted candidate dates on the second terminal device as the adjustment partner operation screen, and determining a meeting date from the candidate dates in response to a selection operation of the adjustment partner on the schedule adjustment screen; The determined meeting date is registered in the schedule information of the participants managed by the calendar tool. Scheduling system.
3. 3. The schedule adjustment system according to claim 1, The schedule adjustment device is According to the input of the adjustment initiator, the adjustment conditions including the designation of the reserved time before and after the adjustment are set; A schedule that does not include the required attendance schedule and that does not include the reserved time before and after the required attendance schedule is determined as an available schedule for the participant. Scheduling system.
4. The schedule adjustment system according to claim 2, The schedule adjustment device is The existing schedule designated by the adjustment initiator from the list display of the existing schedules of the participants is set as the excluded schedule. Scheduling system.
5. A schedule adjustment system according to any one of claims 1 to 4, The schedule adjustment device is determining a second candidate schedule in response to an input by the adjustment initiator on a schedule editing screen serving as the adjustment initiator operation screen; issuing said access information; When the adjustment partner accesses based on the access information, by referring to the schedule information of the participant, extracting a third candidate schedule that is the available schedule of the participant that satisfies the adjustment condition and is within the range of the second candidate schedule; displaying the schedule adjustment screen showing the extracted third candidate schedule on the second terminal device as the adjustment partner operation screen, and determining a meeting date from the third candidate schedule in response to a selection operation of the adjustment partner on the schedule adjustment screen; The determined meeting date is registered in the schedule information of the participants managed by the calendar tool. Scheduling system.
6. The schedule adjustment system according to claim 5, The schedule adjustment device is extracting, as a first candidate schedule, the available schedule of the participant that satisfies the adjustment condition by referring to the schedule information of the participant managed by the calendar tool; The schedule editing screen for editing the extracted first candidate schedule is displayed on the first terminal device as the adjustment initiator operation screen. Scheduling system.
7. The schedule adjustment system according to claim 5 or 6, The schedule adjustment device is The existing schedule of the participant designated by the adjustment initiator on the schedule editing screen is set as an excluded schedule. Scheduling system.
8. A schedule adjustment system according to any one of claims 1 to 4, The schedule adjustment device is displaying a template creation screen for creating an adjustment condition template on the first terminal device as the adjustment initiator operation screen; According to the designation of the coordination initiator on the template creation screen, the coordination condition template that can be repeatedly used for scheduling different meetings and the access information corresponding to the coordination condition template are registered. Scheduling system.
9. A schedule adjustment system according to any one of claims 1 to 8, The participant is the coordination initiator himself or herself, or an affiliate of an organization to which the coordination initiator belongs. Scheduling system.
10. A schedule adjustment system according to any one of claims 1 to 9, When a plurality of participants are designated as the adjustment condition, the schedule adjustment device In response to an access by the person to be coordinated based on the access information, the schedule information of all the participants managed by the calendar tool is referenced, and the free schedule common to all the participants that satisfies the coordination condition is extracted as the candidate schedule. Scheduling system.
11. A schedule adjustment system according to any one of claims 1 to 9, When a plurality of participants are designated as the adjustment condition, the schedule adjustment device In response to an access by the person to be coordinated based on the access information, the schedule information of all the participants managed by the calendar tool is referenced, and the available date of at least one of the participants that satisfies the coordination condition is extracted as the candidate date. Scheduling system.
12. A schedule adjustment system according to any one of claims 1 to 11, The schedule adjustment device is Set the coordination conditions including the venue to be used for the meeting according to the input of the coordination initiator; When the person to be coordinated accesses the meeting based on the access information, the calendar tool refers to the schedule information of the participant and the venue managed by the calendar tool, and extracts, as the candidate dates, free dates common to the free dates of the participant that satisfy the coordination conditions and free dates of the venue that do not have existing schedules of the venue; displaying the schedule adjustment screen representing the extracted candidate dates on the second terminal device as the adjustment partner operation screen, and determining the meeting date from the candidate dates in response to a selection operation of the adjustment partner on the schedule adjustment screen; The determined meeting date is registered in the schedule information of the participants and the venue managed by the calendar tool. Scheduling system.
13. A schedule adjustment method for a schedule adjustment system in which a schedule adjustment device, a first terminal device used by an adjustment initiator, and a second terminal device used by an adjustment partner are connected via a network, and a meeting schedule is adjusted based on adjustment conditions related to the meeting, comprising: the first terminal device displays an adjustment initiator operation screen for the adjustment initiator and receives an input from the adjustment initiator; the second terminal device displays a adjustment partner operation screen for the adjustment partner and receives an input from the adjustment partner; The schedule adjustment device Set the adjustment conditions including designation of participants and excluded keywords according to the input of the adjustment initiator; Among existing plans of the participant in schedule information managed by a calendar tool, existing plans whose information about the existing plans includes the excluded keyword are excluded from required attendance plans, and the remaining existing plans are regarded as required attendance plans, and dates on which no required attendance plans exist are determined as available dates for the participant; When the other party accesses the coordination meeting based on the access information notified to the other party by the coordination initiator, the coordination tool refers to the schedule information of the participant managed by the calendar tool, and extracts the free dates of the participant that satisfy the coordination conditions as candidate dates; displaying a schedule adjustment screen showing the extracted candidate dates on the second terminal device as the adjustment partner operation screen, and determining a meeting date from the candidate dates in response to a selection operation of the adjustment partner on the schedule adjustment screen; The determined meeting date is registered in the schedule information of the participants managed by the calendar tool. How to schedule, including steps.
14. A schedule adjustment method for a schedule adjustment system in which a schedule adjustment device, a first terminal device used by an adjustment initiator, and a second terminal device used by an adjustment partner are connected via a network, and a meeting schedule is adjusted based on adjustment conditions related to the meeting, comprising: the first terminal device displays an adjustment initiator operation screen for the adjustment initiator and receives an input from the adjustment initiator; the second terminal device displays a adjustment partner operation screen for the adjustment partner and receives an input from the adjustment partner; The schedule adjustment device Set the adjustment conditions including the designation of participants and those to be excluded according to the input of the adjustment initiator; Among existing plans of the participant in the schedule information managed by a calendar tool, the existing plans designated by the adjustment initiator as the excluded plans are excluded from the required attendance plans, the remaining existing plans are regarded as the required attendance plans, and dates on which the required attendance plans do not exist are determined as available dates for the participant, When the other party accesses the coordination meeting based on the access information notified to the other party by the coordination initiator, the coordination tool refers to the schedule information of the participant managed by the calendar tool, and extracts the free dates of the participant that satisfy the coordination conditions as candidate dates; displaying a schedule adjustment screen showing the extracted candidate dates on the second terminal device as the adjustment partner operation screen, and determining a meeting date from the candidate dates in response to a selection operation of the adjustment partner on the schedule adjustment screen; The determined meeting date is registered in the schedule information of the participants managed by the calendar tool. How to schedule, including steps.
