Flood simulation device and flood simulation method

By combining drainage areas and setting multiple pump stations with a condition setting unit and flooding simulation unit, the system simplifies and enhances the accuracy of flood simulations by correctly distributing drainage and assessing flood damage.

JP2024132561APending Publication Date: 2024-10-01HIATACHI POWER SOLUTIONS CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2023043375
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-17
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Existing flood simulation systems face complexity in incorporating drainage areas and pump stations, leading to errors in drainage area settings and inaccurate flood damage assessments due to duplicate or missed drainage paths.

Method used

The system combines multiple drainage areas into one and sets multiple pump stations for each area, using a condition setting unit to distribute drainage amounts and a flooding simulation unit to calculate drainage for each station, ensuring accurate simulation.

Benefits of technology

This approach simplifies the setup of drainage areas and pump stations, reducing errors and providing a more accurate flood simulation by ensuring water is distributed correctly and flood damage is accurately assessed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024132561000001_ABST
    Figure 2024132561000001_ABST
Patent Text Reader

Abstract

To provide a flood simulation device and a flood simulation method capable of easily incorporating a drainage district and a drainage pump station as models in flood simulation.SOLUTION: A flood simulation device according to the present invention comprises: a condition setting section that sets a drainage district including a plurality of adjacent zones on a surface, sets a plurality of drainage pump stations for the set drainage district, and sets a distribution rule for distributing a drainage volume to each of the set plurality of drainage pump stations; and a simulation section that calculates the drainage volume of the set drainage district for each drainage pump station.SELECTED DRAWING: Figure 9
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a flood simulation device and a flood simulation method. [Background technology]

[0002] A pumping station is a facility that drains water from urban areas or farmland into rivers. When the water level at the drainage source is higher than the water level of the destination river, the gate between the drainage source and destination is opened to allow the water to drain naturally. On the other hand, when the water level at the drainage source is lower than the water level of the destination river, the gate is closed and the water is forcibly drained by a drainage pump. Pumping stations are facilities that are used to prevent flooding or reduce damage.

[0003] Since pumping stations are important facilities that have a large impact on flood damage, it is important to incorporate pumping stations as models in flood simulations. In practice, in addition to high simulation accuracy, ease of simulation setup is also required.

[0004] The purpose of the flood risk assessment device of Patent Document 1 is to assess the flood risk in a target area in real time and to provide the user with a diagnosis result that is easy to understand.

[0005] Patent Document 1 describes the solution as follows: "The flood risk diagnosis device has a parameter generation unit, an analytical model construction unit, a runoff analysis unit, and an inundation analysis unit. The parameter generation unit generates parameters necessary for constructing an analytical model for diagnosing the flood risk of the area to be diagnosed based on a flow rate calculation table. The analytical model construction unit constructs an analytical model based on the flow rate calculation table and the parameters. The runoff analysis unit calculates the flow rate for each pipeline in each sub-drainage area based on the analytical model. The inundation analysis unit calculates the fullness rate for each pipeline, which is an indicator of the flood risk of the sub-drainage area, based on the flow rate for each pipeline in each sub-drainage area." [Prior art documents] [Patent documents]

[0006] [Patent Document 1] JP 2017-194344 A Summary of the Invention [Problem to be solved by the invention]

[0007] In Patent Document 1, it is necessary to create a flow calculation table in which the following items are set for each drainage area: inflow line number, line number, area, runoff coefficient, flow time, length, and cross section (Fig. 2). In addition, in order to set a drainage area, it is necessary to specify the sections that belong to that drainage area (Fig. 3).

[0008] The more drainage areas there are, the more complicated the process becomes. This is because in reality, drainage areas exist on the ground surface without overlaps or gaps, and in simulations, users must set the drainage areas in the same way. Furthermore, setting pumping stations for each of the many drainage areas is also complicated. The problem that the present invention aims to solve is to easily incorporate drainage districts and drainage pumping stations as models in inundation simulations. [Means for solving the problem]

[0009] The flood simulation device of the present invention is characterized by comprising a condition setting unit that sets a drainage area including a plurality of adjacent plots on the ground surface, sets a plurality of drainage pumping stations for the set drainage area, and sets a distribution rule for distributing drainage volume to each of the set drainage stations, and an inundation simulation unit that calculates the drainage volume of the set drainage area for each drainage station. Other means will be described in the description of the embodiment of the invention. Effect of the Invention

[0010] According to the present invention, drainage areas and drainage pumping stations can be easily incorporated as models in a flood simulation. [Brief description of the drawings]

[0011] [Figure 1] FIG. 1 is a diagram illustrating an example of setting drainage areas in the prior art. [Diagram 2] FIG. 4 is a diagram illustrating an example of setting drainage areas in this embodiment. [Diagram 3] 1 is a diagram showing the configuration of a flood simulation device according to an embodiment of the present invention. [Figure 4] FIG. 13 is a diagram showing the structure of flood model data. [Diagram 5] FIG. 2 is a diagram showing a structure of river model data. [Figure 6] FIG. 2 is a diagram showing a structure of pumping station model data. [Figure 7] 13 is a flowchart of a processing procedure. [Figure 8] 13 is a flowchart showing details of the process in step S505. [Figure 9] This is the GUI provided for the flood simulation section. [Figure 10] This is the GUI while the simulation is running. [Figure 11] FIG. 11 is a sequence diagram of a processing procedure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] (term) A plot is a virtual management unit on the ground surface where rainwater (hereafter simply called "water") falls. A plot is, for example, a 25m x 25m square. The ground surface is divided into multiple plots with no overlaps or gaps. A drainage district is a group of adjacent land parcels. Each drainage district drains water into a river at the same time. The land surface is divided into drainage districts with no overlaps or gaps. The boundaries of one drainage district from another are determined by topography, transportation routes, sewer distribution, surface structures, flora, land use, etc.

[0013] A pumping station is a facility equipped with equipment (pumps) to drain water accumulated in a drainage area into a river. For example, a drainage area where water is collected at "pumping station A" is sometimes called "drainage area A." A cell is a part of a virtual plane used in the simulation. In this embodiment, the earth's surface is modeled as a cell, and the vertical cross section of a river is also modeled as a cell. In other words, a cell means the above-mentioned section or the vertical cross section of a river.

[0014] (Prior Art) FIG 1 is a diagram illustrating an example of drainage district settings in the prior art. There are drainage pumping stations A 12 and B 13, which drain water into river 11. River 11 flows from the upper right to the lower left of FIG 1. Drainage district A (hatched with diagonal lines slanting upwards to the right) has multiple divisions, including division 14. Drainage district B (hatched with sparse dots) has multiple divisions, including division 15.

[0015] Now, suppose that a user of the flood simulation device mistakenly sets section 16, which is actually included in drainage area A, to also be included in drainage area B. In this case, in the simulation, rainwater that falls on section 16 will be drained into river 11 from drainage area A and drainage area B in duplicate. This causes the amount of rainfall in drainage area B to be overestimated compared to the actual amount. Furthermore, water from section 16 is drained into river 11 not only from drainage station A but also from pumping station B, which should not actually be involved, so the flood damage to section 16 will be underestimated.

[0016] Meanwhile, suppose that the user mistakenly sets another section 17, which is actually included in drainage area A, as not being included in any drainage area. In this case, in the simulation, the rainwater that falls on section 17 is ignored and not drained. This causes the amount of rainfall in drainage areas A and B to be counted as smaller than it actually is. Furthermore, because the water in section 17 is not drained by pumping station A, which should be related to the section, the flood damage to section 17 is overestimated.

[0017] Hereinafter, an embodiment of the present invention (referred to as the "present embodiment") will be described in detail with reference to the drawings.

[0018] In this embodiment, multiple drainage areas that existed in the past are combined into one drainage area, and multiple drainage pumping stations can be set for that one drainage area. This makes it possible to reduce the number of drainage areas, thereby saving the effort of setting the drainage areas. Furthermore, by reducing the number of drainage areas, it is possible to reduce errors in setting the drainage areas.

[0019] Furthermore, in this embodiment, multiple pumping stations are set for one drainage area. However, one drainage area actually corresponds to one pumping station. In that sense, this embodiment does not completely correspond to reality. Nevertheless, this embodiment provides a highly accurate and natural simulation.

[0020] Fig. 2 is a diagram for explaining an example of setting drainage areas in this embodiment. In this embodiment, for example, a drainage area C21 (hatched with diagonal lines slanting downwards to the right) including drainage area A (Fig. 1) and drainage area B (Fig. 1) is newly set. In this embodiment, the drainage capacity of drainage area C21 is the sum of the drainage capacity of drainage area A and the drainage capacity of drainage area B. Therefore, the drainage capacity of drainage area C21 is not overestimated.

[0021] If the amount of water in drainage area C21 is less than the drainage capacity per unit time multiplied by the time step width of the simulation, the amount of water in drainage area C21 becomes 0, and water is distributed to the pumping stations in descending order of priority. In this embodiment, the amount of water in drainage area C21 never becomes less than 0. This is because the amount of water never becomes less than 0 in nature, and the same result should be obtained in the simulation.

[0022] In general, water within a drainage area is thought to flow downstream of a river. Therefore, by setting the priority of a pumping station to be lower the further upstream the pumping station is located in the river into which it discharges water, and higher the priority, it is expected that the model's behavior will be consistent with reality. In the case of Figure 2, the priority of pumping station A12, which is located downstream, is higher than the priority of pumping station B13, which is located upstream.

[0023] In addition, it is generally considered that the greater the pumping capacity, the greater the actual amount of discharge. Therefore, by setting the priority to be higher for pumping stations with a larger pumping capacity and lower for pumping stations with a smaller pumping capacity, it is expected that the behavior of the model will be consistent with reality. Furthermore, the priority may be set based on an index that combines the above criteria.

[0024] 3 is a diagram showing the configuration of a flood simulation device 100 of this embodiment. The flood simulation device 100 is a general computer, for example a personal computer. The flood simulation device 100 includes an input / output unit 110, a main memory device 120, a central control device 130, and an auxiliary memory device 140. The input / output unit 110 includes an input device including a keyboard 111, a mouse 112, etc., and an output device including a display 113, etc. A user can input commands to the keyboard 111 and the mouse 112, and visually check the results on the display 113.

[0025] The central control device 130 reads out the flood simulation unit 121 and the condition setting unit 122, which are programs, from the auxiliary storage device 140 and deploys them in the main storage device 120. In accordance with the instructions of these programs, the central control device 130 performs various calculations, receives signals from the input / output unit 110, outputs signals to the input / output unit 110, saves data in the auxiliary storage device 140, reads data from the auxiliary storage device 140, and the like. In other words, the processes executed by the flood simulation unit 121 and the condition setting unit 122 are actually executed by the central control device 130 in accordance with the instructions written in these programs. The auxiliary storage device 140 stores flood model data 141, river model data 142, pumping station model data 143, and map data 144.

[0026] 4 is a diagram showing the structure of the flood model data 141. When there are multiple types of inundation simulation units 121, there is one flood model data 141 for each type. One flood model data 141 is made up of grid definition information 210 and multiple cell data 220.

[0027] The grid definition information 210 is information about a two-dimensional grid indicating the above-mentioned multiple divisions. The grid definition information 210 consists of grid southwest end coordinate (longitude) 211, grid southwest end coordinate (latitude) 212, cell size (X direction) 213, cell size (Y direction) 214, number of cells (X direction) 215, and number of cells (Y direction) 216. A two-dimensional grid is a grid in which the earth's surface is divided into cells (divisions) at regular intervals by vertical and horizontal lines.

[0028] For example, Figure 4 shows the definition of a grid in which the east-west direction is the X-axis (east is positive) and the north-south direction is the Y-axis (north is positive), with the southwest end of the grid at 135.0 degrees east longitude and 35.0 degrees north latitude, with the cell size divided to 25 m in both the X and Y directions, with 600 cells in the X direction and 400 cells in the Y direction.

[0029] The number of cell data 220 is the same as the number of cells (divisions on the earth's surface). The number of cells is the number of cells (X direction) 215 multiplied by the number of cells (Y direction) 216 (240,000). The cell data 220 consists of a cell ID 221, ground elevation 222, Manning's roughness coefficient 223, water depth time series 224, flow velocity (X direction) time series 225, and flow velocity (Y direction) time series 226. The cell ID 221 takes a unique value for each cell, and indicates the number of the cell from the southwest end of the grid. Note that "XX time series" means that a large number of combinations of time and the value of XX at that time are arranged.

[0030] The user creates a cell ID 221, a ground elevation 222, and a Manning's roughness coefficient 223 in advance based on survey data, etc., and stores them in the auxiliary storage device 140. The flood simulation unit 121 obtains a water depth time series 224, a flow velocity (X direction) time series 225, and a flow velocity (Y direction) time series 226 for each cell as a result of the simulation.

[0031] 5 is a diagram showing the structure of the river model data 142. The number of river model data 142 is the same as the number of rivers targeted by the inundation simulation unit 121. One river model data 142 is made up of grid definition information 310 and multiple cell data 320.

[0032] The grid definition information 310 is information on a one-dimensional grid showing the vertical cross section. The grid definition information 310 includes a river name 311, a distance marker coordinate 312, and the number of cells 313. The distance marker coordinate 312 is data consisting of a set of a distance marker, a left bank coordinate (longitude), a left bank coordinate (latitude), a right bank coordinate (longitude), and a right bank coordinate (latitude). The distance marker is the distance measured from the origin at the downstream end of the river along the left or right bank of the river (the direction from downstream to upstream is positive). The left bank and the right bank are the left and right banks when the upstream of the river is the back and the downstream is the front. The number of cells 313 is the number of underlined vertical cross sections. If 200 distance markers are set every 0.5 km and all vertical cross sections including each of the distance markers are considered as cells, the number of cells 313 is 200. "One-dimensional grid" means that the cells in the vertical cross section are arranged in a line along the river flow.

[0033] The number of cell data 320 is the same as the number of cells (vertical cross sections of the river) 313. The cell data 320 consists of cell ID 321, milepost 322, cross-sectional shape 323, Manning's roughness coefficient 324, water depth time series 325, and flow velocity time series 326. The cell ID 321 is a unique value for each cell, and indicates the number of the cell from the most downstream cell. The cross-sectional shape 323 is the shape of the vertical cross section of the river. More specifically, the river is cut on a coordinate plane in which the line segment connecting the position of the milepost 322 on the left bank and the position of the milepost 322 on the right bank is the X-axis (the direction from the left bank to the right bank is positive), and the vertical direction is the Y-axis (the upward direction is positive). The cross-sectional shape 323 consists of the X-coordinates and Y-coordinates of the endpoints of multiple line segments drawn horizontally at a predetermined interval on the cross section. The plane that envelops all the endpoints is the actual cross-sectional shape. The actual cross-sectional shape is often semicircular or triangular.

[0034] The user creates a cell ID 321, a milepost 322, a cross-sectional shape 323, and a Manning's roughness coefficient 324 in advance based on survey data, etc., and stores them in the auxiliary storage device 140. The flood simulation unit 121 obtains a water depth time series 325 and a current velocity time series 326 for each cell as a result of the simulation.

[0035] 6 is a diagram showing the structure of the pumping station model data 143. The number of pumping station model data 143 is the same as the number of pumping stations targeted by the inundation simulation unit 121. The pumping station model data 143 is composed of a pumping station name 401, a priority 402, a pump drainage capacity 403, a river name 404, a cell ID 405 of the river model data, a cell ID 406 of the flood model data 141, and a drainage volume time series 407.

[0036] The user or the condition setting unit 122 sets the priority 402 so that the further upstream the river into which the pumping station discharges water, the lower the priority, and the further downstream the river, the higher the priority. The distinction between upstream and downstream can be determined based on the milepost 322 specified by the cell ID 405 of the river model data. The user or the condition setting unit 122 may set the priority 402 so that the larger the pump discharge capacity 403 of each pumping station, the higher the priority, and the smaller the pump discharge capacity, the lower the priority. The user or the condition setting unit 122 may set the priority based on an index that combines the above criteria. Note that "the user or the condition setting unit 122" means that the user may set it manually, or the condition setting unit 122 may set it automatically without waiting for the user to set it.

[0037] The river name 404 is the name 311 of the river into which the pumping station discharges water. The river model data cell ID 405 is the cell ID 321 of the cell (vertical cross section of the river) corresponding to the position where the pumping station discharges water. The flood model data cell ID 406 is the cell ID 221 of the flood model data cell (plot on the ground surface) included in the drainage district. Generally, a drainage district includes multiple plots, so multiple values ​​are stored in the flood model data cell ID 406.

[0038] The user creates pumping station names 401, priorities 402, pump drainage capacities 403, river names 404, river model data cell IDs 405, and flood model data cell IDs 406 in advance based on survey data and the like, and stores them in the auxiliary storage device 140. The inundation simulation unit 121 obtains a drainage volume time series 407 for each pumping station as a result of the simulation.

[0039] The map data 144 (FIG. 3) is a map of a river basin. A user or the condition setting unit 122 sets the divisions included in a drainage area, the positions of drainage pumping stations, the correspondence between the drainage area and the drainage pumping stations, and the like on the map data 144. The map data 144 includes grid lines indicating the divisions.

[0040] FIG. 7 is a flowchart of the processing procedure.

[0041] In step S500a, the condition setting unit 122 sets the drainage area. Specifically, first, the condition setting unit 122 displays the map data 144 on the display 113. Secondly, the condition setting unit 122 accepts the user's use of the mouse 112 to set a plurality of sections included in one drainage area (specifying the range by dragging or the like).

[0042] The condition setting unit 122 may automatically set multiple partitions included in one drainage area without receiving a setting from the user. In this case, the condition setting unit 122 associates multiple partitions with one drainage area based on, for example, the following criteria: The area of ​​a drainage basin is greater than (or less than) a given threshold. The difference between the maximum and minimum ground elevations of the parcels contained in a drainage basin is greater than or equal to a specified threshold value. A drainage district cannot include both urban and agricultural land. A drainage district does not include both the left bank and the right bank of a river at the same time. Although not shown in FIG. 4, the flood model data 141 stores land use (urban area, farmland, etc.) for each cell.

[0043] Thirdly, the condition setting unit 122 stores the results set by the user or the condition setting unit 122 in the auxiliary storage device 140 as a combination of a drainage area and a plurality of partitions.

[0044] In step S500b, the condition setting unit 122 sets the drainage pumping stations. Specifically, first, the condition setting unit 122 accepts the user setting a plurality of drainage pumping stations for one drainage area using the mouse 112 (clicking a point on the bank of the river adjacent to the drainage area).

[0045] The condition setting unit 122 may automatically set multiple pumping stations on the banks of rivers adjacent to one drainage area without receiving settings from the user. In this case, the condition setting unit 122 sets multiple pumping stations for one drainage area based on, for example, the following criteria: The difference between the distance marker of one pumping station and the distance marker of another pumping station is greater than (or less than) a predetermined threshold. The pumping station will be located at a bend in the river (or will avoid bends in the river). The number of pumping stations shall be proportional to the area or discharge volume of the drainage area. The number of drainage pumping stations is equal to or greater than the specified lower limit and equal to or less than the specified upper limit.

[0046] Secondly, the condition setting unit 122 stores the results set by the user or by itself in the auxiliary storage device 140 as a combination of drainage districts and a plurality of drainage pumping stations.

[0047] In step S500c, the condition setting unit 122 sets distribution rules. Distribution rules are rules that determine how much of the water of one drainage area is to be distributed to each of multiple drainage pumping stations. Specifically, first, the condition setting unit 122 accepts the user setting (clicking in order) the priority of multiple water distribution stations set for one drainage area with the mouse 112.

[0048] The condition setting unit 122 may automatically set the priority of a pumping station to be higher the further downstream it is, without receiving a setting from the user. Furthermore, the condition setting unit 122 may automatically set the priority of a pumping station to be higher the greater its pump drainage capacity 403 (FIG. 6). That is, the condition setting unit 122 may allocate a larger amount of drainage to a pumping station located downstream of a river, or allocate a larger amount of drainage to a pumping station with a large drainage capacity.

[0049] Secondly, the condition setting unit 122 stores in the drainage pumping station model data 143 the priority set by the user or the condition setting unit 122 itself.

[0050] In step S501, the flood simulation unit 121 repeats the following steps S502 to S509 every t until the current time t in the simulation becomes the end time T. The flood simulation unit 121 accepts the end time T from the user in advance.

[0051] In step S502, the inundation simulation unit 121 performs flow analysis of the flood model data 141 and advances the time by the time step width dt. The inundation simulation unit 121 accepts the time step width dt from the user in advance. The inundation simulation unit 121 may perform two-dimensional unsteady flow calculation as the flow analysis of the flood model data. As a result, the inundation simulation unit 121 calculates the water depth, flow velocity (X direction), and flow velocity (Y direction) for each cell (section on the ground surface) at time "t+dt".

[0052] In step S503, the flood simulation unit 121 performs flow analysis of the river model data 142 and advances the time by the time step width dt. The flood simulation unit 121 may perform one-dimensional unsteady flow calculation as the flow analysis of the river model data. As a result, the flood simulation unit 121 calculates the water depth and flow velocity for each cell (vertical cross section) at the time "t+dt". If the number of river model data 142 is two or more, this step S503 is executed for each river model data 142.

[0053] In step S504, the flood simulation unit 121 repeats steps S505 and S506 for each of the pumping stations arranged in descending order of priority.

[0054] In step S505, the inundation simulation unit 121 performs flow analysis of the pumping station model data 143 and advances the time by the time step width dt. In the flow analysis of the pumping station model data, the inundation simulation unit 121 assumes that each pumping station uniformly drains water within the drainage area. In other words, the inundation simulation unit 121 maintains an equal amount of drainage water collected from each partition, regardless of the distance between the pumping station and the partition. Details of the processing of step S505 will be described later in FIG. 8. As a result, the inundation simulation unit 121 calculates the drainage water volume QD of the pumping station between time t and time "t+dt".

[0055] In step S506, the inundation simulation unit 121 adds the discharge volume QD of the pumping station to the cell indicated by the cell ID of the river model data. That is, the inundation simulation unit 121 gives the value obtained by dividing the discharge volume QD by the time step width dt as the lateral inflow. In step S507, the flood simulation unit 121 adds a time step width dt to the time t.

[0056] In step S508, the flood simulation unit 121 stores the data obtained as the simulation result in the auxiliary storage device 140 as time-series data. In step S509, the flood simulation unit 121 displays the simulation results on the display 113.

[0057] FIG. 8 is a flowchart showing details of the process in step S505.

[0058] In step S601, the inundation simulation unit 121 counts the number of cells specified by the cell ID 406 of the flood model data, that is, the number of cells in the drainage area whose water depth is greater than 0, and assigns this to the variable n.

[0059] In step S602, the flood simulation unit 121 divides the pump drainage capacity Q by the variable n, multiplies the result by dt, and further divides the result by the area Ap of the cell of the flood model data to obtain the amount hm of reduction in water depth of the cell in the drainage area while time advances by the time step width dt. Note that the area Ap of the cell of the flood model data is the value obtained by multiplying the cell size (X direction) 213 by the cell size (Y direction) 214.

[0060] In step S603, the flood simulation unit 121 initializes the discharge volume QD of the drainage pumping station to zero. In step S604, the inundation simulation unit 121 repeats the following steps S605 to S607 for each cell of the inundation model data.

[0061] In step S605, the flood simulation unit 121 assigns the smaller of the water depth h and the amount of reduction in the water depth hm to hm. In step S606, the flooding simulation unit 121 subtracts hm from the water depth h. Since the process of step S605 has been performed, the water depth after calculation is always 0 or more.

[0062] In step S607, the flood simulation unit 121 multiplies hm by dt, multiplies the result by the area Ap of the cell of the flood model data, and adds the result to the discharge volume QD of the drainage station.

[0063] 9 shows a GUI (Graphical User Interface) provided in the inundation simulation unit 121. This GUI is displayed on the display 113, and receives instructions from the user via the keyboard 111 and mouse 112. The user checks the contents of the flood model data 141, river model data 142, and pumping station model data 143 via this GUI, and also edits these data as necessary.

[0064] This GUI consists of a window 700. The window 700 is composed of a project display field 710, a property display field 720, and a map display field 730. The project display field 710 displays an overview of the project to be simulated. In Fig. 9, a river X 711 is set as the river, and pumping stations A 712, B 713, and C 714 are set as the pumping stations. The river names 311 and pumping stations names 401 are used to display these.

[0065] The property display field 720 displays the properties of an item selected by the user. In Fig. 9, pumping station A 712 is selected, and its properties are displayed. The pumping station model data 143 is used as the properties. The user may edit each item of the properties using the keyboard 111, the mouse 112, etc.

[0066] The map display field 730 displays the map data 144. The user may input the display range and scale of the map using the keyboard 111, the mouse 112, etc. The display range of the map is changed by dragging the mouse 112. The scale of the map is changed by rotating the wheel of the mouse 112. The map data 144 displays an icon 741 indicating the north direction and a scale legend 742. In FIG. 9, the river X 711 is displayed as a figure 731, the drainage pumping station A 712 as an icon 732, the drainage pumping station B 713 as an icon 733, and the drainage pumping station C 714 as an icon 734. In addition, all the drainage pumping stations correspond to one drainage area 735 (hatched with diagonal lines going up to the right). This drainage area 735 is composed of multiple cells of the flood model data.

[0067] When the user visually checks this GUI and confirms that there are no problems with its contents, the user issues an instruction to execute a simulation to the flood simulation unit 121. When the user selects "Simulation" from menu 701 and then selects "Start Simulation" from the submenu (not shown) that appears, the GUI transitions to the state shown in FIG.

[0068] 10 shows the GUI during execution of a simulation. The inundation simulation unit 121 fills each cell of the flood model data (reference number 836 as an example) with hatching according to the inundation depth. The inundation depth indicated by the hatching can be confirmed by the legend 843. The value of this inundation depth is the value of the water depth time series 224 of the flood model data 141. The inundation simulation unit 121 successively updates the inundation depth displayed on the screen until the current time 844 in the simulation becomes the end time T. When the end time T is reached, the simulation ends.

[0069] FIG. 11 is a sequence diagram of the processing procedure. In step S901, the inundation simulation unit 121 reads out the flood model data 141, the river model data 142, the pumping station model data 143, and the map data 144 from the auxiliary storage device 140.

[0070] In step S902, the flood simulation unit 121 displays the window 700 on the display 113 of the input / output unit 110. The data necessary for this display has been read out in step S901.

[0071] In step S903, the input / output unit 110 receives an instruction to start a simulation from the user, and sends it to the flood simulation unit 121. This is realized when the user performs a predetermined operation on the menu 701 (FIG. 9).

[0072] The following steps S904 to S906 are repeated every t until the current time t in the simulation becomes the end time T.

[0073] In step S904, the flood simulation unit 121 performs simulation processing. Details of this processing are shown in FIGS. In step S905, the inundation simulation unit 121 updates the time-series information of the flood model data 141, the river model data 142, and the pumping station model data 143 as a result of step S904, and stores them in the auxiliary storage device 140. In step S906, the flood simulation unit 121 displays the simulation results on the input / output unit 110.

[0074] The present invention is not limited to the above-described examples (embodiments), but includes various modified examples. For example, the above-described examples have been described in detail to easily explain the present invention, and the present invention is not necessarily limited to those including all of the configurations described. It is also possible to replace a part of the configuration of one embodiment with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment. It is also possible to add, delete, or replace a part of the configuration of each embodiment with another configuration. [Explanation of symbols]

[0075] 11 Rivers 12, 13 Drainage pump station Sections 14, 15, 16, and 17 21 Drainage area 100 Flood simulation device 110 Input / output section 111 Keyboard 112 Mouse 113 Display 120 Main storage 121 Flood Simulation Department 122 Condition setting section 130 Central Control Unit 140 Auxiliary storage 141 Flood Model Data 142 River model data 143 Drainage pumping station model data 144 Map Data

Claims

1. establishing a drainage district on the surface of the earth that includes a plurality of adjacent parcels; A plurality of drainage pumping stations are set for the one drainage area set, a condition setting unit that sets a distribution rule for distributing a drainage amount to each of the plurality of drainage pumping stations that have been set; a flood simulation unit that calculates the drainage volume of the set drainage area for each drainage pumping station; To have A flood simulation device characterized by:

2. The condition setting unit is allocating a larger amount of drainage to a pumping station located downstream of a river that drains water of one of the drainage areas, among the plurality of pumping stations that have been set; 2. The flood simulation device according to claim 1 .

3. The condition setting unit is Distributing a larger amount of drainage to a drainage station having a larger drainage capacity among the plurality of drainage stations; 2. The flood simulation device according to claim 1 .

4. The flood simulation unit includes: Displaying the flood depth of the set drainage area for each section in chronological order; 4. The flood simulation device according to claim 2 or 3,

5. The condition setting unit is setting the one drainage area and the plurality of drainage pumping stations based on an input by a user; 4. The flood simulation device according to claim 2 or 3,

6. The condition setting section of the flood simulation device is establishing a drainage district on the surface of the earth that includes a plurality of adjacent parcels; A plurality of drainage pumping stations are set for the one drainage area set, setting a distribution rule for distributing a drainage amount to each of the plurality of drainage pumping stations; The flood simulation unit of the flood simulation device includes: Calculating the drainage volume of the set drainage area for each drainage pumping station; A flood simulation method comprising the steps of:

Citation Information

Patent Citations

  • Method of determining drainage distribution and drainage system

    JP1992142606A

  • System and program for predicting distributed outflow

    JP2006184206A

  • Flooding risk diagnosis apparatus, flooding risk diagnostic method, controller, and computer program

    JP2017194344A

  • Flooding state estimation system, flooding state estimation program and flooding state estimation method

    JP2018132504A

  • Inundation simulation program and inundation simulation system

    JP2020034633A