Cutting device and cutting method

The cutting device with an angled saw blade and dual-sided cutting method effectively separates concrete slabs from main girders, reducing damage and debris while minimizing traffic disruptions.

JP2024133963APending Publication Date: 2024-10-03JFE ENGINEERING CORP
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023044006
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-20
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

Existing methods for removing concrete slabs from main girders, such as using hand breakers or wire saws, cause damage to the main girder, generate debris, and require extensive traffic closures, especially when dealing with inclined or low-height haunch parts.

Method used

A cutting device with a saw blade that can be angled relative to the horizontal plane, attached to the main girder via magnets, and moved along a gear rail, allowing it to cut the concrete slab from the lower surface without penetrating it, and a method that involves cutting from both sides to avoid overlapping.

Benefits of technology

The device enables efficient separation of concrete slabs from main girders without damaging them, reducing debris and traffic disruptions, and allows for quicker removal by minimizing overlap and optimizing cutting angles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024133963000001_ABST
    Figure 2024133963000001_ABST
Patent Text Reader

Abstract

To provide a cutting device and a cutting method that can cut a concrete slab out of a main girder, from an undersurface side of the concrete slab despite the presence or absence of a horizontal surface at the undersurface of the concrete slab connected onto the main girder and the height of a haunch part.SOLUTION: A cutting device 10 to cut a concrete slab 82 connected onto a main girder 80 from the main girder 80 has a cutting part 20 provided with a saw blade 22 rotating by power and a cradle 12 to support the cutting part 20. The cradle 12 is mounted to the main girder 80. The saw blade 22 of the cutting part 20 intersects the concrete slab 82 with a predefined angle relative to a horizontal surface from an undersurface side of the concrete slab 82 and cuts the concrete slab 82.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a cutting device and a cutting method, and more particularly to a cutting device and a cutting method for cutting a joint between a main girder and a concrete deck on the main girder. [Background technology]

[0002] There are an increasing number of cases where existing concrete decks are being replaced with new decks, but when replacing an existing concrete deck with a new deck, it is first necessary to remove the existing concrete deck.

[0003] When removing an existing deck of a composite girder which has many shear stoppers placed on the upper flange of the main girders, it is common to cut and remove the deck between the main girders, then remove the deck concrete remaining on the upper flange of the main girders using a hand breaker or similar tool, and then cut and remove the shear stoppers (see, for example, non-patent document 1).

[0004] However, this method requires work on the bridge surface throughout the entire process, which lengthens the period during which traffic restrictions such as road closures are required. In addition, when removing the deck concrete remaining on the main girders with a hand breaker or similar tool, there is a risk of damaging the main girders, which also generates a large amount of concrete crust. In addition, since the shear stoppers must be cut and removed after removing the concrete from the main girders, this is time-consuming and also lengthens the period during which traffic restrictions are required.

[0005] In response to this, Patent Document 1 discloses a cutting device that uses a wire saw under the concrete deck to be cut, and performs approximately horizontal cutting of the joint between the main girder and a concrete deck installed on the main girder of a bridge. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] Patent Publication No. 2021-21227 [Non-patent literature]

[0007] [Non-Patent Document 1] Tomoyuki Izumiya, Hideo Shoya, Hideyuki Kusajima, Hiroshi Kuriyama, "Report on the Construction of the Deck Repair Work of Shin-Uchio Bridge", Kawada Technical Report, vol. 34, 2015 Summary of the Invention [Problem to be solved by the invention]

[0008] However, in the cutting device 200 disclosed in Patent Document 1, as shown in Fig. 10, the suspension frame 202 of the cutting device 200 is attached to the horizontal deck underside 210A of the concrete deck 210, the wire saw 204 is inserted into the insertion hole 212A provided in the haunch portion 212, and the wire saw 204 is hung around multiple pulleys 206. Then, the driving pulley 208 is driven via the driving unit 208A to rotate the wire saw 204 at high speed, horizontally rotating the multiple pulleys 206 around which the wire saw 204 is hung, and the haunch portion 212, which is the joint portion with the main girder 214 in the concrete deck 210, is horizontally cut with the wire saw 204 in a direction parallel to the deck underside 210A along the bridge axis direction. For this reason, for example, in the following cases a and b, it is difficult to separate the concrete deck from the main girder by the cutting device 200 disclosed in Patent Document 1.

[0009] a) For example, when separating a deck portion such as a protruding cantilever portion 220, as shown in Figure 11, whose underside is an inclined surface and which has no horizontal surface (a horizontal surface on which the cutting device 200 can be attached), from the main girder 222.

[0010] b) In the case of a deck where the height h of the haunch, which is the joint with the main girder, is low and approximately equal to or less than the diameter φ of the wire saw (h≦φ) (if the height h of the haunch is approximately the same as the diameter φ of the wire saw, there is a possibility that the upper flange of the main girder 214 will be damaged when cut by the wire saw 204, so it is considered necessary for the height h of the haunch to be somewhat larger than the diameter φ of the wire saw. Note that if there is no haunch, h=0 and h≦φ.).

[0011] The present invention has been made in consideration of the above points, and has an objective of providing a cutting device and cutting method that can cut a concrete floor slab from the underside of the concrete floor slab from the main girder, regardless of the presence or absence of a horizontal surface on the underside of the concrete floor slab joined to the main girder or the height of the haunch portion. [Means for solving the problem]

[0012] The present invention is an invention for solving the above-mentioned problems, and provides a cutting device and a cutting method as described below.

[0013] That is, a first aspect of the cutting device of the present invention is a cutting device for cutting a concrete deck joined onto a main girder from the main girder, the cutting device having a cutting unit equipped with a saw blade that rotates by power, and a stand supporting the cutting unit, the stand being attached to the main girder, and the saw blade of the cutting unit intersecting the concrete deck at a predetermined angle to the horizontal plane from the underside of the concrete deck to cut the concrete deck.

[0014] Here, in this application, "cutting a concrete deck" includes not only cutting through the concrete deck, but also cutting without penetrating the concrete deck (separating only a portion of the concrete deck but not completely separating it).

[0015] In addition, the underside of the concrete slab refers to the surface of the concrete slab that faces downward, and includes both horizontal and inclined surfaces, as well as the downward inclined surface of the haunch. Similar descriptions in other parts of this application shall be interpreted in the same manner.

[0016] In the present application, a saw blade refers to a disk-shaped cutting blade that rotates to cut an object.

[0017] In addition, in the present application, the "predetermined angle with respect to the horizontal plane" in the case where the saw blade "intersects with the concrete floor slab at a predetermined angle with respect to the horizontal plane" includes the case where the saw blade intersects with the concrete floor slab and is parallel to the horizontal plane, in which case the "predetermined angle with respect to the horizontal plane" is 0°. Similar descriptions in other parts of the present application should be interpreted in the same manner.

[0018] A second aspect of the cutting device according to the present invention is the cutting device of the first aspect, further comprising an angle adjustment mechanism that adjusts the predetermined angle of the saw blade with respect to a horizontal plane.

[0019] A third aspect of the cutting device of the present invention is a cutting device according to either the first or second aspect, which is configured to include a moving mechanism that can move the saw blade toward and away from the object to be cut while keeping the specified angle of the saw blade constant relative to the horizontal plane.

[0020] A fourth aspect of the cutting device according to the present invention is a cutting device according to any one of the first to third aspects, further comprising a magnet, and the frame is configured to be detachably attached to the main girder by the magnet.

[0021] A fifth aspect of the cutting device according to the present invention is the cutting device according to the fourth aspect, wherein the magnet is incorporated in the stand.

[0022] A sixth aspect of the cutting device of the present invention is a cutting device according to any one of the first to fifth aspects, wherein the cutting device is provided with a gear rail attached to the main girder so as to extend along the longitudinal direction of the main girder, the frame is provided with a gear that meshes with the gear rail and moves on the gear rail, and the frame is configured to be movable along the gear rail.

[0023] Here, the phrase "attached to the main girder" includes not only the case where the gear rail is directly attached to the main girder, but also the case where the gear rail is indirectly attached to the main girder via another member. Similar descriptions in other parts of this application shall be interpreted in the same manner.

[0024] A seventh aspect of the cutting device according to the present invention is a cutting device according to any one of the first to sixth aspects, wherein the frame is configured to be divisible into a plurality of stages.

[0025] An eighth aspect of the cutting device of the present invention is a cutting device according to any one of the first to seventh aspects, wherein the upper flange of the main girder is provided with a shear stopper that joins the main girder to the concrete floor slab, and the extension direction in which the saw blade extends as a surface member intersects with the shear stopper, so that the saw blade cuts the shear stopper together with the concrete floor slab.

[0026] A first aspect of the cutting method of the present invention is a cutting method for cutting a concrete floor slab joined onto a main girder from the main girder, characterized in that the cutting method includes a cutting step in which a saw blade intersects the concrete floor slab from the underside of the concrete floor slab at a predetermined angle to the horizontal plane to cut the concrete floor slab.

[0027] A second aspect of the cutting method of the present invention is the cutting method of the first aspect, wherein the cutting step is configured to cut from one side of the main girder during a first time period and to cut from the other side of the main girder during a second time period that does not overlap with the first time period.

[0028] A third aspect of the cutting method of the present invention is the cutting method of the first aspect, wherein in the cutting process, the saw blades cut simultaneously from both sides of the main girder at a predetermined position where the main girder's longitudinal positions overlap, so as not to overlap.

[0029] A fourth aspect of the cutting method of the present invention is the cutting method of the first aspect, wherein in the cutting step, cutting is performed simultaneously from both sides of the main girder, but the cuts are performed so that the positions of the main girder in the longitudinal direction do not overlap.

[0030] A fifth aspect of the cutting method of the present invention is a cutting method according to any one of the first to fourth aspects, wherein in the cutting process, a shear stopper provided on an upper flange of the main girder is cut together with the concrete deck.

[0031] A sixth aspect of the cutting method of the present invention is a cutting method according to any one of the first to fourth aspects, wherein the upper flange of the main girder is provided with a plurality of shear stoppers in its width direction to join the main girder to the concrete floor slab, and the cutting process is configured to cut some of the shear stoppers provided in the width direction of the upper flange together with the concrete floor slab.

[0032] A seventh aspect of the cutting method of the present invention is a cutting method according to any one of the first to fourth aspects, wherein the upper flange of the main girder is provided with three or more shear stoppers in its width direction to join the main girder to the concrete floor slab, and in the cutting process, of the three or more shear stoppers provided in the width direction of the upper flange, all but one other than the end part in the width direction of the upper flange are cut together with the concrete floor slab.

[0033] An eighth aspect of the cutting method of the present invention is a cutting method of the first aspect, wherein the upper flange of the main girder is provided with a plurality of shear stoppers in its width direction to join the main girder to the concrete floor slab, and the cutting process is configured such that all of the shear stoppers provided in the width direction of the upper flange are cut together with the concrete floor slab from only one side of the main girder.

[0034] A ninth aspect of the cutting method according to the present invention is a cutting method according to any one of the first to eighth aspects, which is configured to include a separation step of raising the concrete deck after the cutting step and separating the concrete deck and the main girder.

[0035] A tenth aspect of the cutting method of the present invention is a cutting method for cutting a concrete floor slab joined onto a main girder from the main girder using the cutting device of the sixth aspect, characterized in that the cutting method includes a cutting step in which the saw blade of the cutting device intersects with the concrete floor slab at a predetermined position in the longitudinal direction of the main girder from the underside of the concrete floor slab at a predetermined angle to the horizontal plane to cut the concrete floor slab, and a moving step in which, after the cutting step, the cutting device is moved along the gear rail to the next cutting position in the longitudinal direction of the main girder. Effect of the Invention

[0036] According to the present invention, a cutting device and a cutting method can be provided that can cut a concrete floor slab from the main girder from the underside of the concrete floor slab, regardless of whether or not there is a horizontal surface on the underside of the concrete floor slab joined to the main girder, or regardless of the height of the haunch portion. [Brief description of the drawings]

[0037] [Figure 1] 1 is a vertical cross-sectional view of the cutting device 10 according to the first embodiment of the present invention, as seen from the bridge axis direction (cross-sectional view taken along line II in FIG. 2). [Diagram 2] FIG. 1 is a front view of a cutting device 10 according to a first embodiment of the present invention, as viewed perpendicular to the bridge axis (as viewed from the direction of arrow II in FIG. 1). [Diagram 3] FIG. 2 is a plan view of the cutting device 10 according to the first embodiment of the present invention as viewed from above (as viewed from the direction of the arrow III in FIG. 1). [Figure 4]FIG. 1 is an enlarged vertical cross-sectional view of the cutting device 10 according to the first embodiment of the present invention, as viewed from the bridge axis direction (an enlarged vertical cross-sectional view showing a portion of the cutting device 10 in FIG. 1). [Diagram 5] FIG. 1 is a diagram showing a schematic diagram of a situation in which a removed concrete floor slab 82X is being removed after cutting by the cutting device 10 according to the first embodiment of the present invention (as viewed from a direction perpendicular to the bridge axis); [Figure 6] FIG. 11 is a schematic diagram (viewed from the bridge axis direction) showing the situation in which the removed concrete deck 82X is being removed after cutting (all of the shear stoppers 84 have been cut) by the cutting device 10 according to the first embodiment of the present invention, where (A) shows the state in which preparations for lifting the removed concrete deck 82X have been completed, and (B) shows the state after lifting of the removed concrete deck 82X has begun and the edges have been cut. [Figure 7] FIG. 11 is a schematic diagram (viewed from the bridge axis direction) showing the situation in which the removed concrete deck 82X is being removed after cutting (cutting all but one shear stopper 84) by the cutting device 10 according to the first embodiment of the present invention, in which (A) shows the state in which preparations for lifting the removed concrete deck 82X have been completed, and (B) shows the state after lifting of the removed concrete deck 82X has begun and the edges have been cut. [Figure 8] FIG. 11 is a vertical cross-sectional view of a cutting device 11 according to a second embodiment of the present invention, as viewed from the bridge axis direction. [Figure 9] A vertical cross-sectional view (as viewed from the bridge axis direction) showing a schematic view of the manner in which the support steel material 56 is attached to the lower flange 80B of the main girder 80 by the fixing bolt 58. [Figure 10] FIG. 1 is a diagram showing a cutting device 200 disclosed in Patent Document 1 as seen from the bridge axis direction. [Figure 11] FIG. 2 is a vertical cross-sectional view showing a cantilever portion 220 having an inclined lower surface and no horizontal surface (a horizontal surface on which the cutting device 200 can be attached). DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0038] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings.

[0039] (1) First embodiment Fig. 1 is a vertical cross-sectional view of the cutting device 10 according to the first embodiment of the present invention as seen from the bridge axis direction (cross-sectional view along line II in Fig. 2), Fig. 2 is a front view of the cutting device 10 according to the first embodiment of the present invention as seen from a direction perpendicular to the bridge axis (front view as seen from the direction of arrow II in Fig. 1), Fig. 3 is a plan view of the cutting device 10 according to the first embodiment of the present invention as seen from above (plan view as seen from the direction of arrow III in Fig. 1), and Fig. 4 is an enlarged vertical cross-sectional view of the cutting device 10 according to the first embodiment of the present invention as seen from the bridge axis direction (enlarged vertical cross-sectional view showing an enlarged portion of the cutting device 10 in Fig. 1). Note that the illustration of the concrete floor slab 82 is omitted in Fig. 3.

[0040] 1, the cutting device 10 according to the first embodiment of the present invention includes a frame 12 and a cutting unit 20, and is a cutting device that cuts the concrete floor slab 82 from the underside of the concrete floor slab 82 to include at least a directly above portion 86 located directly above the main girder 80, thereby cutting the concrete floor slab 82 from the main girder 80. The directly above portion 86 is specifically a portion of the concrete floor slab 82 that is located vertically above the upper flange 80A of the main girder 80.

[0041] The main girder 80 is a steel I-girder made of a steel material with an I-shaped cross section, and has an upper flange 80A, a lower flange 80B, and a web 80C. A plurality of shear stoppers 84 (three in the width direction of the upper flange 80A here) are provided on the upper surface of the upper flange 80A of the main girder 80 in the width direction to join the main girder 80 and the concrete floor slab 82, and the main girder 80 and the concrete floor slab 82 are integrated to form a composite girder. However, by using the cutting device 10 according to the first embodiment to cut the directly above portion 86 including the shear stoppers 84, the degree of integration between the main girder 80 and the concrete floor slab 82 can be reduced. As a result, as shown in Figures 6 and 7, the removed concrete floor slab 82X can be pulled up by the center hole jack 60, and the removed concrete floor slab 82X can be separated from the main girder 80.

[0042] As shown in Figures 1, 2, 4, etc., the frame 12 has the role of attaching the entire cutting device 10 to the main girder 80 and supporting the cutting section 20 to support cutting by the cutting section 20.

[0043] The mount 12 includes an upper mount 12A, a middle mount 12B, and a lower mount 12C, and the upper mount 12A, the middle mount 12B, and the lower mount 12C are configured to be detachable from each other. As shown in Fig. 2, the upper mount 12A includes two upper mount frames 12A1 and a connecting flange 12A2 attached to their lower ends, the middle mount 12B includes two middle mount frames 12B1 and a connecting flange 12B2 attached to their upper and lower ends, and the lower mount 12C includes two lower mount frames 12C1 and a connecting flange 12C2 attached to their upper ends, and a gear 30 and a gear-like connecting steel material 32 arranged at the lower end.

[0044] The lower surface of the connecting flange 12A2 of the upper stage frame 12A and the upper surface of the connecting flange 12B2 at the top of the middle stage frame 12B are arranged so that their surfaces meet, and bolts 40 are arranged and fixed so as to penetrate those surfaces, thereby connecting the upper stage frame 12A and the middle stage frame 12B. Also, the lower surface of the connecting flange 12B2 at the bottom of the middle stage frame 12B and the upper surface of the connecting flange 12C2 of the lower stage frame 12C are arranged so that their surfaces meet, and bolts 40 are arranged and fixed so as to penetrate those surfaces, thereby connecting the middle stage frame 12B and the lower stage frame 12C. Therefore, the stand 12 can be disassembled into an upper stand 12A, a middle stand 12B, and a lower stand 12C, and by disassembling the stand 12, the size and weight can be reduced to a size that can be carried manually. In addition, the stand 12 can be easily assembled by connecting the upper stand 12A, the middle stand 12B, and the lower stand 12C.

[0045] As shown in Figures 1, 2 and 4, the frame 12 is attached to the web 80C of the main girder 80 via the magnet tools 14. The two upper frame frames 12A1 of the upper frame 12A have magnet tools 14 attached to the upper and lower parts, respectively, and the two lower frame frames 12C1 of the lower frame 12C have magnet tools 14 attached to the middle parts, respectively, so that the frame 12 is attached to the web 80C of the main girder 80 with a total of six magnet tools 14. In the cutting device 10 according to the first embodiment, the magnet tools 14 are incorporated in the frame 12, but the magnet tools 14 may be configured to be detachable from the frame 12. The magnet tool 14 is configured with a plurality of magnets, and is configured so that by changing the position of the lever 14A, it is possible to adopt an arrangement in which the magnetic directions of the plurality of magnets are aligned to produce a large magnetic force, or an arrangement in which the magnetic directions of the plurality of magnets cancel each other out to produce a small magnetic force, thereby changing the strength of the magnetic force and making it possible to attach and detach the magnet tool 14 to the main girder 80. Such magnet tools 14 are commercially available. Also, instead of such magnet tools 14, it is possible to configure the mounting base 12 to be attached to the web 80C of the main girder 80 using an electromagnet.

[0046] As shown in Figs. 1, 2 and 4, the support steel material 50, which is a channel steel, is attached to the lower flange 80B of the main girder 80 via a clasp vise 52 at a predetermined interval so as to be perpendicular to the longitudinal direction of the main girder 80, and the gear rail 54 is arranged so as to span the support steel material 50 and to be along the longitudinal direction of the main girder 80. A gear 30 is provided at the lower end of the lower stage frame 12C via a gear or other connecting steel material 32, and the gear 30 meshes with the gear rail 54 to move forward and backward in the longitudinal direction on the gear rail 54, so that the frame 12 can move forward and backward on the gear rail 54 in the longitudinal direction of the main girder 80. The length of the gear rail 54 is typically set to match the length of the counter-tilt structure and the interval between the cross beams, and specifically, the length of the gear rail 54 is typically set to about 5 to 6 m. When the base 12 is moved forward and backward along the gear rail 54, the magnetic attachment of the magnet tool 14 is released. In the cutting device 10 according to the first embodiment, the base 12 is configured to be manually moved forward and backward on the gear rail 54, and when a cutting operation at one cutting position is completed, the cutting device 10 is manually moved along the gear rail 54 to the next cutting position. Since no driving source for driving the gear 30 is provided, the cutting device 10 has a compact configuration as a whole. Therefore, the cutting device 10 is configured to be easily attached to and detached from the main beam 80 and to be easily transported. Therefore, the cutting device 10 can be easily moved to the next cutting work space adjacent to the main beam or cross beam. However, a driving source for driving the gear 30 may be provided so that the base 12 can be moved by power on the gear rail 54. As described above, the stand 12 can be disassembled into the upper stand 12A, the middle stand 12B, and the lower stand 12C, and by disassembling them, the size and weight can be reduced to a size that can be carried manually. Therefore, even if a driving source for driving the gear 30 is provided, the cutting device 10 can be easily moved to the next adjacent cutting work space separated by a counter-tilt structure or cross beam.

[0047] 4, an upper end support part 16A is provided at the upper end of the upper stage frame 12A, and this upper end support part 16A is provided with a through hole with a threaded inner surface, and a tension bolt 16 is screwed into the through hole and attached, and the tension bolt 16 is configured to be able to adjust the protruding length of the tension bolt 16 from the upper end support part 16A by rotating the tension bolt 16 in the circumferential direction. With the frame 12 attached to the web 80C of the main girder 80 by the magnet tool 14, the protruding length of the tension bolt 16 from the upper end support part 16A is lengthened and the tip of the tension bolt 16 is abutted against the lower surface of the upper flange 80A of the main girder 80, and in cooperation with the fixation by the magnet tool 14, the mounting state of the frame 12 can be made more stable. Instead of such tension bolts 16, for example, a pantograph jack may be placed on the upper end support portion 16A and extended to strike the underside of the upper flange 80A of the main girder 80.

[0048] As shown in Figs. 1, 2, and 4, the cutting section 20 is attached to the upper stand 12A via fixing pins 24C and 24E.

[0049] The cutting unit 20 includes a saw blade 22, an angle adjustment mechanism 24, a handle 26, and the like, and is the site where actual cutting is performed in the cutting device 10 according to the first embodiment.

[0050] The saw blade 22 is a disk-shaped cutting blade that is pressed against an object to be cut and cuts the object to be cut. Specifically, for example, a cutting blade used in a wall saw can be used. The center of the saw blade 22 is fixed by the shaft mechanism 22A, and the shaft mechanism 22A is configured to receive power from the drive unit 22B and rotate the shaft at high speed around the center of the shaft. The saw blade 22 rotates at high speed by the shaft of the shaft mechanism 22A rotating at high speed. In other words, the saw blade 22 rotates at high speed by the power from the drive unit 22B. The shaft mechanism 22A is attached to the first link member 24A of the angle adjustment mechanism 24 so as to be movable along the longitudinal direction of the first link member 24A, and is configured to be able to move forward and backward by manually rotating the handle 26. The saw blade 22 moves forward and backward while maintaining a constant angle with respect to the horizontal plane by manually rotating the handle 26. With the cutting device 10 according to the first embodiment attached to the main girder 80, the handle 26 is manually rotated to press the saw blade 22 rotating at high speed against the underside of the concrete slab 82 to be cut so as to intersect with it, thereby cutting the target portion of the concrete slab 82. The angle of the saw blade 22 with respect to the horizontal plane can be adjusted by the angle adjustment mechanism 24 described later, and by appropriately adjusting the angle, the extension direction in which the saw blade 22 spreads as a surface member can be made to intersect with the slip stopper 84 provided on the upper flange 80A of the main girder 80, and the saw blade 22 can cut the slip stopper 84 together with the concrete slab 82. The cutting depth can be adjusted by adjusting the amount of rotation of the handle 26 to adjust the distance the saw blade 22 is advanced. The forward and backward movement of the saw blade 22 may be performed by power such as electricity, instead of manually.

[0051] The angle adjustment mechanism 24 of the cutting section 20 is configured to have a first link member 24A, a second link member 24B, a fixing pin 24C, a joint pin 24D, and a fixing pin 24E. The first link member 24A has an upper end rotatably attached to the upper end of the upper stage frame 12A1 of the upper stage stand 12A by the fixing pin 24C, and a lower end rotatably connected to the upper end of the second link member 24B by the joint pin 24D. The second link member 24B has an upper end rotatably attached to the lower end of the first link member 24A by the joint pin 24D, and a lower end rotatably connected to the upper stage frame 12A1 of the upper stage stand 12A by the fixing pin 24E. An elongated hole 24B1 (see FIG. 4) is provided at the upper end of the second link member 24B, and the joint pin 24D is inserted through this elongated hole 24B1 so that the joint pin 24D can slide along the elongated hole 24B1.

[0052] Therefore, the angle between the first link member 24A and the second link member 24B at the position of the joint pin 24D can be adjusted, and the inclination of the first link member 24A with respect to the horizontal plane can be adjusted, and the inclination of the saw blade 22 with respect to the horizontal plane can be adjusted. Therefore, in the cutting device 10 according to the first embodiment, the saw blade 22 can cross the lower surface of the concrete floor slab 82 (including the lower surface of the haunch portion 82A and the lower surface of the overhanging cantilever portion 82B) at a desired angle. After appropriately adjusting the inclination of the saw blade 22 with respect to the horizontal plane, the fixing pins 24C and 24E are fixed by screw tightening so as not to rotate, and the joint pin 24D is fixed by screw tightening so as not to rotate and not to slide, thereby fixing the first link member 24A and the second link member 24B.

[0053] The mechanism for adjusting the angle between the first link member 24A and the second link member 24B is not limited to the mechanism described above. For example, a groove can be provided in the upper platform frame 12A1 in the longitudinal direction (vertical direction), and a movable pin can be slidably engaged with the groove instead of the fixed pin 24E (the long hole 24B1 at the upper end of the second link member 24B is changed to a circular hole, and the joint pin 24D cannot slide (it can rotate)).

[0054] As described above, the upper stage stand 12A of the stand 12 has the role of appropriately holding the cutting section 20, and the lower stage stand 12C of the stand 12 has the role of moving the entire cutting device 10 along the main girder 80. On the other hand, the middle stage stand 12B of the stand 12 does not play a particular role in terms of cutting or moving functions, but has the role of adjusting the overall height of the cutting device 10 according to the height of the main girder 80, and the middle stage stand 12B of an appropriate height to match the height of the main girder 80 is manufactured to match the height of the main girder 80.

[0055] Next, removal of the concrete floor slab 82 that is performed after cutting the directly above portion 86 of the concrete floor slab 82 using the cutting device 10 according to the first embodiment will be described.

[0056] FIG. 5 is a diagram (viewed from the direction perpendicular to the bridge axis) that shows a schematic diagram of a situation in which the removed concrete slab 82X is being removed after cutting by the cutting device 10 according to the first embodiment of the present invention (all the shear stoppers 84 are cut off) (viewed from the bridge axis direction). FIG. 6 is a diagram (viewed from the bridge axis direction) that shows a schematic diagram of a situation in which the removed concrete slab 82X is being removed after cutting by the cutting device 10 according to the first embodiment of the present invention (all the shear stoppers 84 are cut off). (A) shows a state in which preparations for lifting the removed concrete slab 82X are completed, and (B) shows a state after the lifting of the removed concrete slab 82X is started and the edge is cut off. FIG. 7 is a diagram (viewed from the bridge axis direction) that shows a schematic diagram of a situation in which the removed concrete slab 82X is being removed after cutting by the cutting device 10 according to the first embodiment of the present invention (cutting off all but one shear stopper 84). (A) shows a state in which preparations for lifting the removed concrete slab 82X are completed, and (B) shows a state after the lifting of the removed concrete slab 82X is started and the edge is cut off.

[0057] After cutting the portion 86 directly above the concrete slab 82 using the cutting device 10 according to the first embodiment, the concrete slab 82 is cut in a direction perpendicular to the bridge axis so that the length of the concrete slab 82X to be removed in the bridge axis direction is a predetermined length (specifically, for example, about 2 m). This cutting can be performed from above the bridge surface using, for example, a wall saw.

[0058] Then, as shown in FIG. 5, two bolsters 72 are arranged so as to sandwich the removed concrete slab 82X in the bridge axis direction. Specifically, one of the two bolsters 72 is arranged on the concrete slab 82, and the other bolster 72 is arranged on an adjustment member 74 (having a height equivalent to the thickness of the concrete slab 82) arranged on the upper flange of the main girder 80. Then, the main beam 70 is arranged so as to span the two bolsters 72 arranged. For the bolster 72 and the adjustment member 74, H-shaped steel (sandre material) reinforced by welding steel plates at a predetermined interval can be used, and for the main beam 70, as shown in FIG. 6 and FIG. 7, two channel steels 70A reinforced by welding steel plates (not shown) at a predetermined interval can be used by arranging them at a predetermined interval (a distance through which the Gebindestarve 62 can be inserted) so that their flanges face each other.

[0059] In this arrangement, as shown in Figures 5 to 7, a center hole jack 60 is placed on the main girder 70. Then, a Gebindestarve 62 is placed so as to pass through the inside of the center hole jack 60, the space between the opposing flanges of the two channel steels 70A, and the through hole 82X1 provided in the removed concrete floor slab 82X, and a support plate 66 is placed on the upper surface of the center hole jack 60 and the lower surface of the removed concrete floor slab 82X. The upper and lower ends of the Gebindestarve 62 are fastened with nuts 64 via the support plate 66, completing the preparation for lifting and removing the removed concrete floor slab 82X (see Figures 6(A) and 7(A)). Figure 6 shows the case where all of the shear stoppers 84 arranged on the upper flange 80A of the main girder 80 have been cut in the width direction of the upper flange 80A, and Figure 7 shows the case where all of the shear stoppers 84 arranged on the upper flange 80A of the main girder 80 have been cut except for one in the center of the width direction of the upper flange 80A.

[0060] Then, lifting is started with the center hole jack 60, and the removed concrete slab 82X is cut off from the main girder 80 as shown in Fig. 6(B) and Fig. 7(B). As shown in Fig. 6, when all the shear stoppers 84 arranged on the upper flange 80A of the main girder 80 are cut in the width direction of the upper flange 80A, it is clear that the removed concrete slab 82X can be cut off from the main girder 80 by lifting with the center hole jack 60 without any problem. However, as shown in Fig. 7, even when the shear stoppers 84 arranged on the upper flange 80A of the main girder 80 are cut off in the width direction of the upper flange 80A except for one, the degree of integration between the removed concrete slab 82X and the main girder 80 is significantly reduced, and the removed concrete slab 82X can be cut off from the main girder 80 by lifting with the center hole jack 60. As shown in Figure 7, when cutting off the shear stoppers 84 arranged on the upper flange 80A of the main girder 80 while leaving only one in the width direction of the upper flange 80A, it is preferable to leave only one in the center of the width direction of the upper flange 80A in order to balance the stresses when the removed concrete deck 82X is lifted and the edge is cut.

[0061] In addition, Figures 1 and 4 show an embodiment in which only the two on the left side of the three slip stoppers 84 arranged in the width direction on the upper flange 80A of the main girder 80 are cut and the one on the right side is left. However, by adjusting the size of the saw blade 22 and the angle of the saw blade 22 relative to the horizontal plane, it is also possible to cut all three slip stoppers 84 arranged in the width direction on the upper flange 80A of the main girder 80 even when cutting the straight-up portion 86 from only one side of the main girder 80 with the cutting device 10.

[0062] Furthermore, as in the case of Figure 7, when the shear stoppers 84 arranged on the upper flange 80A of the main girder 80 are cut off except for one in the center of the width of the upper flange 80A, the degree of integration between the removed concrete deck 82X and the main girder 80 is significantly reduced. However, compared to the case of Figure 6, when all of the shear stoppers 84 arranged on the upper flange 80A of the main girder 80 are cut off in the width direction of the upper flange 80A, the degree of integration is maintained to a certain extent, and if the bridge is in service for a short period of time, it is possible to continue using the bridge after verifying safety.

[0063] (2) Second embodiment FIG. 8 is a vertical cross-sectional view of a cutting device 11 according to a second embodiment of the present invention, as viewed from the bridge axis direction.

[0064] 8, a cutting device 11 according to a second embodiment of the present invention is configured by disposing the cutting devices 10 according to the first embodiment of the present invention on both sides of a main girder 80. The description of the cutting device 10, which is a component of the cutting device 11 according to the second embodiment, will be replaced with the description of the cutting device 10 according to the first embodiment.

[0065] The cutting device 11 according to the second embodiment of the present invention is a cutting device in which the cutting devices 10 are arranged on both sides of the main girder 80, and therefore the cutting work can be carried out faster than when the cutting device 10 is arranged on one side of the main girder 80 and the directly above portion 86 of the concrete floor slab 82 is cut (when the directly above portion 86 is cut from one side of the main girder 80 in a first time period and the directly above portion 86 is cut from the other side of the main girder 80 in a second time period that does not overlap with the first time period (in this case, the number of cutting devices 10 used in the cutting work can be reduced)). However, when cutting the directly above portion 86 simultaneously from both sides of the main girder 80 at a predetermined position in the longitudinal direction of the main girder 80, the cutting work should be carried out while paying sufficient attention to the cutting depth of the saw blades 22 and the adjustment of the angle with respect to the horizontal plane so that the saw blades 22 of the cutting devices 10 arranged on both sides of the main girder 80 do not come into contact with each other. In addition, when cutting the directly above portion 86 simultaneously using cutting devices 10 arranged on both sides of the main girder 80, the timing may be staggered so that the positions of the main girder 80 in the longitudinal direction do not overlap.

[0066] (3) Supplementary Information In the cutting device according to the embodiment described above, the saw blade 22 is tilted at a predetermined angle relative to the horizontal plane to cut the concrete floor slab 82, but the saw blade 22 may be configured to cut the concrete floor slab 82 at an angle parallel to the horizontal plane by adjusting the shape of the concrete floor slab 82 or the dimensions of the portion where it is attached to the main girder 80.

[0067] Furthermore, in the explanation of the cutting devices 10, 11 according to the first and second embodiments, it has been assumed that the saw blade 22 cuts the shear stopper 84 together with the concrete deck 82, but when using the cutting devices 10, 11 according to the first and second embodiments to cut the directly above portion 86, it is also possible to limit the cutting to cutting only the concrete portion of the concrete deck 82. Furthermore, the cutting devices 10, 11 according to the first and second embodiments can also be used to cut the directly above portion of a non-composite girder.

[0068] In the cutting devices 10 and 11 according to the first and second embodiments, the support steel material 50 is attached to the lower flange 80B of the main girder 80 using the clamp 52, but a magnet may be used instead of the clamp 52. Also, as shown in Fig. 9, a configuration may be used that uses a support steel material 56 having a U-shaped cross section and a space into which the lower flange 80B can be fitted, and a fixing bolt 58. The upper protruding portion 56A of this supporting steel material 56 has a through hole with a threaded inner surface, and the shank of a fixing bolt 58 is screwed into the through hole. The fixing bolt 58 is configured so that the amount by which the shank of the fixing bolt 58 protrudes from the underside of the upper protruding portion 56A can be changed by rotating the fixing bolt 58 circumferentially. With the lower flange 80B fitted into the space of the supporting steel material 56, the amount by which the shank of the fixing bolt 58 protrudes from the underside of the upper protruding portion 56A can be increased, and the tip of the shank of the fixing bolt 58 can be abutted against the upper surface of the lower flange 80B of the main girder 80, thereby fixing the supporting steel material 56 to the lower flange 80B of the main girder 80. [Explanation of symbols]

[0069] 10, 11...cutting device 12…Frame 12A…Upper rack 12B...Middle rack 12C…Lower stand 12A1…Upper stand frame 12B1...Middle stand frame 12C1…Lower stand frame 12A2, 12B2, 12C2...Connecting flanges 14…Magnetic tool 14A…Lever 16...Tension bolt 16A…Top end support part 20…cutting section 22…Saw blade 22A…shaft mechanism, etc. 22B…Drive unit 24…Angle adjustment mechanism 24A…First link member 24B…Second link member 24B1…long hole 24C, 24E…Fixed pin 24D…Joint pin 26…Handle 30…Gear 32...Gears and other connecting steel materials 40…Volts 50…Support steel material 52...Cross-head vise 54…Gear rail 56…Support steel material 56A…Top protrusion 58…Fixing bolt 60…Center hole jack 62…Gebindesturb 64…Nut 66…Support plate 70…Main beam 70A…Channel steel 72…pillow beam 74…Adjustment material 80…Main digit 80A...Top flange 80B…Lower flange 80C…Web 82…Concrete deck 82A…Haunch 82B…Protruding cantilever part 82X…Removed concrete floor slab 82X1…Through hole 84…Slip prevention 86…Directly above part 200...Cutting device 202…Suspension stand 204…Wire saw 206…Pulley 208…Drive pulley 208A…Drive unit 210…Concrete deck 210A…Bottom surface of floor slab 212…Haunch 212A…Through hole 214…Main digit 220...Extruding cantilever part 222…Main digit

Claims

1. A cutting device for cutting a concrete deck joined onto a main girder from the main girder, A cutting unit having a saw blade that rotates by power; A stand supporting the cutting unit; having A cutting device characterized in that the frame is attached to the main girder, and the saw blade of the cutting section intersects the concrete floor slab from the underside of the concrete floor slab at a predetermined angle to the horizontal plane to cut the concrete floor slab.

2. 2. The cutting device according to claim 1, further comprising an angle adjustment mechanism for adjusting the predetermined angle of the saw blade with respect to a horizontal plane.

3. 2. The cutting device according to claim 1, further comprising a moving mechanism that can move the saw blade in a direction toward and away from an object to be cut while keeping the predetermined angle of the saw blade relative to a horizontal plane constant.

4. It is equipped with a magnet, The cutting device according to claim 1, wherein the frame is detachably attached to the main beam by the magnet.

5. 5. The cutting device according to claim 4, wherein the magnet is incorporated in the stand.

6. The cutting device includes a gear rail attached to the main girder along a longitudinal direction of the main girder, The frame includes a gear that meshes with the gear rail and moves on the gear rail, 2. The cutting device according to claim 1, wherein the platform is movable along the gear rail.

7. 2. The cutting device according to claim 1, wherein the frame is configured so as to be separable into a plurality of stages.

8. The upper flange of the main girder is provided with a shear stopper that joins the main girder and the concrete floor slab, A cutting device as described in any one of claims 1 to 7, characterized in that the extension direction in which the saw blade extends as a surface member intersects with the shear stopper, and the saw blade cuts the shear stopper together with the concrete floor slab.

9. A cutting method for cutting a concrete deck slab joined onto a main girder from the main girder, comprising: A cutting method comprising a cutting step of cutting the concrete floor slab from the underside thereof with a saw blade at a predetermined angle to a horizontal plane.

10. The cutting method according to claim 9, characterized in that in the cutting step, cutting is performed from one side of the main girder during a first time period and cutting is performed from the other side of the main girder during a second time period that does not overlap with the first time period.

11. The cutting method according to claim 9, characterized in that in the cutting step, the saw blades cut simultaneously from both sides of the main beam so as not to overlap at a predetermined position where the main beams overlap in the longitudinal direction.

12. The cutting method according to claim 9, characterized in that in the cutting step, the main beam is cut simultaneously from both sides, but the cuts are performed so that the positions of the main beam do not overlap in the longitudinal direction.

13. The cutting method according to any one of claims 9 to 12, characterized in that in the cutting step, a shear stop provided on an upper flange of the main girder is cut together with the concrete deck.

14. The upper flange of the main girder is provided with a plurality of shear stoppers in the width direction to join the main girder and the concrete floor slab, The cutting method according to claim 9, characterized in that in the cutting step, some of the plurality of shear stoppers provided in the width direction of the upper flange are cut together with the concrete floor slab.

15. The upper flange of the main girder is provided with three or more shear stoppers in the width direction to join the main girder and the concrete floor slab, The cutting method described in claim 9, characterized in that in the cutting process, of the three or more shear stoppers provided in the width direction of the upper flange, all that is left is one other than the end portion in the width direction of the upper flange, and the upper flange is cut together with the concrete floor slab.

16. The upper flange of the main girder is provided with a plurality of shear stoppers in the width direction to join the main girder and the concrete floor slab, The cutting method according to claim 9, characterized in that in the cutting process, all of the shear stoppers provided in a plurality in the width direction of the upper flange are cut together with the concrete deck from only one side of the main girder.

17. The cutting method according to any one of claims 9 to 12 and 14 to 16, characterized in that after the cutting step, a separation step is included in which the concrete deck is raised and the concrete deck and the main girder are separated from each other.

18. A cutting method for cutting a concrete deck slab joined onto a main girder from the main girder using the cutting device according to claim 6, a cutting process in which the saw blade of the cutting device intersects with the concrete floor slab at a predetermined angle with respect to a horizontal plane from the underside of the concrete floor slab at a predetermined position in the longitudinal direction of the main girder to cut the concrete floor slab; a moving step of moving the cutting device along the gear rail to a next cutting position in the longitudinal direction of the main girder after the cutting step; A cutting method comprising the steps of:

Citation Information

Patent Citations

  • Floor slab removal method for composite girder

    JP2017089302A

  • Cutting machine for concrete slab and method for cutting concrete slab

    JP2019173542A

  • Composite slab removal method and device

    JP2022035542A

  • Cutting device and cutting / separating method of concrete slab from main girder

    JP2021021227A