Evaluation device for degree of fluidization of ready-mixed concrete and evaluation method for degree of fluidization of ready-mixed concrete
The fresh concrete fluidization evaluation device uses rod members and vibrators to intuitively assess compaction, addressing skill transfer challenges and preventing unrecoverable rods, ensuring efficient concrete compaction.
Patent Information
- Application Number
- JP2023046757
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-23
- Publication Date
- 2024-10-04
- Estimated Expiration
- 2043-03-23
AI Technical Summary
Existing methods for determining concrete compaction completion, such as using floating bodies, are not intuitive for young workers and foreign personnel, and can result in unrecoverable floating bodies due to aggregate influence, complicating the transfer of skills in the construction industry.
A fresh concrete fluidization evaluation device comprising rod members with fall prevention devices and a vibrator to intuitively assess fluidization by inserting rod members into concrete, vibrating until they reach the formwork bottom, and removing them to prevent cavities.
The device allows young and foreign workers to intuitively grasp concrete compaction, ensuring efficient skill transfer and preventing unrecoverable rod members, while completing fluidization and compaction within realistic times.
Smart Images

Figure 2024135866000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to an apparatus for evaluating the fluidity degree of ready-mixed concrete and a method for evaluating the fluidity degree of ready-mixed concrete. [Background technology]
[0002] A method for determining the completion of concrete compaction is known (see Patent Document 1). In this method, a floating body is placed at the bottom of a formwork before concrete is poured, and completion of concrete compaction is determined when the floating body rises to the surface. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2019-183392 A DISCLOSURE OF THEINVENTION [Problem to be solved by the invention]
[0004] However, due to the labor shortage problem in the construction industry in recent years, there is a social need to train young workers and utilize foreign workers. On the other hand, concrete compaction has been performed by skilled craftsmen up until now, but there is a problem of aging of craftsmen, and it is urgent to transfer the craftsmen's techniques to young workers and foreign workers. However, in the method of determining the completion of concrete compaction in Patent Document 1, the relationship between the time elapsed in the compaction of concrete and the degree of compaction cannot be intuitively grasped, and there is a problem that it is difficult for young workers and foreign workers to acquire the technique. In addition, there is a problem that if the floating body does not rise to the surface due to the influence of aggregate in the concrete, the floating body cannot be collected.
[0005] Therefore, an object of the present invention is to provide an apparatus for evaluating the fluidity degree of ready-mixed concrete, which enables intuitive understanding of the fluidity degree of ready-mixed concrete with an extremely simple configuration, and a method for evaluating the fluidity degree of ready-mixed concrete. [Means for solving the problem]
[0006] The above problems are solved by the present invention. That is, the evaluation device for evaluating the degree of fluidity of ready-mixed concrete according to the present invention (1) is A ready-mixed concrete fluidity evaluation device capable of evaluating the fluidity of ready-mixed concrete poured into a formwork, One or more rod members having their lower ends inserted into and standing on the surface layer of the fresh concrete; One or more anti-tip devices are provided around the one or more rod members and support the one or more rod members so that the one or more rod members can move up and down; a vibrator that is inserted into the fresh concrete near the rod member and vibrates, and fluidizes the fresh concrete around the rod member until the lower end of the rod member abuts against the bottom of the formwork under the effect of gravity; Equipped with.
[0007] The apparatus for evaluating the fluidity degree of fresh concrete according to the present invention (2) is the apparatus for evaluating the fluidity degree of fresh concrete according to the present invention (1), The bar member has a scale indicating the distance from the bottom end.
[0008] The apparatus for evaluating the fluidity degree of fresh concrete according to the present invention (3) is the apparatus for evaluating the fluidity degree of fresh concrete according to the present invention (1), The vibrator is inserted at a position spaced from the rod member by a length that is 100 to 500% of the diameter of the vibrator.
[0009] The apparatus for evaluating the fluidity degree of fresh concrete according to the present invention (4) is the apparatus for evaluating the fluidity degree of fresh concrete according to the present invention (1), the one or more rod members are a plurality of rod members, the plurality of rod members being provided in the vicinity of a plurality of virtual lattice points within the formwork; a plurality of the fall prevention devices are provided, each of the plurality of fall prevention devices being provided in the vicinity of the plurality of virtual lattice points and supporting each of the plurality of rod members; The vibrator is inserted into the ready-mix concrete at a position corresponding to the virtual lattice point.
[0010] The apparatus for evaluating the fluidity degree of fresh concrete according to the present invention (5) is an apparatus for evaluating the fluidity degree of fresh concrete according to any one of the items (4), the plurality of bar members are also provided at center positions of squares formed by adjacent virtual lattice points among the plurality of virtual lattice points, The plurality of fall prevention devices are also provided at the center position and support the plurality of rod members provided at the center position, The vibrator is inserted into the ready mixed concrete at a location corresponding to the vicinity of the central location.
[0011] In addition, the method for evaluating the degree of fluidity of fresh concrete according to the present invention (6) is as follows: A method for evaluating the fluidity of fresh concrete, which can evaluate the fluidity of fresh concrete poured in a formwork using an evaluation device for evaluating the fluidity of fresh concrete, the evaluation device comprising one or more rod members, one or more fall prevention devices capable of supporting the one or more rod members, and a vibrator, A first step of inserting the lower ends of the one or more rod members into the surface layer of the fresh concrete while passing the one or more rod members through the inside of the one or more fall prevention devices to stand the one or more rod members; A second step of inserting the vibrating vibrator into the fresh concrete near the one or more rod members and fluidizing the fresh concrete around the vibrator until the lower ends of the one or more rod members abut against the bottom of the formwork by the action of gravity; Equipped with.
[0012] The method for evaluating the fluidity of ready-mixed concrete according to the present invention (7) is the method for evaluating the fluidity of ready-mixed concrete according to the present invention (6), A third step of removing the one or more rod members before removing the vibrator.
[0013] The method for evaluating the fluidity of ready-mixed concrete according to the present invention (8) is the method for evaluating the fluidity of ready-mixed concrete according to the present invention (7), In the third step, the vibrator is removed 0.1 seconds to 5 minutes after the one or more rod members are removed.
[0014] The method for evaluating the fluidity of ready-mixed concrete according to the present invention (9) is the method for evaluating the fluidity of ready-mixed concrete according to the present invention (6), The vibrator is inserted at a position spaced from the rod member by a length that is 100 to 500% of the diameter of the vibrator.
[0015] The method for evaluating the degree of fluidity of ready-mixed concrete according to the present invention (10) is the method for evaluating the degree of fluidity of ready-mixed concrete according to the present invention (6), the one or more rod members are a plurality of rod members, the plurality of rod members being provided in the vicinity of a plurality of virtual lattice points within the formwork; the one or more fall prevention devices are a plurality of devices, each of the plurality of fall prevention devices being provided in the vicinity of the plurality of virtual lattice points and supporting each of the plurality of rod members; In the second step, the vibrators are inserted in order into the fresh concrete at positions corresponding to the virtual lattice points, and the plurality of rod members are brought into contact with the bottom of the formwork.
[0016] The method for evaluating the fluidity of ready-mixed concrete according to the present invention (11) is the method for evaluating the fluidity of ready-mixed concrete according to the present invention (10), the plurality of bar members are also provided at center positions of squares formed by adjacent virtual lattice points among the plurality of virtual lattice points, The plurality of fall prevention devices are also provided at the center position and support the plurality of rod members provided at the center position, In the second step, the vibrator is inserted in sequence near the center position, and the plurality of rod members are brought into contact with the bottom of the formwork. Effect of the Invention
[0017] According to the present invention, it is possible to provide an apparatus for evaluating the fluidity degree of ready-mixed concrete, which allows the user to intuitively grasp the fluidity degree of ready-mixed concrete with an extremely simple configuration, and a method for evaluating the fluidity degree of ready-mixed concrete. [Brief description of the drawings]
[0018] [Figure 1] FIG. 1 is a front view showing a schematic diagram of an evaluation device for evaluating the fluidity degree of fresh concrete according to a first embodiment. [Diagram 2] FIG. 2 is a plan view showing a schematic view from above of the ready-mixed concrete fluidity degree evaluation device shown in FIG. 1. [Diagram 3] FIG. 11 is a plan view showing a schematic view from above of the ready-mixed concrete fluidity degree evaluation device of the second embodiment. [Figure 4] FIG. 2 is a front view showing a schematic diagram of an evaluation method for Example 1. [Diagram 5] FIG. 5 is a front view showing a schematic method for measuring the lowering length (subsidence amount) after inserting a vibrator in the evaluation method shown in FIG. 4. [Figure 6] 1 is a graph showing the results of Example 1. [Figure 7] 1 is a graph showing the results of Example 2. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0019] The method for evaluating the fluidity degree of ready-mixed concrete of the present invention includes: A method for evaluating the fluidity of fresh concrete, which can evaluate the fluidity of fresh concrete poured in a formwork using an evaluation device for evaluating the fluidity of fresh concrete, the evaluation device comprising one or more rod members, one or more fall prevention devices capable of supporting the one or more rod members, and a vibrator, A first step of inserting the lower ends of the one or more rod members into the surface layer of the fresh concrete while passing the one or more rod members through the inside of the one or more fall prevention devices to stand the one or more rod members; A second step of inserting the vibrator into the fresh concrete near the one or more rod members to fluidize the fresh concrete around the rod members until the rod members abut against the bottom of the formwork under the action of gravity; Equipped with.
[0020] In the first step, an operator inserts the lower ends of one or more rod members into the surface layer of the ready-mix concrete. The insertion length of the lower ends is preferably about 1 to 10 cm, for example.
[0021] The rod member may be, for example, a round rod having a diameter of 1 to 50 mm, preferably 5 to 30 mm, and more preferably 9 to 11 mm. The rod member may be a round rod having an axial length of 100 to 2000 mm, preferably 500 to 900 mm, and more preferably 600 to 800 mm. The rod member may be a rod of other shape, such as a square rod, a hollow shape such as a cylinder or a square pipe, in addition to a round rod.
[0022] The bar member may be a polyvinyl chloride round bar, an aluminum round bar, or a deformed steel bar that is generally used as a reinforcing bar for reinforced concrete. In order to shorten the evaluation time, it is preferable to use a deformed steel bar that sinks in a short time due to its own weight when the fresh concrete becomes fluid.
[0023] The diameter of the vibrator is generally, for example, 20 to 150 mm. The vibrator is inserted at a position separated from the rod member by a length of 100 to 500% of the vibrator's diameter. That is, if the vibrator has a diameter of 50 mm, it is inserted at a position separated from the rod member by a length of 50 to 250 mm. If the vibrator has a diameter of 100 mm, it is inserted at a position separated from the rod member by a length of 100 to 500 mm.
[0024] Ready-mix concrete can be prepared, for example, under the following mix conditions: The nominal strength of ready-mix concrete is 18 N / mm 2The slump is 5cm. The maximum size of the coarse aggregate is 20mm. The type of cement is ordinary cement.
[0025] In the second step, the worker inserts a vibrating vibrator into the fresh concrete near one or more rod members. The vibration of the vibrator reduces the frictional force between the particles of the fresh concrete, causing the fresh concrete to flow, and the frictional force acting on the rod members decreases, causing the rod members to sink due to the action of gravity. The time for inserting the vibrator into the fresh concrete is the time from inserting the vibrating vibrator into the fresh concrete to the time when the lower end of the rod member reaches the bottom of the formwork. The time for inserting the vibrator into the fresh concrete is, for example, 1 second to 10 minutes, preferably 3 seconds to 5 minutes, and more preferably 5 seconds to 30 seconds per location.
[0026] The method for evaluating the degree of fluidity of fresh concrete includes a third step of removing one or more bar members before removing the vibrator. In the third step, the worker removes the bar members first, and then the vibrator. It is desirable that the vibrator is removed, for example, 0.1 seconds to 5 minutes after the removal of the bar members, more preferably 0.1 seconds to 1 minute, and most preferably 0.1 seconds after the removal of the bar members.
[0027] The vibrator is removed from the fresh concrete no later than 5 minutes, or preferably 5, 4, 3, 2 or 1 minutes, or most preferably 0.1 seconds, after removal of the bar member.
[0028] Hereinafter, an embodiment of an evaluation device for evaluating the fluidity degree of fresh concrete used in the evaluation method for the fluidity degree of fresh concrete of the present invention will be described with reference to the drawings. [First embodiment]
[0029] As shown in Figure 1, the device 11 for evaluating the degree of fluidity of fresh concrete comprises a formwork 12, fresh concrete 13 poured into the formwork 12, one or more rod members 14 whose lower ends 14A are inserted into the surface of the fresh concrete 13, an anti-tip device 15 that supports the one or more rod members 14 so that they can move up and down, and a vibrator 16 (see Figures 4 and 5) that is inserted near the one or more rod members 14 and vibrates.
[0030] In this embodiment, the number of rod members 14 may be multiple or may be one. The number of fall prevention devices 15 may be multiple or may be one.
[0031] As shown in FIG. 2, when the formwork 12 is large, the evaluation device 11 for evaluating the degree of fluidization of fresh concrete has a plurality of scaffolds 17 for raising and removing the rod members 14 located in the formwork 12. The scaffolds 17 can be arranged in a lattice shape in the vertical and horizontal directions when viewed from above. In FIG. 2, the scaffolds 17 are shown by straight dashed lines. The scaffolds 17 are formed, for example, by assembling rods (single-tube pipes) made of general structural carbon steel and having a circular cross section in a grid shape and fixing them to each other. That is, the scaffolds 17 include a plurality of first rods 17A extending vertically when viewed from above, a plurality of second rods 17B extending horizontally, and a lattice point 17C (virtual lattice point) provided at the position where the first rods 17A and the second rods 17B intersect.
[0032] The scaffolding 17 is provided at equal intervals, for example, 50 cm apart. The outermost scaffolding 17 is provided at intervals of, for example, 25 cm apart from the formwork 12.
[0033] The formwork 12 comprises a wooden or steel frame typically used for setting fresh concrete 13. The bottom 18 within the formwork 12 may be concrete that has already been poured, a bottom formwork, or the ground. The number of fall prevention devices 15 can be increased or decreased depending on the number of rod members 14.
[0034] The fall prevention device 15 has a support part 21 provided on the outside of the formwork 12, a connecting part 22 extending from the support part 21, and a support part 23, for example, in the shape of a ring, provided at the tip of the connecting part 22. The structure of the support part 23 is not limited to a ring shape, and may be a discontinuous ring shape. Also, for example, if the rod member 14 is made of metal, the support part 23 may be of any shape as a magnetic device, and if the rod member 14 is hollow, the support part 23 may be of any shape that can be inserted into the hollow part. The connecting part 22 and the support part 23 may be integrally formed by wire or wire. Alternatively, the support part 23 may be formed of a cylindrical member, and the cylindrical member, the support part 23, and the scaffolding 17 may be fixed by the connecting part 22 formed of wire.
[0035] When the tip-over prevention device 15 is provided inside the formwork 12, the support portion 21 can be omitted. In this case, the tip-over prevention device 15 is fixed to the scaffolding 17 via the connecting portion 22.
[0036] The support portion 23 and the rod member 14 supported thereby are provided in the vicinity of the lattice point 17C of the scaffolding 17. More specifically, the support portion 23 and the rod member 14 supported thereby are provided at a position spaced 5 to 25 cm away from the lattice point 17C (a length that is 100 to 500% of the diameter of the vibrator 16, which has a diameter of 5 cm).
[0037] The vibrator 16 is a typical vibrator 16 used at construction sites. The diameter of the vibrator 16 is generally 20 to 150 mm. The vibrator 16 is inserted into the ready-mix concrete 13 at a position corresponding to the lattice point 17C, as described below.
[0038] There may be one bar member 14, or multiple bars when the formwork is large. The bar members 14 are formed in the same shape. Each of the bar members 14 has a cylindrical shape (round bar) with a diameter of 1 to 50 mm. The bar member 14 has a lower end 14A and an upper end 14B. The bar member 14 is formed from, for example, a resin material (vinyl chloride), an aluminum alloy material, or a steel material. It is desirable that the bar member 14 is formed from a steel material, particularly a deformed steel bar.
[0039] It is desirable that a scale 24 indicating the distance from the lower end 14A is formed, for example, by a marker made of tape or the like, on the outer circumferential surface of the bar member 14. The scale 24 may be formed, for example, at intervals of 10 cm.
[0040] A method for evaluating the fluidity degree of fresh concrete using the evaluation device 11 for evaluating the fluidity degree of fresh concrete of this embodiment will be described. First, as shown in Figures 1 and 2, workers set up scaffolding 17 on formwork 12 inside which ready-mixed concrete 13 has been poured. As shown by the dashed straight lines in Figure 2, scaffolding 17 is assembled and fixed vertically and horizontally on formwork 12 when viewed from above. Scaffolding 17 is set up in a lattice pattern with a certain pitch. Furthermore, fall prevention devices 15 are installed on the outside of formwork 12 or on scaffolding 17.
[0041] The fall prevention device 15 located near the formwork 12 is installed so that the support section 21 stands outside the formwork 12 as shown in FIG. 1. The connecting section 22 and the support section 23 are installed on the support section 21. The fall prevention device 15 located near the center of the formwork 12 omits the support section 21, and the connecting section 22 and the support section 23 are installed on the lattice point 17C formed by the scaffolding 17. As shown in FIG. 2, each of the support sections 23 of the fall prevention device 15 is placed in the vicinity of the lattice point 17C indicated by an x mark in the figure (at a position 5 to 25 cm from the lattice point). This completes the advance preparation of the evaluation device 11 for the degree of fluidization of fresh concrete.
[0042] The method for evaluating the fluidity degree of ready-mixed concrete using the ready-mixed concrete fluidity degree evaluation device 11 includes a first step, a second step, and a third step.
[0043] In the first step, a worker installs the anti-toppling device 15 by passing the rod member 14 through the inside of the support portion 23. At that time, the lower end of the rod member 14 is inserted about 1 to 5 cm into the surface of the fresh concrete 13. In this manner, the rod member 14 is made to stand upright on the surface of the fresh concrete 13. As shown in FIG. 2, by passing the rod member 14 through all the anti-toppling devices 15, the rod members 14 are installed in the vicinity of all the lattice points 17C of the scaffolding 17.
[0044] In the second step, the worker inserts the vibrator 16 into the ready-mixed concrete 13 corresponding to the position of the lattice point 17C indicated by an x in the figure, and vibrates the ready-mixed concrete 13 at that position (see Figs. 4 and 5). It is up to the worker to decide the order in which the ready-mixed concrete 13 corresponding to the lattice point 17C is inserted into.
[0045] The vibration by the vibrator 16 is continued until the lower end 14A of the bar member 14 abuts against the bottom 18 in the formwork 12. In the case where the bar member 14 is made of a deformed steel bar with a diameter of 10 mm, and the vibrating vibrator 16 with a diameter of 50 mm is inserted into the fresh concrete 13 at a position 10 cm from the bar member 14, the lower end of the bar member 14 can be brought into contact with the bottom 18 in the formwork 12 by vibration for about 20 to 30 seconds. The worker inserts the vibrating vibrator 16 into the fresh concrete 13 in order at the positions of the lattice points 17C shown by the cross marks in FIG. 2, and fluidizes the fresh concrete 13 so that all the bar members 14 abut against the bottom 18 in the formwork 12 without any omissions. At this time, the range (circle) with a diameter of 50 cm is shown by the dashed circle 25 in FIG. 2 as the range in which the fresh concrete 13 can be roughly fluidized when the diameter of the vibrator 16 is 5 cm.
[0046] In the third step, the worker removes the rod 14 with its lower end 14A in contact with the bottom 18 from the ready-mix concrete 13. After removing the rod 14, the worker removes the vibrating vibrator 16 from the ready-mix concrete 13. The vibrator 16 is removed no later than 5 minutes, and most preferably 0.1 seconds, after the rod 14 is removed. This allows the hollow portion left after the rod 14 is removed to be filled with the surrounding ready-mix concrete 13. This prevents the portion from becoming a cavity and becoming a defect.
[0047] Through the above steps, the ready-mixed concrete 13 in the formwork 12 is largely fluidized, and compaction of the ready-mixed concrete 13 in the formwork 12 is completed.
[0048] According to this embodiment, the following can be said. The fresh concrete fluidity degree evaluation device 11 can evaluate the fluidity degree of fresh concrete 13 poured in a formwork 12, and includes one or more rod members 14 that stand with their lower ends inserted into the surface layer of the fresh concrete 13, one or more anti-toppling devices 15 that are provided around the one or more rod members 14 and support the one or more rod members 14 so that they can move up and down, and a vibrator 16 that is inserted into the fresh concrete 13 near the rod members 14 and vibrates, and fluidizes the surrounding fresh concrete 13 until the lower ends 14A of the rod members 14 abut against the bottom 18 inside the formwork 12 under the action of gravity.
[0049] According to this configuration, the vibrator 16 fluidizes the ready-mixed concrete, and the bar 14 comes into contact with the bottom 18 inside the formwork 12 and stops, allowing the worker to intuitively understand that fluidization and compaction of the ready-mixed concrete 13 have been completed. This allows young workers and foreign personnel to intuitively understand how to compact the ready-mixed concrete 13. This allows for efficient human resource development of young workers and foreign personnel. In addition, the bar 14 can be prevented from becoming impossible to recover because the vicinity of the upper end 14B is exposed from the ready-mixed concrete.
[0050] The bar member 14 has a scale indicating the distance from the lower end 14A. With this configuration, the worker can visually and intuitively grasp the degree of fluidization and compaction of the ready-mix concrete 13 based on the sinking amount (length of descent) of the bar member 14. This allows young workers and foreign workers to intuitively grasp how to compact the ready-mix concrete 13.
[0051] The vibrator 16 is inserted at a position separated from the rod member 14 by a length that is 100 to 500% of the diameter of the vibrator 16. With this configuration, the lower end 14A of the rod member 14 can be brought into contact with the bottom 18 of the formwork 12 within 5 to 30 seconds, which is a typical vibration time for the vibrator 16. This makes it possible to complete the fluidization and compaction of the ready-mix concrete 13 within a realistic time frame, and makes it possible to develop human resources while maintaining efficient work on site.
[0052] The one or more rod members 14 are multiple, and the multiple rod members 14 are arranged on multiple virtual lattice points 17C within the formwork 12, and the anti-tip devices 15 are multiple, and each of the multiple anti-tip devices 15 is arranged on a multiple virtual lattice point 17C and supports each of the multiple rod members 14.
[0053] According to this configuration, all of the ready-mixed concrete 13 in the formwork 12 can be uniformly fluidized and compacted reliably. This allows even young workers or foreign workers to easily and reliably complete the fluidization and compaction of the ready-mixed concrete 13.
[0054] The method for evaluating the degree of fluidity of fresh concrete can evaluate the degree of fluidity of fresh concrete poured into a formwork 12 using an evaluation device 11 for evaluating the degree of fluidity of fresh concrete, which is equipped with one or more rod members 14, one or more anti-tip devices 15 capable of supporting the one or more rod members 14, and a vibrator 16, and includes a first step of passing the one or more rod members 14 inside the one or more anti-tip devices 15 and inserting the lower ends of the one or more rod members 14 into the surface of the fresh concrete 13 to stand the one or more rod members 14 upright, and a second step of inserting a vibrating vibrator 16 near the one or more rod members 14 in the fresh concrete 13 and fluidizing the surrounding fresh concrete 13 until the lower ends 14A of the one or more rod members 14 abut against the bottom 18 in the formwork 12 under the action of gravity.
[0055] According to this configuration, when the vibrator 16 fluidizes the ready-mixed concrete 13, the bar 14 comes into contact with the bottom 18 inside the formwork 12 and stops. This allows the worker to intuitively know that the fluidization and compaction of the ready-mixed concrete 13 has been completed. This also allows young workers and foreign personnel to intuitively understand the technique. This allows for efficient human resource development of young workers and foreign personnel. Also, since the upper end 14B of the bar 14 is exposed from the ready-mixed concrete, it is possible to prevent the problem of it becoming impossible to recover.
[0056] The method for evaluating the degree of fluidity of fresh concrete includes a third step of removing one or more rod members 14 before removing the vibrator 16. According to this configuration, the area where the rod member 14 has been removed can be filled with the surrounding fresh concrete, and it is possible to prevent the area where the rod member 14 has been removed from becoming a cavity (defect).
[0057] In the method for evaluating the degree of fluidity of fresh concrete, in the third step, the vibrator 16 is removed 0.1 seconds to 5 minutes after one or more rod members 14 are removed. This configuration can further reduce the possibility of a defect in which the area from which the rod member 14 was removed becomes a cavity (defect).
[0058] In the following embodiment, differences from the first embodiment will be mainly described, and illustrations or descriptions of parts common to the first embodiment will be omitted. [Second embodiment]
[0059] With reference to FIG. 3, a ready-mixed concrete fluidity degree evaluation device 11 according to a second embodiment and a ready-mixed concrete fluidity degree evaluation method using the same will be described. In this embodiment, one or more fall prevention devices 15 are additionally provided not only near the lattice points 17C (virtual lattice points) of the scaffolding 17 as in the first embodiment, but also at the center positions 31 of the squares formed by four adjacent lattice points 17C. Therefore, in this embodiment, each support part 23 of the fall prevention device 15 is additionally disposed at the center positions 31 of the squares formed by four adjacent lattice points 17C (virtual lattice points).
[0060] This additional fall prevention device 32 does not include the support pole 21. The additional fall prevention device 15 includes a support part 23 and a connecting part 22. One end of the connecting part 22 is fixed to the scaffolding 17, and the other end of the connecting part 22 is fixed to the support part 23. The support part 23 and the connecting part 22 of the additional fall prevention device 15 may be integrally formed by a wire. Alternatively, the support part 23 may be formed of a cylindrical member, and the cylindrical member of the support part 23 and the scaffolding 17 may be fixed by the connecting part 22 formed of a wire.
[0061] A method for evaluating the fluidity degree of ready-mixed concrete using the evaluation device 11 for evaluating the fluidity degree of ready-mixed concrete of this embodiment will be described.
[0062] First, as shown in Fig. 3, workers set up scaffolding 17 on formwork 12 into which ready-mix concrete 13 has been poured. As shown by the dashed straight lines in Fig. 3, scaffolding 17 is assembled and fixed vertically and horizontally on formwork 12 when viewed from above. Scaffolding 17 is set up in a lattice pattern at a fixed pitch. Fall prevention devices 15 are set up on the outside of formwork 12 and on scaffolding 17. Furthermore, additional fall prevention devices 15 are attached to scaffolding 17.
[0063] The tip-prevention device 15 located near the formwork 12 is installed so that the support section 21 stands outside the formwork 12. The connecting section 22 and the support section 23 are installed on the support section 21. The tip-prevention device 15 located near the center of the formwork 12 omits the support section 21, and the connecting section 22 and the support section 23 are installed on the lattice point 17C formed by the scaffolding 17. Each of the support sections 23 of the tip-prevention device 15 is placed in the vicinity of the lattice point 17C (5 to 25 cm from the lattice point). Each of the support sections 23 of the additional tip-prevention device 15 is placed at the center position 31 of the square formed by four adjacent lattice points 17C (virtual lattice points). This completes the advance preparation of the evaluation device for the degree of fluidization of the ready-mixed concrete 13.
[0064] The method for evaluating the fluidity degree of fresh concrete using the evaluation device 11 for evaluating the fluidity degree of fresh concrete includes a first step, a second step, and a third step.
[0065] In the first step, the worker installs the rod members 14 by passing them through the inside of the support parts of the fall prevention devices 15 and the additional fall prevention devices 15. At this time, the lower ends of the rod members 14 are inserted about 1 to 5 cm into the surface of the fresh concrete 13. In this manner, the rod members 14 are erected against the surface of the fresh concrete 13. As shown in FIG. 3, by installing the rod members 14 for all the fall prevention devices 15 and all the additional fall prevention devices 15, the rod members 14 are installed near all the lattice points 17C of the lattice formed by the scaffolding 17, and at the center position 31 of the square formed by four adjacent lattice points 17C (virtual lattice points).
[0066] In the second step, the worker inserts vibrator 16 into ready-mixed concrete 13 corresponding to the position of lattice point 17C and into ready-mixed concrete 13 corresponding to position 31 at the center of a square formed by four adjacent lattice points 17C (virtual lattice points), and vibrates ready-mixed concrete 13 at that position. The order in which the worker inserts vibrator 16 into ready-mixed concrete 13 is arbitrary.
[0067] Vibration by the vibrator 16 is continued until the lower end of the bar 14 abuts against the bottom 18 in the formwork 12. In the case where the bar 14 is made of a deformed steel bar with a diameter of 10 mm, and the vibrating vibrator 16 is inserted into the fresh concrete 13 at a position 10 cm from the bar 14, the lower end 14A of the bar 14 can be brought into contact with the bottom 18 in the formwork 12 with vibration for about 20 to 40 seconds. The worker inserts the vibrating vibrator 16 into the fresh concrete 13 in order at the position of the lattice point 17C indicated by an x mark in FIG. 3 and at the center position 31 of the square formed by the four lattice points 17C (virtual lattice points) (strictly speaking, in the vicinity of the bar 14 at the position 31), thereby fluidizing the fresh concrete 13 so that all the bar members 14 abut against the bottom 18 in the formwork 12 without any omissions. In this case, as shown by the dashed circle in FIG. 3, when the diameter of the vibrator 16 is 5 cm, the range in which the ready-mixed concrete 13 can be fluidized is generally within a diameter of 50 cm.
[0068] In the third step, the worker removes the rod 14 with its lower end 14A in contact with the bottom 18 from the ready-mix concrete 13. After removing the rod 14, the worker removes the vibrating vibrator 16 from the ready-mix concrete 13. The vibrator 16 is removed no later than 5 minutes, and most preferably 0.1 seconds, after the rod 14 is removed. This allows the hollow portion left after the rod 14 is removed to be filled with the surrounding ready-mix concrete 13. This prevents the portion from becoming a cavity and becoming a defect.
[0069] Through the above steps, the ready-mixed concrete 13 in the formwork 12 is largely fluidized, and compaction of the ready-mixed concrete 13 in the formwork 12 is completed.
[0070] According to this embodiment, the following can be said. A plurality of rod members 14 are also provided at center positions 31 of a square formed by adjacent virtual lattice points among the plurality of virtual lattice points, a plurality of anti-toppling devices are also provided at the center positions 31 and support the plurality of rod members 14 provided at the center positions 31, and a vibrator 16 is inserted into the ready-mixed concrete 13 at a position corresponding to the vicinity of the center position 31. This configuration makes it possible to prevent a situation in which the ready-mixed concrete 13 is not sufficiently fluidized and compacted at the center positions 31 of the square. This makes it possible to further ensure the fluidization and compaction of the ready-mixed concrete 13. EXAMPLES
[0071] Prior to completing the present invention, the inventors conducted an experiment regarding the distance of the rod member 14 from the vibrator 16 (Example 1) and an experiment regarding the material of the rod member 14 (Example 2). [Example 1]
[0072] The evaluation method of Example 1 is shown in Figures 4 and 5. As shown in Figure 4, the rod member 14 was arranged to stand at positions 10 cm, 30 cm, 50 cm, and 90 cm from the position (vibration position) of a vibrator 16 with a diameter of 50 mm, and the effect of the distance from the vibrator 16 was examined. A deformed steel bar with a diameter of 10 mm and a length of 700 mm was used as the rod member 14.
[0073] The mix conditions of the ready mixed concrete 13 used this time were the same as those in the above embodiment. The nominal strength of the ready mixed concrete 13 was 18 N / mm 2 The slump was 5 cm. The maximum size of the coarse aggregate was 20 mm. The type of cement used was ordinary cement. The depth (height) of the ready mixed concrete 13 was 60 cm.
[0074] In this state, as shown in Figure 5, a vibrating vibrator 16 was inserted into the fresh concrete 13. Figure 6 shows the results of the amount of sinking of the rod 14 over time. When the rod 14 was placed 10 cm from the position (vibration position) of the vibrator 16, the rod 14 sank with good sensitivity, and the lower end of the rod 14 sank to the bottom 18 inside the formwork 12 in 20 to 30 seconds. On the other hand, when the rod 14 was placed 30 cm, 50 cm, or 90 cm from the position (vibration position) of the vibrator 16, it was found that the vibration did not affect the fluidization of the fresh concrete 13, and almost no sinking of the rod 14 was observed. [Example 2]
[0075] Next, it was examined whether the sinking amount of the rod member 14 would change when the material of the rod member 14 was changed. The distance from the vibrator 16 to the rod member 14 was 10 cm. Three types of rod member 14 were prepared: a deformed steel bar, an aluminum alloy (aluminum) round bar, and a polyvinyl chloride resin (PVC) round bar. The rod member 14 had a diameter of 10 mm and a length of 700 mm. The mix condition and depth (height) of the ready-mix concrete 13 were the same as in Example 1. The results are shown in FIG. 7.
[0076] When deformed steel bars were used as the bar members 14, the bar members 14 sunk sensitively in 20 to 30 seconds, with the lower ends 14A of the bar members 14 sinking to the bottom 18 within the formwork 12. On the other hand, with the bar members 14 made of an aluminum alloy, which has a smaller specific gravity than the deformed steel bars, the amount of sinking relative to the vibration time was more gradual, and with the bar members 14 made of polyvinyl chloride resin, which has an even smaller specific gravity, the amount of sinking relative to the vibration time was even smaller. [Consideration]
[0077] From the results of the above-mentioned Examples 1 and 2, the inventors selected a deformed steel bar as the bar member 14 capable of detecting the degree of fluidization of the fresh concrete with the highest sensitivity. In addition, it was confirmed that the position of the bar member 14 relative to the vibrator 16 is preferably 10 cm from the vibrator 16, where the most sensitive settlement occurs. Furthermore, it was confirmed that by selecting a deformed steel bar as the bar member 14 and arranging the bar member 14 at a position 10 cm from the vibrator 16, the lower end 14A of the bar member 14 can be sensitively sunk to the bottom 18 in the formwork 12 in 20 to 30 seconds. This vibration time of 20 to 30 seconds is necessary and sufficient time to fluidize the fresh concrete 13, and it also matches the actual situation at the work site. [Explanation of symbols]
[0078] 11 Evaluation equipment 12 Formwork 13 Ready-mix concrete 14 Bar member 14A bottom end 15 Fall prevention equipment 16. Vibrator 17C grid point 18 Bottom 24 scales 31 position 32 Additional fall prevention equipment
Claims
1. A ready-mixed concrete fluidity evaluation device capable of evaluating the fluidity of ready-mixed concrete poured into a formwork, One or more rod members having their lower ends inserted into and standing on the surface layer of the fresh concrete; One or more anti-tip devices are provided around the one or more rod members and support the one or more rod members so that the one or more rod members can move up and down; a vibrator that is inserted into the fresh concrete near the rod member and vibrates, and fluidizes the fresh concrete around the rod member until the lower end of the rod member abuts against the bottom of the formwork under the effect of gravity; An apparatus for evaluating the degree of fluidity of fresh concrete.
2. The device for evaluating the degree of fluidity of ready-mixed concrete according to claim 1 , wherein the rod member has a scale indicating the distance from the lower end.
3. 2. The device for evaluating the degree of fluidity of ready-mixed concrete according to claim 1, wherein the vibrator is inserted at a position spaced from the rod member by a length that is 100 to 500% of the diameter of the vibrator.
4. the one or more rod members are a plurality of rod members, the plurality of rod members being provided in the vicinity of a plurality of virtual lattice points within the formwork; a plurality of the fall prevention devices are provided, each of the plurality of fall prevention devices being provided in the vicinity of the plurality of virtual lattice points and supporting each of the plurality of rod members; The device for evaluating the degree of fluidity of ready-mixed concrete according to claim 1 , wherein the vibrator is inserted into the ready-mixed concrete at a position corresponding to the virtual lattice point.
5. the plurality of bar members are also provided at center positions of squares formed by adjacent virtual lattice points among the plurality of virtual lattice points, The plurality of fall prevention devices are also provided at the center position and support the plurality of rod members provided at the center position, The device for evaluating the degree of fluidity of ready-mixed concrete according to claim 4 , wherein the vibrator is inserted into the ready-mixed concrete at a position corresponding to the vicinity of the center position.
6. A method for evaluating the fluidity of fresh concrete, which can evaluate the fluidity of fresh concrete poured into a formwork using an evaluation device for evaluating the fluidity of fresh concrete, the evaluation device comprising one or more rod members, one or more fall prevention devices capable of supporting the one or more rod members, and a vibrator, A first step of inserting the lower ends of the one or more rod members into the surface layer of the fresh concrete while passing the one or more rod members through the inside of the one or more fall prevention devices to stand the one or more rod members; A second step of inserting the vibrator into the fresh concrete near the one or more rod members and fluidizing the fresh concrete around the vibrator until the lower ends of the one or more rod members abut against the bottom of the formwork by the action of gravity; A method for evaluating the degree of fluidity of ready-mixed concrete.
7. The method for evaluating the degree of fluidity of fresh concrete according to claim 6, further comprising a third step of removing the one or more rod members before removing the vibrator.
8. The method for evaluating the degree of fluidity of fresh concrete according to claim 7, wherein in the third step, the vibrator is removed 0.1 seconds to 5 minutes after the one or more rod members are removed.
9. The method for evaluating the degree of fluidity of fresh concrete according to claim 6, wherein the vibrator is inserted at a position spaced apart from the rod member by a length of 100 to 500% of a diameter of the vibrator.
10. the one or more rod members are a plurality of rod members, the plurality of rod members being provided in the vicinity of a plurality of virtual lattice points within the formwork; the one or more fall prevention devices are a plurality of devices, each of the plurality of fall prevention devices being provided in the vicinity of the plurality of virtual lattice points and supporting each of the plurality of rod members; 7. The method for evaluating the degree of fluidity of fresh concrete according to claim 6, wherein in the second step, the vibrator is inserted into the fresh concrete in sequence at positions corresponding to the virtual lattice points, and the plurality of rod members are brought into contact with the bottom of the formwork.
11. the plurality of bar members are also provided at center positions of squares formed by adjacent virtual lattice points among the plurality of virtual lattice points, The plurality of fall prevention devices are also provided at the center position and support the plurality of rod members provided at the center position, The method for evaluating the degree of fluidity of fresh concrete according to claim 10, wherein in the second step, the vibrator is inserted in sequence near the center position to bring the plurality of rod members into contact with the bottom of the formwork.
Citation Information
Patent Citations
Vibrator for solidifying raw concrete
JP1985105765A
Rodding rod
JP2012154080A
Determining method of concrete compaction completion
JP2019183392A
Concrete compaction evaluation device and concrete compaction evaluation method
JP2021080771A
Concrete compaction measuring tool and concrete compaction measuring method
JP2021085238A