Power reset unit and road equipment management system equipped with the power reset unit

The power reset unit facilitates remote control of circuit breakers to address CPU freezes or thermal runaway in road equipment, ensuring quick and efficient power resets by integrating the unit with a reset control device for easy installation and retrofitting.

JP2024135925AActive Publication Date: 2024-10-04SEIWA ELECTRIC MFG CO LTD +1

Patent Information

Application Number
JP2023046835
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-23
Publication Date
2024-10-04
Estimated Expiration
2043-03-23

AI Technical Summary

Technical Problem

Conventional power resets for road equipment require manual intervention due to CPU freezes or thermal runaway, which is labor-intensive and time-consuming, especially in high-temperature environments.

Method used

A power reset unit connected to a circuit breaker via an IP network, allowing remote control to switch the circuit breaker ON/OFF, integrated with a reset control device that operates independently in high-temperature environments to reset power supply remotely.

Benefits of technology

Enables quick and labor-saving power resets without manual intervention, improving workability, safety, and economic efficiency by integrating the reset unit into a single package for easy installation and retrofitting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024135925000001_ABST
    Figure 2024135925000001_ABST
Patent Text Reader

Abstract

To provide a power reset unit and a road equipment management system equipped with the power reset unit that can reset a power supply in the event of a freeze or thermal runaway of a CPU provided in a control unit, etc., at an early stage while reducing labor.SOLUTION: If a CPU 21 of a control unit 2A freezes or thermally runs out of control in a high-temperature environment, remote control from a management unit 4 activates a CPU 27 of a power reset unit 2B, which is in a stopped or standby state when the CPU 21 is operating normally, to a switch circuit breaker 25 off and on for power resetting. This eliminates the need for an operator to go to an installation site of road equipment to perform the resetting operation, and can quickly perform power supply resetting in the event of the freezing or thermal runaway of the CPU 21 with reduced labor.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a power reset unit and a road facility management system including the power reset unit. In particular, the present invention relates to an improvement for resetting the power supply of road facilities. [Background technology]

[0002] As disclosed in Patent Documents 1 and 2, road facilities installed on expressways and the like include various facilities such as electronic notice boards that provide drivers with road information and surveillance camera facilities that capture road conditions, etc. These road facilities are generally installed outdoors, and therefore are exposed to high temperature environments, including the effects of solar radiant heat, particularly in the summer.

[0003] In recent years, with the advancement of information and communication technology, the control unit of each road facility is equipped with a CPU (Central Processing Unit) such as a microprocessor. In addition, this control unit is generally housed in a metal case. For this reason, in a situation where the road facility is exposed to a high-temperature environment as described above, the surface temperature of the CPU may reach about 70°C (in this case, the internal temperature is about 90°C), which may cause the CPU to freeze or run away from heat.

[0004] When such a CPU freeze or thermal runaway occurs, the road equipment will not be able to operate normally at all, and it will fall into a state where it cannot be controlled from the outside using existing communication means, making it impossible to reset it remotely. For this reason, up until now, workers have gone to the site and manually reset the CPU-related power supply (so-called power reset). Generally, since a relatively large current of 1A or more flows through the power supply circuits used in road equipment, molded-case circuit breakers (MCCB, ELCB, etc.) and electromagnetic contactors (MG) are used as circuit breakers, and the power reset requires a manual reset operation in which the circuit breaker is first turned OFF and then turned ON. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2016-126538 A [Patent Document 2] JP 2019-144980 A Summary of the Invention [Problem to be solved by the invention]

[0006] However, conventional power resets required a worker to go to the site to perform the reset work, which not only took a long time to restore (restore) the operation of road equipment, but also required a great deal of labor from the worker.

[0007] The present invention has been made in consideration of the above points, and its object is to provide a power reset unit that can perform a power reset early when the CPU in the control unit freezes or experiences thermal runaway, while reducing the amount of labor required, and a road facility management system equipped with the power reset unit. [Means for solving the problem]

[0008] The solution of the present invention for achieving the above object is a power reset unit for restoring the operation of road equipment when a control device that controls equipment installed in the road equipment becomes unable to operate normally in a high temperature environment. The power reset unit is characterized by comprising a circuit breaker device installed in a power line of the road equipment, a switching operation means that can switch the circuit breaker device ON and OFF, and a reset control device that is connected to a management device by an IP network, is in a stopped state or a standby state during normal operation of the control device, and is activated upon receiving a reset command signal transmitted from the management device via the IP network when the control device becomes unable to operate normally, outputs a switching operation command signal to the switching operation means, and causes the switching operation of the switching operation means to perform switching operation.

[0009] The control device (e.g., a CPU for controlling the device) generates heat because it continuously controls the device installed in the road facility, and may become unable to operate normally, such as freezing or thermal runaway, especially in a high-temperature environment. On the other hand, the reset control device (e.g., a dedicated CPU for resetting the power supply) is in a stopped state or standby state during normal operation of the control device, so it hardly generates heat until the control device becomes unable to operate normally, and is able to operate normally even in a high-temperature environment. For this reason, when the control device becomes unable to operate normally, a reset command signal is sent manually or automatically from the management device to the reset control device via an IP network, and the reset control device that receives the reset command signal operates normally and outputs a switching operation command signal to the switching operation means. Then, the switching operation of the switching operation means is performed according to this switching operation command signal, and the circuit breaker device is switched OFF / ON to reset the power supply of the road facility. In other words, the circuit breaker device is switched OFF / ON by remote control from the management device to reset the power supply of the road facility. This eliminates the need for workers to travel to the installation site of the road equipment to perform the reset work, making it possible to perform a power reset early when the control device becomes unable to operate normally while reducing the amount of labor required.

[0010] Moreover, the circuit breaker device, the switching operation means, and the reset control device are accommodated within a single housing.

[0011] By making the power reset unit into a so-called one-package in this way, it becomes easier to install it on road facilities, especially to retrofit it to existing road facilities. It also makes it easier to install, safer, easier to maintain, and more economical.

[0012] In addition, the reset control device is equipped with an image information generation unit that, when it receives a designation signal from the management device specifying the IP address to which the reset control device belongs, generates image information for displaying, on the display screen of the management device, a status information image of the circuit breaker device using a Web browser and an operation image that can instruct the transmission of the reset command signal.

[0013] With this, an administrator can view images displayed using a web browser on the display screen of the management device, allowing the administrator to check the status of the circuit breaker device and perform operations to instruct the sending of a reset command signal, thereby increasing convenience when manually sending a reset command signal from the management device to the reset control device and also preventing erroneous operations.

[0014] As a more preferable configuration, when the device generates heat during operation, the reset control device may be installed at a position farther from the device than the control device is installed, although this configuration is not essential to the present invention.

[0015] When this configuration is adopted, the reset control device is installed in a position that is less susceptible to the effects of heat from the device compared to the control device. Therefore, the reset control device hardly experiences a temperature rise to the point where the control device becomes unable to operate normally, and the reliability of the operation (output operation of the switching operation command signal to the switching operation means) when the control device becomes unable to operate normally can be sufficiently ensured.

[0016] As a more preferable configuration, the reset control device may have a higher heat dissipation property than the control device, although this configuration is not essential to the present invention.

[0017] When this configuration is adopted, stable operation of the reset control device can be expected even in a high temperature environment where the control device is unable to operate normally due to freezing, thermal runaway, etc. Therefore, it is possible to fully ensure the reliability of being able to reset the power supply to the road facility when the control device is unable to operate normally.

[0018] Furthermore, the OFF / ON switching operation of the circuit breaker device by the switching operation means is such that, after the OFF operation of the circuit breaker device, an ON operation of the circuit breaker device is performed with a predetermined delay time.

[0019] When resetting the power supply for road equipment, the timing for turning the circuit breaker device OFF and then ON must be set so as to discharge the charge stored in the built-in capacitor of the constant voltage power supply for DC output built into the device and eliminate the output of the constant voltage power supply. For this reason, in this solution, a delay time is provided between turning the circuit breaker device OFF and ON until the discharge is complete.

[0020] The technical idea of ​​the present invention also includes a road facility management system including the power reset unit. Specifically, the present invention is directed to a road facility management system configured by connecting a management device and devices provided in each of a plurality of road facilities, a control device for controlling the devices, and a management device via an IP network. The road facility management system is provided with a power reset unit for restoring the operation of the road facility when the control device becomes unable to operate normally in a high temperature environment. The power reset unit is characterized by including a circuit breaker provided in the power line of the road facility, a switching operation means for switching the circuit breaker device ON / OFF, and a reset control device connected to the management device via the IP network, which is in a stopped state or a standby state during normal operation of the control device, and which operates upon receiving a reset command signal transmitted from the management device via the IP network when the control device becomes unable to operate normally, and outputs a switching operation command signal to the switching operation means to cause the switching operation means to perform a switching operation.

[0021] This makes it possible to build a road facility management system that eliminates the need for workers to go to the installation site of the road facility to perform resetting work.

[0022] In addition, a server capable of sending and receiving information between the control device and the IP network and capable of recognizing that the control device has become unable to operate normally may be connected to the IP network, and upon the condition that the server recognizes that the control device has become unable to operate normally, a reset command signal may be sent manually or automatically from the management device to the reset control device via the IP network.

[0023] This makes it possible to quickly transmit a reset command signal to the reset control device when the control device becomes unable to operate normally.

[0024] Furthermore, when the circuit breaker device is tripped, the reset control device may transmit information about the trip to the management device.

[0025] This allows the management device to quickly recognize that the circuit breaker has tripped, allowing subsequent measures (measures to turn the circuit breaker ON) to be implemented quickly, and enabling the operation of the road equipment to be restored quickly. Effect of the Invention

[0026] In the present invention, when the control device becomes unable to operate normally in a high temperature environment, the management device remotely operates the reset control device, which is in a stopped or standby state when the control device is operating normally, to switch the circuit breaker device OFF / ON and reset the power supply to the road equipment. This eliminates the need for workers to go to the installation site of the road equipment to perform the reset work. As a result, it becomes possible to reset the power supply when the control device becomes unable to operate normally, while reducing the labor required. [Brief description of the drawings]

[0027] [Figure 1] 1 is a block diagram showing an outline of a road facility management system according to an embodiment; [Diagram 2] FIG. 2 is a functional block diagram of a CPU provided in each of the control unit and the power reset unit. [Diagram 3] FIG. 13 is a diagram showing an example of a Web browser image on a display screen of a management device installed in an office. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0028] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In this embodiment, the power reset unit according to the present invention is provided in an electronic signage facility on a highway. The road facilities to which the power reset unit according to the present invention can be applied are not limited to electronic signage facilities, but include various facilities such as surveillance camera facilities and weather observation facilities.

[0029] -Outline of the road facility management system- FIG. 1 is a block diagram showing an outline of a road facility management system 1 according to the present embodiment. As shown in FIG. 1, the road facility management system 1 according to the present embodiment is configured such that a plurality of electronic notice equipment 2, 2, ..., a server 3 installed in a control room, and a management device 4 installed in an office are connected to each other via an IP network N so that signals can be transmitted and received between them. The server 3 and the management device 4 are configured as general personal computers equipped with a communication unit, a CPU, a memory, an input / output interface, and the like. The server 3 and the management device 4 may be other types of terminal devices such as tablets, smartphones, and dedicated devices. Note that FIG. 1 shows the internal configuration of only one electronic notice equipment 2 among the plurality of electronic notice equipment 2, 2, ..., but the other electronic notice equipment 2, 2, ... have the same configuration. The connection form between the plurality of electronic notice equipment 2, 2, ..., the server 3, and the management device 4 and the IP network N may be a wired connection or a wireless connection.

[0030] (Electronic display equipment) As described above, each of the electronic sign equipment 2, 2, . . . has the same configuration, so here, one electronic sign equipment 2 will be described as a representative.

[0031] The electronic display equipment 2 is intended to provide road information to drivers of vehicles traveling on expressways through electronic displays using LEDs, etc., and is configured to include a control unit 2A, a power reset unit 2B, and a layer 2 switch (L2SW) 2C.

[0032] <Control unit> The control unit 2A includes a CPU (control device) 21, an LED display unit (device controlled by the CPU 21) 22, a group of sensors 23, and the like.

[0033] Fig. 2 is a functional block diagram of the CPUs 21, 27 provided in the control unit 2A and the power reset unit 2B, respectively. As shown in Fig. 2, the CPU 21 of the control unit 2A includes a communication unit 21a, an LED control unit 21b, and a response information generation unit 21c as functional units realized by a computer program.

[0034] The communication unit 21a transmits and receives signals to and from the server 3 in the control room via the L2SW 2C and the IP network N. Examples of signals transmitted from the server 3 to the control unit 2A include an electric sign control signal and a monitoring information request signal. On the other hand, examples of signals transmitted from the control unit 2A to the server 3 include a response signal in response to the monitoring information request signal. Specifically, a monitoring information request signal is transmitted from the server 3 to the control unit 2A at predetermined intervals or at a timing when a predetermined time is reached, and the control unit 2A receives this monitoring information request signal by the communication unit 21a. Then, when the CPU 21 is operating normally, normal response information is generated by the response information generating unit 21c, and the normal response information is returned to the server 3 as a response signal by the communication unit 21a. On the other hand, when the CPU 21 freezes, thermal runaway, or the like occurs and the control unit 2A is not operating normally (when the control unit 2A is in a state where it cannot operate normally), the response signal in response to the monitoring information request signal cannot be returned to the server 3, and the server 3 is in a state where it does not receive the response signal in response to the monitoring information request signal. This allows the control room to recognize that the CPU 21 has frozen or overheated.

[0035] The LED control unit 21b transmits information to be displayed on the LED display unit 22 to the LED display unit 22. This information is road information provided to drivers of vehicles traveling on a highway. For example, when each electronic sign equipment 2, 2, ... is provided with a sensor group 23, information acquired by each sensor group 23 (such as traffic jam information and traffic accident information) is collected in the server 3, and the server 3 transmits an electronic sign control signal including information suitable for display on the LED display unit 22 of each electronic sign equipment 2, 2, ... to the control unit 2A of the electronic sign equipment 2, and the information is displayed on the LED display unit 22. The LED display unit 22 is provided with a lighting circuit and an LED module (not shown), and is configured by connecting multiple sets of lighting circuits and LED modules to each other. Each LED module includes an LED array in which multiple LED elements are arranged, and the multiple LED modules form a display screen. Each lighting circuit is a power supply for LEDs, and converts an input voltage such as a commercial power supply into a direct current (a current whose waveform, current value, etc. are controlled) under the control of the LED control unit 21b, and supplies the direct current to the LED module.

[0036] The sensor group 23 is not particularly limited, but may be, for example, a sensor that detects the speed of each vehicle traveling on the expressway, a Doppler type sensor that detects the occurrence of congestion on the expressway, etc. These sensors do not necessarily need to be provided in the electronic notice equipment 2.

[0037] <Power Reset Unit> The power supply reset unit 2B includes a circuit breaker 25, a switching operation means 26, a CPU (reset control device) 27, etc. The circuit breaker 25, the switching operation means 26, and the CPU 27 are housed in a single housing to form a so-called one-package. A metal or resin housing is used as the housing. The power supply reset unit 2B and the control unit 2A may also be housed in a single housing to form a one-package configuration.

[0038] The circuit breaker 25 is provided on the power line L of the electronic sign equipment 2, and turns off / on an electric circuit including this power line L. This circuit breaker 25 turns off (trips) the electric circuit when a current exceeding the rated current flows due to an overload of the equipment of the electronic sign equipment 2, or when a short circuit occurs in the electric circuit. In this embodiment, an MCCB, which is a molded case circuit breaker, is used as the circuit breaker 25. However, without being limited thereto, an ELCB, which is a molded case circuit breaker, or an MG, which is an electromagnetic contactor, may also be used.

[0039] The switching operation means 26 is an operation unit for switching the circuit breaker 25 between OFF and ON. Specifically, the circuit breaker 25 is provided with a switching lever (not shown) for switching between OFF and ON. For example, when the switching lever is pressed down, the circuit breaker 25 is turned OFF (a state in which the electric circuit is opened), and when the switching lever is pressed up, the circuit breaker 25 is turned ON (a state in which the electric circuit is closed). The switching operation means 26 is a mechanical means for performing the operation of pressing down and pressing up the switching lever, and is configured to include an operation unit that applies a pressing force (a pressing force for pressing down and pressing up) to the switching lever, and an electric motor that generates a driving force for raising and lowering the operation unit, similar to a known auto-reset breaker. The electric motor operates according to a switching operation command signal output from the CPU 27. When the switching operation means 26 switches the circuit breaker 25 between OFF and ON according to the switching operation command signal, the circuit breaker 25 is turned OFF once, and then turned ON after a predetermined time has elapsed. For example, a delay process is provided in the operation control program of the electric motor of the switching operation means 26. When resetting the power supply of the electronic sign equipment 2, the timing for turning the circuit breaker device 25 OFF and then ON must be set so as to discharge the charge stored in a built-in capacitor or the like (not shown) of the constant voltage power supply for DC output built into the device and eliminate the output of the constant voltage power supply. For this reason, in this embodiment, a delay time is provided between turning the circuit breaker device 25 OFF and ON until this discharge is completed. This delay time is set in advance by experiments and simulations. For example, it is set to 5 seconds. This value is not limited to this.

[0040] In this embodiment, it is preferable that the CPU 27 is installed at a position farther from the LED display unit 22 than the CPU 21. As described above, the CPU 21 controls the display of the LED display unit 22 by the LED control unit 21b, so that the CPU 21 is installed at a position close to the LED display unit 22 to satisfy the requirement to shorten the length of the signal line connecting the CPU 21 and the LED display unit 22, whereas the CPU 27 does not have such a requirement and can be installed at a position farther from the LED display unit 22. The LED display unit 22 generates heat during operation, but when the configuration for setting the installation position of the CPU 27 is adopted as described above, the CPU 27 is installed at a position less susceptible to the heat from the LED display unit 22 than the CPU 21.

[0041] Also, it is preferable that the CPU 27 has a configuration having higher heat dissipation than the CPU 21. For example, a heat sink applied to the CPU 27 may have a higher heat dissipation capability than the heat sink applied to the CPU 21, or a CPU grease for the CPU 27 may have a higher thermal conductivity than the CPU grease for the CPU 21.

[0042] As shown in FIG. 2, the CPU 27 includes a communication unit 27a, a state detection unit 27b, and an image information generation unit 27c as functional units realized by a computer program.

[0043] The communication unit 27a transmits and receives signals to and from the management device 4 in the office via the L2SW 2C and the IP network N. Examples of signals transmitted from the management device 4 to the power reset unit 2B include a status information request signal and a reset command signal. On the other hand, examples of signals transmitted from the power reset unit 2B to the management device 4 include an image information signal in response to the status information request signal.

[0044] Specifically, when an administrator belonging to an office wants to monitor the state of the circuit breaker 25 of a specific electronic sign equipment 2, the administrator operates the management device 4 to transmit a state information request signal (designation signal in the present invention) specifying the IP address of the CPU 27 in the electronic sign equipment 2 to which the circuit breaker 25 belongs. In other words, the installation locations (address and latitude and longitude information) of each electronic sign equipment 2, 2, ... are registered in the management device 4 as individual information of each electronic sign equipment 2, 2, ..., and the administrator operates the management device 4 to transmit a state information request signal specifying the IP address of the electronic sign equipment 2 to be monitored. This state information request signal is transmitted to the CPU 27 of the IP address included in the signal. Then, in the CPU 27 that receives this state information request signal (received by the communication unit 27a), the state detection unit 27b detects the state of the circuit breaker 25 (information on whether the circuit breaker 25 is in an ON state or an OFF state, etc.), and the detected state information of the circuit breaker 25 is output to the image information generation unit 27c. The image information generating unit 27c processes the image information including the information on the state of the circuit breaker device 25 into information that can be displayed by a Web browser, and outputs this information to the communication unit 27a. The communication unit 27a then transmits this information to the management device 4, and the image including the information on the state of the circuit breaker device 25 is displayed by the Web browser on the display screen of the management device 4. The Web browser used here is one that is publicly available.

[0045] Fig. 3 is a diagram showing an example of a Web browser image on the display screen of the management device 4. As shown in Fig. 3, the Web browser image is divided into an installation location information area 41 of the target electronic sign equipment 2, a breaker monitoring information area 42, a breaker control operation area 43, a name setting area 44, and a network setting area 45.

[0046] The breaker monitoring information area 42 displays whether the current state of the circuit breaker device 25 is ON or OFF (display of a state information image of the circuit breaker as referred to in this invention), the number of times the circuit breaker device 25 has automatically recovered, and the state of the control unit (terminal) 2A.

[0047] The breaker control operation area 43 displays a selection screen (an operation image capable of instructing transmission of a reset command signal, as referred to in the present invention) for an operation requested of the power reset unit 2B. This selection screen has a selection section for requesting switching OFF / ON of the circuit breaker device 25 (power reset), a selection section for requesting forced power ON when the power is OFF, a selection section for requesting forced power OFF when the power is ON, and a selection section for selection when performing equipment maintenance. By operating the execute button after selecting any of the selection sections, the selected request information is transmitted to the power reset unit 2B. For example, when the selection section for requesting switching OFF / ON of the circuit breaker device is selected and the execute button is operated, a reset command signal is transmitted from the management device 4 to the power reset unit 2B at the IP address included in the signal via the IP network N. Then, the CPU 27 of the power reset unit 2B that receives this reset command signal outputs a switching operation command signal to the switching operation means 26.

[0048] Hereinafter, an operation will be described when the CPU 21 of one of the electronic notice facilities 2 freezes, experiences thermal runaway, or the like in the road facility management system 1 configured as described above.

[0049] When the CPU 21 freezes or experiences thermal runaway, as described above, the server 3 does not receive a response signal in response to the monitoring information request signal, and the control room can recognize that the CPU 21 of a specific IP address freezes or experiences thermal runaway. By informing the office manager of this, the manager operates the management device 4 to transmit a reset command signal to the power supply reset unit 2B provided in the same electronic sign equipment 2 as the CPU (CPU experiencing freeze or thermal runaway) 21. For example, in the Web browser image on the display screen of the management device 4 shown in FIG. 3, a selection section requesting switching of the circuit breaker device between ON and OFF is selected and an execute button is operated, whereby a reset command signal is transmitted from the management device 4 to the power supply reset unit 2B via the IP network N.

[0050] Since the CPU27 of the power reset unit 2B is stopped (or in a standby state) when the CPU21 is operating normally, the CPU21 hardly generates heat enough to become unable to operate normally, and is capable of operating normally even in a high-temperature environment. Therefore, upon receiving the reset command signal, the CPU27 outputs a switching operation command signal to the switching operation means 26. The switching operation means 26 performs switching operation according to the switching operation command signal, and turns the circuit breaker device 25 OFF / ON. That is, the power is reset by turning the circuit breaker device 25 ON after a predetermined time has elapsed after turning the circuit breaker device 25 OFF once. The fact that the power reset has been performed appropriately is detected, for example, by providing a limit switch in the circuit breaker device 25, and the information is sent to the management device 4 so that the manager in the office can check it.

[0051] In this way, the circuit breaker 25 is switched OFF / ON by remote operation from the management device 4, and a power reset is performed for the electronic sign equipment 2. This eliminates the need for an operator to go to the installation site of the electronic sign equipment 2 to perform the reset work, so that a power reset can be performed early while reducing the labor required when the CPU 21 of the control unit 2A becomes unable to operate normally.

[0052] Even in summer, when the surface temperature of CPU 21 reaches approximately 70° C., the temperature around CPU 27 only rises to approximately 55° C. In other words, there is a temperature difference of 15° C. between CPUs 21 and 27. When this is applied to the Arrhenius law, the lifespan of CPU 27 and its peripheral circuits can be ensured to be approximately 2.8 times longer than the lifespan of CPU 21 and its peripheral circuits.

[0053] In this embodiment, the circuit breaker 25, the switching operation means 26, and the CPU 27 are housed inside a single housing and are integrated into a so-called one-package. This makes it easy to install the circuit breaker 2, and in particular makes it easy to retrofit the circuit breaker 2 to an existing circuit breaker 2. It also makes it possible to improve workability, safety, ease of maintenance, and economy.

[0054] Furthermore, when the installation position of CPU27 is set farther from LED display unit 22 than the installation position of CPU21, CPU27 hardly experiences a temperature rise to the point where CPU21 becomes unable to operate normally, and the reliability of operation (output operation of a switching operation command signal to switching operation means 26) when CPU21 becomes unable to operate normally can be sufficiently ensured.

[0055] Furthermore, as described above, if the CPU 27 is configured to have higher heat dissipation than the CPU 21, stable operation of the CPU 27 can be expected even in a high temperature environment where the CPU 21 is unable to operate normally due to freezing, thermal runaway, etc. Therefore, it is possible to fully ensure the reliability of being able to reset the power supply to the electronic sign equipment 2 when the CPU 21 is unable to operate normally.

[0056] -Other embodiments- The present invention is not limited to the above-described embodiment, and all modifications and applications within the scope of the claims and equivalents thereto are possible.

[0057] For example, in the above embodiment, the administrator operates the management device 4 to transmit a reset command signal to the power reset unit 2B. The present invention is not limited to this, and the management device 4 may automatically receive information from the server 3 (information that the CPU 21 of a specific IP address has frozen, thermal runaway, or the like) and, in response, automatically transmit a reset command signal to the power reset unit 2B. The management device 4 may also be configured to be able to receive information that the CPU 21 of a specific IP address has frozen, thermal runaway, or the like, and, in response, automatically transmit a reset command signal to the power reset unit 2B.

[0058] In the above embodiment, the circuit breaker device 25, the switching operation means 26, and the CPU 27 are accommodated in a single housing. However, the present invention is not limited to this, and two of the circuit breaker device 25, the switching operation means 26, and the CPU 27 may be accommodated in a single housing.

[0059] In the above embodiment, a reset command signal is sent to the power reset unit 2B at approximately the same time as the administrator operates the management device 4. In this case, even if the power reset of the electronic sign equipment 2 can be performed, if the CPU 21 is at a high temperature, there is a possibility that freezing or thermal runaway will occur again in a short time thereafter. In consideration of this, for example, a temperature sensor may be provided in the CPU 21, and after the administrator operates the management device 4, a reset command signal may be sent to the power reset unit 2B at a timing when the temperature of the CPU 21 is detected by the temperature sensor to drop to a predetermined temperature (a temperature at which freezing or thermal runaway will not occur again in a short time after the power reset of the electronic sign equipment 2 is performed). [Industrial Applicability]

[0060] The present invention is applicable to a power reset unit in electronic signage equipment on expressways and the like, and to a road facility management system equipped with the power reset unit. [Explanation of symbols]

[0061] 1 Road facility management system 2. Electronic display equipment (road equipment) 21 CPU (control unit) 22 LED display section (equipment) 25 Circuit Breaker 26 Switching operation means 27 CPU (Reset control unit) 27c Image information generation section 2B Power Reset Unit 4 Management device N IP network L Power line

Claims

1. A power reset unit for restoring operation of road equipment when a control device that controls equipment installed in the road equipment becomes unable to operate normally in a high temperature environment, comprising: A circuit breaker provided in a power line of the road facility; A switching operation means for switching the circuit breaker device between ON and OFF; A power supply reset unit comprising: a reset control device that is connected to a management device via an IP network, is in a stopped or standby state when the control device is operating normally, and, when the control device becomes unable to operate normally, operates upon receiving a reset command signal transmitted from the management device via the IP network, outputs a switching operation command signal to the switching operation means, and causes the switching operation means to perform a switching operation.

2. 2. The power reset unit according to claim 1, A power supply reset unit, characterized in that the circuit breaker device, the switching operation means, and the reset control device are accommodated within a single housing.

3. 3. The power reset unit according to claim 1, The power reset unit is characterized in that, when the reset control device receives a designation signal from the management device specifying the IP address to which the reset control device belongs, it is provided with an image information generation unit that generates image information for displaying, on the display screen of the management device, a status information image of the circuit breaking device using a Web browser and an operation image that can instruct the transmission of the reset command signal.

4. 3. The power reset unit according to claim 1, The device generates heat during operation, A power supply reset unit, characterized in that the reset control device is installed at a position farther from the device than the control device.

5. 3. The power reset unit according to claim 1, A power supply reset unit, characterized in that the reset control device employs a configuration having higher heat dissipation properties than the control device.

6. 3. The power reset unit according to claim 1, A power supply reset unit characterized in that the switching operation of the circuit breaker device by the switching operation means is such that after the OFF operation of the circuit breaker device is performed, an ON operation of the circuit breaker device is performed with a predetermined delay time.

7. In a road facility management system in which a plurality of road facilities each have a device, a control device for controlling the device, and a management device are connected via an IP network, Each of the plurality of road facilities is provided with a power reset unit for restoring operation of the road facilities when the control device becomes unable to operate normally in a high temperature environment; The power reset unit includes: A circuit breaker provided in a power line of the road facility; A switching operation means for switching the circuit breaker device between ON and OFF; A road equipment management system characterized in that it is equipped with a reset control device that is connected to the management device via the IP network, is in a stopped or standby state when the control device is operating normally, and when the control device becomes unable to operate normally, operates upon receiving a reset command signal transmitted from the management device via the IP network, outputs a switching operation command signal to the switching operation means, and causes the switching operation means to perform a switching operation.

8. 8. The road facility management system according to claim 7, A server capable of transmitting and receiving information to and from the control device and capable of recognizing that the control device has become unable to operate normally is connected to the IP network, A road equipment management system characterized in that, when the server recognizes that the control device has become unable to operate normally, a reset command signal is sent manually or automatically from the management device to the reset control device via the IP network.

9. 8. The road facility management system according to claim 7, A road facility management system characterized in that, when a trip occurs in the circuit breaker device, the reset control device transmits information thereof to the management device.

Citation Information

Patent Citations

  • Road information provision system

    JP2016126538A

  • Road information display system and cloud server

    JP2019144980A

Cited By

  • Power supply reset unit and facility management system equipped with the power supply reset unit

    JP7802976B1