Construction method of embankment and embankment structure

The method uses bag-shaped frames and a protective layer to enhance the durability and ease of fluidized soil construction, addressing durability and efficiency challenges in embankment construction.

JP2024136060AActive Publication Date: 2024-10-04RAILWAY TECHNICAL RESEARCH INSTITUTE
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023047019
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-23
Publication Date
2024-10-04
Estimated Expiration
2043-03-23

AI Technical Summary

Technical Problem

Fluidized soil used in embankment construction is prone to deterioration due to external factors like rainwater and dryness, and there is a need for methods that enhance durability and allow high-volume pouring without compaction work, especially in narrow spaces and limited timeframes.

Method used

A method involving the use of bag-shaped frames filled with filler material, fixed by protruding hooks, and a protective layer to cover fluidized soil, allowing easy and quick construction while resisting hydraulic pressure and external factors.

Benefits of technology

The method enables high-volume pouring of fluidized soil, enhancing durability against rainwater and dryness, and provides a quick, labor-saving construction process that can withstand repeated loads and seismic forces.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024136060000001_ABST
    Figure 2024136060000001_ABST
Patent Text Reader

Abstract

To provide a construction method of embankment which can be constructed easily and quickly using fluidized soil, and has durability with respect to an external factor such as retention of rainwater and the like, and dryness and the like.SOLUTION: A construction method of embankment includes the steps of: forming a bag body form 2 by arranging a bag body at a position which becomes an outer edge of embankment 1 and filling a filler inside; arranging a bagging material 3 in which an infilling material is filled, further on an embankment internal side than the bag body form; installing an anchoring material 5 having a protrusion part capable of securing hooks respectively, striding over an upper surface side of the bag body form and the bagging material; repeating formation of the bag body form, arrangement of the bagging material, and installation of the anchoring material for a predetermined number of times upwardly; placing fluidized soil 4 in a space where the bagging material is arranged on the embankment internal side; and covering an upper surface of the fluidized soil with a protective layer 6.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for constructing an embankment using liquefied treated soil and an embankment structure. [Background technology]

[0002] Railway embankment construction work often involves construction in places where sufficient construction space cannot be secured, such as narrow sections, making work inefficient, and construction is often carried out during limited time periods, such as at night, so there is a high demand for faster and more labor-saving construction.

[0003] In general, construction of embankments involves the compaction of embankment materials, but in narrow areas, small construction machinery and manual labor are required, so there is a particular need to reduce labor. In addition, damage to railway earth structures caused by torrential rain has been increasing in recent years, and there is an increasing demand for early restoration in areas where it is difficult to bring in heavy machinery.

[0004] Fluidized treated soil has high fluidity and filling properties during construction (pouring), and since it has the property of hardening afterwards, it does not require the compaction work of embankment materials that is specific to earth structures, and can be constructed more quickly and with less labor than when conventional soil materials are used. For example, Patent Document 1 discloses a method of constructing embankments in which fluidized treated soil is poured into a dam made of multiple boxes or bags filled with a filling material. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2002-21083 A Summary of the Invention [Problem to be solved by the invention]

[0006] However, liquefied treated soil has the property of deteriorating due to external factors such as water retention by rainwater or drying due to the outside air. For example, in order to ensure the long-term performance of railway embankments to support train loads, it is necessary to have a means of protecting it from these external factors and improving its durability. Also, in order to complete construction in a short time, it is desirable to be able to pour liquefied treated soil as high as possible in one go.

[0007] Therefore, the present invention aims to provide a method for constructing an embankment and an embankment structure that can be constructed easily and quickly using liquefied treated soil and that is durable against external factors such as water retention by rainwater and drying. [Means for solving the problem]

[0008] In order to achieve the above-mentioned object, the method for constructing an embankment of the present invention is a method for constructing an embankment using liquefied treated soil, and is characterized by comprising the steps of: placing a bag body at a position that will be the outer edge of the embankment, and filling the inside of the bag body with filling material to form a bag body formwork; placing a packed material, which is a perforated bag body that can pass through liquefied treated soil and is filled with a filling material, on the inner side of the embankment than the bag body formwork, regardless of the order of forming the bag body formwork; installing an anchoring material having a protrusion that can ensure a hooking, straddling the upper side of the bag body formwork and the packed material; repeating the formation of the bag body formwork, the arrangement of the bag material and the installation of the anchoring material a predetermined number of times in an upward direction; pouring liquefied treated soil into the space inside the embankment where the bag material is placed; and covering the upper surface of the liquefied treated soil with a protective layer.

[0009] Here, the fixing material may be formed by a rod-shaped shaft member and protruding parts protruding in the axially orthogonal direction at least at both ends of the shaft member. The filling material is preferably gravel. Furthermore, the bagged material may be arranged between the bag formworks formed at intervals in the width direction of the embankment, and the liquefied treated soil may be poured between the bag formworks.

[0010] The invention for an embankment structure is an embankment structure using liquefied treated soil, characterized in that it comprises a bag formwork in which a filling material is filled inside a bag provided at a position that is the outer edge of the embankment, a bagged material in which a perforated bag is filled with a filling material and is located inside the embankment further than the bag formwork, an anchoring material installed across the upper side of the bag formwork and the bagged material with its protruding portion hooked onto each, liquefied treated soil filled in the space in which the bagged material is located on the inside of the embankment, and a protective layer covering the upper surface of the liquefied treated soil. Effect of the Invention

[0011] In the embankment construction method of the present invention configured as described above, a bag formwork is first formed at the outer edge of the embankment, and then the bagged material placed further inside the embankment is connected to it by an anchoring material whose protruding part serves as a hook.

[0012] Therefore, the liquid pressure of the liquefied treated soil poured into the inside of the fill inside the bag formwork can be resisted not only by the weight of the bag formwork itself, but also by the reaction force from the bagged material obtained through the fixing material.

[0013] As a result, it becomes possible to pour the liquefied treated soil to a high position in one go, enabling simple and rapid construction of embankments. In addition, by covering the surface of the liquefied treated soil with the bag formwork and protective layer, it is possible to improve its durability against external factors such as water retention from rainwater and drying.

[0014] In addition, in the embankment structure invention, the bag formwork provided at the outer edge of the embankment and the bag material arranged further inside the embankment are connected by an anchoring material whose protruding portion serves as a hook.

[0015] If the bag formwork placed on the outer edge of the embankment in this manner is supported by the filling material and the surrounding liquefied treated soil via anchoring materials, it will be possible to create an embankment structure equipped with a reaction mechanism that resists the inertial force acting on the bag formwork during an earthquake. [Brief description of the drawings]

[0016] [Figure 1] FIG. 2 is an explanatory diagram showing a schematic configuration of the embankment structure of the present embodiment. [Diagram 2] These are diagrams explaining the positional relationship between the bag body form, the bag filling material, and the fixing material, where (a) is an explanatory diagram of a configuration in which there are protrusions only on both ends of the fixing material, and (b) is an explanatory diagram of a configuration in which there are protrusions on both ends and in the middle of the fixing material. [Diagram 3] 1A and 1B are diagrams illustrating protrusions of a fixing material, where (a) is an explanatory diagram of a cross-shaped protrusion, (b) is an explanatory diagram of an X-shaped protrusion, and (c) is an explanatory diagram of a rectangular protrusion. [Figure 4] 1 is an explanatory diagram showing a schematic diagram of the bag formwork and bagging material placement process of the embankment construction method of this embodiment. FIG. [Diagram 5] FIG. 11 is an explanatory diagram showing the process of bridging the first fixing material. [Figure 6] This is an explanatory diagram showing the arrangement of the second-stage bag body form and bagging material, and the process of bridging the fixing material. [Figure 7] 1 is an explanatory diagram showing the state in which a predetermined number of bag body forms, bagging materials, and fixing materials are arranged. [Figure 8] An explanatory diagram showing the state in which liquefied treated soil has been poured. [Figure 9] FIG. 1 is an explanatory diagram showing the state in which the top surface of the embankment is covered with a protective layer. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0017] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. FIG. 1 is an explanatory diagram showing a schematic configuration of an embankment structure according to the present embodiment.

[0018] The embankment 1 in Fig. 1 shows a cross section of a railway embankment, which serves as the roadbed for a track on which trains and the like run. The use of this embankment 1 is not limited to railway embankments, and it may also be used as road embankments on which automobiles run, and is constructed to have a structure that can withstand repeated loading.

[0019] In this embodiment, the embankment 1 comprises a bag formwork 2 provided at the outer edge, a bagging material 3 arranged inside the embankment relative to the bag formwork 2, a fixing material 5 arranged across the upper surface of the bag formwork 2 and the bagging material 3, liquefied treated soil 4 filled inside the embankment, and a protective layer 6 covering the top surface of the liquefied treated soil 4.

[0020] The bag formwork 2, which is placed on the outer edge of the embankment 1, is formed into, for example, a rectangular parallelepiped by filling the inside of the bag with a filler. The bag of the bag formwork 2 is made of a material with excellent weather resistance and strength, such as synthetic fiber, and has an injection port for filling with a filler such as concrete or liquefied treated soil.

[0021] The bag body before being filled with the filling material is preferably of a weight and size that can be folded and transported and set up manually, for example. In other words, if the filling material is filled in through the injection port after the empty bag body is set at the position that will be the outer edge of the embankment 1, there is no need to move the heavy bag body formwork 2, and the bag body formwork 2 can be set up in the specified position quickly and easily.

[0022] The bag formwork 2 is stacked up to the height of the embankment 1 excluding the protective layer 6. For example, by stacking two to ten layers of bag formwork 2 each having a height of about 50 cm, an embankment 1 having a height of about 1 to 5 m can be constructed.

[0023] The longitudinal dimension of the bag formwork 2 (perpendicular to the paper surface of Figure 1) is not particularly limited, but if it is an elongated shape arranged along the longitudinal direction of the embankment 1, it can be, for example, several meters to about 50 meters long.

[0024] The bagged material 3 is formed by filling a filling material into a perforated bag. The perforated bag is a bag made of a net or the like that allows the permeation of liquefied treated soil while preventing the outflow of the filling material. The perforated bag may be a mesh bag or a bag made of a sheet with many holes.

[0025] For example, gravel such as pebbles or large boulders can be used as the filling material for the bagged material 3. For example, coarse gravel with a particle size of about 50 mm or more can be used as the filling material. When the perforated bag is filled with coarse gravel, a highly fluid material such as liquefied treated soil will penetrate through the holes in the perforated bag and then fill the gaps between the coarse gravel.

[0026] 2 is a diagram for explaining the positional relationship between the bag body form 2, the bagging material 3, and the fixing material 5. The fixing material 5 includes a rod-shaped shaft material 51 and protruding parts 52 that protrude perpendicularly to the axis at least at both ends of the shaft material 51.

[0027] The shaft member 51 of the fixing member 5 is formed of a rigid axial force member such as a deformed reinforcing bar or round steel. The protruding portion 52 may have a shape that protrudes only downward, for example, as long as it can be hooked onto the bag body formwork 2 and the bag material 3, respectively. Fig. 2(a) is an explanatory diagram seen from the side of a configuration in which the protruding portions 52 protrude both upward and downward from both ends of the fixing member 5. If the protruding portions 52 protrude both upward and downward, they can be hooked not only onto the lower bag body formwork 2 and the bag material 3, but also onto the upper bag body formwork 2 and the bag material 3 (see Fig. 1).

[0028] 2(b) is an explanatory diagram of a configuration in which there are protrusions 52 at both ends and in the middle of the fixing material 5. When multiple bagged materials 3 are placed inside the embankment of the bag formwork 2, protrusions 52 can also be provided at the middle position of the shaft material 51 to ensure that each bagged material 3 is caught.

[0029] 3 is a diagram illustrating an example of the protruding portion 52 of the fixing material 5. The protruding portion 52 may be any portion that protrudes upward or downward in the direction perpendicular to the axis of the shaft material 51, and various shapes may be applied.

[0030] Fig. 3(a) is an explanatory diagram of the cross-shaped protrusion 52A. This protrusion 52A has rod-shaped protrusions extending directly above and below, and also has protrusions extending to the left and right. The left and right protrusions do not appear to hook onto the bag material 3 in Fig. 3(a), but they function as hooks when the freely deformable bag material 3 is stacked.

[0031] Fig. 3(b) is an explanatory diagram of the X-shaped protrusion 52B. This protrusion 52B is arranged by rotating the protrusion 52A in Fig. 3(a) by 45° around the shaft 51, and can more reliably catch on the bagged materials 3 arranged above and below.

[0032] 3(c) is an explanatory diagram of a square (rectangular) protrusion 52C. The protrusion 52C may be a surface material such as a plate material, and the shape thereof may be arbitrarily selected, such as a vertically long rectangle, an ellipse, or a circle.

[0033] The liquefied treated soil 4 filled in the space in which the bagged material 3 is placed can be a general one made by mixing construction waste soil with water and solidifying materials such as cement. When providing a protective layer 6 on embankment 1 using liquefied treated soil, if the uniaxial compressive strength of the liquefied treated soil is set to about 600 kPa or more, an embankment structure capable of withstanding the repeated action of train loads can be obtained. For example, the embankment 1 of this embodiment uses liquefied treated soil 4 with a mix that has a 28-day strength of 1200 kPa.

[0034] The protective layer 6 covering the top surface of the liquefied treated soil 4 is not particularly limited as long as it can suppress deterioration of the liquefied treated soil 4. In the case of railway embankments, the protective layer 6 can also be made of grain-adjusted crushed stone that is spread evenly on the top surface of the roadbed as a roadbed.

[0035] The protective layer 6 can also be formed by stacking two types of layers with different permeabilities. For example, the lower layer directly above the liquefied treated soil 4 can be a highly permeable layer, such as a coarse gravel layer, and the upper layer can be a fine-grained sand layer. Reducing the permeability of the upper layer in this way promotes drainage in the upper layer and at the boundary between the upper and lower layers, and prevents rainwater from seeping into the liquefied treated soil 4 through the lower layer. The overall thickness of the protective layer 6 is, for example, about 30 cm.

[0036] The protective layer 6 can prevent the liquefied treated soil 4 from drying out excessively and can also have the effect of dispersing the load of trains, etc. The protective layer 6 is provided in an area that covers at least the top surface of the liquefied treated soil 4, and may also cover the top surface of the bag formwork 2 as shown in Figure 1.

[0037] Next, the steps of the embankment construction method of this embodiment will be described with reference to Figs. 4, in the first step, the first stage of the bag body form 2 is formed and the first stage of the bagging material 3 is arranged. Either the formation of the bag body form 2 or the arrangement of the bagging material 3 may be performed first, or they may be performed in parallel.

[0038] To explain the formation of the first-stage bag formwork 2, first, empty bags are placed at the outer edge of the embankment 1. For example, folded bags are manually carried and placed at the positions on both side edges of the embankment 1. Then, filler such as liquefied treated soil or mortar is poured into the bag through its injection port and allowed to expand into a rectangular parallelepiped shape.

[0039] Meanwhile, the first layer of bagged materials 3 is placed between the bag formwork 2 formed at intervals in the width direction of the embankment (on the inside of the embankment). The bagged materials 3 can be prepared in advance so that they are light enough to be carried by hand. This can shorten the work time at the embankment construction site.

[0040] After the first stage of the bag formwork 2 and the bagging material 3 are in place, the anchoring materials 5 are installed so as to straddle their upper surfaces. The anchoring materials 5 are installed at intervals in the extension direction of the embankment 1. The axis material 51 of the anchoring materials 5 is placed on the bag formwork 2 and the bagging material 3, so they can be stably installed simply by placing them.

[0041] A protrusion 52 is formed on at least both ends of the shaft material 51 of the fixing material 5, so that one protrusion 52 is brought into contact with the outer surface of the bag body formwork 2 and the other protrusion 52 is brought into contact with an edge of the bagging material 3, etc. (see Figure 2(a)).

[0042] Next, as shown in Fig. 6, the second-stage bag body form 2 is formed, the bagging material 3 is arranged, and the fixing material 5 is installed. For the second-stage bag body form 2, as with the first stage, the folded bag body is carried by hand and placed on the first-stage bag body form 2, and the bag body is expanded into a rectangular parallelepiped shape by filling the inside of the bag body with filling material.

[0043] Additionally, the second-stage bagging material 3, which is placed on the inner side of the embankment than the bag formwork 2, is placed on top of the first-stage fixing material 5. As a result, the first-stage fixing material 5, sandwiched between the upper and lower bagging materials 3, becomes fixed. Here, the upwardly protruding portions of the protruding parts 52 of the first-stage fixing material 5 come into contact with the second-stage bag formwork 2 and bagging material 3, respectively.

[0044] After the second-stage bag body form 2 and the stuffing material 3 are placed, the second-stage fixing material 5 is installed so as to straddle the upper surfaces of these. The protrusions 52 on both ends of the second-stage fixing material 5 are also brought into contact with the outer surface of the second-stage bag body form 2 and the ends of the stuffing material 3.

[0045] Fig. 7 shows the state in which the seventh tier of bag formwork 2 has been formed after repeating the formation of bag formwork 2, arrangement of bag material 3, and installation of fixing material 5 up to the sixth tier, which is the predetermined number of times in this example. For the top tier, in order to ensure the flatness of the top surface of the liquefied treated soil 4, the arrangement of bag material 3 and installation of fixing material 5 are not performed.

[0046] In the next step, liquefied treated soil 4 is poured into the space inside the embankment where the bagged material 3 has been piled up. Figure 8 is an explanatory diagram showing the state in which the liquefied treated soil 4 has been poured. That is, in the method for constructing an embankment in this embodiment, instead of pouring the liquefied treated soil 4 into each layer of the bag formwork 2, the liquefied treated soil 4 can be poured all at once inside the bag formwork 2 that has been piled up in multiple layers.

[0047] Before solidification, the liquefied treated soil 4 is in a fluid state, and the resulting liquid pressure acts as lateral pressure from inside the bag formwork 2. This lateral pressure increases downward as the height of the piled-up bag formwork 2 increases, but the fixing materials 5 installed at each stage can resist this lateral pressure.

[0048] In other words, the weight of the bag formwork 2 can resist the lateral pressure when the liquefied treated soil 4 is poured, but the installation of the fixing material 5 with the protruding portion 52 hooked onto the bag material 3 can contribute to resist the outward movement of the bag formwork 2.

[0049] The liquefied treated soil 4, which is poured between multiple tiers of bag formwork 2 formed at intervals in the width direction of the embankment, fills the spaces between the piled up bagged materials 3 and also seeps into the bagged materials 3 through the holes in the perforated bags, filling the voids in the filling material.

[0050] In the next step, the top surface of the liquefied treated soil 4 is covered with a protective layer 6. Figure 9 is an explanatory diagram showing the state in which the top surface of the embankment 1 is covered with the protective layer 6. The protective layer 6 is provided so as to cover not only the top surface of the liquefied treated soil 4 but also the top surface of the bag formwork 2.

[0051] Next, the method for constructing an embankment according to this embodiment and the action of the embankment structure constructed thereby will be described.

[0052] In the method for constructing an embankment in this embodiment configured as described above, first, a bag formwork 2 is formed at the position that will be the outer edge of the embankment 1, and then the bag formwork 2 is connected to the bagged material 3 that is placed further inside the embankment by an anchoring material 5, whose protruding portion 52 serves as a hook.

[0053] Therefore, the liquid pressure of the liquefied treated soil 4 poured into the inside of the fill of the bag formwork 2 can be resisted not only by the weight of the bag formwork 2 itself, but also by the reaction force of the bagged material 3 obtained through the fixing material 5.

[0054] As a result, it becomes possible to continuously pour the liquefied treated soil 4 up to a high position in one go, enabling simple and rapid construction of embankments. Railway embankment construction often involves work in places where work efficiency is low, such as narrow areas, or in limited time periods, such as at night, but the embankment construction method of this embodiment can contribute to speeding up construction and saving labor.

[0055] Furthermore, the bagged materials 3, which are placed inside the embankment from the bag formwork 2, can be prepared in advance in a work yard adjacent to the embankment construction site, making it possible to shorten the work time at the embankment construction site. Railway construction is often carried out in a span of just a few hours at night, and this makes it possible to construct the embankment 1 efficiently even in such a short construction time.

[0056] In addition, the embankment structure constructed in this manner is connected between the bag formwork 2, which is provided at the outer edge of the embankment 1, and the bagging material 3, which is arranged further inside the embankment, by an anchoring material 5, whose protruding portion 52 serves as a hook.

[0057] In this way, if the bag formwork 2 arranged on the outer edge of the embankment 1 is supported by the bagged material 3 and the surrounding liquefied treated soil 4 via the fixing material 5, it will not only be able to resist the lateral pressure of the liquefied treated soil 4 during construction, but it will also be able to function as a reaction mechanism to resist the inertial force acting on the bag formwork 2 during an earthquake even after construction.

[0058] In addition, by covering the surfaces of the sides and top of the liquefied treated soil 4 with the bag formwork 2 and the protective layer 6, contact with external factors such as stagnation of rainwater and drying is reduced, making it possible to create a durable embankment 1.

[0059] Although an embodiment of the present invention has been described in detail above with reference to the drawings, the specific configuration is not limited to this embodiment, and design changes that do not deviate from the gist of the present invention are included in the present invention.

[0060] For example, in the above embodiment, the case where a new embankment 1 is constructed has been described as an example, but the present invention is not limited to this. For example, when the slope of an embankment collapses due to an earthquake or heavy rain, the present invention can also be applied to the restoration of the slope on the collapsed side. [Explanation of symbols]

[0061] 1: Embankment 2: Bag body frame 3: Bagging material 4: Liquefied soil 5: Fixing agent 51: Shaft material 52,52A-52C: Protrusion 6:Protective layer

Claims

1. A method for constructing embankments using liquefied treated soil, comprising the steps of: A process of placing a bag at a position that will be the outer edge of the embankment and filling the inside of the bag with a filler material to form a bag formwork; A process of placing a bag material filled with a filling material in a perforated bag that allows permeation of liquefied treated soil on the inside of the embankment from the bag body form regardless of the formation and order of the bag body form; A step of installing a fixing material having a protrusion that can be hooked on the bag body form and the upper surface side of the bagging material, the protrusion having a protrusion that can be hooked on the bag body form and the upper surface side of the bagging material, and a step of repeating the formation of the bag body form, the arrangement of the bagging material, and the installation of the fixing material in an upward direction a predetermined number of times; A step of pouring liquefied treated soil into the space in which the bagged material is placed on the inside of the embankment; A method for constructing embankments, comprising the step of covering the upper surface of the liquefied treated soil with a protective layer.

2. 2. A method for constructing embankments according to claim 1, characterized in that the anchoring material is formed by a rod-shaped shaft member and protruding portions protruding perpendicular to the axis at least at both ends of the shaft member.

3. 3. The method for constructing embankments according to claim 1 or 2, characterized in that the filling material is gravel.

4. A method for constructing embankments as described in claim 1 or 2, characterized in that the bagged material is placed between the bag formworks formed at intervals in the width direction of the embankment, and the liquefied treated soil is poured between the bag formworks.

5. An embankment structure using liquefied treated soil, A bag formwork in which a filler material is filled inside a bag provided at a position that is the outer edge of the embankment; A bag material in which a perforated bag body arranged on the inside side of the embankment from the bag body formwork is filled with a filling material; A fixing material is installed across the upper surface side of the bag body form and the bagging material with the protruding portion hooked on each of them; The liquefied treated soil is filled in the space in which the bagged material is arranged on the inside of the embankment; A banking structure characterized by being provided with a protective layer covering the upper surface of the liquefied treated soil.

6. The embankment structure according to claim 5, characterized in that the anchoring material is formed by a rod-shaped shaft member and protruding portions protruding perpendicular to the axis at least at both ends of the shaft member.

Citation Information

Patent Citations

  • Lightweight civil engineering method

    JP1990229316A

  • Construction method for wall face material

    JP1994220860A

  • Ground stabilizing construction method

    JP2000273870A

  • Reinforcing soil structure and wall surface block

    JP2004060220A

  • Fill and construction method therefor

    JP2002021083A