Stud and stud construction method of stud
The stud construction method enables precise attachment of studs to steel beams using adhesive bonding and high tension bolts, addressing welding restrictions and enhancing structural rigidity and vibration reduction.
Patent Information
- Application Number
- JP2023047340
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-23
- Publication Date
- 2024-10-04
AI Technical Summary
Welding studs to steel beams on-site is restricted due to open flame limitations, necessitating an alternative method for joining studs to steel beams.
A stud construction method involving a lower bracket bonded to a base plate with adhesive, an upper bracket bonded to a steel beam with adhesive, and a stud body bolted to both brackets using high tension bolts, allowing for precise attachment without welding.
Studs can be joined to steel beams with high precision and without welding, even in environments where open flames are prohibited, effectively increasing structural rigidity and reducing vibrations.
Smart Images

Figure 2024136267000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a partition wall and a method for installing the partition wall. [Background technology]
[0002] Patent Document 1 discloses a technique relating to a seismic control reinforcement structure that provides seismic control to existing buildings with low earthquake resistance by adding reinforcement elements incorporating seismic control devices.
[0003] Patent Document 2 discloses technology relating to a structure for installing partitions in existing buildings that is suitable for use when adding partition dampers or the like as earthquake reinforcement to the column-beam frame of an existing building whose beams are made of steel.
[0004] Patent Document 3 discloses a technique relating to a stud installation structure in which a girder and a stud are installed with the positions of their webs substantially aligned. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2000-45538 A [Patent Document 2] JP 2007-126830 A [Patent Document 3] JP 2021-161663 A Summary of the Invention [Problem to be solved by the invention]
[0006] For example, it may not be possible to weld studs to steel beams on-site due to reasons such as a strict no-open flame policy.
[0007] In view of the above, an object of the present invention is to join a stud to a steel beam without welding on-site. [Means for solving the problem]
[0008] The first embodiment is a partition comprising a lower bracket joined to a base plate fixed to a floor slab, an upper bracket adhesively attached to a steel beam above the floor slab, and a partition body whose top and bottom are bolted to the lower bracket and upper bracket.
[0009] In the first embodiment of the stud, the upper bracket is adhesively attached to the steel beam above the floor slab, and the stud body is bolted to the lower bracket and the upper bracket, so that the stud is joined to the steel beam without welding on-site.
[0010] The second aspect is a method of installing partition walls, comprising the steps of: adhesively adhering a lower bracket to a base plate fixed to a floor slab; adhesively adhering an upper bracket to a steel beam above the floor slab; and, after the adhesive has hardened, bolting the partition wall body to the lower bracket and the upper bracket.
[0011] In the second embodiment of the stud construction method, the lower bracket is adhesively bonded to a base plate fixed to the floor slab, and the upper bracket is adhesively bonded to a steel beam, so that the stud is joined to the steel beam without on-site welding.
[0012] A third aspect is a method for constructing partition walls according to the second aspect, comprising the steps of: adjusting the planar position of the upper bracket; and bringing the adhesive surface of the upper bracket, whose planar position has been adjusted, into close contact with the adhesive surface of the steel beam.
[0013] In the third embodiment of the stud installation method, the upper bracket is bonded to the steel beam with an adhesive with high precision. Effect of the Invention
[0014] The present invention allows the studs to be joined to the steel beams without on-site welding. [Brief description of the drawings]
[0015] [Figure 1] FIG. 2 is an elevation view of the internal structure of a building provided with the studs of the present invention, viewed from the Y direction. [Diagram 2] FIG. 2 is an enlarged elevational view of a main part of FIG. [Diagram 3] FIG. 3 is a side view of the main part in which the studs of FIG. 2 are installed, viewed from the X direction. [Figure 4] FIG. 3 is a front view of the main part in which the studs of FIG. 2 are installed, viewed from the Y direction. [Diagram 5] 13A is a cross-sectional view along the Y direction with an adjustment jig attached to the upper bracket of the partition, and FIG. 13B is a plan view of FIG. [Figure 6] This is a process diagram showing, in order, (A) to (C) the process of joining the upper bracket of a partition post to a steel beam using an adjustment jig. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0016] <Embodiment> An embodiment of the present invention will be described below with reference to the studs and the method of installing the studs. The two directions perpendicular to the horizontal direction are the X direction and the Y direction, which are indicated by the arrows X and Y, respectively. The vertical direction perpendicular to the X direction and the Y direction is the Z direction, which is indicated by the arrow Z.
[0017] [building] First, an overview of a building in which studs are installed according to the present embodiment will be described. Note that the building in which studs are installed is merely an example, and the present invention is not limited to this example.
[0018] 1, a building 10 in this example is a semiconductor manufacturing factory, and the second floor is a clean room 30 for manufacturing semiconductors. The first floor below the clean room 30 is an equipment floor 20.
[0019] The building 10 has a steel frame rigid-frame structure made up of steel columns 40 and steel beams 50. In this embodiment, the steel beams 50 are made of H-shaped steel having upper and lower flanges 52 and webs 54 (see FIG. 2). The floor slab 22 of the equipment floor 20 on the first floor of the building 10 is made of reinforced concrete. The roof 12 of the building 10 has a structure in which a dry roofing material 16 is provided on a truss structure 14.
[0020] As shown in Fig. 2, the floor 32 (see also Fig. 1) of the clean room 30 on the second floor of the building 10 has steel joists 60 erected on steel beams 50, and a grating 62 is provided on the joists 60. Therefore, the structure is such that air circulates between the equipment floor 20 and the clean room 30 via the floor 32.
[0021] In an area in the vibration-free area 34 of the clean room 30 where semiconductor manufacturing equipment 68 is installed, a joist 60 is joined to the side of a steel beam 50 for erection. A high-rigidity module 64 is installed on the joist 60, and an active vibration isolation table 66 is installed on the high-rigidity module 64. The semiconductor manufacturing equipment 68 is installed on the active vibration isolation table 66.
[0022] The studs 100 (see also FIG. 1) of this embodiment are provided below the vibration-resistant area 34 on the first floor equipment floor 20 in order to increase the rigidity of the equipment floor 20 and further reduce vibration.
[0023] [Studs] Next, the structure of the stud 100 will be described.
[0024] As shown in Figures 3 and 4, the stud 100 (see also Figures 1 and 2) is composed of a steel lower bracket 130, a steel upper bracket 150, and a steel stud body 110.
[0025] The lower bracket 130 is joined to a steel base plate 70 that is fixed to the floor slab 22. The base plate 70 is fixed to the floor slab 22 with post-installed anchors 72. Non-shrink mortar 74 is filled between the base plate 70 and the floor slab 22.
[0026] The lower bracket 130 is composed of a horizontal plate portion 132 and a vertical plate portion 134, and has an inverted T shape when viewed from the X direction (see FIG. 3). The lower bracket 130 is adhesively joined to the base plate 70. Specifically, the lower surface 133 of the horizontal plate portion 132 of the lower bracket 130 and the upper surface 71 of the base plate 70 are adhesively joined with an adhesive S (see FIG. 5(A)).
[0027] The upper bracket 150 is configured to have a U-shaped upper side portion 154 and a plate-like lower side portion 152. The upper side portion 154 is configured to have a bottom plate portion 156 and a side plate portion 158 protruding upward from the Y-direction end portion of the bottom plate portion 156, and is generally U-shaped when viewed from the X direction (see FIG. 3). Two rectangular through holes 160 with the Y direction as the longitudinal direction are formed in each of the side plate portions 158. The plate-like lower side portion 152 is disposed with the out-of-plane direction in the Y direction, and protrudes downward from the bottom plate portion 156.
[0028] The upper bracket 150 configured as above is adhesively joined to the lower end of the steel beam 50. Specifically, a lower surface 53 of a lower flange 52 of the steel beam 50 and an upper surface 157 of a bottom plate portion 156 of a substantially U-shaped upper portion 154 of the upper bracket 150 are adhesively joined with an adhesive S (see FIG. 5(A)).
[0029] The adhesive S used to bond the lower bracket 130 and the upper bracket 150 is the same as the adhesive used to bond high-rigidity modules. Specifically, the adhesive S has properties superior to general adhesives in terms of strength, fatigue resistance, and impact resistance, and a one-component or two-component epoxy resin adhesive or the like can be used.
[0030] The stud body 110 is composed of a steel pipe 112 and upper and lower fastening parts 120U, 120L. Note that the upper and lower fastening parts 120U, 120L have the same shape except that they are symmetrical from top to bottom, so when there is no need to distinguish between them in an explanation, the U and L after the reference numerals are omitted.
[0031] The fastening portion 120, consisting of a cover plate 122 and a fastening plate 124, is T-shaped when viewed from the X direction (see FIG. 3). A cover plate 122U of an upper fastening portion 120U is joined to the upper end of the steel pipe 112, and a cover plate 122L of a lower fastening portion 120L is joined to the lower end of the steel pipe 112.
[0032] The fastening plate 124L of the lower fastening portion 120L of the stud main body 110 is bolted to the vertical plate portion 134 of the lower bracket 130, and the fastening plate 124U of the upper fastening portion 120U of the stud main body 110 is bolted to the plate-shaped lower portion 152 of the upper bracket 150.
[0033] 3, the upper fastening portion 120U and the upper bracket 150 are frictionally joined by a high tension bolt HTB inserted through a bolt hole 128U of a fastening plate 124U of the fastening portion 120U and a bolt hole 158 of a lower portion 152 of the upper bracket 150. Similarly, the lower fastening portion 120L and the lower bracket 130 are frictionally joined by a high tension bolt (high strength bolt) HTB inserted through a bolt hole 128L of a fastening plate 124L of the fastening portion 120L and a bolt hole 138 of a vertical plate portion 134 of the lower bracket 130.
[0034] [Construction method] Next, an example of a construction method for installing the studs 100 will be described.
[0035] In this example, studs 100 are added to increase the rigidity of equipment floor 20 after completion. Adding studs 100 to increase the rigidity of equipment floor 20 after completion of construction can occur, for example, when a need arises to further suppress micro-vibrations as a result of test operation of semiconductor manufacturing equipment 68.
[0036] 3 and 4, first, the base plate 70 is fixed to the floor slab 22 with post-installed anchors 72. When the post-installed anchors 72 are set in the floor slab 22, the work is carried out with care to prevent the clean room 30 from being contaminated by dust or the like.
[0037] Next, the lower bracket 130 is adhesively joined to the base plate 70. Also, the upper bracket 150 is adhesively joined to the steel beam 50.
[0038] The distance between the lower bracket 130 and the upper bracket 150 is measured, and the stud body 110 is manufactured to match this measured distance. Specifically, the distance between the bolt hole 138 of the lower bracket 130 and the bolt hole 158 of the upper bracket 150 is measured, and the stud body 110 is manufactured so that the distance between the bolt hole 128U of the upper fastening portion 120U of the stud body 110 and the bolt hole 128L of the lower fastening portion 120L matches or nearly matches.
[0039] After the adhesive S has hardened, the stud body 110 is fastened to the lower bracket 130 and the upper bracket 150 with high tension bolts HTB.
[0040] The order of the step of adhering the lower bracket 130 and the step of adhering the upper bracket 150 may be arbitrary, and either may be performed first, or they may be performed simultaneously.
[0041] Next, a detailed description will be given of the process of adhesively joining the upper bracket 150 to the steel beam 50 using the adjustment jig 200. First, the adjustment jig 200 will be described, and then the adhesive joining process will be described.
[0042] As shown in FIGS. 5(A) and 5(B), the upper bracket 150 is joined to the steel beam 50 using an adjustment jig 200.
[0043] The adjustment jig 200 is configured to include a jig body 210 and an adjustment bolt 230. The lower surface of the jig body 210 forms an inclined surface 214 whose plate thickness increases from a tip portion 212 toward a base portion. The adjustment bolt 230 is screwed into the tip portion 212.
[0044] As shown in Figures 5(A), 5(B) and 6, the upper bracket 150 is installed below the steel beam 50 with a gap therebetween. At this time, the bracket is installed so that the through hole 160 of the side plate portion 158 of 154 is above the lower flange 52 of the steel beam 50. Note that adhesive S is applied in advance to the top surface 157 of the bottom plate portion 156 of the upper portion 154 of the upper bracket 150.
[0045] A wedge-shaped jig body 210 is inserted into the through-hole 160 of the upper bracket 150. The base portions of the four jig bodies 210 are struck with a mallet 250 (see FIGS. 5(A) and 5(B)) or the like, and the jig bodies 210 are inserted little by little to adjust the horizontal position of the upper bracket 150. Specifically, the bottom plate portion 156 of the upper bracket 150 is adjusted so as to be horizontal or approximately horizontal.
[0046] When the adjustment is completed, the adjustment bolts 230 are screwed into the threaded bolt holes (not shown) formed in the tip portions 212 of the jig bodies 210 .
[0047] As shown in Fig. 6(B), each adjustment bolt 230 is screwed in little by little. Then, as shown in Fig. 6(C), the lower surface 53 of the lower flange 52 of the steel beam 50 and the upper surface 155 of the bottom plate portion 156 of the upper bracket 150 are brought into close contact with each other, and left until the adhesive S hardens.
[0048] After the adhesive S has hardened, the adjustment jig 200 is removed. Note that the adjustment jig 200 does not necessarily have to be removed.
[0049] [Effect] Next, the operation of this embodiment will be described.
[0050] The stud 100 has an upper bracket 150 bonded to a steel beam 50 with adhesive S, and a lower bracket 130 joined to a base plate 70 fixed to a floor slab 22 with adhesive S. The stud body 110 is friction-joined to the upper bracket 150 and the lower bracket 130 with high tension bolts HTB.
[0051] Therefore, as in this embodiment, even in a place where open flames are strictly prohibited and welding work is not possible, such as the clean room 30 and the equipment floor 20 where air circulates, the partition wall 100 can be pin-joined to the steel beam 50 with high precision and without any rattling.
[0052] In addition, after adjusting the planar position of the upper bracket 150, the upper surface 155 of the bottom plate portion 156 of the upper bracket 150 is brought into close contact with the lower surface 53 of the lower flange 52 of the steel beam 50, so that the upper bracket 150 can be bonded to the steel beam 50 with adhesive S with high precision.
[0053] Here, in this embodiment, as described above, as a measure against micro-vibrations, the partition 100 is added to the equipment floor 20 after completion in order to increase its rigidity in the vertical direction. It is necessary to ensure that the partition 100 added later does not bear earthquake forces. In this embodiment, the partition body 110 is friction-jointed with the upper bracket 150 and the lower bracket 130 by high tension bolts HTB, and thus is a pin joint. Therefore, in terms of structural design, the partition 100 of this embodiment only bears vertical loads (long-term loads) and does not bear earthquake forces.
[0054] Furthermore, if the stud body 110 and the upper bracket 150 and lower bracket 130 are fastened together using normal bolts, which serve as pressure-bearing connections, rattling will occur, and this is not appropriate as a measure against micro-vibrations as in this embodiment.
[0055] Furthermore, when friction-joining the bracket 150 and the lower bracket 130 to the steel beam 50 with high tension bolts HTB, or when friction-joining the stud body 110 directly to the steel beam 50 with high tension bolts HTB, adjustments using a filler plate are necessary to join the two with high precision. However, in the case of measures against micro-vibrations such as in this embodiment, a highly accurate metal-to-metal touch is required, so the use of a filler plate is not appropriate.
[0056] <Other> The present invention is not limited to the above embodiment.
[0057] For example, in the above embodiment, the lower bracket 130 is bonded to the base plate 70 with the adhesive S, but this is not limited to this. The lower bracket 130 may be welded to the base plate 70 in advance at a factory or the like before being carried in.
[0058] Furthermore, the present invention can be embodied in various forms without departing from the spirit and scope of the present invention. [Explanation of symbols]
[0059] 10. Building 40 Steel column 50 Steel Beam 70 Base Plate 100 Studs 110 Stud body 130 Lower bracket 150 Upper bracket 200 Adjustment jig S Adhesive
Claims
1. a lower bracket joined to a base plate fixed to the floor slab; an upper bracket adhesively attached to a steel beam above the floor slab; A stud body whose upper and lower ends are fastened to the lower bracket and the upper bracket by bolts; A stud equipped with a.
2. adhesively attaching the lower bracket to a base plate secured to the floor slab; adhesively attaching an upper bracket to a steel beam above the floor slab; and, bolting a stud body to the lower bracket and the upper bracket after the adhesive has hardened; A method for constructing studs equipped with the above features.
3. adjusting a planar position of the upper bracket; a step of bringing the adhesive surface of the upper bracket, the planar position of which has been adjusted, into close contact with the adhesive surface of the steel beam; The method for installing studs according to claim 2, further comprising:
Citation Information
Patent Citations
Vibration hazard-preventing method for floor beam of steel structure
JP1995054499A
Vibration control reinforcing structure for existing building
JP2000045538A
Vibration control stud and its construction method
JP2009221695A
Universal instrument hanging bracket for h-shaped steel
JP3045952U
Aseismatic reinforcing device of a building
KR101007073B1