Growth condition estimation device, plant management system, growth condition estimation method, plant management method, and program
The growth state estimating device in a plant factory measures carbon dioxide and nutrient solution consumption to estimate plant growth, enabling precise environmental control without additional equipment, addressing the need for accurate growth state estimation.
Patent Information
- Application Number
- JP2023047531
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-24
- Publication Date
- 2024-10-04
- Estimated Expiration
- 2043-03-24
Smart Images

Figure 2024136418000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a growth state estimating device, a plant management system, a growth state estimating method, a plant management method, and a program. [Background technology]
[0002] Patent document 1 states that "a laser scanner 4 scans with pulse distance measuring light consisting of two wavelengths with different reflectivities according to the nitrogen content, separates and receives the two wavelengths, detects the distance measuring value and light amount for each pulse distance measuring light and for each of the two wavelengths, detects the height of the crop based on the distance measuring value, detects the ratio of the received light amounts of the two wavelengths, and detects the growth condition of the crop based on the detected height and ratio of received light amounts." [Prior art document] [Patent documents] [Patent Document 1] JP 2022-054395 A Summary of the Invention [Problem to be solved by the invention]
[0003] It is desirable to specify the growth state of plants grown in a plant factory while minimizing the need for additional equipment. [Means for solving the problem]
[0004] A growth state estimation device according to an aspect of the present invention may include a concentration acquisition unit that acquires a carbon dioxide concentration at a first time point in the plant factory and a carbon dioxide concentration at a second time point after the first time point, both detected by a sensor provided in the plant factory. The growth state estimation device may include a supply amount acquisition unit that acquires a supply amount of carbon dioxide supplied into the plant factory from the first time point to the second time point via a carbon dioxide supply facility having a tank for storing carbon dioxide. The growth state estimation device may include a consumption amount specification unit that specifies a consumption amount of carbon dioxide consumed by a plant cultivated in the plant factory from the first time point to the second time point, based on the carbon dioxide concentration at the first time point, the carbon dioxide concentration at the second time point, and the supply amount of carbon dioxide. The growth state estimation device may include an estimation unit that estimates a growth state of the plant based on relationship information indicating a relationship between the consumption amount of carbon dioxide and the growth state of the plant in the plant factory and the specified consumption amount.
[0005] In the growth state estimation device, the consumption amount identifying unit may identify the amount of carbon dioxide consumed by the plant in the plant factory from the first time point to the second time point, further based on a predetermined basic consumption amount, which is the amount of carbon dioxide consumed in the plant factory during a period corresponding to the period from the first time point to the second time point when the plant is not being cultivated in the plant factory.
[0006] In any of the growth state estimation devices, the consumption identification unit may identify an amount of carbon dioxide emission emitted by people from the first time point to the second time point based on the number of people present in the plant factory and the duration of their stay between the first time point and the second time point, and may further identify an amount of carbon dioxide consumption consumed by the plants in the plant factory from the first time point to the second time point based on the carbon dioxide emission of the identified people.
[0007] In any of the growth state estimation devices, the supply amount acquisition unit may acquire the supply amount of the nutrient solution supplied to the plant from the first time point to the second time point via a nutrient solution supply facility having a tank for storing a nutrient solution containing fertilizer components. The estimation unit may estimate the growth state of the plant based on the supply amount of the nutrient solution and relationship information indicating a relationship between the supply amount of the nutrient solution and the growth state of the plant. The estimation unit may estimate the growth state of the plant based on the growth state of the plant estimated based on the carbon dioxide consumption amount and the growth state of the plant estimated based on the supply amount of the nutrient solution.
[0008] In any of the growth state estimation devices, when the growth state of the plant estimated based on the amount of carbon dioxide consumption coincides with the growth state of the plant estimated based on the amount of nutrient solution supplied, the estimation unit may use the coincident growth state as the growth state of the plant for controlling environmental control equipment that controls the environment within the plant factory.
[0009] In any of the growth state estimation devices, when the growth state of the plant estimated based on the amount of carbon dioxide consumption does not match the growth state of the plant estimated based on the amount of nutrient solution supplied, the estimation unit does not need to use the inconsistent growth state as the growth state of the plant for controlling environmental control equipment that controls the environment within the plant factory.
[0010] A growth state estimating device according to one aspect of the present invention may include a supply amount acquiring unit that acquires a supply amount of nutrient solution supplied to a plant cultivated in a plant factory from a first time point to a second time point after the first time point via a nutrient solution supply facility having a tank for storing a nutrient solution containing fertilizer components. The growth state estimating device may include an estimating unit that estimates the growth state of the plant based on relationship information indicating a relationship between the supply amount of the nutrient solution and the growth state of the plant and the supply amount of the nutrient solution.
[0011] A plant management system according to one embodiment of the present invention may include the growth state estimation device and an environmental control unit that controls environmental control equipment that controls the environment within the plant factory so that the growth state of the plant estimated by the estimation unit becomes a predetermined growth state that should be satisfied at the second point in time.
[0012] In the plant management system, the environmental control equipment may include a nutrient solution supplying equipment that supplies a nutrient solution containing a fertilizer component to the plant. The environmental control unit may adjust a fertilizer concentration of the nutrient solution supplied to the plant by the nutrient solution supplying equipment so that the growth state of the plant estimated by the estimation unit becomes a predetermined growth state that should be satisfied at the second time point.
[0013] In any of the plant management systems, the environmental control equipment may include an irrigation equipment that supplies water to a medium in which the plant is grown. The environmental control unit may adjust the amount of water irrigated to the medium by the irrigation equipment so that the growth state of the plant estimated by the estimation unit matches a predetermined growth state that should be satisfied at the second time point.
[0014] In any of the plant management systems, the environmental control facility may include a light source facility having a light source that irradiates the plant with artificial light. The environmental control unit may adjust the amount of light irradiated to the plant by the light source facility and the irradiation time so that the growth state of the plant estimated by the estimation unit becomes a predetermined growth state that should be satisfied at the second time point.
[0015] Any of the plant management systems may further include a notification unit that notifies a message indicating an abnormality has occurred in the environmental control equipment when the consumption amount of carbon dioxide identified by the consumption amount identification unit is smaller than a predetermined threshold value.
[0016] A growth state estimation method according to an aspect of the present invention may include a step of acquiring a carbon dioxide concentration at a first time point in the plant factory and a carbon dioxide concentration at a second time point after the first time point, which are detected by a sensor provided in the plant factory. The growth state estimation method may include a step of acquiring a supply amount of carbon dioxide supplied to the plant factory from the first time point to the second time point via a carbon dioxide supply facility having a tank for storing carbon dioxide. The growth state estimation method may include a step of specifying an amount of carbon dioxide consumption consumed by the plant in the plant factory from the first time point to the second time point, based on the carbon dioxide concentration at the first time point, the carbon dioxide concentration at the second time point, and the supply amount of carbon dioxide. The growth state estimation method may include a step of estimating a growth state of the plant based on relationship information indicating a relationship between the amount of carbon dioxide consumption and the growth state of the plant cultivated in the plant factory and the specified amount of consumption.
[0017] A growth state estimation method according to one aspect of the present invention may include a step of acquiring a supply amount of nutrient solution supplied to a plant cultivated in a plant factory from a first time point to a second time point after the first time point via a nutrient solution supplying facility having a tank for storing the nutrient solution containing fertilizer components. The growth state estimation method may include a step of estimating a growth state of the plant based on relationship information indicating a relationship between the supply amount of the nutrient solution and the growth state of the plant and the supply amount of the nutrient solution.
[0018] A plant management method according to an aspect of the present invention may include a step of estimating a growth state of the plant according to any one of the growth state estimation methods. The plant management method may include a step of controlling an environmental control facility that controls an environment in the plant factory so that the estimated growth state of the plant becomes a predetermined growth state that should be satisfied at the second time point.
[0019] A program according to an aspect of the present invention may cause a computer to execute a step of acquiring a carbon dioxide concentration at a first time point in the plant factory and a carbon dioxide concentration at a second time point after the first time point, both detected by a sensor provided in the plant factory. The program may cause the computer to execute a step of acquiring a supply amount of carbon dioxide supplied to the plant factory from the first time point to the second time point via a carbon dioxide supplying facility having a tank for storing carbon dioxide. The program may cause the computer to execute a step of specifying an amount of carbon dioxide consumption consumed by a plant cultivated in the plant factory from the first time point to the second time point, based on the carbon dioxide concentration at the first time point, the carbon dioxide concentration at the second time point, and the supply amount of carbon dioxide. The program may cause the computer to execute a step of estimating a growth state of the plant based on relationship information indicating a relationship between the amount of carbon dioxide consumption and a growth state of the plant in the plant factory and the specified amount of consumption.
[0020] A program according to one aspect of the present invention may cause a computer to execute a step of acquiring a supply amount of nutrient solution supplied to a plant cultivated in a plant factory from a first time point to a second time point after the first time point via a nutrient solution supplying facility having a tank for storing a nutrient solution containing fertilizer components. The program may cause the computer to execute a step of estimating a growth state of the plant based on relationship information indicating a relationship between the supply amount of the nutrient solution and a growth state of the plant, and the supply amount of the nutrient solution.
[0021] The above summary of the invention does not list all of the features of the present invention. Also, subcombinations of these features may also be inventions. [Brief description of the drawings]
[0022] [Figure 1] 1 is a diagram showing an example of functional blocks of an overall configuration of a plant management system according to an embodiment of the present invention; [Diagram 2] FIG. 2 is a diagram illustrating an example of functional blocks of the plant management device. [Figure 3A] FIG. 11 is a diagram showing an example of relationship information indicating the relationship between the growth state of a plant and the amount of carbon dioxide consumed. [Figure 3B] FIG. 11 is a diagram showing an example of relationship information showing the relationship between the growth state of a plant and the amount of nutrient solution supplied. [Figure 4] 4 is a flowchart showing an example of a procedure for estimating the growth state of the plant 30 based on the amount of carbon dioxide consumption and controlling the environment. [Diagram 5] 5 is a flowchart showing an example of a procedure for estimating the growth state of the plant 30 based on the amount of carbon dioxide consumed and the amount of nutrient solution supplied, and for controlling the environment. [Figure 6] FIG. 2 illustrates an example of a hardware configuration. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0023] The present invention will be described below through embodiments of the invention, but the following embodiments do not limit the scope of the invention according to the claims. Furthermore, not all of the combinations of features described in the embodiments are necessarily essential to the solution of the invention.
[0024] 1 is a diagram showing an example of functional blocks of the overall configuration of a plant management system according to this embodiment. The plant management system manages the growth state of plants 30 cultivated in a plant factory 10. The plant management system includes a plurality of cultivation shelves 20, a light source facility 40, a nutrient solution supply facility 50, a carbon dioxide supply facility 60, an air conditioning facility 70, a ventilation facility 80, a sensor 90, and a plant management device 100. The light source facility 40, the nutrient solution supply facility 50, the carbon dioxide supply facility 60, the air conditioning facility 70, and the ventilation facility 80 are examples of environmental control facilities.
[0025] The cultivation shelf 20 cultivates plants 30 such as vegetables, fruits, or flowers. The light source equipment 40 includes a plurality of light sources 42 that irradiate artificial light such as LEDs or incandescent lamps, and irradiates the plants 30 with artificial light from each of the plurality of light sources 42. The plurality of light sources 42 may be disposed facing the cultivation surface of the cultivation shelf 20.
[0026] The nutrient solution supplying equipment 50 has a pump 52 and a pipe 54, and supplies a nutrient solution containing each fertilizer component such as potassium or calcium to the cultivation shelf 20 via the pump 52 and the pipe 54. The nutrient solution supplying equipment 50 appropriately adjusts the fertilizer concentration and supplies the nutrient solution with the adjusted fertilizer concentration to the plant 30. The nutrient solution supplying equipment 50 may supply the nutrient solution to the plant 30 by spraying the nutrient solution with the adjusted fertilizer concentration in the form of a mist onto the roots of the plant 30. The nutrient solution supplying equipment 50 may function as an irrigation equipment that supplies moisture to the medium in which the plant 30 is grown. The amount of irrigation water supplied to the cultivation shelf 20 may be adjusted by adjusting the amount of nutrient solution supplied from the nutrient solution supplying equipment 50 to the cultivation shelf 20.
[0027] The carbon dioxide supplying equipment 60 has a tank 62 and a nozzle 64. The tank 62 stores carbon dioxide. The carbon dioxide supplying equipment 60 supplies the carbon dioxide stored in the tank 62 into the plant factory 10 through the nozzle 64.
[0028] The air conditioning equipment 70 adjusts the temperature and humidity of the air in the plant factory 10, and circulates the temperature- and humidity-adjusted air in the indoor space. The ventilation equipment 80 includes a circulator or an electric fan that supplies air into the plant factory 10.
[0029] The sensor 90 detects the carbon dioxide concentration in the plant factory 10. 2 A sensor 90. A plurality of sensors 90 may be provided in the plant factory 10. A sensor 90 may be provided for each cultivation shelf 20. The sensor 90 periodically detects the carbon dioxide concentration in the plant factory 10 and provides the detection result to the plant management device 100. Only one sensor 90 may be provided in the plant factory 10.
[0030] The plant management device 100 controls the growth state of the plant 30 by controlling the light source equipment 40, the nutrient solution supplying equipment 50, the carbon dioxide supplying equipment 60, the air conditioning equipment 70, and the air blowing equipment 80. The plant management device 100 communicates with the light source equipment 40, the nutrient solution supplying equipment 50, the carbon dioxide supplying equipment 60, the air conditioning equipment 70, the air blowing equipment 80, and the sensor 90 via a wireless network or a wired network. The plant management device 100 is an example of a growth state estimation device.
[0031] The plant management device 100 may be a computer having a central processing unit (CPU) and a memory. The light source equipment 40, the nutrient solution supply equipment 50, the carbon dioxide supply equipment 60, the air conditioning equipment 70, and the ventilation equipment 80 may each be equipped with a computer having a central processing unit (CPU) and a memory.
[0032] The computer may be a personal computer, a tablet computer, a smartphone, a workstation, a server computer, a general-purpose computer, or a computer system in which multiple computers are connected. Such a computer system is also a computer in a broad sense. The computer may be a dedicated computer designed for environmental control of a plant factory, or may be dedicated hardware realized by a dedicated circuit. The computer may be implemented by a virtual computer environment. When a computer is used, the plant management device 100, the light source equipment 40, the nutrient solution supply equipment 50, the carbon dioxide supply equipment 60, the air conditioning equipment 70, and the air blowing equipment 80 are realized by executing a program by the computer.
[0033] 2 is a diagram illustrating an example of functional blocks of the plant management device 100. The plant management device 100 includes a concentration acquisition unit 102, a supply amount acquisition unit 104, a consumption amount specifying unit 106, an estimation unit 108, an environment control unit 110, a notification unit 112, and a storage unit 120.
[0034] The concentration acquisition unit 102 periodically acquires the carbon dioxide concentration from each of the multiple sensors 90. The concentration acquisition unit 102 may acquire an average value of the carbon dioxide concentrations acquired from each of the multiple sensors 90 as the carbon dioxide concentration in the plant factory 10. The concentration acquisition unit 102 may acquire the carbon dioxide concentration at time T1 in the plant factory 10 and the carbon dioxide concentration at time T2 after time T1 from the multiple sensors 90. The concentration acquisition unit 102 may acquire the carbon dioxide concentration from each of the multiple sensors 90 every hour, every 6 hours, every 12 hours, or every 24 hours, and register the average value of the carbon dioxide concentrations from the multiple sensors 90 in the storage unit 120 as the carbon dioxide concentration in the plant factory 10.
[0035] The supply amount acquisition unit 104 acquires the supply amount of carbon dioxide supplied into the plant factory 10 within a predetermined period via the carbon dioxide supply equipment 60 having a tank 62 for storing carbon dioxide. The supply amount acquisition unit 104 acquires the supply amount of carbon dioxide supplied into the plant factory 10 from time T1 to time T2. The supply amount acquisition unit 104 may acquire the supply amount of carbon dioxide supplied into the plant factory 10 within a predetermined period for each predetermined period. The supply amount acquisition unit 104 may acquire the supply amount of carbon dioxide supplied into the plant factory 10 within 1 hour, 6 hours, 12 hours, or 24 hours.
[0036] The consumption amount specifying unit 106 specifies the amount of carbon dioxide consumed by the plants 30 in the plant factory 10 based on the carbon dioxide concentration in the plant factory 10 detected by the multiple sensors 90 and the amount of carbon dioxide supplied to the plant factory 10 via the carbon dioxide supply equipment 60. The consumption amount specifying unit 106 specifies the amount of carbon dioxide consumed by the plants 30 in the plant factory 10 from time T1 to time T2 based on the carbon dioxide concentration at time T1, the carbon dioxide concentration at time T2, and the amount of carbon dioxide supplied from time T1 to time T2. The consumption amount specifying unit 106 specifies the amount of carbon dioxide consumed by the entire plants 30 cultivated in the plant factory 10. The consumption amount specifying unit 106 specifies the amount of carbon dioxide consumed by the entire plants 30 cultivated in the plant factory 10 that are cultivated in an area where the carbon dioxide concentration is detected by the sensor 90 among the plants 30 cultivated in the plant factory 10 and that can grasp the amount of carbon dioxide supplied from the carbon dioxide supply equipment 60 to that area.
[0037] The consumption amount specification unit 106 calculates the carbon dioxide concentration (ppm) at the time T1 by the capacity (m 3 ) to derive the amount of carbon dioxide in the plant factory 10 at time T1. The consumption specifying unit 106 similarly derives the amount of carbon dioxide in the plant factory 10 at time T2. The consumption specifying unit 106 then specifies the amount of carbon dioxide consumed by the plants 30 in the plant factory 10 from time T1 to time T2 by subtracting the amount of carbon dioxide in the plant factory 10 at time T2 from the sum of the amount of carbon dioxide in the plant factory 10 at time T1 and the amount of carbon dioxide supplied from time T1 to time T2.
[0038] The estimation unit 108 estimates the growth state of the plant based on the relationship information indicating the relationship between the carbon dioxide consumption and the growth state of the plant cultivated in the plant factory 10 and the carbon dioxide consumption identified by the consumption amount identification unit 106. The growth state may be distinguished by dividing the growth state from planting to harvest into a plurality of stages. For example, as shown in FIG. 3A, the relationship information divides the growth state from planting to harvest into five stages, and associates a range of carbon dioxide consumption with each stage. As the growth of the plant 30 progresses, the amount of carbon dioxide consumed by the plant 30 increases. Therefore, the relationship information may be information divided into stages such that the greater the carbon dioxide consumption, the more advanced the growth state of the plant 30 is. The relationship information may be generated by actually measuring the carbon dioxide consumption for each type of plant 30 by experiment or the like and collecting statistical data for each stage of the growth state of the plant 30. The relationship information may be registered in advance in the storage unit 120.
[0039] The carbon dioxide consumed in the plant factory 10 may be due to factors other than the plants 30. Therefore, a predetermined basic consumption amount, which is the amount of carbon dioxide consumed in the plant factory 10 during a period corresponding to the period from time T1 to time T2 when the plants 30 are not being cultivated in the plant factory 10, may be derived by experiment or the like, and the basic consumption amount may be registered in advance in the storage unit 120.
[0040] The consumption amount specifying unit 106 may specify the amount of carbon dioxide consumed by the plants 30 in the plant factory 10 from time T1 to time T2, further based on the basic consumption amount. That is, the consumption amount specifying unit 106 may specify the amount of carbon dioxide consumed by the plants 30 in the plant factory 10 from time T1 to time T2 by subtracting the amount of carbon dioxide in the plant factory 10 at time T2 from the sum of the amount of carbon dioxide in the plant factory 10 at time T1 and the amount of carbon dioxide supplied from time T1 to time T2, and further by currentizing the basic consumption amount.
[0041] There is a possibility that people enter and leave the plant factory 10. When people enter and leave the plant factory 10, the consumption amount specifying unit 106 should specify the amount of carbon dioxide consumed by the plants 30, taking into consideration the amount of carbon dioxide emitted by people. Therefore, the consumption amount specifying unit 106 may specify the amount of carbon dioxide emitted by people from time T1 to time T2 based on the number of people present in the plant factory 10 and the duration of their stay between time T1 and time T2, and may specify the amount of carbon dioxide consumed by the plants 30 in the plant factory 10 from time T1 to time T2 based on the amount of carbon dioxide emitted by the specified people.
[0042] The storage unit 120 may store the amount of carbon dioxide emitted by one person per unit time. A human sensor may be provided at the entrance and exit of the plant factory 10, and the plant management device 100 may measure the number of people present in the plant factory 10 and their stay time, and store the results in the storage unit 120. The consumption amount specifying unit 106 derives the total amount of carbon dioxide generated by people in the plant factory 10 from time T1 to time T2 based on the number of people present in the plant factory 10 from time T1 to time T2 and the stay time of each person. Then, the consumption amount specifying unit 106 may specify the amount of carbon dioxide consumed by the plants 30 in the plant factory 10 from time T1 to time T2 by summing up the amount of carbon dioxide supplied to the plant factory 10 and the total amount of carbon dioxide generated by people from time T1 to time T2 and subtracting the amount of carbon dioxide in the plant factory 10 at time T2 from the sum of the total amount and the amount of carbon dioxide in the plant factory 10 at time T1.
[0043] The environmental control unit 110 controls at least one of the environmental control equipment, i.e., the light source equipment 40, the nutrient solution supply equipment 50, the carbon dioxide supply equipment 60, the air conditioning equipment 70, and the ventilation equipment 80, which control the environment within the plant factory 10, so that the growth state of the plant 30 estimated by the estimation unit 108 becomes a predetermined growth state that should be satisfied at time T2.
[0044] The environmental control unit 110 may adjust the fertilizer concentration of the nutrient solution supplied by the nutrient solution supplying equipment 50 to the medium of the cultivation shelf 20 so that the growth state of the plant 30 estimated by the estimation unit 108 reaches a predetermined growth state to be met at time T2. If the growth state of the plant 30 estimated by the estimation unit 108 has not reached the predetermined growth state to be met at time T2, the environmental control unit 110 may adjust the fertilizer concentration of the nutrient solution supplied by the nutrient solution supplying equipment 50 to the medium of the cultivation shelf 20 so as to increase it. If the growth state of the plant 30 estimated by the estimation unit 108 is growing lower than the predetermined growth state to be met at time T2, the environmental control unit 110 may adjust the fertilizer concentration of the nutrient solution supplied by the nutrient solution supplying equipment 50 to the medium of the cultivation shelf 20 so as to decrease it. If the plant 30 is a tomato or the like whose growth condition changes depending on the amount of irrigation, the environmental control unit 110 may adjust the amount of irrigation water supplied to the culture medium of the cultivation shelf 20 by the nutrient solution supply equipment 50 so that the growth condition of the plant 30 estimated by the estimation unit 108 becomes a predetermined growth condition that should be met at time T2.
[0045] The environment control unit 110 may adjust the amount of light irradiated to the plant 30 by the light source equipment 40 and the irradiation time so that the growth state of the plant 30 estimated by the estimation unit 108 becomes a predetermined growth state that should be satisfied at the time T2. If the growth state of the plant 30 estimated by the estimation unit 108 has not reached the predetermined growth state that should be satisfied at the time T2, the environment control unit 110 may increase the amount of light irradiated to the plant 30 by the light source equipment 40. Alternatively, the environment control unit 110 may increase the irradiation time of the light to the plant 30 by the light source equipment 40. On the other hand, if the growth state of the plant 30 estimated by the estimation unit 108 is growing worse than the predetermined growth state that should be satisfied at the time T2, the environment control unit 110 may decrease the amount of light irradiated to the plant 30 by the light source equipment 40. Alternatively, the environment control unit 110 may shorten the irradiation time of the light to the plant 30 by the light source equipment 40.
[0046] If the carbon dioxide consumption amount specified by the consumption amount specifying unit 106 is too small, there is a possibility that an abnormality has occurred in at least one of the environmental control equipments, which are the light source equipment 40, the nutrient solution supply equipment 50, the carbon dioxide supply equipment 60, the air conditioning equipment 70, and the ventilation equipment 80, which control the environment in the plant factory 10. Therefore, if the carbon dioxide consumption amount specified by the consumption amount specifying unit 106 is smaller than a predetermined threshold, the notification unit 112 notifies a message indicating the occurrence of an abnormality in the environmental control equipment. The notification unit 112 may notify the message to a manager who manages the plant factory 10. The notification unit 112 may display the message on a display provided in the plant management device 100. The notification unit 112 may notify the message to a terminal owned by the manager who manages the plant factory 10.
[0047] In the above, an example has been described in which the estimation unit 108 estimates the growth state of the plant based on the relationship information indicating the relationship between the carbon dioxide consumption and the growth state of the plant cultivated in the plant factory 10 and the carbon dioxide consumption identified by the consumption amount identifying unit 106. However, the estimation unit 108 may estimate the growth state of the plant 30 based on the supply amount of nutrient solution supplied by the nutrient solution supplying equipment 50 instead of or in addition to the carbon dioxide consumption amount. Note that the nutrient solution supplying equipment 50 may newly supply nutrient solution to the plant 30 in accordance with the consumption amount of nutrient solution consumed by the plant 30. In other words, the supply amount of nutrient solution supplied by the nutrient solution supplying equipment 50 corresponds to the consumption amount of nutrient solution consumed by the plant 30.
[0048] The supply amount acquisition unit 104 may acquire the amount of nutrient solution supplied to the medium of the cultivation shelf 20 by the nutrient solution supply equipment 50 between time T1 and time T2. The estimation unit 108 may estimate the growth state of the plant 30 based on the relationship information indicating the relationship between the amount of nutrient solution supplied and the growth state of the plant cultivated in the plant factory 10, and the amount of nutrient solution supplied acquired by the supply amount acquisition unit 104. For example, as shown in FIG. 3B, the relationship information is obtained by dividing the growth state from planting to harvest into five stages and associating a range of the amount of nutrient solution supplied with each stage. As the growth of the plant 30 progresses, the amount of nutrient solution consumed by the plant 30 increases, so the amount of supply also increases. Therefore, the relationship information may be information divided into stages such that the greater the amount of nutrient solution supplied, the more advanced the growth state of the plant 30 is. The relationship information may be generated by actually measuring the amount of nutrient solution supplied for each type of plant 30 at each stage of the growth state of the plant 30 through experiments or the like, and collecting statistical data. The relationship information may be registered in advance in the storage unit 120 .
[0049] The estimation unit 108 may finally estimate the growth state of the plant 30 based on the growth state of the plant 30 estimated based on the amount of carbon dioxide consumption and the growth state of the plant 30 estimated based on the amount of nutrient solution supplied. By estimating the growth state of the plant 30 using two parameters, the growth state of the plant 30 can be estimated with higher accuracy.
[0050] When the growth state of the plant 30 estimated based on the amount of carbon dioxide consumption and the growth state of the plant 30 estimated based on the amount of nutrient solution supplied match, the estimation unit 108 may use the matched growth state as the growth state of the plant 30 for controlling the environmental control equipment that controls the environment in the plant factory 10. On the other hand, when the growth state of the plant 30 estimated based on the amount of carbon dioxide consumption and the growth state of the plant 30 estimated based on the amount of nutrient solution supplied do not match, the estimation unit 108 does not need to use the inconsistent growth state as the growth state of the plant 30 for controlling the environmental control equipment that controls the environment in the plant factory 10.
[0051] FIG. 4 is a flow chart showing an example of a procedure for estimating the growth state of the plant 30 based on the amount of carbon dioxide consumption and for controlling the environment.
[0052] The concentration acquisition unit 102 acquires the carbon dioxide concentrations at time points T1 and T2 detected by the sensor 90 (S100). The supply amount acquisition unit 104 acquires the amount of carbon dioxide supplied from the carbon dioxide supply equipment 60 into the plant factory 10 from time points T1 to T2 (S102). The consumption amount determination unit 106 determines the amount of carbon dioxide consumed by the plant 30 between time points T1 and T2 based on the carbon dioxide concentrations at time points T1 and T2, the amount of carbon dioxide supplied from time points T1 to T2, the basic consumption amount, and the amount of carbon dioxide supplied by people entering and leaving the plant factory 10 (S104).
[0053] If the carbon dioxide consumption is less than the threshold value ("Y" in S106), the notification unit 112 notifies the outside of an equipment error indicating an abnormality in the environmental control equipment (S108). On the other hand, if the carbon dioxide consumption is equal to or greater than the threshold value ("N" in S106), the estimation unit 108 estimates the growth state of the plants 30 in the plant factory 10 based on the related information and the identified carbon dioxide consumption (S110).
[0054] The environmental control unit 110 determines whether the estimated growth state of the plant 30 is a predetermined growth state assumed at the time T2 (S112). If the estimated growth state of the plant 30 is a predetermined growth state assumed at the time T2, the process ends.
[0055] If the estimated growth state of the plant 30 is not a predetermined growth state assumed at time T2, and the estimated growth state of the plant 30 lags behind the predetermined growth state assumed at time T2 ("Y" in S114), the environmental control unit 110 controls the nutrient solution supplying equipment 50 and the light source equipment 40 to increase the fertilizer concentration of the nutrient solution supplied to the culture medium of the cultivation shelf 20 and the amount of light irradiated to the plant 30 (S116). If the growth state of the plant 30 changes depending on the amount of irrigation, the environmental control unit 110 may increase the amount of irrigation supplied to the plant 30 instead of adjusting the fertilizer concentration.
[0056] On the other hand, if the estimated growth state of the plant 30 is more advanced than the predetermined growth state assumed at time T2 ("N" in S114), the nutrient solution supply equipment 50 and the light source equipment 40 are controlled to reduce the fertilizer concentration of the nutrient solution supplied to the medium of the cultivation shelf 20 and the amount of light irradiated to the plant 30 (S118). If the growth state of the plant 30 changes depending on the amount of irrigation, the environment control unit 110 may reduce the amount of irrigation supplied to the plant 30 instead of adjusting the fertilizer concentration.
[0057] As described above, the plant management device 100 according to this embodiment identifies the amount of carbon dioxide consumed by all the plants 30 cultivated in the plant factory 10, and estimates the overall growth state of the plants 30 cultivated in the plant factory 10 based on the amount of carbon dioxide consumption. Furthermore, based on the estimated growth state, the plant management device 100 controls the environmental control equipment so that the environment in the plant factory 10 becomes the growth state that the plants 30 should satisfy. By utilizing existing equipment installed in the plant factory 10, the amount of carbon dioxide consumption can be estimated, the growth state of the plants 30 can be grasped, and the environment in the plant factory 10 can be appropriately controlled.
[0058] FIG. 5 is a flow chart showing an example of a procedure for estimating the growth state of the plant 30 based on the amount of carbon dioxide consumed and the amount of nutrient solution supplied, and for controlling the environment.
[0059] The estimation unit 108 estimates the growth state of the plant 30 based on the relationship information indicating the relationship between the carbon dioxide consumption and the growth state of the plant cultivated in the plant factory 10 and the carbon dioxide consumption identified by the consumption amount identifying unit 106 (S200). The estimation unit 108 estimates the growth state of the plant 30 based on the relationship information indicating the relationship between the amount of nutrient solution supplied and the growth state of the plant 30 cultivated in the plant factory 10 and the amount of nutrient solution supplied acquired by the supply amount acquiring unit 104 (S202).
[0060] The estimation unit 108 determines whether the growth state of the plant 30 estimated based on the amount of carbon dioxide consumption matches the growth state of the plant 30 estimated based on the amount of nutrient solution supplied (S204). If the estimated growth states match, the environmental control unit 110 controls the environmental control equipment, such as the light source equipment 40 and the nutrient solution supply equipment 50, based on the estimated growth state of the plant 30 (S206). On the other hand, if the estimated growth states do not match, the environmental control unit 110 does not control the environmental control equipment, such as the light source equipment 40 and the nutrient solution supply equipment 50, based on the estimated growth state of the plant 30, and ends the process.
[0061] As described above, the plant management device 100 according to the embodiment identifies the amount of carbon dioxide consumed by the entire plants 30 cultivated in the plant factory 10 and the amount of nutrient solution supplied to the plants 30, and estimates the overall growth state of the plants 30 cultivated in the plant factory 10 based on the consumption and supply amounts. The plant management device 100 estimates the final growth state of the plants 30 taking into account the growth state estimated based on each of the carbon dioxide consumption and the amount of nutrient solution supply, thereby making it possible to more accurately estimate the growth state of the plants 30. Therefore, based on the estimated growth state, the plant management device 100 can more accurately control the environmental control equipment so that the environment in the plant factory 10 becomes the growth state that the plants 30 should satisfy.
[0062] 6 shows an example of a computer 1200 that may embody aspects of the present embodiment in whole or in part. A program installed on the computer 1200 may cause the computer 1200 to perform operations associated with an apparatus according to an embodiment of the present invention or one or more "parts" of the apparatus. Alternatively, the program may cause the computer 1200 to execute the operations or one or more "parts". The program may cause the computer 1200 to execute a process or steps of the process according to an embodiment of the present invention. Such a program may be executed by the CPU 1212 to cause the computer 1200 to execute specific operations associated with some or all of the blocks of the flowcharts and block diagrams described herein.
[0063] The computer 1200 according to this embodiment includes a CPU 1212 and a RAM 1214, which are connected to each other by a host controller 1210. The computer 1200 also includes a communication interface 1222 and an input / output unit, which are connected to the host controller 1210 via an input / output controller 1220. The computer 1200 also includes a ROM 1230. The CPU 1212 operates according to programs stored in the ROM 1230 and the RAM 1214, thereby controlling each unit.
[0064] The communication interface 1222 communicates with other electronic devices via a network. The hard disk drive may store programs and data used by the CPU 1212 in the computer 1200. The ROM 1230 stores a boot program executed by the computer 1200 when activated and / or a program that depends on the hardware of the computer 1200. The programs are provided via a computer-readable storage medium such as a CR-ROM, a USB memory, or an IC card, or a network. The programs are installed in the RAM 1214, which is also an example of a computer-readable storage medium, or the ROM 1230, and executed by the CPU 1212. The information processing described in these programs is read by the computer 1200, and brings about cooperation between the programs and the various types of hardware resources. An apparatus or method may be configured by implementing an operation or processing of information according to the use of the computer 1200.
[0065] For example, when communication is performed between the computer 1200 and an external device, the CPU 1212 may execute a communication program loaded in the RAM 1214 and instruct the communication interface 1222 to perform communication processing based on the processing described in the communication program. Under the control of the CPU 1212, the communication interface 1222 reads transmission data stored in a transmission buffer area provided in the RAM 1214 or a storage medium such as a USB memory, transmits the read transmission data to a network, or writes reception data received from the network to a reception buffer area or the like provided on the storage medium.
[0066] Furthermore, the CPU 1212 may cause all or a necessary portion of a file or database stored in an external storage medium such as a USB memory to be read into the RAM 1214, and perform various types of processing on the data on the RAM 1214. The CPU 1212 may then write back the processed data to the external storage medium.
[0067] Various types of information, such as various types of programs, data, tables, and databases, may be stored in the storage medium and undergo information processing. The CPU 1212 may perform various types of processing on the data read from the RAM 1214, including various types of operations, information processing, conditional judgment, conditional branching, unconditional branching, information search / replacement, etc., as described throughout this disclosure and specified by the instruction sequence of the program, and writes back the results to the RAM 1214. The CPU 1212 may also search for information in a file, database, etc. in the storage medium. For example, when a plurality of entries each having an attribute value of a first attribute associated with an attribute value of a second attribute are stored in the storage medium, the CPU 1212 may search for an entry that matches a condition, in which the attribute value of the first attribute is specified, from among the plurality of entries, read the attribute value of the second attribute stored in the entry, and thereby obtain the attribute value of the second attribute associated with the first attribute that satisfies a predetermined condition.
[0068] The above-described programs or software modules may be stored in a computer-readable storage medium on the computer 1200 or in the vicinity of the computer 1200. Also, a storage medium such as a hard disk or a RAM provided in a server system connected to a dedicated communication network or the Internet can be used as a computer-readable storage medium, thereby providing the programs to the computer 1200 via the network.
[0069] A computer-readable medium may include any tangible device capable of storing instructions that are executed by a suitable device. As a result, a computer-readable medium having instructions stored thereon comprises an article of manufacture that includes instructions that can be executed to create means for performing the operations specified in the flowchart or block diagram. Examples of computer-readable media may include electronic storage media, magnetic storage media, optical storage media, electromagnetic storage media, semiconductor storage media, and the like. More specific examples of computer-readable media may include floppy disks, diskettes, hard disks, random access memories (RAMs), read-only memories (ROMs), erasable programmable read-only memories (EPROMs or flash memories), electrically erasable programmable read-only memories (EEPROMs), static random access memories (SRAMs), compact disk read-only memories (CD-ROMs), digital versatile disks (DVDs), Blu-ray (RTM) disks, memory sticks, integrated circuit cards, and the like.
[0070] The computer readable instructions may include either source code or object code written in any combination of one or more programming languages. The source code or object code includes conventional procedural programming languages. The conventional procedural programming languages may be assembler instructions, instruction set architecture (ISA) instructions, machine instructions, machine dependent instructions, microcode, firmware instructions, state setting data, or object oriented programming languages such as Smalltalk®, JAVA®, C++, etc., and the “C” programming language or similar programming languages. The computer readable instructions may be provided to a processor or programmable circuitry of a general purpose computer, special purpose computer, or other programmable data processing apparatus locally or over a wide area network (WAN) such as a local area network (LAN), the Internet, etc. The processor or programmable circuitry may execute the computer readable instructions to create means for performing the operations specified in the flowcharts or block diagrams. Examples of processors include computer processors, processing units, microprocessors, digital signal processors, controllers, microcontrollers, etc.
[0071] Although the present invention has been described above using the embodiments, the technical scope of the present invention is not limited to the scope described in the above embodiments. It is clear to those skilled in the art that various modifications and improvements can be made to the above embodiments. It is clear from the description of the claims that such modifications and improvements can also be included in the technical scope of the present invention.
[0072] It should be noted that the order of execution of each process, such as operations, procedures, steps, and stages, in the devices, systems, programs, and methods shown in the claims, specifications, and drawings is not specifically stated as "before," "prior to," etc., and may be realized in any order unless the output of a previous process is used in a later process. Even if the operational flow in the claims, specifications, and drawings is explained using "first," "next," etc. for convenience, it does not mean that it is essential to perform the process in this order. [Explanation of symbols]
[0073] 10 Plant factory 20 cultivation rack 30 plants 40 Light source equipment 42 Light source 50 Nutrient solution supply equipment 52 Pump 54 Pipe 60 Carbon dioxide supply equipment 62 Tank 64 Nozzles 70 Air conditioning equipment 80 Ventilation equipment 90 Sensors 100 Plant management equipment 102 Concentration acquisition section 104 Supply amount acquisition section 106 Consumption Specification Department 108 Estimation part 110 Environmental Control Section 112 Notification Department 120 Storage section 1200 Computer 1210 Host Controller 1212 CPU 1214 RAM 1220 Input / Output Controller 1222 Communication Interface 1230 ROM
Claims
1. A concentration acquisition unit that acquires a carbon dioxide concentration at a first time point in the plant factory and a carbon dioxide concentration at a second time point after the first time point, both detected by a sensor provided in the plant factory; a supply amount acquisition unit that acquires a supply amount of carbon dioxide supplied into the plant factory from the first time point to the second time point via a carbon dioxide supply facility having a tank for storing carbon dioxide; a consumption amount specifying unit that specifies an amount of carbon dioxide consumed by plants cultivated in the plant factory from the first time point to the second time point based on the carbon dioxide concentration at the first time point, the carbon dioxide concentration at the second time point, and the supply amount of carbon dioxide; an estimation unit that estimates a growth state of the plant based on relationship information indicating a relationship between a consumption amount of carbon dioxide and a growth state of the plant in the plant factory and the identified consumption amount; A growth state estimation device comprising:
2. 2. The growth state estimation device according to claim 1, wherein the consumption amount determination unit determines the amount of carbon dioxide consumed by the plant in the plant factory from the first time point to the second time point, further based on a predetermined basic consumption amount, which is the amount of carbon dioxide consumed in the plant factory during a period corresponding to the period from the first time point to the second time point when the plant is not being cultivated in the plant factory.
3. 2. The growth state estimation device according to claim 1, wherein the consumption amount determination unit determines the amount of carbon dioxide emission emitted by people from the first time point to the second time point based on the number of people present in the plant factory and their staying time between the first time point and the second time point, and determines the amount of carbon dioxide consumption consumed by the plants in the plant factory from the first time point to the second time point based further on the amount of carbon dioxide emission of the identified people.
4. the supply amount acquisition unit acquires a supply amount of the nutrient solution supplied to the plant from the first time point to the second time point via a nutrient solution supplying facility having a tank for storing a nutrient solution containing a fertilizer component; The estimation unit estimates a growth state of the plant based on relationship information indicating a relationship between the supply amount of the nutrient solution and the growth state of the plant and the supply amount of the nutrient solution; 2. The growth state estimation device according to claim 1, wherein the estimation unit estimates the growth state of the plant based on a growth state of the plant estimated based on the amount of carbon dioxide consumption and a growth state of the plant estimated based on an amount of nutrient solution supplied.
5. 5. The growth state estimation device according to claim 4, wherein, when the growth state of the plant estimated based on the amount of carbon dioxide consumption coincides with the growth state of the plant estimated based on the amount of nutrient solution supplied, the estimation unit uses the coincident growth state as the growth state of the plant for controlling an environmental control equipment that controls the environment in the plant factory.
6. 5. The growth state estimation device according to claim 4, wherein, when the growth state of the plant estimated based on the amount of carbon dioxide consumption does not match the growth state of the plant estimated based on the amount of nutrient solution supplied, the estimation unit does not use the inconsistent growth state as the growth state of the plant for controlling an environmental control equipment that controls the environment in the plant factory.
7. a supply amount acquisition unit that acquires a supply amount of the nutrient solution supplied to plants cultivated in the plant factory from a first time point to a second time point that is later than the first time point via a nutrient solution supplying equipment having a tank for storing the nutrient solution containing fertilizer components; an estimation unit that estimates a growth state of the plant based on relationship information indicating a relationship between the supply amount of the nutrient solution and the growth state of the plant and the supply amount of the nutrient solution; A growth state estimation device comprising:
8. A growth state estimating device according to any one of claims 1 to 7, an environmental control unit that controls an environmental control facility that controls an environment in the plant factory so that the growth state of the plant estimated by the estimation unit becomes a predetermined growth state that should be satisfied at the second time point; A plant management system comprising:
9. the environmental control facility includes a nutrient solution supply facility for supplying a nutrient solution containing a fertilizer component to the plant; 9. The plant management system according to claim 8, wherein the environmental control unit adjusts a fertilizer concentration of the nutrient solution supplied to the plant by the nutrient solution supply equipment so that the growth state of the plant estimated by the estimation unit becomes a predetermined growth state that should be satisfied at the second time point.
10. The environmental control system includes a watering system that supplies water to a medium in which the plant is grown; The plant management system of claim 8, wherein the environmental control unit adjusts the amount of water irrigated to the culture medium by the irrigation equipment so that the growth state of the plant estimated by the estimation unit becomes a predetermined growth state that should be satisfied at the second point in time.
11. The environmental control facility includes a light source facility having a light source that irradiates the plant with artificial light, 9. The plant management system according to claim 8, wherein the environmental control unit adjusts the amount of light and the irradiation time irradiated to the plant by the light source equipment so that the growth state of the plant estimated by the estimation unit becomes a predetermined growth state that should be satisfied at the second point in time.
12. A growth state estimating device according to any one of claims 1 to 6, an environmental control unit that controls an environmental control equipment that controls an environment in the plant factory so that the growth state of the plant estimated by the estimation unit becomes a predetermined growth state that should be satisfied at the second time point; and a notification unit that notifies a message indicating an abnormality has occurred in the environmental control equipment when the consumption amount of carbon dioxide identified by the consumption amount identification unit is smaller than a predetermined threshold value.
13. A step of acquiring a carbon dioxide concentration at a first time point in the plant factory and a carbon dioxide concentration at a second time point after the first time point, the carbon dioxide concentration being detected by a sensor installed in the plant factory; acquiring a supply amount of carbon dioxide supplied into the plant factory from the first time point to the second time point via a carbon dioxide supplying facility having a tank for storing carbon dioxide; determining an amount of carbon dioxide consumed by plants cultivated in the plant factory from the first time point to the second time point based on the carbon dioxide concentration at the first time point, the carbon dioxide concentration at the second time point, and the supply amount of carbon dioxide; estimating a growth state of the plant based on relationship information indicating a relationship between a consumption amount of carbon dioxide and a growth state of the plant in the plant factory and the identified consumption amount; A growth state estimation method comprising the steps of:
14. acquiring a supply amount of the nutrient solution supplied to plants cultivated in the plant factory from a first time point to a second time point that is later than the first time point via a nutrient solution supplying facility having a tank for storing the nutrient solution containing fertilizer components; estimating a growth state of the plant based on relationship information indicating a relationship between the supply amount of the nutrient solution and the growth state of the plant and the supply amount of the nutrient solution; A growth state estimation method comprising the steps of:
15. estimating a growth state of the plant according to the method for estimating a growth state of the plant according to claim 13 or 14; controlling an environmental control facility that controls an environment in the plant factory so that the estimated growth state of the plant becomes a predetermined growth state that should be satisfied at the second time point; A plant management method comprising:
16. A step of acquiring a carbon dioxide concentration at a first time point in the plant factory and a carbon dioxide concentration at a second time point after the first time point, the carbon dioxide concentration being detected by a sensor installed in the plant factory; acquiring a supply amount of carbon dioxide supplied into the plant factory from the first time point to the second time point via a carbon dioxide supplying facility having a tank for storing carbon dioxide; determining an amount of carbon dioxide consumed by plants cultivated in the plant factory from the first time point to the second time point based on the carbon dioxide concentration at the first time point, the carbon dioxide concentration at the second time point, and the supply amount of carbon dioxide; estimating a growth state of the plant based on relationship information indicating a relationship between a consumption amount of carbon dioxide and a growth state of the plant in the plant factory and the identified consumption amount; A program for causing a computer to execute the following.
17. acquiring a supply amount of the nutrient solution supplied to plants cultivated in the plant factory from a first time point to a second time point that is later than the first time point via a nutrient solution supplying facility having a tank for storing the nutrient solution containing fertilizer components; estimating a growth state of the plant based on relationship information indicating a relationship between the supply amount of the nutrient solution and the growth state of the plant and the supply amount of the nutrient solution; A program for causing a computer to execute the following.
Citation Information
Patent Citations
Strawberry greenhouse intelligent control system and greenhouse strawberry growth model construction method
CN111650976A
Method for measuring rate of photosynthesis
JP1996172913A
Evaluation device of photosynthesis or evaluation method of photosynthesis
JP2007071758A
Plant cultivation system, plant-cultivation plant, and method for cultivating plant
JP2012005468A
Plant cultivation system
JP2023040690A
