Carbon dioxide emissions calculation system and carbon dioxide emissions calculation method
The carbon dioxide emissions calculation system addresses the lack of evaluation in concrete production and distribution by using a blockchain platform to track and calculate emissions, effectively promoting the use of environmentally friendly concrete through precise reduction assessment.
Patent Information
- Application Number
- JP2023048399
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-24
- Publication Date
- 2024-10-04
AI Technical Summary
There is a lack of a systematic approach to evaluate the carbon dioxide emissions reduction effect in the production and distribution of ready-mixed concrete, leading to insufficient awareness of carbon reduction opportunities.
A carbon dioxide emissions calculation system and method that utilizes a blockchain-based platform to track and calculate emissions across the concrete supply chain, incorporating data storage and calculation units to assess the difference between standard and actual emissions, enabling accurate evaluation of reduction efforts.
Enables precise evaluation of carbon dioxide emissions reduction, raising awareness and promoting the use of environmentally friendly concrete by quantifying the contribution of each supply chain participant.
Smart Images

Figure 2024137045000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a carbon dioxide emission calculation system and a carbon dioxide emission calculation method for calculating the amount of carbon dioxide emissions generated in the production and distribution of ready-mix concrete. [Background technology]
[0002] Patent Document 1 discloses a system for managing the delivery of ready-mix concrete to a pouring site. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2018-1658 A Summary of the Invention [Problem to be solved by the invention]
[0004] In recent years, there has been a demand to actively use building materials with low carbon dioxide emissions. As described in Patent Document 1, ready-mixed concrete, which is delivered to a casting site in a timely manner, is expected to be highly effective in reducing carbon dioxide emissions because it emits a relatively large amount of carbon dioxide during its manufacturing and distribution processes, among building materials. However, since there is no system that can appropriately evaluate the extent to which carbon dioxide reduction has been achieved at which part of the supply chain in which ready-mixed concrete is manufactured and distributed, awareness of carbon dioxide reduction among businesses involved in the supply chain has not been sufficiently raised.
[0005] The present invention aims to appropriately evaluate the effect of reducing carbon dioxide emissions generated in the production and distribution of concrete. [Means for solving the problem]
[0006] The present invention is a carbon dioxide emission calculation system that calculates the amount of carbon dioxide emissions generated in the production and distribution of concrete, and includes a data storage unit in which calculation data used to calculate the amount of carbon dioxide emissions is stored, a business operator terminal operated by each business operator involved in the concrete supply chain and into which the calculation data can be input, and a calculation unit that calculates the amount of carbon dioxide emission reduction based on the calculation data, wherein the calculation data includes standard data related to a standard concrete mix, transaction data related to the mix and delivery amount of the concrete already delivered to a construction site, and emission data indicating the amount of carbon dioxide emissions generated in the production and distribution processes of the concrete, and the calculation unit calculates, based on the standard data, transaction data, and emission data, the amount of carbon dioxide emission reduction as the difference between the standard emission amount of carbon dioxide that would have occurred in the production and distribution processes if standard concrete had been delivered instead of the delivered concrete, and the actual emission amount of carbon dioxide that would have occurred in the production and distribution processes of the delivered concrete.
[0007] The present invention also provides a carbon dioxide emission calculation method for calculating the amount of carbon dioxide emissions generated in the production and distribution of concrete, comprising: an input step of inputting transaction data related to the mix and delivery amount of concrete delivered to a construction site into a data storage unit in which standard data related to a standard concrete mix and emission data indicating the amount of carbon dioxide emissions generated in the production and distribution processes of concrete are pre-stored as calculation data used in calculating the amount of carbon dioxide emissions; and a calculation step of calculating, based on the standard data, transaction data, and emission data, the difference between the base emission amount of carbon dioxide estimated to have occurred in the production and distribution processes if standard concrete had been delivered in place of the delivered concrete, and the actual emission amount of carbon dioxide estimated to have occurred in the production and distribution processes of the delivered concrete, as the amount of carbon dioxide emission reduction. Effect of the Invention
[0008] According to the present invention, it is possible to appropriately evaluate the effect of reducing carbon dioxide emissions generated in the production and distribution of concrete. [Brief description of the drawings]
[0009] [Figure 1] 1 is a configuration diagram showing the overall configuration of a carbon dioxide emission calculation system according to an embodiment of the present invention. [Diagram 2] 1 is a graph showing an example of calculation of carbon dioxide emission reduction amount. [Diagram 3] 1 is a graph for explaining the calculation of the carbon dioxide emission reduction amount of each business operator involved in the ready-mix concrete supply chain. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A carbon dioxide emission calculation system and a carbon dioxide emission calculation method according to an embodiment of the present invention will be described below with reference to the drawings.
[0011] First, a carbon dioxide emission calculation system 100 according to an embodiment of the present invention will be described with reference to Fig. 1. The carbon dioxide emission calculation system 100 is a system for evaluating the degree of contribution of each business operator involved in the ready-mix concrete supply chain to the reduction of carbon dioxide emission by calculating the amount of carbon dioxide emission generated in the manufacturing and distribution processes of ready-mix concrete (hereinafter referred to as "ready-mixed concrete").
[0012] As shown in Fig. 1, the carbon dioxide emission calculation system 100 comprises a blockchain 10 that distributes and manages the same information within a platform consisting of multiple nodes 11 on a network, a data storage server 12 that can store data handled on the blockchain 10, and information processing terminals 13A-13F that can be connected to the blockchain 10. The blockchain 10, the data storage server 12, and the information processing terminals 13A-13F are each connected by wire or wirelessly via a network such as the Internet.
[0013] Blockchain 10 is a so-called distributed ledger management technology. Specifically, data including transaction data and hash values are organized into a single block. When a new record is added, a new block is generated and linked to the previous block. Block data linked in a chronological chain is shared between each node 11, thereby ensuring the reliability of the data recorded in the block.
[0014] Each node 11 is managed and owned by each business participating in the carbon dioxide emission calculation system 100, for example, each business involved in the ready-mix concrete supply chain. In other words, the blockchain 10 of the carbon dioxide emission calculation system 100 is a so-called consortium type made up of each business involved in the ready-mix concrete supply chain. Note that the blockchain 10 is not limited to a consortium type in which multiple management entities exist, and may be a public type in which there is no administrator, or a private type in which a specific administrator exists.
[0015] Such a mechanism for an information-sharing platform with data tamper-resistance is publicly known, and transaction data, hash values, and nonce values are stored in the blockchain 10. Non-fungible tokens (NFTs, hereinafter referred to as "NFTs") issued on the blockchain 10 record, for example, transaction data related to the content of transactions between businesses involved in the ready-mix concrete supply chain, as well as links for linking to various data stored in the data storage server 12.
[0016] The data storage server 12 is configured, for example, by combining a web server, an application server, and a database, and has a data storage unit 12a in which calculation data used to calculate carbon dioxide emissions is stored, and a calculation unit 12b that calculates the amount of carbon dioxide emission reduction based on the calculation data stored in the data storage unit 12a.
[0017] The data storage server 12 is located outside the blockchain 10, so-called off-chain, but it is also possible to not have a data storage server 12 and record all data in the blockchain 10.
[0018] It is possible to record all data, such as transaction data and calculation data, in the blockchain 10 without providing the data storage server 12. However, if the amount of data increases, the data storage capacity of each node 11 constituting the blockchain 10 will increase, and the amount of data communication between each node 11 will increase due to an increase in transactions. For this reason, there is a risk that it will take a long time to record data in the blockchain 10.
[0019] Therefore, in order to smoothly record data in the blockchain 10, it is preferable to reduce the amount of data shared within the blockchain 10 by providing the data storage server 12 separately from the blockchain 10. Note that the data storage unit 12a and the calculation unit 12b may be provided in one server or in separate servers.
[0020] The information processing terminals 13A to 13F are business operator terminals managed and owned by each business operator involved in the ready-mixed concrete supply chain, which will be described later, a system administrator who manages the carbon dioxide emission calculation system 100, and a verification organization that verifies the carbon dioxide emission calculation method, etc., and may be a general personal computer having an input unit, a display unit, a communication unit, a control unit that controls each of these units, and a storage unit that stores programs executed by the control unit, etc., or may be a portable terminal such as a smartphone or a tablet terminal. Note that the information processing terminals 13A to 13F may also function as the node 11.
[0021] The businesses to which information processing terminals 13A to 13F are assigned, that is, businesses involved in the ready-mixed concrete supply chain, include, for example, as shown in Figure 1, a first business SC1 such as a construction company that uses ready-mixed concrete and concrete products at construction sites (pouring sites), a second business SC2 such as a ready-mixed concrete factory that manufactures ready-mixed concrete in response to orders from the first business SC1, a third business SC3 such as a cement factory that supplies Portland cement and other raw materials for ready-mixed concrete to the second business SC2, and a fourth business SC4 such as a limestone quarry that supplies limestone and other raw materials for ready-mixed concrete to the third business SC3.
[0022] The second business operator SC2 includes, in addition to ready-mix concrete plants, PC plants that deliver precast concrete to construction sites, while the third business operator SC3 includes, in addition to cement plants, steel mills that deliver blast furnace slag to the second business operator SC2, thermal power plants that deliver fly ash, recycled cement plants that deliver recycled cement, and crushed stone plants that deliver aggregates. The fourth business operator SC4 includes, in addition to limestone quarries, raw stone excavations that deliver raw aggregate to crushed stone plants, and demolition sites that deliver demolition materials to recycled aggregate plants. Note that businesses involved in the ready-mix concrete supply chain are not limited to these.
[0023] When each business entity SC1 to SC4 involved in the ready-mix concrete supply chain as described above inputs transaction data and the like relating to the content of transactions between the businesses via each information processing terminal 13A to 13F, an NFT is issued for each transaction data, and the contents of the transaction data are stored in the data storage unit 12a as calculation data to be used in calculating carbon dioxide emissions.
[0024] The transaction data for the first business operator SC1 includes information related to pouring of ready-mixed concrete, such as the delivery location of the ready-mixed concrete, the pouring date of the delivered ready-mixed concrete (delivered ready-mixed concrete), the pouring location, the pouring amount, and the mix of the poured ready-mixed concrete, for the second business operator SC2, includes the delivery amount and mix of the ready-mixed concrete (delivered ready-mixed concrete) delivered to the first business operator SC1, the delivery departure date and time, the delivery arrival date and time, the supplier of each material, the purchase date of each material, the mixing method and the associated energy consumption, the means of transportation and the transport distance, etc., for the third business operator SC3, includes the delivery amount of raw materials delivered to the second business operator SC2, the manufacturing method and the associated energy consumption, the supplier of the raw materials, the purchase date of the materials, the means of transportation and the transport distance, etc., and for the fourth business operator SC4, includes the delivery amount of materials delivered to the third business operator SC3, the collection method and the associated energy consumption, the means of transportation and the transport distance, etc. Therefore, by referring to various information recorded on the blockchain 10 or by referring to various information stored in the data storage unit 12a via NFT, reliable transaction history information and the distribution status of raw materials can be obtained. Note that the contents included in the transaction data are not limited to these. In addition, if the transaction data includes confidential information between the transactors, access to the data in the data storage unit 12a may be restricted.
[0025] In addition, the data storage unit 12a receives from time to time a mix plan describing the detailed specifications of the ready-mixed concrete that the second business operator SC2 can deliver to the first business operator SC1, a specification describing the detailed specifications of the raw materials for the ready-mixed concrete that the third business operator SC3 can deliver to the second business operator SC2, and a specification describing the detailed specifications of the raw materials for the ready-mixed concrete that the fourth business operator SC4 can deliver to the third business operator SC3.
[0026] Therefore, for example, the first contractor SC1 can refer to the mix plan entered by each second contractor SC2, select ready mixed concrete that meets the strength required for the building, and determine the order amount and mix. Also, the second contractor SC2 can refer to the specifications entered by each third contractor SC3, and select and order the raw materials necessary to manufacture the ready mixed concrete ordered from the first contractor SC1, and the third contractor SC3 can refer to the specifications entered by each fourth contractor SC4, and select and order the materials necessary to manufacture the raw materials for the ready mixed concrete ordered from the second contractor SC2.
[0027] In other words, the carbon dioxide emission calculation system 100 also functions as a platform that can computerize ordering operations, delivery receipt confirmation operations, and the like.
[0028] In addition, the data storage unit 12a stores in advance, as calculation data used to calculate the amount of carbon dioxide emissions, standard data on standard mixes such as the ratio of cement components and aggregate ratios contained in standard ready-mixed concrete, and emission data including the emission intensity (emission coefficient) of carbon dioxide generated in the manufacturing and distribution processes of ready-mixed concrete and its raw materials, etc., by the system administrator. The emission intensity of carbon dioxide is a value publicly known in academic societies, etc., and, as described below, an emission intensity corresponding to the manufacturing process and transportation process of each business operator is set. In addition to the emission intensity, the emission data may include primary data that corresponds to the actual situation that is directly measured or estimated, such as the amount of energy consumed in the manufacturing and distribution processes. In this case, the emission intensity is used to roughly estimate the amount of carbon dioxide emissions when primary data cannot be obtained.
[0029] In the carbon dioxide emission calculation system 100, the calculation unit 12b uses the above-mentioned calculation data stored in the data storage unit 12a to calculate the amount of carbon dioxide emission reduction estimated to have been achieved in the process of manufacturing and distributing the ready-mixed concrete and concrete products used to construct the building, and also calculates the degree to which each of the businesses SC1 to SC4 has contributed to the reduction of carbon dioxide emissions.
[0030] Next, a method for calculating the amount of carbon dioxide emission reduction ER that is reduced during the process of constructing a building, that is, the amount of carbon dioxide emission reduction ER by the client who has ordered the construction of the building, will be described.
[0031] The client's emission reduction amount ER is calculated by adding up the carbon dioxide emission reduction amounts ER1 to ER4 achieved by each business operator SC1 to SC4 in all processes of producing and transporting the ready-mixed concrete used to construct the building.
[0032] First, we will explain the calculation of the carbon dioxide emission reduction amount ER1 achieved by the first business operator SC1 in the process in which the first business operator SC1 is involved among all processes for manufacturing and transporting the ready-mixed concrete used to construct the building.
[0033] The first business operator SC1 proposes to the building owner that the first business operator SC1 use environmentally friendly ready-mixed concrete that it can handle in the construction of the building, i.e., ready-mixed concrete that is more effective in reducing carbon dioxide emissions during the manufacturing process than conventional standard ready-mixed concrete, and, based on the building owner's approval, places an order for the production of the ready-mixed concrete with the second business operator SC2, which is capable of manufacturing environmentally friendly ready-mixed concrete, thereby becoming involved in the process of manufacturing the ready-mixed concrete, etc.
[0034] In order to calculate the carbon dioxide emission reduction amount ER1 of the first business entity SC1, the following carbon dioxide emission intensity (emission coefficient) is stored in the data storage unit 12a as calculation data. Carbon dioxide emissions emitted when producing a unit weight of Portland cement (C1p) - Carbon dioxide emissions during the production of unit weight of blast-furnace cement type B (C1b) Carbon dioxide emissions during the production of a unit weight of ground granulated blast furnace slag (C1s) - Carbon dioxide emissions emitted when producing a unit weight of fly ash (C1f) - Carbon dioxide emissions during the production of a unit weight of recycled cement (C1r) - Carbon dioxide emissions emitted when extracting fine aggregate by unit weight (C1fa) - Carbon dioxide emissions emitted when extracting unit weight of coarse aggregate (C1ca) Note that these are examples of raw materials contained in environmentally friendly ready mixed concrete, and the carbon dioxide emission unit values stored in the data storage unit 12a as calculation data are not limited to these raw materials. For example, when a new raw material contained in environmentally friendly ready mixed concrete is added, the emission unit value of the new raw material is added.
[0035] On the other hand, the transaction data stored in the data storage unit 12a as calculation data includes the following items. Total weight of environmentally friendly ready mixed concrete delivered (Q1) Weight of Portland cement in the total weight of environmentally friendly ready mixed concrete (Q1p) Weight of B-type blast furnace cement out of the total weight of environmentally friendly ready mixed concrete (Q1b) Weight of ground granulated blast furnace slag out of the total weight of environmentally friendly ready mixed concrete (Q1s) Weight of fly ash out of the total weight of environmentally friendly ready mixed concrete (Q1f) - Weight of recycled cement out of the total weight of environmentally friendly ready mixed concrete (Q1r) Weight of fine aggregate out of the total weight of environmentally friendly ready mixed concrete (Q1fa) Weight of coarse aggregate out of the total weight of environmentally friendly ready mixed concrete (Q1ca) Weight of Portland cement out of the total weight of standard ready mixed concrete of the same specifications as the delivered environmentally friendly ready mixed concrete (Q1pS) - Weight of fine aggregate out of the total weight of standard ready mixed concrete of the same specifications as the delivered environmentally friendly ready mixed concrete (Q1faS) Weight of coarse aggregate out of the total weight of standard ready mixed concrete of the same specifications as the delivered environmentally friendly ready mixed concrete (Q1caS) In addition, ready mixed concrete having the same specifications means that the concrete type, nominal strength, slump, and maximum dimensions of the coarse aggregate are the same.
[0036] In the calculation unit 12b, based on these calculation data, assuming that the environmentally friendly ready mixed concrete ordered by the first business SC1 from the second business SC2, i.e., the environmentally friendly ready mixed concrete delivered by the second business SC2 to the first business SC1, was all standard ready mixed concrete made primarily from Portland cement, the carbon dioxide emissions estimated to have occurred during the manufacturing, transportation, etc. processes are first calculated as the standard emissions (baseline emissions) EB1 of the first business SC1.
[0037] The standard emission amount EB1 is calculated by the following formula (1). EB1=C1p・Q1pS+C1fa・Q1faS+C1ca・Q1caS (1)
[0038] Next, in the calculation unit 12b, based on the above calculation data, the amount of carbon dioxide emissions estimated to have occurred during the production and transportation of environmentally friendly ready mixed concrete actually delivered from the second business operator SC2 to the first business operator SC1, i.e., ready mixed concrete using blast-furnace cement type B, blast-furnace slag powder, fly ash, and recycled cement as alternative materials to Portland cement in order to reduce carbon dioxide emissions, is calculated as the actual emissions (project emissions) EP1 of the first business operator SC1.
[0039] The actual emission amount EP1 is calculated using the following formula (2). EP1=C1p・Q1p+C1b・Q1b+C1s・Q1s+C1f・Q1f+C1r・Q1r+C1fa・Q1fa+C1ca・Q1ca (2)
[0040] Then, the calculation unit 12b calculates the difference between the standard emission amount EB1 and the actual emission amount EP1, obtained by subtracting the actual emission amount EP1 of the first business operator SC1 from the standard emission amount EB1 of the first business operator SC1, as the emission reduction amount ER1 of the first business operator SC1, as shown in Figure 2.
[0041] In this way, when calculating the emission reduction amount ER1, by taking into consideration the amount of each raw material contained in the environmentally friendly ready mixed concrete, the emission reduction amount ER1 can be calculated with high accuracy.
[0042] In calculating the actual emissions EP1, the weight of each of the raw materials contained in the delivered environmentally friendly ready-mixed concrete may be found from the mix plan previously inputted in the data storage unit 12a by the second business operator SC2 and the weight of the ready-mixed concrete inputted in the transaction data containing information traded between the second business operator SC2 and the first business operator SC1.
[0043] In addition, in the above example, we have explained the case where unset concrete is delivered to the first business operator SC1, but the emission reduction amount ER1 of the first business operator SC1 can also be calculated in a similar manner when precast concrete manufactured at a PC factory (second business operator SC2) is delivered.
[0044] Next, we will explain the calculation of the carbon dioxide emission reduction amount ER2 achieved by the second business operator SC2 in the process in which the second business operator SC2 is involved among all processes for manufacturing and transporting the ready-mixed concrete used to construct the building.
[0045] The second business operator, SC2, manufactures environmentally friendly ready-mixed concrete upon receiving an order from the first business operator, SC1, and transports the environmentally friendly ready-mixed concrete to the construction site, thereby becoming involved in the process of manufacturing ready-mixed concrete.
[0046] In order to calculate the carbon dioxide emission reduction amount ER2 of the second business operator SC2, the following carbon dioxide emission intensity (emission coefficient) is stored in the data storage unit 12a as calculation data. Standard carbon dioxide emissions (C2mB) when mixing a unit weight of ready mixed concrete using a standard conventional mixing device or method - Carbon dioxide emissions (C2mP) emitted when mixing a unit weight of ready mixed concrete using a mixing device or method that is different from the conventional one and that can reduce carbon dioxide emissions compared to the conventional one Standard carbon dioxide emissions (C2tB) from a standard conventional freight vehicle (e.g., agitator truck) when transporting a unit weight of ready-mixed concrete over a unit distance - The amount of carbon dioxide emissions (C2tP) emitted when transporting a unit weight of ready mixed concrete over a unit distance using a freight vehicle that is different from the conventional one and that can reduce carbon dioxide emissions more than conventional freight vehicles
[0047] The above-mentioned values of countermeasure carbon dioxide emissions (C2mP, C2tP) are registered by the system administrator after the carbon dioxide emissions from the new mixing method or new transportation method are actually measured or estimated in response to an application for a new mixing method or new transportation method from the second business operator SC2. Also, when the method registered as a new method in this way becomes a common method among the second business operators SC2, the standard carbon dioxide emissions (C2mB, C2tB), which are standard values, are updated to the countermeasure carbon dioxide emissions (C2mP, C2tP).
[0048] On the other hand, the transaction data stored in the data storage unit 12a as calculation data includes the following items. Total weight of environmentally friendly ready mixed concrete delivered (Q1) - Transport distance of ready mixed concrete (distance from ready mixed concrete plant to construction site) (L2)
[0049] In the calculation unit 12b, based on these calculation data, assuming that the environmentally friendly ready mixed concrete delivered from the second business operator SC2 to the first business operator SC1 was mixed using a standard mixing device or mixing method and transported using a standard transportation method, the carbon dioxide emissions estimated to have occurred during its production and transportation are first calculated as the standard emissions (baseline emissions) EB2 of the second business operator SC2.
[0050] The standard emission amount EB2 is calculated by the following formula (3). EB2 = C2mB Q1 + C2tB Q1 L2 (3)
[0051] Next, in the calculation unit 12b, based on the above calculation data, the amount of carbon dioxide emissions estimated to have occurred during mixing and transportation of the ready-mixed concrete actually delivered from the second business operator SC2 to the first business operator SC1, i.e., the environmentally friendly ready-mixed concrete that has been mixed using a new mixing device or method to reduce carbon dioxide emissions and transported by a new transportation method, is calculated as the actual emissions (project emissions) EP2 of the second business operator SC2.
[0052] The actual emission amount EP2 is calculated using the following formula (4). EP2 = C2mP Q1 + C2tP Q1 L2 (4)
[0053] Then, the calculation unit 12b calculates the difference between the standard emission amount EB2 and the actual emission amount EP2, obtained by subtracting the actual emission amount EP2 of the second operator SC2 from the standard emission amount EB2 of the second operator SC2, as the emission reduction amount ER2 of the second operator SC2.
[0054] The emission reduction amount ER2 of another second business SC2 (for example, a PC factory that delivers precast concrete to the first business SC1) is calculated in a similar manner.
[0055] In the above formula (4), the emission intensity (C2mP, C2tP) registered as emission data is used to calculate the actual emission EP2, but if primary data of the energy consumption measured in a mixing method or a transportation method in which measures to reduce carbon dioxide emissions have been implemented are input as emission data, the actual emission EP2 may be calculated using the primary data instead of the emission intensity. In other words, the emission data includes either the emission intensity or the primary data, or both. In addition, the distance from the second business operator SC2, such as a ready-mixed concrete plant or a PC plant, to the construction site may be compiled into a database in advance and stored in the data storage unit 12a.
[0056] Next, we will explain the calculation of the carbon dioxide emission reduction amount ER3 by the third business SC3 in the process in which the third business SC3 is involved among all the processes of manufacturing and transporting ready-mixed concrete used to build a building. Note that the following will explain the case where the third business SC3 is a cement factory that delivers Portland cement, a raw material for ready-mixed concrete, to the second business SC2, manufactures Portland cement ordered from the second business SC2, and transports the Portland cement to the second business SC2, thereby being involved in the process of manufacturing ready-mixed concrete, etc.
[0057] In order to calculate the carbon dioxide emission reduction amount ER3 of the third business operator SC3, the following carbon dioxide emission intensity (emission coefficient) is stored in the data storage unit 12a as calculation data. Standard carbon dioxide emissions (C3pB) for the production of a unit weight of Portland cement using standard conventional manufacturing methods - The amount of carbon dioxide emissions (C3pP) emitted when a unit weight of Portland cement is produced using a manufacturing method that is different from the conventional method and that can reduce carbon dioxide emissions compared to the conventional manufacturing method -Standard carbon dioxide emissions (C3tB) from a standard conventional freight vehicle when transporting a unit weight of Portland cement over a unit distance - Carbon dioxide emissions (C3tP) emitted when transporting a unit weight of Portland cement over a unit distance using a freight vehicle that is different from the conventional one and that can reduce carbon dioxide emissions more than the conventional freight vehicle
[0058] The above-mentioned values of countermeasure carbon dioxide emissions (C3pP, C3tP) are registered by the system administrator after the carbon dioxide emissions from the new manufacturing method or new transportation method are actually measured or estimated in response to an application for a new manufacturing method or new transportation method from the third business SC3. Furthermore, the standard carbon dioxide emissions (C3pB, C3tB), which are standard values, are updated to the countermeasure carbon dioxide emissions (C3pP, C3tP) values at the stage when the method registered as a new method in this way becomes a common method among the third business SC3.
[0059] On the other hand, the transaction data stored in the data storage unit 12a as calculation data includes the following items. Total weight of Portland cement delivered (Q3) - Transport distance of Portland cement (distance from cement plant to ready-mix concrete plant) (L3)
[0060] In the calculation unit 12b, based on these calculation data, assuming that the Portland cement delivered from the third business SC3 to the second business SC2 was manufactured using a standard manufacturing method and transported using a standard transportation method, the amount of carbon dioxide emissions estimated to have occurred during its manufacture and transportation is first calculated as the standard emission (baseline emission) EB3 of the third business SC3.
[0061] The standard emission amount EB3 is calculated by the following formula (5). EB3 = C3pB Q3 + C3tB Q3 L3 (5)
[0062] Next, in the calculation unit 12b, based on the above calculation data, the amount of carbon dioxide emissions estimated to have occurred in the production and transportation of the Portland cement actually delivered from the third business SC3 to the second business SC2, i.e., the Portland cement produced using a new production method in order to reduce carbon dioxide emissions and transported using a new transportation method, is calculated as the actual emissions (project emissions) EP3 of the third business SC3.
[0063] The actual emission amount EP3 is calculated using the following formula (6). EP3 = C3pP·Q3 + C3tP·Q3·L3 (6)
[0064] Then, the calculation unit 12b calculates the carbon dioxide emission reduction amount per unit weight of Portland cement delivered to the second business operator SC2 ((EB3-EP3) / Q3) by dividing the difference between the standard emission amount EB3 and the actual emission amount EP3, which is calculated by subtracting the actual emission amount EP3 of the third business operator SC3 from the standard emission amount EB3 of the third business operator SC3, by the total weight (Q3) of the Portland cement delivered to the second business operator SC2.
[0065] The emission reduction amount ER3 for the third company SC3 is calculated by multiplying the emission reduction amount per unit weight calculated in this way ((EB3-EP3) / Q3) by the amount of Portland cement produced by the third company SC3 contained in the ready-mixed concrete delivered to the first company SC1, which is understood from the transaction data described above.
[0066] The emission reductions ER3 are calculated in a similar manner for another third business SC3 that supplies blast-furnace cement Type B, ground granulated blast-furnace slag, fly ash, and recycled cement to the second business SC2.
[0067] In addition, in the above formula (6), the emission intensity (C3pP, C3tP) registered as emission data is used to calculate the actual emission amount EP3. However, if primary data on the energy consumption measured in a manufacturing method or transportation method in which measures to reduce carbon dioxide emissions are implemented are input as emission data, the actual emission amount EP3 may be calculated using the primary data instead of the emission intensity.
[0068] Next, we will explain the calculation of the carbon dioxide emission reduction amount ER4 by the fourth business operator SC4 in the process in which the fourth business operator SC4 is involved among all the processes of manufacturing and transporting the ready-mixed concrete delivered to the first business operator SC1. Note that the following will explain an example in which the fourth business operator SC4 is a quarry that delivers raw stones to the third business operator SC3 (a crushing plant) as the raw material for the coarse aggregate of ready-mixed concrete, and is involved in the process of manufacturing ready-mixed concrete by collecting the raw stones ordered from the third business operator SC3 and transporting them to the third business operator SC3.
[0069] In order to calculate the carbon dioxide emission reduction amount ER4 of the fourth utility SC4, the following carbon dioxide emission intensity (emission coefficient) is stored in the data storage unit 12a as calculation data. Standard carbon dioxide emissions (C4caB) generated when extracting a unit weight of coarse aggregate using standard conventional extraction methods - The amount of carbon dioxide emissions (C4caP) emitted when extracting a unit weight of coarse aggregate raw stone using a method that is different from the conventional method and that can reduce carbon dioxide emissions compared to the conventional method Standard carbon dioxide emissions (C4tB) from a standard conventional freight vehicle or ship when transporting a unit weight of raw coarse aggregate over a unit distance - Carbon dioxide emissions (C4tP) emitted when transporting a unit weight of coarse aggregate raw material over a unit distance by a freight vehicle or ship that is different from the conventional one and can reduce carbon dioxide emissions more than the conventional freight vehicles or ships
[0070] The above-mentioned values of countermeasure carbon dioxide emissions (C4caP, C4tP) are registered by the system administrator after the carbon dioxide emissions from the new collection method or new transportation method are actually measured or estimated in response to an application for a new collection method or new transportation method from the fourth operator SC4. In addition, when the method registered as a new method in this way becomes a common method among the fourth operator SC4, the standard carbon dioxide emissions (C4caB, C4tB), which are standard values, are updated to the countermeasure carbon dioxide emissions (C4caP, C4tP).
[0071] On the other hand, the transaction data stored in the data storage unit 12a as calculation data includes the following items. Total weight of delivered coarse aggregate raw materials (Q4) - Transport distance of raw aggregate (distance from quarry to crushing plant) (L4)
[0072] In the calculation unit 12b, based on these calculation data, assuming that the coarse aggregate raw material delivered from the fourth business operator SC4 to the third business operator SC3 was collected using a standard collection method and transported using a standard transportation method, the amount of carbon dioxide emissions estimated to have occurred during the collection and transportation is first calculated as the standard emission (baseline emission) EB4 of the fourth business operator SC4.
[0073] The standard emission amount EB4 is calculated by the following formula (7). EB4=C4caB・Q4+C4tB・Q4・L4 (7)
[0074] Next, in the calculation unit 12b, based on the above calculation data, the amount of carbon dioxide emissions estimated to have occurred during the collection and transportation of the coarse aggregate raw material actually delivered from the third business operator SC3 to the second business operator SC2, i.e., the coarse aggregate raw material that was collected using a new collection method in order to reduce carbon dioxide emissions and transported using a new transportation method, is calculated as the actual emissions (project emissions) EP4 of the fourth business operator SC4.
[0075] The actual emission amount EP4 is calculated using the following formula (8). EP4=C4caP・Q4+C4tP・Q4・L4 (8)
[0076] Then, the calculation unit 12b calculates the carbon dioxide emission reduction amount per unit weight of coarse aggregate raw material delivered to the third business operator SC3 ((EB4-EP4) / Q4)) by dividing the difference between the standard emission amount EB4 and the actual emission amount EP4, obtained by subtracting the actual emission amount EP4 of the fourth business operator SC4 from the standard emission amount EB4 of the fourth business operator SC4, by the total weight (Q4) of the coarse aggregate raw material delivered to the third business operator SC3.
[0077] The emission reduction amount ER4 of the fourth company SC4 is calculated by multiplying the emission reduction amount per unit weight calculated in this way ((EB4-EP4) / Q4) by the amount of coarse aggregate collected by the fourth company SC4 contained in the ready-mixed concrete delivered to the first company SC1, which is determined from the transaction data described above.
[0078] The emission reductions ER4 are calculated in a similar manner for other fourth business operators SC4, such as a fourth business operator SC4 that supplies limestone to a cement plant (third business operator SC3), a fourth business operator SC4 that supplies raw fine aggregate to a crushed stone plant (third business operator SC3), and a fourth business operator SC4 that supplies demolition materials to a recycled aggregate plant (third business operator SC3).
[0079] In the above formula (8), the emission intensity units (C4caP, C4tP) registered as emission data are used to calculate the actual emission amount EP4. However, if primary data on the energy consumption measured in a collection method or transportation method in which measures to reduce carbon dioxide emissions have been implemented are input as emission data, the actual emission amount EP4 may be calculated using the primary data instead of the emission intensity units.
[0080] By adding up the carbon dioxide emission reduction amounts ER1 to ER4 of the respective businesses SC1 to SC4 calculated in this manner, the carbon dioxide emission reduction amount ER of the building owner can be determined as shown in FIG.
[0081] In other words, the carbon dioxide emission reduction amount ER of the building owner is the difference between the standard carbon dioxide emissions EB estimated to have occurred during the manufacturing and transportation processes, assuming that the environmentally friendly ready mixed concrete used to build the building was standard ready mixed concrete, as shown in Figure 3, and the actual carbon dioxide emissions EP estimated to have occurred when manufacturing and transporting the environmentally friendly ready mixed concrete actually used to build the building, i.e., the ready mixed concrete for which each business operator SC1 to SC4 has taken various measures to reduce carbon dioxide emissions.
[0082] The calculation process in which the difference (emission reduction amount ER) between the standard carbon dioxide emission amount EB and the actual carbon dioxide emission amount EP is calculated by the calculation unit 12b is executed after the input process in which the second business operator SC2 inputs transaction data via the business operator terminal when delivering ready-mixed concrete to the construction site and the first business operator SC1 confirms acceptance of the ready-mixed concrete.
[0083] Therefore, the emission reduction amount ER, the standard carbon dioxide emission amount EB, and the actual carbon dioxide emission amount EP calculated by the calculation unit 12b can be confirmed each time the ready-mixed concrete is delivered, or confirmed or reported daily, rather than after the building is completed. It is also possible to confirm the reduction effect for each part of the building, for example, for parts with different required performance such as the foundation structure and the superstructure, to confirm the reduction effect only for ready-mixed concrete delivered within a specified period, or to confirm the reduction effect only for ready-mixed concrete produced by a specific business operator.
[0084] As described above, the carbon dioxide emission calculation system 100 employs the blockchain 10 configured among each business operator involved in the ready-mix concrete supply chain, and therefore can be used by each business operator on an equal footing, and can prevent double counting of the emission reduction amount ER, the standard carbon dioxide emission amount EB, and the actual carbon dioxide emission amount EP calculated by the calculation unit 12b. In addition, since the blockchain 10 ensures data authenticity and prevents tampering, for example, when converting the emission reduction amount ER into carbon credits, it is also possible to create an application form to be submitted to a public certification body via the carbon dioxide emission calculation system 100.
[0085] In addition, the calculation unit 12b divides the carbon dioxide emission reduction amounts ER1 to ER4 of each of the businesses SC1 to SC4 by the carbon dioxide emission reduction amount ER of the building owner calculated as described above, thereby determining the contribution degree (ER1 / ER, ER2 / ER, ER3 / ER, ER4 / ER) of each of the businesses SC1 to SC4 to the carbon dioxide emission reduction amount ER of the environmentally friendly ready mixed concrete used to construct the building.
[0086] For this reason, for example, if the carbon dioxide emission reduction amount ER is converted into carbon credits by a public certification body in order to promote the use of environmentally friendly concrete, which is more expensive than conventional standard concrete but has a high effect in reducing carbon dioxide emissions, the carbon credits can be appropriately distributed to each business operator SC1 to SC4 and client according to the above-mentioned level of contribution, thereby raising awareness of carbon dioxide reduction among each business operator SC1 to SC4 and client involved in the ready-mix concrete supply chain.
[0087] In determining the degree of contribution, not only the carbon dioxide emission reduction amounts ER1 to ER4 described above may be taken into account, but also increases in costs at each operator SC1 to SC4, such as the increase in labor hours required to produce environmentally friendly ready mixed concrete instead of standard ready mixed concrete, the costs required for capital investment, and the costs required for replacing freight vehicles.
[0088] According to the above embodiment, the following effects are achieved.
[0089] In the above-mentioned carbon dioxide emission calculation system 100, the difference between the base emission amount of carbon dioxide estimated to have occurred during the manufacturing and distribution processes when standard concrete is delivered to the pouring site instead of the environmentally friendly concrete, and the actual emission amount of carbon dioxide estimated to have occurred during the manufacturing and distribution processes of the environmentally friendly concrete is calculated as the carbon dioxide emission reduction amount.
[0090] In this way, by calculating the carbon dioxide emission reduction effect of environmentally friendly concrete delivered to construction sites, it is possible to grasp the degree of contribution to carbon dioxide emission reduction of each business involved in the supply chain that manufactures and distributes concrete.
[0091] In addition, by understanding the degree of contribution of each business operator, it becomes possible to properly evaluate which part of the supply chain is most effective in reducing carbon dioxide emissions, thereby raising each business operator's awareness of carbon dioxide reduction.
[0092] In addition, the following modified examples are also within the scope of the present invention, and it is possible to combine the configuration shown in the modified example with the configuration described in the above embodiment, or to combine the configurations described in the different modified examples below.
[0093] In the above embodiment, the calculation unit 12b calculates the emission reduction amount ER, the standard carbon dioxide emission amount EB, and the actual carbon dioxide emission amount EP using transaction data of multiple businesses SC1 to SC4 involved in the ready-mixed concrete supply chain. Alternatively, the emission reduction amount ER, the standard carbon dioxide emission amount EB, and the actual carbon dioxide emission amount EP may be calculated based only on transaction data between the first business entity SC1 and the second business entity SC2. In this case, the carbon credits assigned to the emission reduction amount ER can be allocated to the second business entity SC2 according to the ratio of cement components contained in the ready-mixed concrete produced by the second business entity SC2, for example, to increase the awareness of the second business entity SC2 regarding carbon dioxide reduction.
[0094] In the above embodiment, the cement components of the standard ready-mixed concrete are all Portland cement. Alternatively, the cement components of the standard ready-mixed concrete may contain a predetermined ratio of blast-furnace cement type B in addition to Portland cement, and the components of the standard ready-mixed concrete may be switched depending on the part of the building in which the ready-mixed concrete is used, for example, between the foundation structure and the superstructure of the building.
[0095] In addition, in the above embodiment, the case where carbon dioxide is emitted during the manufacturing process and distribution process of ready-mixed concrete has been mainly described. However, in the case where environmentally friendly ready-mixed concrete contains a special admixture that absorbs carbon dioxide when it comes into contact with carbon dioxide, the amount of carbon dioxide absorbed during the distribution process of this admixture alone or contained in concrete may be subtracted from the actual carbon dioxide emissions EP1 to EP4 of each of the businesses SC1 to SC4, respectively, to calculate the final carbon dioxide emission reduction amounts ER1 to ER4.
[0096] For example, the first business operator SC1 may absorb a large amount of carbon dioxide by contacting concrete containing a special admixture with a high concentration of carbon dioxide (carbonation curing), measure or estimate the amount of carbon dioxide absorbed in this process by a known method, and subtract the measured or estimated amount of absorption from the above-mentioned actual carbon dioxide emission amount EP1. Also, each business operator SC2 to SC4 may constantly absorb carbon dioxide in the process of manufacturing or transporting the special admixture, measure or estimate the amount of carbon dioxide absorbed in this process by a known method, and subtract the measured or estimated amount of absorption from the above-mentioned actual carbon dioxide emission amount EP2 to EP4. Note that the amount of carbon dioxide absorbed by the special admixture and the concrete containing it may be converted into carbon credit as a fixed amount of carbon dioxide separately from the carbon dioxide emission reduction amount ER without being added to the above-mentioned actual carbon dioxide emission amount EP1 to EP4.
[0097] Although the embodiments of the present invention have been described above, the above-mentioned embodiments merely show some of the application examples of the present invention, and it is not intended that the technical scope of the present invention be limited to the specific configurations of the above-mentioned embodiments.
[0098] For example, the above formulas (1) to (8) for calculating the amount of carbon dioxide emission are merely examples and are not limited to these. Any formula having the same meaning may be used. For example, the formula may be a formula that allows for a more precise calculation of the amount of carbon dioxide emission, or a formula that is simplified to the extent that the amount of carbon dioxide emission can be roughly calculated. [Explanation of symbols]
[0099] 100 Carbon dioxide emissions calculation system 10. Blockchain 11... Node 12 Data storage server 12a Data storage section 12b...Arithmetic section 13A~13F···Information processing terminal (business operator terminal) SC1~SC4...Business operator
Claims
1. A carbon dioxide emission calculation system for calculating the amount of carbon dioxide emissions generated in the production and distribution of concrete, a data storage unit in which calculation data used to calculate carbon dioxide emissions is stored; a business operator terminal that is operated by each business operator involved in the concrete supply chain and into which the calculation data can be input; A calculation unit that calculates an amount of carbon dioxide emission reduction based on the calculation data, The calculation data includes: Standard data for standard concrete mixes; Transaction data on mixes and quantities of concrete delivered to construction sites; and emission data showing the amount of carbon dioxide emitted during the manufacturing and distribution of concrete. The calculation unit calculates, based on the standard data, the transaction data, and the emission data, a difference between a reference emission amount of carbon dioxide estimated to have occurred in a manufacturing process and a distribution process of the standard concrete if the standard concrete is delivered in place of the delivered concrete, and an actual emission amount of carbon dioxide estimated to have occurred in a manufacturing process and a distribution process of the delivered concrete. Carbon dioxide emissions calculation system.
2. The transaction data is input via the business operator terminal when concrete is delivered to the construction site, The calculation unit calculates the difference for each of the transaction data. The carbon dioxide emission calculation system according to claim 1 .
3. The calculation unit further calculates the degree of contribution of each business operator in the supply chain to the difference. The carbon dioxide emission calculation system according to claim 1 or 2.
4. A method for calculating carbon dioxide emissions generated in the production and distribution of concrete, comprising: an input process for inputting transaction data relating to the mix and delivery amount of concrete delivered to a construction site into a data storage unit in which standard data relating to standard concrete mixes and emission data showing the amount of carbon dioxide emissions generated during the manufacturing and distribution processes of concrete are pre-stored as calculation data used to calculate the amount of carbon dioxide emissions; and a calculation step of calculating, based on the standard data, the transaction data, and the emission data, the difference between the reference emission amount of carbon dioxide estimated to have occurred in the manufacturing process and distribution process of the standard concrete when the standard concrete is delivered in place of the delivered concrete, and the actual emission amount of carbon dioxide estimated to have occurred in the manufacturing process and distribution process of the delivered concrete, as the carbon dioxide emission reduction amount. Carbon dioxide emissions calculation method.
Citation Information
Patent Citations
Computing unit for carbon-dioxide emissions caused by use of concrete, computing method for carbon-dioxide emissions, computing program for carbon-dioxide emissions and computer-readable recording medium
JP2012159892A
Information processing device, information processing method, and program thereof
JP2021189566A
Emissions simulation system, emissions simulation method, and emissions simulation program
JP2024053672A
Delivery and placement management system of ready-mixed concrete
JP2018001658A
Cited By
Greenhouse gas reduction calculation system, program, greenhouse gas reduction calculation method, and server device
JP2026120459A
Greenhouse gas reduction calculation system, program, greenhouse gas reduction calculation method, and server device
JP2026120460A
Device and method for managing cardon dioxide emissions for products
US12670746B2