A learning model-based program predicts power demand using historical data and weather information, addressing inaccuracies in existing systems and enhancing power transmission efficiency.

JP2024137047APending Publication Date: 2024-10-04TOKYO ELECTRIC POWER CO HOLDINGS INC

Patent Information

Application Number
JP2023048401
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-24
Publication Date
2024-10-04

AI Technical Summary

Technical Problem

Existing systems struggle to accurately predict the power requirements of facilities, necessitating inefficient power transmission.

Method used

A program that utilizes a learning model trained with historical power demand data and weather data to predict power demand based on day of the week and expected outside temperature, combining deep neural networks and random forests for enhanced accuracy.

Benefits of technology

Enables precise prediction of power demand, optimizing power transmission to facilities and reducing inefficiencies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024137047000001_ABST
    Figure 2024137047000001_ABST
Patent Text Reader

Abstract

To provide a program or the like which can predict an amount of power required in a facility using power with high accuracy.SOLUTION: A program allows a computer to execute processing: to acquire the day of the week of a first specific date and a predicted outdoor temperature in a power use facility, and a power demand actual value in the power use facility on a second specific date before the first specific date; and to input the day of the week of the first specific date and the predicted outdoor temperature, and the power demand actual value on the second specific date to a learning model trained to output a power demand prediction value on the first specific date when the day of the week of the first specific date and the predicted outdoor temperature, and the power demand actual value on the second specific date before the first specific date are input, and to output the power demand prediction value on the first specific date.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present technology relates to a program, an information processing method, and an information processing device. [Background technology]

[0002] Conventionally, energy management systems have been proposed that manage the power supply to homes, facilities, etc. For example, the energy management system described in Patent Document 1 collects power consumption information indicating the power consumption of each home, and determines whether or not power adjustment is necessary based on the collected power consumption information. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2023-008053 A Summary of the Invention [Problem to be solved by the invention]

[0004] In order to efficiently transmit electricity from a power plant to a facility that uses the electricity (electricity-using facility), it is necessary to transmit an amount of electricity that is sufficient for the amount of electricity required at the facility. In order to transmit sufficient electricity to a facility, it is necessary to predict in advance with high accuracy the amount of electricity required at the facility that uses the electricity.

[0005] The present disclosure has been made in consideration of the above circumstances, and aims to provide a program or the like that is capable of predicting with high accuracy the amount of electricity required in a facility that uses electricity. [Means for solving the problem]

[0006] A program according to one embodiment of the present disclosure acquires the day of the week and the predicted outside temperature at an electricity-using facility for a first specific day, and an actual electricity demand value at the electricity-using facility for a second specific day that is earlier than the first specific day; when the day of the week and the predicted outside temperature at the first specific day, and the actual electricity demand value for a second specific day that is earlier than the first specific day are input, the program causes a computer to execute a process of inputting the day of the week and the predicted outside temperature at the first specific day, and the actual electricity demand value for the second specific day into a learning model that has been trained to output a predicted electricity demand value for the first specific day, and outputting a predicted electricity demand value for the first specific day.

[0007] An information processing method according to one embodiment of the present disclosure obtains the day of the week and the predicted outside temperature at an electricity-using facility for a first specific day, and an actual electricity demand value at the electricity-using facility for a second specific day that is earlier than the first specific day, and when the day of the week and the predicted outside temperature at the first specific day, and the actual electricity demand value for a second specific day that is earlier than the first specific day are input, the day of the week and the predicted outside temperature at the first specific day, and the actual electricity demand value for the second specific day are input into a learning model that is trained to output a predicted electricity demand value for the first specific day, and the prediction value for the first specific day is output.

[0008] An information processing device according to one embodiment of the present disclosure includes a processing unit that acquires the day of the week of a first specific day and the predicted outside temperature at an electricity-using facility, and an actual electricity demand value at the electricity-using facility on a second specific day that is earlier than the first specific day, and when the day of the week of the first specific day and the predicted outside temperature at the first specific day and the actual electricity demand value on a second specific day that is earlier than the first specific day are input, inputs the day of the week of the first specific day and the predicted outside temperature at the first specific day, and the actual electricity demand value on the second specific day into a learning model that is trained to output a predicted electricity demand value for the first specific day, and outputs a predicted electricity demand value for the first specific day. Effect of the Invention

[0009] A program according to an embodiment of the present disclosure makes it possible to predict with high accuracy the amount of electricity required in a facility that uses electricity. [Brief description of the drawings]

[0010] [Figure 1] FIG. 1 is a schematic diagram showing an overview of an energy management system. [Diagram 2] 1 is a block diagram showing an example of the configuration of an information processing device; [Diagram 3] FIG. 11 is an explanatory diagram illustrating an example of an electric power demand actual value table. [Figure 4] FIG. 1 is an explanatory diagram illustrating an example of a learning model. [Diagram 5] 11 is a flowchart illustrating an example of processing by an information processing device. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] (Embodiment 1) Hereinafter, the embodiment will be described with reference to the drawings. FIG. 1 is a schematic diagram showing an overview of an energy management system S. The energy management system S is a system that manages power supply from a power plant E to a power-using facility (facility) F. An information processing device 1 of the energy management system S is connected to, for example, a management device Em of the power plant E and a smart meter Fm that receives power supplied to the facility F via a network N. The information processing device 1 acquires the amount of power that the facility has received in the past, that is, the amount of power consumed in the facility F (power demand actual value), from the smart meter Fm of the facility F. The information processing device 1 outputs a power demand forecast value in the facility F based on the acquired power demand actual value, and transmits power transmission amount information to the management device Em of the power plant E for controlling the amount of power transmitted from the power plant E to the facility F based on the output power demand forecast value. The management device Em of the power plant E transmits the power generated by the power plant E to the facility F via a power transmission line L and the smart meter Fm. Furthermore, the information processing device 1 acquires from the weather server a predicted value of the outside temperature in the area where the facility F is located (the predicted outside temperature at the facility F).

[0012] The facility F is, for example, an indoor facility visited by an unspecified number of people, such as a sports center, a hospital, a station, a shopping mall, or a hotel. The facility F may be an outdoor facility such as a sports field, a theme park, or a golf course. The facility F may also be an office, a factory, an apartment building, or a house. When the power transmitted from the power plant E to the facility F is a so-called self-consignment, the power plant E is, for example, a solar power plant (solar power generation facility). The power plant E may be a thermal power plant, a nuclear power plant, a hydroelectric power plant, a wind power plant, a geothermal power plant, or a tidal power plant. The power transmission from the power plant E to the facility F may use a part of a wide-area power transmission network. In this case, the information processing device 1 may be owned by a general power transmission and distribution business operator that manages the wide-area power transmission network.

[0013] FIG. 2 is a block diagram showing a configuration example of the information processing device 1. The information processing device 1 is, for example, a server computer, and includes a control unit 11, a storage unit 12, and a communication unit 13. The control unit 11 is configured with a CPU (Central Processing Unit), an MPU (Micro Processing Unit), a GPU (Graphical Processing Unit), a quantum processor, or the like, and performs various control processing, arithmetic processing, and the like by reading and executing a program P (program product) and a database stored in advance in the storage unit 12. Note that a database server or the like may be provided outside the information processing device 1, and the control unit 11 may read the database from the database server or the like. In addition, the information processing device 1 may be one whose functions are realized by a plurality of server devices or computers. In addition, the information processing device 1 may correspond to a node on a blockchain.

[0014] The storage unit 12 of the information processing device 1 is, for example, a volatile memory and a non-volatile memory. The storage unit 12 stores a program P, an electric power demand actual value table 121, and a learning model M. The program P may be provided to the information processing device 1 using a storage medium 12a in which the program P is stored so as to be readable by a computer. The storage medium 12a is, for example, a portable memory. Examples of the portable memory include a CD-ROM, a USB (Universal Serial Bus) memory, an SD card, a micro SD card, and a Compact Flash (registered trademark) memory. When the storage medium 12a is a portable memory, the processing element of the control unit 11 may read the program P from the storage medium 12a using a reading device not shown. The read program P is written to the storage unit 12. Furthermore, the program P may be provided to the information processing device 1 by the communication unit 13 communicating with an external device. The learning model M includes a first learning model M1 and a second learning model M2. The electric power demand actual value table 121 and the learning model M will be described in detail later.

[0015] The communication unit 13 is a communication module or communication interface for communicating with the smart meter Fm of the facility F and the management device Em of the power plant E by wire or wirelessly, and is, for example, a wide-area wireless communication module such as LTE (registered trademark), 4G, or 5G. The control unit 11 acquires an actual power demand value from the smart meter Fm of the facility F via the communication unit 13 and an external network N such as the Internet. In addition, the control unit 11 transmits information (power transmission amount information) for controlling the power transmission amount of the power plant E to the management device Em of the power plant E.

[0016] FIG. 3 is an explanatory diagram showing an example of the power demand actual value table 121. In the power demand actual value table 121, the power demand actual value at each time that the information processing device 1 previously acquired from the smart meter Fm is recorded. The management items (fields) of the power demand actual value table 121 include, for example, a date field, a day of the week field, a time field, a power demand actual value field, and an outside temperature field. In the date field, the date (date) of the day when the power demand actual value was recorded is recorded. In the day of the week field, the day of the week of the date when the power demand actual value was recorded is stored. In the time field, the time (hour) when the power demand actual value was recorded is stored. In the power demand actual value field, the amount of power used by the facility F in the hour of the time stored in the time field (power demand actual value (kWh)) is stored.

[0017] In this embodiment, the time stored in the time field is divided into 30-minute intervals. For example, when the time stored in the time field is "early midnight", the power demand actual value field of the same record stores the power demand actual value in facility F from 0:00 to 0:30, and when the time stored in the time field is "late midnight", the power demand actual value field of the same record stores the power demand actual value in facility F from 0:30 to 1:00. That is, the power demand actual value table 121 records the power demand actual value for each unit time (30 minutes). The time stored in the time field may be divided into 1-hour or 3-hour intervals, etc.

[0018] The control unit 11 of the information processing device 1 reads out the power demand actual value at each time (per unit time) on a second specific day described later from the power demand actual value table 121, and creates input data to be input to the learning model M.

[0019] FIG. 4 is an explanatory diagram showing an example of the learning model M. The learning model M according to this embodiment is an ensemble learning model including a first learning model M1 and a second learning model M2. The learning model M may be composed of a single learning model. The first learning model M1 and the second learning model M2 each output a predicted value of the power demand (per unit time) at each time on a day (first specific day) on which the power demand needs to be predicted. The learning model M identifies (outputs) a power demand predicted value (per unit time) at each time on the first specific day based on the predicted value (first predicted value) output by the first learning model M1 and the predicted value (second predicted value) output by the second learning model M2. The input data input to the learning model M includes the day of the week of the first specific day, the predicted outside temperature (for each unit time) at the facility F (the predicted outside temperature in the area where the facility F is located) at each time of the first specific day acquired by the control unit 11 of the information processing device 1 from the weather server, and the actual power demand value (for each unit time) at each time of a second specific day prior to the first specific day read from the power demand actual value table 121. In this embodiment, the second specific day includes the same day of the week before the first specific day, the same day of the week before the first specific day, and the nearest day within the past week of the first specific day. In this embodiment, the nearest day within the past week of the first specific day is two days before the first specific day, but is not limited to this. In addition, the second specific day is not limited to each of the above-mentioned days, and may include, for example, a day one year before the first specific day, the same day of the week 52 weeks before the first specific day, or the day before the first specific day. In addition, the number of days included in the second specific day is not limited to three, and may be one, two, or four or more.

[0020] The first learning model M1 and the second learning model M2 are respectively input with the day of the week of the first specific day, the predicted outside temperature (per unit time) at each time on the first specific day, and the actual power demand value (per unit time) at each time on the second specific day, and the first learning model M1 outputs a first predicted value, and the second learning model M2 outputs a second predicted value. The learning model M, for example, specifies the average value of the first predicted value and the second predicted value as the power demand predicted value and outputs it. Note that the learning model M may be composed of a number of learning models each outputting a predicted value, and may specify a representative value including the average value, trimmed mean value, median, or mode of the predicted values ​​output by each learning model as the power demand predicted value. The day of the week of the first specific day included in the input data may be a numerical value (1 to 7) corresponding to each day of the week. 3, the predicted outside temperature on the first specific day and the actual power demand value on the second specific day included in the input data, and the first predicted value, the second predicted value, and the power demand forecast value on the first specific day to be output are shown in a table format in which the values ​​correspond to each time (each unit time). The learning model M outputs the values ​​at each time by performing the same calculation for each item of the input data at the same time.

[0021] FIG. 4 shows an example in which the first specific day is May 25, 2022 (hereinafter, the description will be made without mentioning the year). When the first specific day is May 25, the day of the week of the first specific day is Wednesday. In addition, the same day of the week before last of the first specific day included in the second specific day is May 11, the same day of the week before the first specific day is May 18, and two days before the first specific day is May 23. The control unit 11 of the information processing device 1 refers to the year, month, and day field of the power demand actual value table 121, reads out the power demand actual value at each time on each 22nd specific day, and sets it as input data. The day of the week of May 25 (Wednesday), the expected outside temperature on May 25, the power demand actual value on May 11, the power demand actual value on May 18, and the power demand actual value on May 23 are inputted into the learning model M. The learning model M to which the above-mentioned input data is inputted outputs the power demand forecast value on May 25.

[0022] The first learning model M1 according to the present embodiment is configured by a deep neural network (DNN). The first learning model M1 may be configured by various machine learning methods such as, for example, a long short term memory (LSTM), a transformer, a support vector machine (SVM), a logistic regression analysis, a multiple regression analysis, a decision tree, a random forest, or a k-nearest neighbor method.

[0023] The input layer included in the first learning model M1 has a plurality of neurons that accept input data including actual power demand values ​​(per unit time) at each time on the second specific day, the day of the week of the first specific day, and predicted outside temperature (per unit time) at each time on the first specific day, and passes the input data to the intermediate layer. The intermediate layer has a plurality of neurons that extract features of the input data, and passes the extracted features to the output layer. The output layer has neurons that output a first predicted value (per unit time) at each time on the first specific day, and outputs the first predicted value (per unit time) at each time on the first specific day based on the features output from the intermediate layer.

[0024] The first learning model M1 according to the present embodiment is trained using training data in which, for example, an actual power demand value on any day (third specific day) in the past than the first specific day is set as a correct output value, and actual power demand values ​​on the same day of the week before the third specific day, the same day of the week before, and a day two days before the third specific day, the day of the week of the third specific day, and the outdoor air temperature in the facility F measured on the third specific day are linked to the correct output value as input data. The control unit 11 of the information processing device 1 adjusts the bias in each layer of the first learning model M1 and the weight between each layer so that the correct output value included in the training data is output when input data included in the training data is input, and trains the first learning model M1. The control unit 11 of the information processing device 1 constructs the first learning model M1 by training using a plurality of training data (data related to the third specific day). The first learning model M1 may be trained by a computer different from the information processing device 1.

[0025] The second learning model M2 according to the present embodiment is configured by a random forest. The second learning model M2 may be configured by various machine learning methods such as DNN, LSTM, Transformer, SVM, logistic regression analysis, multiple regression analysis, decision tree, or k-nearest neighbor method.

[0026] The second learning model M2 configured in a random forest is a collection of a large number of randomly created decision trees (weak learners). Input data including the actual power demand value (per unit time) at each time on the second specific day, the day of the week on the first specific day, and the predicted outside temperature (per unit time) at each time on the first specific day are input to each decision tree of the second learning model M2. In each decision tree, the input data is classified according to conditions on the way from the root to the branch, and when the input data reaches a terminal leaf node, the value assigned to the terminal leaf node is output as a predicted value. The second learning model M2 outputs a second predicted value by averaging the predicted values ​​output from each decision tree. The second learning model M2 may output a representative value including the trimmed mean value, median, or mode of the predicted values ​​output from each decision tree as the second predicted value.

[0027] The second learning model M2 is trained using training data in which the actual power demand value on any day (third specific day) in the past than the first specific day is set as the correct output value, and the actual power demand value on the same day of the week before the third specific day, the same day of the week before, and the day two days before the third specific day, the day of the week of the third specific day, and the outdoor air temperature at the facility F measured on the third specific day are input as input data and linked to the correct output value. Each decision tree of the second learning model M2 is input with a sample set of training data related to a plurality of third specific days generated by bagging using bootstrap sampling, for example. The control unit 11 of the information processing device 1 generates a plurality (N pieces) of sample sets including training data related to the third specific day randomly selected from, for example, 500 days from the days in the past three years before the first specific day, by bootstrap. That is, the combination of the dates of the third specific day related to the training data is different for each sample set (note that overlap of the dates of the third specific day between each sample set is allowed). The control unit 11 performs learning for each decision tree by inputting the N sample sets to the N decision trees, respectively. In this way, the second learning model M2 is learned. The second learning model M2 may be learned by boosting.

[0028] The control unit 11 of the information processing device 1 identifies and outputs a power demand forecast value for each time on the first specific day by averaging, at each time, the first predicted value for each time on the first specific day output from the first learning model (DNN) M1 and the second predicted value for each time on the first specific day output from the second learning model (random forest) M2. That is, the control unit 11 outputs a power demand forecast value for each time on the first specific day by the learning model M.

[0029] 5 is a flowchart showing an example of processing by the information processing device 1. The control unit 11 of the information processing device 1 starts the processing at a specific time (e.g., 9:00 a.m.) every day, for example, with the day after the day on which the following processing is performed as the first specific day. Note that the control unit 11 may start the following processing when it acquires an instruction to output a power demand forecast value. The control unit 11 may also accept an input specifying a date on or after the next day, and perform the following processing with the specified date as the first specific day.

[0030] The control unit 11 of the information processing device 1 identifies the day of the week of the first specific day based on the year, month, and date of the first specific day (S1). The control unit 11 acquires the predicted outside temperature (for each unit time) at each time of the first specific day in the facility F from the weather server (S2). The control unit 11 reads out the power demand actual value (for each unit time) at each time on the same day of the week before last the first specific day, the same day of the week before the first specific day, and two days before the first specific day (multiple second specific days) from the power demand actual value table 121 (S3).

[0031] The control unit 11 inputs the day of the week of the first specific day, the predicted outside temperature (per unit time) at the facility F at each time on the first specific day, and the actual power demand value (per unit time) at each time on the second specific day into the first learning model M1 (S4), and outputs a first predicted value (per unit time) at each time on the first specific day (S5). The control unit 11 also inputs the day of the week of the first specific day, the predicted outside temperature (per unit time) at the facility F at each time on the first specific day, and the actual power demand value (per unit time) at each time on the second specific day into the second learning model M2 (S6), and outputs a second predicted value (per unit time) at each time on the first specific day (S7). The control unit 11 averages the first predicted value and the second predicted value at each time (S8), and specifies (outputs) the predicted power demand value (per unit time) at each time on the first specific day (S9). The control unit 11 identifies power transmission amount information for controlling the amount of power transmitted by the power plant E to the facility F based on the power demand forecast value (S10). The control unit 11 transmits the power transmission amount information to the management device Em of the power plant E (S11) and ends the process.

[0032] According to the above configuration, it is possible to predict with high accuracy the amount of electricity required on the first specific day in the facility F on a day before the first specific day. Note that the control unit 11 of the information processing device 1 may obtain an actual electricity demand value on the first specific day on a day after the first specific day, and calculate an imbalance fee for the facility F based on the difference between the predicted electricity demand value and the actual electricity demand value on the first specific day.

[0033] (Modification) In the above embodiment, the control unit 11 of the information processing device 1 inputs the day of the week of the first specific day, the predicted outside temperature of the first specific day, and the actual power demand value on the second specific day into the learning model M, and outputs the predicted power demand value on the first specific day, but is not limited to this. The control unit 11 may output the predicted power demand value by a learning model that outputs the predicted power demand value on the first specific day when the day of the week of the first specific day and the predicted outside temperature of the facility F on the first specific day are input. In this case, the learning model may be one that has been learned, re-learned, or tuned so as to output the same value as the actual power demand value on the second specific day when the day of the week of the second specific day and the outside temperature at the facility F actually measured on the second specific day are input.

[0034] The embodiments disclosed herein should be considered to be illustrative in all respects and not restrictive. The technical features described in each embodiment can be combined with each other, and the scope of the present invention is intended to include all modifications within the scope of the claims and equivalents to the scope of the claims. In addition, the independent claims and dependent claims described in the claims can be combined with each other in all combinations regardless of the reference format. Furthermore, the claims use a format in which a claim references two or more other claims (multiple claim format), but this is not limited to this. A format in which a multiple claim (multi-multi claim) that references at least one multiple claim may be used. [Explanation of symbols]

[0035] 1. Information processing device 11 Control section 12 Storage section 12a Storage medium 121 Electricity demand actual value table 13. Communications Department E Power Plant Em management device F Electricity-using facility (facility) Fm smart meter L Power Line M Learning Model M1 First learning model (DNN) M2 Second learning model (random forest) N Network P Program S Energy Management System

Claims

1. A day of the week of a first specific date and a predicted outside temperature at the power consumption facility, and an actual power demand value at the power consumption facility on a second specific date that is earlier than the first specific date are acquired; A learning model is trained to output a power demand forecast value for a first specific day when the day of the week and the predicted outside temperature of the first specific day and the actual power demand value for the second specific day that is older than the first specific day are input, and the learning model is trained to output a power demand forecast value for the first specific day when the day of the week and the predicted outside temperature of the first specific day and the actual power demand value for the second specific day are input, and the power demand forecast value for the first specific day is output. A program that causes a computer to carry out processing.

2. The day of the week and the predicted outside temperature per unit time of the first specific day, and the actual power demand value per unit time of the second specific day are input to the learning model, and a predicted power demand value per unit time of the first specific day is output. The program according to claim 1.

3. The second specific day is the same day of the week as the first specific day of the previous week.

3. The program according to claim 1 or 2.

4. inputting actual power demand values ​​on a plurality of the second specific dates into the learning model; Outputting a power demand forecast value for the first specific date 3. The program according to claim 1 or 2.

5. The second specific date includes the same day of the week before the first specific date, the same day of the week before the first specific date, and the closest day within the past week to the first specific date. The program according to claim 4.

6. the learning model includes a first learning model and a second learning model; inputting the day of the week and the predicted outside temperature of the first specific day, and the actual power demand value of the second specific day into the first learning model, and outputting a first predicted value for the first specific day; inputting the day of the week and the predicted outside temperature of the first specific day, and the actual power demand value on the second specific day into the second learning model, and outputting a second predicted value on the first specific day; The power demand forecast value is identified based on the first forecast value and the second forecast value.

3. The program according to claim 1 or 2.

7. the first learning model is a deep neural network; The second learning model is a random forest. The program according to claim 6.

8. The power demand forecast value is identified by averaging the first forecast value and the second forecast value. The program according to claim 6.

9. A day of the week of a first specific date and a predicted outside temperature at the power consumption facility, and an actual power demand value at the power consumption facility on a second specific date that is earlier than the first specific date are acquired; A learning model is trained to output a power demand forecast value for a first specific day when the day of the week and the predicted outside temperature of the first specific day and the actual power demand value for the second specific day that is older than the first specific day are input, and the learning model is trained to output a power demand forecast value for the first specific day when the day of the week and the predicted outside temperature of the first specific day and the actual power demand value for the second specific day are input, and the power demand forecast value for the first specific day is output. Information processing methods.

10. A day of the week of a first specific date and a predicted outside temperature at the power consumption facility, and an actual power demand value at the power consumption facility on a second specific date that is earlier than the first specific date are acquired; A learning model is trained to output a power demand forecast value for a first specific day when the day of the week and the predicted outside temperature of the first specific day and the actual power demand value for the second specific day that is older than the first specific day are input, and the learning model is trained to output a power demand forecast value for the first specific day when the day of the week and the predicted outside temperature of the first specific day and the actual power demand value for the second specific day are input, and the power demand forecast value for the first specific day is output. Processing section An information processing device comprising:

Citation Information

Patent Citations

  • Demand prediction apparatus, computer program, smart meter and power storage device

    JP2016019358A

  • Electric power demand supply supporting system, information processing apparatus, information processing method and information processing program

    JP2018077571A

  • Power demand prediction device, power demand prediction method, and power demand prediction program

    JP2019146283A

  • Power demand prediction system

    JP2020205692A

  • Information processing apparatus, information processing method, information processing system, and computer program

    JP2022042835A

Cited By

  • system

    JP2026155559A

  • system

    JP7943438B2