Slab lifting device and installation method of slab lifting device
The floor slab lifting device addresses the issue of weight and transportation inefficiency by using a self-propelled configuration with horizontal displacement mechanisms, reducing weight and traffic impact while maintaining lifting performance.
Patent Information
- Application Number
- JP2024116993
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2041-02-25
AI Technical Summary
Existing floor slab lifting devices are heavy and require multiple telescoping mechanisms for transportation, leading to increased weight, which affects fuel efficiency and imposes a burden on bridges and transportation vehicles, necessitating lane closures for installation.
A floor slab lifting device with a self-propelled configuration, comprising a lower unit and an upper unit connected by columns with a column displacement mechanism, allowing horizontal displacement and reduced vertical expansion, enabling separate transportation and assembly on one lane without heavy machinery.
The device reduces weight, minimizes traffic disruption, improves fuel efficiency, and enhances lifting performance by allowing self-propelled operation and compact transportation, facilitating efficient floor slab renewal work.
Smart Images

Figure 2024138549000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a deck slab lifting device for removing or erecting a deck and a method for installing the deck slab lifting device. [Background technology]
[0002] Patent Document 1 discloses a deck lifting device for removing or erecting a deck. This deck lifting device has gate-shaped legs that can be extended and retracted in the vertical and lateral directions to facilitate transportation by trailer. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2004-232426 A Summary of the Invention [Problem to be solved by the invention]
[0004] The deck slab lifting device described in Patent Document 1 has legs that are designed to expand and contract by a large amount in the vertical direction because the height when transported by a trailer needs to be significantly lower than the height during lifting work. Furthermore, this deck slab lifting device is provided with slide guides that support the legs along the width direction in order to expand and contract the legs in the width direction.
[0005] A deck lifting device equipped with multiple telescopic mechanisms with a relatively large amount of extension and contraction can be made compact in size during transportation, but it is heavy. If the weight of the deck lifting device is large, it may impose a heavy burden on the bridge or the like where the deck is removed or erected, and may worsen the fuel efficiency of the trailer transporting the deck lifting device.
[0006] An object of the present invention is to reduce the weight of a deck slab lifting device, in particular to reduce the weight of the deck slab lifting device during transportation. [Means for solving the problem]
[0007] The present invention is a deck slab lifting device comprising a lifting mechanism capable of lifting a deck slab, an upper support body extending in the fore-and-aft direction and holding the lifting mechanism, a plurality of pillars attached to the upper support body, a running mechanism provided below the pillars, and a pillar displacement mechanism that displaces the position of the pillars horizontally to a first position close to the upper support body and a second position away from the upper support body, wherein the pillar displacement mechanism has a horizontal connecting member that connects the pillars and the upper support body in the horizontal direction, and a hinge joint that supports the horizontal connecting member rotatably in a horizontal plane with the connection part between the upper support body and the horizontal connecting member as a fulcrum, and the position of the pillar can be displaced between the first position and the second position as the horizontal connecting member is rotated.
[0008] The present invention also provides a method for installing a deck lifting device comprising a lifting mechanism capable of lifting the deck, an upper support body extending in the fore-and-aft direction and holding the lifting mechanism, a plurality of pillars attached to the upper support body, a running mechanism provided below the pillars, and a pillar displacement mechanism for displacing the position of the pillars horizontally to a first position close to the upper support body and a second position away from the upper support body, the method including a step of displacing the position of the pillars from the first position to the second position by rotating a horizontal connecting member in a horizontal plane, the horizontal connecting member connecting the pillars and the upper support body horizontally, using the connection part between the horizontal connecting member and the upper support body as a fulcrum, when lowering the deck from the bed of a transport vehicle. Effect of the Invention
[0009] According to the present invention, the weight of the deck slab lifting device can be reduced, in particular the weight of the deck slab lifting device during transportation can be reduced. [Brief description of the drawings]
[0010] [Figure 1] FIG. 11 is a schematic diagram for explaining deck renewal work. [Diagram 2] FIG. 2 is a side view of the deck lifting device according to the embodiment of the present invention. [Diagram 3] FIG. 2 is a plan view of the deck lifting device according to the embodiment of the present invention. [Figure 4] FIG. 3 is a cross-sectional view taken along line AA in FIG. 2. [Diagram 5] FIG. 13 is a diagram showing the lower unit in a transported state. [Figure 6] FIG. 13 is a diagram showing the upper unit in a transported state. [Figure 7] 11A to 11C are diagrams for sequentially explaining the process of lowering the lower unit from the loading platform. [Figure 8] 11A to 11C are diagrams for sequentially explaining the process of lowering the upper unit from the loading platform. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] Hereinafter, a deck slab lifting device and an installation method for the deck slab lifting device according to an embodiment of the present invention will be described with reference to the drawings.
[0012] A deck slab lifting device 100 according to an embodiment of the present invention is a device used to lift and lower a deck in the work of updating an existing deck installed in a bridge or tunnel with a new deck.
[0013] First, a typical deck renewal work performed by a deck lifting device will be described with reference to Fig. 1. Fig. 1 is a schematic diagram showing an overview of the deck renewal work on a bridge 1.
[0014] As shown in FIG. 1, the bridge 1 has a number of girders 4 spaced apart across the width of the bridge 1 between abutments (not shown), and a number of cross beams 5 provided between adjacent girders 4, and is constructed by installing a number of deck slabs 2 along the longitudinal direction of the bridge 1 so as to fill the gaps between adjacent girders 4.
[0015] The load of vehicles passing over the bridge 1 is transmitted to the girder 4 via the deck 2, which is mainly made of reinforced concrete. As a result, the deck 2 gradually deteriorates or becomes damaged over time. Therefore, it is necessary to periodically carry out deck renewal work to replace the deck 2.
[0016] In the deck renewal work, the existing deck 2a is removed from the girder 4, and a new deck 2b is installed on the girder 4. The range in which the deck 2 is renewed may be the entire bridge 1, or only a part of it.
[0017] In the deck removal work, the existing deck 2a is lifted up using a deck removal device 7 (deck lifting device), and the existing deck 2a is removed from the girder 4. The lifted existing deck 2a is loaded onto the platform of a transport vehicle (not shown) and transported out of the bridge 1.
[0018] The deck removal device 7 is self-propelled and equipped with urethane rubber tires driven by a motor, and can move on the existing deck 2a in the longitudinal direction of the bridge 1. The existing deck 2a is removed by sequentially removing the existing deck 2a from the girder 4 while moving the deck removal device 7 from one end of the bridge 1 to the other end.
[0019] During deck installation work, a new deck slab 2b is transported into one end of the bridge 1 by a transport cart (not shown), and the new deck slab 2b is lifted by a deck erection device 8 (deck lifting device) and installed on the girder 4.
[0020] The deck erection device 8, like the deck removal device 7, is configured to be self-propelled and can move in the longitudinal direction of the bridge 1 on the new deck 2b installed on the girder 4. The deck erection device 8 is moved from one end of the bridge 1 to the other end, and the new deck 2b is sequentially installed in the portion from which the existing deck 2a was removed, thereby installing the new deck 2b.
[0021] In the above-mentioned deck renewal work, the deck removal work and deck installation work will be carried out in parallel, and scraping work to remove rust and other imperfections from girder 4 and height adjustment work to adjust the height of girder 4 will also be carried out simultaneously.
[0022] In order to minimize the impact on vehicle traffic, deck renewal work, which is carried out periodically in this manner, is carried out by restricting traffic on only one of the multiple lanes 3a, 3b on bridge 1.
[0023] However, in order to install relatively large deck lifting devices such as the deck removal device 7 and deck erection device 8 on the bridge 1, it is necessary to restrict traffic on all lanes 3a and 3b, set up large heavy machinery such as a crane truck, and assemble the components of the deck lifting device brought in by a transport vehicle such as a trailer while suspending them from the crane truck. This requires the temporary halt of vehicle traffic, which has a significant impact on traffic.
[0024] In order to make it possible to install a deck lifting device without restricting traffic on all lanes 3a, 3b, it is possible, for example, to provide the deck lifting device with a mechanism that expands and contracts in the width direction and a mechanism that expands and contracts in the vertical direction, and to lower the deck lifting device from the loading platform within one lane 3a by extending each of the expansion mechanisms of the deck lifting device brought in by a transport vehicle onto the loading platform of the transport vehicle.
[0025] However, if a deck slab lifting device is provided with multiple telescopic mechanisms with a relatively large amount of telescopic movement, the size of the device during transportation can be made compact, but the weight of the device increases, which may result in a greater burden on the bridge on which the deck slab lifting device is installed and a worsening of the fuel efficiency of the vehicle transporting the deck slab lifting device. In addition, there is a limit to the load weight of the vehicle transporting the device, which limits the weight of the device itself, and as a result, there is a risk of a decrease in the deck slab lifting capacity.
[0026] Furthermore, in order to reduce the weight of the deck lifting device, it is possible to make it a stationary type that does not have a running mechanism such as an electric motor to make it self-propelled. However, in order to efficiently carry out the above-mentioned deck renewal work, it is preferable to make the deck lifting device self-propelled.
[0027] In order to solve such problems, the deck slab lifting device 100 according to this embodiment is configured to minimize the impact on traffic when installing the device, reduce the burden on bridges, etc., and improve the fuel efficiency of transport vehicles. Also, the device is configured to improve lifting performance.
[0028] Next, the configuration of the deck slab lifting device 100 according to this embodiment will be described with reference to Figures 2 to 4. Figure 2 is a side view of the deck slab lifting device 100, Figure 3 is a plan view of the deck slab lifting device 100, and Figure 4 is a cross-sectional view showing a cross section along line AA in Figure 2. Note that in the following description, as shown by the arrows in Figures 2 to 4, the left side of Figures 2 and 3 is the front, the right side is the rear, and the upper side of Figure 3 is the right side and the lower side is the left side.
[0029] 2, the deck slab lifting device 100 is composed of a lower unit 10 having traveling mechanisms 21, 26, and an upper unit 40 having a lifting mechanism 50 attached to the front thereof, and is integrated by connecting the upper unit 40 above the lower unit 10. In other words, the deck slab lifting device 100 is configured to be transportable in a state where it is separated into the lower unit 10 and the upper unit 40, as described later.
[0030] As shown in Figures 3 and 4, the lower unit 10 is composed of a first lower unit 10A arranged on the left side of the deck slab lifting device 100 and a second lower unit 10B arranged on the right side of the deck slab lifting device 100 in the fore-and-aft direction, and each lower unit 10A, 10B has a lower support body 11 extending in the fore-and-aft direction, a front running mechanism 21 attached to the lower front of the lower support body 11, and a rear running mechanism 26 attached to the lower rear of the lower support body 11.
[0031] The lower support body 11 has a lower main girder 12 extending in the front-rear direction and a connection column 13 extending upward from the lower main girder 12. The connection columns 13 are provided at the front and rear of the lower main girder 12, respectively, and a connection flange 13a is provided at the upper end of each of them, which serves as a connection portion between the lower unit 10 and the upper unit 40. In addition, a front connection portion 12a (traveling mechanism connection portion) to which the front running mechanism 21 is connected is provided at the lower front of the lower main girder 12, and a rear connection portion 12b (traveling mechanism connection portion) to which the rear running mechanism 26 is connected is provided at the lower rear of the lower main girder 12. The lower main girder 12 and the connection column 13 are formed of steel materials such as steel pipes and H-shaped steel, and are welded together.
[0032] The front traveling mechanism 21 is provided with two wheel units 22, 23 (wheels) which are tires made of urethane rubber, and an electric motor 24 which drives one of the wheel units 23, and the rear traveling mechanism 26 is provided with one wheel unit 27 (wheel) which is a tire made of urethane rubber, and an electric motor 28 which drives the wheel unit 27. The two wheel units 22, 23 of the front traveling mechanism 21 which are provided closer to the lifting mechanism 50 are arranged at a predetermined distance in the front-rear direction in order to distribute the load acting on the front traveling mechanism 21 during lifting work.
[0033] The driving of each electric motor 24, 28 is controlled by an operator via an operation panel (not shown). By providing the electric motors 24, 28 for driving the wheel sections 23, 27 in this way in the lower unit 10, the deck slab lifting device 100 can move independently in the forward and backward directions in response to the operation of the operator. Note that the number of travel mechanisms, the number of wheel sections, the arrangement of the electric motors, etc. described above are merely examples, and for example, three or more travel mechanisms may be provided, and an electric motor may be provided in only one of the travel mechanisms.
[0034] The upper unit 40 has a lifting mechanism 50 capable of lifting and lowering the deck 2, an upper holder 41 extending in the front-rear direction and holding the lifting mechanism 50 at its front side, a plurality of pillars 60A-60D having an extension mechanism capable of extending and contracting in the up-down direction and attached to the upper holder 41, and pillar displacement mechanisms 70A-70D that displace the positions of the pillars 60A-60D in the horizontal direction between a first position close to the upper holder 41 and a second position away from the upper holder 41. The positions of the pillars 60A-60D shown in Figures 2-4 are the second positions.
[0035] The upper support body 41 has a pair of main girders 42 extending in the front-rear direction, a pair of upper connecting beams 43 connecting the pair of main girders 42 in the horizontal direction, a pair of lower girders 45 provided below the pair of main girders 42 and extending parallel to the pair of main girders 42, a pair of lower connecting beams 46 connecting the pair of lower girders 45 in the horizontal direction, and four connecting columns 44 connecting the pair of main girders 42 and the pair of lower girders 45 in the up-down direction. These members are formed from steel materials such as steel pipes and H-shaped steel, and are joined to each other by, for example, welding.
[0036] The pair of main girders 42 are longer than the pair of lower girders 45 and have an extension portion 42a that extends forward further than the upper connecting beam 43 and connecting column 44 located on the forward side, and the lifting mechanism 50 is held in this extension portion 42a.
[0037] The lifting mechanism 50 constitutes a suspension point that serves as the payout and take-up portion of the suspension wire rope that lifts the deck 2, which is the suspended load, and has a beam 52 formed of an H-shaped steel material that is suspended between a pair of main girders 42, and a lifting part 51 attached to the beam 52. The lifting part 51 is movable in the left-right direction along the beam 52, and has a structure that allows it to rise and fall and rotate when the deck slab 2 is suspended from the hook.
[0038] The pillars 60A to 60D are formed of hydraulic cylinders (telescopic mechanisms) and are attached to the respective connecting pillars 44 in a state in which they can be extended and retracted in the vertical direction. Specifically, each of the pillars 60A to 60D is a hydraulic cylinder having a cylinder tube 61, a piston (not shown) that slides in the cylinder tube 61, and a rod 62 whose upper end is connected to the piston and whose lower end extends outside the cylinder tube 61. The cylinder tube 61 is attached to the connecting pillar 44 via a horizontal connecting member 75 (to be described later) or the like, thereby being held by the upper holder 41. In addition, a connecting flange 62a that serves as a connecting portion between the lower unit 10 and the upper unit 40 is provided at the lower end of the rod 62 of each of the pillars 60A to 60D. The connecting flange 62a can be freely connected to and separated from the connecting flange 13a of the lower unit 10.
[0039] The mechanism for extending and retracting the pillars 60A to 60D is not limited to a hydraulic cylinder, and may be any mechanism that is capable of extending and retracting in the vertical direction, such as an electric actuator.
[0040] The pillar displacement mechanisms 70A to 70D include a horizontal connecting member 75 that connects the pillars 60A to 60D and the upper holding body 41 in the horizontal direction, and an actuator 71 that can rotate the horizontal connecting member 75 in a horizontal plane, using the connection portion between the upper holding body 41 and the horizontal connecting member 75 as a fulcrum.
[0041] The horizontal connection members 75 are plate-like members having one end joined to the cylinder tubes 61 of the supports 60A to 60D, and a pair of them are provided at an interval in the vertical direction on each cylinder tube 61. The other end of the horizontal connection member 75 is connected to a connecting portion 44a provided on each connecting pillar 44 of the upper holder 41.
[0042] As shown in Figure 4, the connecting portion 44a is a portion formed by bulging outward from each connecting pillar 44 toward the outside of the upper retaining body 41 in the left-right direction, and its vertical length is large enough to be inserted between a pair of horizontal connecting members 75.
[0043] The horizontal connection member 75 and the coupling portion 44a thus formed are coupled by a hinge joint including a pin member 76 that passes through the horizontal connection member 75 and the coupling portion 44a in the up-down direction. In this manner, the horizontal connection member 75 is supported by the hinge joint so as to be rotatable in a horizontal plane relative to the upper holder 41 around the pin member 76. In other words, each of the columns 60A-60D is rotatable in a horizontal plane relative to the upper holder 41 around the pin member 76 by the hinge joint.
[0044] The actuator 71 is a hydraulic cylinder having a cylinder tube 72, a piston (not shown) that slides inside the cylinder tube 72, and a rod 73 having one end connected to the piston and the other end connected to a horizontal connecting member 75. The actuator 71 is fixed to the upper holder 41 by attaching the cylinder tube 72 to the connecting column 44 via a bracket (not shown).
[0045] A connecting portion 75a to which the rod 73 of the actuator 71 is connected is formed protruding from the horizontal connection member 75. The position at which the connecting portion 75a is provided and the mounting angle of the actuator 71 relative to the connecting column 44 are set so that the positions of the columns 60A-60D can be smoothly switched between the first position and the second position in response to the extension and contraction of the actuator 71.
[0046] Specifically, when the actuator 71 is extended, as shown in FIG. 3, when the deck slab lifting device 100 is viewed from above, the horizontal connecting member 75 and the main girder 42 are approximately perpendicular to each other, and the positions of the pillars 60A to 60D are in a second position away from the upper supporting body 41, and when the actuator 71 is contracted, the horizontal connecting member 75 and the main girder 42 are approximately parallel to each other, and the positions of the pillars 60A to 60D are in a first position close to the upper supporting body 41.
[0047] The actuator 71 may not be completely fixed to the connecting column 44, but may be attached in a state in which it can rotate slightly in a horizontal plane. The actuator 71 is not limited to a hydraulic cylinder, and may be any mechanism that has an expandable and contractible configuration, such as an electric actuator.
[0048] 2 to 4, the deck slab lifting device 100 configured as described above lifts and lowers the deck slab 2 in a state in which the positions of the pillars 60A to 60D are in a second position away from the upper support body 41. For this reason, in order to prevent the positions of the pillars 60A to 60D from moving from the second position to the first position during the lifting operation, the upper unit 40 is provided with a connecting member 78 that connects the lower girder 45 and the cylinder tubes 61 of the pillars 60A to 60D to hold the pillars 60A to 60D in the second position when the pillars 60A to 60D are in the second position.
[0049] The connecting member 78 is a rod-shaped member having a turnbuckle that can adjust the axial length. When the positions of the pillars 60A-60D are switched or when the pillars 60A-60D are in the first position, one end of the connecting member 78 is detached from the cylinder tube 61 and is stored in the upper unit 40 in a state aligned with the lower girder 45.
[0050] The deck slab lifting device 100 has a connection flange 13a of the lower unit 10 configured as described above and a connection flange 62a of the upper unit 40 configured as described above that can be freely connected and separated, and are integrally configured by being joined together via bolts not shown.
[0051] Next, the transportation state of the deck lifting device 100 will be described with reference to Figs. 5 and 6. As shown in Figs. 5 and 6, the deck lifting device 100 is divided into a lower unit 10 and an upper unit 40, which are transported by different transport vehicles T1 and T2. Fig. 5(a) is a diagram of the transportation state of the lower unit 10 seen from the left side of the first transport vehicle T1, and Fig. 5(b) is a diagram of the transportation state of the lower unit 10 seen from above the first transport vehicle T1. Fig. 6(a) is a diagram of the transportation state of the upper unit 40 seen from the left side of the second transport vehicle T2, and Fig. 6(b) is a diagram of the transportation state of the upper unit 40 seen from above the second transport vehicle T2. In the following, the front of the vehicle will be referred to as the front, the rear as the rear, the left side of the vehicle as the left, and the right side as the right, as shown by the arrows in Figs. 5 and 6.
[0052] First, with reference to FIG. 5, the transportation state of the lower unit 10 will be described.
[0053] A lift device 80 used when lowering the lower unit 10 onto the road is provided on the loading platform of the first transport vehicle T1 that transports the lower unit 10. The lift device 80 is also used when loading the lower unit 10 from the road onto the loading platform.
[0054] The lift device 80 has a lift section 81 capable of moving the lower unit 10 in the up-down direction, and a slide section 84 (gap expansion / contraction mechanism) capable of moving the lower unit 10 in the width direction of the vehicle.
[0055] The lift section 81 has a box-shaped base section 83 that is fixed to the loading platform and is open at the top, a box-shaped displacement section 82 that is open at the bottom and covers the base section 83 from above, and a plurality of hydraulic cylinders (not shown) arranged in a space partitioned inside the base section 83 and the displacement section 82.
[0056] The displacement section 82 and the base section 83 are nested, and the displacement section 82 is supported by the base section 83 so as to be slidable in the vertical direction. In addition, the multiple hydraulic cylinders are installed in a state in which they can expand and contract in the vertical direction, with their cylinder tubes fixed to the base section 83 and the tips of the rods extending from the cylinder tubes connected to the displacement section 82. For this reason, the displacement section 82 is displaced in the vertical direction relative to the base section 83 in response to the expansion and contraction of the multiple hydraulic cylinders.
[0057] The slide parts 84 are provided on the front and rear sides of the vehicle with the lift part 81 in between, and are displaced in the vertical direction in accordance with the displacement of the lift part 81. Note that since the two slide parts 84 have the same configuration, the following will describe the slide part 84 provided on the rear side of the vehicle.
[0058] The slide portion 84 has a slide guide portion 84a attached to the displacement portion 82 of the lift portion 81, two slide members 85a, 85b supported by the slide guide portion 84a so as to be freely slidable in the left-right direction, and two hydraulic cylinders 87a, 87b provided within the slide guide portion 84a and which slide each of the slide members 85a, 85b horizontally in the left-right direction.
[0059] The slide members 85a, 85b are composed of a first slide member 85a which is coupled to the first lower unit 10A mounted on the left side of the loading platform, and a second slide member 85b which is coupled to the second lower unit 10B which is mounted on the right side of the loading platform.
[0060] An extension portion 86 extending downward is provided at the left end portion of the first slide member 85a, and a flange portion 86a is provided at the lower end of the extension portion 86, which is connected to the lower main girder 12 of the first lower unit 10A via a bolt (not shown).
[0061] The first hydraulic cylinder 87a that slides the first slide member 85a has a cylinder tube fixed to the slide guide portion 84a, while the tip end of the rod extending from the cylinder tube is connected to an extension portion 86 provided on the first slide member 85a. Therefore, the first slide member 85a slides leftward when the first hydraulic cylinder 87a expands, and slides rightward when the first hydraulic cylinder 87a contracts.
[0062] The second slide member 85b and the second hydraulic cylinder 87b are also configured in a similar manner, and the second slide member 85b slides to the right when the second hydraulic cylinder 87b extends, and slides to the left when the second hydraulic cylinder 87b contracts.
[0063] 5, when the first lower unit 10A and the second lower unit 10B are transported by the first transport vehicle T1, the hydraulic cylinders 87a, 87b of the slide section 84 are contracted to reduce the distance between the first lower unit 10A and the second lower unit 10B in the left-right direction so that the first lower unit 10A and the second lower unit 10B fit on the loading platform. At this time, the lift section 81 is extended to such an extent that the wheel sections 22, 23, 27 come into contact with the loading platform.
[0064] The mechanism for extending and retracting the lift portion 81 in the vertical direction and the mechanism for sliding the slide member 85a in the horizontal direction are not limited to hydraulic cylinders, and may be any mechanism having an extendable and retractable configuration, for example, an electric actuator.
[0065] The first lower unit 10A and the second lower unit 10B loaded on the loading platform are fixed to a certain extent to the loading platform by the lift device 80 configured as described above, but fixing devices (not shown) are used as appropriate to prevent them from moving on the loading platform due to vibrations during transportation, etc.
[0066] Next, the transportation state of the upper unit 40 will be described with reference to FIG.
[0067] A lift device 90 used when assembling the upper unit 40 to the lower unit 10 is provided on the loading platform of the second transport vehicle T2 that transports the upper unit 40. The lift device 90 is also used when removing the upper unit 40 from the lower unit 10 and loading it onto the loading platform.
[0068] The lift device 90 is a hydraulic cylinder with a telescopic mechanism that can be extended and retracted in the vertical direction, and includes a cylinder tube 91 fixed to the platform, a piston (not shown) that slides inside the cylinder tube 91, and a rod 92 having one end connected to the piston and the other end protruding upward from the cylinder tube 91. In addition, the upper end of the rod 92 is provided with a flange portion 92a that is connected to the lower girder 45 of the upper unit 40 via a bolt (not shown).
[0069] A pair of the lift devices 90 having the above configuration is provided on the front side and a pair is provided on the rear side of the pair of lower girders 45. In other words, the upper unit 40 is supported and fixed by at least four lift devices 90 on the loading platform.
[0070] As shown in FIG. 6, when the upper unit 40 is transported by the second transport vehicle T2, each lift device 90 is put into its most contracted state so as to make the height of the upper unit 40, which corresponds to the height of the second transport vehicle T2 during transport, as low as possible.
[0071] The mechanism for extending and retracting the lift device 90 in the vertical direction is not limited to a hydraulic cylinder, and may be any mechanism having an extendable configuration, for example, an electric actuator. Also, since the lift device 90 only needs to support the parts of the upper unit 40 other than the columns 60A-60d having an extendable function, like the lower girder 45, it may be configured to support the main girder 42 instead of the lower girder 45.
[0072] In addition, when the upper unit 40 is transported by the second transport vehicle T2, in order to enable the upper unit 40 to fit onto the loading platform, the actuators 71 of the pillar displacement mechanisms 70A-70D are contracted to move the pillars 60A-60D to a first position close to the upper holding body 41 in the horizontal direction, thereby making the width of the upper unit 40 in the left-right direction as small as possible.
[0073] The upper unit 40 loaded on the platform is fixed to the platform to some extent by the lift device 90 configured as described above, but fixing devices (not shown) are used as appropriate to prevent the upper unit 40 from moving on the platform due to vibrations during transportation. Note that, in order to stabilize the posture of the upper unit 40 during transportation, the telescopic mechanisms of the pillars 60A-60D may be extended so that the connection flanges 62a come into contact with the platform.
[0074] Next, the process of unloading each unit 10, 40 from the bed of the transport vehicles T1, T2 and assembling the deck slab lifting device 100 will be described with reference to Figures 7 and 8. Figure 7 is a diagram showing the process of unloading the lower unit 10 from the bed of the first transport vehicle T1, and Figure 8 is a diagram showing the process of unloading the upper unit 40 from the bed of the second transport vehicle T2 and assembling it to the lower unit 10. Note that in the following description, similar to Figures 5 and 6, the front of the vehicle will be referred to as the front, the rear as the rear, the left side of the vehicle as the left, and the right side as the right.
[0075] First, with reference to FIG. 7, a process of unloading the lower unit 10 from the bed of the first transporter vehicle T1 will be described.
[0076] The first transport vehicle T1 (leading transport vehicle) transporting the lower unit 10 arrives at the site where the deck lifting device 100 is to be installed ahead of the second transport vehicle T2 (following transport vehicle) transporting the upper unit 40, and lowers the lower unit 10 from its loading platform onto the road.
[0077] Specifically, when the first transport vehicle T1 arrives at the site where the deck lifting device 100 is to be installed, the lift section 81 of the lift device 80 is further extended on the loading platform of the first transport vehicle T1, and as shown in (a) of Figure 7, each wheel section 22, 23, 27 of the lower unit 10 is raised from the loading platform by a predetermined gap G1, i.e., each wheel section 22, 23, 27 is slightly separated from the loading platform.
[0078] In this state where the wheel sections 22, 23, 27 are separated from the bed, the hydraulic cylinders 87a, 87b of the slide section 84 are extended, and the first slide member 85a is slid leftward and the second slide member 85b is slid rightward as shown in Fig. 7(b). That is, the distance between the first lower unit 10A and the second lower unit 10B in the left-right direction of the first transporter vehicle T1 is widened by extending the hydraulic cylinders 87a, 87b of the slide section 84. In this manner, the slide section 84 functions as a gap widening / reducing mechanism that can widen / reduc the distance between the pair of lower holders 11.
[0079] As a result, the first lower unit 10A connected to the first slide member 85a moves to the outside left of the cargo bed, and the second lower unit 10B connected to the second slide member 85b moves to the outside right of the cargo bed.
[0080] Then, with the first lower unit 10A and the second lower unit 10B positioned outside the loading platform, the lift unit 81 is gradually contracted, and the wheel units 22, 23, 27 of the lower unit 10 are landed on the road surface as shown in Fig. 7(c). The first lower unit 10A and the second lower unit 10B, with the wheel units 22, 23, 27 in contact with the road surface, are supported by support members such as wheel stops (not shown) and become self-supporting.
[0081] Then, with the first lower unit 10A and the second lower unit 10B supported independently on the road surface, the bolts connecting the flange portions 86a of each slide member 85a to the lower main girder 12 of the lower unit 10 are removed.
[0082] As a result, the first lower unit 10A and the second lower unit 10B transported by the first transport vehicle T1 are lowered on one lane along the first transport vehicle T1, respectively, on the left and right sides thereof, completing the process of lowering the lower units 10 from the loading platform of the first transport vehicle T1. Note that the gap between the first lower unit 10A and the second lower unit 10B in the left-right direction is set to a gap that allows the following second transport vehicle T2 to enter.
[0083] Next, with reference to FIG. 8, a process of lowering the upper unit 40 from the bed of the second transporter vehicle T2 and assembling it to the lower unit 10 lowered onto the road surface will be described.
[0084] The second transport vehicle T2 transporting the upper unit 40 enters between the first lower unit 10A and the second lower unit 10B, replacing the first transport vehicle T1 which has unloaded the lower unit 10 and retreated forward, and unloads the upper unit 40 from its loading platform onto the lower unit 10.
[0085] Specifically, when the second transport vehicle T2 arrives between the first lower unit 10A and the second lower unit 10B, each lift device 90 is extended on the loading platform of the second transport vehicle T2 so that the height H2 of the lower surface of the connecting flange 62a of the upper unit 40 is higher than the height H1 of the upper surface of the connecting flange 13a of the lower unit 10, as shown in (a) of Figure 8.
[0086] In addition, when the upper unit 40 supported by each lift device 90 is transported by the second transport vehicle T2, if the height H2 of the lower surface of the connection flange 62a is higher than the height H1 of the upper surface of the connection flange 13a of the lower unit 10 lowered on the road surface, each lift device 90 does not need to have a telescopic function and may be provided as a simple stand. In other words, when each lift device 90 is used as a stand that simply supports the upper unit 40, its height is set so that the height H2 of the lower surface of the connection flange 62a of the upper unit 40 when transported by the second transport vehicle T2 is higher than the height H1 of the upper surface of the connection flange 13a of the lower unit 10 lowered on the road surface. In addition, if the upper unit 40 is transported in such a state in which the height H2 of the lower surface of the connection flange 62a of the upper unit 40 is relatively high, there is a risk of exceeding the height limit of the second transport vehicle T2, so it is preferable that the lift device 90 has a telescopic function.
[0087] It is preferable that the height H1 of the upper surface of the connection flange 13a of the lower unit 10 is as high as possible in order to reduce the amount of expansion and contraction of the pillars 60A to 60D. However, in order to increase this height H1, it is necessary to increase the amount of expansion and contraction of the lift device 90. However, if the amount of expansion and contraction of the lift device 90 is increased, the length of the lift device 90 when contracted also increases, and as a result, there is a risk that the height of the upper unit 40 during transportation, i.e., the height of the second transport vehicle T2, will exceed the limit. For this reason, the height H1 of the upper surface of the connection flange 13a of the lower unit 10 is appropriately set according to the amount of expansion and contraction that can be set in the lift device 90.
[0088] In this state where the connection flange 62a of the upper unit 40 is positioned higher than the connection flange 13a of the lower unit 10, the actuators 71 of each of the support column displacement mechanisms 70A-70D are extended, and the horizontal connection members 75 are rotated about the pin members 76 as shown in Fig. 8(b), displacing the positions of each of the support columns 60A-60D from the first positions shown by the dashed lines to the second positions. Note that the lower unit 10 is not shown in Fig. 8(b) to make the movement of each of the support columns 60A-60D easier to understand.
[0089] Then, when the positions of the pillars 60A-60D are in the second positions, the telescopic mechanisms of the pillars 60A-60D are slightly extended, and the connection flange 62a of the upper unit 40 is brought into contact with the connection flange 13a of the lower unit 10 as shown in Fig. 8(c), and the connection flange 13a and the connection flange 62a are joined by bolts (not shown). At the same time, the lower girder 45 and the cylinder tubes 61 of the pillars 60A-60D are connected by the connecting members 78.
[0090] In addition, when the connection flange 62a of the upper unit 40 is abutted against the connection flange 13a of the lower unit 10, instead of slightly extending the telescopic mechanisms of each of the pillars 60A to 60D, the telescopic mechanisms of each of the lift devices 90 may be slightly contracted.
[0091] After the connection flange 13a and the connection flange 62a are connected via bolts, the bolts connecting the flange portion 92a of each lift device 90 to the lower girder 45 of the upper unit 40 are removed, and the telescopic mechanism of each lift device 90 is contracted as shown in (c) of Figure 8.
[0092] After the loading platform of the second transport vehicle T2 is thus disconnected from the upper unit 40, the telescopic mechanisms of the pillars 60A-60D are further extended, so that the height of the lifting mechanism 50 of the deck slab lifting device 100 reaches a predetermined height as shown in Fig. 2, making it possible to perform the lifting operation of lifting up and lowering the deck slab 2. After this, the second transport vehicle T2 retreats forward.
[0093] As a result, the upper unit 40 transported by the second transport vehicle T2 is assembled to the lower unit 10 that was previously lowered onto the road surface on one lane, and the process of lowering the upper unit 40 from the loading platform of the second transport vehicle T2 is completed, and the installation of the deck lifting device 100 is also completed.
[0094] In the above embodiment, the upper unit 40 and the lower unit 10 are each transported so that the lifting mechanism 50 is positioned at the front side, but the upper unit 40 and the lower unit 10 may also be transported by each transport vehicle T1, T2 so that the lifting mechanism 50 is positioned at the rear side.
[0095] The process for removing the deck slab lifting device 100 is performed in the reverse order to the above-mentioned delivery process, and therefore a description thereof will be omitted.
[0096] According to the above embodiment, the following advantageous effects are achieved.
[0097] In this embodiment, the deck slab lifting device 100 can be easily installed on one traffic lane by connecting the supports 60A-60D of the upper unit 40 to the lower support body 11 of the lower unit 10. In this way, there is no need to restrict traffic on multiple traffic lanes to assemble the deck slab lifting device 100, and there is also no need to prepare large heavy machinery such as a crane truck, so the impact on traffic when installing the deck slab lifting device 100 at the construction site can be kept to a minimum.
[0098] In addition, since the running mechanisms 21, 26 having the wheel sections 22, 23, 27 are attached to the lower support 11 of the lower unit 10 to which the columns 60A-60D of the upper unit 40 are connected, the columns 60A-60D are connected to the lower support 11 at a relatively high position. This makes it possible to reduce the amount of expansion and contraction in the vertical direction of the telescopic mechanism of the columns 60A-60D or to eliminate the telescopic mechanism of the columns 60A-60D, resulting in a reduction in the weight of the entire deck lifting device 100. This reduces the burden on the bridge or the like on which the deck lifting device 100 is installed, and improves the fuel efficiency of the transport vehicles T1, T2 that transport the deck lifting device 100.
[0099] In addition, since the deck slab lifting device 100 is divided into upper and lower units 10, 40 and transported separately, the degree of freedom in distributing weight between each unit 10, 40 is increased, and as a result, the lifting performance of the deck slab lifting device 100 can be improved.
[0100] In this embodiment, the lower support 11 of the lower unit 10 is fitted with running mechanisms 21, 26 having wheel sections 22, 23, 27 and electric motors 24, 28 for driving these wheels, so that the deck slab lifting device 100 is self-propelled. Therefore, compared to a case where the deck slab lifting device is a stationary type, the range in which lifting work of the deck 2 can be performed per unit time is expanded, and as a result, deck renewal work involving lifting work can be performed efficiently.
[0101] Furthermore, in this embodiment, the positions of the pillars 60A-60D are displaced between the first position and the second position by rotation in response to the expansion and contraction of the actuators 71 of the pillar displacement mechanisms 70A-70D. By configuring the positions of the pillars 60A-60D to be changeable in this manner without using a relatively heavy slide mechanism, the weight of the deck slab lifting device 100 body can be reduced, and the size of the deck slab lifting device 100 when transported can be made compact.
[0102] In addition, the following modified examples are also within the scope of the present invention, and it is possible to combine the configuration shown in the modified example with the configuration described in the above embodiment, or to combine the configurations described in the different modified examples below.
[0103] In the above embodiment, the telescopic mechanism is provided on each of the columns 60A to 60D of the upper unit 40. Alternatively, the telescopic mechanism capable of telescopically extending in the vertical direction may be provided on the connecting columns 13 that are the connecting parts of the lower unit 10 to which the columns 60A to 60D are connected, so as to move the connecting flanges 13a in the vertical direction. In this case, the telescopic mechanism of each connecting column 13 slightly extends when the connecting flanges 13a of the lower unit 10 and the connecting flanges 62a of the upper unit 40 are connected, and the telescopic mechanism of each connecting column 13 abuts against the connecting flanges 62a, and after the connecting flanges 13a and the connecting flanges 62a are connected, the telescopic mechanism further extends to set the height of the lifting mechanism 50 to a predetermined height. The telescopic mechanism may be provided on both the columns 60A to 60D of the upper unit 40 and the connecting columns 13 of the lower unit 10.
[0104] Also, in the above embodiment, after the connection flange 13a of the lower unit 10 and the connection flange 62a of the upper unit 40 are joined, an extension mechanism for setting the height of the lifting mechanism 50 to a predetermined height is provided on each of the columns 60A-60D of the upper unit 40, i.e., on the deck slab lifting device 100. If the height of the lifting mechanism 50 can be set to a predetermined height simply by joining the connection flange 13a of the lower unit 10 and the connection flange 62a of the upper unit 40, an extension mechanism does not need to be provided on the deck slab lifting device 100.
[0105] As a specific means, for example, it is possible to increase the height H1 of the upper surface of the connection flange 13a of the lower unit 10 in advance by the extension of the telescopic mechanism. In this case, since it is necessary to significantly increase the extension amount of each lift device 90 that lifts the upper unit 40 on the loading platform of the second transport vehicle T2, for example, a multi-stage (telescope type) hydraulic cylinder is used as the lift device 90. As another specific means, it is possible to increase the height from the lower surface of the connection flange 62a of the upper unit 40 to the upper support body 41 that holds the lifting mechanism 50 in advance. However, in any of these means, there is a risk of exceeding the height limit of the transport vehicles T1 and T2 when transporting the units 10 and 40, so in order to set the height of the lifting mechanism 50 to a predetermined height, it is preferable to provide the telescopic mechanism in the deck lifting device 100.
[0106] In this way, when the deck lifting device 100 is not provided with an extension mechanism, when connecting the connection flange 13a of the lower unit 10 and the connection flange 62a of the upper unit 40, the lift device 90 is slightly contracted to bring the connection flange 13a into contact with the connection flange 62a.
[0107] In the above embodiment, the lift device 90 is fixed to the bed side of the second transport vehicle T2. Alternatively, the lift device 90 may be fixed to the lower girder 45 side of the upper unit 40. In this case, since there is no need to process the bed of the second transport vehicle T2, a general bed can be used as the bed.
[0108] In the above embodiment, the position of each of the pillars 60A-60D is switched between the first position and the second position by rotating the horizontal connection member 75 around the pin member 76 that constitutes the hinge joint. Alternatively, the position of each of the pillars 60A-60D may be switched between the first position and the second position by a slide mechanism that slides the horizontal connection member 75 in the left-right direction.
[0109] In addition, in the above embodiment, the running mechanisms 21, 26 are attached to the lower unit 10 in advance, but the running mechanisms 21, 26 may be connected to the connecting portions 12a, 12b of the lower main girder 12 when the lower unit 10 is lowered.
[0110] In the above embodiment, the lift device 90 is used as a mechanism for raising and lowering the upper unit 40 relative to the loading platform. Alternatively, the telescopic mechanism of the pillars 60A-60D may be used as a mechanism for raising and lowering the upper unit 40 relative to the loading platform. In this case, after the telescopic mechanism of the pillars 60A-60D is extended, a support platform for maintaining the height of the upper unit 40 is temporarily sandwiched between the loading platform and the lower girder 45, and in a state in which the entire upper unit 40 is supported by this support platform, the pillars 60A-60D are coupled to the lower unit 10 as described above.
[0111] In addition, in the above embodiment, the operation panels and power sources of each mechanism such as the lifting mechanism 50, the traveling mechanisms 21, 26, and the column displacement mechanisms 70A to 70D are not explicitly shown, but the operation panels of each mechanism and the generators that serve as the power sources may be installed in the upper unit 40. In this case, it becomes possible to move the deck slab lifting device 100 and perform lifting operations independently.
[0112] Although the embodiments of the present invention have been described above, the above-mentioned embodiments merely show some of the application examples of the present invention, and it is not intended that the technical scope of the present invention be limited to the specific configurations of the above-mentioned embodiments. [Explanation of symbols]
[0113] 100...Floor slab lifting device 2...Floor slab 10 Lower unit 10A···First lower unit (lower unit) 10B Second lower unit (lower unit) 11...Lower holding body 12a Front connection part (travel mechanism connection part) 12b Rear connection part (travel mechanism connection part) 21...Front traveling mechanism (traveling mechanism) 22, 23, 27... Wheel section (wheel) 26 Rear travel mechanism (travel mechanism) 40 Upper unit 41...Upper holding body 50...Lifting mechanism 60A~60D...Strut (extension mechanism) 70A~70D ···Support column displacement mechanism 75 Horizontal connection member 80 Lifting device 84....Slide section (gap expansion / contraction mechanism) 90 Lift device (extension mechanism) T1: First transport vehicle (preceding transport vehicle) T2: Second transport vehicle (following transport vehicle)
Claims
1. A lifting mechanism capable of lifting the deck; An upper holder extending in the front-rear direction and holding the lifting mechanism; A plurality of posts attached to the upper support; A traveling mechanism provided below the support pillar; a support displacement mechanism that displaces the position of the support in a horizontal direction between a first position close to the upper holder and a second position away from the upper holder, The support column displacement mechanism includes: a horizontal connection member that connects the support column and the upper support body in a horizontal direction; a hinge joint that supports the horizontal connection member rotatably in a horizontal plane with a connection portion between the upper holding body and the horizontal connection member as a fulcrum, The position of the support post is displaceable between the first position and the second position in response to the horizontal connection member being rotated. Floor slab lifting device.
2. The support is provided with an extension mechanism that can extend and retract in the vertical direction. The deck lifting device according to claim 1.
3. A method for installing a deck lifting device comprising: a lifting mechanism capable of lifting a deck; an upper support body extending in the front-rear direction and supporting the lifting mechanism; a plurality of pillars attached to the upper support body; a traveling mechanism provided below the pillars; and a pillar displacement mechanism for displacing the positions of the pillars in the horizontal direction between a first position close to the upper support body and a second position away from the upper support body, and when unloading the platform of the transport vehicle, displacing the position of the support from the first position to the second position by rotating a horizontal connecting member, which connects the support and the upper support in the horizontal direction, in a horizontal plane around a connection portion between the horizontal connecting member and the upper support as a fulcrum. How to install deck lifting equipment.
Citation Information
Patent Citations
JP1992081881U
Track carriage
JP2002331927A
Working carrier
JP2004176486A
Floor panel laying apparatus
JP2004232426A
Mobile pre-cast floor slab erection machine
JP2004300688A