In-furnace scaffold construction method

The use of foldable, integrated scaffolding units for in-furnace construction in boiler furnaces addresses the inefficiencies of conventional methods by reducing assembly and disassembly time, improving workability, and simplifying storage and management.

JP2024138722APending Publication Date: 2024-10-09KYC MACHINE IND
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023049361
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-27
Publication Date
2024-10-09

AI Technical Summary

Technical Problem

The conventional method for constructing in-furnace scaffolding in a boiler furnace is time-consuming due to the need for assembling and dismantling multiple types of temporary members, which complicates the assembly and disassembly process, and requires significant time and effort in managing these members.

Method used

A method involving the use of foldable scaffolding units with integrated components that are transported into the furnace in a compact state, assembled in situ, and connected to form a multi-span scaffold, reducing the need for individual member connections and simplifying the assembly and disassembly process.

Benefits of technology

This approach significantly reduces the time required for constructing and dismantling the scaffold, enhances workability, and simplifies storage and management of components, as the units can be easily transported and stored in a limited space.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024138722000001_ABST
    Figure 2024138722000001_ABST
Patent Text Reader

Abstract

To provide an in-furnace scaffold construction method capable of efficiently assembling and disassembling the in-furnace scaffold.SOLUTION: An in-furnace scaffold construction method of the invention is a method to assemble an in-furnace scaffold by a method to collectively assemble or disassemble previously assembled scaffolds in a furnace having a space inside and comprises: a transportation step to transport a plurality of scaffold units 10, which have substantially flat plate-like scaffold boards 11 having length of at least a plurality of spans, a pair of baseboards 12 provided on both ends of the scaffold board 11 and extending in a vertical direction, and a plurality of posts 13 that are rotatably supported by outside surfaces of the baseboards 12 respectively, and in a folded state into a furnace through an opening formed on a furnace wall in the furnace; an assembly step to shift the transported scaffold units 10 from the folded state to an assembled state; an arrangement step to lift the scaffold units 10 shifted to the assembled state in the assembly step upward and arrange the scaffold units at desired positions in the furnace; and a connection step to connect the scaffold units 10 arranged in the arrangement step to each other.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for constructing an in-furnace scaffold to be installed inside a boiler furnace of, for example, a thermal power plant. [Background technology]

[0002] Conventionally, for example, a boiler furnace in a thermal power plant has a hollow interior and a hopper structure in which the furnace bottom tapers downward. The upper part of the boiler furnace is a furnace section for generating high-temperature, high-pressure steam, and is formed in a substantially rectangular prism shape (see, for example, Patent Document 1). In this furnace bottom and furnace section, for example, during maintenance such as inspection and repair of the inside of the boiler furnace, an in-furnace scaffold is assembled inside.

[0003] The in-furnace scaffolding is assembled, for example, using a large assembly and large sweeping construction method. Fig. 13 is a perspective view showing a schematic configuration of a conventional in-furnace scaffolding assembled using the large assembly and large sweeping construction method. The in-furnace scaffolding 31 is constructed and configured in a substantially rectangular frame shape in a plan view on a stage 33 of a furnace section 32. For convenience of explanation, the in-furnace scaffolding 31 shown in the figure is three layers in the height direction, but in reality, the in-furnace scaffolding will be about 15 to 20 layers.

[0004] In the large-scale assembly and removal method, for example, a single-layer foundation scaffold 34 is assembled at a position on a stage 33 where the in-furnace scaffold 31 is actually installed. After that, an upper-layer scaffold 35 made up of multiple layers is assembled at a position different from the assembly position of the foundation scaffold 34, and the upper-layer scaffold 35 is lifted by a crane or the like and connected to the top of the foundation scaffold 34. As shown in Fig. 13, the in-furnace scaffold 31 is constructed by connecting a plurality of connected foundation scaffolds 34 and upper-layer scaffolds 35 in a vertical and horizontal manner.

[0005] More specifically, as a procedure for assembling the foundation scaffolding 34, as shown in Fig. 14(a), a plurality of jacks 36 are lined up at a position where the in-furnace scaffolding 31 is to be installed on the stage 33 of the furnace section 32. Next, horizontal ties 37 and supports 38 are connected to the jacks 36 (see Fig. 14(b)), and then horizontal members 39, scaffolding boards 40, handrails 41, etc. are connected on top of them to assemble the foundation scaffolding 34 (see Fig. 14(c)).

[0006] As shown in Fig. 15(a), the procedure for assembling the upper scaffolding 35 is to install a temporary assembly jig 45 consisting of jacks 42, horizontal ties 43, and short supports 44 at a position different from the position at which the base scaffolding 34 is assembled. After that, supports 46, scaffolding boards 47, handrails 48, etc. are connected onto the temporary assembly jig 45 to assemble, for example, a two-layer scaffolding (see Fig. 15(b)).

[0007] A wire W is attached to the assembled upper scaffolding 35 (see FIG. 16(c)), and the upper scaffolding 35 is separated from the temporary assembly jig 45 and lifted by a crane (not shown) or the like (see FIG. 16(a)). The lifted upper scaffolding 35 is moved to an installation position of the foundation scaffolding 34, and the lower ends of the supports 46 of the upper scaffolding 35 are connected to the upper ends of the supports 38 of the foundation scaffolding 34, thereby connecting the upper scaffolding 35 to the foundation scaffolding 34 (see FIG. 16(b)).

[0008] The block consisting of the connected upper scaffolding 35 and foundation scaffolding 34 is treated as one unit, and other blocks are connected to the sides of it, and upper scaffolding 35 is connected above these blocks to construct an approximately square frame-shaped in-furnace scaffolding 31 as shown in Figure 13. [Prior art documents] [Patent documents]

[0009] [Patent Document 1] JP 2012-52305 A Summary of the Invention [Problem to be solved by the invention]

[0010] Here, for example, in the case of a boiler furnace of a thermal power plant, in order to minimize opportunity loss due to equipment shutdowns, it is required that assembly and dismantling work for the in-furnace scaffolding 31 constructed within the boiler furnace be completed in a short period of time.

[0011] In the construction method of the in-furnace scaffolding 31 using the conventional large-scale assembly and sweeping construction method, the upper scaffolding 35 is lifted up in blocks by wires W or the like, but the upper scaffolding 35 is assembled by connecting temporary members such as supports, scaffolding boards, and handrails one by one. Therefore, there was a problem that the workability was poor due to the large number of parts, and it took a long time to assemble the in-furnace scaffolding 31. In addition, in the dismantling work of dismantling the in-furnace scaffolding 31, it was necessary to remove multiple types of temporary members one by one, which also took a long time.

[0012] Furthermore, before assembling the in-furnace scaffolding 31, the various types of temporary materials must be transported and stored in a limited area, such as on the stage 33 inside the furnace. Therefore, there was also a problem that managing the types and quantities of those temporary materials was very time-consuming and troublesome.

[0013] The present invention was devised in light of the above-mentioned circumstances, and its object is to provide a method for constructing an internal scaffolding that enables efficient assembly and dismantling of the internal scaffolding. [Means for solving the problem]

[0014] The method for constructing an in-furnace scaffold provided by the present invention is a method for constructing an in-furnace scaffold assembled by a large-assembly and large-laying method inside a furnace having a space inside, and is characterized in that it comprises a transport step of transporting a plurality of scaffolding units in a folded state into the furnace through an opening formed in the furnace wall, an assembly step of changing each of the scaffolding units transported in the transport step from the folded state to an assembled state, an arrangement step of lifting each of the scaffolding units assembled in the assembly step and placing them in desired positions inside the furnace, and a connection step of connecting each of the scaffolding units placed in the arrangement step to each other.

[0015] In the method for constructing an internal scaffolding of the present invention, in the assembly process, each of the posts is rotated along the outer surface of the baseboard to erect it, and the handrails placed on the upper surface of the scaffolding board are removed and hung on the posts.

[0016] In the method for constructing a scaffolding inside the furnace of the present invention, the placement process preferably includes placing a plurality of base supports at desired positions inside the furnace, and fixing each of the scaffolding units in an assembled state to one of the base supports and placing them respectively.

[0017] In the method for constructing an interior scaffolding of the present invention, the connecting process may include a left-right connecting process for connecting multiple scaffolding units in the left-right direction, and a top-bottom connecting process for connecting multiple scaffolding units in the top-bottom direction.

[0018] In the method for constructing a furnace scaffolding of the present invention, in the vertical connecting process, the scaffolding units may be connected in the vertical direction by connecting each of the supports of the scaffolding units located in the vertical direction. Effect of the Invention

[0019] According to the present invention, a plurality of scaffolding units in a folded state are transported into a furnace, each of the transported scaffolding units is assembled from the folded state, the assembled plurality of scaffolding units are arranged at a desired position in the furnace, and the arranged plurality of scaffolding units are connected to construct a scaffolding for the furnace. The length of the scaffolding unit is equivalent to a plurality of spans of a conventional temporary scaffolding, and the members are integrally constructed, so that there is no need to assemble the scaffolding for the furnace by connecting a plurality of types of temporary members one by one as in the conventional method, and the work time for assembly and disassembly when constructing the scaffolding for the furnace can be significantly reduced. In addition, since the scaffolding unit is foldable, it can be smoothly transported into the furnace, for example, and can be easily stored and maintained. [Brief description of the drawings]

[0020] [Figure 1] 1 is an oblique view showing the schematic configuration of an internal scaffolding constructed by applying the internal scaffolding construction method according to this embodiment. FIG. [Diagram 2] This is a view from one side of the furnace scaffolding. [Diagram 3] FIG. 2 is a perspective view showing the assembled state of the scaffolding unit. [Figure 4] 13A to 13C are diagrams for explaining the assembly procedure of the scaffolding unit. [Diagram 5] 13A to 13C are diagrams for explaining the assembly procedure of the scaffolding unit. [Figure 6] FIG. 13 is a diagram for explaining the assembly procedure of the in-furnace scaffolding. [Figure 7] FIG. 13 is a diagram for explaining the assembly procedure of the in-furnace scaffolding. [Figure 8] FIG. [Figure 9] FIG. 13 is a diagram for explaining the assembly procedure of the in-furnace scaffolding. [Figure 10] FIG. 13 is a diagram for explaining the assembly procedure of the in-furnace scaffolding. [Figure 11] 1A and 1B are perspective views showing the connection state of scaffolding units, where (a) shows the connection state of baseboards, and (b) shows the connection state of handrail rod members (lower side). [Figure 12]FIG. 13 is a diagram for explaining the assembly procedure of the in-furnace scaffolding. [Figure 13] FIG. 1 is a perspective view showing a schematic configuration of a conventional in-furnace scaffolding. [Figure 14] FIG. 1 is a diagram for explaining the assembly procedure of a conventional in-furnace scaffold. [Figure 15] FIG. 1 is a diagram for explaining the assembly procedure of a conventional in-furnace scaffold. [Figure 16] FIG. 1 is a diagram for explaining the assembly procedure of a conventional in-furnace scaffold. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0021] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings.

[0022] Fig. 1 is a perspective view showing a schematic configuration of an in-furnace scaffold constructed by applying the in-furnace scaffold construction method according to the present embodiment. Fig. 2 is a view of the in-furnace scaffold from one side. The in-furnace scaffold according to the present embodiment is installed inside a boiler furnace of a thermal power plant, for example. As described later, the in-furnace scaffold construction method is used.

[0023] As shown in Fig. 1, a boiler furnace 1 of a thermal power plant is composed of a furnace bottom section 2 having a hopper structure tapering downward, and a furnace section 3 formed above the furnace bottom section 2 and having an overall structure formed in a hollow, approximately rectangular prism shape. The in-furnace scaffolding 4 according to this embodiment is installed on a stage 5 of the furnace section 3, and is used during maintenance such as inspection and repair of the inside of the furnace section 3. For convenience of explanation, the in-furnace scaffolding 4 shown in Fig. 1 has a three-layer structure in the height direction, but is not limited to this (in reality, about 15 to 20 layers are installed).

[0024] The in-furnace scaffolding 4 is configured to have a substantially rectangular frame shape in plan view along the inner wall surface of the furnace section 3 (see Fig. 1), and is constructed by combining a plurality of scaffolding units 10, which will be described later. As shown in Fig. 2, which is viewed from one side of the in-furnace scaffolding 4, for example, two scaffolding units 10 are connected to one side of one layer, and these are stacked in the height direction.

[0025] In addition, in the side view of the in-furnace scaffolding 4 shown in Fig. 2, the two supports 6 on both the left and right ends show a part of the scaffolding on the left and right side, and the scaffolding on the depth side is omitted. In addition, the configuration of the in-furnace scaffolding 4 is not limited to the configuration shown in Fig. 1 or Fig. 2.

[0026] As shown in Figure 3, one scaffolding unit 10 is composed of a scaffolding board 11 for workers to perform inspection work, etc., a pair of baseboards 12 extending vertically from both longitudinal ends of the scaffolding board 11, a number of posts 13 supported by the baseboards 12 so as to be freely rotatable, and a pair of handrails 14 hung on the posts 13, all of which are connected together.

[0027] The scaffolding board 11 has a total length (corresponding to the total length of one scaffolding unit 10) that is equal to or longer than a plurality of spans (for example, three spans or more) of conventional temporary scaffolding. The scaffolding board 11 may be a plurality of single board members arranged side by side.

[0028] The pair of baseboards 12 are connected by multiple connecting members (not shown) extending in the left-right direction when viewed from the front on the underside of the scaffolding board 11. Multiple posts 13 are rotatably supported along the outer surfaces of the pair of baseboards 12. When the scaffolding unit 10 is in an assembled state (see FIG. 3), each post 13 extends in a substantially vertical direction and is bolted to the baseboard 12 at a predetermined position away from the lower end. Each post 13 has a tenon 15 formed at its lower end and a recess formed at its upper end into which the tenon 15 of the other post 13 fits.

[0029] One handrail 14 is hung on two support posts 13 aligned in the longitudinal direction along one baseboard 12 on the near side. The other handrail 14 is also hung on two support posts 13 aligned along the other baseboard 12 on the opposing depth side.

[0030] Each handrail 14 is made up of two rod-shaped members 16 that extend in the longitudinal direction and vertically in parallel, and multiple connecting members 17 that vertically connect each rod-shaped member 16. Each handrail 14 is hung on the support post 13 by fitting an unillustrated locking piece into an unillustrated pocket formed in the support post 13.

[0031] The scaffolding unit 10 shown in Fig. 3 shows an assembled state, and this scaffolding unit 10 is of a foldable type. That is, as shown in Fig. 4(a), the scaffolding unit 10 is in a substantially flat plate shape in the folded state, and the multiple supports 13 are arranged along the respective outer surfaces of a pair of baseboards 12. Also, the handrails 14 are placed on the upper surface of the scaffolding board 11 in the folded state. The scaffolding boards 11 are transported in this folded state, or stacked for temporary storage.

[0032] To change the scaffolding unit 10 from the folded state shown in FIG. 4(a) to the assembled state shown in FIG. 3, one pair of posts 13 are rotated and erected along the baseboard 12 as shown in FIG. 4(b) (see arrow A in the figure). Next, the other pair of posts 13 are rotated and erected along the baseboard 12 (see arrow B in FIG. 5). Then, the handrails 14 are taken out from the top surface of the scaffolding board 11, and the handrails 14 are hooked to each of the two posts 13 lined up along the baseboard 12 as shown in FIG. 3. In this way, in this embodiment, a scaffolding of multiple spans or more can be easily assembled using the scaffolding unit 10.

[0033] Next, a method for constructing the in-furnace scaffolding 4 according to this embodiment will be described.

[0034] In this construction method, a large-scale assembly and removal construction method is adopted to construct an in-furnace scaffold 4 using multiple scaffold units 10. Here, it is assumed that other scaffolds have already been assembled at the furnace bottom 2 of the boiler furnace 1, and a stage 5 is provided above them below the furnace section 3. This in-furnace scaffold 4 is assembled on the stage 5.

[0035] First, the multiple scaffolding units 10 are carried in a folded state (see FIG. 4(a)) onto the stage 5 of the furnace section 3. For example, the boiler furnace 1 has an opening (not shown) called a boiler manhole in its furnace wall. Usually, the furnace wall of the boiler furnace 1 is configured with multiple wall tubes (not shown) extending linearly, but these wall tubes need to be curved around the opening. If the wall tubes are curved, the flow of steam is hindered, so the opening is formed with a relatively small diameter (for example, a diameter of 600 to 800 mm).

[0036] The scaffolding unit 10 of this embodiment is carried into the inside of the boiler furnace 1 through this opening. In this case, the scaffolding unit 10 is carried in a folded state, and in this state is configured to be approximately flat and compact, so that it can be smoothly carried into the inside of the boiler furnace 1 through the above-mentioned opening. In addition, since the scaffolding unit 10 is configured with a plurality of members integrally, it can be carried in more quickly and efficiently than, for example, a conventional in-furnace scaffold (see FIG. 13), in which each temporary member is configured separately and each temporary member is carried into the inside of the boiler furnace 1.

[0037] When the scaffolding unit 10 is carried into the inside of the boiler furnace 1, the scaffolding unit 10 is assembled from the folded state. In this case, as shown in Fig. 6(a), a plurality of platforms 20 are arranged on the stage 5 in a place other than the installation location of the in-furnace scaffolding 4, and the scaffolding unit 10 is placed on the platforms 20 in the folded state.

[0038] Next, each scaffolding unit 10 has a pair of posts 13 rotated along the outer surface of the baseboard 12 (see arrows A and B in FIG. 1(b)), and is displaced from a state along the baseboard 12 to an upright state extending in a direction perpendicular to the baseboard 12. In the upright state, the lower ends of the posts 13 are suspended in the air. Next, a pair of handrails 14 are each removed from the top surface of the scaffolding board 11 and hooked onto the posts 13. As a result, each handrail 14 is supported by the posts 13, and one scaffolding unit 10 is assembled on the platform 20.

[0039] The scaffolding unit 10 assembled on the platform 20 is lifted by a wire W, for example, by a crane or the like (see FIG. 1(c)), and moved to a desired position (on the base support 21) described below. The baseboard 12 of the scaffolding unit 10 is formed in advance in a shape to which the wire W of a crane or the like can be attached.

[0040] On the other hand, as shown in Fig. 7, a plurality of base supports 21 are arranged on the stage 5 at a location where the in-furnace scaffolding 4 is actually installed. In this case, when the in-furnace scaffolding 4 is configured to have a substantially rectangular frame shape in a plan view along the inner wall surface of the furnace section 3, a plurality of base supports 21 are arranged in this substantially rectangular frame-shaped area. Note that the base support 21 is composed of a base 22 and a substantially rectangular tubular receiving part 23 erected on the base 22, as shown in Fig. 8.

[0041] The scaffolding unit 10, suspended and supported by the wire W, is moved and lowered onto the desired base support 21, as shown in Figure 9(a), and the tenons 15 at the lower ends of the supports 13 are fitted into the receiving portions 23 of the multiple base supports 21, respectively, to secure the scaffolding unit 10 in place.

[0042] Next, another scaffolding unit 10 is assembled from the folded state to the assembled state on the platform 20, and is moved to the installation position of the desired base support 21 as shown in Fig. 9(b), and the tenons 15 of the support 13 are fitted into the base support 21. Once the adjacent scaffolding units 10 are installed, the scaffolding blocks 10 on the left and right side sides are similarly moved onto the base support 21 and fixed to the base support 21 as shown in Fig. 10(a). In this way, a plurality of scaffolding units 10 are installed on the stage 5 so as to form a substantially rectangular frame shape in a plan view.

[0043] When the scaffolding units 10 are installed, the adjacent scaffolding units 10 in the left-right direction are connected to each other as shown in FIG. 11(b). Specifically, as shown in FIG. 11(a), the baseboards 12 are connected to each other by a substantially plate-shaped connecting member 24 and a bolt 25. Also, as shown in FIG. 11(b), the handrails 14 are connected to each other by a sliding member 26 fixed by a thumbscrew 27. FIG. 11(b) shows the lower side of the rod-shaped member 16 of the handrail 14, and the upper side of the rod-shaped member 16 is attached with a thumbscrew 27 from the lower side. Furthermore, although not shown, the baseboards 12 and the handrails 14 are connected to each other at each corner by dedicated members. In this way, the first layer of the furnace scaffolding 4 is provided by connecting the multiple scaffolding units 10 in the left-right direction.

[0044] Once the first layer of in-furnace scaffolding 4 has been set up, as shown in Figure 12(a), another scaffolding unit 10 is moved above the first layer of scaffolding unit 10 and then lowered to connect the supports 13 together, thereby connecting the scaffolding units 10 in the vertical direction.

[0045] Next, as shown in Figure 12 (b), another scaffolding unit 10 is moved to the side of the other scaffolding unit 10 and then lowered so that the supports 13 are connected to each other, thereby connecting the scaffolding units 10 in the vertical direction.

[0046] Thereafter, the other adjacent scaffolding units 10 are connected to each other in the left-right direction to provide the second layer of in-furnace scaffolding 4. Similarly, the scaffolding units 10 are successively installed as the third and subsequent layers of in-furnace scaffolding 4 to provide the multiple layers of in-furnace scaffolding 4 as shown in FIG.

[0047] As described above, according to this embodiment, a plurality of scaffolding units 10 are used to construct the in-furnace scaffolding 4 by the large-assembly and large-layout construction method. Since one scaffolding unit 10 has a length equivalent to a plurality of spans (e.g., three spans) and the members are integrally constructed, it is not necessary to construct the in-furnace scaffolding 4 by connecting, for example, a plurality of types of temporary members one by one for each span, as in the conventional large-assembly and large-layout construction method. In addition, the scaffolding unit 10 can form one layer of the in-furnace scaffolding 4 simply by rotating and fixing the supports 13 along the baseboard 12. Therefore, the work time required to construct the in-furnace scaffolding 4 can be significantly reduced. Similarly, the dismantling time of the in-furnace scaffolding 4 can also be significantly reduced.

[0048] In addition, the scaffolding unit 10 can be folded, so that it can be smoothly brought into the boiler furnace 1. Furthermore, since the scaffolding unit 10 is in a substantially flat plate shape when folded, it can be simply stacked on top of each other when storing and maintaining it in a limited area such as on the stage 33 inside the boiler furnace 1, so that it can be stored and maintained in a space-saving manner. In addition, since the members of the scaffolding unit 10 are integrally constructed, there is no need to manage the type and quantity of temporary members before assembling the in-furnace scaffolding, as in the past.

[0049] The scope of the present invention is not limited to the above-mentioned embodiment, and various modifications can be made without departing from the scope of the invention. For example, in the above-mentioned embodiment, one scaffolding unit 10 is lifted and moved as a unit by a crane or the like, but this is not limited to this, and a plurality of linked scaffolding units 10 may be lifted and moved as a unit by a crane or the like. In addition, the scaffolding unit 20, scaffolding board 11, baseboard 12, support 13, handrail 14, etc. are not limited to the shapes, sizes, quantities, and positional relationships of the above-mentioned embodiment.

[0050] In the above embodiment, the scaffolding unit 10 is applied to the large-assembly and large-laying construction method, but may be applied to a so-called lifting construction method instead. Alternatively, it may be applied to a so-called hanging construction method. [Explanation of symbols]

[0051] 1 Boiler furnace 4 Furnace scaffolding 5 Stage 10 Scaffolding Units 11 Scaffolding Planks 12 Baseboard 13 Posts 14 Handrails 15 Mortice 21 Base support

Claims

1. A method for constructing an in-furnace scaffolding by a large assembly and removal method in a furnace having a space inside, a transport process for transporting a plurality of scaffolding units, each of which has a length of at least a plurality of spans and is substantially flat, a pair of baseboards extending in the vertical direction at both ends of the scaffolding board, and a plurality of posts rotatably supported on the outer surfaces of each baseboard, into the furnace through an opening formed in a furnace wall within the furnace; an assembly process for assembling each of the scaffolding units transported in the transport process from a folded state to an assembled state; a placement process for lifting each of the scaffolding units assembled in the assembly process and placing them at desired positions in the furnace; A connecting step of connecting the scaffolding units arranged in the arrangement step to each other; A method for constructing an in-furnace scaffolding, comprising:

2. In the assembly process, Each of the posts is rotated along the outer surface of the baseboard to erect it, The method for constructing an in-furnace scaffold according to claim 1, further comprising the steps of: taking out handrails placed on the upper surface of the scaffold boards; and hooking the handrails onto the posts.

3. In the placing step, The method for constructing an in-furnace scaffold as described in claim 1, further comprising the steps of: arranging a plurality of base supports at desired positions within the furnace; and fixing each of the assembled scaffold units to one of the base supports and placing the scaffold units accordingly.

4. The linking step comprises: A left-right connecting step of connecting a plurality of the scaffolding units in the left-right direction; A vertical connecting process for connecting a plurality of the scaffolding units in the vertical direction; The method for constructing an in-furnace scaffold according to claim 1, comprising:

5. In the vertical connecting step, The method for constructing an internal scaffolding according to claim 4, wherein the scaffolding units are connected to each other in the vertical direction by connecting each of the supports of the scaffolding units located in the vertical direction.