Operation optimization equipment, operation optimization method, and operation optimization program for methane fermentation facility

The operation optimization device and method for methane fermentation equipment address inefficiencies by predicting and controlling methane gas production to align with consumption, ensuring stable and efficient gas supply to gas operation equipment, thus optimizing energy use and reducing waste.

JP2024139271APending Publication Date: 2024-10-09JFE ENGINEERING CORP +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2023050138
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-27
Publication Date
2024-10-09

AI Technical Summary

Technical Problem

Methane fermentation equipment faces challenges in effectively utilizing generated methane gas due to limitations in gas operation equipment capacity, leading to excess gas incineration or reduced operational efficiency when production exceeds consumption limits, and difficulty in accurately controlling gas generation to match demand.

Method used

An operation optimization device and method that utilizes a methane fermentation reaction model to predict and control methane gas production, adjusting raw material input based on real-time data and evaluation scoring to align with gas operation equipment capacity, ensuring stable and efficient gas supply.

Benefits of technology

The solution allows for precise control of methane gas generation to match consumption, preventing waste and optimizing energy use by stabilizing methane gas supply to gas operation equipment, thereby enhancing operational efficiency and reducing excess incineration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024139271000001_ABST
    Figure 2024139271000001_ABST
Patent Text Reader

Abstract

To provide an operation optimization equipment, an operation optimization method, and an operation optimization program for a methane fermentation facility capable of controlling a methane gas generation amount from a methane fermentation tank to a predetermined target value.SOLUTION: In operation optimization of a methane fermentation facility that generates methane gas by performing methane fermentation of a fed raw material according to a first operation plan that defines at least a feeding plan of the raw material, a predicted value of an operation state including at least a methane gas generation amount of the methane fermentation facility is derived for each of a plurality of second operation plans on the basis of a methane fermentation reaction model representing a generation process of methane gas by a methane fermentation tank included in the methane fermentation facility and the plurality of second operation plans that are candidates for an operation plan to be applied as the first operation plan, and an evaluation score is calculated for each of the plurality of second operation plans on the basis of the predicted value of the operation state. The second operation plan having the highest evaluation score among the plurality of second operation plans is applied as the first operation plan.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an operation optimization device, an operation optimization method, and an operation optimization program for a methane fermentation facility. [Background technology]

[0002] Conventionally, methane fermentation equipment has been proposed that uses organic waste such as food waste and garbage as a raw material and produces methane gas by methane fermentation using microorganisms. Methane fermentation is a process in which biodegradable raw materials (organic matter such as biomass resources) are decomposed into methane gas and water by anaerobic fermentation treatment using methanogens. In general, methane fermentation equipment includes a methane fermentation tank for performing methane fermentation of the raw material, and methane gas produced by methane fermentation is generated from the methane fermentation tank. The methane gas thus produced is temporarily stored in a storage facility such as a gas holder from the methane fermentation tank, and is then supplied to a facility that uses methane gas to drive the facility, such as a gas engine of a generator (hereinafter referred to as gas-operated facility). As a result, the methane gas produced by the methane fermentation facility is effectively used as energy for the gas-operated facility.

[0003] As a conventional technique for producing methane gas using such methane fermentation, for example, a wet methane fermentation treatment facility that receives a plurality of types of organic waste and subjects them to wet methane fermentation treatment is disclosed (see Patent Document 1). In the wet methane fermentation treatment facility described in Patent Document 1, the pH, alkalinity, and organic acid concentration in the wet methane fermentation tank are set as index values, and the supply amount or mixing ratio of the raw material (organic waste) is controlled so that the index values ​​are within a predetermined range.

[0004] Furthermore, as a conventional technique for producing methane gas using the above-mentioned methane fermentation, for example, a methane fermentation treatment device has been disclosed in which organic waste as a raw material is slurried and received in a slurry adjustment tank, and the received slurry is subjected to methane fermentation in the methane fermentation tank to generate methane gas (see Patent Document 2). In the methane fermentation treatment device described in Patent Document 2, a planned value for the amount of slurry to be supplied to the methane fermentation tank is calculated based on the planned amount of slurry to be received in the slurry adjustment tank, the capacity and current water level of the slurry adjustment tank, and the processing capacity of the methane fermentation tank, and the amount of slurry as a raw material supplied to the methane fermentation tank is controlled based on the planned value and upper limit value of the amount of slurry to be supplied. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] Patent No. 7035572 [Patent Document 2] Patent No. 4218486 Summary of the Invention [Problem to be solved by the invention]

[0006] In addition, in the above-mentioned methane fermentation facility, the amount of methane gas generated tends to increase as the amount of organic matter flowing into the methane fermentation tank increases. In this case, it is possible to supply more methane gas from the methane fermentation facility to the gas operation facility.

[0007] However, since there is an upper limit to the driving capacity of the gas-operated equipment, there is also an upper limit to the consumption of methane gas that can be consumed as energy when the gas-operated equipment is operated. Therefore, even if the amount of methane gas generated from the methane fermentation tank increases, if the amount of methane gas generated exceeds the upper limit of the amount of methane gas consumed by the gas-operated equipment, the amount of methane gas that exceeds the upper limit of the amount of methane gas consumed cannot be supplied to the gas-operated equipment, and may be burned without being effectively used.

[0008] Furthermore, if the amount of methane gas generated from the methane fermentation tank is less than the amount of methane gas consumed at the upper limit of the driving capacity of the gas operation equipment, the operating rate of the gas operation equipment will decrease, and the gas operation equipment will lose an opportunity to effectively utilize the methane gas from the methane fermentation tank as energy.

[0009] As described above, the methane fermentation facility is provided with a storage facility for storing the methane gas generated from the methane fermentation tank. However, the storage facility is intended to stabilize the supply of methane gas to the gas operation facility, and does not have a capacity large enough to constantly store the methane gas generated in excess of the amount of methane gas consumed at the upper limit of the driving capacity of the gas operation facility.

[0010] In addition, in the above-mentioned conventional technology, the amount of raw material supplied to the methane fermentation tank is controlled, but it is difficult to accurately grasp the actual state inside the methane fermentation tank. Therefore, even if the amount of raw material supplied is controlled, it is difficult to control the amount of methane gas generated from the methane fermentation tank to near the upper limit of the amount consumed by the gas operation equipment.

[0011] Therefore, in order to suppress ineffective combustion processing of methane gas generated from the methane fermentation tank and a decrease in the operating rate of the gas operation equipment, and to make maximum use of the methane gas, it is desirable to control the amount of methane gas generated from the methane fermentation tank to a predetermined value that targets near the upper limit of the amount consumed by the gas operation equipment.

[0012] The present invention has been made in consideration of the above circumstances, and aims to provide an operation optimization device, an operation optimization method, and an operation optimization program for a methane fermentation facility that can control the amount of methane gas generated from a methane fermentation tank to a target predetermined value. [Means for solving the problem]

[0013] In order to solve the above-mentioned problems and achieve the object, the operation optimization device for a methane fermentation facility of the present invention is an operation optimization device for a methane fermentation facility that produces methane gas by methane fermentation of input raw materials in accordance with a first operation plan that specifies at least a raw material input plan, and is characterized in that it comprises a prediction processing unit that derives a predicted value of the operational state including at least the methane gas generation amount of the methane fermentation facility for each of the second operation plans based on a methane fermentation reaction model that represents the methane gas production process in a methane fermentation tank equipped in the methane fermentation facility and a plurality of second operation plans that are candidates for the operation plan to be applied as the first operation plan, and an evaluation processing unit that calculates an evaluation score for each of the second operation plans based on the derived predicted value of the operational state, and among the plurality of second operation plans, the second operation plan with the highest evaluation score is applied as the first operation plan.

[0014] In addition, the operation optimization device for a methane fermentation facility according to the present invention, in the above-mentioned invention, further comprises a data collection unit that collects actual measured values ​​including at least the amount of methane gas generated actually measured from the methane fermentation facility, and an estimation processing unit that estimates the current internal state of the methane fermentation tank based on the methane fermentation reaction model and the actual measured values, and the prediction processing unit derives a predicted value of the operation state for each of the multiple second operation plans based on the methane fermentation reaction model that reflects the estimated current internal state of the methane fermentation tank and the multiple second operation plans.

[0015] In addition, the operation optimization device for a methane fermentation facility according to the present invention, in the above-mentioned invention, further comprises an operation planning unit which creates the plurality of second operation plans and provides them to the prediction processing unit, and a judgment processing unit which judges whether or not to terminate the evaluation scoring of the plurality of second operation plans by the evaluation processing unit, and the judgment processing unit is characterized in that, when the evaluation scoring is to be terminated, the judgment processing unit applies the second operation plan having the highest evaluation score among the plurality of second operation plans as the first operation plan, and when the evaluation scoring is not to be terminated, the judgment processing unit instructs the operation planning unit to remake at least one of the plurality of second operation plans.

[0016] In addition, the method for optimizing the operation of a methane fermentation facility according to the present invention is a method for optimizing the operation of a methane fermentation facility that produces methane gas by methane fermentation of input raw materials in accordance with a first operation plan that specifies at least the input plan of the raw materials, and includes a prediction processing step of deriving predicted values ​​of the operational state including at least the methane gas generation amount of the methane fermentation facility for each of the second operation plans that are candidates for the operation plan to be applied as the first operation plan, based on a methane fermentation reaction model that represents the methane gas production process in a methane fermentation tank equipped in the methane fermentation facility and a plurality of second operation plans that are candidates for the operation plan to be applied as the first operation plan, and an evaluation processing step of calculating an evaluation score for each of the second operation plans based on the derived predicted values ​​of the operational state, and is characterized in that the second operation plan with the highest evaluation score among the plurality of second operation plans is applied as the first operation plan.

[0017] In addition, the method for optimizing operation of a methane fermentation facility according to the present invention, in the above-mentioned invention, further includes a data collection step of collecting actual measured values ​​including at least the amount of methane gas generated actually measured from the methane fermentation facility, and an estimation processing step of estimating the current internal state of the methane fermentation tank based on the methane fermentation reaction model and the actual measured values, and is characterized in that in the prediction processing step, a predicted value of the operation state is derived for each of the multiple second operation plans based on the methane fermentation reaction model reflecting the estimated current internal state of the methane fermentation tank and the multiple second operation plans.

[0018] In addition, the method for optimizing operation of a methane fermentation facility according to the present invention, in the above-mentioned invention, further includes an operation plan creation step of creating the plurality of second operation plans, and a judgment processing step of judging whether or not to terminate the evaluation scoring of the plurality of second operation plans by the evaluation processing step, and is characterized in that, if the evaluation scoring is terminated, the second operation plan having the highest evaluation score among the plurality of second operation plans is applied as the first operation plan, and if the evaluation scoring is not terminated, the operation plan creation step is repeated so as to regenerate at least one of the plurality of second operation plans, and the processing steps subsequent to the operation plan creation step are repeated.

[0019] Further, a program for optimizing operation of a methane fermentation facility according to the present invention is characterized in that it causes a computer to execute any one of the methods for optimizing operation of a methane fermentation facility described above.

[0020] In addition, the operation optimization program for a methane fermentation facility according to the present invention is characterized in that, in the above invention, the computer further executes an operation plan creation step of creating the plurality of second operation plans, and a judgment processing step of judging whether or not to terminate the evaluation scoring of the plurality of second operation plans by the evaluation processing step, and if the evaluation scoring is to be terminated, the second operation plan having the highest evaluation score among the plurality of second operation plans is applied as the first operation plan, and if the evaluation scoring is not to be terminated, the operation plan creation step is repeated so as to regenerate at least one of the plurality of second operation plans, and the processing steps subsequent to the operation plan creation step are repeated. Effect of the Invention

[0021] According to the present invention, the amount of methane gas generated from the methane fermentation tank can be controlled to a target predetermined value. [Brief description of the drawings]

[0022] [Figure 1]FIG. 1 is a block diagram showing an example of the configuration of an operation optimization device for a methane fermentation facility according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a diagram showing an example of an outline of a methane fermentation reaction model in an embodiment of the present invention. [Diagram 3] FIG. 3 is a diagram showing a specific example of an equation constituting a methane fermentation reaction model in an embodiment of the present invention. [Figure 4] FIG. 4 is a flow diagram showing an example of a method for optimizing operation of a methane fermentation facility according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0023] Hereinafter, with reference to the drawings, a preferred embodiment of the operation optimization device, operation optimization method, and operation optimization program for a methane fermentation facility according to the present invention will be described in detail. Note that the present invention is not limited to this embodiment. It should be noted that the drawings are schematic, and the dimensional relationships and ratios of each element may differ from the actual ones. There may also be parts in which the dimensional relationships and ratios differ between the drawings.

[0024] Fig. 1 is a block diagram showing an example of the configuration of an operation optimization device for a methane fermentation facility according to an embodiment of the present invention. In addition to an operation optimization device 200 according to this embodiment, Fig. 1 also shows a methane fermentation facility 110 to which the operation optimization device 200 is applied. In Fig. 1, the flow of materials is indicated by solid arrows, and the flow of signals is indicated by dashed arrows. Below, first, a methane fermentation plant 100 equipped with the methane fermentation facility 110 and the like will be described, and then the operation optimization device 200 will be described.

[0025] (Methane fermentation plant) First, a description will be given of the methane fermentation plant 100. The methane fermentation plant 100 is a plant for producing methane gas from a raw material by methane fermentation, and includes a methane fermentation facility 110 and a control device 120, as shown in FIG.

[0026] The methane fermentation facility 110 is a facility that performs various processes for producing methane gas through methane fermentation of the raw material. For example, as shown in Fig. 1, the methane fermentation facility 110 includes a receiving section 101 that receives the raw material, a crushing section 102 that crushes the received raw material, a removing section 103 that removes unsuitable materials from the raw material, a mixing and adjusting tank 104 that mixes the raw material with dilution water to adjust it, and a methane fermentation tank 105 that performs methane fermentation of the raw material.

[0027] The receiving section 101 is composed of a hopper or the like, and receives raw materials for methane fermentation from the outside. For example, a wide variety of raw materials collected by a collection vehicle or the like are input into the receiving section 101. The receiving section 101 receives the raw materials thus input, and sends the received raw materials to downstream equipment. In this embodiment, as shown in FIG. 1, the raw materials received by the receiving section 101 are sent to the downstream crushing section 102 by a conveying device or the like (not shown).

[0028] In this embodiment, examples of the raw material for methane fermentation include biodegradable organic waste, such as food waste and kitchen garbage. In addition, the types of the raw material include a plurality of types, such as organic waste mainly composed of proteins, organic waste mainly composed of lipids, and organic waste mainly composed of carbohydrates.

[0029] 1, the crushing unit 102 is disposed downstream of the receiving unit 101 in the direction in which the raw material is transported, and crushes the raw material sent out from the receiving unit 101. The raw material crushed by the crushing unit 102 is sent to the subsequent removal unit 103 by a transport device or the like (not shown).

[0030] As shown in FIG. 1, the removal section 103 is disposed downstream of the crushing section 102 in the raw material conveying direction, and receives the raw material crushed by the crushing section 102. The removal section 103 separates materials unsuitable for methane fermentation (hereinafter, referred to as unsuitable materials) from the raw materials received as described above. In this way, the removal section 103 separates the received raw materials into the unsuitable materials and materials suitable for methane fermentation (raw materials having biodegradability). Examples of the unsuitable materials include materials that do not contribute to methane fermentation, such as plastic bags, plastic containers, and paper. The unsuitable materials separated by the removal section 103 are discharged from the methane fermentation equipment 110 and disposed of by an external facility or the like. The raw materials from which the unsuitable materials have been removed (i.e., raw materials having biodegradability) are sent from the removal section 103 to the downstream mixing adjustment tank 104 by a conveying device or the like (not shown) as shown in FIG. 1.

[0031] The mixing adjustment tank 104 adjusts the target raw material into a slurry state. In detail, as shown in FIG. 1, the mixing adjustment tank 104 is disposed downstream of the removal section 103 in the raw material conveying direction, and receives the raw material (biodegradable raw material) sent from the removal section 103. In addition, dilution water is supplied to the mixing adjustment tank 104 from a water supply facility (not shown). The mixing adjustment tank 104 mixes the raw material and the dilution water, thereby adjusting the solid raw material into a slurry containing biodegradable raw material (hereinafter referred to as raw material slurry). The raw material slurry adjusted by the mixing adjustment tank 104 is sent to the downstream methane fermentation tank 105 by a pump, piping, etc. (neither of which are shown).

[0032] The methane fermentation tank 105 produces methane gas by methane fermentation of the raw material. In detail, as shown in Fig. 1, the methane fermentation tank 105 is disposed downstream of the mixing and adjustment tank 104 in the transport direction (flow direction) of the raw material slurry, and receives the raw material slurry supplied from the mixing and adjustment tank 104. The methane fermentation tank 105 ferments the raw material in the received raw material slurry by the action of microorganisms in the tank. Specifically, in the methane fermentation tank 105, the supplied raw material (the raw material in the raw material slurry) is decomposed into biogas and water by microorganisms in an anaerobic environment.

[0033] The methane gas generated by the methane fermentation as described above is temporarily stored in a storage facility (not shown) such as a gas holder through a pipe from the methane fermentation tank 105, and is then supplied to a gas operation facility (not shown). The gas operation facility is a facility that uses methane gas to drive, such as a gas engine of a generator. The methane gas from the methane fermentation tank 105 is consumed as energy for the gas operation facility. Meanwhile, the fermentation residue in the methane fermentation is discharged from the methane fermentation tank 105 to the outside of the methane fermentation facility 110 together with water and the like generated by the methane fermentation. The fermentation residue can be utilized as compost or the like, or may be disposed of by an external facility or the like after being dehydrated. The water obtained by dehydrating the fermentation residue is purified by a wastewater treatment facility (not shown) to a water quality that can be discharged to an external facility or the like, and then discharged as treated water. The treated water may be reused, for example, as dilution water to be supplied to the mixing and adjusting tank 104.

[0034] The control device 120 controls the operation of the methane fermentation facility 110. In detail, as shown in Fig. 1, the control device 120 has a first operation plan S1 for the methane fermentation facility 110, and controls the operation of the methane fermentation facility 110 based on this first operation plan S1.

[0035] The first operation plan S1 is an operation plan that is actually applied in the operation of the methane fermentation facility 110, and specifies at least a plan for feeding raw materials in the methane fermentation facility 110. For example, the first operation plan S1 specifies the feeding amount and feeding timing of multiple types of raw materials to the methane fermentation facility 110, and the supply amount of raw material slurry and the amount of dilution water to the methane fermentation tank 105. In this embodiment, the feeding amount and feeding timing of the multiple types of raw materials are the feeding amount and feeding timing of raw materials fed to the receiving section 101 of the methane fermentation facility 110. The feeding amount and feeding timing of these raw materials correspond to the amount and timing of raw materials sent from the receiving section 101 to downstream equipment (for example, the crushing section 102 or the removal section 103). The amount of dilution water for the raw material slurry is the supply amount of dilution water supplied to the mixing adjustment tank 104 to adjust the raw material slurry by mixing with the raw materials. The above-mentioned supply amount of the raw material slurry is the supply amount of the raw material slurry supplied from the mixing adjustment tank 104 to the methane fermentation tank 105.

[0036] In this embodiment, the control device 120 controls the amount of raw materials input to the receiving section 101 of the methane fermentation equipment 110 and the input timing, such as the date and time, at which the raw materials are input, for each type of raw material, based on the input amount and input timing of multiple types of raw materials shown in the first operation plan S1. In addition, the control device 120 controls the supply amount of dilution water supplied up to the mixing adjustment tank 104 based on the dilution water amount shown in the first operation plan S1. Furthermore, the control device 120 controls the supply amount of raw material slurry supplied from the mixing adjustment tank 104 to the methane fermentation tank 105 based on the supply amount of raw material slurry shown in the first operation plan S1. By controlling the operation of the methane fermentation equipment 110 by the control device 120 in this way, the methane fermentation equipment 110 performs methane fermentation of the input raw materials in accordance with the first operation plan S1 to generate methane gas. Note that each of the above controls can be executed, for example, by the control device 120 driving and controlling equipment such as a transport device of the methane fermentation equipment 110.

[0037] (Operation Optimization Device) Next, an operation optimization device 200 according to an embodiment of the present invention will be described. The operation optimization device 200 is a device that optimizes the operation of the above-mentioned methane fermentation facility 110, and includes a data collection unit 210 and a calculation processing unit 220, as shown in FIG.

[0038] The data collection unit 210 collects actual measured values ​​of the methane fermentation facility 110. The actual measured values ​​of the methane fermentation facility 110 are values ​​of data that can be actually measured (observed) during the operation of the methane fermentation facility 110, and include at least the amount of methane gas generated. In this embodiment, specific examples of the actual measured values ​​include the amount of methane gas generated from the methane fermentation tank 105 and the organic acid concentration in the methane fermentation tank 105. The amount of methane gas generated is the amount of methane gas generated (produced) by methane fermentation of the raw material in the methane fermentation tank 105, and corresponds to the flow rate of methane gas sent out from the methane fermentation tank 105. The organic acid concentration in the methane fermentation tank 105 is the concentration of organic acid contained in the methane fermentation tank 105. For example, the methane fermentation facility 110 is provided with a plurality of measuring devices (not shown) that measure various data in a time series. The data collection unit 210 is configured with a memory etc., and collects actual measurement values ​​actually measured in the methane fermentation equipment 110 continuously in chronological order or intermittently at predetermined time intervals from the methane fermentation equipment 110. The data collection unit 210 sequentially accumulates the collected actual measurement values ​​in association with the timing (date, time, etc.) at which the actual measurement values ​​were measured.

[0039] The calculation processing unit 220 executes various calculation processes for optimizing the operation of the methane fermentation facility 110, and as shown in Fig. 1, includes an estimation processing unit 221, an operation planning unit 222, a prediction processing unit 223, an evaluation processing unit 224, and a judgment processing unit 225. In addition, the calculation processing unit 220 has a methane fermentation reaction model 230 that represents the process of methane gas production in the methane fermentation tank 105, as shown in Fig. 1.

[0040] The estimation processing unit 221 estimates the current internal state of the methane fermentation tank 105 based on the methane fermentation reaction model 230 and the actual measurement values ​​of the methane fermentation equipment 110. In detail, as shown in Fig. 1, the estimation processing unit 221 acquires the actual measurement values ​​of the methane fermentation equipment 110 from the data collection unit 210. At this time, the estimation processing unit 221 sequentially reads the actual measurement values ​​from the data collection unit 210 in chronological order, for example. The estimation processing unit 221 executes data assimilation of the estimated values ​​derived from the methane fermentation reaction model 230 and the acquired actual measurement values, thereby estimating the current internal state of the methane fermentation tank 105.

[0041] In this embodiment, the methane fermentation reaction model 230 is a state space model configured by state variables representing the internal state of the methane fermentation tank 105 and observation variables observable during operation of the methane fermentation equipment 110. Specific examples of the internal state of the methane fermentation tank 105 represented by the above state variables include a substrate concentration, an organic acid concentration, an acid-producing bacteria concentration, and a methanogen concentration. In the above state variables, the substrate concentration is the concentration of the organic raw material (i.e., biodegradable organic matter) contained in the methane fermentation tank 105. The organic acid concentration is the concentration of the volatile fatty acid contained in the methane fermentation tank 105. The acid-producing bacteria concentration is the concentration of the acid-producing bacteria contained in the methane fermentation tank 105. The methanogen concentration is the concentration of the methanogens contained in the methane fermentation tank 105. Specific examples of the above observation variables include the amount of methane gas generated from the methane fermentation tank 105, the organic acid concentration in the methane fermentation tank 105, and the like.

[0042] For example, the estimation processing unit 221 derives an observation variable corresponding to the state variable at the same time as the measurement timing of the acquired actual measurement value from the methane fermentation reaction model 230. The estimation processing unit 221 estimates the value of the state variable at the same time as the measurement timing, i.e., the current internal state of the methane fermentation tank 105, so as to correct the error between the acquired actual measurement value and the derived observation variable (estimated value). The estimation processing unit 221 reflects the current internal state of the methane fermentation tank 105 estimated in this manner in the state variable of the methane fermentation reaction model 230.

[0043] The operation planning unit 222 creates a second operation plan S2 used in a calculation process for optimizing the operation of the methane fermentation facility 110. In this embodiment, the second operation plan S2 is a candidate operation plan to be applied as the first operation plan S1 (actual operation plan) of the methane fermentation facility 110 described above. Examples of plan items of the second operation plan S2 include the input amount and input timing of multiple types of raw materials to the methane fermentation facility 110, the amount of dilution water for the raw material slurry and the supply amount to the methane fermentation tank 105, and the like. The plan items included in the second operation plan S2 are the same as the plan items of the first operation plan S1 described above. For example, the operation planning unit 222 creates multiple such second operation plans S2 by appropriately changing the values ​​of each plan item. The operation planning unit 222 provides the multiple created second operation plans S2 to the prediction processing unit 223. The second operation plan S2 created by the operation planning unit 222 includes the second operation plan S2 before being evaluated by the evaluation processing unit 224 (hereinafter, appropriately referred to as the initial second operation plan) and the second operation plan S2 modified based on the evaluation results by the evaluation processing unit 224 (hereinafter, appropriately referred to as the modified second operation plan).

[0044] The prediction processing unit 223 predicts the future operation state of the methane fermentation facility 110 based on the above-mentioned methane fermentation reaction model 230 and the plurality of second operation plans S2. For example, the prediction processing unit 223 inputs the second operation plan S2 to the methane fermentation reaction model 230, and calculates a predicted value of the operation state of the methane fermentation facility 110 corresponding to the input second operation plan S2 from the methane fermentation reaction model 230. In this embodiment, the methane fermentation reaction model 230 used by the prediction processing unit 223 for the calculation process is a model that reflects the current internal state of the methane fermenter 105 estimated by the above-mentioned estimation processing unit 221. The prediction processing unit 223 sequentially executes the calculation process of the above-mentioned predicted value for each of the plurality of second operation plans S2 provided by the operation planning unit 222. As a result, the prediction processing unit 223 derives a predicted value of the operation state of the methane fermentation facility 110 for each of the plurality of second operation plans S2. The prediction processing unit 223 inputs the derived predicted values ​​of the operation state to the evaluation processing unit 224 in association with each of the multiple second operation plans S2.

[0045] The predicted value of the operation state of the methane fermentation equipment 110 by the prediction processing unit 223 is a value indicating the future operation state of the methane fermentation equipment 110 when the methane fermentation equipment 110 is operated according to the second operation plan S2 inputted to the methane fermentation reaction model 230. The predicted value of the operation state includes at least the amount of methane gas generated by the methane fermentation equipment 110. For example, the predicted value of the operation state may include the amount of methane gas generated from the methane fermentation tank 105 (an observation variable of the methane fermentation reaction model 230), the internal state of the methane fermentation tank 105 (a state variable of the methane fermentation reaction model 230), and the like.

[0046] The evaluation processing unit 224 evaluates the second operation plans S2 based on the predicted value of the operation state of the methane fermentation facility 110 derived for each of the second operation plans S2. In detail, the evaluation processing unit 224 evaluates the second operation plans S2 to be evaluated by converting them into scores based on the predicted value acquired from the prediction processing unit 223. For example, the evaluation processing unit 224 calculates, for the second operation plan S2 to be evaluated, a score based on the predicted value of the methane gas generation amount by the prediction processing unit 223 (hereinafter referred to as a reference score) and a score based on an element (hereinafter referred to as an error element) that causes an error between the target value and the predicted value of the methane gas generation amount (hereinafter referred to as an element score). The evaluation processing unit 224 calculates the evaluation score of the second operation plan S2 to be evaluated by subtracting the element score from the reference score. The evaluation processing unit 224 sequentially executes such an evaluation score calculation process for each of the second operation plans S2 to be evaluated, thereby calculating the evaluation scores of the second operation plans S2. The evaluation processing unit 224 inputs the calculated evaluation scores to the judgment processing unit 225 in association with the second operation plans S2.

[0047] In this embodiment, the target value of the methane gas generation amount is a predetermined value that is set near the upper limit of the methane gas consumption amount of the gas operation equipment (preferably the same value as the upper limit) based on the specifications of the gas operation equipment that consumes methane gas from the methane fermentation equipment 110 to drive the equipment. The error element is expressed, for example, by the error between the predicted value of the operation state of the methane fermentation equipment 110 derived by the methane fermentation reaction model 230 and the set value. The set value of the operation state of the methane fermentation equipment 110 is a value that is set so that the methane gas generation amount becomes the target value for the operation state of the methane fermentation equipment 110, and is a value that is set so that the methane fermentation equipment 110 can operate stably without malfunction. Examples of the error element include an element for controlling the methane gas generation amount to the target value, an element for stably operating the methane fermentation equipment, and an element related to both controlling the methane gas generation amount to the target value and stably operating the methane fermentation equipment. Examples of the element for controlling the methane gas generation amount to the target value include an element related to the predicted value of the methane gas generation amount. Elements for stably operating the methane fermentation equipment include, for example, elements related to the predicted value of the nitrogen concentration in the methane fermentation tank 105, elements related to the predicted value of the organic acid concentration in the methane fermentation tank 105, etc. Elements related to both controlling the amount of methane gas generated to a target value and stably operating the methane fermentation equipment include, for example, elements related to the predicted value of the supply amount of raw material slurry input to the methane fermentation tank 105, elements related to the predicted value of the solid content in the raw material slurry input to the methane fermentation tank 105, elements related to the predicted value of the component concentration in the raw material slurry input to the methane fermentation tank 105, elements related to the predicted value of the supply amount of each type of raw material input to the methane fermentation tank 105, etc.

[0048] The determination processing unit 225 determines whether or not to end the evaluation scoring of the second operation plans S2 by the evaluation processing unit 224. For example, the determination processing unit 225 acquires the second operation plans S2 evaluated by the evaluation processing unit 224 and the evaluation scores of the second operation plans S2. The determination processing unit 225 determines whether or not to end the evaluation scoring of the second operation plans S2 (i.e., the evaluation of the second operation plans S2 by scoring) based on a preset end condition. Examples of the end condition include an end condition regarding the evaluation scores of the second operation plans S2 and an end condition regarding the number of evaluations of the second operation plans S2. When the determination processing unit 225 determines to end the evaluation scoring, the second operation plan S2 with the highest evaluation score among the second operation plans S2 is applied as the first operation plan S1 of the methane fermentation facility 110. Furthermore, when the judgment processor 225 judges not to end the evaluation scoring, it instructs the operation planner 222 to modify at least one of the second operation plans S2. As a result, the above-mentioned processes of the prediction processor 223, the evaluation processor 224, and the judgment processor 225 are repeatedly executed for the second operation plan S2 modified by the operation planner 222.

[0049] (Methane fermentation reaction model) Next, the methane fermentation reaction model 230 in an embodiment of the present invention will be described. Fig. 2 is a diagram showing an example of an outline of the methane fermentation reaction model in an embodiment of the present invention. For convenience of explanation, Fig. 2 shows an outline of a model in which five types of raw materials are input as an example of the methane fermentation reaction model 230 in which the types of raw materials are multiplexed, but the methane fermentation reaction model 230 is not limited to this.

[0050] 2, the methane fermentation reaction model 230 simulates a methane gas production process by methane fermentation in a methane fermentation tank 105 to which multiple types of raw materials (five types of raw materials 1 to 5 in FIG. 2) are charged. For example, the methane fermentation reaction model 230 includes variables related to the raw materials flowing (supplied) into the methane fermentation tank 105 from the mixing adjustment tank 104, variables related to the internal state of the methane fermentation tank 105, and variables related to products flowing out from the methane fermentation tank 105.

[0051] As a variable related to the raw material, for example, as shown in FIG. 2, the inflow liquid flow rate F feed [L / d], influent substrate concentration S of each raw material 1 to 5 bvsin_1 ~S bvsin_5 [g / L], total influent substrate concentration of each raw material 1 to 5 S bvsin [g / L], the inflow organic acid concentration of each raw material 1 to 5 S vfain_1 ~S vfain_5 [g / L], total inflow organic acid concentration of each raw material 1 to 5 S vfain [g / L], etc. feed is the flow rate of the raw material slurry flowing from the mixing adjustment tank 104 to the methane fermentation tank 105. bvsin_1 ~S bvsin_5 is the substrate concentration of each of the raw materials 1 to 5 in the raw material slurry flowing from the mixing adjustment tank 104 to the methane fermentation tank 105. The total inflow substrate concentration S bvsin is the influent substrate concentration S bvsin_1 ~S bvsin_5 The inflow organic acid concentration S vfain_1 ~S vfain_5 is the organic acid concentration of each of the raw materials 1 to 5 in the raw material slurry flowing from the mixing adjustment tank 104 to the methane fermentation tank 105. The total inflow organic acid concentration S vfain is the inflow organic acid concentration S vfain_1 ~S vfain_5 The sum of the above.

[0052] As variables related to the internal state of the methane fermentation tank 105, for example, as shown in FIG. 2, the tank liquid volume V [L], the tank temperature T reac [℃], substrate concentration in the tank for each raw material 1 to 5 S bvs_1 ~S bvs_5[g / L], total substrate concentration in the tank S bvs [g / L], tank organic acid concentration S vfa [g / L], acid-producing bacteria concentration X acid [g / L], methanogen concentration X meth The tank liquid volume V is the liquid volume in the methane fermentation tank 105. The tank temperature T reac is the temperature in the methane fermentation tank 105. The substrate concentration in the tank S bvs_1 ~S bvs_5 are the substrate concentrations of the raw materials 1 to 5 contained in the methane fermentation tank 105. The total substrate concentration in the tank S bvs is the substrate concentration in the tank S bvs_1 ~S bvs_5 The organic acid concentration in the tank S vfa is the organic acid concentration in the methane fermentation tank 105. acid is the concentration of acid-producing bacteria contained in the methane fermentation tank 105. meth is the concentration of methanogens contained in the methane fermentation tank 105.

[0053] As a variable related to the above product, for example, as shown in FIG. 2, the amount of methane gas generated F meth , effluent flow rate F out etc. Methane gas generation amount F meth is the flow rate of methane gas discharged (outflowed) from the methane fermentation tank 105. out is the flow rate of liquid discharged from the methane fermenter 105.

[0054] FIG. 3 is a diagram showing a specific example of an equation constituting a methane fermentation reaction model in an embodiment of the present invention. In this embodiment, the methane fermentation reaction model 230 is composed of, for example, equations (1) to (9) shown in FIG. 3. In FIG. 3, equation (1) represents the mass balance of substrates (biodegradable organic matter) in each of a plurality of types of raw materials i (e.g., raw materials 1 to 5) in the process of methane gas generation by a methane fermentation reaction. equation (2) represents the mass balance of organic acids in the process of methane gas generation by a methane fermentation reaction. equation (3) represents the mass balance of acid-producing bacteria in the process of methane gas generation by a methane fermentation reaction. equation (4) represents the mass balance of methanogens in the process of methane gas generation by a methane fermentation reaction. equation (5) represents the generation of methane gas by a methane fermentation reaction. equation (6) represents the growth rate of acid-producing bacteria in the total of all substrates of a plurality of types of raw materials i in the process of methane gas generation by a methane fermentation reaction. Equation (7) represents the growth rate of acid-producing bacteria in each of multiple types of raw materials i during the methane gas production process by methane fermentation reaction. Equation (8) represents the growth rate of methanogens during the methane gas production process by methane fermentation reaction. Equation (9) represents the maximum growth rate of methanogens during the methane gas production process by methane fermentation reaction.

[0055] In the formulas (1) to (9) shown in FIG. i is the specific growth rate [l / d] of acid-producing bacteria corresponding to each of the multiple types of raw materials i. m is the maximum specific growth rate of acid-producing bacteria [l / d]. K d is the rate of extinction of acid-producing bacteria [l / d]. c is the specific growth rate of methanogens [l / d]. mc is the maximum specific growth rate of methanogens [l / d]. K dc is the methanogen death rate [l / d]. K s is the acidogenic half-saturation constant [g BVS / L]. K sc is the methanogen half-saturation constant [g VFA / L]. k 1_iis the BVS yield [g BVS / (g acidogens / L)] of the acid-producing bacteria corresponding to each of the multiple types of raw materials i. k2 is the VFA yield [g VFA / (g acidogens / L)] of the acid-producing bacteria. k3 is the VFA yield [g VFA / (g methanegens / L)] of the methanogens. k5 is the methane gas yield [L / (g methanegens / L)] of the methanogens. _i is the reaction rate ratio [-] for each of the multiple types of raw materials i. b is the ratio SRT / HRT [d / d] of the sludge retention time (SRT) to the hydraulic retention time (HRT). Note that the above BVS represents biodegradable organic matter. The above VFA represents organic acid.

[0056] 2 and 3, and any methane fermentation reaction model including the input of raw materials into the methane fermentation tank 105, the organic acid concentration in the methane fermentation tank 105, the amount of methane gas generated from the methane fermentation tank 105, etc., can be applied to the present invention. For example, the anaerobic digestion model (ADM1) of the International Water Association (IWA) can also be applied to the present invention as the methane fermentation reaction model 230.

[0057] In addition, since the above-mentioned methane fermentation reaction model 230 is nonlinear, a state space model consisting of a state model and an observation model can be constructed and expressed as a discrete-time nonlinear system. In the methane fermentation reaction model 230, the state model can be expressed by the following state equation (10), and the observation model can be expressed by the following observation equation (11). x k+1 =f(x k )+w k (10) y k+1 =h(x k+1 )+v k+1 (11)

[0058] In the state equation (10) and the observation equation (11), k and k+1 represent times along the time series. That is, time k+1 is a time later than time k. x kis a vector of state variables (hereafter referred to as the state vector), and y k+1 is a vector of observed variables (hereafter referred to as the observation vector). f(x k ) is a nonlinear function that constitutes the state equation (10), and h(x k+1 ) is a nonlinear function that constitutes the observation equation (11). Also, w k is the system noise, and v k+1 is the observation noise.

[0059] For example, the state vector x k is the substrate concentration S of each raw material i in the methane fermentation tank 105 at time k. bvs_i_k , tank organic acid concentration S vfa_k , acid-producing bacteria concentration acid_k and methanogen concentration X meth_k Using the above, the observation vector y k+1 is the amount of methane gas generated in the methane fermentation tank 105 at time k+1. meth_k+1 and the organic acid concentration in the tank S vfa_k+1 Using this, it is expressed as the following equation (13). x k =(S bvs_i_k ,S vfa_k ,X acid_k ,X meth_k ) ···(12) y k+1 =(F meth_k+1 ,S vfa_k+1 ) ···(13)

[0060] In addition, in the methane fermentation reaction model 230, the nonlinear function f(x k ) is the substrate concentration S in the methane fermentation tank 105 described above. bvs_i_k , tank organic acid concentration S vfa_k , acid-producing bacteria concentration acid_k and methanogen concentration X meth_k The time evolution of the above is described, and is expressed as the following equation (14) using the mass balance equations for the substrate, organic acid, acid-producing bacteria, and methanogens (see equations (1) to (4) in Figure 3).

[0061]

number

[0062] The nonlinear function h(x k+1 ) is the methanogen concentration X in the methane fermenter 105 at time k+1 calculated by the state equation (10). meth_k+1 and the organic acid concentration in the tank S vfa_k+1 Using this, it is expressed as the following equation (15).

[0063]

number

[0064] In the state space model constituting the methane fermentation reaction model 230, the state vector can be a function including at least one of the substrate concentration in the methane fermentation tank 105, the organic acid concentration in the tank, the acid-producing bacteria concentration, and the methanogen concentration. The observation vector can be a function including at least the methane gas generation amount of the methane fermentation tank 105 and the organic acid concentration in the tank.

[0065] (Operation optimization method) Next, a method for optimizing operation of a methane fermentation facility according to an embodiment of the present invention will be described. Fig. 4 is a flow diagram showing an example of the method for optimizing operation of a methane fermentation facility according to an embodiment of the present invention. In this method for optimizing operation of a methane fermentation facility 110, the above-mentioned operation optimization device 200 (see Fig. 1) sequentially executes each of the processing procedures of steps S101 to S107 shown in Fig. 4, thereby optimizing the operation of the methane fermentation facility 110.

[0066] 4, the operation optimization device 200 first collects actual measurement values ​​of the methane fermentation equipment 110 that is the target of operation optimization (step S101). In step S101, the data collection unit 210 collects actual measurement values ​​actually measured by each measuring device of the methane fermentation equipment 110 in chronological order from the methane fermentation equipment 110. For example, the data collection unit 210 collects actual measurement values ​​such as the amount of methane gas generated from the methane fermentation tank 105 and the organic acid concentration in the methane fermentation tank 105. The data collection unit 210 sequentially accumulates the collected actual measurement values ​​in association with the measurement timing of the actual measurement values.

[0067] After executing the processing procedure of step S101 described above, the operation optimization device 200 estimates the current internal state of the methane fermentation facility 110 (step S102). In step S102, the estimation processing unit 221 sequentially reads the actual measurement values ​​of the methane fermentation facility 110 in step S101 from the data collection unit 210 in time series, thereby acquiring the actual measurement values ​​from the data collection unit 210. Next, the estimation processing unit 221 derives, from the methane fermentation reaction model 230, observed variables corresponding to the state variables at the same time as the measurement timing of the acquired actual measurement values, and corrects the error between the derived observed variables and the acquired actual measurement values.

[0068] Specifically, the estimation processing unit 221 derives an estimate of the amount of methane gas generated as the observation variable from the methane fermentation reaction model 230, and corrects the error between the estimated value and the actual value of the amount of methane gas generated at the same time. Furthermore, the estimation processing unit 221 may derive an estimate of the organic acid concentration as the observation variable from the methane fermentation reaction model 230, and correct the error between the estimated value and the actual value of the organic acid concentration at the same time. The estimation processing unit 221 corrects the error to correct the state variables of the methane fermentation reaction model 230, thereby updating the methane fermentation reaction model 230. The estimation processing unit 221 estimates the internal state of the methane fermenter 105 represented by the state variables of the updated methane fermentation reaction model 230 as the current internal state of the methane fermenter 105.

[0069] After executing the processing procedure of step S102 described above, the operation optimization device 200 creates multiple second operation plans S2 as candidates to be applied to the actual operation plan (first operation plan S1 shown in Figure 1) of the methane fermentation equipment 110 (step S103).

[0070] In step S103, the operation planning unit 222 determines the value of each plan item within the range of conditions preset for the plan items of the operation plan of the methane fermentation facility 110 to create multiple second operation plans S2. For example, the operation planning unit 222 randomly determines the values ​​of the plan items, such as the input amount and input timing of multiple types of raw materials to the methane fermentation facility 110, and the amount of dilution water and the supply amount of the raw material slurry to the methane fermentation tank 105, within the range of the conditions. At this time, the operation planning unit 222 creates multiple second operation plans S2 so that the values ​​of the plan items are different between each second operation plan S2. The number of second operation plans S2 created by the operation planning unit 222 is a predetermined number (for example, 100). The operation planning unit 222 provides each of the multiple second operation plans S2 created as described above to the prediction processing unit 223 as an initial second operation plan.

[0071] After executing the processing procedure of step S103 described above, the operation optimization device 200 derives a predicted value of the operation state of the methane fermentation facility 110 (step S104). In step S104, the prediction processing unit 223 acquires a plurality of second operation plans S2 as initial second operation plans from the operation planning unit 222. The prediction processing unit 223 sequentially inputs each of the acquired plurality of second operation plans S2 to the methane fermentation reaction model 230. At this time, the methane fermentation reaction model 230 is a model (updated methane fermentation reaction model) in which the estimation processing unit 221 reflects the estimation result of the internal state of the methane fermentation tank 105 in the above-mentioned step S102. The prediction processing unit 223 derives a predicted value of the operation state of the methane fermentation facility 110 from the methane fermentation reaction model 230 for each of the input plurality of second operation plans S2. The prediction processing unit 223 inputs the derived predicted values ​​of the operation state to the evaluation processing unit 224 in association with each of the multiple second operation plans S2.

[0072] For example, the prediction processing unit 223 derives the amount of methane gas generated from the methane fermentation tank 105, the substrate concentration, the organic acid concentration, the nitrogen concentration, the acid-producing bacteria concentration, and the methanogen concentration in the methane fermentation tank 105 as predicted values ​​of the operating state of the methane fermentation facility 110. The prediction processing unit 223 also derives the amount of raw material slurry supplied to the methane fermentation tank 105, the fluctuation rate of the supply amount, the solid content concentration, the volumetric load of the solid content, and the fluctuation rate of the volumetric load as predicted values ​​of the operating state of the methane fermentation facility 110. The fluctuation rate of the supply amount is the fluctuation rate per unit time of the amount of raw material slurry supplied to the methane fermentation tank 105. The volumetric load of the solid content is a value obtained by dividing the content of solid content (solid content amount) in the raw material slurry supplied to the methane fermentation tank 105 per day by the liquid volume in the methane fermentation tank 105. The fluctuation rate of the volumetric load is the fluctuation rate of the volumetric load per unit time.

[0073] Furthermore, the prediction processing unit 223 derives the component concentrations in the raw material slurry supplied into the methane fermentation tank 105 as predicted values ​​of the operational state of the methane fermentation equipment 110. Examples of the component concentrations include protein concentration, lipid concentration, carbohydrate concentration, and salt concentration. Furthermore, the prediction processing unit 223 derives the supply amount of each type of raw material contained in the raw material slurry supplied per day into the methane fermentation tank 105 and the fluctuation rate of the supply amount as predicted values ​​of the operational state of the methane fermentation equipment 110. The fluctuation rate of the supply amount is the fluctuation rate per unit time of the supply amount of each type of raw material.

[0074] After executing the processing procedure of step S104 described above, the operation optimization device 200 calculates the evaluation score for each of the second operation plans S2 (step S105). In step S105, the evaluation processing unit 224 acquires the second operation plans S2 to be evaluated and predicted values ​​of the operation state of the methane fermentation equipment 110 corresponding to each of the second operation plans S2 from the prediction processing unit 223. The evaluation processing unit 224 evaluates each of the acquired second operation plans S2 and calculates an evaluation score for each of the second operation plans S2.

[0075] In detail, the evaluation processing unit 224 calculates the above-mentioned reference score based on the predicted value of the methane gas generation amount among the predicted values ​​of the operating state of the methane fermentation equipment 110 obtained from the prediction processing unit 223. For example, the evaluation processing unit 224 calculates the reference score by the following formula (16). In formula (16), coefficient J1 is a predetermined coefficient for converting the predicted value of the methane gas generation amount into a score. Reference points = predicted amount of methane gas generated × coefficient J1 (16)

[0076] Furthermore, the evaluation processing unit 224 calculates the above-mentioned element scores based on the predicted value and the set value of the operation state of the methane fermentation equipment 110 acquired from the prediction processing unit 223. As described above, the set value is a value set so that the amount of methane gas generated becomes a target value for the operation state of the methane fermentation equipment 110, and is a value set so that the methane fermentation equipment 110 can operate stably without malfunctioning. The evaluation processing unit 224 calculates the evaluation score by the following formula (17) based on the reference score and element score obtained for each of the multiple second operation plans S2. Evaluation score = Reference score - Element score P1 (17)

[0077] Here, the element score P1 is a score based on an error element between the target value and the predicted value of the methane gas generation amount. Such element score P1 includes, for example, a score based on an error element of the methane gas generation amount, a score based on an error element of the supply amount of the raw material slurry input to the methane fermentation tank 105, a score based on an error element of the solid content amount in the raw material slurry input to the methane fermentation tank 105, a score based on an error element of the component concentration in the raw material slurry input to the methane fermentation tank 105, a score based on an error element of the supply amount of each type of raw material input to the methane fermentation tank 105, a score based on an error element of the nitrogen concentration in the methane fermentation tank 105, and a score based on an error element of the organic acid concentration in the methane fermentation tank 105.

[0078] Specifically, the following formula (18) can be used as a formula for calculating the element score based on the error element of the methane gas generation amount. In formula (18), the methane gas excess amount is the value by which the predicted value exceeds the set value of the methane gas generation amount, and is expressed by the difference (absolute value) between the predicted value and the set value of the methane gas generation amount. The coefficient J2 is a predetermined coefficient for scoring the methane gas excess amount. Number of elements P2 = methane gas excess amount × coefficient J2 (18)

[0079] The following formulas (19) and (20) can be used as formulas for calculating element scores based on error elements of the supply amount of raw slurry. In formulas (19) and (20), the raw slurry excess amount is a value obtained by exceeding a predicted value from a set value of the supply amount of raw slurry to be supplied into the methane fermenter 105, and is represented by the difference (absolute value) between the predicted value and the set value of the supply amount of raw slurry. The fluctuation rate excess amount of the raw slurry supply amount is a value obtained by exceeding a predicted value from a set value of the fluctuation rate of the raw slurry supply amount, and is represented by the difference (absolute value) between the predicted value and the set value of the fluctuation rate. Coefficient J3 is a predetermined coefficient for converting the raw slurry excess amount into a score, and coefficient J4 is a predetermined coefficient for converting the fluctuation rate excess amount of the raw slurry supply amount into a score. Number of elements P3 = raw material slurry excess amount × coefficient J3 (19) Number of elements P4 = Fluctuation rate excess of raw material slurry supply amount × Coefficient J4 (20)

[0080] The following formulas (21) to (23) can be used as formulas for calculating element scores based on the error element of the solid content amount in the raw material slurry. In the formulas (21) to (23), the excess amount of solid content concentration is a value obtained by exceeding a predicted value from a set value of the solid content concentration in the raw material slurry supplied into the methane fermentation tank 105, and is represented by the difference (absolute value) between the predicted value of the solid content concentration and the set value. The excess amount of volumetric load of solid content is a value obtained by exceeding a predicted value from a set value of the volumetric load of solid content contained in the raw material slurry, and is represented by the difference (absolute value) between the predicted value of the volumetric load and the set value. The excess amount of fluctuation rate of the volumetric load of solid content is a value obtained by exceeding a predicted value from a set value of the fluctuation rate of the volumetric load, and is represented by the difference (absolute value) between the predicted value of the fluctuation rate and the set value. In addition, the coefficient J5 is a predetermined coefficient for converting the excess amount of solid content concentration into a score. The coefficient J6 is a predetermined coefficient for converting the excess amount of volumetric load of solid content into a score. The coefficient J7 is a predetermined coefficient for scoring the volumetric load excess of solids. Element score P5 = excess solids concentration × coefficient J5 (21) Number of elements P6 = excess volume load of solids × coefficient J6 (22) Number of elements P7 = Excess fluctuation rate of volumetric load of solid matter × Coefficient J7 (23)

[0081] The following formulas (24) to (27) can be used as formulas for calculating the element scores based on the error elements of the component concentrations in the raw material slurry. In formulas (24) to (27), the first component concentration excess amount is a value obtained by exceeding a predicted value of a first component concentration (e.g., protein concentration) in the raw material slurry supplied into the methane fermentation tank 105 from a set value, and is represented by the difference (absolute value) between the predicted value of the first component concentration and the set value. The second component concentration excess amount is a value obtained by exceeding a predicted value of a second component concentration (e.g., lipid concentration) in the raw material slurry from a set value, and is represented by the difference (absolute value) between the predicted value of the second component concentration and the set value. The third component concentration excess amount is a value obtained by exceeding a predicted value of a third component concentration (e.g., carbohydrate concentration) in the raw material slurry from a set value, and is represented by the difference (absolute value) between the predicted value of the third component concentration and the set value. The fourth component concentration excess amount is a value obtained by exceeding a predicted value from a set value of the fourth component concentration (e.g., salt concentration) in the raw slurry, and is represented by the difference (absolute value) between the predicted value of the fourth component concentration and the set value. Coefficient J8 is a predetermined coefficient for scoring the first component concentration excess amount. Coefficient J9 is a predetermined coefficient for scoring the second component concentration excess amount. Coefficient J10 is a predetermined coefficient for scoring the third component concentration excess amount. Coefficient J11 is a predetermined coefficient for scoring the fourth component concentration excess amount. Number of elements P8 = excess concentration of first component × coefficient J8 (24) Number of elements P9 = excess concentration of second component × coefficient J9 (25) Number of elements P10 = excess concentration of the third component × coefficient J10 (26) Number of elements P11 = Excess concentration of 4th component × Coefficient J11 (27)

[0082] The following formulas (28) and (29) can be used as formulas for calculating element scores based on the error factors of the supply amount for each type of raw material. In formulas (28) and (29), the raw material type excess amount is the excess of a predicted value from a set value of the supply amount for each type of raw material input per day to the receiving section 101 of the methane fermentation equipment 110 (hereinafter abbreviated as raw material type supply amount), and is represented by the difference (absolute value) between the predicted value of the raw material type supply amount and the set value. The fluctuation rate excess amount of the raw material type supply amount is the excess of a predicted value from a set value of the raw material type supply amount, and is represented by the difference (absolute value) between the predicted value of the fluctuation rate and the set value. The coefficient J12 is a predetermined coefficient for converting the raw material type excess amount into a score. The coefficient J13 is a predetermined coefficient for converting the fluctuation rate excess amount of the raw material type supply amount into a score. Element score P12 = excess amount by raw material type × coefficient J12 (28) Element score P13 = excess fluctuation amount of supply amount by raw material type × coefficient J13 (29)

[0083] The following formula (30) can be used as a formula for calculating the element score based on the error element of the nitrogen concentration in the methane fermentation tank 105. In formula (30), the nitrogen concentration excess amount is the value by which the predicted value exceeds the set value of the nitrogen concentration in the methane fermentation tank 105, and is expressed by the difference (absolute value) between the predicted value and the set value of the nitrogen concentration. Furthermore, coefficient J14 is a predetermined coefficient for converting the nitrogen concentration excess amount into a score. Number of elements P14 = excess nitrogen concentration × coefficient J14 (30)

[0084] The following formula (31) can be used as a formula for calculating the element score based on the error element of the organic acid concentration in the methane fermentation tank 105. In formula (31), the excess organic acid concentration is the value by which the predicted value exceeds the set value of the organic acid concentration in the methane fermentation tank 105, and is represented by the difference (absolute value) between the predicted value and the set value of the organic acid concentration. Furthermore, coefficient J15 is a predetermined coefficient for converting the excess organic acid concentration into a score. Element score P15 = excess organic acid concentration × coefficient J15 (31)

[0085] The evaluation processing unit 224 calculates the element scores P2 to P15 based on the above-mentioned formulas (18) to (31), respectively, and adds up (sums up) these element scores P2 to P15 to calculate the element score P1 of formula (17). In the above-mentioned formulas (16) to (31), the coefficients J1 to J15 are different values. The evaluation processing unit 224 calculates each evaluation score of the plurality of second operation plans S2 by subtracting the reference score based on the predicted value of the above-mentioned methane gas generation amount from the element score P1, which is the sum of the above-mentioned element scores P2 to P15, based on formulas (16) and (17). The evaluation processing unit 224 inputs each of the evaluation scores calculated in this way to the judgment processing unit 225 in association with the plurality of second operation plans S2.

[0086] After executing the processing procedure of step S105 described above, the operation optimization device 200 judges whether or not to end the evaluation scoring of the plurality of second operation plans S2 (step S106). In step S106, the judgment processor 225 acquires the plurality of second operation plans S2 evaluated in step S105 and the evaluation scores of the plurality of second operation plans S2 from the evaluation processor 224. The judgment processor 225 judges whether or not to end the evaluation scoring of the plurality of second operation plans S2 based on a preset end condition.

[0087] For example, in the judgment processing unit 225, a threshold value for the rate of change of the highest score and a reference number of times the rate of change is less than the threshold value are preset as termination conditions for each evaluation score of the second operation plans S2.

[0088] The above-mentioned maximum score is the highest evaluation score among the evaluation scores of the second operation plans S2 calculated by the evaluation processing unit 224 in a series of processing procedures in the optimization operation method of the present invention. In particular, the highest evaluation score among the evaluation scores of the second operation plans S2 currently acquired by the judgment processing unit 225 from the evaluation processing unit 224 is distinguished from the past maximum score as the current maximum score. The past maximum score is the highest evaluation score (e.g., the previous maximum score) among the evaluation scores of the second operation plans S2 calculated by the evaluation processing unit 224 before the current maximum score. The above-mentioned series of processing procedures are processing procedures from the creation of the first second operation plan S2 to the application of the second operation plan S2 as the first operation plan S1 of the methane fermentation facility 110, that is, the processing procedures of steps S103 to S107 shown in FIG. 4.

[0089] The rate of change of the highest score is the rate of change of the current highest score relative to the highest score in the past. The rate of change is calculated, for example, by the following formula based on the difference between the current highest score Pma and the highest score in the past Pmb. The reference number of times is a reference value for the number of times that the rate of change of the highest score has consecutively fallen below the threshold value of the rate of change (hereinafter, referred to as the number of times below the threshold value). Rate of change in highest score [%] = (Pma-Pmb) ÷ Pmb × 100

[0090] The judgment processor 225 compares the evaluation scores of the second operation plans S2 currently acquired from the evaluation processor 224, and selects the highest evaluation score among these evaluation scores as the current maximum score. The judgment processor 225 calculates the rate of change of the maximum score based on the currently selected maximum score and the past maximum score previously selected, and compares the calculated rate of change (hereinafter referred to as the current rate of change) with a preset threshold value.

[0091] If the current rate of change is less than the threshold, the determination processor 225 performs an increase process of adding +1 to the number of times when the rate of change is less than the threshold, calculates the current number of times when the rate of change is less than the threshold, and compares this calculated number of times when the rate of change is less than the threshold with a preset reference number. If the result of each comparison process described above shows that the current rate of change is less than the threshold and the current number of times when the rate of change is less than the threshold is equal to or greater than the reference number, for example, if the rate of change in the highest score is less than 1% ten times in a row, the determination processor 225 determines to end the conversion of the evaluation scores of the multiple second operation plans S2. If the evaluation score has not been calculated in the past, the determination processor 225 may use a preset default value of the evaluation score as the highest score in the past.

[0092] On the other hand, if the current rate of change is equal to or greater than the threshold, the determination processor 225 resets the number of times less than the threshold to an initial value (e.g., zero). In this case, the determination processor 225 may determine whether or not to end the conversion of the evaluation scores of the second operation plans S2 with respect to the number of evaluations of the second operation plans S2.

[0093] For example, a reference evaluation count is preset in the judgment processing unit 225 as a termination condition for the evaluation count of a plurality of second operation plans S2. The evaluation count is the number of times a series of processing steps are executed from when the first second operation plan S2 is created until the second operation plan S2 is applied as the first operation plan S1 of the methane fermentation equipment 110. In this embodiment, the series of processing steps are the processing steps of steps S103 to S107 shown in Fig. 4. The reference evaluation count is a reference value of the evaluation count.

[0094] The judgment processor 225 calculates the current evaluation count by performing an increase process of adding +1 to the evaluation count of the second operation plans S2 every time it acquires each evaluation score of the second operation plans S2 from the evaluation processor 224. The judgment processor 225 compares the calculated current evaluation count with a preset reference evaluation count, and if the current evaluation count exceeds the reference evaluation count, i.e., if the above series of processing procedures have been repeated more than the reference evaluation count, it judges to end the conversion of the evaluation scores of the second operation plans S2.

[0095] Furthermore, if the above-mentioned current rate of change is equal to or greater than a threshold value, if the above-mentioned current number of times less than the threshold value is less than the reference number of times, or if the above-mentioned current number of evaluations is equal to or less than the reference number of evaluations, the judgment processor 225 judges not to end the evaluation scoring of the plurality of second operation plans S2. Note that the judgment processor 225 may perform the above-mentioned judgment of whether or not to end the evaluation scoring of the plurality of second operation plans S2 for each evaluation score of the plurality of second operation plans S2 and then for the number of evaluations of the plurality of second operation plans S2, or may perform the judgment for the number of evaluations of the plurality of second operation plans S2 and then for each evaluation score of the plurality of second operation plans S2.

[0096] In the above-mentioned step S106, if the judgment processor 225 judges not to end the evaluation scoring of the second operation plans S2 (step S106, No), the operation optimization device 200 returns to the above-mentioned processing procedure of step S103 and repeatedly executes the processing procedure from step S103 onwards. In this case, the judgment processor 225 instructs the operation planning unit 222 to remake at least one of the second operation plans S2.

[0097] In step S103 after step S106, the operation plan unit 222 remakes the second operation plan S2 evaluated by the evaluation processing unit 224 based on an instruction from the judgment processing unit 225, using a known algorithm such as a genetic algorithm.

[0098] In detail, the operation plan unit 222 acquires a plurality of second operation plans S2 and the evaluation scores of the plurality of second operation plans S2 from the judgment processing unit 225, and ranks the acquired plurality of second operation plans S2 (after evaluation) in descending order of evaluation score. The operation plan unit 222 selects a predetermined number (e.g., 10) of second operation plans S2 (hereinafter referred to as a group of highly evaluated second operation plans) in descending order of evaluation score from among the plurality (e.g., 100) of second operation plans S2. The operation plan unit 222 maintains the contents of the plan items in each of the selected groups of highly evaluated second operation plans. Next, the operation plan unit 222 selects a predetermined number (e.g., 20) of second operation plans S2 (hereinafter referred to as a group of second operation plans to be modified) in ascending order of evaluation score from among the remaining predetermined number (e.g., 90) of second operation plans S2. The operation plan unit 222 appropriately changes the values ​​of each plan item based on the selected second operation plan group to be modified, to create a new second operation plan group having mutually different contents. The number of second operation plans included in the new second operation plan group is the same as the above-mentioned lower predetermined number of second operation plans S2. Note that the above-mentioned upper predetermined number may be one, or two or more.

[0099] The operation planning unit 222 obtains a plurality of second operation plans S2 whose plan items have been modified by combining the group of second operation plans having the high evaluation and the new group of second operation plans. The number of the modified second operation plans S2 is the same as the number of the second operation plans S2 before the modification (for example, the initial second operation plans S2). The operation planning unit 222 provides the plurality of second operation plans S2 modified as described above to the prediction processing unit 223 as modified second operation plans. Thereafter, the processing procedures from step S104 onwards described above are sequentially performed on the plurality of second operation plans S2 (modified second operation plans).

[0100] On the other hand, in the above-mentioned step S106, if the judgment processing unit 225 determines to terminate the evaluation scoring of the multiple second operation plans S2 (step S106, Yes), the operation optimization device 200 applies the second operation plan S2 with the highest evaluation score among the multiple second operation plans S2 to the first operation plan S1 of the methane fermentation equipment 110 (step S107).

[0101] In step S107, the judgment processing unit 225 provides the second operation plan S2 with the highest score among the multiple second operation plans S2 currently acquired from the evaluation processing unit 224 to the control device 120 of the methane fermentation plant 100 to be applied as the first operation plan S1 of the methane fermentation facility 110. The second operation plan S2 with the highest score is updated by the control device 120 as the first operation plan S1 and applied to the actual operation of the methane fermentation facility 110. As a result, the operation of the methane fermentation facility 110 is optimized to match the current internal state.

[0102] In step S107, the judgment processor 225 resets the number of times the rate of change of the highest score is less than the threshold and the number of times the second operation plans S2 are evaluated to their initial values. After executing the processing procedure of step S107 described above, the operation optimization device 200 returns to the processing procedure of step S101 and repeatedly executes the processing procedures from step S101 onward.

[0103] (Operation Optimization Program) Next, an operation optimization program according to an embodiment of the present invention will be described. This operation optimization program is a program that causes a computer to execute the same processing procedure (see steps S101 to S107 shown in FIG. 4) as the above-mentioned post-operation optimization method. For example, the operation optimization device 200 shown in FIG. 1 is configured by a computer including a CPU, a memory, etc. The operation optimization program is stored in the memory of the computer and executed by the CPU.

[0104] As described above, in an embodiment of the present invention, in optimizing the operation of the methane fermentation equipment 110 that generates methane gas by methane fermentation of input raw materials in accordance with at least a first operation plan S1 that specifies a raw material input plan, a predicted value of the operational state of the methane fermentation equipment 110, including at least the amount of methane gas generated, is derived for each of the second operation plans S2 based on a methane fermentation reaction model 230 that represents the methane gas production process in the methane fermenter 105 and a plurality of second operation plans S2 that are candidates for operation plans to be applied as the first operation plan S1, and an evaluation score is calculated for each of the second operation plans S2 based on the derived predicted value of the operational state. Of the second operation plans S2, the second operation plan with the highest evaluation score is applied as the first operation plan S1. As a result, the amount of methane gas generated from the methane fermentation tank 105 can be controlled to a predetermined value (target predetermined value) that targets near the upper limit of the consumption by the gas operation equipment, allowing the methane gas generated from the methane fermentation tank 105 to be stably supplied to the gas operation equipment, and by suppressing unnecessary combustion processing of the methane gas, the methane gas can be utilized to the maximum extent possible.

[0105] In addition, in the embodiment of the present invention, actual measurement values ​​including at least the amount of methane gas generated that are actually measured from the methane fermentation equipment 110 are collected, the current internal state of the methane fermentation tank 105 is estimated based on the methane fermentation reaction model 230 and the actual measurement values, and a predicted value of the operation state is derived for each of the second operation plans S2 based on the methane fermentation reaction model 230 reflecting the estimated current internal state of the methane fermentation tank 105 and the second operation plans S2. Therefore, the amount of methane gas generated from the methane fermentation tank 105 can be accurately controlled to a target predetermined value in accordance with the current internal state of the methane fermentation tank 105.

[0106] In addition, in the embodiment of the present invention, a plurality of second operation plans S2 to be used in the derivation process of the predicted value of the operation state are created, and it is determined whether or not to end the evaluation scoring of the created plurality of second operation plans S2. If the evaluation scoring is to be ended, the second operation plan with the highest score among the plurality of second operation plans S2 is applied as the first operation plan S1, and if the evaluation scoring is not to be ended, at least one of the plurality of second operation plans S2 is modified. Therefore, a series of processing procedures from the creation (including modification) of the plurality of second operation plans S2 to the determination of the end of the evaluation scoring can be repeatedly executed until the second operation plan with the highest score among the plurality of second operation plans S2 is applied as the first operation plan S1. This allows the second operation plan with the highest score to be further optimized as the one to be applied to the actual operation plan of the methane fermentation facility 110.

[0107] In the above-described embodiment, the second operation plans S2 to be evaluated are automatically created by the operation planning unit 222, but the present invention is not limited to this. For example, a group of initial second operation plans may be set in advance, and the initial group of second operation plans may be input to the calculation processing unit 220 (more specifically, the prediction processing unit 223) of the operation optimization device 200 as the second operation plans S2.

[0108] In the above embodiment, the second operation plans S2 that have been evaluated once are modified, and the evaluation scores of the modified second operation plans S2 are repeatedly calculated, but the present invention is not limited to this. For example, the second operation plan S2 that has the highest score among the second operation plans S2 may be applied as the actual operation plan of the methane fermentation facility 110 without modifying the second operation plans S2 that have been evaluated once.

[0109] In the above-described embodiment, the element score (point deduction material for evaluation score) based on the error element between the target value and the predicted value of the methane gas generation amount is a score obtained by converting the amount of error between the set value of the operating state of the methane fermentation facility 110 and the predicted value, but the present invention is not limited to this. For example, the element score may be a score obtained by converting the amount of error between the set value of the operating state of the methane fermentation facility 110 and the predicted value, and the amount of error may be a value by which the predicted value exceeds or falls short of the set value.

[0110] Furthermore, the present invention is not limited to the above-described embodiment, and the present invention also includes configurations in which the above-described components are appropriately combined. In addition, other embodiments, examples, operation techniques, etc. made by those skilled in the art based on the above-described embodiment are all included in the scope of the present invention. [Explanation of symbols]

[0111] 100 Methane fermentation plant 101 Acceptance Department 102 Crushing section 103 Removal part 104 Mixing adjustment tank 105 Methane fermentation tank 110 Methane fermentation facility 120 Control device 200 Operation Optimization Device 210 Data Collection Department 220 Processing section 221 Estimation processing unit 222 Operation Planning Department 223 Prediction Processing Unit 224 Evaluation Processing Unit 225 Judgment processing unit 230 Methane fermentation reaction model S1 First operation plan S2 Second operation plan

Claims

1. An operation optimization device for a methane fermentation facility that generates methane gas by methane fermentation of an input material in accordance with a first operation plan that defines at least a feed plan for the raw material, comprising: a prediction processing unit that derives a predicted value of an operational state including at least a methane gas generation amount of the methane fermentation facility for each of a plurality of second operation plans that are candidates for an operation plan to be applied as the first operation plan, based on a methane fermentation reaction model that represents a process of methane gas generation by a methane fermentation tank provided in the methane fermentation facility and the plurality of second operation plans that are candidates for an operation plan to be applied as the first operation plan; an evaluation processing unit that calculates an evaluation score for each of the second operation plans based on the derived predicted value of the operation state; Equipped with Among the plurality of second operation plans, the second operation plan having the highest evaluation score is applied as the first operation plan. The present invention relates to an operation optimization device for a methane fermentation facility.

2. A data collection unit that collects actual measured values ​​including at least the amount of methane gas generated actually measured from the methane fermentation facility; an estimation processing unit that estimates a current internal state of the methane fermentation tank based on the methane fermentation reaction model and the actual measured value; Further equipped with The prediction processing unit derives a predicted value of the operation state for each of the second operation plans based on the methane fermentation reaction model reflecting the estimated current internal state of the methane fermentation tank and the second operation plans.

2. The methane fermentation facility operation optimization device according to claim 1 .

3. an operation planning unit that creates the second operation plans and provides them to the prediction processing unit; a determination processing unit that determines whether or not to end the evaluation scoring of the plurality of second operation plans by the evaluation processing unit; Further equipped with When the evaluation scoring is to be terminated, the judgment processing unit applies, as the first operation plan, a second operation plan having the highest evaluation score among the plurality of second operation plans, and when the evaluation scoring is not to be terminated, the judgment processing unit instructs the operation planning unit to modify at least one of the plurality of second operation plans.

3. The device for optimizing operation of a methane fermentation facility according to claim 1 or 2.

4. 1. A method for optimizing operation of a methane fermentation facility for producing methane gas by methane fermentation of an input material in accordance with a first operation plan that defines at least a feed plan for the raw material, comprising: A prediction processing step of deriving a predicted value of an operational state including at least a methane gas generation amount of the methane fermentation facility for each of a plurality of second operation plans which are candidates for an operation plan to be applied as the first operation plan, based on a methane fermentation reaction model which represents a process of generating methane gas in a methane fermentation tank provided in the methane fermentation facility and the plurality of second operation plans which are candidates for an operation plan to be applied as the first operation plan; an evaluation processing step of calculating an evaluation score for each of the second operation plans based on the derived predicted value of the operation state; Including, Among the plurality of second operation plans, the second operation plan having the highest evaluation score is applied as the first operation plan. A method for optimizing the operation of a methane fermentation facility.

5. A data collection step of collecting actual measured values ​​including at least the amount of methane gas generated actually measured from the methane fermentation facility; an estimation processing step of estimating a current internal state of the methane fermentation tank based on the methane fermentation reaction model and the actual measured value; Further comprising: In the prediction processing step, a predicted value of the operation state is derived for each of the second operation plans based on the methane fermentation reaction model reflecting the estimated current internal state of the methane fermenter and the second operation plans. The method for optimizing the operation of a methane fermentation facility according to claim 4.

6. an operation plan creation step of creating the plurality of second operation plans; a determination process step of determining whether or not to end the evaluation scoring of the plurality of second operation plans by the evaluation process step; Further comprising: When the evaluation scoring is to be terminated, the second operation plan having the highest evaluation score among the plurality of second operation plans is applied as the first operation plan, and when the evaluation scoring is not to be terminated, the operation plan creation step is repeated so as to create at least one of the plurality of second operation plans, and the processing steps subsequent to the operation plan creation step are repeated. The method for optimizing operation of a methane fermentation facility according to claim 4 or 5.

7. A method for optimizing the operation of a methane fermentation facility according to claim 4 or 5, The present invention relates to a methane fermentation facility and a method for optimizing the operation of the facility.

8. On the computer, an operation plan creation step of creating the plurality of second operation plans; a determination process step of determining whether or not to end the evaluation scoring of the plurality of second operation plans by the evaluation process step; Then, When the evaluation scoring is to be terminated, the second operation plan having the highest evaluation score among the plurality of second operation plans is applied as the first operation plan, and when the evaluation scoring is not to be terminated, the operation plan creation step is repeated so as to create at least one of the plurality of second operation plans, and the processing steps subsequent to the operation plan creation step are repeated.

8. The methane fermentation facility operation optimization program according to claim 7.

Citation Information

Patent Citations

  • Methane fermentation treatment equipment

    JP4218486B2

  • Operation method of wet methane fermentation treatment facility

    JP7035572B2