Humidity conditioner

The batch-type humidity control device addresses high energy consumption by using rotating chambers and a bypass flow path to reduce air pressure loss, ensuring efficient and stable humidification.

JP2024139366APending Publication Date: 2024-10-09PANASONIC HOMES CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2023050269
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-27
Publication Date
2024-10-09

AI Technical Summary

Technical Problem

Existing humidity control systems require powerful air conveying means due to the dense arrangement of humidity control materials, leading to significant pressure loss and energy consumption.

Method used

A batch-type humidity control device with two independent chambers, each with a cylindrical structure and humidity control material, alternately supplying air to chambers in moisture-absorbing and dry states, using a drive unit to rotate the chambers and a bypass flow path to reduce air pressure loss.

Benefits of technology

Reduces the power required for air conveyance, stabilizes humidification, and maintains comfort by efficiently supplying conditioned air while minimizing energy consumption and maintaining humidification capacity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024139366000001_ABST
    Figure 2024139366000001_ABST
Patent Text Reader

Abstract

To provide a humidity conditioner capable of reducing power of an air transporting part for supplying air to a chamber.SOLUTION: A butch-type humidity conditioner 15 is for conditioning humidity in the air. The humidity conditioner 15 includes a casing 26, a humidity conditioning part 16, an air transporting part, a drive part 28, and a bypass flow passage. The casing 26 includes a first inlet 35A, a first outlet 36A, a second inlet 35B, and a second outlet 36B. The humidity conditioning part 16 has two chambers independent from each other. A humidity conditioning material 43 is provided inside of each of the chambers, and a cylindrical structure opening with at both ends open is provided. The air transporting part supplies first air to the first inlet 35A, and supplies second air to the second inlet 35B. The drive part 28 moves the humidity conditioning part 16 to the casing 26 at prescribed time intervals T. The bypass flow passage sends a part of the first air to the first outlet 36A while bypassed so as not to pass through one of the chambers.SELECTED DRAWING: Figure 5
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a humidity control device. [Background technology]

[0002] The following Patent Document 1 describes a batch-type humidity control system having a humidity control chamber. The humidity control chamber is configured to include a first chamber and a second chamber that are independent of each other, and a humidity control material is disposed inside them. Air with a low relative humidity that has been conditioned by an air conditioner and air with a high relative humidity for putting the humidity control material into a moisture-absorbing state are alternately supplied to these chambers via a damper. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2018-071891 A Summary of the Invention [Problem to be solved by the invention]

[0004] In order to efficiently absorb and release water vapor between the air and the humidity control material, the humidity control material tends to be densely arranged in the chamber, which causes a large pressure loss in the air passing through the chamber, necessitating the need for a powerful air conveying means to supply air to the chamber.

[0005] The present invention has been devised in view of the above circumstances, and has as its main object to provide a humidity control device capable of reducing the power required for an air conveying section for supplying air to a chamber. [Means for solving the problem]

[0006] The present invention provides a batch-type humidity control device for controlling the humidity of air, comprising: a casing having a first inlet, a first outlet, a second inlet, and a second outlet; a humidity control unit disposed within the casing, the humidity control unit having two mutually independent chambers, each of which has a humidity control material disposed therein and has a cylindrical structure with both ends open; an air conveying unit for supplying a first air to the first inlet and supplying a second air having a relative humidity higher than that of the first air to the second inlet; and a drive unit for moving the humidity control unit relative to the casing at predetermined time intervals so that the first air can be supplied to the opening of one of the two chambers, in which the humidity control material is in a hygroscopic state, and the second air can be supplied to the opening of the other of the two chambers, in which the humidity control material is in a dry state; a bypass flow path that diverts a portion of the first air so as not to pass through the one chamber in the hygroscopic state and sends it to the first outlet; It is a humidity control device. Effect of the Invention

[0007] By adopting the above-mentioned configuration, the humidity control device of the present invention can reduce the power required for the air conveying section to supply air to the chamber. [Brief description of the drawings]

[0008] [Figure 1] 1 is a conceptual cross-sectional view of a house equipped with a humidity control device and an air conditioner of the present embodiment. [Diagram 2] 1 is a perspective view showing a main casing of an air conditioning / humidity control apparatus including the humidity control apparatus of the present embodiment. [Diagram 3] FIG. 3 is a partial perspective view of FIG. 2. [Figure 4] FIG. 3 is a partial cross-sectional view of FIG. 2. [Diagram 5] FIG. 2 is an exploded perspective view of the humidity control device excluding the air conveying unit. [Figure 6] FIG. 2 is a cross-sectional view of the humidity control device excluding the air conveying section. [Figure 7]FIG. 2(a) is a cross-sectional view showing a first position, and FIG. 2(b) is a cross-sectional view showing a second position. [Figure 8] 11 is a planar perspective view perpendicular to the supply direction of the first air by the air conveying unit. FIG. [Figure 9] 4 is a cross-sectional view showing a humidity control device of a comparative example in a first position. FIG. [Figure 10] 4 is a graph of an equilibrium moisture content curve showing the relationship between the adsorption amount of a humidity conditioning material and the relative pressure. [Figure 11] 11 is a graph showing an example of a change in the amount of humidification. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. It should be understood that the drawings include exaggerated expressions and expressions different from the dimensional ratio of the actual structure in order to help understand the contents of the invention. Furthermore, the same or common elements are given the same reference numerals throughout the embodiments, and duplicated explanations are omitted. Furthermore, the specific configurations shown in the embodiments and drawings are for understanding the contents of the present invention, and the present invention is not limited to the specific configurations shown in the drawings.

[0010] The humidity control device of the present embodiment is for controlling the humidity of air. The humidity control device of the present embodiment is configured as a batch-type humidity control device capable of alternately repeating moisture release and moisture absorption in a predetermined cycle.

[0011] The humidity control apparatus of the present embodiment is provided in a house together with an air conditioner, for example. In the present embodiment, the humidity control apparatus is provided in an air conveyance path to living rooms in a central air conditioning system including the air conditioner.

[0012] [Residential] 1 is a conceptual cross-sectional view of a house 2 equipped with a humidity control device and an air conditioner of the present embodiment. The house 2 of the present embodiment is configured to include, for example, an underfloor space 3 and an above-floor space 4.

[0013] In the above-floor space 4 of this embodiment, for example, a plurality of rooms 5 are provided. The rooms 5 include rooms on the first floor, but may also include rooms on the second floor or higher (not shown). Each room 5 is partitioned, for example, by a door 6, and air A2 circulates through a gap 7 formed in the door 6. Furthermore, an attic 39 is provided in the above-floor space 4. This attic 39 is provided with an attic air intake 72 in an eaves ceiling 71 that protrudes from the exterior wall to the eaves side (outdoor side). Outside air A3 can be supplied to the attic 39 side from this attic air intake 72.

[0014] [Whole building air conditioning system] The central air-conditioning system 1 of this embodiment is for adjusting the humidity of air conditioned by an air conditioner 13 (hereinafter, sometimes simply referred to as “conditioned air”) A1 and supplying it to a plurality of rooms 5.

[0015] The central air conditioning system 1 of this embodiment is configured to include an air conditioning / humidity control device 10 and a first flow path 11. The first flow path 11 of this embodiment is connected between the air conditioning / humidity control device 10 and a plurality of rooms 5. This enables the first flow path 11 to supply conditioned air (humidity-controlled conditioned air) A1 from the air conditioning / humidity control device 10 to the plurality of rooms 5. The first flow path 11 can be formed, for example, by a duct formed in a cylindrical shape.

[0016] [Air conditioning and humidity control equipment] The air conditioning / humidity control device 10 of this embodiment is configured to include a main casing 12, an air conditioner 13, and a filter member 17. Furthermore, the air conditioning / humidity control device 10 of this embodiment includes the above-mentioned humidity control device 15. The humidity control device 15 may be independent of the air conditioning / humidity control device 10. FIG. 2 is a perspective view showing the main casing 12 of the air conditioning / humidity control device 10 including the humidity control device 15 of this embodiment. FIG. 3 is a partial perspective view of FIG. 2. FIG. 4 is a partial cross-sectional view of FIG. 2. In this embodiment, the positions of each component of the air conditioning / humidity control device 10 are specified on an orthogonal coordinate system consisting of an x-axis, a y-axis, and a z-axis perpendicular to the x-axis and y-axis. In this embodiment, the directions of the x-axis and y-axis are set to the horizontal direction, and the direction of the z-axis is set to the vertical direction (height direction), but this is not limited to this embodiment.

[0017] [Main casing] 2 and 3, the main casing 12 of this embodiment is formed in a box shape having a main space 18 therein. The main space 18 of this embodiment is divided by a frame 19 and a face material 20 supported by the frame 19. The face material 20 may include, for example, a heat insulating material (not shown) for insulating the inside of the main space 18 from the outside of the main casing 12.

[0018] 3 and 4, the main space 18 in this embodiment is divided into a first main space 18A, a second main space 18B, and a third main space 18C by a first partitioning surface material 20A (including a first side surface material 33A, which will be described later, in this example) provided in the main casing 12. The first partitioning surface material 20A (first side surface material 33A) in this embodiment is disposed in approximately the center in the x-axis direction in the main casing 12. As a result, the first main space 18A and the second main space 18B are adjacent to each other in the x-axis direction via the first partitioning surface material 20A (first side surface material 33A).

[0019] The first partition surface material 20A (first side surface material 33A) of this embodiment extends in the z-axis direction from one end (in this example, the upper end) of the main casing 12 to the other end (in this example, the lower end) and terminates without reaching the other end. As a result, the main space 18 is divided into a third main space 18C that communicates with the first main space 18A and the second main space 18B on the other end side of the first partition surface material 20A (first side surface material 33A).

[0020] 2 and 3, the main casing 12 of this embodiment is provided with an openable and closable door section 21. By opening such door section 21, the main space 18 inside the main casing 12 can be easily accessed, improving the maintainability of the air conditioning and humidity control device 10. The door section 21 of this embodiment is configured to include a first door section 21A and a second door section 21B.

[0021] As shown in Figures 2 to 4, the main casing 12 of this embodiment has at least one inlet 22, at least one outlet 23, and an internal flow passage 24 (shown in Figure 4) that connects the inlet 22 and the outlet 23.

[0022] The inlet 22 in this embodiment is for supplying air to the main space 18 of the main casing 12. The inlet 22 in this embodiment is formed, for example, as a hole that communicates between the outside of the main casing 12 (in this example, the above-floor space 4 shown in FIG. 1 ) and the main space 18 of the main casing 12.

[0023] In this embodiment, the inlet 22 is provided on one end (upper end) side of the main casing 12 in the direction of the z-axis. Furthermore, the inlet 22 is provided on one side (first main space 18A) of the first partition surface material 20A in the direction of the x-axis. This allows the inlet 22 to supply air (in this example, air A2 inside the house 2) to the first main space 18A. The inlet 22 in this embodiment is formed so as to be able to supply air (in this example, return air from the multiple living rooms 5) A2 inside the house 2 to the main space 18 of the main casing 12, but may also be formed so as to be able to supply outside air for ventilation (not shown).

[0024] The outlet 23 in this embodiment is for supplying, for example, conditioned air (humidity-controlled conditioned air in this example) A1 in the main space 18 of the main casing 12 to the outside of the main casing 12. The outlet 23 in this embodiment is formed as a hole that communicates between the main space 18 of the main casing 12 and the outside of the main casing 12 (the first flow path 11 in this example).

[0025] The outlet 23 in this embodiment is provided on one end (upper end) side of the main casing 12 in the direction of the z-axis. Furthermore, the outlet 23 is provided on the other side (second main space 18B) side of the first partition surface material 20A in the direction of the x-axis. This allows the outlet 23 to take out air from the second main space 18B and supply it to the outside of the main casing 12 (in this example, the first flow path 11). The above-mentioned first flow path 11 is connected to the outlet 23 in this embodiment. This allows the air in the second main space 18B (conditioned air A1) to be supplied to multiple rooms 5 (shown in FIG. 1) from the outlet 23 via the first flow path 11.

[0026] 4, the internal flow path 24 of this embodiment communicates between the inlet 22 and the outlet 23. An air conditioner 13 is provided in the internal flow path 24. This allows air (in this example, return air) A2 supplied from the inlet 22 to be conditioned by the air conditioner 13, and also allows the conditioned air A1 to be guided to the outlet 23 (first flow path 11).

[0027] The internal flow path 24 of this embodiment is composed of a first main space 18A communicating with the inlet 22, a second main space 18B communicating with the outlet 23, and a third main space 18C communicating between the first main space 18A and the second main space 18B. As a result, the internal flow path 24 is formed in a U-shape when viewed from the side in the y-axis direction.

[0028] [Air conditioner] 3 and 4, the air conditioner 13 of this embodiment is configured, for example, as a typical household separate type air conditioner. The air conditioner 13 includes, as a set, an indoor unit 13A and an outdoor unit (not shown) installed outside the house 2. The indoor unit 13A has an intake port 13a and an exhaust port 13b.

[0029] The air conditioner 13 (indoor unit 13A) of this embodiment is disposed in an internal flow path 24 of the main casing 12. In this embodiment, the indoor unit 13A is disposed in the first main space 18A (on the inlet 22 side) of the internal flow path 24.

[0030] The intake port 13a in this embodiment takes in air A2 supplied from the inlet 22 (in this example, air (return air) inside the house 2) and supplies it to a heat exchanger (not shown) provided inside the indoor unit 13A. On the other hand, the exhaust port 13b in this embodiment discharges air A1 conditioned by the heat exchanger (conditioned air) to the outlet 23 side (the downstream side of the internal flow path 24 (the third main space 18C and second main space 18B side)). The set temperature and air volume (blowout air volume) of the air conditioner 13 are controlled by, for example, the control unit 25 (shown in FIG. 1).

[0031] [Filter material] The filter member 17 of the present embodiment is for purifying air. The filter member 17 of the present embodiment is disposed in the internal flow path 24 of the main casing 12. The filter member 17 can purify the air in the internal flow path 24.

[0032] The filter member 17 of the present embodiment is located in the internal flow path 24 between the air conditioner 13 and a humidity control device 15 described below. As a result, the conditioned air A1 purified by the filter member 17 is supplied to the humidity control device 15, thereby suppressing contamination of the humidity control device 15. An example of the filter member 17 is a HEPA (High Efficiency Particulate Air) filter.

[0033] [Humidity control device] 4, the humidity control device 15 of the present embodiment is disposed in the internal flow path 24 of the main casing 12, and on the outlet 23 side of the air conditioner 13. By such a humidity control device 15, the humidity of the conditioned air A1 of the air conditioner 13 can be controlled.

[0034] The position of the humidity control device 15 of this embodiment is not particularly limited as long as it is disposed in the internal flow path 24 of the main casing 12 and closer to the outlet 23 (downstream of the internal flow path 24) than the air conditioner 13. The humidity control device 15 (humidity control section 16) of this embodiment is provided in the second main space 18B.

[0035] As shown in FIGS. 2 to 4, the humidity control device 15 of the present embodiment includes a casing 26, a humidity control section 16, an air conveying section 14, a drive section 28, and a bypass flow path 55.

[0036] [Casing (secondary casing)] The casing 26 of the present embodiment is configured as an auxiliary casing 27 in which the humidity control unit 16 is disposed within the main casing 12. As shown in Fig. 4, the casing 26 of the present embodiment is formed in a box shape having a subspace 29 therein.

[0037] The casing 26 in this embodiment is fixed to the main casing 12 in a manner that allows it to be disassembled. This improves the maintainability of the humidity control device 15. The casing 26 may be configured integrally with the main casing 12 (fixed so as not to be disassembled). Fig. 5 is an exploded perspective view of the humidity control device 15 excluding the air conveying unit 14. Fig. 6 is a cross-sectional view of the humidity control device 15 excluding the air conveying unit 14.

[0038] 4 to 6, the casing 26 of this embodiment is configured to include a bottom surface material 31 and a top surface material 32 disposed on both sides in the direction of the z-axis, and a plurality of side surface materials 33 disposed between the bottom surface material 31 and the top surface material 32. A sub-space 29 is defined in the casing 26 by the bottom surface material 31, the top surface material 32, and the plurality of side surface materials 33.

[0039] In this embodiment, the lower surface material 31, the upper surface material 32, and the multiple side surface materials 33 are each formed to have a rectangular shape in a plan view. As a result, the casing 26 is formed to have a rectangular shape in a plan view seen from each of the x-axis, y-axis, and z-axis directions. The lower surface material 31, the upper surface material 32, and the multiple side surface materials 33 may include a heat insulating material (not shown).

[0040] 5, the lower surface material 31 and the upper surface material 32 of this embodiment extend in the x-y plane. The lower surface material 31 and the upper surface material 32 are disposed spaced apart from each other in the z-axis direction.

[0041] As shown in Figs. 4 to 6, the multiple side members 33 in this embodiment are comprised of a first side member 33A, a second side member 33B, a third side member 33C and a fourth side member 33D.

[0042] The first side member 33A and the second side member 33B of this embodiment extend in a y-z plane. The first side member 33A and the second side member 33B are arranged spaced apart from each other in the x-axis direction. As shown in Fig. 4, the first side member 33A of this embodiment is fixed to the first partition surface member 20A of the main casing 12, but is not limited to this.

[0043] 5, the third side member 33C and the fourth side member 33D of this embodiment extend in the x-z plane and are spaced apart from each other in the y-axis direction.

[0044] As shown in Figs. 5 and 6, the casing 26 of this embodiment is provided with a second partition 34. The second partition 34 extends in the z-axis direction adjacent to both ends (in this example, both ends in the z-axis direction) of a first partition 30 described below that extends in the z-axis direction. The second partition 34 of this embodiment is formed in a plate shape extending in the x-axis-z plane. Furthermore, the second partition 34 is disposed between the third side member 33C and the fourth side member 33D in the y-axis direction. By such first partition 30 and second partition 34, the casing 26 (subspace 29) is divided into a first space 29A and a second space 29B that are arranged side by side in the y-axis direction and allow air to pass in the z-axis direction.

[0045] The casing 26 of the present embodiment has a first inlet 35A, a first outlet 36A, a second inlet 35B, and a second outlet 36B as air inlets and outlets.

[0046] The first inlet 35A in this embodiment is for supplying air to the first space 29A. This first inlet 35A is formed in the bottom surface member 31. On the other hand, the second inlet 35B in this embodiment is for supplying air to the second space 29B. This second inlet 35B is formed in the fourth side surface member 33D.

[0047] In this embodiment, the first outlet 36A is for taking out air from the first space 29A. Meanwhile, the second outlet 36B is for taking out air from the second space 29B. The first outlet 36A and the second outlet 36B are formed in the upper surface material 32.

[0048] 6, the first inlet 35A and the first outlet 36A in this embodiment are provided on one side in the y-axis direction (in this example, one side (first space 29A side) relative to the first partitioning portion 30 and the second partitioning portion 34) in the casing 26. As a result, the first inlet 35A and the first outlet 36A can communicate between the first space 29A and the outside of the casing 26.

[0049] 4, the first inlet 35A of this embodiment communicates with the third main space 18C of the main casing 12. This allows the first inlet 35A to supply the conditioned air A1 from the third main space 18C to the first space 29A (second main space 18B). On the other hand, the first outlet 36A of this embodiment is configured as the outlet 23 of the main casing 12 described above.

[0050] 6, the second inlet 35B and the second outlet 36B in this embodiment are provided on the other side in the y-axis direction (in this example, the other side (the second space 29B side) with respect to the first partition portion 30 and the second partition portion 34) in the casing 26. As a result, the second inlet 35B and the second outlet 36B can communicate between the second space 29B and the outside of the casing 26.

[0051] 5 and 6, the second inlet 35B of the present embodiment is connected to an outside air supply unit 37 for supplying outside air A3 (shown in FIG. 1). This allows the second inlet 35B to supply the outside air A3 to the second space 29B (second main space 18B).

[0052] The outside air supply unit 37 of this embodiment is configured to include a second flow path 38. As shown in FIG. 1, a part of the second flow path 38 is arranged in the attic 39. Furthermore, one end of the second flow path 38 is connected to an attic air intake port 72 provided in the eaves ceiling 71. This attic air intake port 72 is supplied with outside air A3 used for recovery (regeneration) of the humidity control material 43 (humidity control element 53) described later. Meanwhile, as shown in FIG. 5, the other end of the second flow path 38 is connected to the second inlet 35B. The second flow path 38 of this embodiment is formed by a duct formed in a cylindrical shape.

[0053] 5 and 6, the second outlet 36B of the present embodiment is connected to one end of the third flow path 41. The other end of the third flow path 41 is disposed in the attic 39 as shown in Fig. 1. Therefore, the outside air A3 in the second space 29B can be supplied to the attic 39 (shown in Fig. 1) via the second outlet 36B and the third flow path 41.

[0054] 3 to 5, the casing 26 of the present embodiment is preferably provided with an openable and closable inspection door 42. By opening such an inspection door 42, the inside of the casing 26 (in this example, the humidity control section 16 (humidity control material 43) described later) can be easily accessed, improving maintainability.

[0055] The inspection door 42 can be appropriately designed as long as it can open and close the casing 26. As shown in Figs. 3 and 4, the inspection door 42 of this embodiment is provided on the underside of the first side member 33A as part of the first side member 33A, and is configured as a door that can rotate around the y axis. Therefore, for example, the inspection door 42 can be opened from the outside of the main casing 12 by opening the door portion 21 (shown in Fig. 2) and removing the filter member 17. This allows easy access to the inside of the casing 26.

[0056] [Humidity control section] 5 and 6, the humidity adjustment section 16 is disposed inside a casing 26. This humidity adjustment section 16 has two chambers (for example, a first chamber 45 and a second chamber 46) that are independent from each other.

[0057] As shown in Fig. 4 to Fig. 6, the humidity control unit 16 of this embodiment is rotatably disposed around a rotation shaft 51 within the casing 26. The rotation shaft 51 of this embodiment extends in the x-axis direction, and one end of the rotation shaft 51 is connected to the drive unit 28. As shown in Fig. 4, the other end of the rotation shaft 51 is supported by a bearing (not shown) provided on the second side member 33B. This allows the humidity control unit 16 of this embodiment to rotate around the rotation shaft 51.

[0058] [1st chamber / 2nd chamber] As shown in Figures 5 and 6, two chambers (first chamber 45 and second chamber 46) are separated side by side in the y-axis direction via a first partition portion 30. The first partition portion 30 of this embodiment extends in the z-axis direction. The first partition portion 30 of this embodiment is formed in a plate shape extending in the x-axis-z-axis plane. The first partition portion 30 and the second partition portion 34 divide the casing 26 into a first space 29A and a second space 29B. Both ends of the first partition portion 30 of this embodiment in the x-axis direction are adjacent to the first side material 33A and the second side material 33B.

[0059] The first chamber 45 of this embodiment is disposed on one side in the y-axis direction with respect to a rotation axis 51 extending in the x-axis direction, while the second chamber 46 of this embodiment is disposed on the other side in the y-axis direction with respect to the rotation axis 51.

[0060] The first chamber 45 in this embodiment is divided by the first partition 30, the third partition 48, the above-mentioned first side material 33A, and the above-mentioned second side material 33B. Note that the first chamber 45 is not limited to this embodiment, and may be divided, for example, by other partitions (not shown).

[0061] The third partition portion 48 of this embodiment is formed in a plate shape extending in the x-axis-z-axis plane, similar to the first partition portion 30. This third partition portion 48 is fixed to the first partition portion 30, for example, via a connecting portion (not shown). Furthermore, both ends 56, 56 in the x-axis direction of the third partition portion 48 (shown in FIG. 5) are adjacent to the first side material 33A and the second side material 33B, similar to the first partition portion 30.

[0062] The second chamber 46 in this embodiment is divided by the first partition 30, the fourth partition 49, the above-mentioned first side material 33A, and the above-mentioned second side material 33B. Note that the second chamber 46 is not limited to this embodiment, and may be divided, for example, by other partitions (not shown).

[0063] The fourth partition portion 49 of this embodiment is formed in a plate shape extending in the x-axis-z-axis plane, similar to the first partition portion 30 and the third partition portion 48. This fourth partition portion 49 is fixed to the first partition portion 30, for example, via a connecting portion (not shown). Furthermore, both ends 57, 57 (shown in FIG. 5) in the x-axis direction of the fourth partition portion 49 are adjacent to the first side material 33A and the second side material 33B, similar to the first partition portion 30.

[0064] In this manner, the first chamber 45 and the second chamber 46 are each divided by a plurality of partitions and side members, so that the first chamber 45 and the second chamber 46 are independent from each other.

[0065] 5 and 6, the two chambers (the first chamber 45 and the second chamber 46) have a cylindrical structure with both ends open. The first chamber 45 and the second chamber 46 of the humidity adjustment section 16 of this embodiment are open at both ends in the longitudinal direction (z-axis direction) of the first partition section 30, the third partition section 48, and the fourth partition section 49. This allows the first chamber 45 to pass a first air 58 (described later) and the second chamber 46 to pass a second air 59 (described later) along the z-axis direction (up-down direction).

[0066] [Humidity control material] The two chambers (first chamber 45 and second chamber 46) each have a humidity control material 43 disposed therein. The humidity control material 43 in this embodiment is for controlling the humidity of air (first air 58 and second air 59) passing through in the direction of the z-axis. The humidity control material 43 has moisture absorption and desorption properties that enable it to adsorb water vapor from air with a high relative humidity and to release the water vapor that it has adsorbed into air with a low relative humidity.

[0067] The humidity conditioner 43 is not particularly limited as long as it has moisture absorbing and releasing properties. The humidity conditioner 43 of the present embodiment is constituted by a humidity control element 53.

[0068] As shown in Fig. 5, the humidity control element 53 of this embodiment is configured to include a plurality of humidity control sheets 54. The plurality of humidity control sheets 54 are stacked at intervals (for example, stacked in a honeycomb or double-tiered shape) so that air can pass in the z-axis direction. Such a humidity control element 53 makes it possible to effectively increase the moisture exchange area. The humidity control sheets 54 carry, for example, an adsorbent material (not shown) similar to that in Patent Document 1 above.

[0069] Each humidity control material 43 in this embodiment is configured to include a plurality of separable humidity control elements 53. For example, the humidity control material 43 arranged inside the first chamber 45 includes a first humidity control element 53A and a second humidity control element 53B adjacent to the first humidity control element 53A in the y-axis direction. On the other hand, the humidity control material 43 arranged inside the second chamber 46 includes a first humidity control element 53C and a second humidity control element 53D adjacent to the first humidity control element 53C in the y-axis direction. The first humidity control elements 53A and 53C are provided on the rotating shaft 51 side.

[0070] The humidity control elements 53A to 53D of this embodiment are formed to have the same shape, which reduces the manufacturing cost of the humidity control elements 53A to 53D. Note that the humidity control elements 53A to 53D may have different shapes.

[0071] [Air conveying section] As shown in Fig. 1, the air conveying section 14 is for supplying a first air 58 to a first inlet 35A (shown in Fig. 6) and for supplying a second air 59 having a higher relative humidity than the first air to a second inlet 35B (shown in Fig. 6). As a result, as shown in Figs. 4 to 6, the air conveying section 14 can pass the first air 58 through the first space 29A and pass the second air 59 through the second space 29B. The air conveying section 14 of this embodiment includes a first fan 14A and a second fan 40 (shown in Fig. 1).

[0072] 1 to 4, the first fan 14A of the present embodiment is for supplying air (first air 58) to the first inlet 35A. The first fan 14A is disposed in the internal flow path 24 of the main casing 12, and is located between the air conditioner 13 and the humidity adjustment section 16 (in this example, in the third main space 18C (shown in FIG. 4)).

[0073] The first fan 14A of the present embodiment generates an airflow from the inlet 22 of the main casing 12 toward the outlet 23 (first outlet 36A of the casing 26). This allows the first fan 14A to pass air (first air) 58 through the first space 29A to the outside of the humidity adjustment section 16. This airflow allows air (return air) A2 within the house 2 to be taken in from the inlet 22 and conditioned by the air conditioner 13. Furthermore, the airflow allows conditioned air A1 discharged from the air conditioner 13 to pass through the casing 26 and be smoothly guided toward the outlet 23 (first outlet 36A).

[0074] As shown in FIG. 1, the second fan 40 of this embodiment is for supplying air (second air) 59 to the second space 29B of the casing 26. The second fan 40 is arranged in the second flow path 38 and generates an air flow from one end side (the attic air supply port 72 side) to the other end side (the second inlet 35B side of the casing 26). This allows the second fan 40 to pass the air (second air) 59 through the second space 29B to the outside of the humidity control unit 16. This air flow allows the outside air (second air) A3 to be taken in from the second inlet 35B, and the outside air (second air) A3 to pass through the inside of the casing 26 and be smoothly guided to the second outlet 36B. The second fan 40 is not limited to being arranged in the second flow path 38, and may be arranged, for example, between the second inlet 35B and the humidity control unit 16.

[0075] As described above, the first air 58 is air conditioned by the air conditioner 13. On the other hand, the second air 59 is exemplified as the outside air A3 from the attic air supply port 72, but may be the outside air A3 from the underfloor space 3, or may be the outside air A3 from an interfloor space (not shown) if the house 2 is a multi-story building. For example, in winter, when the air conditioner 13 is in heating operation, the air conveying unit 14 supplies the first air (warmed conditioned air) A1 to the first inlet 35A, and supplies the second air (outside air) A3 having a higher relative humidity than the first air 58 to the second inlet 35B.

[0076] [Drive unit] 4 and 5, the drive unit 28 is for moving the humidity adjustment unit 16 relative to the casing 26 at a predetermined time interval T. Such movement at the time interval T can be performed by the control unit 25 controlling the rotational movement of the drive unit 28. The drive unit 28 of the present embodiment, for example, rotates the humidity adjustment unit 16 relative to the casing 26 around a rotation axis 51 extending in the x-axis direction.

[0077] The driving unit 28 is not particularly limited as long as it can rotate the humidity adjustment unit 16. The driving unit 28 of the present embodiment is configured as, for example, a rotatable electric motor, and is connected to a rotation shaft 51. In Fig. 6, the rotational trajectory of the humidity adjustment unit 16 is indicated by a virtual line.

[0078] In this embodiment, the drive unit 28 is fixed to the first side member 33A. As shown in Fig. 4, in this embodiment, the drive unit 28 is exposed and fixed in the first main space 18A. This allows easy access to the drive unit 28 from the door portion 21 provided in the main casing 12 through the first main space 18A, improving maintainability.

[0079] In this embodiment, the drive unit 28 rotates the humidity adjustment unit 16 180° around the rotation shaft 51 inside the casing 26, thereby alternately switching between a first position and a second position, which will be described later. Here, "180°" is an allowable range for an error (-5 to +5°) in the rotation accuracy of the drive unit 28.

[0080] Fig. 7(a) is a cross-sectional view showing a first position. Fig. 7(b) is a cross-sectional view showing a second position. In Fig. 7, the humidity conditioner 43 in the first chamber 45 and the humidity conditioner 43 in the second chamber 46 are given different colors to make them easier to distinguish from each other. Furthermore, the outside air A3 in Fig. 7 is given a color.

[0081] [First position] 7(a), in this embodiment, at the first position, the humidity conditioner 43 in the first chamber 45 is in a moisture-absorbing state, and the humidity conditioner 43 in the second chamber is in a dry state. At the first position, the first inlet 35A is connected to the first outlet 36A via the first chamber 45, and the second inlet 35B is connected to the second outlet 36B via the second chamber 46.

[0082] In the first position of this embodiment, the first chamber 45 is disposed in the first space 29A, and the second chamber 46 is disposed in the second space 29B. By disposing in this manner, at the first position, the first air 58 can be supplied to the opening of one of the two chambers in which the humidity control material 43 is in a moisture-absorbing state (one end 45a in the z-axis direction of the first chamber 45). Furthermore, the second air 59 can be supplied to the opening of the other of the two chambers in which the humidity control material 43 is in a dry state (one end 46a in the z-axis direction of the second chamber 46). As a result, at the first position, the first air 58 from the first inlet 35A flows through the first chamber 45 to the first outlet 36A, and the second air 59 from the second inlet 35B flows through the second chamber 46 to the second outlet 36B.

[0083] The first air (conditioned air) 58 of the air conditioner 13 (shown in FIG. 4) is supplied to the first inlet 35A at the first position. For example, in winter, when the air conditioner 13 is in heating operation, the relative humidity of the first air (warmed conditioned air) 58 is low. When the first air 58 having such a low relative humidity passes from one end 45a to the other end 45b in the z-axis direction of the first chamber 45 (humidity control element 53), water vapor adsorbed to the humidity control material 43 (humidity control element 53) of the first chamber 45 is released (humidity releasing state). This increases the relative humidity of the first air 58. Then, the first air 58 with an increased relative humidity (passing through the other end 45b of the first chamber 45) is supplied to the multiple rooms 5 (shown in FIG. 1) from the first outlet 36A via the first flow path 11. This allows the multiple rooms 5 to be effectively humidified while being heated at the first position.

[0084] On the other hand, the second inlet 35B at the first position is supplied with second air (outside air) 59 from the outside air supply unit 37. For example, the second air 59 in winter has a higher relative humidity than the first air (warmed air-conditioned air) 58. When the second air 59 having such a high relative humidity passes from one end 46a to the other end 46b in the z-axis direction of the second chamber 46, the water vapor contained in the second air 59 is adsorbed (moisture-absorbing state) by the humidity control material 43 (humidity control element 53) of the second chamber 46. This makes it possible to recover the humidifying ability of the humidity control material 43. Then, the second air 59 whose relative humidity has been reduced by the adsorption of water vapor (having passed through the other end 46b of the second chamber 46) is supplied from the second outlet 36B through the third flow path 41 to the attic 39 (shown in FIG. 1). This makes it possible to dehumidify the attic 39 at the first position (suppress condensation in the attic 39).

[0085] [Second position] 7(b), in this embodiment, in the second position, the humidity conditioner 43 in the second chamber 46 is in a moisture-absorbing state, and the humidity conditioner 43 in the first chamber is in a dry state. In the second position, the first inlet 35A is connected to the first outlet 36A via the second chamber 46, and the second inlet 35B is connected to the second outlet 36B via the first chamber 45.

[0086] In the second position of this embodiment, the first chamber 45 is disposed in the second space 29B, and the second chamber 46 is disposed in the first space 29A. By disposing in this manner, in the second position, the first air 58 can be supplied to the opening (the other end 46b in the z-axis direction of the second chamber 46) of one of the two chambers (the second chamber 46) in which the humidity control material 43 is in a moisture-absorbing state. Furthermore, the second air 59 can be supplied to the opening (the other end 45b in the z-axis direction of the first chamber 45) of the other of the two chambers (the first chamber 45) in which the humidity control material 43 is in a dry state. As a result, in the second position, the first air 58 from the first inlet 35A flows through the second chamber 46 to the first outlet 36A, and the second air 59 from the second inlet 35B flows through the first chamber 45 to the second outlet 36B.

[0087] In the second position, the first air (in this example, conditioned air with a low relative humidity) 58 of the air conditioner 13 is supplied to the first inlet 35A. When the first air 58 with a low relative humidity passes from the other end 46b to the one end 46a of the second chamber 46, the water vapor adsorbed on the humidity control material 43 of the second chamber 46 is released (humidity releasing state). This increases the relative humidity of the first air 58. Then, the first air 58 with an increased relative humidity (having passed through the one end 46a of the second chamber 46) is supplied to the multiple rooms 5 (shown in FIG. 1) from the first outlet 36A via the first flow path 11. In this way, in the second position, the multiple rooms 5 can be effectively humidified while being heated, similar to the first position.

[0088] On the other hand, the second inlet 35B at the second position is supplied with second air (outside air with a high relative humidity in this example) 59 from the outside air supply unit 37. When the second air 59 with a high relative humidity passes from the other end 45b to the one end 45a of the first chamber 45, the water vapor contained in the second air 59 can be adsorbed by the humidity control material 43 of the first chamber 45 (moisture absorbing state). This makes it possible to recover the humidifying ability of the humidity control material 43. Then, the second air 59 with a lowered relative humidity due to the adsorption of water vapor (having passed through the one end 45a of the first chamber 45) is supplied from the second outlet 36B through the third flow path 41 to the attic 39 (shown in FIG. 1). This makes it possible to dehumidify the attic 39 (suppress condensation in the attic 39) at the second position.

[0089] In this way, in the humidity control device 15 of the present embodiment, the drive unit 28 can move the humidity control unit 16 relative to the casing 26 at predetermined time intervals T. By such movement, the first air 58 can be supplied to the opening of one of the two chambers in which the humidity control material 43 is in a moisture-absorbing state, and the second air 59 can be supplied to the opening of the other chamber in which the humidity control material 43 is in a dry state. This makes it possible to continuously and efficiently supply the conditioned and humidified conditioned air A1 (first air 58) to the multiple rooms 5, and also makes it possible to restore the humidifying ability of the humidity control material 43.

[0090] In this embodiment, the drive unit 28 rotates the humidity adjustment unit 16 180° inside the casing 26, thereby alternately switching the supply of the first air 58 and the second air 59 to each of the two chambers (the first chamber 45 and the second chamber 46), and therefore does not require a damper as in Patent Document 1. Therefore, the humidity control device 15 of this embodiment can reduce the number of dampers and reduce maintenance.

[0091] The time interval T is set appropriately depending on the size, moisture absorption and desorption performance, etc. of the humidity conditioner 43. The time interval T can be set, for example, to 10 to 120 minutes, and preferably 30 to 60 minutes. This allows the drive unit 28 to rotate the humidity conditioner 16 from one of the first position and the second position to the other at the timing when most of the water vapor adsorbed on the humidity conditioner 43 in the chamber at the first position (first chamber 45 in FIG. 7(a)) has been reliably desorbed.

[0092] [Bypass flow path] The bypass flow path 55 is for directing a portion of the first air 58 to the first outlet 36A without passing through one of the chambers in a moisture-absorbing state (in FIG. 7(a), the first chamber 45 disposed in the first space 29A). The bypass flow path 55 in this embodiment is provided inside the casing 26 (in this example, the first space 29A). This allows the size of the humidity control device 15 to be reduced.

[0093] 7(a), the bypass flow path 55 is formed by a space between the inner wall surface of the casing 26 (the inner surface in the y-axis direction of the third side member 33C (the x-axis-z plane)) and the outer wall surface of the cylindrical structure of the first chamber 45 in a moisture-absorbing state (the outer surface in the y-axis direction of the third partition portion 48 (the x-axis-z plane)). Such a bypass flow path 55 allows a portion of the first air 58 to be diverted so as not to pass through the first chamber 45 (humidity control material 43) in a moisture-absorbing state, and sent to the first outlet 36A.

[0094] 7(b), the bypass flow path 55 is formed by the space between the inner wall surface of the casing 26 (the inner surface in the y-axis direction of the third side member 33C (the x-axis-z plane)) and the outer wall surface of the cylindrical structure of the second chamber 46 in a moisture-absorbing state (the outer surface in the y-axis direction of the fourth partition portion 49 (the x-axis-z plane)). This bypass flow path 55 allows a portion of the first air 58 to be diverted so as not to pass through the second chamber 46 (humidity control material 43) in a moisture-absorbing state, and sent to the first outlet 36A.

[0095] In this way, the humidity control device 15 of the present embodiment can send a part of the first air 58 to the first outlet 36A by bypassing the bypass flow path 55 so as not to pass through the first chamber 45 and the second chamber 46. The humidity control material 43 having the humidity control element 53 laminated thereon is disposed in the first chamber 45 and the second chamber 46, which tends to reduce the pressure of the air passing through the first chamber 45 and the second chamber 46. Therefore, the humidity control device 15 of the present embodiment can reduce the amount of the first air 58 passing through the first chamber 45 and the second chamber 46, thereby reducing the pressure loss of the first air 58 caused by passing through the first chamber 45 and the second chamber 46, and thus the power of the air conveying unit 14 for supplying air to the first chamber 45 and the second chamber 46 can be reduced.

[0096] Furthermore, the reduction in the amount of first air 58 passing through the first chamber 45 and the second chamber 46 prevents the amount of water vapor released from the humidity control material 43 from increasing suddenly (suppresses the peak of the humidification amount), so that water vapor can be released stably for a long period of time. Therefore, the amount of humidification in the living room 5 can be stabilized.

[0097] Moreover, unlike the first chamber 45 and the second chamber 46 which pass the first air 58 along the supply direction (z-axis direction), the bypass flow path 55 diverts the first air 58 in a direction bending with respect to the supply direction (y-axis direction). Therefore, most of the first air 58 is prevented from being guided to the bypass flow path 55, and the supply amount of the first air 58 to the first chamber 45 and the second chamber 46 is ensured. Therefore, the amount of humidification of the first air 58 can be maintained.

[0098] In this way, the humidity control device 15 of the present embodiment can reduce the power of the air conveying unit 14 by using the bypass flow path 55. However, if the flow rate of the first air 58 bypassing the bypass flow path 55 is too high, the supply of the first air 58 to the chamber (the first chamber 45 or the second chamber 46) is reduced, and the humidification amount of the first air 58 may not be maintained. From this viewpoint, it is preferable that the bypass flow path 55 bypasses a flow rate of 30% or less of the first air 58 supplied by the air conveying unit 14. This reduces the power of the air conveying unit 14 while maintaining the supply of the first air 58 to the chamber (the first chamber 45 or the second chamber 46), and the comfort of each room 5 is improved by humidifying the first air 58.

[0099] Fig. 8 is a planar perspective view perpendicular to the supply direction of the first air 58 by the air conveying unit 14. Fig. 8 is a view of the humidity control device 15 as viewed in the z-axis direction from the third main space 18C (shown in Fig. 4) side (as viewed from below the humidity control device 15).

[0100] As shown in FIG. 8, in the planar perspective view, the first inlet 35A is preferably provided at a position at which it at least partially overlaps with the opening of one of the chambers (the first chamber 45 or the second chamber 46) in the hygroscopic state (the one end 45a in the z-axis direction of the first chamber 45 or the other end 46b in the z-axis direction of the second chamber 46, as shown in FIG. 7). This allows the first air 58 to be effectively supplied to the opening of one of the chambers (the first chamber 45 or the second chamber 46) in the hygroscopic state (the one end 45a in the z-axis direction of the first chamber 45 or the other end 46b in the z-axis direction of the second chamber 46, as shown in FIG. 7). In order to effectively exert such an action, the first inlet 35A is preferably provided at a position at which it entirely (all areas) overlaps with the opening (the one end 45a in the z-axis direction of the first chamber 45 or the other end 46b in the z-axis direction of the second chamber 46).

[0101] On the other hand, it is preferable that the bypass flow passage 55 is provided at a position that does not overlap with the first inlet 35A. This allows the bypass flow passage 55 to divert a part of the first air 58 so as not to pass through one of the chambers in a moisture-absorbing state. This makes it possible to effectively reduce the power of the air conveying unit 14 for supplying air to the chamber. In addition, the peak of the humidification amount due to the water vapor released from the humidity control material 43 is further suppressed, making it possible to more effectively stabilize the humidification amount in the living room.

[0102] In addition, when gaps (not shown) are formed between both ends of the first chamber 45 and the second chamber 46 in the x-axis direction and the first side material 33A and the second side material 33B, it is preferable to provide an airtight material (not shown). Such an airtight material prevents the first air 58 from flowing into the gaps, so that the amount of the first air 58 supplied to the first chamber 45 and the second chamber 46 in a moisture-absorbing state can be prevented from decreasing. The airtight material is not particularly limited as long as it can prevent the first air 58 from flowing into the gaps. For the airtight material of this embodiment, a fibrous material such as mohair can be used. Such a fibrous material can be flexibly deformed, so that the rotation of the humidity adjustment unit 16 can be prevented from being hindered. In addition, the airtight material is not limited to such a fibrous material, and may be, for example, a resin packing material or the like.

[0103] On the other hand, as shown in FIG. 7, the second space 29B of the casing 26 of this embodiment is provided with a fifth partition 52. The fifth partition 52 of this embodiment is formed in a plate shape extending in the x-axis-y-axis plane. This fifth partition 52 extends between the fourth partition 49 and the fourth side member 33D in the first position of FIG. 7(a). On the other hand, the fifth partition 52 extends between the third partition 48 and the fourth side member 33D in the second position of FIG. 7(b). Such a fifth partition 52 closes the gap between the fourth partition 49 and the fourth side member 33D and the gap between the third partition 48 and the fourth side member 33D. Therefore, no bypass flow path is provided in the second space 29B.

[0104] In this way, since no bypass flow path is provided in the second space 29B, the second air 59, which has a higher relative humidity than the first air 58, can pass through the other chamber (the second chamber 46 arranged in the second space 29B in FIG. 7(a)) in a dry state without detouring the other chamber. This allows the water vapor contained in the second air 59 to be efficiently adsorbed by the humidity control material 43 (humidity control element 53) in the second chamber 46, and the humidifying ability of the humidity control material 43 to be quickly restored.

[0105] In the present embodiment, a mode in which no bypass flow path is provided in the second space 29B has been exemplified, but the present invention is not limited to such a mode. For example, a bypass flow path may be provided in the second space 29B. In this case, the bypass flow path can be formed by omitting the fifth partition portion 52 provided in the second space. In this way, by providing a bypass flow path in the second space 29B, a part of the second air 59 can be detoured so as not to pass through the first chamber 45 and the second chamber 46 and sent to the second outlet 36B. This reduces the pressure loss of the second air 59 caused by passing through the first chamber 45 and the second chamber 46, and thus reduces the power of the air conveying unit 14 for supplying air to the first chamber 45 and the second chamber 46.

[0106] Although the embodiments of the present invention have been described in detail above, the present invention is not limited to the above specific disclosure, and can be implemented in various modified forms within the scope of the technical ideas described in the claims. EXAMPLES

[0107] A humidity control device having the basic structure shown in Figures 5 to 7 and a bypass flow path for directing a portion of the first air to the first outlet so as not to pass through one of the chambers in a moisture-absorbing state was input into a computer as a model (Example). For comparison, a humidity control device having the same structure as the Example except for the bypass flow path of the Example was input into the computer as a model (Comparative Example). Figure 9 is a cross-sectional view showing the first position of the humidity control device of the Comparative Example. In this Comparative Example, the bypass flow path of the Example is not provided.

[0108] In the example, the air pressure at the first outlet was calculated for the first air that was supplied from the first inlet of the casing and passed through one of the chambers and the bypass flow path, whereas in the comparative example, the air pressure at the first outlet was calculated for the first air that was supplied from the first inlet of the casing and passed through only one of the chambers.

[0109] Furthermore, for the models (humidity control devices) of the examples and comparative examples, the humidification amount (humidification amount of the first air at the first outlet) was calculated when the supply of the first air and the second air to each of the two chambers was alternately switched at a time interval T. This humidification amount was obtained by performing a known simultaneous heat and moisture transfer calculation (simulation) based on the following common specifications. The results are shown in Table 1. Primary air (conditioning air): ·Temperature: 35℃ ·Air volume: 480m 3 / h Secondary air (outside air) ·Temperature: 5℃ Weight absolute humidity: 3.4g / kg (relative humidity: 63.1%) ·Air volume: 200m 3 / h Flow distribution Example: Chamber (humidity control material): 70% Bypass flow: 30% Comparison example: Chamber (humidity control material): 100% Time interval: 60 minutes Conditions for humidity control materials: Structure: Moisture-regulating sheets are layered in layers Thickness of moisture-regulating sheet: 1mm Moisture control sheet area: 5.5m 2 ·Dry density: 523kg / m 3 Specific heat: 1917J / kg K ·Porosity: 0.72m 3 / m 3 Moisture conductivity: 0.00000239kg / m·s·(kg / kg') Thermal conductivity: 0.11W / m K Equilibrium moisture content curve: shown in the graph in Figure 10. In Figure 10, the horizontal axis indicates relative pressure, and the vertical axis indicates the amount of adsorption. The relative pressure is the value obtained by dividing the adsorption equilibrium pressure P by the saturated vapor pressure P0. The amount of adsorption is the value obtained by subtracting the volume V0 in the dry state from the volume V in the equilibrium state, and dividing this value by the volume V0 in the dry state.

[0110] [Table 1]

[0111] As a result of the test, the air pressure at the first outlet of the embodiment could be made smaller than the air pressure at the first outlet of the comparative example (about 70% of the air pressure of the comparative example). Therefore, it was confirmed that the embodiment reduces the pressure loss caused by the air passing through the humidity control material, and can reduce the power of the air conveying unit (fan).

[0112] Fig. 11 is a graph showing an example of the transition of the humidification amount. As shown in Fig. 11, the peak of the humidification amount (instantaneous maximum humidification amount) of the embodiment is smaller than the peak of the humidification amount (instantaneous maximum humidification amount) of the comparative example. This is because the embodiment having the bypass flow path reduces the amount of the first air passing through the chamber in a humidified state compared to the comparative example not having the bypass flow path.

[0113] On the other hand, as shown in Table 1, the cumulative amount of humidification per day was approximately the same in the example and the comparative example. Therefore, it was confirmed that the humidification effect can be maintained while reducing the power of the air conveying unit (fan).

[0114] 11 also shows the amount of humidification (h1) when the amount of humidification has decreased by 80% from the peak amount of humidification, and the time t1 at that time, for the embodiment. Furthermore, the amount of humidification (h2) when the amount of humidification has decreased by 80% from the peak amount of humidification, and the time t2 at that time, for the comparative example. Comparing these times t1 and t2, it was confirmed that the time until the amount of humidification decreased was longer in the embodiment compared to the comparative example, and the amount of humidification was leveled out (humidification capacity was maintained). Therefore, it was confirmed that the embodiment can reduce the power of the air conveying section for supplying air to the chamber while maintaining the humidification capacity.

[0115] [Note] The present invention includes the following aspects.

[0116] [Invention 1] A batch-type humidity control device for controlling the humidity of air, a casing having a first inlet, a first outlet, a second inlet, and a second outlet; a humidity control unit disposed within the casing, the humidity control unit having two chambers independent of each other, each of the two chambers having a humidity control material disposed therein and a cylindrical structure with both ends open; an air conveying section for supplying a first air to the first inlet and a second air having a higher relative humidity than the first air to the second inlet; a drive unit for moving the humidity control unit relative to the casing at predetermined time intervals so that the first air can be supplied to the opening of one of the two chambers in which the humidity control material is in a moisture-absorbed state, and the second air can be supplied to the opening of the other of the two chambers in which the humidity control material is in a dry state; and a bypass flow path that diverts a portion of the first air so as not to pass through the one chamber in the hygroscopic state and sends it to the first outlet; Humidity control device. [Invention 2] 2. The humidity control device according to claim 1, wherein the bypass passage is provided inside the casing. [Invention 3] 3. The humidity control device according to claim 1 or 2, wherein the bypass flow path is a space between an inner wall surface of the casing and an outer wall surface of the cylindrical structure of one of the chambers in the moisture-absorbing state. [Invention 4] In a plan view perspective view perpendicular to a supply direction of the first air by the air conveying unit, the first inlet is provided at a position at which it at least partially overlaps with the opening of the one chamber in the moisture-absorbing state; 4. The humidity control apparatus according to any one of claims 1 to 3, wherein the bypass flow path is provided at a position that does not overlap with the first inlet. [Invention 5] 5. The humidity control device according to any one of claims 1 to 4, wherein the bypass flow passage diverts 30% or less of the flow rate of the first air supplied by the air conveying section. [Invention 6] A humidity control device described in any one of claims 1 to 5, wherein the drive unit alternates between supplying the first air and the second air to each of the two chambers by rotating the humidity control unit 180 degrees within the casing. [Explanation of symbols]

[0117] 15 Humidity control device 16 Humidity Control Section 26 Casing 28 Drive unit 35A 1st entrance 35B 2nd entrance 36A Exit 1 36B 2nd exit 43 Humidity Control Materials 55 Bypass flow path

Claims

1. A batch-type humidity control device for controlling the humidity of air, a casing having a first inlet, a first outlet, a second inlet, and a second outlet; a humidity control unit disposed within the casing, the humidity control unit having two chambers independent of each other, the two chambers each having a humidity control material disposed therein and a cylindrical structure with both ends open; an air conveying section for supplying a first air to the first inlet and a second air having a higher relative humidity than the first air to the second inlet; a drive unit for moving the humidity control unit relative to the casing at predetermined time intervals so that the first air can be supplied to the opening of one of the two chambers in which the humidity control material is in a moisture-absorbed state, and the second air can be supplied to the opening of the other of the two chambers in which the humidity control material is in a dry state; and a bypass flow path that diverts a portion of the first air so as not to pass through the one chamber in the hygroscopic state and sends it to the first outlet, Humidity control device.

2. The humidity control device according to claim 1 , wherein the bypass passage is provided inside the casing.

3. The humidity control device according to claim 2 , wherein the bypass flow passage is a space between an inner wall surface of the casing and an outer wall surface of the cylindrical structure of one of the chambers in the moisture-absorbing state.

4. In a plan view perspective view perpendicular to a supply direction of the first air by the air conveying unit, the first inlet is provided at a position at which it at least partially overlaps with the opening of the one chamber in the moisture-absorbing state; The humidity control apparatus according to claim 1 , wherein the bypass flow passage is provided at a position that does not overlap with the first inlet.

5. The humidity control device according to claim 1 , wherein the bypass flow passage diverts a flow rate of 30% or less of the first air supplied by the air conveying section.

6. 4. The humidity control device according to claim 1, wherein the drive unit alternates between supplying the first air and the second air to each of the two chambers by rotating the humidity control unit 180 degrees within the casing.

Citation Information

Patent Citations

  • Air conditioner

    JP2001046830A

  • Humidity conditioning system

    JP2018071891A