Underground water storage tank and method for constructing the same

The use of H-shaped PC piles as both side walls and temporary earth retainers for underground water tanks addresses the limitations of conventional reinforced concrete structures, enabling efficient, cost-effective, and environmentally friendly construction of larger capacity tanks.

JP2024142636APending Publication Date: 2024-10-11PS CONSTRUCTION CO LTD +3
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023054865
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-30
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

Existing underground water storage tanks with reinforced concrete structures require temporary earth retaining walls and scaffolding, limiting their scale and increasing construction time and cost, while deeper tanks necessitate additional supports, reducing effective capacity and posing environmental risks.

Method used

The underground water storage tank is constructed using horizontally connected H-shaped precast concrete (PC) piles driven into the ground, serving as both a side wall and temporary earth retainer, with integrated columns and slabs formed by cast-in-place concrete, eliminating the need for temporary scaffolding and supports.

Benefits of technology

This method allows for constructing larger capacity tanks closer to site boundaries in a shorter time and at lower cost, with reduced environmental impact and increased water storage capacity, utilizing H-shaped PC piles for enhanced rigidity and stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024142636000001_ABST
    Figure 2024142636000001_ABST
Patent Text Reader

Abstract

To provide an underground water storage tank and a method for constructing the same, which can construct the underground water storage tank near a site boundary and can construct the underground water storage tank of a large storage capacity at low cost within a shorter period.SOLUTION: This underground water storage tank comprises: a side wall in which a plurality of H-type PC piles vertically installed in the ground are connected to be integrated in a horizontal direction so as to form a prescribed water storage space; one or more intermediate pillars erected in the water storage space; a top slab set above the one or more intermediate pillars; and a bottom slab of a site installation concrete structure provided so as to form a bottom part of the water storage space.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an underground water tank capable of storing rainwater or the like underground, and a method for constructing the same. [Background technology]

[0002] In recent years, abnormal weather caused by global warming has caused frequent flood damage in many areas, and the importance of large-capacity balancing ponds and water tanks that temporarily store rainwater and other water has increased in order to build disaster-resistant towns. Particularly in urban areas, in order to make the most efficient use of limited land, it has become common to build underground water tanks that store floodwater underground, and use the top of the tanks for other purposes such as parks, sports facilities, and apartment complexes.

[0003] In general, the side walls and bottom slab of underground water tanks are constructed from cast-in-place concrete or precast members. A typical structure of an underground water tank using precast members is one in which precast members called stand-type end blocks that surround the perimeter and members called intermediate blocks that support the top slab are arranged on a concrete foundation, and the bottoms of the stand-type end blocks and the intermediate blocks are connected with cast-in-place concrete.

[0004] There is also a known method in which multiple rectangular tubular steel pieces with a rectangular tubular cross section are lined up and buried underground, and expansive concrete is poured into the hollow parts of the rectangular tubular steel pieces to integrate them with the rectangular tubular steel pieces, thereby forming a rectangular steel pipe concrete composite wall panel for use as the exterior wall of an underground structure (see Patent Document 1).

[0005] Furthermore, a method is also known in which concrete sheet piles having an H-shaped or I-shaped cross section are used as sheet piles for retaining walls (see Patent Document 2). In addition, a technique is known for constructing an underpass by burying prestressed concrete piles in the ground and constructing an exterior wall by pouring a cast-in-place reinforced concrete wall into the space between adjacent prestressed concrete piles (see Patent Document 3). [Prior art documents] [Patent documents]

[0006] [Patent Document 1] Japanese Utility Model Application Publication No. 60-014133 [Patent Document 2] Japanese Patent Application Publication No. 48-065716 [Patent Document 3] JP 2005-023576 A Summary of the Invention [Problem to be solved by the invention]

[0007] However, when constructing an underground water tank with a reinforced concrete structure as described above, a temporary earth retaining wall is required, so a temporary scaffolding is required between the side wall, which is the main structural part of the underground water tank, and the temporary earth retaining wall. Since the construction of the temporary scaffolding requires a width of about 2.0 m, the main structural part of the underground water tank cannot be constructed close to the site boundary, which limits the size of the underground water tank. In addition, when constructing an underground water tank of a general size, the excavation depth often exceeds 3 m, and in this case, it is necessary to install supports such as wales and struts to support the temporary earth retaining wall, which requires construction time and costs, and there is a possibility that the surrounding ground and nearby structures will be affected when the temporary earth retaining wall is removed, and measures against this will also require costs. In addition, in an underground water tank whose side wall of a reinforced concrete structure also serves as an earth retaining wall, the side wall receives a larger load from the outside as the depth increases, so a larger thickness is required, which reduces the effective water storage capacity.

[0008] In consideration of the above circumstances, the present invention aims to provide an underground water tank and a construction method thereof that can construct an underground water tank close to a site boundary and that can construct an underground water tank with a large water storage capacity in a shorter construction period and at low cost. [Means for solving the problem]

[0009] In order to solve these problems, the underground water tank of the present invention comprises a side wall portion formed by horizontally connecting and integrating a number of H-shaped PC piles driven vertically into the ground to form a specified water storage space, one or more intermediate columns erected within the water storage space, a top plate erected on the one or more intermediate columns, and a bottom plate of a cast-in-place concrete structure provided to form the bottom of the water storage space.

[0010] The method for constructing an underground water tank according to the present invention involves burying a number of H-shaped PC piles that constitute the side wall portion in the ground using a core excavation and pressing method, constructing soil cement in the recesses of adjacent H-shaped PC piles using a high-pressure injection mixing method to construct the side wall portion, excavating the ground in the portion where the underground water tank is to be constructed in the space surrounded by the side wall portion, constructing a number of intermediate columns in the space surrounded by the side wall portion, constructing a top plate on the multiple intermediate columns, and constructing a bottom plate between the multiple intermediate columns using cast-in-place concrete.

[0011] According to the underground water tank and its construction method of the present invention, the side wall of the underground water tank is constructed using a plurality of H-shaped PC piles driven vertically into the ground, so that the side wall also functions as a temporary retaining wall. This allows the underground water tank to be constructed close to the site boundary, resulting in an underground water tank with a larger water storage space. In addition, since the installation of shoring such as wales and struts is not required, the underground water tank can be constructed in a shorter time and at a lower cost. [Brief description of the drawings]

[0012] [Figure 1] 1 is a diagram showing the overall structure of an underground water tank according to an embodiment of the present invention; [Diagram 2] FIG. 2 is a vertical cross-sectional view of the underground water tank of FIG. [Diagram 3] 2 is a horizontal cross-sectional view of a portion of the side wall portion 1. FIG. [Figure 4] FIG. 1 is a vertical cross-sectional view showing a method for constructing a typical underground water tank made of cast-in-place reinforced concrete. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] Next, an embodiment of the present invention will be described in detail with reference to the drawings. Note that the intermediate column 3 and the top plate 4 described in this embodiment may be precast concrete members fabricated in advance in a factory, or may be cast-in-place concrete members. FIG. 1 is a diagram showing the overall structure of an underground water tank 10 according to an embodiment of the present invention. As shown in the figure, the underground water tank 10 of this embodiment includes a side wall portion 1, a bottom slab 2, a plurality of intermediate columns 3, and a top slab 4. The side wall 1 is composed of a plurality of H-shaped PC piles 1A driven vertically into the ground 12. These plurality of H-shaped PC piles 1A are connected to each other in the horizontal direction so as to form a predetermined water storage space 5 that is actually used for storing water. In this embodiment, the water storage space 5 has a cubic shape, and the side wall 1 is composed of four side walls 1-1, 1-2, 1-3, 1-4 corresponding to the four side surfaces of the water storage space 5, respectively.

[0014] The multiple intermediate columns 3 are each erected in the water storage space and support a top plate 4 that closes the upper part of the water storage space 5. The intermediate columns 3 and the top plate 4 are, for example, components of a PC structure or a reinforced concrete structure. The side wall portions 1 and the bottom plate 2 are rigidly connected to each other, and the side wall portions 1 and the top plate 4 are also rigidly connected to each other. The intermediate columns 3 are arranged at a predetermined interval between the side walls 1 facing each other in one direction (X-axis direction). The bottom slab 2 is a part made of cast-in-place concrete between the intermediate columns 3 and 3, and between the intermediate columns 3 and the side walls 1, which are arranged at a predetermined interval between the side walls 1 facing each other in one direction, so as to form the bottom of the water storage space indicated by the symbol 5.

[0015] The construction procedure for the underground water tank 10 of this embodiment will be described. Fig. 2 is a vertical cross-sectional view of the underground water tank 10 of this embodiment. Fig. 3 is a horizontal cross-sectional view of a portion of the side wall portion 1. First, multiple H-shaped PC piles 1A that make up the side wall 1 are buried in the ground 12 by the excavation and press-in method. As shown in Fig. 3, each H-shaped PC pile 1A is arranged in a row with the concave surfaces of the H-shaped cross section facing each other. Soil cement 8 is laid in the concaves of adjacent H-shaped PC piles 1A by the high-pressure jet mixing method, thereby constructing the side wall 1 with watertightness between adjacent H-shaped PC piles 1A.

[0016] Next, in the space surrounded by the side wall 1, the ground is excavated where the underground water tank 10 is to be constructed, multiple intermediate columns 3 are constructed on the excavated surface, and the bottom slab 2 is constructed using cast-in-place concrete. Next, the top slab 4 is constructed on each intermediate column 3. With the above steps, the underground water tank 10 is completed.

[0017] For example, the H-shaped PC pile 1A has a flange width of 1,064 mm, a flange-to-flange length of 540-740 mm, a flange thickness of 96 mm or 146 mm, and a web thickness of 150 mm.

[0018] As described above, in the underground water tank 10 of this embodiment, the side wall 1 of the underground water tank 10 is constructed using a plurality of H-shaped PC piles 1A driven vertically into the ground 12, so that the side wall 1 itself also functions as a temporary earth retaining structure. Therefore, the underground water tank 10 can be constructed close to the site boundary B, and the underground water tank 10 having a larger water storage space can be obtained. On the other hand, as shown in FIG. 4, in the case of an underground water tank 100 having a general cast-in-place reinforced concrete structure, a temporary scaffolding 12 must be installed between the earth retaining member 21 and the side wall 11 of the underground water tank 100, and the capacity of the water storage space 15 is reduced accordingly. According to the underground water tank 10 of this embodiment, since the side wall 1 also functions as a temporary earth retaining structure, the temporary scaffolding 12 is not required, and the underground water tank 10 can be constructed close to the site boundary B. In addition, since the installation of supports such as wales and struts is not required, the construction period and costs can be reduced.

[0019] In addition, since the H-type PC pile 1A has high bending rigidity and high tip bearing capacity, the cross-sectional dimensions of the side wall 1 can be made smaller, making it possible to construct an underground water tank 10 with a large water storage capacity. More specifically, the wall height of the side wall 1 (height from the root height to the top) can be made 8.5 m with an H-type PC pile with a width of 1,064 mm and a height of 740 mm, 8.0 m with an H-type PC pile with a width of 1,064 mm and a height of 640 mm, and 7.0 m with an H-type PC pile with a width of 1,064 mm and a height of 540 mm, thereby obtaining an underground water tank 10 with a sufficient water storage capacity.

[0020] In addition, according to the underground water tank 10 of this embodiment, by using the H-shaped PC piles 1A, the construction period for the side wall portion 1 can be significantly reduced compared to the conventional construction method that adopts a cast-in-place reinforced concrete structure, and since construction can be performed with low vibration and low noise, the impact on the surrounding environment can be minimized.

[0021] The bottom slab 2, the intermediate columns 3, and the top slab 4 may be constructed of high-strength concrete, thereby obtaining an underground water tank 10 with excellent durability, such as resistance to frost damage and neutralization. [Explanation of symbols]

[0022] 1 Side wall 2 bottom plate 3. Middle Pillar 4 Top plate 5 Water storage space 1A H type PC pile 10 Underground Water Tank

Claims

1. A side wall portion is formed by connecting a plurality of H-shaped PC piles vertically driven into the ground in a horizontal direction to form a predetermined water storage space, One or more intermediate columns erected in the water storage space; A top plate installed on the one or more intermediate columns; A bottom slab of a cast-in-place concrete structure provided to form a bottom of the water storage space; An underground water tank equipped with:

2. The multiple H-shaped PC piles that make up the side walls are buried in the ground using the excavation and press-in method. The side wall is constructed by constructing soil cement in the recesses of the adjacent H-shaped PC piles using a high-pressure injection mixing method, Excavating the ground in a portion where an underground water tank is to be constructed in the space surrounded by the side wall portion; constructing a plurality of intermediate columns within a space enclosed by the sidewall portion; constructing a top plate on the plurality of intermediate columns; Construct a base plate between the intermediate columns by cast-in-place concrete. How to build an underground water tank.

Citation Information

Patent Citations

  • Continuous construction method for precast concrete column wall member

    JP2002088785A

  • JP1973065716A

  • The steel sheet pile wall - square concrete composite

    JP1985014133U

  • Concrete pile and underpass construction method

    JP2005023576A