Method and structure for reducing stress acting on main girder

The method of using formwork and hardened fillers in the gap between slabs addresses stress reduction on the main girder during deck replacement, ensuring reliable axial force transmission and reducing construction costs and labor.

JP2024142924APending Publication Date: 2024-10-11OHBAYASHI GUMI LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2023055339
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-30
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

Existing methods for replacing composite girder deck slabs face challenges in reducing stress on the main girder during temporary deck installation, particularly due to non-constant gaps between slabs, uneven surfaces, and the need for multiple jacks, leading to increased costs and labor.

Method used

A method involving the use of formwork to create a mold in the gap between temporary and adjacent slabs, filling it with a fluid filler that hardens to form an axial force transmission member, which is expandable and contractible, and includes a flexible sheet-like member to prevent leakage and facilitate removal.

Benefits of technology

This approach effectively reduces stress on the main girder by ensuring reliable axial force transmission, minimizing construction costs and labor, and allowing for efficient installation and removal of temporary slabs without requiring complex reinforcement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024142924000001_ABST
    Figure 2024142924000001_ABST
Patent Text Reader

Abstract

To easily and reliably reduce stress acting on a main girder 20 during a period in which a temporary floor slab 12 is placed in floor slab replacement work of an existing composite girder.SOLUTION: In a floor slab replacement method, after an existing floor slab 11 of a composite girder is removed and set in a temporary state in which a temporary floor slab 12 having a strength capable of being regarded as a rigid body against a force acting in a bridge axial direction AX is placed in the position where the existing floor slab 11 is removed, the temporary floor slab 12 is removed and a new floor slab 13 is placed in the position where the temporary floor slab 12 is removed, in a temporary state, a form 31 is provided in at least a part of a gap G which is a space between another floor slab adjacent to the temporary floor slab 12 and the temporary floor slab 12 in the bridge axial direction AX, and a filling material 32 having fluidity is placed in the form 31 to harden the filling material 32.SELECTED DRAWING: Figure 7
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a method and structure for reducing stress acting on main girders, and in particular to a technology suitable for reducing stress acting on main girders during the period when a temporary deck is installed in place of an existing deck that has been removed during bridge deck replacement work. [Background technology]

[0002] In the replacement of decks of existing composite girders using conventional methods, a certain section of the existing deck is removed, a new deck is laid in that section, and the area is opened to traffic after curing such as paving (see, for example, Patent Document 1). In such conventional methods, one lane restrictions (hereinafter also referred to as "nighttime one lane restrictions") may be implemented only at night when traffic volume is low. In such cases, the traffic closure period during which continuous construction work can be carried out is limited to nighttime only, making it difficult or impossible to complete a series of construction works from removing the existing deck to laying the new deck and completing curing such as paving within one traffic closure period.

[0003] Therefore, a deck replacement method is adopted in which a temporary deck is installed in place of the existing deck that has been removed (hereinafter referred to as the "temporary state"), dividing the traffic closure period into several relatively short periods and replacing the deck. However, the temporary deck is a temporary deck that is installed to open traffic during the traffic closure period, and is not completely fixed to the main girders. In other words, in the temporary state, the deck and the main girders are not integrated, making it a non-composite girder. In a non-composite girder, the load on the bridge surface, such as the load of heavy machinery during construction and the wheel load when traffic is opened, is supported only by the main girders, so the compressive stress acting on the upper part of the main girder and the tensile stress acting on the lower part are greater than those of a composite girder.

[0004] Therefore, in conventional construction methods, it was necessary to reinforce the main girders, for example by attaching angle irons to the webs of the main girders (near the upper flanges) with bolts, or by connecting adjacent main girders with H-shaped steel beams in the horizontal direction. Such reinforcement members are installed before removing the existing deck, but the space under the girders is narrow, making it difficult to lift and install the reinforcement members.

[0005] In this technical field, attempts have been made to solve the above problems while reducing the stress acting on the main girder in a temporary state. For example, in the deck replacement method according to the invention disclosed in Patent Document 2, jacks are placed between the temporary deck and the deck (existing deck and new deck) adjacent to the temporary deck, so that the axial force is transmitted through the temporary deck. According to this technology, the temporary deck can function as a strut installed above the main girder, so that sufficient rigidity can be ensured even in the temporary state, and the stress acting on the main girder can be reduced.

[0006] However, the width between adjacent temporary decks (hereinafter also referred to simply as "gap") is not always constant due to, for example, errors in bridge design and / or construction, and the jack may not fit into the gap. There is also concern that the desired axial force transmission effect may not be achieved due to, for example, unevenness and / or inclination of the surfaces where adjacent decks face each other. Furthermore, depending on the length of the temporary deck in the width direction and / or the number of temporary decks to be installed, it may be necessary to prepare a large number of jacks, which may lead to increased construction costs and / or labor. [Prior art documents] [Patent documents]

[0007] [Patent Document 1] JP 2005-282272 A [Patent Document 2] Patent Publication No. 2022-6913 Summary of the Invention [Problem to be solved by the invention]

[0008] As mentioned above, there is a demand in the field of technology for a technology that can more easily and reliably reduce the stress acting on the main girder during the period when a temporary deck is in place during deck replacement work for an existing composite girder.

[0009] The present disclosure has been made in consideration of the above-mentioned problems, and aims to provide a method and structure that are suitable for reducing the stress acting on the main girder during the period when a temporary deck is in place during deck replacement work for an existing composite girder. [Means for solving the problem]

[0010] As a result of extensive research, the inventors have discovered that the above-mentioned problems can be solved by placing formwork in at least part of the space between the temporary deck and another deck adjacent to the temporary deck during deck replacement work, and pouring filler material into the formwork and allowing it to harden.

[0011] Specifically, the method of reducing stress acting on the main girders according to the present disclosure (hereinafter also referred to as the "presently disclosed method") is a method of reducing stress acting on the main girders in a deck replacement construction method. In the deck replacement construction method to which the presently disclosed method is applied, the existing deck of the composite girder is removed, a temporary deck is arranged in the location where the existing deck was removed, and then the temporary deck is removed and a new deck is arranged in the location where the temporary deck was removed. The temporary deck is a deck that has a strength that allows it to be considered as a rigid body against forces acting in the bridge axis direction.

[0012] The disclosed method reduces stress acting on the main girder in a temporary state in which a temporary deck is installed at the location where the existing deck was removed. Specifically, in the disclosed method, a formwork is installed in at least a part of the gap between the temporary deck and another deck adjacent to the temporary deck in the bridge axis direction, and a filler having fluidity is poured into the formwork and the filler is allowed to harden.

[0013] Another aspect of the disclosed method is characterized in that the formwork is configured to be flexible at least in the bridge axis direction before the filling material hardens.

[0014] Another aspect of the disclosed method is characterized in that a flexible sheet-like member is preliminarily placed inside a formwork, and a filler is poured inside the sheet-like member.

[0015] Another aspect of the disclosed method is characterized in that the joint reinforcing bars do not protrude into the temporary interfacial area, which is the area where axial force transmission members are arranged on the end face of the newly constructed deck facing the adjacent temporary deck.

[0016] Another aspect of the disclosed method is characterized in that a connecting member, which is a member for attaching a connecting member, which is a member for connecting to a new deck that will be arranged at the removed location of the temporary deck after the adjacent temporary deck and axial force transmission member are removed, is provided in the temporary interfacial area.

[0017] As mentioned at the beginning of this specification, the present disclosure relates not only to a method for reducing stress acting on a main girder, but also to a structure for reducing stress acting on a main girder.

[0018] The structure for reducing stress acting on the main girder according to the present disclosure (hereinafter also referred to as the "disclosed structure") is a structure for reducing stress acting on the main girder in a deck replacement method. In the deck replacement method to which the disclosed structure is applied, the existing deck of the composite girder is removed, a temporary deck is placed in the location where the existing deck was removed, and then the temporary deck is removed and a new deck is placed in the location where the temporary deck was removed. The temporary deck is a deck that has a strength that allows it to be considered as a rigid body against forces acting in the bridge axis direction.

[0019] The disclosed structure reduces stress acting on the main girder in a temporary state in which a temporary deck is installed at the location where the existing deck has been removed. Specifically, the disclosed structure is configured such that an axial force transmission member made of a hardened filler is installed in at least a part of the gap between the temporary deck and an adjacent deck, which is another deck adjacent to the temporary deck in the bridge axis direction.

[0020] Another aspect of the disclosed structure is characterized in that an axial force transmission member is formed from a formwork and a hardened filling material inside the formwork, and the formwork is configured so as to be freely expandable at least in the bridge axis direction before the filling material hardens.

[0021] Another aspect of the disclosed structure is characterized in that the axial force transmission member further comprises a flexible sheet-like member interposed between the deck and formwork adjacent to the filler and the filler.

[0022] Another aspect of the disclosed structure is characterized in that the joint reinforcing bars do not protrude from the temporary interfitting area, which is the area where the axial force transmission members are arranged on the end face of the newly constructed deck facing the adjacent temporary deck, and the joint reinforcing bars are not embedded inside the axial force transmission members.

[0023] Another aspect of the disclosed structure is characterized in that a connecting member, which is a member for attaching a connecting member, which is a member for connecting to a new deck that will be arranged at the removed location of the temporary deck after the adjacent temporary deck and axial force transmission member are removed, is provided in the temporary interfacial area. Effect of the Invention

[0024] According to the method and structure disclosed herein, the stress acting on the main girder during the period when a temporary deck is in place during deck replacement work for an existing composite girder can be more easily and reliably reduced. [Brief description of the drawings]

[0025] [Figure 1] 1 is a flowchart showing the flow of each construction process in a deck replacement method to which a method for reducing stress acting on a main girder according to the present disclosure (the method disclosed herein) is applied. [Diagram 2] FIG. 13 is a schematic diagram illustrating the construction procedures for deck replacement work during the first nighttime one-lane restriction period. [Diagram 3] FIG. 13 is a schematic diagram illustrating the construction procedures for deck replacement work during the second nighttime one-lane restriction period. [Figure 4]This is a schematic diagram comparing deck replacement work with two-way traffic restrictions using conventional construction methods with deck replacement work with one-lane restrictions at night. [Diagram 5] FIG. 2 is a schematic perspective view showing an example of the configuration of a temporary deck used in the disclosed method. [Figure 6] FIG. 1 is a schematic diagram illustrating the difference in the magnitude of stress acting on the main girder in a composite girder and a non-composite girder. [Figure 7] 1 is a schematic diagram illustrating a manner in which an axial force transmission member is formed by hardening a filler material poured into a formwork arranged in a gap between an adjacent deck and a temporary deck. FIG. [Figure 8] FIG. 8 is a schematic diagram showing an example of the configuration of a portion in which an axial force transmission member is disposed in a gap between a temporary deck and an adjacent deck as illustrated in FIG. 7. [Figure 9] FIG. 1 is a schematic diagram showing an example of installation of a temporary deck in a temporary state to which the method disclosed herein is applied. [Figure 10] 1 is a schematic cross-sectional view illustrating the difference in stress acting on the main girder depending on whether or not an axial force transmission member is present in the gap between the adjacent deck and the temporary deck in a temporary state. FIG. [Figure 11] A schematic perspective view showing a specific example of a formwork that is freely expandable and contractable in the bridge axis direction. [Figure 12] FIG. 12 is a schematic perspective view illustrating a state in which a formwork formed by the plastic rectangular U-shaped groove illustrated in FIG. 11(a) is disposed in the gap between a temporary deck and a new deck. [Figure 13] 1 is a schematic diagram showing a state in which a sheet-like member has been pre-arranged inside a formwork arranged at a predetermined position in the gap between a temporary deck and a new deck. FIG. [Figure 14] FIG. 14 is a schematic diagram showing an example of installation of a temporary deck in a temporary state to which the technology disclosed herein is applied, as illustrated in FIG. 13 . [Figure 15] FIG. 13 is a schematic diagram showing an example of the configuration of a portion in which an axial force transmission member is arranged in the gap between a new deck slab and a temporary deck slab where no joint reinforcing bars protrude from the temporary interfacial area. [Figure 16]FIG. 13 is a schematic diagram illustrating the disclosed technology, which uses a new deck in which a connecting member, which is a member for attaching a connecting member, is provided in a temporary interfacial filling area. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0026] Hereinafter, a method (the disclosed method) and a structure (the disclosed structure) for reducing stress acting on a main girder according to the present disclosure will be described with reference to the drawings.

[0027] <composition> The disclosed method and structure (hereinafter also referred to as the "disclosed technology") provide a technology for reducing stress acting on main girders, for example, in a deck replacement method for bridges and the like. In a deck replacement method to which the disclosed technology is applied, the existing deck of a composite girder is removed, a temporary deck is installed in the location where the existing deck was removed, and then the temporary deck is removed and a new deck is installed in the location where the temporary deck was removed. The temporary deck is a deck that has a strength that allows it to be considered as a rigid body against forces acting in the bridge axis direction.

[0028] FIG. 1 is a flowchart showing the flow of each construction process in the deck replacement method to which the technology disclosed herein is applied. As illustrated in FIG. 1, in the first nighttime one-lane restriction period R01, a first process (step S01) of removing the existing deck of the composite girder, a second process (step S02) of installing a temporary deck at the location where the existing deck was removed, and a third process (step S03) of temporarily paving the location where the temporary deck is installed are executed. In the second nighttime one-lane restriction period R02, a fourth process (step S04) of removing the temporary deck, a fifth process (step S05) of installing a new deck at the location where the temporary deck was removed, and a sixth process (step S06) of permanently paving the location where the new deck is installed are executed. Depending on the length of the period during which lane restrictions are permitted and / or the work content in each construction process, the first night-time one-lane restriction period R01 may be repeated multiple times before moving on to a second night-time one-lane restriction period R02.

[0029] Fig. 2 is a schematic diagram illustrating a first step (step S01), a second step (step S02), and a third step (step S03) executed in a first nighttime one-lane regulation period R01. Fig. 3 is a schematic diagram illustrating a fourth step (step S04), a fifth step (step S05), and a sixth step (step S06) executed in a second nighttime one-lane regulation period R02.

[0030] In the first nighttime one-lane restriction period R01, as illustrated in FIG. 2, construction is carried out from (a) removal of the existing deck 11 to (b) installation of the temporary deck 12 and (c) laying of the temporary pavement 50, and traffic is opened during the day the next day. As illustrated in FIG. 2(c), the axial force transmission member 30 (see FIG. 7 to FIG. 9) of the present disclosure, which will be described in detail later, is applied to the installation of the temporary deck 12 (b). Then, in the second nighttime one-lane restriction period R02, construction is carried out from (a) removal of the temporary deck 12 to (b) installation of the new deck 13 and pouring of filler concrete (not shown) into the gaps between the new deck slabs 13 and (c) laying of the permanent pavement 60, as illustrated in FIG. 3. The gaps between the new deck slabs 13 into which concrete has been poured are also called "filling sections". The axial force transmission member 30 is removed when the temporary deck 12 in (a) is removed.

[0031] Figure 4 is a schematic diagram comparing deck replacement work with two-way traffic control in the conventional construction method and one-lane control at night. As shown in (a) of Figure 4, in the conventional construction method for replacing decks of existing composite girders, a certain section of the existing deck is removed, a new deck is laid in that section, and curing such as paving is performed in one go. In this case, two-way traffic control is required throughout the day and night, which may lead to problems such as traffic congestion.

[0032] On the other hand, in the case of deck replacement work that goes through a temporary state to which the technology disclosed herein is applied, it is possible to divide the deck replacement work into processes that can be completed at night. That is, as shown in (b) of Figure 4, by restricting traffic to one lane only at night when traffic volume is low (one lane restriction at night), the traffic closure period can be minimized, and problems such as the occurrence of traffic congestion can be reduced.

[0033] The number of the existing deck 11 to be removed in the first step (step S01) and the temporary deck 12 to be arranged in the second step (step S02) is not particularly limited as long as the first to third steps can be completed within the first one-lane nighttime regulation period R01. That is, the number of the existing deck 11 to be removed in the first step and the temporary deck 12 to be arranged in the second step may be one or more. Similarly, the number of the temporary deck 12 to be removed in the fourth step (step S04) and the new deck 13 to be arranged in the fifth step (step S05) is not particularly limited as long as the fourth step and the fifth step can be completed within the second one-lane nighttime regulation period R02. That is, the number of the temporary deck 12 to be removed in the fourth step and the new deck 13 to be arranged in the fifth step may be one or more.

[0034] FIG. 5 is a schematic perspective view showing an example of the configuration of the temporary deck 12 used in the disclosed method. The configuration of the temporary deck 12 is not particularly limited as long as it has a strength that can be regarded as a rigid body against a force acting in the bridge axis direction and can support a traffic load in a temporary state in which the temporary deck 12 is arranged at a location where the existing deck 11 is removed. For example, the temporary deck 12 illustrated in FIG. 5 includes a covering plate 12a and an asphalt pavement 12b provided on the covering plate 12a, and a steel balustrade 12c is provided as a substitute for the wall balustrade of the new deck 13. The main girder 20 on which the temporary deck 12 is arranged is a so-called "H-shaped steel" having a pair of flanges 20a and 20b and a web 20c. In FIG. 5, the cross-sectional shape is drawn by a broken line in order to show that the main girder 20 is an H-shaped steel, but the cross section does not mean the end face of the main girder 20. In the following description, the flange 20a on which the temporary deck 12 is disposed is referred to as the "upper flange."

[0035] The covering plate 12a is, for example, an H-shaped steel material and a steel plate integrated by welding, and has a strength that allows it to be regarded as a rigid body against forces acting in the bridge axis direction at least on the upper flange 20a of the main girder 20. A precast plate may be used as the covering plate 12a.

[0036] As shown in FIG. 3(b), the main girder 20 and the new deck 13 are fixed by inserting the dowels 20d provided at a predetermined pitch on the upper flange 20a of the main girder 20 into the dowel holes 13a formed in the new deck 13 and pouring a filler such as mortar into the dowel holes 13a. Therefore, depending on the progress of the deck replacement work, the temporary deck 12 may be placed on the main girder 20 with the dowels 20d provided on the upper flange 20a. Therefore, it is preferable to configure the shape (e.g., recessed hole, etc.) of the lower surface of the covering plate 12a so as not to interfere with the dowels 20d provided on the upper flange 20a of the main girder 20. In this case, regardless of the progress of the deck replacement work, the temporary deck 12 can be placed on the main girder 20 to open the traffic.

[0037] However, as mentioned above, the temporary deck 12 is a temporary deck installed to open traffic during traffic closure periods, and is not completely fixed to the main girders 20, making it a non-composite girder. Moreover, in a state where the temporary deck 12 is simply installed on the main girders 20, the transmission of axial force between the temporary deck 12 and the decks adjacent to it (other temporary decks 12, the existing deck 11, or the new deck 13) is insufficient or nonexistent.

[0038] FIG. 6 is a schematic diagram for explaining the difference in the magnitude of the stress acting on the main girder 20 in a composite girder and a non-composite girder. In FIG. 6, it is assumed that a traffic load P acts on the center of the span of the main girder 20 as shown in (a). In a composite girder, as shown in the cross-sectional view of the center of the span on the left side of FIG. 6(b), the traffic load P is supported by both the integrated deck 10 and the main girder 20, so the compressive stress acting on the upper part of the main girder 20 is small as shown in the graph on the right side (see the shorter black arrow). For this reason, there is an advantage that, for example, it is possible to reduce the thickness of the upper flange 20a of the main girder 20. On the other hand, in a non-composite girder, as shown in the cross-sectional view of the center of the span on the left side of FIG. 6(c), the traffic load P is supported only by the main girder 20, so the compressive stress acting on the upper part of the main girder 20 is larger than that of a composite girder as shown in the graph on the right side (see the black arrow).

[0039] As described above, in a non-composite girder, the load on the bridge surface, such as the load of heavy machinery during construction and the wheel load when traffic is opened, is supported only by the main girder 20, so the compressive stress acting on the upper part of the main girder 20 and the tensile stress acting on the lower part are greater than those of a composite girder.

[0040] 7 to 9, the technology disclosed herein uses an axial force transmission member 30 to reduce the stress acting on the main girder 20 in a temporary state in which a temporary deck 12 is placed at the location where the existing deck 11 has been removed. Specifically, in the technology disclosed herein, a formwork is placed in at least a part of the gap G between the temporary deck 12 and an adjacent deck, which is another deck adjacent to the temporary deck 12 in the bridge axis direction AX, and a filler having fluidity is poured into the formwork and the filler is allowed to harden.

[0041] Hereinafter, the details of the axial force transmission member 30 of the present disclosure will be described with reference to Figs. 7 to 9. The location where the axial force transmission member 30 is disposed in the gap G between the adjacent deck and the temporary deck 12 is not particularly limited as long as it is possible to sufficiently transmit the axial force between the adjacent deck and the temporary deck 12. Typically, the axial force transmission member 30 is disposed at a location where the main girder 20 and the gap G intersect in a plan view. However, the axial force transmission member 30 may be disposed at other locations, and as exemplified later in Fig. 9(c), the axial force transmission member 30 may be disposed at other locations (e.g., locations hatched with diagonal lines) in addition to the locations where the main girder 20 and the gap G intersect in a plan view (locations hatched with diagonal lattices).

[0042] The configuration of the form for pouring and hardening the filler is not particularly limited, so long as it can define an internal space corresponding to the shape of the axial force transmission member 30 capable of sufficiently transmitting axial force between the adjacent deck and the temporary deck 12 at the location where the axial force transmission member 30 is to be disposed, and can maintain the shape of the internal space at least for the period until the poured filler hardens. For example, a form corresponding to the shape of the axial force transmission member 30 can be assembled using wood such as plywood.

[0043] The filler, which is the raw material of the axial force transmission member 30, is not particularly limited as long as it has fluidity that allows it to be poured into a formwork before hardening, fill the internal space of the formwork, and assume the intended shape of the axial force transmission member 30, and is capable of withstanding loads such as load and vibration acting in the temporary state after hardening, and is capable of sufficiently transmitting axial force between the adjacent deck and the temporary deck 12 to solve the problem of reducing the stress acting on the main girder 20 in the temporary state. Typically, the filler is concrete and / or mortar.

[0044] From the viewpoint of shortening the construction period, for example, it is preferable to use a fast-hardening or ultra-fast-hardening filler that requires a short time for hardening. Also, from the viewpoint of sufficiently and reliably transmitting the axial force between the adjacent deck and the temporary deck 12 in the temporary state, it is preferable to use a non-shrinkage filler that shrinks little when hardened.

[0045] As described above, the axial force transmission member 30 is formed by hardening the filler poured into the formwork 31 arranged in the gap G between the adjacent deck and the temporary deck 12. Therefore, even if the width of the gap G is not necessarily constant due to, for example, bridge design and / or construction errors, or if the surfaces where the adjacent decks face each other are uneven and / or inclined, the axial force transmission member 30 that fits the shape of the gap G between the adjacent deck and the temporary deck 12 can be easily and reliably formed. Furthermore, for example, concrete and / or mortar, or other filler that is easy to obtain and inexpensive, can be used as the raw material for the axial force transmission member 30. In addition, for example, plywood, or other material that is easy to obtain and inexpensive, can be used as the formwork 31 used in the method disclosed herein. Therefore, compared to the method using a jack, such as the deck replacement method according to the invention disclosed in the above-mentioned Patent Document 2, the construction cost and / or labor can be reduced.

[0046] FIG. 7 is a schematic diagram illustrating a state in which an axial force transmission member 30 is formed by hardening a filler poured into a formwork arranged in a gap G between an adjacent floor slab and a temporary floor slab 12. FIG. 7(a) shows a state in which pre-hardened fluid concrete is poured from a bucket as a filler 32 into a formwork 31 assembled from wood at a predetermined location in the gap G between a new floor slab 13 as an adjacent floor slab and a temporary floor slab 12. FIG. 7(b) shows a state in which the concrete (filler 32) poured as described above is hardened to form an axial force transmission member 30. Note that FIG. 7(b) illustrates a state in which the formwork 31 has been removed in order to make the axial force transmission member 30 easier to observe, but it is not necessarily necessary to remove the formwork 31 when forming the axial force transmission member 30. For example, a third step (step S03) may be carried out in which temporary paving is performed at the location where the temporary deck 12 is to be installed while the formwork 31 is still in place, and in a fourth step (step S04), the formwork 31 may be removed together with the temporary deck 12 and the axial force transmission member 30.

[0047] FIG. 8 is a schematic diagram showing an example of the configuration of a portion in which an axial force transmission member 30 is disposed in the gap G between the temporary deck and the adjacent deck as illustrated in FIG. 7, where (a) is a schematic side view of the temporary state when observed from the width direction, and (b) is a schematic top view (plan view) of the temporary state. In FIG. 8, the portion embedded inside the axial force transmission member 30 of the new deck 13 is depicted by a broken line. In addition, the bottom of the axial force transmission member 30 is actually supported from below by the main girder 20 or the support member 33, but these members are omitted in FIG. 8. As shown in FIG. 8, even if the surface facing the gap G of the new deck 13 has a complex shape, the axial force transmission member 30 that fits the shape of the gap G between the new deck 13 and the temporary deck 12 can be easily and reliably formed.

[0048] As described above, in the disclosed technology, the formwork 31 is assembled only at the necessary places to sufficiently transmit the axial force between the adjacent deck and the temporary deck 12, and the filler 32 is poured and hardened to install the axial force transmission member 30. By disposing the axial force transmission member 30 made of the hardened filler 32 in the gap G between the adjacent deck and the temporary deck 12, the axial force can be sufficiently transmitted between the adjacent deck and the temporary deck 12, and the stress acting on the main girder 20 in the temporary state can be reduced. Therefore, there is no need to handle heavy members for reinforcing the main girder 20 in the narrow space under the girder as in the conventional construction method, and construction costs and / or labor can be reduced and the safety of the deck replacement work can be improved.

[0049] 9(a) and 9(b) are schematic side views of the temporary state when observed from the width direction, and FIG. 9(c) is a schematic top view (plan view) of the temporary state. In the example shown in FIG. 9, axial force transmission members 30 are disposed not only at the locations (locations hatched with diagonal grid) where gaps G between adjacent decks (existing deck 11, temporary deck 12, and new deck 13) that are decks adjacent to the temporary deck 12 in the bridge axis direction and the temporary deck 12 intersect with the main girder 20 in plan view.

[0050] At the location where the gap G and the main girder 20 intersect in plan view, as shown in the diagonally hatched areas in Fig. 9(a) and (c), the formwork 31 can be easily assembled by the surfaces where the adjacent deck and the temporary deck 12 face each other in the bridge axis direction AX, the upper surface of the upper flange 20a of the main girder 20, and the side surface 31s made of a member such as plywood. On the other hand, at other locations than the above, as shown in the diagonally hatched areas in Fig. 9(b) and (c), the main girder 20 does not exist at the bottom, so it is necessary to make the side surface 31s and bottom surface 31b of the formwork 31 out of a member such as plywood, and to hold the formwork 31 in a predetermined position by a support member 33 fixed to the underside of the adjacent deck and / or the temporary deck 12. In this case, the support members 33 are provided solely for the purpose of holding the formwork 31, and do not need to have as great a mechanical strength as is required, for example, for transmitting axial force and / or preventing deflection between the adjacent deck and the temporary deck 12. Therefore, for example, angle steel or other members having small size and weight can be used as the support members 33.

[0051] As described above, according to the disclosed method, a structure disclosed herein is constructed in a temporary state in which an axial force transmission member 30 made of hardened filler material 32 is arranged in at least a portion of the gap G, which is the space between the temporary deck 12 and an adjacent deck, which is another deck adjacent to the temporary deck 12 in the bridge axial direction.

[0052] As described above, in the deck replacement method to which the technology of the present disclosure is applied, in order to open traffic during the traffic closure period, it is necessary to lay temporary pavement at the location where the temporary deck 13 is arranged in the third step (step S03). For this reason, before the temporary pavement, flat plate-shaped members such as steel plates are fixed to the upper surfaces of the adjacent deck and the temporary deck 12 by a method such as bolting so as to cover the entire gap G between the adjacent deck and the temporary deck 12, including the location where the axial force transmission member 30 is arranged. However, the flat plate-shaped members are arranged solely for the purpose of supporting the weight of the temporary pavement and the wheel load when traffic is opened, and do not need to have a mechanical strength large enough to contribute to the transmission of axial force between the adjacent deck and the temporary deck 12 and / or the reduction of stress acting on the main girder 20.

[0053] Fig. 10 is a schematic cross-sectional view illustrating the difference in stress acting on the main girder 20 depending on the presence or absence of an axial force transmission member 30 in the gap G between the adjacent deck and the temporary deck 12 in the temporary state. Fig. 10(a) illustrates a temporary state in a conventional construction method in which the temporary deck 12 is disposed on the main girder 20 but the axial force transmission member 30 is not disposed in the gap G between the adjacent deck and the temporary deck 12. On the other hand, Fig. 10(b) illustrates a temporary state according to the present disclosure in which the axial force transmission member 30 is disposed in the gap G between the adjacent deck and the temporary deck 12 by the presently disclosed method and structure as illustrated in Figs. 7 to 9.

[0054] As illustrated in (a) of Figure 10, in the temporary state where no axial force transmission member 30 is disposed in the gap G between the adjacent deck slabs (the existing deck slab 11, the temporary deck slab 12, and the new deck slab 13) and the temporary deck slab 12, not only is the temporary deck slab 12 and the main girder 20 not integrated but also a non-composite girder, no axial force (see black arrows) is transmitted between the adjacent decks. As a result, as described above with reference to Figure 6, the traffic load P is supported only by the main girder 20, so that the compressive stress acting on the upper part of the main girder 20 (see the arrows hatched with diagonal lines) and the tensile stress acting on the lower part (see the open arrows) are large.

[0055] On the other hand, as illustrated in (b) of FIG. 10, in a temporary state in which an axial force transmission member 30 is disposed in the gap G between the adjacent deck and the temporary deck 12 by the disclosed method and structure, the temporary deck 12 and the main girder 20 are not integrated and are non-composite girders, as in (a) above, but an axial force (see black arrows) is transmitted between the adjacent decks, and the temporary deck 12 can function as a strut installed above the main girder 20. As a result, sufficient rigidity can be ensured even in the temporary state, and the stress acting on the main girder 20, that is, the compressive stress acting on the upper part of the main girder 20 (see the arrows hatched with diagonal lines) and the tensile stress acting on the lower part (see the open arrows) can be reduced. Therefore, traffic can be opened without carrying out reinforcement work, and the traffic closure period can be minimized.

[0056] As described above, the width of the gap G between the adjacent deck and the temporary deck 12 is not necessarily constant due to, for example, design and / or construction errors of the bridge, and there may be cases where the surfaces (opposing surfaces) of the adjacent decks facing each other have irregularities and / or inclinations. Therefore, when assembling the formwork 31 using wood or the like as shown in Fig. 7(a) as an example, it is necessary to assemble the formwork 31 after processing the wood according to the width of the gap G at each point where the formwork 31 is assembled and the irregularities and / or inclinations of the opposing surfaces, and therefore it is required to make the assembling work of the formwork 31 more efficient.

[0057] Therefore, in one preferred embodiment of the disclosed technology, the formwork 31 is configured to be expandable at least in the bridge axis direction AX before the filling material 32 hardens. The configuration of the formwork 31 is not particularly limited as long as it is expandable at least in the bridge axis direction AX, defines an internal space corresponding to the shape of the axial force transmission member 30 capable of sufficiently transmitting axial force between the adjacent deck and the temporary deck 12 at the location where the axial force transmission member 30 is to be disposed as described above, and can maintain the shape of the internal space at least for the period until the cast filling material 32 hardens.

[0058] FIG. 11 is a schematic perspective view showing a specific example of a formwork 31 that is expandable in the bridge axis direction AX. Such a formwork 31 can be made by using a commercially available resin (e.g., polyethylene, etc.) square U-shaped groove 41 as shown in FIG. 11(a). As shown in the figure, the square U-shaped groove 41 has a bellows-like shape and can expand and contract in the longitudinal direction. If necessary, flat or flexible sheet-like members may be attached to both ends in the longitudinal direction of the square U-shaped groove 41 to close both ends of the formwork 31 in the bridge axis direction AX. In addition, instead of the above-mentioned resin square U-shaped groove, a square bellows hose 42 made of resin (e.g., polyethylene, etc.) cut (e.g., split in half) by a plane parallel to the axial direction as shown in FIG. 11(b) may be used. That is, not only a commercially available square U-shaped gutter as illustrated in (a), but also a corrugated U-shaped gutter made by slicing a square bellows hose horizontally as illustrated in (b) can be adopted as the formwork 31 used in the disclosed technology.

[0059] Fig. 12 is a schematic perspective view illustrating a state in which a formwork 31 made of a plastic rectangular U-shaped gutter as illustrated in Fig. 11(a) is disposed in the gap G between the temporary deck 12 and the new deck 13. In the example shown in Fig. 12, the formwork 31 is disposed at the end in the width direction of the gap G, and since there is no main girder 20 below the formwork 31, the bottom of the formwork 31 is supported by angle steel as a support member 33 fixed to the underside of the covering plate 12a of the temporary deck 12 and the new deck 13 so as to span the gap G.

[0060] As described above, the rectangular U-shaped groove 41 has a bellows-like shape and can expand and contract in the longitudinal direction. Therefore, even if the width of the gap G between the adjacent floor slabs and the temporary floor slab 12 is not constant, the dimension in the longitudinal direction can be easily changed to match the width of the gap G. In addition, since the rectangular U-shaped groove 41 is formed of a resin having a certain degree of flexibility, even if there are unevenness and / or inclinations on the opposing surfaces of the adjacent floor slabs, the formwork 31 can be easily configured to match the state of the opposing surfaces. Furthermore, since the rectangular U-shaped groove 41 has a groove-like shape that can be used as the formwork 31, it is not necessary to assemble the formwork 31 to match the width and shape of the gap G at each location where the axial force transmission member 30 is to be disposed, and it is only necessary to place the rectangular U-shaped groove 41 at the location. Therefore, the efficiency of the assembly work of the formwork 31 can be significantly improved.

[0061] Incidentally, except for the case where flat or flexible sheet-like members are attached to both ends in the longitudinal direction of the rectangular U-shaped gutter 41 as the formwork 31 that is expandable in the bridge axis direction AX as described above to block both ends of the formwork 31 in the bridge axis direction AX, depending on the degree of adhesion of the ends in the longitudinal direction of the formwork 31 to the opposing surfaces of the adjacent decks and the temporary deck 12, there is a risk that the unhardened filler 32 will leak from the boundary between the existing deck 11, the temporary deck 12, and / or the new deck 13 and the formwork 31. In this case, the leakage of the filler 32 can be prevented by filling the gap with a filler such as a rag. However, such work leads to an increase in the labor required for construction, so it is preferable to reduce the risk of the unhardened filler 32 leaking. Furthermore, as described above, if flat or flexible sheet-like members are attached to both ends in the longitudinal direction of the rectangular U-shaped gutter 41 as the formwork 31 that is expandable in the bridge axis direction AX, and both ends of the formwork 31 in the bridge axis direction AX are not blocked, the filler 32 poured into the formwork 31 hardens in a state of contact with the opposing surfaces of the adjacent deck and the temporary deck 12. Therefore, when removing the axial force transmission member 30 (i.e., the formwork 31 and the hardened filler 32) during removal of the temporary deck 12, it is necessary to separate the adjacent deck and the temporary deck 12 from the hardened filler 32, which may make the removal of the axial force transmission member 30 difficult.

[0062] From the standpoint of preventing leakage of the unhardened filler 32 from the formwork 31 and facilitating the removal of the axial force transmission member 30, it is preferable to encapsulate the unhardened filler 32 in a flexible member so that it does not come into direct contact with the surrounding members, as long as the fluidity of the unhardened filler 32 is not impeded.

[0063] Therefore, in another preferred embodiment of the disclosed technique, a flexible sheet-like member 34 is preliminarily arranged inside the formwork 31, and the filler 32 is cast inside the sheet-like member 34. Since the filler 32 is then hardened, the axial force transmission member 30 further includes the sheet-like member 34 interposed between the deck and formwork 31 adjacent to the filler and the hardened filler 32. The sheet-like member 34 is not particularly limited as long as it does not hinder the fluidity of the unhardened filler 32 and can contain the unhardened filler 32 so as not to directly contact the surrounding members. Typically, the sheet-like member 34 is a sheet or bag made of resin, such as polyethylene, and it is preferable to adopt a resin bag from the viewpoint of easy handling during construction.

[0064] 13 is a schematic diagram showing a state in which a polyethylene bag is pre-placed as a sheet-like member 34 inside a formwork 31 placed at a predetermined position in the gap G between the temporary deck 12 and the new deck 13. In this embodiment, the axial force transmission member 30 is formed by hardening the uncured filler 32 poured into the polyethylene bag thus placed.

[0065] Fig. 14 is a schematic diagram showing an example of installation of a temporary deck in a temporary state to which the disclosed technology according to this embodiment is applied. Fig. 14(a) is a schematic top view (plan view) of a temporary state consisting of an existing deck 11, a new deck 13, and two temporary decks 12 arranged between the existing deck 11 and the new deck 13. Fig. 14(b) is a schematic diagram of a cross section along a plane perpendicular to the bridge axis direction AX, including the straight line LL shown in Fig. 14(a), observed from the side of the temporary deck 12. Fig. 14(c) is a schematic enlarged view of the area X surrounded by the thick dashed line shown in Fig. 14(b).

[0066] As illustrated in Figures 13 and 14, in this embodiment, the unhardened filler 32 is poured inside the sheet-like member 34 that is preliminarily arranged inside the formwork 31, so even if both ends of the formwork 31 in the bridge axis direction AX are not blocked, the filler 32 does not leak from the boundary between the existing deck 11, the temporary deck 12, and / or the new deck 13 and the formwork 31. Therefore, it is not necessary to fill the area where the filler 32 leaks with a filler such as a rag, so that an increase in the labor required for construction can be prevented. In addition, since the filler 32 does not directly contact the opposing surfaces of the adjacent temporary deck 12 and the new deck 13, the temporary deck 12 and the new deck 13 can be easily separated from the hardened filler 32 when removing the axial force transmission member 30 (i.e., the formwork 31 and the hardened filler 32) when removing the temporary deck 12. For example, even if the facing surface of the new deck 13 has irregularities and the filler 32 constituting the axial force transmission member 30 fits into the irregularities, the axial force transmission member 30 can be easily removed from the facing surface of the new deck 13 after the temporary deck 12, which has a flat facing surface, is lifted and removed, for example, by a crane. In addition, since the filler 32 does not come into direct contact with the formwork 31, the formwork 31 and the filler 32 can be easily separated, making it easier to reuse the formwork 31.

[0067] Incidentally, in the first step (step S01) of removing the existing deck slab of the composite girder, the existing deck slab 11 to be removed is separated from the adjacent existing deck slab 11. Therefore, the joint reinforcing bars 13r do not protrude from the end face in the bridge axis direction X of the existing deck slab 11 from which the adjacent existing deck slab 11 has been removed, and therefore the joint reinforcing bars 13r do not protrude into the gap G between the existing deck slab 11 and the temporary deck slab 12 that is arranged next to the existing deck slab 11 in the second step (step S02). In addition, when multiple temporary decks 12 are arranged in a location where multiple existing decks 11 have been removed, the joint reinforcing bars 13r do not protrude into the gap G between the adjacent temporary decks 12 either. When an axial force transmission member 30 is to be arranged at any location in such a gap G, in the second step (step S02), a temporary deck is arranged at the location where the existing deck is removed, and then a formwork 31 is arranged, and in the fourth step (step S04), the temporary deck 12 and the axial force transmission member 30 can be easily removed.

[0068] However, as illustrated in Figures 7 and 8, joint reinforcing bars 13r for joining adjacent new decks 13 protrude at a predetermined interval from the end face in the bridge axis direction AX of the new deck 13. When the joint reinforcing bars 13r protrude from the portion where the formwork 31 for forming the axial force transmission member 30 is assembled, the joint reinforcing bars 13r are embedded inside the axial force transmission member 30 composed of the hardened filler material 32, as illustrated in Figure 8. Therefore, when removing the axial force transmission member 30 at the time of removing the temporary deck 12, it is necessary to destroy the axial force transmission member 30 while paying attention not to damage or deform the joint reinforcing bars 13r embedded inside the axial force transmission member 30. From the viewpoint of facilitating the removal work of the axial force transmission member 30, it is preferable that the joint reinforcing bar 13r does not protrude into the temporary interfacial area, which is the area where the axial force transmission member 30 is arranged on the end face of the newly constructed deck 13 facing the adjacent temporary deck 12.

[0069] In addition to the formwork 31 assembled from wood such as plywood, the formwork 31 configured to be freely expandable as described above (for example, the rectangular U-shaped groove 41, etc.) or the formwork 31 with a flexible sheet-like member 34 disposed inside can also be disposed in the location where the joint reinforcing bar 13r protrudes. However, from the viewpoint of making the installation work of these forms 31 more efficient, it is preferable that the joint reinforcing bar 13r does not protrude into the temporary interfacial area, which is the area where the axial force transmission member 30 of the end face of the new deck 13 facing the adjacent temporary deck 12 is disposed.

[0070] Therefore, in another preferred embodiment of the disclosed technology, the joint reinforcing bars 13r do not protrude from the temporary interfacial area, which is an area where the axial force transmission members 30 of the end face of the new slab 13 facing the adjacent temporary slab 12 are arranged. FIG. 15 is a drawing corresponding to FIG. 8 referred to above, in which (a) is a schematic side view of the temporary state when observed from the width direction, and (b) is a schematic top view (plan view) of the temporary state. However, it differs from the configuration illustrated in FIG. 8 in that the joint reinforcing bars 13r do not protrude from the temporary interfacial area, which is an area where the axial force transmission members 30 of the end face of the new slab 13 facing the adjacent temporary slab 12 are arranged, and the joint reinforcing bars 13r are not embedded inside the axial force transmission members 30. As a result, when removing the axial force transmission member 30 at the time of removing the temporary deck 12, there is no need to pay attention not to damage or deform the joint reinforcing bars 13r embedded inside the axial force transmission member 30, and the removal work of the axial force transmission member 30 can be facilitated. In addition, the installation of the formwork 31 is also easy, and particularly when a formwork 31 configured to be freely expandable such as a square U-shaped groove 41 or the like is used, it is even more efficient since it is only necessary to place the formwork 31 at the location where the axial force transmission member 30 is to be installed.

[0071] However, the disclosed technology relating to this embodiment does not eliminate the protrusion of joint rebars 13r in all temporary inter-filling areas of the end face of the newly constructed deck 13; for example, depending on the strength required for the bridge after the deck is replaced and / or construction convenience, there may be a mixture of temporary inter-filling areas of the end face of the newly constructed deck 13 with protruding joint rebars 13r and those with no protruding joint rebars 13r.

[0072] However, depending on the strength required for the bridge after the deck replacement, even in the new deck 13 in which the joint reinforcing bars 13r do not protrude from the temporary inter-filling end face in the temporary state, members such as reinforcing bars may be required to connect to the new deck 13 that will be placed adjacently in the fifth process (step S05). Therefore, in another preferred embodiment of the disclosed technology, a new deck 13 is used in which a connecting member is provided in the temporary inter-filling area, which is a member for attaching a connecting member that is a member for connecting to the new deck 13 that will be placed in the removed portion of the temporary deck 12 after the adjacent temporary deck 12 and axial force transmission member 30 are removed.

[0073] FIG. 16 is a schematic diagram illustrating the disclosed technique using a new slab 13 in which the above-mentioned connecting member 13j is provided in the temporary filling area. (a) to (c) of FIG. 16 are schematic side views when observed from the width direction, and (d) of FIG. 16 is a schematic top view (plan view). In (a) of FIG. 16, similar to (a) of FIG. 15, an axial force transmission member 30 is disposed in the gap G between the new slab 13 and the temporary slab 12 in which the joint reinforcing bar 13r does not protrude from the temporary filling area. Therefore, the formwork 31 can be easily disposed, and the joint reinforcing bar 13r is not embedded inside the axial force transmission member 30, so that the temporary slab 12 and the axial force transmission member 30 can be easily removed in the fourth step (step S04) of removing the temporary slab 12, and the state illustrated in (b) of FIG. 16 can be obtained. Although the formwork 31 is not depicted in FIG. 16(a), the formwork 31 may be present around the hardened filling material 32 in this state (that is, the temporary state).

[0074] Next, as illustrated in FIG. 16(c), after removing the adjacent temporary deck 12 and the axial force transmission member 30, the connection member 13c is attached to the temporary inter-space area of ​​the new deck 13 via the connection member 13j provided on the already installed new deck 13. The specific configuration of the connection member 13c and the connecting member 13j is not particularly limited as long as it is possible to connect the new deck 13 and the new deck 13' with a strength that can withstand the load of heavy machinery during construction and the load on the bridge surface such as wheel load when traffic is opened by connecting the joint rebar 13r of the new deck 13' newly installed adjacent to the new deck 13 with the connection member 13c by a joint structure well known to those skilled in the art. Typically, a mechanism called a "mechanical joint" is adopted. Specifically, for example, the connection member 13c is a post-installation rebar with a male thread processed at the end on the base end side (the new deck 13 side with the connection member 13j). On the other hand, the connecting member 13j is a sleeve (bag coupler) that is provided at the end of the tip side (temporary filling area side) of the preceding reinforcing bar 13e, which is a reinforcing bar that is previously embedded inside the new deck 13, and is processed with a female thread. By screwing the male thread portion of the connecting member 13c into the female thread portion of the connecting member 13j, the connecting member 13j and the connecting member 13c can be connected with sufficient strength.

[0075] Next, as illustrated in FIG. 16(d), the connection member 13c attached to the temporary interfacial area of ​​the new slab 13 already installed as described above via the connecting member 13j and the joint reinforcing bar 13r of the new slab 13' newly installed adjacent to the new slab 13 can be connected by a joint structure well known to those skilled in the art. Therefore, according to the disclosed technology of this aspect, the joint reinforcing bar 13r does not protrude from the temporary interfacial area of ​​the new slab 13 during the period from the installation to the removal of the axial force transmission member 30, so that the work of installing the formwork 31 and the axial force transmission member 30 and the work of removing the axial force transmission member 30 when removing the temporary slab 12 can be made easier. In addition, after the removal of the axial force transmission member 30, the connection member 13c can be attached to the temporary interfacial area of ​​the new slab 13 via the connecting member 13j. Therefore, the preceding rebar 13e embedded inside the already installed new slab 13 and the joint rebar 13r of the new slab 13' newly installed adjacent to the new slab 13 can be connected via the connection member 13c. As a result, the already installed new slab 13 and the newly installed new slab 13' can be connected with sufficient strength. Typically, as illustrated in (d) of FIG. 16, the connection member 13c of the new slab 13 and the joint rebar 13r of the new slab 13' are arranged so as to enter between each other so as not to interfere with each other in a plan view. On the other hand, although not shown, in a side view, the connection member 13c of the new slab 13 and the joint rebar 13r of the new slab 13' are arranged so as to overlap each other.

[0076] <effect> As described above, in the disclosed method and structure, in a temporary state in which the temporary deck 12 is arranged at the location where the existing deck 11 is removed, a formwork 31 is arranged in at least a part of the gap G, which is the space between the adjacent deck and the temporary deck 12, and a filler material 32 having fluidity is poured into the formwork 31, and the filler material 32 is hardened. Therefore, since the axial force is transmitted between the adjacent decks via the axial force transmission member 30 formed by the hardened filler material 32, the temporary deck 12 can function as a strut installed above the main girder 20. As a result, according to the disclosed method and structure, sufficient rigidity can be ensured even in the temporary state, and the stress acting on the main girder 20 can be reduced.

[0077] Furthermore, as described above, the axial force transmission member 30 according to the disclosed method and structure is formed by hardening the filler 32 poured into a formwork 31 arranged in the gap G between the adjacent deck and the temporary deck 12. Therefore, even if the width of the gap G is not necessarily constant due to, for example, bridge design and / or construction errors, or if the opposing surfaces of adjacent decks have irregularities and / or inclinations, the axial force transmission member 30 that fits the shape of the gap G between the adjacent deck and the temporary deck 12 can be easily and reliably formed.

[0078] In addition, easily available and inexpensive materials such as plywood can be used as the formwork 31 used in the disclosed method. Therefore, compared to the method using jacks such as the deck replacement method according to the invention disclosed in the above-mentioned Patent Document 2, the construction cost and / or labor can be reduced.

[0079] Furthermore, by disposing the formwork 31, which is configured to be expandable at least in the bridge axis direction AX, in the area in the gap G where the joint rebar does not protrude, it is not necessary to assemble the formwork 31 according to the width and shape of the gap G at each location where the axial force transmission member 30 is to be disposed, and it is only necessary to dispose the formwork 31 at the location. Therefore, the efficiency of the assembly work of the formwork 31 can be significantly improved. In addition, by disposing the flexible sheet-like member 34 in advance inside the formwork 31 and casting the filler 32 inside the sheet-like member 34, even when both ends of the formwork 31 in the bridge axis direction AX are not blocked, it is possible to prevent the filler 32 from leaking from the boundary between the existing deck 11, the temporary deck 12, and / or the new deck 13 and the formwork 31, and also to easily separate the temporary deck 12 and the new deck 13 as well as the formwork 31 from the hardened filler 32 when removing the axial force transmission member 30 when removing the temporary deck 12.

[0080] In addition, by adopting a new slab 13 in which the joint reinforcing bars 13r do not protrude from the temporary interfacial area, which is the area in which the axial force transmission members 30 of the end faces facing the adjacent temporary slabs 12 are arranged, the work of arranging the formwork 31 and the axial force transmission members 30 and the work of removing the axial force transmission members 30 when removing the temporary slab 12 can be made easier. Furthermore, by adopting a new slab 13 in which a connecting member 13j (e.g., a mechanical joint, etc.) is provided in the temporary interfacial area for attaching a connecting member 13c, which is a member for connecting with a new new slab 13 arranged in the removed portion of the temporary slab 12 after the adjacent temporary slabs 12 and the axial force transmission members 30 are removed, the new slab 13' newly arranged adjacent to the new slab 13 and the new slab 13 can be connected with sufficient strength.

[0081] In other words, according to the disclosed method and structure, the stress acting on the main girder 20 during the period when the temporary deck 12 is in place during deck replacement work for an existing composite girder can be more easily and reliably reduced.

[0082] For the purpose of explaining the contents of the present disclosure, a number of embodiments having specific configurations have been described above, sometimes with reference to the accompanying drawings. However, the scope of the present disclosure should not be construed as being limited to these exemplary embodiments, and it goes without saying that appropriate modifications can be made within the scope of the claims and the matters described in the specification. [Explanation of symbols]

[0083] 10... Deck, 11... Existing deck, 12... Temporary deck, 12a... Covering plate, 12b... Pavement, 12c... Steel railing, 13... New deck, 13'... New deck, 13a... Dowel hole, 13r... Joint reinforcing bar, 13c... Connection member, 13j... Connecting member, 13e... Pre-reinforcing bar, 20... Main girder, 20a... Upper flange, 20b... (Lower) flange, 20c... Web, 20d... Dowel, 30... Axial force transmission member, 31... Formwork, 31s... (Formwork) side, 31b... (Formwork) bottom, 32... Filling material, 33... Support member, 34... Sheet-like member, 41... Plastic square U-shaped gutter, 42... Plastic square bellows hose, 50... Temporary pavement, 60... Permanent pavement, AX... Bridge axis direction, G... Gap, P... Traffic load

Claims

1. In a deck replacement method, the existing deck of a composite girder is removed, a temporary deck, which is a deck having a strength that can be regarded as a rigid body against forces acting in the bridge axial direction, is placed in the location where the existing deck was removed, and then the temporary deck is removed and a new deck is placed in the location where the temporary deck was removed. A formwork is disposed in at least a part of the gap between the temporary deck and an adjacent deck, which is another deck adjacent to the temporary deck in the bridge axis direction, and a fluid filler is poured into the formwork and allowed to harden. A method for reducing stress acting on a main girder, comprising:

2. A method for reducing stress acting on a main beam as described in claim 1, comprising: The formwork is configured to be expandable and contractible at least in the bridge axis direction before the filling material hardens. A method for reducing stress acting on a main girder, comprising:

3. A method for reducing stress acting on a main girder according to claim 2, comprising: A flexible sheet-like member is preliminarily disposed inside the formwork, and the filler is poured inside the sheet-like member. A method for reducing stress acting on a main girder, comprising:

4. A method for reducing stress acting on a main girder according to any one of claims 1 to 3, comprising: The joint reinforcing bar does not protrude into the temporary interfacial area, which is the area where the axial force transmission member is arranged on the end surface of the new deck facing the adjacent temporary deck. A method for reducing stress acting on a main girder, comprising:

5. A method for reducing stress acting on a main girder according to claim 4, comprising the steps of: A connecting member is provided in the temporary filling area, which is a member for attaching a connecting member that is a member for connecting to the new floor slab that is disposed at the removal location of the temporary floor slab after the adjacent temporary floor slab and the axial force transmission member are removed. A method for reducing stress acting on a main girder, comprising:

6. In a deck replacement method, an existing deck of a composite girder is removed, a temporary deck having a strength that can be regarded as a rigid body against a force acting in the bridge axis direction is placed in the location where the existing deck was removed, and then the temporary deck is removed and a new deck is placed in the location where the temporary deck was removed. An axial force transmission member made of a hardened filler is disposed in at least a part of a gap between the temporary deck and an adjacent deck, which is another deck adjacent to the temporary deck in the bridge axis direction. A structure that reduces stress acting on the main girder, characterized by:

7. A structure for reducing stress acting on the main girder according to claim 6, The axial force transmission member is configured by a form and the filler material hardened inside the form, The formwork is configured to be expandable and contractible at least in the bridge axis direction before the filling material hardens. A structure that reduces stress acting on the main girder, characterized by:

8. A structure for reducing stress acting on the main girder according to claim 7, The axial force transmission member further includes a flexible sheet-like member interposed between the deck adjacent to the filler and the formwork and the filler, A structure that reduces stress acting on the main girder, characterized by:

9. A structure for reducing stress acting on the main girder according to any one of claims 6 to 8, The joint reinforcing bar does not protrude from a temporary interfacial region, which is a region in which the axial force transmission member is disposed on the end surface of the new deck facing the adjacent temporary deck, The joint reinforcing bar is not embedded inside the axial force transmission member. A structure that reduces stress acting on the main girder, characterized by:

10. A structure for reducing stress acting on the main girder according to claim 9, A connecting member is provided in the temporary filling area, which is a member for attaching a connecting member that is a member for connecting to the new floor slab that is disposed at the removal location of the temporary floor slab after the adjacent temporary floor slab and the axial force transmission member are removed. A structure that reduces stress acting on the main girder, characterized by: