Distribution board
The power distribution board manages branch breakers to an off state during power restoration, addressing the lack of management in existing systems and reducing the likelihood of troubles by preventing simultaneous power supply.
Patent Information
- Application Number
- JP2023056690
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-30
- Publication Date
- 2024-10-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing power restoration systems do not adequately address the potential troubles that can occur when power is restarted after an overcurrent or power outage, as they do not provide a mechanism to manage branch breakers during the restoration process.
A power distribution board with a main breaker, branch breakers, an abnormality detection section, and a state control section that controls the connection state of branch breakers to an off state during power restoration to prevent simultaneous power supply, thereby mitigating potential troubles.
The solution effectively suppresses troubles during power restoration by ensuring branch breakers are in an off state when power is restored, reducing the likelihood of issues arising from abnormal conditions in the branch breakers.
Smart Images

Figure 2024143800000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates generally to a distribution board, and more particularly to a distribution board including a main breaker and multiple branch breakers. [Background technology]
[0002] The shutdown system of Patent Document 1 includes an acquisition unit and a shutdown control unit. The acquisition unit acquires information on the power outage duration, which is the duration of a power outage that occurs in a grid power source. When the power outage duration exceeds a predetermined threshold time, the shutdown control unit turns off the contacts of a breaker (main breaker) connected to the grid power source. By including this configuration, the shutdown system prevents a situation in which power is restored to the breaker when no one is nearby after a power outage occurs due to a disaster. In other words, it becomes possible to prevent problems that may occur when power is restored to the breaker. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2022-53304 A Summary of the Invention [Problem to be solved by the invention]
[0004] When power supply is resumed via the main breaker (when power is restored) after an overcurrent, power outage, etc. occurs, it is necessary to suppress troubles that occur when power is restored. However, the interruption system of the above-mentioned Patent Document 1 turns off the contacts of the breaker when a power outage occurs, but does not disclose how to suppress troubles when power is restored.
[0005] The present disclosure has been made in consideration of the above-mentioned problems, and aims to provide a distribution board that can reduce problems when power is restored. [Means for solving the problem]
[0006] A distribution board according to an embodiment of the present disclosure includes a main breaker, a plurality of branch breakers, an abnormality detection unit, and a state control unit. The main breaker is supplied with power from an external source. The plurality of branch breakers receive the power from the main breaker and supply the power to an electrically connected load. The abnormality detection unit detects an abnormality related to the power supply or an abnormality related to the installation environment. The state control unit controls the connection state of the plurality of branch breakers to switch between an ON state in which the plurality of branch breakers are electrically connected to the load, and an OFF state in which the plurality of branch breakers are not electrically connected. At the time of power restoration when the power supply is started after the power supply via the main breaker is stopped due to the abnormality detection unit detecting the abnormality, the connection state of the plurality of branch breakers is the OFF state. Effect of the Invention
[0007] According to the present disclosure, problems occurring when power is restored can be reduced. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a block diagram showing the configuration of a distribution board according to one embodiment. [Diagram 2] FIG. 2 is a front view of the housing of the distribution board. [Diagram 3] FIG. 3 is a block diagram showing a configuration of a control device provided in the distribution board. [Figure 4] FIG. 4 is a flow chart showing the overall operation performed by the control device of the above embodiment. [Diagram 5] FIG. 5 is a flowchart showing a first power restoration process performed by the control device of the above embodiment. [Figure 6] FIG. 6 is a flowchart showing a second power restoration process performed by the control device of the above embodiment. [Figure 7] FIG. 7 is a flowchart showing a third power restoration process performed by the control device of the above embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] The embodiments and modifications described below are merely examples of the present disclosure, and the present disclosure is not limited to the embodiments and modifications. Various modifications other than the following embodiments and modifications are possible according to the design, etc., as long as they do not deviate from the technical idea of the present disclosure.
[0010] (Embodiment) Hereinafter, a distribution board 1 according to this embodiment will be described with reference to Figs. 1 to 7.
[0011] (1) Overview As shown in FIG. 1, the distribution board 1 according to the present embodiment includes a main breaker 3, a plurality of (three in the illustrated example) branch breakers 4, an abnormality detection unit 5, and a state control unit 241. The main breaker 3 is supplied with power from the outside (for example, a power system PS). The plurality of branch breakers 4 are supplied with power from the main breaker 3, and supply the power to the loads LD electrically connected thereto. The abnormality detection unit 5 detects an abnormality related to the power supply or an abnormality related to the installation environment. The state control unit 241 controls the connection state of the plurality of branch breakers 4 so as to switch between an ON state in which the plurality of branch breakers 4 are electrically connected to the loads LD, and an OFF state in which the plurality of branch breakers 4 are not electrically connected. At the time of power recovery when the power supply is started after the power supply via the main breaker 3 is stopped due to the abnormality detection unit 5 detecting an abnormality, the connection state of the plurality of branch breakers 4 is OFF. Here, the power system PS is, for example, a commercial power source.
[0012] This configuration can suppress troubles when power is restored. For example, if the connection state of the branch breaker 4 is in the ON state when power is restored, and power supply starts at the same time as power is restored, this is likely to cause troubles. Therefore, by setting the connection state of the multiple branch breakers 4 to the OFF state when power is restored, power supply to the multiple branch breakers 4 does not start at the same time as power is restored. As a result, troubles when power is restored can be suppressed.
[0013] (2) Composition The distribution board 1 is installed in consumer facilities such as detached houses, apartment buildings, factories, stores, offices, office buildings, commercial buildings, stadiums, hospitals, and schools. The distribution board 1 distributes commercial power (AC power) supplied from a commercial power system PS to multiple loads LD in the consumer facilities.
[0014] As shown in Fig. 2, the distribution board 1 includes a rectangular box-shaped housing 10. The housing 10 houses a main breaker 3, a plurality of branch breakers 4, and a control device 20. A rectangular opening 10a is formed in the front of the housing 10, and a cover (not shown) is attached to the opening 10a so as to be freely opened and closed. The cover is movable between a closed position that covers the opening 10a and an open position that exposes the opening 10a to the front. The housing 10 is attached to, for example, a wall or a pillar of a building.
[0015] The housing 10 accommodates a main breaker 3, a plurality of branch breakers 4, and a control device 20. The main breaker 3, the plurality of branch breakers 4, and the control device 20 are attached to a bottom plate of the housing 10 (a plate member facing the opening 10a) directly or via a mounting member or the like. Note that Fig. 2 shows an example of the arrangement of the main breaker 3, the plurality of branch breakers 4, and the control device 20 inside the housing 10. Note that this arrangement can be changed as appropriate.
[0016] The power system PS is connected to a main breaker 3 via a main electric circuit L1. Commercial power supplied from the power system PS is supplied from the main electric circuit L1 to a load LD outside the housing 10 via the main breaker 3 and the branch breakers 4.
[0017] A primary terminal of the main breaker 3 is connected to the main electric circuit L1. A secondary terminal of the main breaker 3 is connected to the main electric circuit L1 inside the housing 10. The main electric circuit L1 is composed of a bus bar, an electric wire, and the like.
[0018] A main electric circuit L1 connected to a secondary terminal of the main breaker 3 branches into a plurality of branch electric circuits L2 within the housing 10. A plurality of branch breakers 4 are respectively connected to the plurality of branch electric circuits L2. The branch breakers 4 connect and cut off the branch electric circuit L2 to which the branch breaker 4 is connected. Specifically, a primary terminal of the branch breaker 4 is connected to the branch electric circuit L2 branched from the main electric circuit L1. A secondary terminal of the branch breaker 4 is connected to the branch electric circuit L2 drawn out to the outside of the housing 10. A load LD of a customer facility is connected to the branch electric circuit L2 drawn out to the outside of the housing 10. The branch electric circuit L2 is composed of a bus bar, an electric wire, etc.
[0019] The load LD includes electric devices that are directly connected to the branch electric circuit L2, and electric devices that are indirectly connected to the branch electric circuit L2 via an outlet connected to the branch electric circuit L2. The electric devices include, for example, a heater, a cooker, a light, and an air conditioner.
[0020] As described above, commercial power is supplied to a plurality of loads LD via the main electric line L1, the main breaker 3, the branch electric line L2, the branch breaker 4, and the branch electric line L2.
[0021] (2.1) Main breaker The main breaker 3 is supplied with power from the outside (here, the power system PS). The main breaker 3 includes a contact portion 3a electrically connected between a primary terminal and a secondary terminal of the main breaker 3.
[0022] In this embodiment, the contact portion 3a of the main breaker 3 is a mechanical contact having a fixed contact and a movable contact. The main breaker 3 has a handle 3b on the front for turning the contact portion 3a on and off. When the handle 3b is turned on, the contact portion 3a is turned on and the main breaker 3 conducts the main electric circuit L1. When the handle 3b is turned off, the contact portion 3a is turned off and the main breaker 3 interrupts the main electric circuit L1.
[0023] Furthermore, the main breaker 3 further includes an abnormality detection unit 5 that detects an abnormality related to the power supply or an abnormality related to the installation environment. The abnormality detection unit 5 includes an electric leakage detection unit 31 and an overcurrent detection unit 32. That is, the main breaker 3 includes the electric leakage detection unit 31 and the overcurrent detection unit 32 as the abnormality detection unit 5 that detects an abnormality related to the power supply.
[0024] The leakage current detection unit 31 detects the presence or absence of leakage current in the branch electric circuit L2 and the load LD by using the current flowing from the power system PS to the load LD and the current flowing from the load LD to the power system PS. When the leakage current detection unit 31 detects a leakage current, the leakage current detection unit 31 outputs a detection result indicating that a leakage current has been detected to the control device 20 via the communication line W2.
[0025] The overcurrent detection unit 32 detects an overcurrent, such as a short circuit current or an overload current, based on a current flowing from the power system PS to the load LD. When the overcurrent detection unit 32 detects an overcurrent, it outputs a detection result indicating that an overcurrent has been detected to the control device 20 via the communication line W2.
[0026] When the leakage current detection unit 31 detects leakage current, the main breaker 3 forcibly opens the contact 3a to cut off the main electric circuit L1. When the overcurrent detection unit 32 detects overcurrent, the main breaker 3 forcibly opens the contact 3a to cut off the main electric circuit L1. Furthermore, even if the abnormality detection unit 5 included in the control device 20 detects an abnormality (e.g., earthquake, power outage), the main breaker 3 forcibly opens the contact 3a to cut off the main electric circuit L1. That is, when the abnormality detection unit 5 detects an abnormality (e.g., leakage current, overcurrent, earthquake, power outage), the main breaker 3 forcibly opens the contact 3a to cut off the main electric circuit L1. At this time, the distribution board 1 is in a state in which the abnormality detection unit 5 detects an abnormality and power supply to the multiple branch breakers 4 via the main breaker 3 is stopped.
[0027] (2.2) Branch breaker The multiple branch breakers 4 are supplied with power from the main breaker 3 and supply the power to an electrically connected load LD. As shown in Fig. 1, the multiple branch breakers 4 each include a switch SW, a control unit 41, an operation unit 42, a current detection unit 43, and a voltage detection unit 44.
[0028] The switch SW switches between electrical connection and disconnection between the main breaker 3 and the load LD. The switch SW is a semiconductor switch, and includes, for example, a field effect transistor (FET), an insulated gate bipolar transistor (IGBT), a bipolar transistor, or a solid state relay (SSR: Solid State Relay). In this embodiment, the switch SW is a normally-off type semiconductor switch, and is turned off when the voltage or current of the drive signal becomes zero. The switch SW is connected between the primary terminal and the secondary terminal of the branch breaker 4. When the switch SW is turned on, the branch electric circuit L2 is conductive, and when the switch SW is turned off, the branch electric circuit L2 is interrupted. The switch SW receives a drive signal from the control unit 41, and is switched on and off by the drive signal. If the magnitude of the voltage or current of the drive signal is the level of the drive signal, when the level of the drive signal is equal to or higher than a threshold value, the switch SW is turned on, and when the level of the drive signal is lower than the threshold value, the switch SW is turned off.
[0029] The operating power source of the control unit 41 is commercial power supplied from the branch electric circuit L2 on the primary side of the branch breaker 4. In addition, when the current detection unit 43 includes a current transformer (CT) or the like, the operating power source of the current detection unit 43 is also commercial power supplied from the branch electric circuit L2 on the primary side of the branch breaker 4.
[0030] The control unit 41 drives the switch SW to turn on and off in accordance with the operation of the operation unit 42 and an instruction from the control device 20. That is, the control unit 41 controls the switch SW to be switchable between an off state in which the branch electric circuit L2 is interrupted and an on state in which the branch electric circuit L2 is conductive. In other words, the control unit 41 switches between an on state in which the branch breaker 4 including the control unit 41 is electrically connected to the load LD and an off state in which the electric connection is not made. Specifically, the control unit 41 outputs a drive signal to the switch SW and drives the switch SW to turn on and off by the drive signal. For example, the control unit 41 turns on the switch SW by setting the drive signal to an H level (e.g., 10 V). The control unit 41 turns off the switch SW by setting the drive signal to an L level (e.g., 0 V). Here, at the time of power recovery when power supply is started after the power supply is stopped via the main breaker 3 due to the abnormality detection unit 5 detecting an abnormality, the connection state of the multiple branch breakers 4 is in an off state.
[0031] The operation unit 42 is, for example, a button for manually switching the switch SW on or off, and is provided on the front surface of the branch breaker 4 (see FIG. 2). The control unit 41 outputs a drive signal in response to operation of the operation unit 42. When the operation unit 42 is turned on, the control unit 41 sets the drive signal to H level to turn on the switch SW. When the operation unit 42 is turned off, the control unit 41 sets the drive signal to L level to turn off the switch SW. Note that in this embodiment, the operation unit 42 is a push-type button switch that performs a momentary operation, but the operation unit 42 may have another structure.
[0032] The control unit 41 also communicates with the control device 20 via the communication line W1, and can control the on / off state of the switch SW in response to an instruction signal from the control device 20. The control unit 41 outputs a drive signal in response to the instruction signal from the control device 20. When receiving an on instruction signal from the control device 20, the control unit 41 sets the drive signal to H level to turn on the switch SW. When receiving an off instruction signal from the control device 20, the control unit 41 sets the drive signal to L level to turn off the switch SW. The control unit 41 also outputs a monitor signal indicating the state (on state or off state) of the switch SW to the control device 20.
[0033] The current detection unit 43 detects the load current I1 flowing through the branch electric circuit L2. The current detection unit 43 has a CT, a shunt resistor, or the like. The current detection unit 43 may be provided on either the primary side or the secondary side of the branch breaker 4. In this embodiment, the current detection unit 43 is provided on the secondary side of the branch breaker 4. The current detection unit 43 outputs a load current signal to the control device 20 as a detection result of the load current I1.
[0034] The voltage detection unit 44 detects the AC voltage applied to the branch electric circuit L2 on the primary side of the branch breaker 4. The voltage detection unit 44 has a voltage dividing resistor and the like. The voltage detection unit 44 outputs a voltage signal to the control device 20 as a detection result of the AC voltage.
[0035] (2.3) Control device The control device 20 monitors and controls each of the multiple branch breakers 4. The control device 20 outputs an ON instruction signal to a branch breaker 4, thereby setting the drive signal of that branch breaker 4 to H level and turning on the switch SW. The control device 20 outputs an OFF instruction signal to a branch breaker 4, thereby setting the drive signal of that branch breaker 4 to L level and turning off the switch SW. In addition, the branch breaker 4 outputs a monitoring signal indicating the state (ON state or OFF state) of the switch SW of that branch breaker 4 to the control device 20. The control device 20 can monitor the state of the branch breaker 4 based on the monitoring signal.
[0036] As shown in FIG. 3, the control device 20 includes a memory unit 21, an earthquake detection unit 22 as an abnormality detection unit 5 that detects abnormalities in the installation environment, a power outage detection unit 23 as an abnormality detection unit 5 that detects abnormalities related to the supply of power, and a control unit 24.
[0037] The control device 20 has, for example, a computer system having a processor and a memory. The processor executes a program stored in the memory, causing the computer system to function as the control unit 24. The program executed by the processor is pre-recorded in the memory of the computer system here, but may be provided by being recorded on a recording medium such as a memory card, or may be provided via a telecommunications line such as the Internet.
[0038] The storage unit 21 is configured with a device selected from a ROM (Read Only Memory), a RAM (Random Access Memory), an EEPROM (Electrically Erasable Programmable Read Only Memory), etc. As shown in FIG. 3, the storage unit 21 includes a state information storage unit 211 and a load information storage unit 212.
[0039] The state information storage unit 211 stores state information for each branch breaker 4. The state information indicates whether the branch breaker 4 and the load LD are electrically connected or not connected based on a monitoring signal output from the branch breaker 4. That is, the state information storage unit 211 stores, for each of the multiple branch breakers 4, state information indicating the connection state of the branch breaker.
[0040] The load information storage unit 212 stores, for each branch breaker 4, load information related to the power consumption of the load LD connected to the branch breaker 4. The load information includes, for example, the power consumption of the load LD.
[0041] The earthquake detection unit 22 serving as the abnormality detection unit 5 detects an earthquake. Specifically, it includes a seismic sensor that detects seismic motion. When the seismic motion detected by the seismic sensor is equal to or greater than a first predetermined value, it detects that an earthquake has occurred. When the earthquake detection unit 22 detects an earthquake (occurrence of an earthquake), it controls the main breaker 3 to forcibly open the contact unit 3a and cut off the main electric circuit L1.
[0042] The power outage detection unit 23 serving as the abnormality detection unit 5 detects a power outage. For example, the power outage detection unit 23 detects the occurrence of a power outage when the power supplied from the power system PS becomes equal to or lower than a second predetermined value. When the power outage detection unit 23 detects a power outage, it controls the main breaker 3 to forcibly open the contact unit 3a to interrupt the main electric circuit L1.
[0043] As shown in FIG. 3, the control unit 24 includes a state control unit 241 and a short circuit detection unit 242.
[0044] The state control unit 241 controls the connection state of the multiple branch breakers 4 so as to switch between an ON state in which electrical connection is established between the load LD and an OFF state in which electrical connection is not established.
[0045] The state control unit 241 monitors whether or not power restoration has started after an abnormality is detected by the abnormality detection unit 5. For example, the state control unit 241 determines that power restoration has started when the contact unit 3a of the main breaker 3 is closed and the main electric circuit L1 is conductive. More specifically, the state control unit 241 determines that power restoration has started when it detects that an AC voltage is applied to the main electric circuit L1 to which the secondary terminal of the main breaker 3 is connected.
[0046] During the period from when the abnormality is detected until power restoration is started, power is not supplied to the control device 20. Therefore, the control device 20 has an auxiliary power supply, and is configured to operate on the auxiliary power supply when the main electric line L1 is interrupted and power is not supplied to the control device 20.
[0047] When power is restored, the state control unit 241 sequentially controls one or more branch breakers 4 that are to be controlled to be switched from an OFF state to an ON state so that their connection states are switched to an ON state. For example, when power is restored, the state control unit 241 controls one or more branch breakers 4 that were in an ON state when an abnormality was detected, based on the connection states represented by the state information of each of the branch breakers stored in the state information storage unit 211. Note that the state control unit 241 may control all branch breakers 4 when power is restored.
[0048] When power is restored, the state control unit 241 switches the connection state from the OFF state to the ON state by controlling the switch SW of the branch breaker 4 to be controlled. Specifically, the state control unit 241 outputs an ON instruction signal to the branch breaker 4 to be controlled, to control the switch SW, and switches the connection state from the OFF state to the ON state.
[0049] The state control unit 241 controls one or more predetermined branch breakers 4 out of the multiple branch breakers 4 when power is restored after the earthquake detection unit 22 detects an earthquake. For example, the one or more predetermined branch breakers 4 are branch breakers 4 that were in the on state when the earthquake was detected by the earthquake detection unit 22. Moreover, the state control unit 241 may control all branch breakers 4 when power is restored after the earthquake detection.
[0050] The state control unit 241 controls one or more predetermined branch breakers 4 out of the multiple branch breakers 4 when power is restored after the power outage detection unit 23 detects a power outage. For example, the one or more predetermined branch breakers 4 are branch breakers 4 that were in the on state when the power outage was detected by the power outage detection unit 23. The state control unit 241 may control all branch breakers 4 when power is restored after the power outage detection unit 23 detects a power outage.
[0051] When power is restored after the overcurrent detection unit 32 detects an overcurrent, the state control unit 241 sequentially controls one or more branch breakers 4 that are candidates for control among the multiple branch breakers 4 to be in the on state for a predetermined period of time. Here, the predetermined period of time is, for example, several tens of μsec.
[0052] For example, the state control unit 241 sets each of the branch breakers 4 as a control target candidate, and sequentially controls each of the control target candidates to be in an on state for a predetermined period. When the short circuit detection unit 242 does not detect a short circuit in the control target candidate (branch breaker 4) controlled to be in an on state for a predetermined period, the state control unit 241 controls the control target candidate controlled to be in an on state for a predetermined period as a control target to maintain the on state in a connected state. At this time, the state control unit 241 outputs an on instruction signal to the branch breaker 4 as the control target, controls the switch SW, and controls the connection state to be in an on state. When the short circuit detection unit 242 detects a short circuit in the control target candidate (branch breaker 4) controlled to be in an on state for a predetermined period, the state control unit 241 controls the control target candidate controlled to be in an on state for a predetermined period to be not a control target, and to set the connection state to an off state. At this time, the state control unit 241 outputs an OFF instruction signal to the branch breaker 4 to be controlled, thereby controlling the switch SW so that the connection state becomes OFF. Note that the state control unit 241 may set, as candidates for control targets, one or more branch breakers 4 that were ON when the overcurrent detection unit 32 detected an overcurrent among the multiple branch breakers 4.
[0053] Moreover, the state control unit 241 determines the start timing of the predetermined period based on the voltage signal received from the voltage detection unit 44. The state control unit 241 monitors the phase of the AC voltage based on the voltage signal output by the voltage detection unit 44. The state control unit 241 sets the start timing of the predetermined period to a timing other than when the phase of the AC voltage is 0 degrees, 90 degrees, 180 degrees, and 360 degrees. For example, the start timing of the predetermined period is set within a phase range of the AC voltage in which the load current I1 in the predetermined period does not become too large and in which the occurrence or non-occurrence of a short circuit can be accurately determined. Specifically, the start timing of the predetermined period is set within a phase range of the AC voltage from 30 degrees to 60 degrees.
[0054] When the leakage current detection unit 31 detects leakage current, the state control unit 241 identifies an abnormal branch breaker in which leakage current occurs among the plurality of branch breakers 4. When power is restored, the state control unit 241 sets a branch breaker 4 other than the abnormal branch breaker among the plurality of branch breakers 4 as a control target. Specifically, the state control unit 241 sequentially controls one or more branch breakers 4 that are candidates for control targets among the plurality of branch breakers 4 to be in the ON state. The state control unit 241 identifies a branch breaker 4 that is a control target candidate controlled to be in the ON state when the leakage current detection unit 31 detects leakage current as an abnormal branch breaker. For example, the state control unit 241 sets all of the plurality of branch breakers 4 as control target candidates, and sequentially controls them to be in the ON state. The state control unit 241 identifies a branch breaker 4 that is a control target candidate controlled to be in the ON state when the leakage current detection unit 31 detects leakage current as an abnormal branch breaker.
[0055] When an abnormal branch breaker is identified, the leakage current detection unit 31 detects a leakage current, and the contact unit 3a of the main breaker 3 is opened. That is, when an abnormal branch breaker is identified, each of the multiple branch breakers 4 is turned off again. Therefore, the state control unit 241 sequentially controls one or more branch breakers 4 that are candidates for control to be turned on. At this time, the state control unit 241 does not turn on the branch breaker 4 that is a candidate for control and that has been identified as an abnormal branch breaker. That is, the state control unit 241 turns off the branch breaker 4 that is a candidate for control and that has been identified as an abnormal branch breaker.
[0056] When controlling the branch breakers 4 to be controlled to be sequentially turned on, the state control unit 241 sequentially switches the connection state from the off state to the on state, starting from the branch breaker 4 with the least power consumption among the one or more branch breakers 4 to be controlled. For example, the state control unit 241 determines the order in which the connection state of the one or more branch breakers 4 to be controlled is switched from the off state to the on state, based on the load information stored in the load information storage unit 212. That is, the state control unit 241 determines the order in which the connection state of the one or more branch breakers 4 to be controlled is switched from the off state to the on state, based on the power consumption of the load LD included in the load information stored in the load information storage unit 212.
[0057] The short circuit detector 242 detects a short circuit between the plurality of branch breakers 4 and the connected load LD.
[0058] The short circuit detection unit 242 detects whether or not a short circuit has occurred based on the waveform of the load current I1 detected by the current detection unit 43 when the state control unit 241 controls the branch breaker 4, which is a candidate for control, to be turned on for a specified period of time.
[0059] For example, the short circuit detection unit 242 preferably includes a learning model created by machine learning such as deep learning using a large number of waveform data of the load current I1 as teacher data. The learning model is constructed by deep learning using, for example, a convolutional neural network (CNN) or a fully convolutional network (FCN). The learning model receives the waveform data of the load current I1 and detects the presence or absence of a short circuit. The algorithm executed by the short circuit detection unit 242 is not limited to a specific algorithm. The learning model may be a model using other algorithms such as multiple regression analysis and a support vector machine. The short circuit detection unit 242 detects the occurrence of a short circuit if the waveform of the load current I1 in a predetermined period is not an allowable waveform (or is not an allowable waveform). The short circuit detection unit 242 detects the absence of a short circuit if the waveform of the load current I1 in a predetermined period is an allowable waveform (or is not an allowable waveform).
[0060] The short circuit detection unit 242 may also detect the presence or absence of a short circuit based on the rate of increase (amount of increase per unit time) of the load current I1 in a predetermined period. The short circuit detection unit 242 detects that a short circuit has occurred if the rate of increase of the load current I1 in the predetermined period is equal to or greater than a first threshold. The short circuit detection unit 242 detects that a short circuit has not occurred if the rate of increase of the load current I1 in the predetermined period is less than the first threshold.
[0061] The short circuit detection unit 242 may also detect the presence or absence of a short circuit based on the absolute value of the load current I1 in a predetermined period. The short circuit detection unit 242 detects that a short circuit has occurred if the absolute value of the load current I1 in the predetermined period is equal to or greater than a second threshold. The short circuit detection unit 242 detects that a short circuit has not occurred if the absolute value of the load current I1 in the predetermined period remains less than the second threshold.
[0062] (3) Operation The operation of the control device 20 will be described below with reference to FIGS.
[0063] (3.1) Overall Operation Here, the overall operation of the control device 20 will be described with reference to FIG.
[0064] The state control unit 241 judges whether the anomaly detection unit 5 has detected an anomaly (step S1). The state control unit 241 judges whether at least one of the detection units among the electric leakage detection unit 31, the overcurrent detection unit 32, the earthquake detection unit 22, and the power outage detection unit 23 has detected an anomaly. For example, the state control unit 241 judges that an electric leakage has been detected when the detection result from the electric leakage detection unit 31 indicates that an electric leakage has been detected. The state control unit 241 judges that an overcurrent has been detected when the detection result from the overcurrent detection unit 32 indicates that an overcurrent has been detected. The state control unit 241 judges that an earthquake has been detected when the earthquake detection unit 22 included in the control device 20 detects an earthquake. The state control unit 241 judges that a power outage has been detected when the power outage detection unit 23 included in the control device 20 detects a power outage.
[0065] When the state control unit 241 determines that the abnormality detection unit 5 has not detected an abnormality ("No" in step S1), the process returns to step S1.
[0066] When it is determined that the abnormality detection unit 5 has detected an abnormality ("Yes" in step S1), the state control unit 241 determines whether or not power restoration has started (step S2).
[0067] If the state control unit 241 determines that power restoration has not started ("No" in step S2), the process returns to step S2.
[0068] When it is determined that power restoration has started ("Yes" in step S2), the state control unit 241 determines whether the detected abnormality is an earthquake or a power outage (step S3).
[0069] When it is determined that the detected abnormality is an earthquake or a power outage ("Yes" in step S3), the state control unit 241 performs a first power restoration process (step S4).
[0070] When it is determined that the detected abnormality is neither an earthquake nor a power outage ("No" in step S3), the state control unit 241 determines whether the detected abnormality is an overcurrent (step S5).
[0071] When it is determined that the detected abnormality is an overcurrent ("Yes" in step S5), the state control unit 241 performs a second power restoration process (step S6).
[0072] When it is determined that the detected abnormality is not an overcurrent, that is, a leakage current ("No" in step S5), the state control unit 241 performs a third power restoration process (step S7).
[0073] (3.2) First power restoration process Here, the first power restoration process will be described with reference to FIG.
[0074] The state control unit 241 acquires state information of each of the plurality of branch breakers 4 when an abnormality (earthquake or power outage) is detected from the state information storage unit 211 (step S51).
[0075] The state control unit 241 acquires the load information of each of the plurality of branch breakers 4 from the load information storage unit 212 (step S52).
[0076] Based on the status information and load information of each of the multiple branch breakers 4, one or more branch breakers 4 that were on when the abnormality was detected are designated as control objects, and the branch breakers 4 are controlled so that they are turned on in order starting from the control object (branch breaker 4) with the least power consumption (step S53).
[0077] (3.3) Second power restoration process Here, the second power restoration process will be described with reference to FIG.
[0078] The state control unit 241 selects one of the control target candidates from one or more branch breakers 4 that are control target candidates (step S101). For example, the state control unit 241 sets each of the multiple branch breakers 4 as a control target candidate, and selects one of the multiple control target candidates.
[0079] The state control unit 241 controls the branch breaker 4, which is the selected candidate for control, to be in the ON state for a predetermined period (step S102).
[0080] The state control unit 241 judges whether or not the short circuit detection unit 242 has detected a short circuit in the control target candidate (branch breaker 4) that has been controlled to be in the on state for a predetermined period of time (step S103).
[0081] If the short circuit detection unit 242 determines that a short circuit has been detected in the control object candidate (branch breaker 4) ("Yes" in step S103), the state control unit 241 controls the control object candidate to set the connection state of the control object candidate to the off state, assuming that the control object candidate is not a control object (step S104).
[0082] If the short circuit detection unit 242 determines that no short circuit is detected in the control object candidate (branch breaker 4) ("No" in step S103), the state control unit 241 controls the control object candidate as a control object to maintain the control object candidate in a connected state and an on state (step S105).
[0083] The state control unit 241 judges whether or not all the control object candidates have been selected (step S106).
[0084] When the state control unit 241 determines that all the control object candidates have been selected ("Yes" in step S106), the process ends.
[0085] If the state control unit 241 determines that all the control object candidates have not been selected ("No" in step S106), the process returns to step S101. After that, steps S101 to S106 are repeated until all the control objects have been selected.
[0086] (3.4) Third power restoration process Here, the third power restoration process will be described with reference to FIG.
[0087] The state control unit 241 selects one of the control target candidates from one or more branch breakers 4 that are control target candidates (step S151). For example, the state control unit 241 sets each of the multiple branch breakers 4 as a control target candidate, and selects one of the multiple control target candidates.
[0088] It is determined whether the selected control target candidate has been identified as an abnormal branch breaker (step S152).
[0089] When it is determined that the control target candidate is identified as the abnormal branch breaker ("Yes" in step S152), the state control unit 241 controls the branch breaker 4, which is the abnormal branch breaker, to be turned off (step S153).
[0090] When it is determined that the control target candidate has not been identified as an abnormal branch breaker ("No" in step S152), the state control unit 241 controls the branch breaker 4, which is the control target candidate, to be in the ON state (step S154).
[0091] After controlling the branch breaker 4 that is a candidate for control to be turned on, the state control unit 241 determines whether or not the leakage current detection unit 31 has detected a leakage current (step S155).
[0092] When it is determined that the leakage current detection unit 31 has detected a leakage current ("Yes" in step S155), the state control unit 241 identifies the branch breaker 4, which is a candidate for control and which is controlled to be in the ON state when the leakage current detection unit 31 detects a leakage current, as an abnormal branch breaker (step S156). Then, the process returns to step S151. At this time, each of the branch breakers 4 is in the OFF state again, so that all of the one or more branch breakers 4, which are candidates for control, are in the unselected state, and steps S151 and after are executed.
[0093] After step S153 is executed, or if the leakage current detection unit 31 determines that no leakage current is detected ("No" in step S155), the state control unit 241 determines whether or not all control target candidates have been selected (step S157).
[0094] When the state control unit 241 determines that all the control object candidates have been selected ("Yes" in step S157), the process ends.
[0095] If the state control unit 241 determines that all the control object candidates have not been selected ("No" in step S157), the process returns to step S151. After that, steps S101 to S106 are repeated until all the control objects have been selected.
[0096] (4) Advantages As described above, the distribution board 1 of the present embodiment includes the main breaker 3, the branch breakers 4, the abnormality detection unit 5, and the state control unit 241. The main breaker 3 is supplied with power from the outside (for example, the power system PS). The branch breakers 4 are supplied with power from the main breaker 3 and supply the power to the loads LD electrically connected thereto. The abnormality detection unit 5 detects abnormalities related to the power supply. The state control unit 241 controls the connection state of the branch breakers 4 so as to switch between an ON state in which the loads LD are electrically connected to each other and an OFF state in which the loads LD are not electrically connected to each other. At the time of power recovery when the power supply is started after the power supply via the main breaker 3 is stopped due to the abnormality detection unit 5 detecting an abnormality, the connection state of the branch breakers 4 is OFF.
[0097] This configuration can suppress troubles when power is restored. For example, if the connection state of the branch breaker 4 is in the ON state when power is restored, the supply of power starts at the same time as power is restored. Therefore, if the cause of the abnormality is in the branch breaker 4, or if the branch breaker 4 is experiencing trouble due to the occurrence of an abnormality, the possibility of trouble occurring increases if the supply of power starts at the same time as power is restored. Therefore, by keeping the connection states of the multiple branch breakers 4 in the OFF state when power is restored, the supply of power to the multiple branch breakers 4 does not start at the same time as power is restored. As a result, troubles when power is restored can be suppressed.
[0098] (5) Variations The following are examples of modified examples. The modified examples described below can be applied in appropriate combination with the above-described embodiment.
[0099] (5.1) Variation 1 In the embodiment, the earthquake detection unit 22 and the power outage detection unit 23 are configured to be provided in the control device 20, but the present invention is not limited to this configuration.
[0100] At least one of the earthquake detection unit 22 and the power outage detection unit 23 described above may be provided in the main breaker 3. When the earthquake detection unit 22 is provided in the main breaker 3, the detection result by the earthquake detection unit 22 is output to the control device 20 via the communication line W2. When the power outage detection unit 23 is provided in the main breaker 3, the detection result by the power outage detection unit 23 is output to the control device 20 via the communication line W2.
[0101] Alternatively, at least one of the earthquake detection unit 22 and the power outage detection unit 23 may be provided separately from the main breaker 3, the branch breakers 4, and the control device 20. When the earthquake detection unit 22 is provided in a device (separate device) separate from the main breaker 3, the branch breakers 4, and the control device 20, the detection result by the earthquake detection unit 22 is output to the control device 20 via a communication line connecting the separate device and the control device 20. When the power outage detection unit 23 is provided in a device (separate device) separate from the main breaker 3, the branch breakers 4, and the control device 20, the detection result by the power outage detection unit 23 is output to the control device 20 via a communication line connecting the separate device and the control device 20.
[0102] (5.2) Variation 2 In the embodiment, the earth leakage detection unit 31 and the overcurrent detection unit 32 are configured to be provided in the main breaker 3, but the present invention is not limited to this configuration.
[0103] At least one of the above-mentioned earth leakage detection unit 31 and overcurrent detection unit 32 may be provided in the control device 20.
[0104] Alternatively, at least one of the earth leakage detection unit 31 and the overcurrent detection unit 32 may be provided separately from the main breaker 3, the branch breakers 4, and the control device 20. When the earth leakage detection unit 31 is provided in a device (separate device) separate from the main breaker 3, the branch breakers 4, and the control device 20, the detection result by the earth leakage detection unit 31 is output to the control device 20 via a communication line connecting the separate device and the control device 20. When the overcurrent detection unit 32 is provided in a device (separate device) separate from the main breaker 3, the branch breakers 4, and the control device 20, the detection result by the overcurrent detection unit 32 is output to the control device 20 via a communication line connecting the separate device and the control device 20.
[0105] (5.3) Variation 3 In the embodiment, the short circuit detection unit 242 is configured to be included in the control device 20 (the control unit 24 thereof), but is not limited to this configuration.
[0106] The control unit 41 of each of the multiple branch breakers 4 may have a short circuit detection unit 242. In this case, the short circuit detection unit 242 of the third modification detects the presence or absence of a short circuit based on the waveform of the load current I1 detected by the current detection unit 43 of the branch breaker 4. The short circuit detection unit 242 of the third modification outputs the detection result to the control device 20 via the communication line W1.
[0107] In addition, if the control unit 41 of the branch breaker 4 has a short circuit detection unit 242, the control unit 41 may determine the start timing for turning on the switch SW for a specified period based on the voltage signal that is the detection result of the voltage detection unit 44.
[0108] (5.4) Variation 4 In the embodiment, when power is restored after detecting an overcurrent, the presence or absence of a short circuit is detected based on the waveform of the load current I1 in the branch breaker 4 obtained by the operation of the switch SW for a predetermined period. However, the present invention is not limited to this configuration.
[0109] When the state control unit 241 of the control device 20 controls one or more branch breakers 4 to be controlled to be turned on in sequence, the overcurrent detection unit 32 of the main breaker 3 may detect an overcurrent. In this case, the state control unit 241 determines that a short circuit has occurred in the branch breaker 4 that has been controlled to be turned on when the overcurrent detection unit 32 detects an overcurrent, and controls the branch breaker 4 to be turned off.
[0110] (5.5) Variation 5 In the embodiment, the predetermined period during which the candidate control device is turned on when power is restored after an overcurrent is detected is set to several tens of μsec as an example, but is not limited to this.
[0111] For example, the predetermined period may be a period corresponding to, for example, two cycles of the AC voltage. The period corresponding to two cycles is, for example, 40 or 33.3 msec. In this case, if the controlled object candidate (branch breaker 4) controlled to have its connection state in the ON state detects an overcurrent (short circuit) before the predetermined period (two cycles) has elapsed, the branch electric circuit L2 is interrupted and the switch SW is turned OFF. Therefore, the state control unit 241 detects the presence or absence of a short circuit based on the waveform of the load current I1 during the predetermined period of the controlled object candidate (branch breaker 4) controlled to have its connection state in the ON state, and identifies the controlled object candidate (branch breaker 4) in which a short circuit has occurred. Alternatively, the state control unit 241 detects the presence or absence of a short circuit by detecting that the controlled object candidate (branch breaker 4) controlled to have its connection state in the ON state has become OFF within the predetermined period, thereby detecting the presence or absence of a short circuit, and identifying the controlled object candidate (branch breaker 4) in which a short circuit has occurred.
[0112] (5.6) Variation 6 In the embodiment, the control device 20 is configured to monitor the start of power restoration, but the present invention is not limited to this configuration.
[0113] The control device 20 may receive the initiation of power restoration from another terminal, or may receive the initiation through a user operation.
[0114] (5.7) Variation 7 In the embodiment, the load information includes the power consumption of the load LD, but is not limited to this.
[0115] The load information may be the current consumption of the load LD. Since the voltage of the power supplied from the power system PS is constant, the power consumption depends on the current. Therefore, the state control unit 241 controls the branch breakers 4 so that the control targets (branch breakers 4) with the smallest current consumption are sequentially turned on for one or more branch breakers 4 as the control targets, thereby making it possible to sequentially turn on the control targets with the smallest power consumption.
[0116] (5.8) Variation 8 Power restoration is not limited to the resumption of power supply from a commercial power source as the power system PS. For example, power restoration also includes a case where power supply is started from a distributed power source such as a solar power generation facility or a hydroelectric power generation facility after the abnormality detection unit 5 detects an abnormality and the main electric circuit L1 is cut off. In other words, power restoration refers to the start of power supply after the power supply via the main breaker 3 is stopped due to the abnormality detection unit 5 detecting an abnormality.
[0117] (5.9) Variation 9 In the embodiment, the branch breaker 4 is configured to include a semiconductor switch as the switch SW, but is not limited to this configuration.
[0118] The switch SW included in the branch breaker 4 may be any switch configured to be able to switch between an on state and an off state in response to a signal, and may be, for example, a power relay.
[0119] (summary) As described above, the distribution board (1) according to the first embodiment includes a main breaker (3), a plurality of branch breakers (4), an abnormality detection unit (5), and a state control unit (241). The main breaker (3) is supplied with power from the outside (for example, a power system PS). The plurality of branch breakers (4) are supplied with power from the main breaker (3) and supply the power to an electrically connected load (LD). The abnormality detection unit (5) detects an abnormality related to the power supply. The state control unit (241) controls the connection state of the plurality of branch breakers (4) so as to switch between an ON state in which the load (LD) is electrically connected and an OFF state in which the load (LD) is not electrically connected. At the time of power restoration when the power supply is started after the power supply via the main breaker (3) is stopped due to the detection of an abnormality by the abnormality detection unit (5), the connection state of the plurality of branch breakers (4) is OFF.
[0120] According to this embodiment, troubles when power is restored can be suppressed. For example, if the connection state of the branch breaker (4) is in the ON state when power is restored, the supply of power starts at the same time as power is restored. Therefore, if the cause of the abnormality is in the branch breaker (4) or if a trouble has occurred in the branch breaker (4) due to the occurrence of an abnormality, the possibility of trouble occurring increases if the supply of power starts at the same time as power is restored. Therefore, by keeping the connection states of the multiple branch breakers (4) in the OFF state when power is restored, the supply of power to the multiple branch breakers (4) does not start at the same time as power is restored. As a result, troubles when power is restored can be suppressed.
[0121] In the distribution board (1) according to the second aspect, in the first aspect, when power is restored, the state control unit (241) sequentially controls the connection state of one or more branch breakers (4) that are to be controlled to be switched from an OFF state to an ON state among the multiple branch breakers (4) to be switched ON.
[0122] According to this embodiment, one or more branch breakers (4) to be controlled are sequentially controlled to turn on the connection state, so that the voltage drop is smaller than when they are all controlled to turn on at once, and therefore troubles when power is restored can be suppressed.
[0123] The distribution board (1) according to the third aspect is the same as that of the second aspect, and further includes a status information storage unit (211). The status information storage unit (211) stores, for each of the plurality of branch breakers (4), status information indicating a connection state of the branch breaker. When power is restored, the status control unit (241) controls one or more branch breakers (4) that were in an on state when the abnormality was detected among the plurality of branch breakers (4) based on the connection state indicated by the status information of each of the plurality of branch breakers (4) stored in the status information storage unit.
[0124] According to this embodiment, it is possible to restore the connection state of the plurality of branch breakers (4) at the time of abnormality detection.
[0125] In the distribution board (1) according to the fourth aspect, in the second or third aspect, the abnormality detection unit (5) includes an earthquake detection unit (22) that detects an earthquake. When power is restored after the earthquake detection unit (22) detects an earthquake, the state control unit (241) controls one or more predetermined branch breakers (4) among the multiple branch breakers (4).
[0126] According to this embodiment, when power is restored after an earthquake occurs, the connection state of the plurality of branch breakers (4) can be restored to the state it was in when the abnormality was detected.
[0127] In the distribution board (1) according to the fifth aspect, in any one of the second to fourth aspects, the abnormality detection unit (5) includes a power outage detection unit (23) that detects a power outage. When power is restored after the power outage detection unit (23) detects a power outage, the state control unit (241) controls one or more predetermined branch breakers (4) among the multiple branch breakers (4).
[0128] According to this embodiment, when power is restored after a power outage occurs, the connection state of the plurality of branch breakers (4) can be restored to the state it was in when the abnormality was detected.
[0129] The distribution board (1) according to a sixth aspect is in any one of the second to fifth aspects, and further includes a short circuit detection unit (242). The short circuit detection unit (242) detects a short circuit between the plurality of branch breakers (4) and a connected load (LD). The abnormality detection unit (5) includes an overcurrent detection unit (32) that detects an overcurrent. When power is restored after the overcurrent detection unit (32) detects an overcurrent, the state control unit (241) sequentially controls one or more branch breakers that are candidates for control objects among the plurality of branch breakers (4) to be in an on state for a predetermined period. When the short circuit detection unit (242) does not detect a short circuit for the predetermined period, the state control unit (241) maintains the on state of the candidate for control objects, which has been controlled to be in an on state for the predetermined period, as a control object in a connected state. When the short circuit detection unit (242) detects a short circuit during a predetermined period, the state control unit (241) determines that the control target candidate that has been controlled to be in the on state during the predetermined period is not a control target and sets the connection state to the off state.
[0130] According to this embodiment, the branch breaker (4) in which a short circuit has occurred is not the subject of control, so that troubles when power is restored can be suppressed.
[0131] In a distribution board (1) according to a seventh aspect, in any one of the second to sixth aspects, the abnormality detection unit (5) includes an electric leakage detection unit (31) that detects an electric leakage. When the electric leakage detection unit (31) detects an electric leakage, the state control unit (241) identifies an abnormal branch breaker in which an electric leakage occurs among the plurality of branch breakers. When power is restored, the state control unit (241) controls a branch breaker other than the abnormal branch breaker among the plurality of branch breakers.
[0132] According to this embodiment, the branch breaker (4) in which a ground leak is occurring is not the subject of control, so that troubles when power is restored can be suppressed.
[0133] In the distribution board (1) according to the eighth aspect, in the seventh aspect, the state control unit (241) sequentially controls one or more branch breakers (4) that are candidates for control among the multiple branch breakers (4) to be turned on, and identifies the branch breaker (4) that is the candidate for control that is controlled to be turned on when the leakage current detection unit (31) detects a leakage current as an abnormal branch breaker.
[0134] According to this embodiment, by sequentially controlling one or more branch breakers (4) that are candidate for control to be turned on, it is possible to identify the branch breaker (4) in which a leakage current is occurring.
[0135] In the distribution board (1) according to the ninth aspect, in any of the second to eighth aspects, the state control unit (241) switches the connection state from the OFF state to the ON state in sequence, starting from the branch breaker with the least power consumption among one or more branch breakers to be controlled.
[0136] According to this embodiment, the one or more branch breakers (4) to be controlled are sequentially controlled to be turned on starting from the branch breaker (4) with the least power consumption, so that the priority of turning on a load (LD) that consumes a lot of power, such as a heater, and is likely to cause trouble, can be lowered. In other words, the load (LD) that is less likely to cause trouble can be turned on preferentially.
[0137] The distribution board (1) according to the tenth aspect is the same as the ninth aspect, and further includes a load information storage unit (212). The load information storage unit (212) stores, for each of the multiple branch breakers (4), load information related to power consumption of a load (LD) connected to the branch breaker (4). The state control unit (241) determines, based on the load information stored in the load information storage unit (212), an order for switching the connection state of one or more branch breakers (4) to be controlled from an OFF state to an ON state.
[0138] According to this embodiment, the order in which the connection state is switched from the OFF state to the ON state can be determined using the load information.
[0139] In a distribution board (1) according to an eleventh aspect, in any one of the second to tenth aspects, the plurality of branch breakers (4) have switches (SW) for switching between electrical connection and disconnection between the main breaker (3) and the load (LD). When power is restored, the state control unit (241) controls the switch (SW) of the branch breaker (4) to be controlled, thereby switching the connection state from an off state to an on state.
[0140] According to this embodiment, electrical individual control can be performed. [Explanation of symbols]
[0141] 1 Distribution board 3 Main breaker 4-branch breaker 5. Anomaly detection section 22 Earthquake detection section 23 Power outage detection unit 31 Earth leakage detection section 32 Overcurrent detection section 211 Status information storage unit 212 Load information storage unit 241 State control section 242 Short circuit detection unit LD load PS power system SW Switch
Claims
1. A main breaker to which power is supplied from an external source; a plurality of branch breakers each receiving the power from the main breaker and supplying the power to an electrically connected load; an abnormality detection unit that detects an abnormality related to the power supply or an abnormality related to an installation environment; a state control unit that controls a connection state of the plurality of branch breakers so as to switch between an ON state in which the plurality of branch breakers are electrically connected to the load and an OFF state in which the plurality of branch breakers are not electrically connected to the load, When the abnormality detection unit detects the abnormality and the power supply via the main breaker is stopped and then restarted, the connection states of the branch breakers are in the off state. Distribution board.
2. the state control unit sequentially controls, at the time of power recovery, one or more branch breakers that are to be controlled to be switched from the off state to the on state among the plurality of branch breakers so that the connection state becomes the on state. The distribution board according to claim 1 .
3. a state information storage unit configured to store state information representing the connection state of each of the plurality of branch breakers, The state control unit, at the time of power recovery, identifies, as the control target, one or more branch breakers that were in the on state when the abnormality was detected among the plurality of branch breakers, based on the connection state represented by the state information of each of the plurality of branch breakers stored in the state information storage unit. The distribution board according to claim 2.
4. The abnormality detection unit includes an earthquake detection unit that detects an earthquake, The state control unit sets one or more predetermined branch breakers among the plurality of branch breakers as the control targets at the time of power restoration after the detection of the earthquake by the earthquake detection unit. The distribution board according to claim 2 or 3.
5. The abnormality detection unit includes a power outage detection unit that detects a power outage, The state control unit sets one or more predetermined branch breakers among the plurality of branch breakers as the control targets at the time of power restoration after the power outage detection unit detects the power outage, The distribution board according to claim 2 or 3.
6. The plurality of branch breakers further includes a short circuit detection unit that detects a short circuit between the plurality of branch breakers and the loads connected thereto, the abnormality detection unit includes an overcurrent detection unit that detects an overcurrent, The state control unit is When power is restored after the overcurrent detection unit detects the overcurrent, one or more branch breakers that are candidates for control among the plurality of branch breakers are sequentially controlled to be in the on state for a predetermined period of time; When the short circuit detection unit does not detect the short circuit during the predetermined period, the control object candidate that has been controlled to be in the on state during the predetermined period is set as the control object in the connected state, and the on state is maintained; When the short circuit detection unit detects the short circuit during the predetermined period, the control target candidate that has been controlled to be in the ON state during the predetermined period is determined not to be a control target and the connection state is changed to the OFF state. The distribution board according to claim 2 or 3.
7. The abnormality detection unit includes a leakage current detection unit that detects a leakage current, The state control unit is When the leakage current detection unit detects the leakage current, the abnormal branch breaker in which the leakage current occurs is identified among the plurality of branch breakers, At the time of power recovery, a branch breaker other than the abnormal branch breaker among the plurality of branch breakers is set as the control target. The distribution board according to claim 2 or 3.
8. The state control unit is sequentially controlling one or more branch breakers that are candidates for control among the plurality of branch breakers to be in the on state, and identifying the branch breaker that is the candidate for control and that is controlled to be in the on state when the leakage current detection unit detects the leakage current as the abnormal branch breaker; The distribution board according to claim 7.
9. the state control unit switches the connection state from the off state to the on state in sequence, starting from a branch breaker having less power consumption among the one or more branch breakers to be controlled; The distribution board according to claim 2 or 3.
10. a load information storage unit configured to store, for each of the plurality of branch breakers, load information related to power consumption of the load connected to the corresponding branch breaker; the state control unit determines an order of switching the connection states of the one or more branch breakers to be controlled from the off state to the on state based on the load information stored in the load information storage unit. The distribution board according to claim 9.
11. The plurality of branch breakers each have a switch for switching between electrical connection and disconnection between the main breaker and the load, The state control unit controls the switch of the branch breaker to be controlled at the time of power recovery to switch the connection state from the off state to the on state. The distribution board according to claim 2.
Citation Information
Patent Citations
Shutoff system, breaker, distribution board, shutoff method, and program
JP2022053304A
