Work device for tunnel construction and tunnel construction method
The working device with a rail, base, boom, and manipulator addresses the challenges of wire mesh installation in tunnel construction by enabling efficient and automated placement on uneven surfaces, reducing accident risks and enhancing efficiency.
Patent Information
- Application Number
- JP2023067471
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-29
- Publication Date
- 2024-10-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing tunnel construction methods face challenges in efficiently installing wire mesh due to the risk of accidents, difficulty in automating the process, and interference of wire mesh ends with tunnel walls, especially when dealing with uneven surfaces.
A working device equipped with a rail, base, boom, and manipulator with a rotating clamp, allowing for precise manipulation and installation of wire mesh, reducing the need for manual labor and enhancing automation.
The device enables efficient wire mesh installation even on uneven tunnel walls, reducing accident risks and increasing work efficiency by allowing for automated and precise placement of wire mesh without manual intervention.
Smart Images

Figure 2024143950000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a working device for tunnel construction and a tunnel construction method. [Background technology]
[0002] Conventionally, in tunnel construction using the New Alpine Tunneling Method (NATM), a work device for tunnel construction such as that shown in Patent Document 1 is used to perform the work of erecting supports, installing wire mesh, and spraying concrete.
[0003] The working equipment for this tunnel construction is equipped with an erector device, a basket device, and a spraying device. The erector device is used for erecting the shoring work, the basket device is used as a lift and a work scaffold that moves from side to side for workers to install wire mesh and other incidental work, and the spraying device is used for spraying concrete twice, when the tunnel wall surface is at the natural ground stage, and after erecting the shoring and installing the wire mesh. When the tunnel has a large cross section, the specifications are changed to accommodate this, such as by installing two basket devices.
[0004] Recently, in the construction industry, in order to deal with the shortage of skilled workers and the problem of preventing industrial accidents, various construction methods, construction machines (work equipment), systems, etc. are being developed to reduce the number of people and labor required for construction. For this reason, companies are also developing remote control and automation technology for each task, such as erecting shoring and spraying concrete, for the work equipment used in tunnel construction.
[0005] However, installing the wire mesh requires workers to get into a basket and move around while approaching the tunnel wall, which poses a high risk of disaster. However, the task is complicated, as it involves placing the ends of the wire mesh between the support structure and the tunnel wall (ground), and tying and connecting the wire mesh, making it difficult to do the work remotely or automate.
[0006] In light of this situation, Patent Document 2 proposes a method of attaching wire mesh to shoring in advance to form a unit, so that installation of the wire mesh and erection of the shoring, which were previously separate tasks, can be carried out simultaneously.
[0007] However, when excavating before the construction of the shoring, the space between the shoring and the tunnel wall (ground) and the overexcavation are made as small as possible, and excavated right up to the outer edge of the arch-shaped shoring so that the sprayed material will not get caught in the concrete when it is sprayed later, i.e., the amount of material sprayed needs to be kept as small as possible.This means that the shape of the shoring does not follow the unevenness of the tunnel wall (ground) (including the protruding parts of the ground, so-called ``knobs''), and it becomes blocked, making it difficult to erect the shoring even under normal circumstances.
[0008] Therefore, when erecting supports with wire mesh, there is a problem that the protruding ends of the wire mesh interfere with the tunnel walls, making work even more difficult. [Prior art documents] [Patent documents]
[0009] [Patent Document 1] Japanese Patent Application Publication No. 7-217392 [Patent Document 2] JP 2020-26695 A Summary of the Invention [Problem to be solved by the invention]
[0010] The present invention has been made in consideration of the above circumstances, and aims to provide a working device for tunnel construction and a tunnel construction method that can improve the efficiency of wire mesh installation work. [Means for solving the problem]
[0011] The invention of claim 1 relates to a working device for tunnel construction, which has a rail attached to the upper end of a carriage body, a base attached to the rail, a boom attached to the base, the boom having a multi-stage telescopic structure, an arm attached to the tip of the boom, a manipulator having a rotating clamp attached to the arm, an erector device, and a spraying device.
[0012] The invention of claim 2 comprises a tunneling method comprising the steps of loading a wire mesh, the shape of which has been changed by a manipulator having a rotating clamp, onto a work device for tunneling construction, transporting the wire mesh with the work device for tunneling construction, and inserting an end of the wire mesh between the tunnel wall and a support structure using the manipulator. Effect of the Invention
[0013] According to the invention of claim 1, by using the manipulator, the rotating clamp can be moved to the desired position and can be moved back and forth, left and right, and up and down. In addition, the gripping part can be oriented in the desired direction. By using this in combination with the bracket, the work device can load, transport, and install wire mesh. In addition, since the rotating clamp is separate from the bracket, it can be used as a multi-function manipulator because it can grip various objects using only the rotating clamp.
[0014] According to the invention of claim 2, the tunnel construction work equipment can install one wire mesh per interval of shoring at a time, and even if the tunnel wall has unevenness, the wire mesh's ability to change shape makes it relatively easy to install and improves work efficiency. Also, even if there is almost no gap between the tunnel wall and the shoring, it is easy to deal with it because the protruding end of the steel wire can be pierced and inserted. Also, while workers previously had to get close to the tunnel wall by riding in a basket to work, this is no longer necessary, reducing the risk of disasters and accidents in tunnel construction. [Brief description of the drawings]
[0015] [Figure 1]1A to 1E are diagrams showing a working device for tunnel construction according to an embodiment of the present invention, in which (A) is a plan view, (B) is a side view, (C) is a plan view showing the main parts, (D) is a side view showing the main parts, and (E) is a front view showing the main parts. [Diagram 2] FIG. 2 is a diagram illustrating loading of wire mesh in a tunnel construction method according to an embodiment of the present invention. [Diagram 3] FIG. 2 is a diagram illustrating loading of wire mesh in a tunnel construction method according to an embodiment of the present invention. [Figure 4] 1A to 1C are diagrams illustrating the transportation of wire mesh in a tunnel construction method according to an embodiment of the present invention, where (A) is a plan view, (B) is a side view, and (C) is a front view. [Diagram 5] 1A to 1C are diagrams for explaining the installation of wire mesh in a tunnel construction method according to an embodiment of the present invention, where (A) is a plan view, (B) is a side view, and (C) is a front view. [Figure 6] FIG. 2 is a front view from the face side illustrating the installation of wire mesh in a tunnel construction method according to an embodiment of the present invention. [Figure 7] FIG. 2 is a front view from the face side illustrating the installation of wire mesh in a tunnel construction method according to an embodiment of the present invention. [Figure 8] FIG. 2 is a front view from the face side illustrating the installation of wire mesh in a tunnel construction method according to an embodiment of the present invention. [Figure 9] FIG. 2 is a front view from the face side illustrating the installation of wire mesh in a tunnel construction method according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0016] Hereinafter, an embodiment of a working device for tunnel construction and a tunnel construction method according to the present invention will be described.
[0017] The working device for tunnel construction according to the present invention can perform wire mesh installation work, shoring work, and concrete spraying work. Hereinafter, an embodiment will be described with reference to FIG.
[0018] Reference numeral 1 denotes the bogie body, which is a mobile vehicle device. The bogie body 1 is equipped with manipulators 18, 180, erector devices 19, 190, and a spraying device 28. As shown in FIG. 1(A) and FIG. 1(B), the left side is the front of the vehicle body, which is the direction of travel, and the right side is the rear of the vehicle body. The bogie body 1 is equipped with four outriggers (not shown), which can be used to maintain the stability of the vehicle body during wire mesh installation work according to an embodiment of the present invention.
[0019] Next, an embodiment of the manipulator 18 will be described.
[0020] Reference numeral 2 denotes a rail, which is provided at the upper right end when viewed from the front side in the traveling direction of the bogie 1 (the left side in Figs. 1(A) and (B)).
[0021] Reference numeral 3 denotes a base which is attached to the rail 2 and moves along the rail 2 .
[0022] Numeral 4 denotes a boom, which is attached to the base 3 and is adapted to swing up and down and rotate left and right by hydraulic cylinders (not shown) installed on each of the booms, with the base 3 as a fulcrum. The boom 4 has a multi-stage telescope structure, and can be extended and retracted by hydraulic cylinders (not shown) installed on each stage.
[0023] Reference numeral 5 denotes an arm which is attached to the tip of the boom 4 and which swings up and down and vertically by a hydraulic cylinder (not shown).
[0024] Reference numeral 7 denotes a rotating clamp, which is composed of a connecting portion 6, a rotating portion 8 and a gripping portion 9.
[0025] The connecting portion 6 is attached to the tip of the arm 5, and is adapted to swing left and right by a hydraulic cylinder (not shown) and a link portion 16.
[0026] The rotating part 8 is attached to the tip of the connecting part 6, and is rotated by a hydraulic motor (not shown).
[0027] The gripping part 9 is composed of a pair of rods 82 with gripping claws 81 attached to the tips thereof, and is attached to the rotating part 8. By changing the orientation of the pair of rods 82, the distance between the pair of gripping claws 81 becomes wider or narrower.
[0028] By using the manipulator 18 configured as described above, the rotating clamp 7 can be moved to the desired position and moved back and forth, left and right, and up and down. The rotating clamp 7 can rotate the gripping part 9 at any angle, so that the desired angle can be achieved.
[0029] Next, an embodiment of the manipulator 180 will be described.
[0030] Reference numeral 20 denotes a rail, which is provided at the upper end on the left side when viewed from the front in the traveling direction of the carriage body 1.
[0031] Reference numeral 30 denotes a base which is attached to the rail 20 and moves along the rail 20 .
[0032] Numeral 40 denotes a boom, which is attached to the base 30 and is adapted to swing up and down and rotate left and right by hydraulic cylinders (not shown) installed on each of the bases 30. The boom 40 has a multi-stage telescope structure and is adapted to extend and retract by hydraulic cylinders (not shown) installed on each stage.
[0033] Reference numeral 50 denotes an arm which is attached to the tip of the boom 40 and which swings up and down and vertically by a hydraulic cylinder (not shown).
[0034] Reference numeral 70 denotes a rotating clamp, which is composed of a connecting portion 60, a rotating portion 80 and a gripping portion 90.
[0035] The connecting portion 60 has the same embodiment as the connecting portion 6, and is adapted to perform left and right lateral swinging motion by a hydraulic cylinder (not shown) and a link portion 160.
[0036] The rotating part 80 has the same embodiment as the connecting part 8. The gripping part 90 has the same embodiment as the gripping part 9.
[0037] By using the manipulator 180 configured as described above, the rotating clamp 70 can be moved to the desired position and moved back and forth, left and right, and up and down. The rotating clamp 70 can rotate the gripping part 90 to any desired angle, so that the gripping part 90 can be set to the desired angle.
[0038] Next, an embodiment of the erector apparatus 19 will be described.
[0039] Reference numeral 21 denotes an erector boom, which is attached to a bracket 20 on the right side of the front end when viewed from the front side of the carriage body 1 in the direction of travel. The erector boom 21 uses the bracket 20 as a fulcrum and is capable of swinging up and down and rotating left and right by hydraulic cylinders (not shown) installed in each of the brackets.
[0040] The erector boom 21 has a multi-stage telescopic structure, and is adapted to extend and retract by hydraulic cylinders (not shown) installed in each stage.
[0041] An erector arm 22 is attached to the tip of the erector boom 21 via a link (not shown), and is adapted to swing up and down and rotate left and right by hydraulic cylinders (not shown) installed in each of them. The erector arm 22 is provided with a gripping portion 23 that grips the support 51.
[0042] Next, an embodiment of the erector apparatus 190 will be described.
[0043] Reference numeral 210 denotes an erector boom, which is attached to a bracket 200 on the left side of the front end as viewed from the front side in the traveling direction of the dolly 1, and the erector boom 210 is adapted to swing up and down vertically and rotate left and right horizontally with the bracket 200 as a fulcrum by hydraulic cylinders (not shown) respectively installed. The erector boom 210 also has a multi-stage telescope structure, and is adapted to extend and retract by hydraulic cylinders (not shown) respectively installed in each stage.
[0044] An erector arm 220 is attached to the tip of the erector boom 210 via a link (not shown), and is adapted to swing up and down and rotate left and right by hydraulic cylinders (not shown) installed in each. The erector arm 220 is provided with a gripping portion 230 that grips the support 51.
[0045] Next, an embodiment of the spray device 28 will be described.
[0046] Reference numeral 25 denotes a spray boom, which is attached to a bracket 24 at the center of the front end as viewed from the front in the traveling direction of the cart body 1, and the spray boom 25 is adapted to swing up and down vertically and turn left and right horizontally with the bracket 24 as a fulcrum by hydraulic cylinders (not shown) installed in each of the brackets 24. The spray boom 25 also has a multi-stage telescope structure, and can be extended and retracted by hydraulic cylinders (not shown) installed in each stage.
[0047] Reference numeral 26 denotes a spray arm which is attached to the tip of the spray boom 25. Each spray arm 26 is capable of swinging up and down and rotating left and right by means of an interposed hydraulic cylinder (not shown), and can change the direction of the spray nozzle 27 attached to the tip, which is the discharge outlet for the concrete material.
[0048] Next, an embodiment of the bracket 10 will be described with reference to FIGS.
[0049] Reference numeral 17 denotes a panel, which in this embodiment is an iron plate, and two ribs 11 are attached to the panel 17 as reinforcement to prevent bending. A rubber plate or ribs to prevent the wire mesh 49 from slipping may be attached to the back surface of the panel 17 to which the ribs 11 are attached.
[0050] Reference numeral 54 denotes a spacer, which is made up of two steel plates 12 with two L-shaped steel bars 13 attached thereto, and two steel plates 14 with two L-shaped steel bars 15 attached thereto. By overlapping two panels 17 with the spacer 54 in between, it is possible to provide gaps (insertion holes) into which the wire mesh 49, the gripping part 9 of the rotating clamp 7, and the gripping part 90 of the rotating clamp 70 can be inserted.
[0051] As shown in FIGS. 1(C) and 1(E), the spacer 54 has a shape that allows it to be held by the rotating clamp 7 and the rotating clamp 70 inside the gap.
[0052] With the tunnel construction work device having the above-mentioned configuration, the installation of wire mesh, which was previously performed by a worker riding in a basket, can now be performed by the work device itself.
[0053] Next, an embodiment of a tunnel construction method using a working device for tunnel construction according to the present invention will be described with reference to Figs.
[0054] First, regarding the work process of loading the wire mesh, as shown in Fig. 2, a single piece of wire mesh 49 is prepared with its short sides cut to the same length as the erection interval of the supports 51 and its long sides cut to the required length along the periphery of the tunnel, and is temporarily placed at the loading site. The wire mesh 49 has a lattice shape, and one mesh (one square) of the wire mesh 49 may be, for example, about 150 mm square. One or both sides of the end of the long side of the wire mesh 49 are formed into an edge with a steel wire protruding. The required number of wire mesh 49 with dimensions that are easy to transport may be brought to the loading site, and the wire meshes may be connected to each other on the spot to form a single piece.
[0055] Next, one bracket 10 is gripped by the rotating clamp 7, and the other bracket 10 is gripped by the rotating clamp 70. Note that the gripping of the rotating clamp 7 and the rotating clamp 70 may be performed in either order, or simultaneously.
[0056] Next, the dolly body 1 is moved to the loading position. Note that after the dolly body 1 is moved to the loading position, one bracket 10 may be gripped by the rotating clamp 7 and the other bracket 10 may be gripped by the rotating clamp 70.
[0057] Next, the end of wire mesh 49 is inserted into the gap (insertion hole) between bracket 10 held by rotating clamp 7 and wire mesh bracket 10 held by rotating clamp 70 from the edge side where the steel wire protrudes, and held therein.
[0058] Next, as shown in Figure 3, rotating clamp 7 holding bracket 10 holding wire mesh 49 is rotated clockwise when viewed from the tip side, and at the same time, rotating clamp 70 holding bracket 10 holding wire mesh 49 is rotated counterclockwise when viewed from the tip side, so that the long sides of wire mesh 49 are bent in a spiral shape with the middle arching, the right side clockwise and the left side counterclockwise, creating a shape that can be transported.
[0059] Next, regarding the work process for transporting the wire mesh, as shown in Figure 4, after bending the wire mesh 49 into a shape that can be transported, the bracket 10 holding the wire mesh 49 is held by the rotating clamp 7 and the rotating clamp 70 in a traveling position so as not to lose its shape, and the tunnel construction work equipment is moved to the working position at the face 55.
[0060] Next, regarding the work process for installing the wire mesh, as shown in Figure 5, the edge side (nearest side) of the top end of the arched shape of the wire mesh 49, where the steel wire protrudes, is inserted between the tunnel wall and the existing support structure 51 (closest to the face 55) (on the face 55 side) to fix the wire mesh 49 in place.
[0061] Next, as shown in FIG. 6, the wire mesh 49 held by the wire mesh clamp 10 gripped by the rotating clamp 7 is released.
[0062] Next, as shown in FIG. 7, the wire mesh clamp 10 that was gripped by the rotating clamp 7 is released.
[0063] Next, from the above-mentioned fixed location of the wire mesh 49, the end of the wire mesh 49 is inserted from top to bottom using a rotating clamp 7 along the periphery between the tunnel wall and the support 51 on the right side when viewed from the face side.
[0064] Next, as shown in FIG. 8, while the fixed portion of the top portion of the wire mesh 49 is being held by the rotary clamp 7, the wire mesh 49 held by the wire mesh clamp 10 gripped by the rotary clamp 70 is released.
[0065] Next, as shown in FIG. 9, the rotating clamp 10 that was gripped by the rotating clamp 70 is released.
[0066] Next, from the fixed location of the wire mesh 49, the end of the wire mesh 49 is inserted from top to bottom using a rotating clamp 70 along the periphery between the tunnel wall on the left side as viewed from the face side and the support 51.
[0067] Next, once the ends of the wire mesh 49 around the tunnel have been inserted, the erector devices 19 and 190 are used to erect the newly constructed support structure 51 so as to hold down the end of the wire mesh 49 on the face side, and then the concrete is sprayed using the spraying device 28 to finish it off.
[0068] The above-mentioned work steps are embodiments of the tunnel construction method of the present invention, but in the work step of installing the wire mesh, it is also possible to first discard the wire mesh 49 held by the wire mesh clamp 10 which is gripped by the rotating clamp 70 when installing the wire mesh 49, and then insert the wire mesh 49 from the left-hand tunnel wall when viewed from the face side. [Explanation of symbols]
[0069] 1. Cart body 2, 20 rail 3, 30 base 4, 40 Boom 5, 50 Arm 6, 60 connection part 7, 70 Rotation Clamp 8, 80 Rotating section 81 Gripping claw 82 Rod 9, 90 Grip part 10 Bracket 11 Ribs 12 boards 13 L-shaped steel 14 boards 15 L-shaped steel 16, 160 Link section Panel 17 18, 180 Manipulator 19 190 Erector device 20 200 Bracket 21 210 Erector Boom 22 220 Erector Arm 23 230 Gripping part 24 Bracket 25 Spray Boom 26 Spray Arm 27 Spray nozzle 28 Spraying equipment 49 Wire Mesh 51 Shoring 52 Tunnel wall 53 Spraying materials 54 Spacer 55 Cutting Edge
Claims
1. A work device for tunnel construction comprising: a rail provided on the upper end of a carriage body; a base attached to the rail; a boom attached to the base; the boom having a multi-stage telescopic structure; an arm attached to the tip of the boom; a manipulator having a rotating clamp attached to the arm; an erector device; and a spraying device.
2. A tunnel construction method comprising the steps of: loading a wire mesh, the shape of which has been changed by a manipulator having a rotating clamp, onto a work device for tunnel construction; transporting the wire mesh with the work device for tunnel construction; and inserting an end of the wire mesh between the tunnel wall and a support structure using the manipulator.
Citation Information
Patent Citations
Working apparatus for tunnel construction
JP1995217392A
Method and device for installing large net
JP1996082195A
Tunnel timbering installation device
JP2000160996A
Apparatus for constructing tunnel
JP2014134025A
Tunnel construction method
JP2020026695A