Application plan generation device, application plan generation method, program, and application plan generation system

The operation plan generation device optimizes non-firm power source integration into the grid by determining output patterns and costs, addressing the limitations of conventional EDC algorithms in integrating renewable energy.

JP2024145014APending Publication Date: 2024-10-15MITSUBISHI ELECTRIC CORP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023057232
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Conventional EDC algorithms fail to support the creation of operation plans that include power sources connected in a non-firm type, leading to challenges in integrating renewable energy into the grid without requiring significant infrastructure expansion.

Method used

An operation plan generation device and method that determines output patterns for power sources connected in a non-firm type, utilizing a non-firm output determining unit, EDC processing, and output pattern selection to optimize power transmission line utilization, considering power flow values, predicted generation capacity, and cost characteristics.

Benefits of technology

Enables the creation of operation plans that effectively integrate non-firm power sources into the grid, optimizing power transmission line usage and reducing costs by determining optimal output patterns based on multiple rules and cost considerations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024145014000001_ABST
    Figure 2024145014000001_ABST
Patent Text Reader

Abstract

To provide an application plan generation device capable of creating an application plan including a power supply connected in non-firm type.SOLUTION: An application plan generation device comprises: a non-firm output determination unit that determines an output pattern of a first power supply connected to a power transmission line in non-firm type for a case where each of a plurality of rules is applied; an EDC processing unit that determines the output of a second power supply connected to the power transmission line in a manner other than non-firm type using the output pattern of the first power supply determined by the non-firm output determination unit for a case where each of the plurality of rules is applied; and an output pattern selection unit that calculates a sum of a cost of the output pattern determined by the non-firm output determination unit and a cost of the output of the second power supply determined by the EDC processing unit for a case where each of a plurality of rules is applied, and selects one case from the cases where the plurality of rules are applied on the basis of the sum as an application plan.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an operation plan generating device, an operation plan generating method, a program, and an operation plan generating system. [Background technology]

[0002] In recent years, the large-scale introduction of renewable energy into power grids has progressed, and an economic load dispatching control (EDC) algorithm using the output value of power generation from renewable energy has also been developed. On the other hand, with the spread of renewable energy, a problem has arisen in which there is no available capacity on transmission lines and power sources using renewable energy cannot be connected to the grid. One possible solution to this problem is to increase the capacity of the transmission lines, but expanding the facilities requires a lot of money and time. As a method of connecting power sources using renewable energy to the grid without incurring large costs and time, a non-firm type connection that uses the available capacity of transmission lines and supplies power within the available capacity is being considered.

[0003] Furthermore, Patent Document 1 discloses a power supply and demand planning device that evaluates a power supply and demand plan created for a power system in which renewable energy power sources have been introduced. Furthermore, Patent Document 2 discloses a load frequency control device that maintains the system frequency within an acceptable range even if the introduction of renewable energy sources such as solar power generation or wind power generation increases, despite the fact that such fluctuations occur. Furthermore, Patent Document 3 discloses an electric power supply and demand control device that can swiftly and accurately procure electric power for adjusting electric power supply and demand, even when the timing of control amount instructions by a higher-level control device differs from the control timing in each electric power system. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2012-034444 A [Patent Document 2] Patent Publication No. 2022-066022 [Patent Document 3] Patent Publication No. 2021-097424 Summary of the Invention [Problem to be solved by the invention]

[0005] However, conventional EDC algorithms have the problem that they do not support the creation of operation plans that include non-firm connected power sources.

[0006] The present invention has been made in consideration of the above circumstances, and provides an operation plan generation device, an operation plan generation method, a program, and an operation plan generation system that are capable of creating an operation plan that includes power sources connected in a non-firm type. [Means for solving the problem]

[0007] The present invention has been made to solve the above-mentioned problems, and one aspect of the present invention is an operation plan generation device including: a non-firm output determination unit that determines an output pattern of a first power source connected to a transmission line in a non-firm type when each of a plurality of rules is applied; an EDC (Economic load Dispatching Control) processing unit that determines an output of a second power source connected to the transmission line in a non-firm type using the output pattern of the first power source determined by the non-firm output determination unit when each of the plurality of rules is applied; and an output pattern selection unit that calculates a sum of a cost of the output pattern determined by the non-firm output determination unit and a cost of the output of the second power source determined by the EDC processing unit when each of the plurality of rules is applied, selects one case from the cases when each of the plurality of rules is applied based on the sum, and sets the outputs of the first power source and the second power source corresponding to the one case as an operation plan for the first power source and the second power source.

[0008] Another aspect of the present invention is the above-mentioned operation plan generation device, further comprising a power flow value acquisition unit that acquires a power flow value of the power transmission line, and the non-firm output determination unit uses the power flow value acquired by the power flow value acquisition unit when determining the output of the first power source.

[0009] Another aspect of the present invention is the above-mentioned operation plan generation device, further comprising a generateable power value acquisition unit that acquires a predicted value of the power that can be generated by the first power source, and the non-firm output determination unit uses the predicted value acquired by the generateable power value acquisition unit when determining the output of the first power source.

[0010] Another aspect of the present invention is an operation plan generating method including a first step of determining an output pattern of a first power source connected to a transmission line in a non-firm type for each of a plurality of rules being applied; a second step of determining an output of a second power source connected to the transmission line in a manner other than a non-firm type, using the output pattern of the first power source determined in the first step for each of the plurality of rules being applied; and a third step of calculating a sum of a cost of the output pattern determined in the first step and a cost of the output of the second power source determined in the second step for each of the plurality of rules being applied, selecting one case from the cases in which each of the plurality of rules is applied based on the sum, and setting the outputs of the first power source and the second power source corresponding to the one case as an operation plan for the first power source and the second power source.

[0011] Another aspect of the present invention is a program for causing a computer to function as: a non-firm output determination unit that determines an output pattern of a first power source connected to a power transmission line in a non-firm type when each of a plurality of rules is applied; an EDC (Economic load Dispatching Control) processing unit that determines an output of a second power source connected to the power transmission line in a non-firm type manner using the output pattern of the first power source determined by the non-firm output determination unit when each of the plurality of rules is applied; and an output pattern selection unit that calculates a sum of a cost of the output pattern determined by the non-firm output determination unit and a cost of the output of the second power source determined by the EDC processing unit when each of the plurality of rules is applied, selects one case from the cases when each of the plurality of rules is applied based on the sum, and sets the outputs of the first power source and the second power source corresponding to the one case as an operation plan for the first power source and the second power source.

[0012] Another aspect of the present invention is an operation plan generation system including: a power generation capacity prediction unit that calculates a predicted value of the power that can be generated by a first power source connected in a non-firm type; a non-firm output determination unit that determines an output pattern of the first power source using the predicted value calculated by the power generation capacity prediction unit when each of a plurality of rules is applied; an EDC (Economic load Dispatching Control) processing unit that determines an output of a second power source connected to the transmission line in a manner other than a non-firm type using the output pattern of the first power source determined by the non-firm output determination unit when each of the plurality of rules is applied; and an output pattern selection unit that calculates a sum of a cost of the output pattern determined by the non-firm output determination unit and a cost of the output of the second power source determined by the EDC processing unit when each of the plurality of rules is applied, selects one case from the cases when each of the plurality of rules is applied based on the sum, and sets the outputs of the first power source and the second power source corresponding to the one case as an operation plan for the first power source and the second power source. Effect of the Invention

[0013] According to the present invention, the operation plan creation device can create an operation plan that includes a power source connected in a non-firm type. [Brief description of the drawings]

[0014] [Figure 1] FIG. 1 is a schematic block diagram showing a configuration of an operation plan generation system 10 according to an embodiment of the present invention. [Diagram 2] 2 is a schematic block diagram showing the configuration of an operation plan generating device 200 in the embodiment. FIG. [Diagram 3] 11 is a table showing an example of contents stored in a transmission line capacity storage unit 202 in the embodiment. [Figure 4] 13 is a table showing an example of contents stored in a cost characteristic storage unit 203 in the embodiment. [Diagram 5] 10 is a flowchart illustrating an example of the operation of the operation plan generating device 200 in the embodiment. [Figure 6] FIG. 2 is an explanatory diagram illustrating a hardware configuration of each device according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0015] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. Fig. 1 is a schematic block diagram showing the configuration of an operation plan generation system 10 according to an embodiment of the present invention. The operation plan generation system 10 is a system that generates operation plans for a plurality of power sources (also called power generation facilities) connected to a power grid, including non-firm type power sources connected to a transmission line, for each planning period (e.g., several tens of minutes). Here, the operation plan is a planned value of the power that the power source supplies to the transmission line.

[0016] The operation plan generation system 10 shown in Fig. 1 includes a power generating capacity prediction device 100, an operation plan generation device 200, a power demand prediction device 300, and sensors A4 and B4. The power system targeted by the operation plan generated by the operation plan generation system 10 includes power transmission lines A and B, power generation facilities A1 and B1, and non-farm power generation facilities A2, A3, B2, and B3. The numbers of power transmission lines A and B, power generation facilities A1 and B1, non-farm power generation facilities A2, A3, B2, and B3, and sensors A4 and B4 may be different from the numbers shown in Fig. 1. Each of the power transmission lines A and B is a transmission line that constitutes the power system.

[0017] The power generation facilities A1 and B1 (also called second power sources) are power sources connected to the power transmission line by a conventional connection, i.e., a connection other than the non-firm type. A power source with a conventional connection is one in which the total generating capacity (in watts) of the power sources connected to the power transmission line is equal to or less than the capacity of the power transmission line. That is, in the case of FIG. 1, the generating capacity of the power generation facility A1 connected to the power transmission line A is equal to or less than the capacity of the power transmission line A, and the generating capacity of the power generation facility B1 connected to the power transmission line B is equal to or less than the capacity of the power transmission line B. Note that in FIG. 1, each of the power transmission lines A and B has one power generation facility (power generation facility A1 or power generation facility B1) connected to it by a conventional connection, but when multiple power generation facilities are connected, the total generating capacity of those facilities is equal to or less than the capacity of the connected power transmission line.

[0018] Each of the non-firm power generating facilities A2, A3, B2, B3 (also referred to as first power sources) is a power source connected to a transmission line in a non-firm connection. In a non-firm connection, the total generating capacity of the power sources connected to a transmission line, including power sources with conventional connections, may exceed the capacity of the transmission line. When the power flow transmitted by the connected transmission line is less than the capacity of the transmission line and there is available capacity, the power source with the non-firm connection is controlled to supply power within the available capacity. Here, the available capacity is the capacity of the transmission line minus the power flow value.

[0019] Each of the power generation facilities A1, B1 and the non-farm power generation facilities A2, A3, B2, and B3 may be a power source that supplies electricity in any manner, for example, a solar power generation facility, a wind power generation facility, a power generation facility equipped with a storage battery, a thermal power generation facility, or a hydroelectric power generation facility.

[0020] The sensors A4 and B4 measure the power flows of the power transmission lines A and B that are installed, respectively, and output the power flow values ​​(unit: watts) for each planning period. The generateable power prediction device 100 (generable power prediction unit) calculates the predicted value of the generateable power of the non-firm power generation facilities A2, A3, B2, and B3 for each planning period, for example, based on meteorological information. The power demand prediction device 300 predicts the power demand for each planning period. The operation plan generation device 200 generates operation plans for the power generation facilities A1 and B1 and the non-firm power generation facilities A2, A3, B2, and B3 for each planning period, using the power flow values ​​of the power transmission lines A and B acquired from the sensors A4 and B4, the predicted value acquired from the generateable power prediction device 100, and the power demand predicted by the power demand prediction device 300.

[0021] Each of the power generating capacity prediction device 100, the operation plan generation device 200, and the power demand prediction device 300 may be realized by one or more computers reading and executing a program. Also, some or all of the power generating capacity prediction device 100, the operation plan generation device 200, and the power demand prediction device 300 may be realized by the same computer reading and executing a program.

[0022] 2 is a schematic block diagram showing the configuration of an operation plan generating device 200 in this embodiment. The operation plan generating device 200 includes a power flow value acquiring unit 201, a power transmission line capacity storage unit 202, a cost characteristic storage unit 203, a generateable power value acquiring unit 204, a non-firm output determining unit 205, an EDC calculating unit 206, an output pattern selecting unit 207, and a power demand acquiring unit 208.

[0023] The power flow value acquisition unit 201 acquires the power flow values ​​of the power transmission lines A and B from the sensors A4 and B4 for each planning period. The power transmission line capacity storage unit 202 stores the capacity of the power transmission lines A and B. The cost characteristic storage unit 203 stores the characteristics of the power generation cost of the power generation facilities A1 and B1 and the non-firm power generation facilities A2, A3, B2, and B3. Here, the power generation cost is the cost per unit of power required for power generation. The generateable power value acquisition unit 204 acquires the predicted value of the generateable power of each of the non-firm power generation facilities A2, A3, B2, and B3 for each planning period. The generateable power value acquisition unit 204 may acquire the predicted value of the generateable power of some or all of the non-firm power generation facilities A2, A3, B2, and B3 from some or each of the non-firm power generation facilities A2, A3, B2, and B3.

[0024] The non-firm output determination unit 205 determines a pattern of output (power supply amount) of the power source connected to the power transmission line in a non-firm type when each of a plurality of rules is applied to each of the power transmission lines A and B. In this case, the non-firm output determination unit 205 uses the power flow values ​​of the power transmission lines A and B acquired by the power flow value acquisition unit 201, the predicted values ​​of the power that can be generated by the non-firm power generation facilities A2, A3, B2, and B3 acquired by the generateable power value acquisition unit 204, the capacities of the power transmission lines A and B stored in the power transmission line capacity storage unit 202, and the cost characteristics of the non-firm power generation facilities A2, A3, B2, and B3 stored in the cost characteristic storage unit 203.

[0025] Here, each of the multiple rules is a predetermined rule that determines the output of the non-farm power generation facilities A2, A3, B2, and B3. For example, these rules are a combination of the ratio of the total output of the non-farm power generation facilities connected to the transmission line to the available capacity of the transmission line and the priority of the non-farm power generation facilities. Alternatively, these rules are a combination of the ratio of the total output of the non-farm power generation facilities connected to the transmission line to the available capacity of the transmission line and the ratio between the non-farm power generation facilities.

[0026] For example, one of the rules is that the ratio of the total output of the non-farm power generation facilities to the available capacity of the transmission line is 50%, and the priority order of the non-farm power generation facilities is wind power generation, followed by solar power generation. Furthermore, it is assumed that the non-farm power generation facilities A2 and B2 are wind power generation facilities, and the non-farm power generation facilities A3 and B3 are solar power generation facilities. In this case, the non-farm output determination unit 205 fills 50% of the available capacity of the transmission line A with the output of the non-farm power generation facility A2 within the predicted value of the power that can be generated in that planning period, and if there is a remainder in the 50% available capacity, it fills the remainder with the output of the non-farm power generation facility A3 within the predicted value of the power that can be generated in that planning period, and the output of the non-farm power generation facility A2 and the non-farm power generation facility A3 are regarded as one output pattern. In addition, the non-firm output determination unit 205 fills 50% of the available capacity of transmission line B with the output of non-firm power generation equipment B2 within the predicted value of the power that can be generated in that planning cycle, and if there is any remaining 50% of the available capacity, it fills the remainder with the output of non-firm power generation equipment B3 within the predicted value of the power that can be generated in that planning cycle, and the output of non-firm power generation equipment B2 and non-firm power generation equipment B3 are considered to be one output pattern.

[0027] For example, one rule may be that the ratio of the total output of the non-farm generating equipment to the available capacity of the transmission line is 100%, and the ratio between the non-farm generating equipment may be equal, or it may be proportional to the maximum generating capacity of the non-farm generating equipment, or it may be proportional to the predicted amount of electricity that the non-farm generating equipment can generate.

[0028] The priority order may be determined according to the power generation method as described above, or may be determined in advance. The available capacities of the power transmission lines A and B are calculated by subtracting the power flow values ​​of the power transmission lines A and B acquired by the power flow value acquisition unit 201 from the capacities of the power transmission lines A and B stored in the power transmission line capacity storage unit 202.

[0029] The EDC processing unit 206 determines the output of the power generation facilities A1 and B1 by EDC processing using the output pattern determined by the non-firm output determination unit 205 when each of the above-mentioned multiple rules is applied. At this time, the EDC processing unit 206 uses a value obtained by subtracting the supply power according to the output pattern determined by the non-firm output determination unit 205 from the power demand acquired by the power demand acquisition unit 208 as the power demand value. In addition, the EDC processing unit 206 may use the cost characteristics of the power generation facilities A1 and B1 stored in the cost characteristic storage unit 203 during the EDC processing. In addition, the EDC processing unit 206 may use a known method, for example, the equal incremental fuel cost method (equal λ method), for this EDC processing.

[0030] The output pattern selection unit 207 calculates the sum of the cost of the output pattern determined by the non-firm output determination unit 205 and the cost of the output of the power generation facilities A1 and B1 determined by the EDC processing unit 206 for each of the above-mentioned multiple rules being applied. Based on this sum, the output pattern selection unit 207 selects one case from among the cases for which each of the above-mentioned multiple rules is applied. For example, the output pattern selection unit 207 selects the case with the smallest total cost.

[0031] Furthermore, the output pattern selection unit 207 sets the outputs of the power generation facilities A1 and B1 and the non-firm power generation facilities A2, A3, B2, and B3 corresponding to this one case as the operation plans for the power generation facilities A1 and B1 and the non-firm power generation facilities A2, A3, B2, and B3. The output pattern selection unit 207 may use the cost characteristics stored in the cost characteristic storage unit 203 to calculate the cost.

[0032] The power demand acquisition unit 208 acquires the power demand predicted by the power demand prediction device 300 for each planning period.

[0033] Fig. 3 is a table showing an example of the contents stored in the transmission line capacity storage unit 202 in this embodiment. In the example shown in Fig. 3, the transmission line capacity storage unit 202 stores a capacity "XXX [kW]" in association with the transmission line "transmission line A" and stores a capacity "YYY [kW]" in association with the transmission line "transmission line B".

[0034] FIG. 4 is a table showing an example of the contents stored in the cost characteristic storage unit 203 in this embodiment. In the example shown in FIG. 4, the cost characteristic storage unit 203 stores, as the power generation cost [yen / kW], "aaa" for X1 [kW] to X2 [kW], "bbb" for X2 [kW] to X3 [kW], "ccc" for X3 [kW] to X4 [kW], and "ddd"... for X4 [kW] to X5 [kW] in association with the power generation facility "power generation facility A2", "eee" for X1 [kW] to X2 [kW], "fff" for X2 [kW] to X3 [kW], "ggg" for X3 [kW] to X4 [kW], and "hhh"... for X4 [kW] to X5 [kW] in association with the power generation facility "power generation facility A2".

[0035] FIG. 5 is a flowchart illustrating an example of the operation of the operation plan generating device 200 in this embodiment. The operation plan generating device 200 performs the process shown in FIG. 5 for each planning period. The operation plan generating device 200 processes steps Sa2 to Sa5 for each of the power transmission lines A and B. In step Sa2, the power flow value acquiring unit 201 acquires the power flow value of the corresponding power transmission line from the sensor A4 or the sensor B4. Next, in step Sa3, the non-firm output determining unit 205 compares the capacity stored in the transmission line capacity storage unit 202 with the power flow value acquired in step Sa2, and determines whether the corresponding power transmission line has available capacity.

[0036] When it is determined that there is no available capacity (step Sa3-No), the operation plan generating device 200 skips steps Sa4 and Sa5. When it is determined that there is available capacity (step Sa3-Yes), the potential power generating unit 204 obtains a predicted value of the potential power of the power source connected to the corresponding transmission line in a non-firm manner from the potential power generating unit 100 (step Sa4). Next, the non-firm output determining unit 205 generates an output pattern of the power source connected to the corresponding transmission line in a non-firm manner using each of a plurality of rules (step Sa5).

[0037] By repeating steps Sa1 to Sa6, output patterns are generated for each transmission line with available capacity, the number of which is equal to the number of rules. Next, the operation plan generation device 200 processes steps Sa8 and Sa9 for each combination of output patterns. Here, a combination of output patterns is a combination obtained by selecting one output pattern for each transmission line. Therefore, if there are three output patterns for each of transmission lines A and B, there are nine combinations of output patterns, which is 3 x 3.

[0038] In step Sa8, the EDC processor 206 performs EDC processing according to the corresponding output pattern. Here, the EDC processing according to the output pattern means processing the power demand as a value obtained by subtracting the supply power according to the output pattern from the power demand acquired by the power demand acquisition unit 208.

[0039] Next, in step Sa9, the output pattern selection unit 207 calculates the total cost as the sum of the cost of the power source connected in a non-firm type based on the corresponding output pattern and the cost of the power source connected in a conventional type based on the result of the EDC processing in step Sa8.

[0040] By repeating steps Sa7 to Sa10, the total cost is calculated for each combination of output patterns. Next, the output pattern selection unit 207 selects the combination of output patterns with the smallest total cost (step Sa11), and controls the power sources (power generation facilities A1, B1, non-farm power generation facilities A2, A3, B2, B3) to achieve the selected combination of output patterns (step Sa12).

[0041] FIG. 6 is an explanatory diagram illustrating the hardware configuration of each device according to this embodiment. The devices are a power generating capacity prediction device 100, an operation plan generation device 200, and a power demand prediction device 300. Each device includes an input / output module I, a storage module M, and a control module P. The input / output module I is realized by including a part or all of a communication module H11, a connection module H12, a pointing device H21, a keyboard H22, a display H23, a button H3, a microphone H41, a speaker H42, a camera H51, or a sensor H52. The storage module M is realized by including a drive H7. The storage module M may further be configured by including a part or all of a memory H8. The control module P is realized by including a memory H8 and a processor H9. These hardware components are connected to each other so as to be able to communicate with each other via a bus, and are supplied with power from a power source H6.

[0042] The connection module H12 is a digital input / output port such as a USB (Universal Seriul Bus). In the case of a portable device, the pointing device H21, the keyboard H22, and the display H23 are touch panels. The sensor H52 is an acceleration sensor, a gyro sensor, a GPS receiving module, a proximity sensor, or the like. The power source H6 is a power supply unit that supplies electricity required to operate each device. In the case of a portable device, the power source H6 is a battery. The drive H7 is an auxiliary storage medium such as a hard disk drive or a solid state drive. The drive H7 may be a non-volatile memory such as an EEPROM or a flash memory, or a magneto-optical disk drive or a flexible disk drive. In addition, the drive H7 is not limited to a drive built into each device, but may be an external storage device connected to a connector of the connection module H12. The memory H8 is a main storage medium such as a random access memory. The memory H8 may be a cache memory. The memory H8 stores instructions when the instructions are executed by one or more processors H9. The processor H9 is a CPU (Central Processing Unit). The processor H9 may be a microprocessing unit (MPU) or a graphics processing unit (GPU). The processor H9 reads out programs and various data from the drive H7 via the memory H8 and performs calculations to execute instructions stored in one or more memories H8.

[0043] The input / output module I is used in the power generating capacity prediction device 100, the operation plan generation device 200, the power demand prediction device 300, etc. The storage module M realizes the power transmission line capacity storage unit 202 and the cost characteristic storage unit 203. The control module P is used to implement each unit of the power generating capacity prediction device 100, the operation plan generation device 200, and the power demand prediction device 300. Note that in this specification and the like, the descriptions of the power generating capacity prediction device 100, the operation plan generation device 200, the power demand prediction device 300, the power flow value acquisition unit 201, the power generating capacity value acquisition unit 204, the non-firm output determination unit 205, the EDC processing unit 206, the output pattern selection unit 207, and the power demand acquisition unit 208 may be replaced with the description of the control module P.

[0044] The following embodiment may be adopted. (1) One embodiment is an operation plan generation device including: a non-firm output determination unit that determines an output pattern of a first power source connected to a power transmission line in a non-firm type when each of a plurality of rules is applied; an economic load dispatching control (EDC) processing unit that determines an output of a second power source connected to the power transmission line in a non-firm type using the output pattern of the first power source determined by the non-firm output determination unit when each of the plurality of rules is applied; and an output pattern selection unit that calculates a sum of a cost of the output pattern determined by the non-firm output determination unit and a cost of the output of the second power source determined by the EDC processing unit when each of the plurality of rules is applied, selects one case from the cases when each of the plurality of rules is applied based on the sum, and sets the outputs of the first power source and the second power source corresponding to the one case as an operation plan for the first power source and the second power source.

[0045] (2) Another embodiment is an operation plan generation device as described above in (1), further comprising a power flow value acquisition unit that acquires a power flow value of the power transmission line, and the non-firm output determination unit uses the power flow value acquired by the power flow value acquisition unit when determining the output of the first power source.

[0046] (3) Another embodiment is an operation plan generation device as described above in (1) or (2), further comprising a generateable power value acquisition unit that acquires a predicted value of the power that can be generated by the first power source, and the non-firm output determination unit uses the predicted value acquired by the generateable power value acquisition unit when determining the output of the first power source.

[0047] (4) Another embodiment is an operation plan generating method including a first step of determining an output pattern of a first power source connected to a transmission line in a non-firm type for each of a plurality of rules being applied; a second step of determining an output of a second power source connected to the transmission line in a manner other than a non-firm type, using the output pattern of the first power source determined in the first step for each of the plurality of rules being applied; and a third step of calculating a sum of a cost of the output pattern determined in the first step and a cost of the output of the second power source determined in the second step for each of the plurality of rules being applied, selecting one case from the cases in which each of the plurality of rules is applied based on the sum, and setting the outputs of the first power source and the second power source corresponding to the one case as an operation plan for the first power source and the second power source.

[0048] (5) Another embodiment is a program for causing a computer to function as: a non-firm output determination unit that determines an output pattern of a first power source connected to a power transmission line in a non-firm type when each of a plurality of rules is applied; an economic load dispatching control (EDC) processing unit that determines an output of a second power source connected to the power transmission line in a non-firm type using the output pattern of the first power source determined by the non-firm output determination unit when each of the plurality of rules is applied; and an output pattern selection unit that calculates a sum of a cost of the output pattern determined by the non-firm output determination unit and a cost of the output of the second power source determined by the EDC processing unit when each of the plurality of rules is applied, selects one case from the cases when each of the plurality of rules is applied based on the sum, and sets the outputs of the first power source and the second power source corresponding to the one case as an operation plan for the first power source and the second power source.

[0049] (6) Another embodiment is an operation plan generation system including: a power generation capacity prediction unit that calculates a predicted value of the power that can be generated by a first power source connected in a non-firm type; a non-firm output determination unit that determines an output pattern of the first power source using the predicted value calculated by the power generation capacity prediction unit for each of a plurality of rules that are applied; an EDC (Economic load Dispatching Control) processing unit that determines an output of a second power source connected to the transmission line in a manner other than a non-firm type, using the output pattern of the first power source determined by the non-firm output determination unit for each of the plurality of rules that are applied; and an output pattern selection unit that calculates a sum of a cost of the output pattern determined by the non-firm output determination unit and a cost of the output of the second power source determined by the EDC processing unit for each of the plurality of rules that are applied, selects one case from the cases in which each of the plurality of rules is applied based on the sum, and sets the outputs of the first power source and the second power source corresponding to the one case as an operation plan for the first power source and the second power source.

[0050] 1 may be recorded on a computer-readable recording medium, and the programs recorded on the recording medium may be read into a computer system and executed to realize the power generating capacity prediction device 100, the operation plan generation device 200, and the power demand prediction device 300. Note that the term "computer system" herein includes hardware such as an OS and peripheral devices.

[0051] In addition, "computer-readable recording medium" refers to portable media such as flexible disks, optical magnetic disks, ROMs, and CD-ROMs, and storage devices such as hard disks built into computer systems. Furthermore, "computer-readable recording medium" also includes those that dynamically hold a program for a short period of time, such as a communication line when transmitting a program via a network such as the Internet or a communication line such as a telephone line, and those that hold a program for a certain period of time, such as volatile memory inside a computer system that is the server or client in such cases. Furthermore, the above program may be one that realizes part of the above-mentioned functions, or may be one that can realize the above-mentioned functions in combination with a program already recorded in the computer system.

[0052] Although an embodiment of the present invention has been described in detail above with reference to the drawings, the specific configuration is not limited to this embodiment, and design changes and the like that do not deviate from the gist of the present invention are also included. [Explanation of symbols]

[0053] 10 Operational Plan Generation System 100 Power generation capacity prediction device 200 Operational plan generation device 201 Current value acquisition unit 202 Transmission Line Capacity Memory Unit 203 Cost characteristic memory unit 204 Power generation capacity acquisition unit 205 Non-firm output decision unit 206 EDC Processing Section 207 Output pattern selection section 208 Electricity demand acquisition department 300 Electricity Demand Forecasting Device A, B transmission lines A1, B1 Power generation facilities A2, A3, B2, B3 Non-farm power generation facilities A4, B4 Sensor

Claims

1. a non-firm output determination unit that determines an output pattern of a first power source that is connected to a power transmission line in a non-firm type when each of a plurality of rules is applied; an EDC (Economic Load Dispatching Control) processing unit that determines an output of a second power source connected to the power transmission line in a manner other than a non-firm type, using the output pattern of the first power source determined by the non-firm output determination unit when each of the plurality of rules is applied; an output pattern selection unit that calculates a sum of a cost of the output pattern determined by the non-firm output determination unit and a cost of the output of the second power source determined by the EDC processing unit for each of the cases in which the plurality of rules are applied, selects one case from the cases in which the plurality of rules are applied based on the sum, and sets the outputs of the first power source and the second power source corresponding to the one case as an operation plan for the first power source and the second power source; An operation plan generating device comprising:

2. a power flow value acquisition unit that acquires a power flow value of the power transmission line, The non-firm output determination unit uses the power flow value acquired by the power flow value acquisition unit when determining the output of the first power source. The operation plan generating device according to claim 1 .

3. a generateable power value acquiring unit that acquires a predicted value of generateable power of the first power source, The non-firm output determination unit uses the predicted value acquired by the generateable power value acquisition unit when determining the output of the first power source. The operation plan generating device according to claim 1 or 2.

4. A first step of determining an output pattern of a first power source connected to a power transmission line in a non-firm type for each of a plurality of rules applied; a second step of determining an output of a second power source connected to the power transmission line in a manner other than a non-firm type, using the output pattern of the first power source determined in the first step for each of the plurality of rules applied; a third step of calculating a sum of a cost of the output pattern determined in the first step and a cost of the output of the second power source determined in the second step for each of the cases where the plurality of rules are applied, selecting one case from the cases where the plurality of rules are applied based on the sum, and setting the outputs of the first power source and the second power source corresponding to the one case as an operation plan for the first power source and the second power source; The operation plan generating method includes:

5. Computer, a non-firm output determination unit that determines an output pattern of a first power source that is connected to a power transmission line in a non-firm type when each of a plurality of rules is applied; an EDC (Economic Load Dispatching Control) processing unit that determines an output of a second power source connected to the power transmission line in a manner other than a non-firm type, using the output pattern of the first power source determined by the non-firm output determination unit when each of the plurality of rules is applied; an output pattern selection unit that calculates the sum of the cost of the output pattern determined by the non-firm output determination unit and the cost of the output of the second power source determined by the EDC processing unit for each of the cases in which the plurality of rules are applied, selects one case from the cases in which the plurality of rules are applied based on the sum, and sets the outputs of the first power source and the second power source corresponding to the one case as an operation plan for the first power source and the second power source. A program to function as a

6. a generateable power prediction unit that calculates a predicted value of generateable power of a first power source that is connected to a power transmission line in a non-firm type; a non-firm output determination unit that determines an output pattern of the first power source by using a predicted value calculated by the generateable power prediction unit when each of a plurality of rules is applied; an EDC (Economic Load Dispatching Control) processing unit that determines an output of a second power source connected to the power transmission line in a manner other than a non-firm type, using the output pattern of the first power source determined by the non-firm output determination unit when each of the plurality of rules is applied; an output pattern selection unit that calculates a sum of a cost of the output pattern determined by the non-firm output determination unit and a cost of the output of the second power source determined by the EDC processing unit for each of the cases in which the plurality of rules are applied, selects one case from the cases in which the plurality of rules are applied based on the sum, and sets the outputs of the first power source and the second power source corresponding to the one case as an operation plan for the first power source and the second power source; An operation plan generation system comprising:

Citation Information

Patent Citations

  • Power supply-demand control device

    JP2021129433A

  • Load frequency control device and method

    JP2022066022A

  • Optimal energy management of a rural microgrid system using multi-objective optimization

    US20130024014A1

  • Power supply-demand planning device and method thereof

    JP2012034444A

  • Power supply / demand controller

    JP2021097424A