Road surface sign management system and road surface sign management method

The road marking management system integrates drawing and maintenance services by using GPS and imaging units to track and assess road markings, enabling efficient management and repair optimization.

JP2024145280AInactive Publication Date: 2024-10-15MITSUBISHI ELECTRIC CORP
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2023057566
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2024-10-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing technologies lack a consistent service for managing road markings from drawing to maintenance, and they cannot manage partial deterioration effectively.

Method used

A road marking management system that includes a drawing device, a drawing position determination unit, an initial state acquisition unit, a progress state acquisition unit, and a diagnosis section to diagnose deterioration based on initial and progress state information, using vehicles and drones equipped with GPS and imaging units to track and assess road markings.

Benefits of technology

Provides a comprehensive service from drawing to maintaining and managing road markings, allowing for efficient diagnosis of partial deterioration and optimizing repair work.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024145280000001_ABST
    Figure 2024145280000001_ABST
Patent Text Reader

Abstract

To provide consistent services from drawing of a road surface sign up to maintenance and management of the road surface sign.SOLUTION: An embodiment of the present disclosure is a road surface sign management system including a drawing position determination unit that determines a drawing position of a road surface sign on the basis of a position of a vehicle, which includes a drawing apparatus which draws a road surface sign on a rod, and a position of an object around the vehicle; an initial condition acquisition unit that acquires initial condition information on a road surface sign associated with each of plural points representing the road surface sign drawn at the drawing position by the drawing apparatus; an elapse condition acquisition unit that acquired elapse condition information on the road surface sign associated with each of the plural points representing the road surface sign; and a diagnosis unit that diagnoses deterioration of the road surface sign on the basis of the initial condition information acquired by the initial condition acquisition unit and the elapse condition information acquired by the elapse condition acquisition unit.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a road marking management system and a road marking management method. [Background technology]

[0002] Conventionally, techniques for managing road markings drawn on roads are known, for example, as disclosed in Patent Documents 1 and 2 below.

[0003] Patent Document 1 describes a painting vehicle equipped with a painting device. This painting vehicle moves while painting the marking lines during construction, and acquires position information of the marking lines using a GPS or the like. Furthermore, the painting vehicle records data acquired by a distance sensor, a speed sensor, and a painting width detection means during construction, making it possible to objectively grasp the construction results and construction status.

[0004] Patent Document 2 describes that a road administrator drives a vehicle to obtain an image of the road surface captured by a drive recorder, and stores the image in association with location information indicating the location where the image was captured. The information processing device of Patent Document 2 extracts road markings from an image in which the road markings are captured, and estimates the degree of deterioration of the road markings by extracting a difference between the extracted road markings and road markings at the time of new construction that are captured at the same location and associated with the extracted road markings. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2015-132152 A [Patent Document 2] Patent Publication No. 2022-17106 Summary of the Invention [Problem to be solved by the invention]

[0006] However, the painting vehicle described in Patent Document 1 records data when the road markings are painted, and the information processing device described in Patent Document 2 estimates the degree of deterioration of the road markings using a captured image of the road markings, but these are technologies that perform drawing of the road markings and estimation of the degree of deterioration of the road markings separately. Therefore, in the past, a consistent service from drawing of the road markings to maintenance of the road markings has not been provided. In addition, Patent Document 1 and Patent Document 2 store the vehicle position when the lane markings are drawn and the vehicle position when the road markings are captured, so they cannot manage partial deterioration of the road markings.

[0007] The present disclosure has been made in consideration of the above circumstances, and aims to provide a road marking management system and a road marking management method that can provide a consistent service from drawing of road markings to maintenance of road markings. [Means for solving the problem]

[0008] The present disclosure has been made to solve the above-mentioned problems, and one aspect of the present disclosure is a road marking management system comprising: a drawing position determination unit that determines a drawing position of the road marking based on a position of a vehicle equipped with a drawing device that draws a road marking on a road and positions of objects around the vehicle; an initial state acquisition unit that acquires initial state information of the road marking corresponding to each of a plurality of points representing the road marking drawn at the drawing position by the drawing device; a progress state acquisition unit that acquires progress state information of the road marking corresponding to each of the plurality of points representing the road marking; and a diagnosis unit that diagnoses deterioration of the road marking based on the initial state information acquired by the initial state acquisition unit and the progress state information acquired by the progress state acquisition unit.

[0009] Another aspect of the present disclosure is a pavement marking management method including the steps of: determining a drawing position of the road marking based on a position of a vehicle equipped with a drawing device that draws a road marking on a road surface and positions of objects around the vehicle; acquiring initial state information of the road marking corresponding to each of a plurality of points representing the road marking drawn at the drawing position by the drawing device; acquiring progress state information of the road marking corresponding to each of the plurality of points representing the road marking; and diagnosing deterioration of the road marking based on the initial state information and the progress state information. Effect of the Invention

[0010] According to one aspect of the present invention, it is possible to provide a consistent service ranging from drawing road markings to maintaining the road markings. [Brief description of the drawings]

[0011] [Figure 1] FIG. 1 is a block diagram showing an example of a road marking management system in a first embodiment. [Diagram 2] 5 is a flowchart showing an example of an operation procedure of the pavement marking management system in the first embodiment. [Diagram 3] FIG. 2 is a top view showing an example of a road marking in the first embodiment. [Figure 4] FIG. 3 is a diagram showing an example of the relationship between the position of a road marking drawing vehicle and a drawing position in the first embodiment. [Diagram 5] FIG. 3 is a diagram showing an example of a plurality of points representing a road marking in the first embodiment. [Figure 6] FIG. 2 is a diagram showing an example of a deteriorated state of a road marking in the first embodiment. [Figure 7] FIG. 4 is a sequence diagram showing an example of an operation procedure of the road marking management system in the first embodiment. [Figure 8] FIG. 11 is a block diagram showing an example of a pavement marking management system in a second embodiment. [Figure 9]11A and 11B are diagrams showing an example of a road marking in the second embodiment, where (A) is a top view showing an example of an undeteriorated road marking, and (B) is a top view showing an example of a deteriorated road marking. [Figure 10] FIG. 13 is a block diagram showing an example of a pavement marking management system in a third embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] Hereinafter, a road marking management system and a road marking management method to which the present invention is applied will be described with reference to the drawings.

[0013] FIG. 1 is a block diagram showing an example of a road marking management system 1 in the first embodiment. The road marking management system 1 includes, for example, a road marking management device 100, a road marking drawing vehicle 200, a road marking detection vehicle 300, a road marking detection drone 400, and a repair management device 500. The road marking management device 100, the road marking drawing vehicle 200, the road marking detection vehicle 300, the road marking detection drone 400, and the repair management device 500 each have a communication interface (not shown) such as a NIC (Network Interface Card) or a wireless communication module for connecting to a communication network NW such as the Internet. The network may include, for example, a general-purpose network such as the Internet, and a private network such as local 5G or WiFi (registered trademark).

[0014] The road marking management device 100 is an information processing device that acquires information via a communication network NW and performs various processes. The road marking management device 100 includes, for example, an initial state acquisition unit 110, a progress state acquisition unit 120, and a diagnosis unit 130. The initial state acquisition unit 110, the progress state acquisition unit 120, and the diagnosis unit 130 are realized by a processor such as a CPU (Central Processing Unit) executing a program stored in a program memory. The initial state acquisition unit 110 acquires initial state information of the road marking corresponding to each of a plurality of points representing the road marking drawn at a drawing position by the drawing device 250 of the road marking drawing vehicle 200. The progress state acquisition unit 120 acquires progress state information of the road marking corresponding to each of a plurality of points representing the road marking. The diagnosis unit 130 diagnoses the deterioration of the road marking based on the initial state information acquired by the initial state acquisition unit 110 and the progress state information acquired by the progress state acquisition unit 120.

[0015] The road marking drawing vehicle 200 includes a GPS (Global Positioning System) processing unit 210, a three-dimensional position detection unit 220, a drawing position determination unit 230, a drawing data generation unit 240, a drawing device 250, and an imaging unit 260. The GPS processing unit 210 acquires position information of the road marking drawing vehicle 200 based on a GPS signal. The three-dimensional position detection unit 220 is, for example, an inertial measurement unit (IMU). The three-dimensional position detection unit 220 acquires, for example, three-dimensional position information of a road surface.

[0016] The drawing position determination unit 230 determines the drawing position of the road marking based on the position of the road marking drawing vehicle 200 and the positions of objects surrounding the road marking drawing vehicle 200. The drawing data generation unit 240 generates drawing data for the drawing device 250 to draw the road marking on the road surface. The drawing position determination unit 230 may change the drawing data so that the road marking does not appear distorted due to unevenness of the road surface detected by the three-dimensional position detection unit 220.

[0017] The drawing device 250 includes, for example, a drawing unit 252 that discharges paint onto the road surface to draw road markings, a drawing control unit 254 that controls the drawing unit 252 based on drawing data, and a drawing position detection unit 256. The drawing position detection unit 256 detects the positions of each of a plurality of points representing the road markings drawn at the drawing position by the drawing unit 252, based on the position of the road marking drawing vehicle 200 and the drawing position in the drawing unit 252.

[0018] The imaging unit 260 captures an image of the road marking drawn by the drawing device 250, and generates imaging data. The coordinates of each of the points included in the imaging data are associated with position information of each of the points representing the road marking detected by the drawing position detection unit 256. In the following description, "position information of each of the points representing the road marking" will be simply referred to as "position information of the road marking." The road marking drawing vehicle 200 transmits the imaging data, the position information of the road marking, and the three-dimensional position information to the road marking management device 100 as initial state information.

[0019] The road marking detection vehicle 300 is a vehicle that travels around roads, such as a bus or a garbage truck. The road marking detection vehicle 300 includes, for example, a GPS processing unit 310, a three-dimensional position detection unit 320, and an imaging unit 330. The GPS processing unit 310 acquires position information of the road marking detection vehicle 300. The three-dimensional position detection unit 320 acquires three-dimensional position information of the road surface on which the road marking detection vehicle 300 travels. The imaging unit 330 generates imaging data of the surroundings of the road marking detection vehicle 300. The road marking detection vehicle 300 transmits the position information, three-dimensional position information, and imaging data of the road markings to the road marking management device 100.

[0020] The road marking detection drone 400 is, for example, an unmanned aerial vehicle. The road marking detection drone 400 includes, for example, a GPS processing unit 410, a three-dimensional position detection unit 420, and an imaging unit 430. The GPS processing unit 410 acquires position information of the road marking detection drone 400. The three-dimensional position detection unit 420 acquires three-dimensional position information of the surroundings of the road marking detection drone 400. The imaging unit 430 generates imaging data of the surroundings of the road marking detection drone 400. The road marking detection drone 400 transmits the position information, three-dimensional position information, and imaging data of the road marking to the road marking management device 100.

[0021] The repair management device 500 includes, for example, a repair management unit 510 and a repair request unit 520. The repair management unit 510 determines whether or not repair is necessary for the road markings and the contents of the repair based on the deterioration of the road markings diagnosed by the diagnosis unit 130. When the repair management unit 510 determines that repair of the road markings is necessary, the repair request unit 520 transmits repair request information to a terminal device of a person who will carry out the repair.

[0022] It should be noted that the initial state acquisition unit 110, progress state acquisition unit 120, and diagnosis unit 130 as shown in FIG. 1 are included in the road marking management device 100, the drawing position determination unit 230 and the drawing data generation unit 240 are included in the road marking drawing vehicle 200, and the repair management unit 510 and the repair request unit 520 are included in the repair management device 500, but are not limited to this and may be arranged in a distributed or concentrated manner in devices included in the road marking management system 1.

[0023] FIG. 2 is a flowchart showing an example of an operation procedure of the road marking management system 1 in the first embodiment. First, the drawing position determination unit 230 determines the drawing position of the road marking (step S100). 3 is a top view showing an example of a road marking in the first embodiment. For example, a road marking 10 for prohibiting U-turns is drawn in an area 12 that is a distance D1 from a curb, a distance D2 from a dividing line, and a distance D3 from a road marking. The drawing position determination unit 230 determines the area 12 in which the road marking 10 is drawn based on the position of the road marking drawing vehicle 200 acquired by the GPS processing unit 210, and the positions of the dividing line, the curb, and the road marking detected by the three-dimensional position detection unit 220. The drawing data generation unit 240 generates drawing data for making the road marking 10 appear without distortion by using the unevenness in the area 12 detected by the three-dimensional position detection unit 220.

[0024] Next, the drawing unit 252 uses the drawing data to draw the road marking 10 under the control of the drawing control unit 254 (step S102). 4 is a diagram showing an example of the relationship between the position of the road marking drawing vehicle and the drawing position in the first embodiment. For example, when the drawing unit 252 is a nozzle that ejects paint, and the drawing control unit 254 controls an actuator that drives the nozzle, the drawing position corresponds to the nozzle position. The drawing position detection unit 256 can detect position information of each of a plurality of points representing the road marking 10 based on the vehicle position including the latitude and longitude of the road marking drawing vehicle 200, the reference position of the nozzle in the road marking drawing vehicle 200, and the relative position of the nozzle driven by the actuator with respect to the reference position. The position information of the road marking 10 includes latitude information, longitude information, and altitude information.

[0025] Next, the initial state acquisition unit 110 acquires initial state information (step S104). At this time, the drawing position detection unit 256 generates position information for each of the multiple points representing the drawn road marking 10. In addition, the imaging unit 260 images the drawn road marking 10 to acquire imaging data. The road marking drawing vehicle 200 transmits the imaging data and position information to the road marking management device 100. The road marking management device 100 acquires the imaging data, position information, and three-dimensional position information acquired from the road marking drawing vehicle 200, and records them as initial state information of the road marking 10. The position information and imaging data corresponding to the multiple points representing the road marking 10 included in the imaging data correspond to the initial state information of the road marking 10.

[0026] 5 is a diagram showing an example of a plurality of points representing a road marking 10 in the first embodiment. The plurality of points representing the road marking 10 may be, for example, points representing vertices from point a to point l. Without being limited to this, the plurality of points representing the road marking 10 may be a point cloud following the shape of the road marking 10, for example, as shown in an enlarged view near point i. Position information of each point constituting the point cloud includes latitude information, longitude information, and altitude information.

[0027] Next, the progress state acquisition unit 120 acquires the position information, three-dimensional position information, and imaging data acquired from the road marking detection vehicle 300 and the road marking detection drone 400 as progress state information of the road marking 10 (step S106).

[0028] Next, the diagnosis unit 130 diagnoses the deterioration of the road marking 10 based on the initial state information and the progress state information (step S108). The diagnosis unit 130 transmits information indicating the diagnosis result to the repair management device 500. FIG. 6 is a diagram showing an example of a deteriorated state of the road marking 10 in the first embodiment. The diagnosis unit 130 detects that the progress state information does not have (is missing) multiple points corresponding to the deteriorated parts by comparing multiple points representing the road marking 10 as the initial state information with multiple points representing the road marking 10 as the progress state information. This allows the diagnosis unit 130 to diagnose that the road marking 10 is partially deteriorated.

[0029] Next, the repair management unit 510 determines whether or not repair is necessary for the road marking 10 and the repair contents based on the deterioration of the road marking 10 indicated by the diagnosis result obtained from the diagnosis unit 130. For example, when a part of the road marking 10 is significantly deteriorated, the repair management unit 510 may determine the repair contents so that the paint of the deteriorated part is changed to a paint that is not easily peeled off or the paint is changed to an increased thickness. In addition, the repair management unit 510 may determine whether or not repair is necessary and determine the repair contents according to the type of deterioration such as the braking point of the vehicle, the traffic volume, and the paint being peeled off due to road construction. When the road marking 10 needs repair, the repair management unit 510 causes the repair request unit 520 to transmit repair request information (step S110). The repair request information may include, for example, the position of the road marking 10, the repair contents, and the progress information of the road marking 10.

[0030] FIG. 7 is a sequence diagram showing an example of an operation procedure of the road marking management system 1 in the first embodiment. The road marking management device 100 transmits a drawing request including information specifying the type of road marking 10 and the drawing position of the road marking 10 to the road marking drawing vehicle 200 based on, for example, an operation by an administrator (step S200). The road marking drawing vehicle 200 moves, and the drawing position determination unit 230 determines the drawing position of the road marking 10 (step S202). Next, the drawing data generation unit 240 generates drawing data based on the three-dimensional position of the road surface detected by the three-dimensional position detection unit 220 (step S204). Next, the drawing unit 252 draws the road marking 10 on the road surface based on the drawing data (step S206). Next, the three-dimensional position detection unit 220 acquires three-dimensional position information of the road marking 10, the imaging unit 260 acquires imaging data of the road marking 10, and the road marking drawing vehicle 200 transmits the position information, three-dimensional position information and imaging data (initial state information) of the road marking 10 to the road marking management device 100 (step S208).

[0031] The pavement marking management device 100 receives the position information, three-dimensional position information, and imaging data of the road marking 10 from the road marking drawing vehicle 200, and the initial state acquisition unit 110 acquires the initial state information (step S210). Next, the road marking detection vehicle 300 and the road marking detection drone 400 transmit the position information, three-dimensional position information, and imaging data of the road marking 10 to the road marking management device 100. The road marking management device 100 acquires progress state information (step S212), and the diagnosis unit 130 diagnoses the deterioration of the road marking 10 based on the initial state information and the progress state information (step S214).

[0032] When the diagnosis unit 130 determines that the pavement marking 10 is deteriorated (step S216), progress state data including initial state information, progress state information, and position information of the pavement marking 10 is transmitted to the repair management device 500. The repair management device 500 determines whether or not repair is necessary for the pavement marking 10 and the contents of the repair, and creates a schedule for carrying out the repair (step S218). The repair management device 500 transmits repair request information to, for example, the pavement marking management device 100 and a terminal device of a person who will carry out the repair. In response, the pavement marking management device 100 carries out the repair work for the pavement marking 10 (step S220).

[0033] As described above, according to the pavement marking management system 1 of the first embodiment, the drawing position determination unit 230 automatically determines the drawing position of the pavement marking 10, the initial state acquisition unit 110 acquires initial state information of the pavement marking 10 corresponding to each of the multiple points representing the pavement marking 10, the progress state acquisition unit 120 acquires progress state information of the pavement marking 10 corresponding to each of the multiple points representing the pavement marking 10, and the diagnosis unit 130 diagnoses deterioration of the pavement marking 10 based on the initial state information and the progress state information. According to such a pavement marking management system 1, it is possible to provide a consistent service from drawing the pavement marking 10 to maintaining and managing the pavement marking 10.

[0034] In addition, according to the road marking management system 1, the initial state information of the road marking 10 corresponding to each of the multiple points representing the road marking 10 and the progress state information of the road marking 10 corresponding to each of the multiple points representing the road marking 10 are used, so that partial deterioration of the road marking 10 can be diagnosed. As a result, according to the road marking management system 1, it is possible to identify a portion that does not require repair work according to the partial deterioration of the road marking 10, suppress unnecessary repair work, and efficiently maintain the road marking 10. The road marking 10 in the first embodiment is not a road marking that matches the shape of the road, such as a dividing line, but has a regular shape such as a no U-turn sign shown in the figure. Therefore, according to the road marking management system 1, the edges (pixels) of the road marking 10 with regularity are determined and drawn, and deterioration diagnosis of the edges of the road marking 10 can be performed.

[0035] In the pavement marking management system 1, the initial state information may include altitude information corresponding to each of the multiple points representing the road marking 10. The altitude information is generated based on three-dimensional position information detected by the three-dimensional position detection unit 220. The position information of each of the multiple points representing the road marking 10, including the altitude information, is transmitted from the road marking drawing vehicle 200 to the road marking management device 100. This allows the initial state acquisition unit 110 to acquire altitude information corresponding to each of the multiple points representing the road marking 10 as initial state information.

[0036] Furthermore, the road marking detection vehicle 300 may detect information including altitude information as three-dimensional position information of the road surface on which the road marking detection vehicle 300 runs, using the three-dimensional position detection unit 320, and transmit the information to the road marking management device 100. Furthermore, the road marking detection drone 400 may detect altitude information as three-dimensional position information around the road marking detection drone 400, using the three-dimensional position detection unit 420, and transmit the information to the road marking management device 100. This allows the progress state acquisition unit 120 to acquire altitude information as progress state information corresponding to each of the multiple points representing the road marking 10. The diagnosis unit 130 can diagnose changes in the road surface shape by comparing the altitude information as the initial state information with the altitude information as the progress state information. This allows the diagnosis unit 130 of the road marking management system 1 to diagnose deterioration of the road marking 10 according to changes in the road surface shape. Furthermore, according to the road marking management system 1, it is possible to measure altitude changes during a disaster based on the altitude of the drawn road marking 10, and to detect changes in the road surface shape that change due to traffic volume.

[0037] Furthermore, the pavement marking management system 1 of the first embodiment includes a repair management unit 510 that determines whether or not repair is necessary for the pavement marking 10 and the repair content based on the deterioration of the pavement marking 10 diagnosed by the diagnosis unit 130. As a result, the pavement marking management system 1 can determine whether or not repair is necessary and the repair content in accordance with the deterioration, even if the way in which the pavement marking 10 deteriorates varies due to various factors such as braking points, traffic volume, and road construction.

[0038] (Second embodiment) 8 is a block diagram showing an example of a pavement marking management system 1A in the second embodiment. In the description of the second embodiment, the same parts as those in the first embodiment are denoted by the same reference numerals and detailed description thereof will be omitted.

[0039] The drawing device 250 in the road marking management system 1A draws the road marking 10 using paint containing a magnetic material. The road marking drawing vehicle 200A in the road marking management system 1A is equipped with a magnetic detection unit 270. The magnetic detection unit 270 includes, for example, a magnetic sensor that detects the magnetism contained in the road marking 10. The magnetic detection unit 270 acquires information based on the magnetic force of the road marking 10 drawn by the drawing device 250. The road marking drawing vehicle 200A transmits the information based on the magnetic force of the road marking 10 to the road marking management device 100A.

[0040] The road marking detection vehicle 300A includes a magnetic detection unit 340. The magnetic detection unit 340 includes, for example, a magnetic sensor that detects magnetism contained in the road marking 10. The magnetic detection unit 340 acquires information based on the magnetic force of the road marking 10 drawn by the road surface. The road marking detection vehicle 300A transmits the information based on the magnetic force of the road marking 10 to the road marking management device 100A.

[0041] The road marking detection drone 400A includes a magnetic detection unit 440. The magnetic detection unit 440 includes, for example, a magnetic sensor that detects magnetism contained in the road marking 10. The magnetic detection unit 440 acquires information based on the magnetic force of the road marking 10 drawn by the road surface. The road marking detection drone 400A transmits the information based on the magnetic force of the road marking 10 to the road marking management device 100A.

[0042] The initial state acquisition unit 110A acquires, as initial state information, information based on the magnetic force of the road marking 10. The progress state acquisition unit 120A acquires, as progress state information, information based on the magnetic force of the road marking 10. The diagnosis unit 130A diagnoses the deterioration of the road marking 10 by comparing the information based on the magnetic force of the road marking 10 as the initial state information with the information based on the magnetic force of the road marking 10 as the progress state information.

[0043] FIG. 9 is a diagram showing an example of a road marking 10 in the second embodiment, where (A) is a top view showing an example of a road marking 10 without deterioration, and (B) is a top view showing an example of a deteriorated road marking 10. If the total magnetic force detected from the road marking 10 without deterioration is A, when a part of the road marking 10 is deteriorated, the total magnetic force detected from the road marking 10 becomes B, which is lower than A. Therefore, the diagnosis unit 130A can diagnose the deterioration of the road marking 10 by comparing the magnetic force as the initial state information with the magnetic force as the progress state information. In addition, the diagnosis unit 130A can identify the part of the road marking 10 where deterioration has occurred by comparing the magnetic information as the initial state information corresponding to each of the multiple points representing the road marking 10 with the magnetic information as the progress state information.

[0044] Furthermore, the diagnosis unit 130A can diagnose the deterioration of the road marking 10 based on magnetic information in addition to the position information and altitude information corresponding to each of the multiple points representing the road marking 10 in the first embodiment. As a result, the road marking management system 1A can diagnose the deterioration of the road marking 10 with high accuracy.

[0045] (Third embodiment) FIG. 10 is a block diagram showing an example of a road marking management system 1B in the third embodiment. In the description of the third embodiment, the same parts as those in the first embodiment are denoted by the same reference numerals, and detailed description thereof will be omitted. The road marking management system 1B includes an accident occurrence information providing device 600. The accident occurrence information providing device 600 is, for example, a server device that acquires accident occurrence information and transmits the accident occurrence information in response to a request. Since there is a large amount of traffic and there are many sudden brakings of vehicles at the accident occurrence location, deterioration of the road marking 10 may easily occur. The accident occurrence information is, for example, information including the location and date and time of the occurrence of an accident related to a vehicle. The accident occurrence information may include information indicating the location information, vehicle speed, and braking point acquired from the drive recorder of the vehicle.

[0046] When the repair management unit 510B receives the diagnosis result of the deterioration of the road marking 10 transmitted from the diagnosis unit 130, it acquires accident occurrence information near the road marking 10 from the accident occurrence information providing device 600. The repair management unit 510B determines the repair content based on the accident occurrence information near the road marking 10. For example, the repair management unit 510 can decide to change the paint of the road marking 10 near an intersection where accidents frequently occur to a high visibility marking paint.

[0047] Although each embodiment and each variant have been described, these are merely examples and are not intended to be limiting. For example, any of the embodiments or variants, or a part of each embodiment or a part of each variant, may be combined with one or more other embodiments or one or more other variants to realize one aspect of the present invention. [Explanation of symbols]

[0048] 1, 1A, 1B... road marking management system, 10... road marking, 100, 100A... road marking management device, 110, 110A... initial state acquisition unit, 120, 120A... progress state acquisition unit, 130, 130A... diagnosis unit, 200, 200A... road marking drawing vehicle, 210... GPS processing unit, 220... three-dimensional position detection unit, 230... drawing position determination unit, 240... drawing data generation unit, 250... drawing device, 252... drawing unit, 254... drawing control unit, 256... drawing position Detection unit, 260...imaging unit, 270...magnetic detection unit, 300, 300A...road marking detection vehicle, 310...GPS processing unit, 320...three-dimensional position detection unit, 330...imaging unit, 340...magnetic detection unit, 400, 400A...road marking detection drone, 410...GPS processing unit, 420...three-dimensional position detection unit, 430...imaging unit, 440...magnetic detection unit, 500...repair management device, 510, 510B...repair management unit, 520...repair request unit, 600...accident occurrence information providing device

Claims

1. a drawing position determination unit that determines a drawing position of the road marking based on a position of a vehicle equipped with a drawing device that draws the road marking on a road and positions of objects around the vehicle; an initial state acquisition unit that acquires initial state information of the road marking corresponding to each of a plurality of points representing the road marking drawn at the drawing position by the drawing device; a progress state acquisition unit that acquires progress state information of the road marking corresponding to each of a plurality of points that represent the road marking; a diagnosis unit that diagnoses deterioration of the road marking based on the initial state information acquired by the initial state acquisition unit and the progress state information acquired by the progress state acquisition unit; A road marking management system comprising:

2. the initial state acquisition unit acquires altitude information corresponding to each of a plurality of points representing the road marking as the initial state information; the progress state acquisition unit acquires altitude information corresponding to each of a plurality of points representing the road marking as the progress state information; The diagnosing unit diagnoses a change in road surface shape by comparing the altitude information as the initial state information with the altitude information as the progress state information. The pavement marking management system according to claim 1 .

3. The road marking management system according to claim 1 , wherein the drawing position determination unit determines the drawing position so as to distort the road marking and draw it based on altitude information corresponding to each of a plurality of points representing the road marking.

4. the drawing device draws the road marking using paint containing a magnetic material; the initial state acquisition unit acquires information based on a magnetic force of the road marking as the initial state information; the progress state acquisition unit acquires information based on a magnetic force of the road marking as the progress state information, the diagnosing unit diagnoses deterioration of the road marking by comparing information based on the magnetic force of the road marking as the initial state information with information based on the magnetic force of the road marking as the progressed state information. The pavement marking management system according to claim 1 .

5. 2. The pavement marking management system according to claim 1, further comprising a repair management unit that determines whether or not repair is required for the pavement marking and the content of the repair based on the deterioration of the pavement marking diagnosed by the diagnosis unit.

6. The pavement marking management system according to claim 5 , wherein the repair management unit determines repair details based on information about accident occurrences near the pavement markings.

7. determining a drawing position of the road marking based on a position of a vehicle equipped with a drawing device for drawing the road marking on a road surface and positions of objects around the vehicle; acquiring initial state information of the road marking corresponding to each of a plurality of points representing the road marking drawn at the drawing position by the drawing device; obtaining road marking progress information corresponding to each of a plurality of points representing the road marking; diagnosing deterioration of the road marking based on the initial state information and the progress state information; A method for managing road markings, comprising:

Citation Information

Patent Citations

  • Road compartment line painting system and compartment line work data recording unit

    JP2015132152A

  • Program, system, and method to support maintenance and management of road surface sign

    JP2022017106A