Production planning device, production planning program, and production planning method

The production planning device uses mathematical and rule-based models to quickly create and revise plans, addressing the inefficiency of existing methods by stabilizing solutions and reducing time to optimal production plans.

JP2024145551AActive Publication Date: 2024-10-15QSOL CO LTD
View PDF 11 Cites 0 Cited by

Patent Information

Application Number
JP2023057951
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2024-10-15
Estimated Expiration
2043-03-31

AI Technical Summary

Technical Problem

Existing production planning technologies take too long to formulate optimal plans due to complex conditions, risking suboptimal results.

Method used

A production planning device and method that uses a combination of mathematical optimization, rule-based models, and metaheuristic models to quickly create and revise base plans, prioritizing high-importance constraints and load balancing, with metaheuristic models to stabilize solutions.

Benefits of technology

This approach reduces the time required to formulate optimal production plans by stabilizing solutions and improving efficiency, while ensuring compliance with critical constraints.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024145551000001_ABST
    Figure 2024145551000001_ABST
Patent Text Reader

Abstract

To provide a production planning device and the like that can quickly create an optimal production plan.SOLUTION: A production planning device 1, which creates, on the basis of input data, an optimal production plan, includes: storage means 13 that stores information necessary for formulating a production plan; first calculation means 14 that uses the information stored in the storage means 13 as input data to create a base plan for the production plan using a mathematical optimization model and / or a rule-based model; and second calculation means 15 that creates a plurality of production plan proposals by revising the base plan using a meta-heuristic model.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a production planning device that automatically creates an optimal production plan, a program that causes a computer to operate as the production planning device, and a method for creating an optimal production plan. [Background technology]

[0002] In various industries such as metal processing, machine assembly, chemical and food manufacturing, the creation of optimal production plans is required in each industry. Therefore, technologies aimed at creating more optimal production plans are known.

[0003] For example, Patent Document 1 describes a factory management device that provides a function for optimizing factory management using information on the work capabilities of workers and machines. This factory management device uses the predicted production capacity of the factory to create a factory plan that satisfies a predetermined productivity index, and the prediction uses worker measurement information that measures the movements of workers and machine measurement information that measures a predetermined value that indicates the operating status of machines that are production equipment in the factory.

[0004] On the other hand, Patent Document 2 describes a production plan creation device that calculates a plan pattern including the production order of each product while taking into consideration each constraint condition when producing each product, based on historical information regarding production plans for each product that were previously planned, rearranges the production order of each product according to the plan pattern, creates multiple plan candidates for the production plan of each product, evaluates the multiple plan candidates based on evaluation indexes corresponding to each constraint condition, and selects the best production plan from the multiple plan candidates.

[0005] Furthermore, Patent Document 3 describes a planning system that prepares multiple plan candidates based on specification information on multiple elements that specify the specifications of the plan and constraint condition information that specifies the constraint condition for each of the multiple elements, evaluates each plan data, and generates multiple evaluation data indicating the evaluation results for each plan data. This planning system also transmits plan data to a user terminal, learns user data indicating the user's evaluation results for each plan data as learning data, constructs an evaluation learning device for each plan candidate from the learning result, and further evaluates the prediction reliability of the evaluation prediction value by the evaluation learning device. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] JP 2021-117538 A [Patent Document 2] Patent No. 6764025 [Patent Document 3] Patent No. 7228470 Summary of the Invention [Problem to be solved by the invention]

[0007] However, in order to utilize it in actual business, it is required to create a production plan quickly as well as an optimal production plan. Since various conditions are imposed on a production plan, such as a large number of items to be manufactured, quantities, and machines to be used, and a long manufacturing time, it takes time to create an optimal production plan. Therefore, since the technologies of Patent Documents 1 to 3 aim to create a more optimal production plan, when creating a complex production plan with many conditions to be considered, it may take a long time to create the production plan or it may not be possible to create an optimal production plan.

[0008] Therefore, an object of the present invention is to provide a production planning device and the like that can quickly create an optimal production plan. [Means for solving the problem]

[0009] The production planning device of the present invention is a production planning device that plans an optimal production plan based on input data, and has: a storage means for storing information necessary for planning a production plan; a first calculation means for creating a base production plan using a mathematical optimization model and / or a rule-based model with the information stored in the storage means as input data; and a second calculation means for creating a plurality of production plan proposals by revising the base plan using a metaheuristic model.

[0010] As a result, using the information stored in the memory means as input data, the first calculation means creates a base draft of the production plan using a mathematical optimization model and / or a rule-based model, and the second calculation means refines (brushes up) this base draft using a metaheuristic model.

[0011] Here, it is preferable that the storage means stores the constraint conditions and the revision rule, and the second calculation means revises the base plan based on the revision rule and randomness, on the premise that the constraint conditions are satisfied. Moreover, it is preferable that the first calculation means creates a plurality of base plans based on a plurality of optimization viewpoints, rather than a single base plan.

[0012] In particular, it is even more preferable that the second calculation means revises the base plan by adopting a revision method that is expected to have an improvement effect based on the evaluation results of the entire production plan and the evaluation results of each individual production plan process as the revision rule. It is further preferable that the first calculation means creates a first base plan created with a priority condition of reducing the variation in load among the machines used in production, and a second base plan created with a priority condition of production using machines with high production capacity, and that the second calculation means creates a plurality of production plan proposals by revising the first base plan and the second base plan.

[0013] The production planning program of the present invention is a program that causes a computer to operate as a production planning device that plans an optimal production plan based on input data, the production planning device having: a storage means for storing information necessary for planning a production plan; a first calculation means for creating a base production plan using a mathematical optimization model and / or a rule-based model with the information stored in the storage means as input data; and a second calculation means for creating a plurality of production plan proposals by revising the base plan using a metaheuristic model.

[0014] The production planning method of the present invention includes storing information necessary for planning a production plan using a memory means, creating a base draft production plan using a mathematical optimization model and / or a rule-based model with the information stored in the memory means as input data using a first calculation means, and creating a plurality of production plan proposals by revising the base plan using a metaheuristic model using a second calculation means. Effect of the Invention

[0015] With such a configuration, the production planning device of the present invention uses the information stored in the memory means as input data, and the first calculation means creates a base draft of the production plan using a mathematical optimization model and / or a rule-based model, and the second calculation means revises this base draft using a metaheuristic model.Therefore, the first calculation means searches for an initial solution that satisfies, among the constraints that must be observed, a condition that is particularly important and can be expressed in a mathematical formula, and sets this as the initial solution (base draft), so that it is possible to start from a production plan draft that has a certain evaluation value at the stage of the initial search by the second calculation means. Therefore, in the second calculation means, the number of revisions can be reduced and the stability of the solution can be improved, resulting in a reduction in the time required to create an optimal production plan.

[0016] According to the production planning program and the production planning method of the present invention, it is possible to achieve the same effects as those of the production planning device of the present invention. [Brief description of the drawings]

[0017] [Figure 1] 1 is a schematic functional block diagram of a production planning device according to an embodiment of the present invention. [Diagram 2] FIG. 1 is a schematic flow diagram of a production planning method according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0018] The following describes an embodiment of the present invention in detail. The description of the components described below is an example (representative example) of an embodiment of the present invention, and the present invention is not limited to the following content unless the gist of the present invention is changed.

[0019] [Production planning device] FIG. 1 is a schematic functional block diagram of a production planning device according to an embodiment of the present invention. As shown in FIG. 1, the production planning device 1 has an input means 11, an output means 12, a storage means 13, a first calculation means 14, a second calculation means 15, and a tendency extraction means 16.

[0020] The input means 11 is a function for accepting input of information (data) from an external device. The external device is, for example, a terminal such as a personal computer, a tablet, or a smartphone, or a database.

[0021] The output means 12 is a function that outputs the production plan drawn up by the production planning device 1 to an external device as described above. For example, the output means 12 can display the drawn up production plan on the display means (display) of the user's personal computer. The output means 12 can also output to a database or as a file (such as a CSV file or a text file).

[0022] The storage means 13 has a function of storing various information input from an external device, and is, for example, a memory, a database, etc. The storage means 13 also stores a program for operating the production plan making device 1, information used in production plan making described later, constraint conditions and revision rules (including program code in which the logic of the constraint conditions and revision rules is written), or a setting file in which settings related to behavior, etc. are managed, temporary information generated when making a production plan, a learned model, etc.

[0023] The first calculation means 14 has a function of creating a base draft of a production plan using the information stored in the storage means 13 as input data and a mathematical optimization model and / or a rule-based model.

[0024] The second calculation means 15 is a function of creating a plurality of production plan proposals by revising (brushing up) the base plan created by the first calculation means 14 using a metaheuristic model.

[0025] The information used as input data by the first calculation means 14 to create a base plan is as follows: (1) Procurement information (items and processes to be manufactured (hereinafter referred to as "items / processes"), quantities, delivery dates (manufacturing deadlines)) (2) Information on the machinery used in production (such as the type of machinery and the amount of electricity required by the machinery) (3) Information on tools, molds, and other auxiliary materials used in manufacturing (4) Production capacity (the production capacity of each machine used in production, whether the target item / process can be produced, and the production time and auxiliary materials required) (5) Information on holidays and non-operation of each machine For example, the manufacturing item / process is the welding process for product A, the assembly process for product B, etc. The first calculation means 14 and the second calculation means 15 formulate a production plan based on this information. This information is input from the input means 11 and stored in the storage means 15.

[0026] The production planning device 1 (first calculation means 14, second calculation means 15) creates a production plan from the input data, aiming to efficiently produce the required quantity within the delivery date while observing various constraint conditions. One example of the constraint condition is that the items / processes to be manufactured are manufactured by machines capable of manufacturing them, and if there is a chronological relationship between the items / processes to be manufactured, the order is maintained in chronological order.

[0027] That is, the first calculation means 14 creates a base proposal for an optimal production plan while observing some or all of the conditions selected from the constraint conditions given as an example above and taking other information into consideration.

[0028] Here, the first calculation means 14 can create multiple base plans by changing the optimization viewpoint. The optimization viewpoint is a viewpoint for evaluating the goodness of the created production plan, which is provided separately from the above-mentioned constraint conditions, and by creating base plans by changing this viewpoint, base plans based on different optimization viewpoints are created. Specifically, the first calculation means 14 creates a first base plan, which is created with the priority condition being to reduce the variation in load between each machine used in production, and a second base plan, which is created with the priority condition being to manufacture using machines with high production capacity.

[0029] The second base plan is a base plan created so that, for each item / process to be manufactured, production is carried out on the machine with the highest production capacity, without taking into account factors such as load balancing between machines. This does not necessarily require the use of a mathematical optimization model, and each constraint can be determined by processing conditional branches to create a base plan. The constraints considered when creating the second base plan are essentially the same as those considered in the first base plan, but only one result is simply derived by processing each conditional branch.

[0030] On the other hand, the first base plan is a base plan created using a mathematical optimization model, and is a base plan created taking into consideration factors such as load distribution among machines (e.g., so that the load on a specific machine is reduced) rather than production capacity. As described above, the first calculation means 14 can create a base plan using a mathematical optimization model, can also create a base plan using a rule-based model that processes with conditional branching, or can create a base plan using both of these.

[0031] In addition, in mathematical optimization, the number of combinations may become huge due to the number of constraints and the number of data, which may cause a sudden increase in processing time (combinatorial explosion). Therefore, in order to prevent the occurrence of this combinatorial explosion, the first calculation means 14 can incorporate the following control when creating a base plan. (1) Limit the constraints that are applied. (2) Starting from the delivery date, the block of ordering information is divided into multiple parts, and optimization processing is performed in stages. (3) Set a timeout period for the process and interrupt it midway (if the process is interrupted midway, the solution (base plan) found at that point in time will be considered the optimal solution).

[0032] Then, the second calculation means 15 creates a plurality of production plan proposals by revising these base plans. The number of production plan proposals created by the second calculation means 15 can be appropriately changed.

[0033] [Production planning method] FIG. 2 is a schematic flow diagram of a production planning method according to an embodiment of the present invention. Next, a production planning method according to an embodiment of the present invention using the production planning device 1 will be described with reference to FIGS.

[0034] First, various information used as the input data as described above is input from an external device to the production planning device 1 via the input means 11 (step S101). The input information is stored in the storage means 13. At this time, information such as conditions related to production planning (for example, what is the top priority condition, what is the next priority condition, what is the next priority condition after that, etc.) and behavior according to those conditions (production planning policy) are also stored in the storage means 13.

[0035] Then, as described above, the first calculation means 14 creates multiple base plans using the information stored in the storage means 13 as input data (step S102). The base plans can be created by changing conditions such as the first base plan and the second base plan, and multiple base plans (three, four, five or more) can be created by further changing conditions.

[0036] Thereafter, the second calculation means 15 refines (brushes up) the base plan created by the first calculation means 14 (step S103), and creates a plurality of production plan proposals (step S104).

[0037] The created multiple production plans are outputted to an external device by the output means 12 (step S105).

[0038] In this way, the production planning device and production planning method of the present invention create a production plan using the first calculation means 14 (mathematical optimization model and / or rule-based model) and the second calculation means 15 (metaheuristics model), and multiple different models.

[0039] Although the mathematical optimization model is not good at finding optimal solutions in complex phenomena that cannot be expressed by mathematical formulas, it is good at logically solving relatively simple combinatorial problems. Meanwhile, the rule-based model solves problems logically and simply by using conditional branching. Therefore, although it cannot be said to be the most optimal solution, the first calculation means 14 can quickly create a base plan that strictly adheres to the highest priority constraint conditions.

[0040] On the other hand, metaheuristic models are generally compatible with large-scale combinatorial problems, but they are heuristic methods with randomness. Therefore, when using a metaheuristic model to create a production plan from scratch (from input data), in the case of production planning with many complex constraints and a potentially huge amount of data, many revisions are required to stabilize the solution, resulting in a huge processing time. In addition, there is no guarantee that the solution will be stable.

[0041] However, in the present invention, since the first calculation means 14 creates a base plan in which the highest priority constraint is observed, the second calculation means 15 can reduce the processing time required to create a production plan.

[0042] In short, the production planning device 1, in the first calculation means 14, searches for an initial solution that satisfies conditions that are particularly important and can be expressed mathematically among the constraints that must be observed (for example, whether each item / process can be produced on each machine), and sets this as the initial solution (base plan), thereby making it possible to start from a production plan plan that has a certain evaluation value at the initial search stage of the second calculation means 15 (a production plan plan that is somewhat efficient, rather than a completely inefficient production plan plan). Therefore, in the second calculation means 15, the number of revisions can be reduced and the stability of the solution can be improved.

[0043] In addition, since the first calculation means 14 creates different base plans (first base plan, second base plan) based on different conditions, multiple revision targets with different starting points, so to speak, are prepared, and the second calculation means 15 can create multiple production plan plans with various patterns.

[0044] Moreover, by providing revision rules (hereinafter simply referred to as "rules") in the revision method performed by the second calculation means 15, the processing time until the optimal solution is stabilized can be further shortened. In other words, the second calculation means can shorten the time required to formulate an optimal production plan by revising the base plan by adopting a revision method that is expected to have an improvement effect based on the evaluation results of the entire production plan and the evaluation results of each individual production plan process. For example, the second calculation means 15 can revise the base plan including a plurality of production planning processes created by the first calculation means 14 by replacing the production planning processes among the plurality of production planning processes in consideration of the time series. That is, in this case, a rule that "considers the time series" is provided.

[0045] Specifically, the second calculation means 15 can revise the base proposal based on the following rules. (1) If there is a production planning process that is on hold due to the completion of manufacturing in the previous process, some of the production planning processes of other machines are selected while taking into account the time series and moved to the front of the production planning process that is on hold. (2) If there is a production planning process that cannot be completed by the delivery date, advance the manufacturing order of that production planning process. (3) Transfer some of the production planning processes of the machine that completes production the slowest (the machine with the highest load) to the machine that completes production the fastest (the machine with the lowest load).

[0046] If all production planning processes that may fall under the above-mentioned rules are revised uniformly using the same rules, there is a risk that the revisions will proceed only in a set way and will not result in heuristic production planning. Therefore, for example, it is preferable to randomly select and revise some of all production planning processes that may fall under the above rules, or to randomly select a destination machine. Also, in order to generate and evaluate as many different patterns of solutions as possible, if a solution identical to a previously created solution is generated, it is preferable to discard the solution and regenerate it.

[0047] In addition, the production planning device 1 can create a production plan using the aforementioned machine power information (power information of one or more machines used in manufacturing) and the priority of the combination of the items / processes to be manufactured and the machines as input data.

[0048] (Electricity Information) Specifically, the storage means 13 stores power information for one or more machines used in manufacturing, and the first calculation means 14 uses this power information as input data in addition to the above-mentioned input data to create a base draft of a production plan with the priority condition being to reduce the power consumption of the entire factory.Then, the second calculation means 15 revises this base draft with the priority condition being to reduce the power consumption of the entire factory. For example, the first calculation means 14 and the second calculation means 15 create or revise a base plan so as to reduce the power consumption of the entire factory by adjusting (leveling out) the number of machines operating simultaneously.

[0049] In this way, by using the power information of machines as input data for creating a production plan, it is possible to create a production plan that reduces power consumption throughout the factory (potentially achieving energy savings).

[0050] (Priority of item / process and machine combination) Furthermore, the production planning device 1 can create a production plan using the priority of a combination of a product / process and a machine to be manufactured as input data. In short, the production planning device 1 creates a production plan based on the idea that this item / process in this arrangement information is often manufactured by this machine, regardless of the production capacity of the machine. In some cases, it is more efficient to manufacture the same product by the same machine as much as possible, since this can reduce the setup time (preparation time) for work such as changing dies. Such information can be determined by the first calculation means 14 and the second calculation means 15 by referring to the priority input from the input means (stored in the storage means 15) or from trends extracted from past production plan data, which will be described later.

[0051] In addition, the production planning device 1 can utilize past production plan data stored in the storage means 13 to create a production plan.

[0052] Specifically, the production planning device 1 has a trend extraction means 16, which extracts trends in past production plan data and reflects the trends, making it possible to create a production plan that includes past know-how, just like a plan made by a veteran person in charge.

[0053] Here, in order to extract trends in past production plan data, the trend extraction means 16 can use various methods, such as statistical processing and machine learning, depending on the trend to be extracted.

[0054] In addition, the past trends extracted by the trend extraction means 16 may be reflected in the base plan created by the first calculation means 14, or in the production plan created by the second calculation means 15.

[0055] The production planning device 1 described above is an example of a production planning device according to the present invention, and the configuration of the present invention is not limited to the example shown without departing from the spirit of the present invention. For example, in this description, the first calculation means 14 creates a base plan under the condition that the load variation between each machine used in manufacturing is small (load distribution), but the second calculation means 15 can also schedule a part of the production plan process of a machine with a high load to be allocated to other machines with a low load (load distribution). In other words, load distribution, priority of production capacity, minimization of power consumption, consideration of the combination of items / processes and machines, etc. are perspectives (planning policies) established for planning an optimal production plan. And, both the first calculation means 14 and the second calculation means 15 can be operated based on a certain perspective, and it is also possible that only the first calculation means 14 or only the second calculation means 15 can be operated based on a certain perspective.

[0056] Alternatively, the storage means 13 may be provided outside the production planning device 1 (such as a cloud server), and the format of the data output by the output means 12 to the outside may be a file format other than display on a terminal. [Industrial Applicability]

[0057] INDUSTRIAL APPLICABILITY The production planning device according to the present invention can be used when creating production plans in various industries such as metal processing, machine assembly (electronic devices and automobile parts), chemicals, and food manufacturing, and is therefore industrially useful. [Explanation of symbols]

[0058] 1. Production planning device 11 Input methods 12 Output Method 13 Memory means 14 First calculation means 15 Second calculation means

Claims

1. A production planning device that creates an optimal production plan based on input data, A storage means for storing information necessary for formulating a production plan; a first calculation means for creating a base draft of a production plan using a mathematical optimization model and / or a rule-based model with the information stored in the storage means as the input data; A second calculation means for creating a plurality of production plan proposals by revising the base plan using a metaheuristic model; A production planning device having the above configuration.

2. The storage means stores constraint conditions and revision rules, 2. The production planning device according to claim 1, wherein the second calculation means revises the base plan based on the revision rule and randomness, on the premise that the constraint condition is satisfied.

3. 2. The production planning device according to claim 1, wherein the first calculation means creates a plurality of the base plans based on a plurality of optimization viewpoints.

4. 3. The production planning device according to claim 2, wherein the second calculation means revises the base plan by adopting, as the revision rule, a revision method that is expected to have an improvement effect based on an evaluation result of the entire production plan and an evaluation result of each individual production plan process.

5. the first calculation means creates a first base plan created under the condition that a load variation between machines used in production is reduced, and a second base plan created under the condition that a production is performed using a machine with a high production capacity, 5. The production planning device according to claim 1, wherein the second calculation means creates a plurality of the production plan proposals by revising the first base proposal and the second base proposal.

6. Computer, A production planning device that creates an optimal production plan based on input data, A storage means for storing information necessary for formulating a production plan; a first calculation means for creating a base draft of a production plan using a mathematical optimization model and / or a rule-based model with the information stored in the storage means as the input data; A second calculation means for creating a plurality of production plan proposals by revising the base plan using a metaheuristic model; A production planning program that causes the production planning device to operate as a production planning device having the above-mentioned configuration.

7. storing information necessary for formulating a production plan by a storage means; creating a base draft of a production plan by a first calculation means using a mathematical optimization model and / or a rule-based model with the information stored in the storage means as the input data; creating a plurality of production plan proposals by revising the base plan using a metaheuristic model by a second calculation means; A method for formulating production plans, including:

Citation Information

Patent Citations

  • Method for preparing production plan

    JP1996305763A

  • Device and method for scheduling and recording medium stored with its scheduling program

    JP2000330966A

  • Scheduling method

    JP2002032113A

  • Optimal solution search device and optimal solution search program

    JP2022079376A

  • Shipping and transportation optimization system and method

    US20020156663A1