Passenger-flow information generation device, passenger-flow information generation method, and passenger-flow information generation program
The passenger flow information generation device enhances fare accuracy for no-latch transfers and mutual direct operations by estimating connecting stations using entry/exit data from ticket gates, addressing the limitations of existing systems in calculating fares for indirect transfers.
Patent Information
- Application Number
- JP2023059767
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-03
- Publication Date
- 2024-10-16
AI Technical Summary
Existing passenger flow information generation systems fail to accurately calculate fares for no-latch transfers and mutual direct operations between different railway businesses due to the inability to identify connecting stations when transfers do not involve ticket gates.
A passenger flow information generation device and method that includes a ticket gate passage data acquisition unit, entry/exit data generation, data identification, connecting station estimation, and fare calculation units to estimate connecting stations and calculate fares using entry/exit data from ticket gates, even in the absence of direct ticket gate transfers.
Improves the accuracy of fare calculation for no-latch transfers and mutual direct operations by estimating connecting stations based on entry/exit data, allowing for precise fare determination without additional data from external sources.
Smart Images

Figure 2024147008000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a passenger flow information generation device, a passenger flow information generation method, and a passenger flow information generation program that generate information regarding the flow of passengers from a first railway line to a second railway line that has mutual access via a specified railway station as a connecting station. [Background technology]
[0002] JP 2013-210753 A (Patent Document 1) describes a passenger flow information generation system that generates a travel log including transfers based on ID information from information such as ticket gate entry and exit information stored as electronic ticket history, creates comprehensive data that tabulates the usage status of each route based on the travel log, and uses the previously created tabulated data to estimate the extent to which each of multiple routes is used. This passenger flow information generation system has the advantage of being simple, without the need for case distinction, and being able to find sections that have a fare impact, because it calculates fare-based usage rates in addition to number-based usage rates. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2013-210753 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, the above-mentioned passenger flow information generation system is based on the assumption that transfers between different railway operators are made through ticket gates, and in the case of so-called no-latch transfers or mutual through-runs, where passengers transfer to lines of different railway operators without going through ticket gates, it is not possible to identify connecting stations.As a result, fares in the case of no-latch transfers or mutual through-runs cannot be calculated using only the data obtained from ticket gates installed at railway stations on the company's own lines, and there is still room for improvement in terms of the accuracy of fare calculation.
[0005] The present invention has been made in consideration of the above, and one of its objectives is to provide technology that contributes to improving the accuracy of fare calculation in no-latch transfers and through-running operations.
[0006] The passenger flow information generating device, the passenger flow information generating method, and the passenger flow information generating program of the present invention employ the following means to achieve the above-mentioned object. [Means for solving the problem]
[0007] A passenger flow information generating device according to a first aspect of the present invention is a passenger flow information generating device that generates information on the flow of passengers from a first railway line to a second railway line that have mutual access with a specific railway station as a connecting station, and includes a ticket gate passage data acquiring unit, an entry / exit data generating unit, a data identifying unit, a connecting station estimating unit, and a fare calculating unit. The ticket gate passage data acquiring unit records, when a passenger passes through a ticket gate installed at a railway station included in the first railway line, the ticket gate passage data together with passenger identification information that can identify the passenger. The entry / exit data generating unit extracts entry data and exit data having the same passenger identification information from the ticket gate passage data acquired by the ticket gate passage data acquiring unit. The entry data includes entry identification information that can identify entry, an entry station, and an entry time. The exit data includes exit identification information that can identify exit, an entry station, an entry time, an exit station, and an exit time. The entrance / exit data generating unit then sorts the extracted entrance data and exit data by entrance time to generate entrance / exit data related to passenger identification information. The data identifying unit determines the presence or absence of first entrance data that is presumed to indicate entrance at a railway station included in the first railway line and exit at a railway station included in the second railway line, based on the entrance / exit data generated by the entrance / exit data generating unit, and, if the first entrance data is present, identifies the first entrance data and identifies first exit data that is presumed to be paired with the first entrance data and indicates entrance at a railway station included in the second railway line and exit at a railway station included in the first railway line. The connecting station estimating unit estimates, based on the first exit data, the first connecting station used when entering at a railway station included in the second railway line and exiting at a railway station included in the first railway line. Furthermore, the connecting station estimating unit estimates that the second connecting station used when entering at a railway station included in the first railway line and exiting at a railway station included in the second railway line is the first connecting station. The fare calculation unit calculates a first fare from the entry station in the first entry data to the first connecting station, and a second fare from the first connecting station to the exit station in the first exit data. Here, the "first railway" in the present invention refers to a railway company on the side of the own bureau that generates passenger flow information, and the second railway refers to a railway company on the side of another bureau that has mutual access with the first railway via a connecting station.The second railway may refer to one railway company, or to multiple railway companies that share a common track via multiple connecting stations. In addition, the "connecting station" in the present invention typically refers to a railway station included in the line of the first railway where passengers get off to transfer from the line of the first railway to the line of the second railway, but in the case where the first railway and the second railway are in mutual direct service, the "connecting station" refers to a railway station included in the line of the first railway that is located on the boundary with the line of the second railway.
[0008] According to the first invention, the presence or absence of first entry data that would have involved a no-latch transfer or a mutual through operation is determined based on the entry / exit data, and if the first entry data is present, the first exit data that would be paired with the first entry data is identified. Based on the first exit data, a first connecting station used when entering a railway station included in the line of the second railway and exiting a railway station included in the line of the first railway is estimated, and the second connecting station used when the no-latch transfer or mutual through operation was performed is estimated to be the first connecting station. The estimated first connecting station is used to calculate the fare from the entry station in the first entry data to the first connecting station. In order to calculate the fare from the first connecting station to the exit station in the first exit data, the connecting station used by the passenger during no-latch transfer or mutual direct operation can be estimated using only the entry / exit data (entrance data and exit data) generated based on the ticket gate passage data acquired by the company (first railway) itself, without obtaining records of ticket gate passage data of passengers who passed through automatic ticket gates installed at railway stations included in the line of the other company (second railway) from an external source such as an issuer of an IC card held by each passenger, and the fare of the company (first railway) during no-latch transfer or mutual direct operation can be calculated. Here, the estimation of the connecting station used when no-latch transfer or mutual direct operation is based on the basic idea that passengers travel the same route on the way there and back.
[0009] A passenger flow information generation device according to a second aspect of the present invention is a passenger flow information generation device according to the first aspect of the present invention, wherein the fare calculation unit calculates the first and second fares by referring to a fare table that associates a first railway station included in a first railway line, a first connecting station, and fares between the first railway station and the first connecting station.
[0010] According to the second invention, the fare of the company (first railway) in case of no-latch transfer or mutual through operation can be calculated easily.
[0011] The passenger flow information generation device of the third invention is a passenger flow information generation device of the first or second invention, wherein the data identification unit identifies, in the entry / exit data generated by the entry / exit data generation unit, entry data that does not have exit data corresponding to the entry data as first entry data, and identifies exit data in which a railway station included in a second railway line is recorded as the entry station of the exit data as the first exit data.
[0012] According to the third invention, the first entrance data and the first exit data can be easily specified using the entry / exit data.
[0013] A passenger flow information generation device of a fourth invention is a passenger flow information generation device of any one of the first to third inventions, wherein the connecting station estimation unit estimates that the second connecting station is the first connecting station when the entry station of the first entry data and the exit station of the first exit data match.
[0014] According to the fourth aspect of the present invention, it is possible to improve the accuracy of estimating the second connecting station used when performing no-latch transfer or mutual through operation.
[0015] A passenger flow information generation device of the fifth invention is a passenger flow information generation device of any one of the first to fourth inventions, wherein when the entry station in the first entry data and the exit station in the first exit data do not match, the connecting station estimation unit estimates a second connecting station based on the entry station in the first entry data and the entry station in the first exit data, and when the estimated second connecting station matches the first connecting station, the connecting station is estimated to be the first connecting station.
[0016] According to the fifth aspect of the present invention, it is possible to improve the accuracy of estimating the second connecting station used when performing no-latch transfer or mutual through operation.
[0017] A passenger flow information generating method according to a sixth aspect of the present invention is a passenger flow information generating method for generating information on the flow of passengers from a first railway line to a second railway line that has mutual access with a specific railway station as a connecting station, and includes a ticket gate passage data acquiring step, an entrance / exit data generating step, a data identifying step, an entrance station estimating step, and a fare calculating step. In the ticket gate passage data acquiring step, ticket gate passage data recorded together with passenger identification information that identifies the passenger when the passenger passes through a ticket gate installed at a railway station included in the first railway line is acquired. In the entrance / exit data generating step, entrance data and exit data having the same passenger identification information are extracted from the acquired ticket gate passage data. The entrance data includes entrance identification information that can identify entrance, an entrance station, and an entrance time. The exit data includes exit identification information that can identify exit, an entrance station, an entrance time, an exit station, and an exit time. In the entrance / exit data generating step, the extracted entrance data and exit data are sorted by the entrance time to generate entrance / exit data related to the passenger identification information. In the data identification step, the presence or absence of first entrance data presumed to indicate entry at a railway station included in the first railway line and exit at a railway station included in the second railway line is determined based on the generated entry / exit data, and if the first entrance data is present, the first entrance data is identified, and first exit data presumed to be paired with the first entrance data, which indicates entry at a railway station included in the second railway line and exit at a railway station included in the first railway line, is identified. In the connecting station estimation step, based on the first exit data, a first connecting station used when entry is made at a railway station included in the second railway line and exit is made at a railway station included in the first railway line is estimated, and a second connecting station used when entry is made at a railway station included in the first railway line and exit is made at a railway station included in the second railway line is estimated to be the first connecting station. Then, in the fare calculation step, a first fare from the entry station in the first entrance data to the first connecting station and a second fare from the first connecting station to the exit station in the first exit data are calculated. Here, the "first railway" in this invention refers to a railway company of the own bureau that generates passenger flow information, and the "second railway" refers to a railway company of another bureau that has mutual access with the first railway via a connecting station.The second railway may refer to one railway company, or to multiple railway companies that share a common track via multiple connecting stations. In addition, the "connecting station" in the present invention typically refers to a railway station included in the line of the first railway where passengers get off to transfer from the line of the first railway to the line of the second railway, but in the case where the first railway and the second railway are in mutual direct service, the "connecting station" refers to a railway station included in the line of the first railway that is located on the boundary with the line of the second railway.
[0018] According to the sixth aspect of the present invention, the presence or absence of first entry data for which a no-latch transfer or mutual through operation would have been performed is determined based on the entry / exit data, and if the first entry data is present, the first entry data is identified, and the first exit data that would be paired with the first entry data is identified, and based on the first exit data, a first connecting station used when entering a railway station included in the line of the second railway and exiting a railway station included in the line of the first railway is estimated, and the second connecting station used when a no-latch transfer or mutual through operation was performed is estimated to be the first connecting station, and the estimated first connecting station is used to determine the first connecting station from the entry station in the first entry data. In order to calculate the fare to the connecting station and the fare from the first connecting station to the exit station in the first exit data, the connecting station used by the passenger during no-latch transfer or mutual direct operation can be estimated using only the entry / exit data (entrance data and exit data) generated based on the ticket gate passage data acquired by the company (first railway) itself, without obtaining records of ticket gate passage data of passengers who passed through automatic ticket gates installed at railway stations included in the line of the other company (second railway) from an external source such as an issuer of an IC card held by each passenger, and the fare of the company (first railway) during no-latch transfer or mutual direct operation can be calculated. Here, the estimation of the connecting station used during no-latch transfer or mutual direct operation is based on the basic idea that passengers travel the same route on the way there and back.
[0019] A passenger flow information generating program according to a seventh aspect of the present invention is a passenger flow information generating program that generates information on the flow of passengers from a first railway line to a second railway line that share a common railway line at a specific railway station, and causes a computer to execute each step of the passenger flow information generating method according to the sixth aspect of the present invention. The program may be recorded on a computer-readable recording medium, such as a hard disk, a ROM, an SSD, a flash memory (such as a USB memory or an SD card), a floppy disk, a CD, or a DVD, or may be distributed from one computer to another computer via a transmission medium, such as a communication network such as the Internet or a LAN, or may be transmitted in any other manner.
[0020] According to the seventh invention, it is possible to achieve the same effects as those achieved by the passenger flow information generation method related to the sixth invention described above, for example, it is possible to estimate the connecting stations used by passengers when making no-latch transfers or mutual through-running operations and to calculate the fares of the company's own station (first railway) when making no-latch transfers or mutual through-running operations using only the entry / exit data (entry data and exit data) generated based on the ticket gate passage data acquired by the company's own station (first railway) without obtaining records of ticket gate passage data of passengers who passed through automatic ticket gates installed at railway stations included in the lines of the other company's station (second railway) from an external source such as an issuer of an IC card held by each passenger. Effect of the Invention
[0021] The passenger flow information generation device, passenger flow information generation method, and passenger flow information generation program of the present invention can provide technology that contributes to improving the accuracy of fare calculation for no-latch transfers and through-running services. [Brief description of the drawings]
[0022] [Figure 1] 1 is a block diagram showing the configuration of a passenger flow information generation device 1 and its peripherals according to an embodiment of the present invention. [Diagram 2]FIG. 1 is an explanatory diagram showing an example of a route map including connecting stations of multiple railway companies through which passengers travel. [Diagram 3] This is an explanatory diagram showing an example of entry / exit data 120 when the entry station of the first entry data 122 matches the exit station of the first exit data 124, and the first exit data 124 appears after the first entry data 122 appears. [Figure 4] This is an explanatory diagram showing an example of entry / exit data 120 when the entry station of the first entry data 122 matches the exit station of the first exit data 124, and the first entry data 122 appears after the first exit data 124 appears. [Diagram 5] FIG. 2 is an explanatory diagram showing an example of a lowest fare route table 32. [Figure 6] FIG. 3 is an explanatory diagram showing an example of a fare table 34. [Figure 7] 13 is a flowchart showing an example of a connecting station estimation processing routine. [Figure 8] 13 is an explanatory diagram showing an example of the entry / exit data 220 in the case where the entry station in the first entry data 222 does not match the exit station in the first exit data 224. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0023] Next, the best mode for carrying out the present invention will be described with reference to examples. In the present embodiment, more detailed explanations than necessary may be omitted. For example, detailed explanations of already well-known matters or duplicate explanations of substantially the same configurations may be omitted. This is to avoid the following explanation becoming unnecessarily redundant and to facilitate understanding by those skilled in the art. In addition, the applicant provides the accompanying drawings and the following explanation so that those skilled in the art can fully understand the present invention, and does not intend to limit the subject matter described in the claims by them. EXAMPLES
[0024] A passenger flow information generation device 1 according to an embodiment of the present invention is connected to a display device 2 and a data server 4 as shown in Fig. 1, and is realized, for example, in a server managed by a railway operator or an information terminal used by an employee of the railway operator involved in timetable revision work. Here, the server or information terminal is a computer equipped with a CPU, memory, and an input / output interface. A passenger flow information generation program according to the present invention is installed in such a computer and stored in its memory. The CPU reads the program in the memory and processes information according to the steps instructed by the program, so that the computer executes the passenger flow information generation method according to the present invention and functions as a passenger flow information generation device.
[0025] The passenger flow information generating device 1 is installed on the side of the company's own station (hereinafter, sometimes referred to as "first railway" or "station A") as shown in Fig. 2. The passenger flow information generating device 1 is configured as a device that generates information on the flow of passengers from the company's own station's line to the line of another company's station (hereinafter, sometimes referred to as "second railway" or "station B", "station C", or "station D") that is mutually connected with the company's own station, with predetermined railway stations (A1 station, A7 station, A13 station) included in the company's own station's line as connecting stations, and estimates connecting stations (A1 station, A7 station, A13 station) used by passengers flowing from the company's own station's line to the other company's station's line without externally acquiring information such as passengers' IC cards used when boarding. Here, as shown in FIG. 2, station A is a railway company having a plurality of lines including a plurality of railway stations (stations A1 to A10, stations A11 to A13), and the line of station B is connected to station A7, the line of station C is connected to station A1, and the line of station D is connected to station A13. That is, station A uses stations A1, A7, and A13 as connecting stations with the lines of station B, station C, and station D. As shown in FIG. 2, the line of station B is also connected to station C at station B9. In this embodiment, stations A1, A7, and A13 are so-called no-latch connecting stations where a passenger can transfer from the line of station A to the lines of station B, station C, and station D without passing through a ticket gate, or are railway stations located at the boundary between station A and the lines of station B, station C, and station D which are mutually operated through station A. The automatic ticket gate 5 is an example of an embodiment corresponding to the "ticket gate" in the present invention.
[0026] In addition, in the passenger flow information generating device 1, a ticket gate passing data acquisition unit 10, an entrance / exit data generation unit 12, a data identification unit 14, a connecting station estimation unit 16, a fare calculation unit 18, an output unit 20, and a memory unit 30 are constructed as functional blocks by cooperation of one or both of hardware resources (CPU, ROM, RAM, various interfaces, etc.) and software (application programs (passenger flow information generating programs) such as an installed operating system), as shown in Fig. 1. In other words, it can be said that each of these units (ticket gate passing data acquisition unit 10, entrance / exit data generation unit 12, data identification unit 14, connecting station estimation unit 16, fare calculation unit 18, output unit 20, and memory unit 30) is a function realized by each component (CPU, ROM, RAM, various interfaces, etc.) operating alone or in cooperation with each other in response to an instruction from a CPU that executes an application program expanded from ROM to RAM. In addition, each functional unit included in the passenger flow information generation device 1 may be configured such that multiple functional units are integrated into one functional unit, or one functional unit may be divided into multiple functional units for each function.
[0027] As shown in FIG. 1, the ticket gate passage data acquisition unit 10 is connected to the data server 4 and the storage unit 30 in which the ticket gate passage data is stored, and acquires the ticket gate passage data acquired at the automatic ticket gates 5 installed at stations A1 to A13 at an appropriate timing. The ticket gate passage data includes the entrance data of each passenger and the corresponding exit data collected from the automatic ticket gates 5 during the operation of trains at station A. The ticket gate passage data is stored on the data server 4 in a state in which the entrance data and the exit data are linked to each other via passenger ID information. In the entrance data and the exit data, a passenger ID, which is information that can identify a passenger and is assigned to each ticket, is recorded at the stage when the entrance data and the exit data are acquired by the automatic ticket gates 5. The entrance data is data that is linked to a passenger ID, such as a type for identifying the entrance, the entrance station of the company's own station (A1 to A13 stations), and the time of entry to the entrance station of the company's own station (A1 to A13 stations). The exit data is data that is linked to a passenger ID, such as a type for identifying the exit, the entrance station of the company's own station (A1 to A13 stations), the time of entry at the entrance station of the company's own station (A1 to A13 stations), the time of entry to the entrance station of other companies' stations (B1 to B1 stations, C1 to C12 stations, D1 to D2 stations), and the time of entry to the entrance station of other companies' stations (B1 to B1 stations, C1 to C12 stations, D1 to D2 stations). The entrance data and the exit data are acquired by the automatic ticket gate 5 at different locations and different times. The ticket gate passage data acquired by the ticket gate passage data acquisition unit 10 may be set to be stored in the storage unit 30. The passenger ID corresponds to the "passenger identification information" in this invention, the type for identifying entry corresponds to the "entry identification information" in this invention, and the type for identifying exit corresponds to the "exit identification information capable of identifying exit" in this invention, which is an example of an implementation configuration.
[0028] As shown in FIG. 1, the entrance / exit data generating unit 12 is connected to the ticket gate passage data acquiring unit 10 and the storage unit 30, and extracts the entrance and exit data of the same passenger, i.e., the entrance and exit data with the same passenger ID, from the entrance and exit data of passengers acquired by the ticket gate passage data acquiring unit 10 in a predetermined time unit, and generates the entrance / exit data 120 by sorting the extracted entrance and exit data by the entrance time (see FIG. 3 and FIG. 4). Since the entrance / exit data 120 is sorted by the entrance time as shown in FIG. 3 and FIG. 4, the entrance data and the exit data corresponding to the entrance data can be made to appear consecutively. In other words, by using the entrance / exit data 120, it is possible to specify one trip data by using the railway from the entrance to the exit of the same passenger. Note that when the entrance data and the exit data corresponding to the entrance data do not appear consecutively, that is, the first entrance data 122, which is the entrance data without the corresponding exit data, may appear. In this case, the first exit data 124, which is the exit data having the entrance station of a railway station (B1-B9 stations, C1-C12 stations, D1-D2 stations) included in the line of the other company station and the exit station of a railway station (A1-A13 stations) included in the line of the company station, also appears, so that the first entrance data 122 and the first exit data 124 can be estimated as a set of data, that is, one trip data by the same passenger using the railway from entrance to exit. FIG. 3 shows a state in which the first entrance data 122 appears first and the first exit data 124 appears later, and FIG. 4 shows a state in which the first entrance data 124 appears first and the first entrance data 122 appears later, which is the opposite of FIG. 3. The entrance / exit data 120 generated in the entrance / exit data generating unit 12 may be set to be stored in the storage unit 30.
[0029] As shown in FIG. 1, the data identification unit 14 is connected to the entrance / exit data generation unit 12 and the storage unit 30, and uses the entrance / exit data 120 generated by the entrance / exit data generation unit 12 to determine the presence or absence of first entrance data 122 that is presumed to have entered at a railway station (A1 to A13 stations) included in the line of the company's station and exited at a railway station (B1 to B9 stations, C1 to C12 stations, D1 to D2 stations) included in the line of the other company's station, and, if the first entrance data 122 is present, identifies the first exit data 124 that is presumed to be paired with the first entrance data 122 (see FIG. 3 and FIG. 4). Here, the determination of the presence or absence of the first entrance data 122 can be specifically performed by determining the presence or absence of entrance data that does not have corresponding exit data (see FIG. 3 and FIG. 4). In FIG. 3 and FIG. 4, the first entrance data 122, which is entrance data that does not have paired exit data, exists, so it is determined that the first entrance data 122 exists. In addition, the first appearance data 124 can be specified by specifying the appearance data that enters at a railway station (B1-B9 stations, C1-C12 stations, D1-D2 stations) included in the line of the other station and exits at a railway station (A1-A13 stations) included in the line of the company station. In Figures 3 and 4, the appearance data that enters at B1 station included in the line of station B and exits at A3 station included in the line of station A is specified as the first appearance data 124.
[0030] As shown in FIG. 1, the connecting station estimation unit 16 is connected to the data identification unit 14, the storage unit 30, and the output unit 20, and estimates the connecting station used by the passenger when entering at a railway station (A1-A13 stations) included in the line of the company's station and exiting at a railway station (B1-B9 stations, C1-C12 stations, D1-D2 stations) included in the line of the other company's station based on the first entrance data 122 and the first exit data 124 identified in the data identification unit 14, and outputs the estimated connecting station to the travel route estimation unit 18 and the output unit 20. In this embodiment, the estimation of the connecting station is performed by referring to the lowest fare route table 32 stored in the storage unit 30. In this embodiment, the estimation of the connecting station is based on the basic idea that, for example, when a person travels from A3 station to B1 station during a certain business day, the passenger will "go and then return home," so that the passenger will also travel from B1 station to A3 station. Details regarding the estimation of the connecting station will be described later.
[0031] As shown in FIG. 1, the fare calculation unit 18 is connected to the connecting station estimation unit 16, the memory unit 30, and the output unit 20, and calculates the fare from the entrance station (A1-A13 station) to the connecting station for a passenger who enters at a railway station (A1-A13 station) included in the line of the company's station and exits at a railway station (B1-B9 station, C1-C12 station, D1-D2 station) included in the line of another company's station, and the fare from the entrance station to the exit station (B1-B9 station, C1-C12 station, D1-D2 station) for a passenger who enters at a railway station (B1-B9 station, C1-C12 station, D1-D2 station) included in the line of another company's station and exits at a railway station (A1-A13 station) included in the line of the company's station, based on the connecting station estimated by the connecting station estimation unit 16, and outputs the estimated fares to the output unit 20. The fare from the entry station (A1-A13 stations) to the connecting station for a passenger who enters at a railway station (A1-A13 stations) included in the company's line and exits at a railway station (B1-B9 stations, C1-C12 stations, D1-D2 stations) included in the other company's line corresponds to the "first fare" in this invention, and the fare from the connecting station to the exit station (B1-B9 stations, C1-C12 stations, D1-D2 stations) for a passenger who enters at a railway station (B1-B9 stations, C1-C12 stations, D1-D2 stations) included in the other company's line and exits at a railway station (A1-A13 stations) included in the company's line corresponds to the "second fare" in this invention.
[0032] As shown in Fig. 1, the output unit 20 outputs the fare estimated by the fare calculation unit 18 to the display device 2. This allows the manager of the company's station (station A) to easily recognize the fare from the entrance station (station A1-A13) to the connecting station of a passenger who entered at a railway station (station A1-A13) on a line included in the company's station (station A) and exited at a railway station (station B1-B9, C1-C12, D1-D2) on the line of the other company's station, and the fare from the connecting station to the exit station (station B1-B9, C1-C12, D1-D2) of a passenger who entered at a railway station (station B1-B9, C1-C12, D1-D2) on the line of the other company's station and exited at a railway station (station A1-A13) on the line of the company's station.
[0033] The storage unit 30 stores a cheapest fare route table 32 and a fare table 34, as shown in Fig. 1. The cheapest fare route table 32 is a table showing the relationship between railway stations (A1 to A13 stations) on the line included in the company's station, railway stations (B1 to B9 stations, C1 to C12 stations, D1 to D2 stations) on the line of other companies' stations, and connecting stations, as shown in Fig. 5. Here, the connecting stations listed in the cheapest fare route table 32 are connecting stations used (passed through) when traveling between railway stations (A1 to A13 stations) on the line included in the company's station and railway stations (B1 to B9 stations, C1 to C12 stations, D1 to D2 stations) on the line of other companies' stations by a route that can travel the relevant section at the cheapest fare. For example, in the route map shown in Fig. 2, when a passenger who entered at B1 station in station B heads for A1 station in station A, there are two possible routes: one to A1 station with A7 station as a connecting station, and another to travel through station C via C12 station in station C and head for A1 station from C1 station. It can be assumed that the passenger will travel by considering which route will have the lowest fare. Fare table 34 is a table showing the relationship between the railway stations (A1 to A13 stations) of the lines included in the company's station that are entry / exit stations, the connecting stations (A1 station, A7 station, A13 station) of the lines included in the company's station, and the fares for the section from the entry / exit stations to the connecting stations, as shown in Fig. 6. For example, in the route map shown in Figure 2, if it is estimated that a passenger who entered at A3 station in Station A passed through A7 station, which is a connecting station of Station A, the fare calculation unit 18 uses the fare table 34 to calculate the fare from Station A3 to Station A7 to be 340 yen.
[0034] The display device 2 is, for example, a PC (Personal Computer) installed as an administrator terminal, and displays information on passenger flows managed by the passenger flow information generating device 1. The data server 4 stores ticket gate passage data. As shown in FIG. 1, the ticket gate passage data is generated based on railway station entry data and exit data collected from automatic ticket gates 5 installed at each railway station (A1 to A13 stations) included in the company's first railway line. One or more automatic ticket gates 5 are installed at a railway station, and when a passenger passes through, they write information to an IC card or the like held by the passenger, or read the information to process a fare claim.
[0035] Next, the operation of the passenger flow information generating device 1 according to this embodiment configured as described above, particularly the operation when calculating the fare for the use of the line of the own station (first railway) of a passenger who uses no-latch transfer or mutual through operation from the line of the own station (first railway) to the line of the other station (second railway), will be described. Fig. 7 is a flowchart showing an example of a fare calculation processing routine executed by the passenger flow information generating device 1. The fare calculation processing routine is executed, for example, when an administrator of the own station (station A) inputs a command to calculate the fare for the use of the line of the own station (first railway) of a passenger who uses no-latch transfer or mutual through operation from the line of the own station (first railway) to the line of the other station (second railway).
[0036] <Freight calculation processing> When the fare calculation processing routine is executed, first, the ticket gate passage data acquisition unit 10 executes a process of acquiring ticket gate passage data from the data server 4 (step S100). Next, the entrance / exit data generation unit 12 executes a process of extracting entrance data and exit data having the same passenger ID from the ticket gate passage data acquired by the ticket gate passage data acquisition unit 10 (step S102), and executes a process of generating entrance / exit data 120 by sorting the extracted entrance data and exit data by entrance time (step S104).
[0037] When the entry / exit data 120 is generated, the data identification unit 14 executes a process of determining whether or not there is first entry data 122 that is presumed to have entered at a railway station (A1 to A13 stations) included in the line of the company's station and exited at a railway station (B1 to B9 stations, C1 to C12 stations, D1 to D2 stations) included in the line of the other company's station from among the entry / exit data 120 (step S106), and executes a process of identifying the first entry data 122 if the first entry data 122 is present (step S108). On the other hand, if the first entry data 122 is not present, the process is terminated without doing anything. In this embodiment, as shown in FIG. 3, since the first entry data 122, which is entry data that does not have a paired exit data, exists, it is determined that the first entry data 122 exists, and the first entry data 122 is identified.
[0038] After identifying the first entry data 122, the data identification unit 14 executes a process of identifying the first exit data 124 that is presumed to be paired with the first entry data 122 (step S110). In this embodiment, as shown in Fig. 3, among the exit data, the exit data in which the train enters at station B1 included in the line of station B and exits at station A3 included in the line of station A is identified as the first exit data 124.
[0039] Next, the connecting station estimation unit 16 executes a process of estimating the first connecting station used in the trip that entered at the entry station (B1 station in FIG. 3) and exited at the exit station (A3 station in FIG. 3) based on the entry station (B1 station in FIG. 3) of the first exit data 124 and the exit station (A3 station in FIG. 3) of the first exit data 124 (step S112). In this embodiment, the estimation of the first connecting station is performed by referring to the lowest fare route table 32 in FIG. 5. Specifically, in FIG. 3, the entry station of the first exit data 124 is B1 station and the exit station of the first exit data 124 is A3 station, so A7 station is estimated as the first connecting station.
[0040] When the first connecting station is estimated, the connecting station estimation unit 16 executes a process to determine whether the entrance station in the first entrance data 122 matches the exit station in the first exit data 124 (step S114). If the entrance station in the first entrance data 122 matches the exit station in the first exit data 124, the fare calculation unit 18 executes a process to calculate the fare from the entrance station in the first entrance data 122 to the first connecting station, and the fare from the first connecting station to the exit station in the first exit data 124 using the estimated first connecting station (step S116), outputs the calculated fare (step S118), and terminates this process. In other words, if the entrance station in the first entrance data 122 and the exit station in the first exit data 124 match, the estimated first connecting station is estimated to be the connecting station used by the passenger in the trip in the first entrance data 122 (a trip that entered at a railway station (A1 to A13 stations) included in the company's line and exited at a railway station (B1 to B9 stations, C1 to C12 stations, D1 to D2 stations) included in the other company's line), and the fare for the section from the entrance station in the first entrance data 122 to the first connecting station, and the fare for the section from the first connecting station to the exit station in the first exit data 124 are calculated. In Fig. 3, since the entrance station (A3 station) in the first entrance data 122 matches the exit station (A3 station) in the first exit data 124, the first connecting station, A7 station, is presumed to be the connecting station used by the passenger in the trip in the first entrance data 122 and the first exit data 124, and the fare from A3 station to A7 station is calculated. Here, in this embodiment, the fare is calculated using the fare table shown in Fig. 6.
[0041] On the other hand, when the entrance / exit data generated in step S104 is like the entrance / exit data 220 shown in Fig. 8, and the entrance station of the first entrance data 222 does not match the exit station of the first exit data 224, the connecting station estimation unit 16 executes a process of estimating the second connecting station that the passenger would have used in the movement in the first entrance data 222 based on the entrance station of the first entrance data 222 and the entrance station of the first exit data 224 (step S120). The estimation of the second connecting station is based on the basic idea that the passenger will move along the same route on the way there and back, and estimates the second connecting station by estimating that the entrance station of the first exit data 224 is the exit station of the first entrance data 222. Specifically, for example, as shown in FIG. 8, when the entrance station in the first entrance data 222 is A3 station and the entrance station in the first exit data 224 is B1 station, the cheapest fare route table 32 shown in FIG. 5 is referenced and A7 station, which is a connecting station corresponding to the entrance station A3 station and the exit station B1 station, is estimated to be the second connecting station.
[0042] Then, after estimating the second connecting station, the connecting station estimation unit 16 executes a process to determine whether the estimated second connecting station matches the first connecting station estimated in step S110 (step S122). If the first connecting station and the second connecting station match, the fare calculation unit 18 executes a process to calculate the fare from the entrance station in the first entrance data 122 to the first connecting station, and the fare from the first connecting station to the exit station in the first exit data 124, using the estimated first connecting station (step S116), and outputs the calculated fares (step S118), thereby terminating this process. That is, if the first connecting station and the second connecting station match, the estimated first connecting station is estimated to be the connecting station used by the passenger in the trip in the first entrance data 122 (a trip entering at a railway station (A1-A13 stations) included in the company's line and exiting at a railway station (B1-B9 stations, C1-C12 stations, D1-D2 stations) included in the other company's line), and the fare calculation unit 18 calculates the fare for the section from the entrance station in the first entrance data 122 to the first connecting station, and the fare for the section from the first connecting station to the exit station in the first exit data 124. Note that in step S120, if the first connecting station and the second connecting station do not match, the process ends without doing anything.
[0043] According to the passenger flow information generating device 1 according to the present embodiment described above, the presence or absence of the first entrance data 122 that would have involved a no-latch transfer or a mutual direct operation is determined based on the entry / exit data, and if the first entrance data 122 is present, the first entrance data 122 is identified and the first exit data 124 that would be paired with the first entrance data 122 is identified. Then, the first connecting station is estimated based on the entry station and exit station of the identified first exit data 124, and if the entry station of the first entrance data 122 and the exit station of the first exit data 124 match, the connecting station used in the no-latch transfer or mutual direct operation is estimated to be the first connecting station, and the fare for the section from the entry station of the first entrance data 122 to the first connecting station and the fare for the section from the first connecting station to the exit station of the first exit data 124 are calculated. On the other hand, if the entrance station in the first entrance data 122 does not match the exit station in the first exit data 124, the second connecting station is estimated based on the entrance station in the first entrance data 122 and the entrance station in the first exit data 124, and only if the first connecting station and the second connecting station match, the connecting station used for no-latch transfers or through-running is estimated to be the first connecting station, and the fare for the section from the entrance station in the first entrance data 122 to the first connecting station, and the fare for the section from the first connecting station to the exit station in the first exit data 124 are calculated. In other words, based on the basic idea that passengers travel the same route on the way there and back, the connecting stations used when making a no-latch transfer or a mutual through-run are estimated, and the fare is calculated using the estimated connecting stations.Therefore, without obtaining records of ticket gate passage data of passengers who passed through automatic ticket gates installed at railway stations on the lines of the other company (second railway) from an external source such as an issuer of an IC card held by each passenger, the fare of the company (first railway) for a no-latch transfer or a mutual through-run from its own company's (first railway) line to the line of another company's (second railway) can be calculated using only the entry / exit data (entry data and exit data) generated based on the ticket gate passage data obtained by the company (first railway).
[0044] In addition, according to the passenger flow information generation device 1 of this embodiment, a fare table is used to calculate the fare from the entry station (A1-A13 station) to the connecting station for passengers who enter at a railway station (A1-A13 station) included in the company's line and exit at a railway station (B1-B9 station, C1-C12 station, D1-D2 station) included in the other company's line, and the fare from the connecting station to the exit station (B1-B9 station, C1-C12 station, D1-D2 station) for passengers who enter at a railway station (B1-B9 station, C1-C12 station, D1-D2 station) included in the other company's line and exit at a railway station (A1-A13 station) included in the company's line, so that fares for the company's own station (first railway) in no-latch transfers and through-running operations can be easily calculated.
[0045] In this embodiment, the first and second connecting stations are estimated by referring to the lowest fare route table, but this is not limiting. The first and second connecting stations may be estimated using a shortest time route table showing the relationship between the railway stations (A1 to A13 stations) of the line included in the company's office, the railway stations (B1 to B9 stations, C1 to C12 stations, D1 to D2 stations) of the line of the other company's office, and the connecting stations used (passed) when traveling between the railway stations (A1 to A13 stations) of the line included in the company's office and the railway stations (B1 to B9 stations, C1 to C12 stations, D1 to D2 stations) of the line of the other company's office by the shortest possible route, or The first and second connecting stations may be estimated using a route table with the fewest transfers that shows the relationship between railway stations on lines included in the company's own station (stations A1 to A13), railway stations on lines included in other companies' stations (stations B1 to B9, C1 to C12, D1 to D2), and connecting stations used (passed through) when traveling between railway stations on lines included in the company's own station (stations A1 to A13) and railway stations on lines included in other companies' stations (stations B1 to B9, C1 to C12, D1 to D2) via a possible route with the fewest number of transfers.
[0046] In this embodiment and the above-mentioned variant, both the first connecting station and the second connecting station are estimated by referring to the cheapest fare route table, the shortest time route table, and the route table with the fewest number of transfers. However, the estimation of the connecting station by referring to the cheapest fare route table, the shortest time route table, and the route table with the fewest number of transfers may be limited to only one of the first connecting station and the second connecting station.
[0047] In the present embodiment and the above-mentioned modified example, the present invention has been described as a passenger flow information generating device 1 that generates information on passenger flow from a first railway line to a second railway line that are mutually connected with a specific railway station as a connecting station, or as a passenger flow information generating method that generates information on passenger flow from a first railway line to a second railway line that are mutually connected with a specific railway station as a connecting station, but it may also be applied to, for example, a program that functions as the passenger flow information generating device 1 or a program for executing the passenger flow information generating method. This program may be recorded on a computer-readable recording medium (for example, a hard disk, a ROM, an SSD, a flash memory (such as a USB memory or an SD card), a floppy disk, a CD, a DVD, etc.), or may be distributed from one computer to another computer via a transmission medium (a communication network such as the Internet or a LAN), or may be transmitted and received in any other form. By executing this program on one computer or by having multiple computers share the execution of each step, each step of the smoking prevention measures processing routine described above is executed, thereby obtaining the same effects as the passenger flow information generation device 1 and passenger flow information generation method of this embodiment.
[0048] The present embodiment shows an example of a mode for carrying out the present invention, and therefore the present invention is not limited to the configuration of the present embodiment.
[0049] <Additional Notes> In consideration of the above-mentioned gist of the invention, the passenger flow information generation device 1, the passenger flow information generation method, and the passenger flow information generation program according to the present invention can be configured in the following aspects. (Aspect 1) "A passenger flow information generating device that generates information on the flow of passengers from a first railway line to a second railway line that are mutually connected with a specific railway station as a connecting station, a ticket gate passage data acquisition unit that acquires ticket gate passage data recorded together with passenger identification information that can identify a passenger when the passenger passes through a ticket gate installed at a railway station included in the first railway line; an entry / exit data generation unit that extracts, from the ticket gate passage data acquired by the ticket gate passage data acquisition unit, entry data including entry identification information capable of identifying entry, an entry station, and an entry time, and exit data including exit identification information capable of identifying exit, an entry station, an entry time, an exit station, and an exit time, which have the same passenger identification information, and sorts the extracted entry data and exit data by the entry time to generate entry / exit data relating to the passenger identification information; a data identification unit that determines whether or not there is first entry data presumably indicating entry at a railway station included in the first railway line and exit at a railway station included in the second railway line based on the entry / exit data generated by the entry / exit data generation unit, and if the first entry data is present, identifies the first entry data and identifies the exit data presumably paired with the first entry data, the first exit data indicating entry at a railway station included in the second railway line and exit at a railway station included in the first railway line; a connecting station estimation unit that estimates a first connecting station used when entering at a railway station included in the line of the second railway and exiting at a railway station included in the line of the first railway based on the first exit data, and estimates that a second connecting station used when entering at a railway station included in the line of the first railway and exiting at a railway station included in the line of the second railway is the first connecting station; A fare calculation unit that calculates a fare from the entrance station in the first entrance data to the first connecting station, and a fare from the first connecting station to the exit station in the first exit data; A passenger flow information generating device equipped with the above. (Aspect 2) The fare calculation unit calculates the fare in the first entrance data by referring to a fare table that associates a first railway station included in the first railway line, the first connecting station, and a fare from the first railway station to the first connecting station. The passenger flow information generating device according to claim 1." (Aspect 3) "The data identification unit, in the entrance / exit data generated by the entrance / exit data generation unit, identifies the entrance data that does not have the exit data corresponding to the entrance data as the first entrance data, and identifies the exit data in which a railway station included in the line of the second railway is recorded as the entrance station of the exit data as the first exit data. The passenger flow information generation device according to aspect 1 or 2." (Aspect 4) "The connecting station estimation unit estimates that the second connecting station is the first connecting station when the entry station of the first entry data and the exit station of the first exit data match. The passenger flow information generation device according to any one of Aspects 1 to 3. (Aspect 5) "When the entrance station of the first entrance data does not match the exit station of the first exit data, the connecting station estimation unit estimates the second connecting station based on the entrance station of the first entrance data and the entrance station of the first exit data, and when the estimated second connecting station matches the first connecting station, estimates that the second connecting station is the first connecting station. The passenger flow information generation device according to any one of 1 to 4 above." (Aspect 6) "A passenger flow information generating method for generating information on the flow of passengers from a first railway line to a second railway line that are mutually connected with a specific railway station as a connecting station, a ticket gate passage data acquisition step of acquiring ticket gate passage data recorded together with passenger identification information that identifies a passenger when the passenger passes through a ticket gate installed at a railway station included in the first railway line; an entry / exit data generation process for extracting, from the acquired ticket gate passage data, entry data including entry identification information capable of identifying entry, an entry station, and an entry time, and exit data including exit identification information capable of identifying exit, an entry station, an entry time, an exit station, and an exit time, which have the same passenger identification information, and for which the extracted entry data and exit data are sorted by the entry time to generate entry / exit data relating to the passenger identification information; a data identification process for determining whether or not there is first entry data presumably indicating entry at a railway station included in the first railway line and exit at a railway station included in the second railway line based on the generated entry / exit data, and if the first entry data is present, identifying the first entry data and identifying the exit data presumably paired with the first entry data, the first exit data indicating entry at a railway station included in the second railway line and exit at a railway station included in the first railway line; a connecting station estimating step of estimating a first connecting station used when entering at a railway station included in the line of the second railway and exiting at a railway station included in the line of the first railway based on the first exit data, and estimating that a second connecting station used when entering at a railway station included in the line of the first railway and exiting at a railway station included in the line of the second railway is the first connecting station; a fare calculation step of calculating a fare in the first entrance data based on the first connecting station estimated in the connecting station estimation step; A passenger flow information generation method comprising: (Aspect 7) "A passenger flow information generating program that generates information on the flow of passengers from a first railway line to a second railway line that are mutually connected at a specific railway station, A passenger flow information generation program for causing a computer to execute each step of the passenger flow information generation method described in aspect 6. [Industrial Applicability]
[0050] The passenger flow information generation device of the present invention has the effect of being able to estimate the connecting stations used by passengers when making no-latch transfers or when running through a mutually-operated line, and being able to calculate the fares of the company's own station (first railway) for no-latch transfers or when running through a mutually-operated line, without having to obtain records of ticket gate passing data of passengers who passed through automatic ticket gates installed at railway stations on the lines of another company's station (second railway) from an external source, such as an issuer of an IC card held by each passenger, and therefore can be widely applied to devices that manage lines where multiple railway companies operate with each other. [Explanation of symbols]
[0051] 1 Passenger flow information generation device (Passenger flow information generation device) 2 Display device 4 Data Server 5 Automatic ticket gates (ticket gates) 10 Ticket gate passing data acquisition unit (ticket gate passing data acquisition unit) 12 Entry / Exit Data Generation Unit (Entry / Exit Data Generation Unit) 14 Data Identification Part (Data Identification Part) 16. Junction Station Estimation Section (Junction Station Estimation Section) 18 Fare Calculation Department (Freight Calculation Department) 20 Output section 30 Storage section 32 Lowest fare route table (lowest fare route table) 34 Fare Table (Fare Table) 120 Entry and exit data (Entry and exit data) 122 1st Entrance Data (1st Entrance Data) 124 1st appearance data (1st appearance data) 220 Entry and exit data (Entry and exit data) 222 1st Entrance Data (1st Entrance Data) 224 1st appearance data (1st appearance data)
Claims
1. A passenger flow information generating device that generates information regarding the flow of passengers from a first railway line to a second railway line that are mutually connected with a predetermined railway station as a connecting station, a ticket gate passage data acquisition unit that acquires ticket gate passage data recorded together with passenger identification information that can identify a passenger when the passenger passes through a ticket gate installed at a railway station included in the first railway line; an entry / exit data generation unit that extracts, from the ticket gate passage data acquired by the ticket gate passage data acquisition unit, entry data including entry identification information capable of identifying entry, an entry station, and an entry time, and exit data including exit identification information capable of identifying exit, an entry station, an entry time, an exit station, and an exit time, each having the same passenger identification information, and sorts the extracted entry data and exit data by the entry time to generate entry / exit data relating to the passenger identification information; a data identification unit that determines whether or not there is first entry data presumably indicating entry at a railway station included in the first railway line and exit at a railway station included in the second railway line based on the entry / exit data generated by the entry / exit data generation unit, and if the first entry data is present, identifies the first entry data and identifies the exit data presumably paired with the first entry data, the first exit data indicating entry at a railway station included in the second railway line and exit at a railway station included in the first railway line; a connecting station estimation unit that estimates a first connecting station used when entering at a railway station included in the second railway line and exiting at a railway station included in the first railway line based on the first exit data, and estimates that a second connecting station used when entering at a railway station included in the first railway line and exiting at a railway station included in the second railway line is the first connecting station; a fare calculation unit that calculates a first fare from the entrance station in the first entrance data to the first connecting station, and a second fare from the first connecting station to the exit station in the first exit data; A passenger flow information generating device comprising:
2. The fare calculation unit calculates the first and second fares by referring to a fare table that associates a first railway station included in the first railway line, the first connecting station, and fares between the first railway station and the first connecting station. The passenger flow information generating device according to claim 1 .
3. The data identification unit identifies, in the entrance / exit data generated by the entrance / exit data generation unit, the entrance data that does not have the exit data corresponding to the entrance data as first entrance data, and identifies the exit data in which a railway station included in the line of the second railway is recorded as the entrance station of the exit data as the first exit data. The passenger flow information generating device according to claim 1 or 2.
4. The connecting station estimation unit estimates that the second connecting station is the first connecting station when the entrance station of the first entrance data and the exit station of the first exit data match. The passenger flow information generating device according to claim 1 or 2.
5. When the entrance station of the first entrance data does not match the exit station of the first exit data, the connecting station estimation unit estimates the second connecting station based on the entrance station of the first entrance data and the entrance station of the first exit data, and when the estimated second connecting station matches the first connecting station, estimates that the second connecting station is the first connecting station. The passenger flow information generating device according to claim 1 or 2.
6. A passenger flow information generating method for generating information on the flow of passengers from a first railway line to a second railway line that are mutually connected with a predetermined railway station as a connecting station, comprising: a ticket gate passage data acquisition step of acquiring ticket gate passage data recorded together with passenger identification information that identifies a passenger when the passenger passes through a ticket gate installed at a railway station included in the first railway line; an entrance / exit data generation process for extracting, from the acquired ticket gate passage data, entrance data including entrance identification information capable of identifying an entrance, an entrance station, and an entrance time, and exit data including exit identification information capable of identifying an exit, an entrance station, an entrance time, an exit station, and an exit time, which have the same passenger identification information, and for which the entrance data and the exit data thus extracted are sorted by the entrance time to generate entrance / exit data relating to the passenger identification information; a data identification process for determining whether or not there is first entry data presumably indicating entry at a railway station included in the first railway line and exit at a railway station included in the second railway line based on the generated entry / exit data, and if the first entry data is present, identifying the first entry data and identifying the exit data presumably paired with the first entry data, the first exit data indicating entry at a railway station included in the second railway line and exit at a railway station included in the first railway line; a connecting station estimating step of estimating a first connecting station used when entering at a railway station included in the line of the second railway and exiting at a railway station included in the line of the first railway based on the first exit data, and estimating that a second connecting station used when entering at a railway station included in the line of the first railway and exiting at a railway station included in the line of the second railway is the first connecting station; a fare calculation step of calculating a fare in the first entrance data based on the first connecting station estimated in the connecting station estimation step; A passenger flow information generating method comprising:
7. A passenger flow information generation program for generating information on the flow of passengers from a first railway line to a second railway line that are mutually connected with a predetermined railway station as a connecting station, A passenger flow information generating program that causes a computer to execute each step of the passenger flow information generating method according to claim 6.
Citation Information
Patent Citations
Passenger flow information generation system and passenger flow information generation method
JP2013210753A
