Positioning system and positioning method
The positioning system optimizes factor graphs using satellite signals to reduce computational load and maintain accuracy for autonomous work machines by selecting reliable nodes and edges, addressing the challenge of real-time positioning in systems with varying GNSS sensor information.
Patent Information
- Application Number
- JP2023060424
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-03
- Publication Date
- 2024-10-16
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing positioning systems for autonomous work machines face challenges in achieving real-time positioning accuracy due to increased computational load with a large number of nodes and edges in factor graphs, particularly when GNSS sensor information has few common features over time.
A positioning system that calculates mobile object information using satellite signals from multiple positioning satellites, constrains nodes and edges based on reliability, and optimizes a factor graph to reduce calculation load without compromising accuracy.
Enables real-time positioning with reduced computational load while maintaining high accuracy by selecting and optimizing nodes and edges in the factor graph based on reliability information.
Smart Images

Figure 2024147418000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a positioning system and a positioning method. [Background technology]
[0002] Development is underway of autonomous work machines that can replace human work, such as the automation of manned vehicles such as automobiles and construction machinery, and the automation of factory inspection work using automatic inspection robots. It is expected that this will lead to improved productivity, such as improved work efficiency through optimized machine operation and labor reduction through the realization of autonomous driving.
[0003] One of the core technologies for realizing such autonomous work machines is a positioning technology that applies a factor graph to information acquired by sensors such as the Global Navigation Satellite System (GNSS), IMU, and cameras, as described in Non-Patent Document 1.
[0004] In positioning using a factor graph, a factor graph represented by nodes and edges is constructed from sensor-acquired information, and the nodes are adjusted by factor graph optimization to calculate the past and present position and orientation of the autonomous work machine as nodes.
[0005] In positioning using a factor graph, the positioning accuracy improves in proportion to the number of nodes and edges, but increasing the number of nodes and edges increases the optimization variables, which increases the computational load required for optimizing the factor graph, making it difficult to position an autonomous work machine in real time. Therefore, it is necessary to select appropriate nodes and edges, taking into account the positioning accuracy and computation time required for positioning an autonomous work machine.
[0006] As a technology for selecting appropriate nodes and edges, Patent Document 1 describes a mobile object position estimation system that determines a group of images from a time series to be subject to adjustment using constraint conditions together with an arbitrary image based on at least one of the following: temporal proximity to an arbitrary image, distance proximity, and the presence or absence of feature points common to the arbitrary image. [Prior art documents] [Non-patent literature]
[0007] [Non-Patent Document 1] “Dellaert, F. (2012) “Factor graphs and GTSAM: A hands-ON introduction”.Technical Report GT-RIM-CP&R-2012-002, Georgia Institute of Technology.” [Patent documents]
[0008] [Patent Document 1] JP 2020-67439 A Summary of the Invention [Problem to be solved by the invention]
[0009] In Patent Document 1, the image group to be adjusted is determined based on the temporal proximity, the distance proximity, and the presence or absence of common feature points, but in GNSS positioning, the nature of the sensor-acquired information changes over time, so there are cases where the sensor-acquired information has few common feature points. Therefore, if the technology of Patent Document 1 is applied to GNSS positioning, the number of nodes in the factor graph will be reduced, and there is a concern that the positioning accuracy will decrease.
[0010] An object of the present invention is to provide a technique capable of performing positioning with reduced computational load without deteriorating positioning accuracy. [Means for solving the problem]
[0011] In order to solve the above problems, one representative positioning system of the present invention is a positioning system that calculates mobile object information of a mobile object based on satellite signals from a plurality of positioning satellites, and includes an antenna that receives satellite signals from the plurality of positioning satellites in a time series, a node information calculation unit that calculates a plurality of nodes with the mobile object information as an optimization variable based on the satellite signals, an edge information calculation unit that calculates a plurality of edges that constrain each of the plurality of nodes based on the satellite signals, a reliability information calculation unit that calculates the reliability for each of the plurality of nodes, a factor graph editing unit that deletes nodes and edges selected from the plurality of nodes and the plurality of edges based on the reliability, and a positioning calculation unit that constructs a factor graph based on the plurality of nodes and the plurality of edges and calculates the mobile object information by optimizing the factor graph. Effect of the Invention
[0012] According to the present invention, it is possible to perform positioning with reduced computational load without deteriorating positioning accuracy.
[0013] Problems, configurations and effects other than those described above will become apparent from the following description of the embodiments. [Brief description of the drawings]
[0014] [Figure 1A] FIG. 2 is a block diagram showing an example of a software configuration of the positioning system according to the first embodiment. [Figure 1B] FIG. 2 is a block diagram showing an example of a hardware configuration of the positioning system according to the first embodiment. [Diagram 2] FIG. 2 is a diagram illustrating an example of a data table of positioning record information recorded in a positioning information DB according to the first embodiment. [Diagram 3] FIG. 2 is a diagram illustrating an example of a factor graph constructed by the positioning system of the first embodiment. [Figure 4] FIG. 2 is a diagram illustrating an example of a data table of node DB information recorded in the node DB according to the first embodiment. [Diagram 5] 11 is a flowchart illustrating an example of a process of an edge information calculation unit according to the first embodiment. [Figure 6]FIG. 13 is a diagram illustrating an example of a data table of an individual edge recorded as edge DB information in the edge DB according to the first embodiment. [Figure 7] 13 is a diagram illustrating an example of a data table of relative edges recorded as edge DB information in the edge DB according to the first embodiment. FIG. [Figure 8] FIG. 4 is a diagram illustrating an example of a data table of reliability information calculated by a reliability information calculation unit according to the first embodiment. [Figure 9] 13 is a flowchart illustrating an example of a process of a factor graph editing unit according to the first embodiment. [Figure 10] 4 is a flowchart illustrating an example of a process of the positioning system according to the first embodiment. [Figure 11] FIG. 11 is a block diagram showing an example of a software configuration of a positioning system according to a second embodiment. [Figure 12] 13 is a flowchart illustrating an example of a process of a factor graph editing unit according to the second embodiment. [Figure 13A] FIG. 13 is a diagram for explaining a non-connected graph assumed in the third embodiment. [Figure 13B] FIG. 13 is a diagram for explaining a non-connected graph assumed in the third embodiment. [Figure 14] 13 is a flowchart illustrating an example of a process of a factor graph editing unit according to the third embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0015] Hereinafter, the embodiments will be described with reference to the drawings.
[0016] In the description of the drawings, the same elements are given the same reference numerals, and duplicated descriptions are omitted. In addition, the present invention is not limited to these drawings, and some components may not be used, and the components of each embodiment described below can be appropriately combined. EXAMPLES
[0017] FIG. 1A is a block diagram illustrating an example of a software configuration of a positioning system according to a first embodiment, and FIG. 1B is a block diagram illustrating an example of a hardware configuration of the positioning system according to the first embodiment.
[0018] The positioning system 1 according to this embodiment is a system used for positioning moving objects such as automobiles, railways, agricultural machinery, construction machinery, etc. The positioning system performs positioning using a global navigation satellite system (GNSS), an inertial sensor, a stereo camera, etc., and outputs the positioning result as moving object information.
[0019] In this embodiment, the positioning system 1 is executed by the GNSS receiver 100 installed in a moving object, constructs a factor graph by determining nodes and edges from the GNSS positioning results, and calculates the location information of the moving object as moving object information 29 from the positioning results by factor graph optimization.
[0020] This positioning method is also applicable to a configuration in which the positioning system 1 calculates attitude information of a moving body as moving body information 29 by using an inertial sensor or two or more GNSS antennas 2.
[0021] As shown in FIG. 1A , the positioning system 1 includes a GNSS antenna 2, a sensor information analysis unit 3, a positioning information DB 4, a node information calculation unit 5, an edge information calculation unit 6, a node DB 7, an edge DB 12, a reliability information calculation unit 8, a factor graph editing unit 9, and a positioning calculation unit 10.
[0022] The sensor information analysis unit 3, node information calculation unit 5, edge information calculation unit 6, reliability information calculation unit 8, factor graph editing unit 9, and positioning calculation unit 10 shown in FIG. 1A operate in the GNSS receiver 100 in FIG. 1B.
[0023] As shown in FIG. 1B, the GNSS receiver 100 includes a GNSS antenna 2, a CPU (Central Processing Unit) 101, a memory 102, a storage device 103, a satellite signal acquisition unit 105, and a data output unit 106.
[0024] The CPU 101 is a central processing unit, and implements necessary functions by executing programs stored in the memory 102 (or storage device 103). The memory 102 is a main storage device used when the CPU 101 executes processes, and is composed of volatile storage elements such as a RAM (Random Access Memory).
[0025] The storage device 103 is an auxiliary storage device for storing input data provided to the CPU 101 and output data output from the CPU 101, and is configured with a non-volatile storage element such as an HDD (Hard Disk Drive) or an SSD (Solid State Drive). The positioning information DB4, the node DB7, and the edge DB12 are stored in the storage device 103.
[0026] The satellite signal acquisition unit 105 acquires satellite signals received by the GNSS antenna 2 from the positioning satellites 11, and stores them in the storage device 103. The CPU 101 executes each process described below and calculates moving object information 29. The data output unit 106 transmits the moving object information 29 calculated by the CPU 101 to an external terminal. For example, when this embodiment is used as a moving object positioning system, the external terminal corresponds to a vehicle control module or an inertial sensor calibration module that requires the position coordinates of the moving object.
[0027] In this embodiment, the positioning system 1 is executed on one or more GNSS receivers 100 having a hardware configuration as exemplified in FIG. 1B, thereby realizing each process described below. [GNSS antenna] The GNSS antenna 2 receives analog satellite signals 20 in time series from multiple positioning satellites 11 positioned above the Earth, A / D converts the received satellite signals 20, and transmits the digital satellite signals 20 to the sensor information analysis unit 3.
[0028] The positioning satellites 11 are made up of multiple artificial satellites positioned in satellite orbits above the Earth, and form the GNSS by transmitting satellite signals 20 toward the ground. In the GNSS, some of the satellite signals 20 from the multiple positioning satellites 11 are received, and the received multiple satellite signals 20 are used to enable the GNSS antenna 2 to obtain its own position on the Earth.
[0029] The satellite signal 20 contains at least the orbit data and satellite clock error of the positioning satellite 11. By using the orbit data in the sensor information analysis unit 3 described later, it is possible to calculate the position of the positioning satellite 11 at any time.
[0030] The positioning satellite 11 transmits satellite signals 20 in a plurality of frequency bands, thereby achieving redundancy of the GNSS.
[0031] In the first embodiment, the positioning system 1 is described as using satellite signals 20 in a single frequency band, but the present invention can be similarly applied to a positioning system using satellite signals 20 in multiple frequency bands.
[0032] The GNSS antenna 2 is installed at a location where it is desired to acquire the position by the positioning system 1. For example, when the positioning system 1 is used for a mobile object, the GNSS antenna 2 is installed on the vehicle body of the target mobile object. The positioning system 1 calculates the position on the earth where the GNSS antenna 2 is located at the time when the GNSS antenna 2 receives the satellite signal 20. [Sensor Information Analysis Division] Based on the satellite signal 20 acquired from the GNSS antenna 2, the sensor information analysis unit 3 calculates a pseudo distance 211, a carrier phase 212, and a satellite position 215, which will be described later with reference to FIG.
[0033] The pseudorange 211 is the distance between the positioning satellite 11 and the GNSS antenna 2, and is calculated by measuring the time it takes for the satellite signal 20 transmitted from the positioning satellite 11 to be received by the GNSS antenna 2. The pseudorange 211 includes a receiver clock error, a satellite clock error, an ionospheric delay, a tropospheric delay, and other noise.
[0034] The carrier phase 212 is a continuous measurement of the carrier phase angle of the satellite signal 20 transmitted from the positioning satellite 11 at the same time. The carrier phase 212 includes integer bias, receiver clock error, satellite clock error, ionospheric delay, tropospheric delay, and other noise. The carrier phase 212 may be expressed as a distance component by multiplying it by the wavelength of the satellite signal 20 transmitted from the positioning satellite 11. In that case, the processing of the positioning system 1 is performed by multiplying the carrier phase 212 by the inverse of the wavelength of the satellite signal 20.
[0035] The satellite position 215 is the position of the positioning satellite 11 calculated from the orbit data included in the satellite signal 20. In this embodiment, the coordinate system used to calculate the satellite position 215 is the XYZ Cartesian coordinate system defined by Earth Centered Earth Fixed (ECEF), and all position information described hereinafter is also described in the XYZ Cartesian coordinate system defined by ECEF.
[0036] This embodiment can be similarly applied to a positioning system using a geographic coordinate system expressed by latitude, longitude, and altitude or other coordinate systems. In that case, the processing of the positioning system 1 performs appropriate coordinate conversion.
[0037] The sensor information analysis unit 3 transmits the calculated pseudo distance 211, carrier phase 212, satellite position 215, satellite identification number 213 (described later in Figure 2), which is information for identifying the positioning satellite 11 that transmitted the satellite signal 20, and reception time 214 (described later in Figure 2), which is the time when the satellite signal 20 was received by the GNSS antenna 2, as positioning information 21 to the positioning information DB 4, the node information calculation unit 5 and the edge information calculation unit 6. [Positioning information DB] The positioning information DB 4 records the positioning information 21 received from the sensor information analysis unit 3 as positioning record information 22.
[0038] FIG. 2 is a diagram showing an example of a data table of the positioning record information 22 recorded in the positioning information DB 4 according to the first embodiment.
[0039] As shown in FIG. 2, the positioning record information 22 includes a satellite identification number 213 , a reception time 214 , a satellite position 215 , a pseudorange 211 , and a carrier phase 212 .
[0040] The positioning information DB4 records the positioning record information 22 in the storage device 103 in chronological order of the reception time 214, and also records the positioning record information 22 in order of the satellite identification number 213 at the same time. If positioning record information 22 with the same reception time 214 and the same satellite identification number 223 as the positioning information 21 received from the sensor information analysis unit 3 has already been recorded, the satellite position 215, pseudo distance 211, and carrier phase 212 of the positioning record information 22 are updated. Fig. 2 shows an example in which positioning record information 22 from 07:00:00 to 07:01:00 of the reception time 214 is stored.
[0041] The positioning information DB4 is configured in a state where the recorded positioning record information 22 can always be referred to by the edge information calculation unit 6. When a sufficient recording area cannot be secured, the positioning information DB4 may, for example, execute a process of recording the positioning record information 22 only for a predetermined fixed period, and deleting the oldest record when the recording time exceeds the fixed period. [Node information calculation part] The node information calculation unit 5 calculates node information 24 regarding the nodes 231 constituting the factor graph 23 of FIG.
[0042] FIG. 3 is a diagram illustrating an example of the factor graph 23 constructed by the positioning system 1 according to the first embodiment.
[0043] As shown in FIG. 3, the factor graph 23 is described by a node 231 and edges 251 and 252 connected to the node 231 .
[0044] The factor graph 23 is used to calculate mobile object information 29 including the position information of the mobile object, and is a method of expressing a complex optimization problem as a mathematical model by associating the position information of the mobile object as an optimization variable with the node 231 and associating constraint conditions for each optimization variable with the edges 251 and 252. By optimizing the factor graph 23 and calculating the mobile object information, highly accurate positioning can be performed.
[0045] In this embodiment, position information of the moving object is linked to the node 231 as an optimization variable. Note that attitude information of the moving object may be linked to the node 231. The optimization variable is updated by an optimization calculation of the factor graph 23 executed by the positioning calculation unit 10, which will be described later.
[0046] A node ID 242 for identifying each node is assigned to the node 231. Fig. 3 shows an example in which node IDs 242 ranging from 0 to 60 are assigned. The node ID 242 is determined by the node DB 7, which will be described later.
[0047] The positioning system 1 associates at least position information as an optimization variable with the node 231, and associates constraints on the position information with the edges 251 and 252, thereby formulating an optimization problem as a factor graph 23, and calculates at least the position information associated with the node 231 by solving the optimization problem. The positioning system 1 also associates time information with the node 231. The time information is not treated as an optimization variable.
[0048] The edges 251 and 252 include an independent edge 251 that is a constraint on position information associated with one node 231, and a relative edge 252 that is a constraint on position information associated with two nodes 231. FIG. 3 shows an example in which the factor graph 23 is constructed using the independent edge 251 and the relative edge 252.
[0049] FIG. 4 is a diagram showing an example of a data table of the node DB information 26 recorded in the node DB 7 according to the first embodiment.
[0050] When the node information calculation unit 5 acquires the positioning information 21 from the sensor information analysis unit 3, the node information calculation unit 5 calculates node information 24, which is information about the node 231, and calculates the node information 24 including the node time 241 and the node position 243 for the new node 231 in the factor graph 23.
[0051] The node information calculation unit 5 calculates the node information 24 using the reception time 214 included in the positioning information 21 acquired from the sensor information analysis unit 3 as the node time 241 .
[0052] Moreover, the node information calculation unit 5 calculates a node position 243, which is an optimization variable indicating position information of the moving object, as an initial value of an optimization variable of the optimization problem in the factor graph 23. The node position 243 is treated as an optimization variable of the optimization problem in the factor graph 23 in an edge information calculation unit 6, a reliability information calculation unit 8, a factor graph editing unit 9, and a positioning calculation unit 10, which will be described later.
[0053] In this embodiment, the node information calculation unit 5 calculates the node information 24 with the initial value of the node position 243 being 0,0,0, but the node position 243 may be a numerical value other than 0. The node information calculation unit 5 transmits the node time 241 and the node position 243 calculated based on the positioning information 21 acquired from the sensor information analysis unit 3 to the node DB 7 as the node information 24. [Node DB] The node DB 7 receives the node information 24 from the node information calculation unit 5 and records it as node DB information 26 representing the nodes 231 that make up the factor graph 23 .
[0054] 4, the node DB information 26 includes a node time 241, a node ID 242, and a node position 243. The node DB 7 determines a new node ID 242 for the node information 24 received from the node information calculation unit 5, and records it as the node DB information 26.
[0055] FIG. 4 shows an example in which node DB information 26 with node IDs 242 from 0 to 59 has already been recorded in the node DB 7, and node DB information 26 with node ID 242 of 60 is newly added.
[0056] The node information 24 in which the node time 241 is 07:01:00 and the node position 243 is 0,0,0 is received from the node information calculation unit 5, and 60 is determined as the new node ID 242. The node ID 242 is determined so that the node IDs 242 recorded in the node DB information 26 are consecutive numbers starting from 0.
[0057] If the node time 241 described in the node information 24 received from the node information calculation unit 5 is not described in the node DB information 26 recorded by the node DB 7, the node DB 7 determines a new node ID 242, links it to the received node information 24, and records it as the node DB information 26.
[0058] If the node time 241 described in the node information 24 received from the node information calculation unit 5 is included in the node DB information 26 recorded by the node DB 7, the node DB 7 does not record the node information 24 received from the node information calculation unit 5 as the node DB information 26.
[0059] The node DB information 26 recorded in the node DB 7 can be constantly referred to by the edge information calculation unit 6, the reliability information calculation unit 8, the factor graph editing unit 9, and the positioning calculation unit 10. When the node DB 7 determines a new node ID 242 and updates the node DB information 26, the edge information calculation unit 6, the reliability information calculation unit 8, the factor graph editing unit 9, and the positioning calculation unit 10 can detect the update.
[0060] The factor graph editing unit 9 can delete the specified node DB information 26 from the node DB 7. Furthermore, the positioning calculation unit 10 can edit the node position 243 recorded as the node DB information 26 in the node DB 7. [Edge information calculation section] The edge information calculation unit 6 calculates edge information 25 as edges 251, 252 to be newly added to the factor graph 23, based on the positioning information 21 acquired from the sensor information analysis unit 3, the positioning record information 22 acquired from the positioning information DB 4, and the node DB information 26 acquired from the node DB 7. The edge information calculation unit 6 operates and calculates the edge information 25 when the edge information calculation unit 6 detects that the node DB information 26 recorded in the node DB 7 has been updated.
[0061] The edge information calculation unit 6 calculates, as the edge information 25, edges 251 and 252 that bind the node 231 added to the factor graph 23 when the node DB 7 updates the node DB information 26.
[0062] The isolated edge 251 is a mathematical model representing a constraint condition for a node position 243, which is an optimization variable linked to one node 231 described in the node DB information 26. In this embodiment, the edge information calculation unit 6 calculates the isolated edge 251 from the isolated position 254 (described later in FIG. 6 ) and the node position 243 linked to the node 231 described in the node DB information 26.
[0063] The edge information calculation unit 6 performs independent positioning based on the positioning information 21 acquired from the sensor information analysis unit 3 , and calculates an independent position 254 which is the position of the GNSS antenna 2 .
[0064] In the stand-alone positioning, a stand-alone position 254 is calculated based on a plurality of satellite signals 20 received by a GNSS antenna 2. In the stand-alone positioning, the stand-alone position 254 is calculated from pseudo distances 211 between at least four or more positioning satellites 11 and the GNSS antenna 2, and satellite positions 215, using the principle of triangulation.
[0065] The above pseudo distance 211 includes errors due to the orbit of each positioning satellite 11, the accuracy of the clocks used in the sensor information analysis unit 3 and the positioning satellite 11, and the delay in the carrier wave that occurs when passing through the ionosphere and troposphere, etc.
[0066] The edge information calculation unit 6 calculates an isolated edge 251 when a node time 241 that is the same as the reception time 214 described in the positioning information 21 acquired from the sensor information analysis unit 3 is recorded in the node DB 7 as the node DB information 26.
[0067] Based on the node DB information 26, the edge information calculation unit 6 determines the node ID 242 linked to the node 231 having the node time 241 that is the same as the reception time 214 described in the positioning information 21 obtained from the sensor information analysis unit 3 as a single node ID 253 (described later in Figure 6).
[0068] The edge information calculation unit 6 calculates, for a node 231 having a node ID 242 identical to an isolated node ID 253 from among the nodes 231 constituting the factor graph 23, an isolated edge 251 which is a mathematical model for evaluating the Euclidean distance between the node position 243 and an isolated position 254 as a constraint condition for a node position 243 linked to the node 231.
[0069] The single edge 251 is a mathematical model that uses the node position 243 as a variable, and calculates the Euclidean distance to the node position 243 linked to the node 231 whose node ID 242 is the same as the single node ID 253 and the single position 254 as an single edge evaluation value. If the single position 254 indicated by the single node ID 253 is xsi, ysi, zsi, the node position 243 is xi, yi, zi, and the single edge evaluation value is es, the mathematical model that uses the node position 243 as a variable and is calculated as the single edge 251 is expressed by the formula shown in Expression 1.
[0070]
number
[0071] In this embodiment, the edge information calculation unit 6 determines the relative edge 252 by calculating a relative distance 258 (described later in FIG. 7 ) that is the Euclidean distance between the node positions 243 linked to the two nodes 231 using interference positioning based on the positioning information 21 acquired from the sensor information analysis unit 3, the positioning record information 22 recorded in the positioning information DB 4, and the node DB information 26 acquired from the node DB 7. The relative distance 258 is the distance that the GNSS antenna 2 has moved between the node times 241 linked to the two nodes 231.
[0072] The edge information calculation unit 6 selects a node 231 for which the reception time 214 described in the positioning information 21 acquired from the sensor information analysis unit 3 is the same as the node time 241 described in the node DB information 26 recorded in the node DB 7, and sets the node ID 242 associated with the selected node 231 as the first relative node ID 256 (described later in Figure 7).
[0073] In addition, the edge information calculation unit 6 selects one reception time 214 from the reception times 214 recorded in the positioning record information 22, and sets the node ID 242 linked to the node 231 whose node time 241 recorded in the node DB information 26 recorded in the node DB 7 is the same as the selected reception time 214 as the second relative node ID 257 (described later in Figure 7).
[0074] The edge information calculation unit 6 performs interferometric positioning for two nodes 231 specified by a first relative node ID 256 and a second relative node ID 257 based on the positioning information 21 and the positioning record information 22, using the carrier phase 212 and satellite position 215 observed at two node times 241 associated with the two nodes 231, thereby calculating a relative distance 258 between node positions 243 associated with the two nodes 231 and determining a relative edge 252.
[0075] In interferometric positioning, a relative distance 258 between two points is calculated from carrier phases 212 and satellite positions 215 between at least five or more positioning satellites 11 and the GNSS antenna 2 observed at the two points.
[0076] In interferometric positioning, a carrier phase difference, which is the difference between a carrier phase 212 observed at a node time 241 associated with a node 231 specified by a first relative node ID 256 and a carrier phase 212 observed at a node time 241 associated with a node 231 specified by a second relative node ID 257, is calculated for the same satellite identification number 213.
[0077] If the interferometric positioning is successful, the edge information calculation unit 6 calculates a relative edge 252 in which the node ID 242 associated with the node 231 whose node time 241 recorded in the node DB information is the same as the reception time 214 of the positioning information 21 that performed the interferometric positioning is set as the first relative node ID 256, and the node ID 242 associated with the node 231 whose node time 241 recorded in the node DB information is the same as the reception time 214 selected from the positioning record information 22 is set as the second relative node ID 256.
[0078] In the interferometric positioning, when the carrier phase difference is calculated, at the node time 241 associated with the node DB information 26 in which the node ID 242 having the same value as the first relative node ID 256 and the second relative node ID 257 is described, the decimal part of the wave number indicating which part of the continuous wave in the carrier phase 212 of the satellite signal 20 is known, but the wave number integer part excluding the decimal part of the wave number is unknown. In this embodiment, the interferometric positioning is considered to be successful only when the wave number integer part is determined in the interferometric positioning. This makes it possible for the edge information calculation unit 6 to calculate with high accuracy the relative distance 258, which is the distance the GNSS antenna 2 has moved between the two node times 241 associated with the two nodes 231 specified by the first relative node ID 256 and the second relative node ID 257, when the interferometric positioning is successful.
[0079] In addition, when the edge information calculation unit 6 performs interferometric positioning, the period of reception times 214 during which the edge information calculation unit 6 selects the positioning record information 22 recorded in the positioning information DB4 may be all reception times 214 recorded in the positioning information DB4, or may be a predetermined time range based on the reception times 214 described in the positioning information 21 acquired from the sensor information analysis unit 3.
[0080] The edge information calculation unit 6 calculates a relative edge 252 as a mathematical model for evaluating the difference between a relative distance 258 calculated by the edge information calculation unit 6 and the Euclidean distance between the node positions 243 linked to two nodes 231, the node IDs 242 of which are a first relative node ID 256 and a second relative node ID 257, as a constraint condition for the Euclidean distance between the node positions 243 linked to the two nodes 231 from among the nodes 231 constituting the factor graph 23.
[0081] The edge information calculation unit 6 is a mathematical model that uses the node positions 243 linked to the two nodes 231 as variables and calculates, as a relative edge evaluation value, the magnitude of the difference between the Euclidean distance of the node positions 243 linked to the two nodes 231 whose node IDs 242 listed in the node DB information 26 are the first relative node ID 256 and the second relative node ID 257, and the relative distance 258 calculated by the edge information calculation unit 6 using interferometric positioning.
[0082] If the relative distance 258 calculated from the interference positioning is Li,j, the node position 243 of the node 231 indicated by the first relative node ID 256 is xi, yi, zi, the node position 243 of the node 231 indicated by the second relative node ID 257 is xj, yj, zj, and the relative edge evaluation value is er, then a mathematical model with the node positions 243 associated with the two nodes 231 indicated by the first relative node ID 256 and the second relative node ID 257, which are calculated as the relative edge 252, as variables, is expressed by the equation shown in Number 2.
[0083]
number
[0084] FIG. 5 is a flowchart illustrating an example of a process of the edge information calculation unit 6 according to the first embodiment.
[0085] The process in FIG. 5 is executed when the edge information calculation unit 6 detects that the node DB information 26 recorded in the node DB 7 has been updated, and is a process of calculating edge information 25 as edges 251, 252 to be newly added to the factor graph 23 based on the positioning information 21, the positioning record information 22, and the node DB information 26.
[0086] In step S101, based on the positioning information 21 acquired from the sensor information analysis unit 3, it is determined whether or not the positioning information 21 includes four or more satellite identification numbers 213.
[0087] In step S101, if four or more satellite identification numbers 213 are described in the positioning information 21, the process proceeds to step S102.
[0088] On the other hand, if it is determined in step S101 that four or more satellite identification numbers 213 are not listed in the positioning information 21, the process ends.
[0089] In step S102, independent positioning is performed based on the positioning information 21 acquired from the sensor information analysis unit 3, and the independent position 254 is calculated.
[0090] In step S103, an isolated edge 251 is constructed from the node DB information 26 acquired from the node DB 7 and the isolated position 254 calculated in step S102, and is calculated as the edge information 25.
[0091] In step S104, based on the positioning information 21 acquired from the sensor information analysis unit 3, it is determined whether or not five or more satellite identification numbers 213 are described in the positioning information 21.
[0092] In step S104, if five or more satellite identification numbers 213 are described in the positioning information 21, the process proceeds to step S105.
[0093] On the other hand, if five or more satellite identification numbers 213 are not listed in the positioning information 21 in step S104, the process ends.
[0094] In step S105, based on the node DB information 26 acquired from the node DB 7, the node ID 242 with the largest value written in the node DB information 26 is recorded as ID1. Thereafter, the value obtained by subtracting 1 from ID1 is recorded as ID2, and the process proceeds to step S106. ID1 and ID2 are variables that store the value of node ID 242 to be temporarily referenced in the processing of the edge information calculation unit 6.
[0095] This process is performed in order to perform interference positioning from the node 231 with the node ID 242 that is close to the node 231 whose node DB information 26 has been updated.
[0096] In step S106, it is determined whether ID2 exceeds IDMIN, which is the lower limit for selecting ID2.
[0097] In step S106, if ID2 exceeds IDMIN, the process proceeds to step S107.
[0098] On the other hand, if it is determined in step S106 that ID2 is equal to or smaller than IDMIN, the process ends.
[0099] The method of determining IDMIN is determined according to the period of reception times 214 at which the edge information calculation unit 6 selects the positioning record information 22 recorded in the positioning information DB 4 when the edge information calculation unit 6 performs interferometric positioning. For example, when the edge information calculation unit 6 performs interferometric positioning at all reception times 214 recorded in the positioning information DB 4, IDMIN becomes 0.
[0100] In step S107, based on the node DB information 26 acquired from the node DB 7, the node time 241 where the node ID 242 is recorded as ID2 in the node DB information 26 is referenced.
[0101] In step S108, based on the positioning record information 22 recorded in the positioning information DB 4, the positioning record information 22 having the same reception time 214 as the node time 241 referred to in step S107 is extracted.
[0102] In step S109, based on the positioning information 21 obtained from the sensor information analysis unit 3 and the positioning record information 22 recorded in the positioning information DB4, interferometric positioning is performed using the positioning information 21 and the positioning record information 22 extracted in step S108, and the relative distance 258 is calculated.
[0103] In step S110, it is determined whether the interferometric positioning in step S109 was successful.
[0104] If it is determined in step S110 that the interferometric positioning has been successful, the process proceeds to step S111. On the other hand, if it is determined in step S110 that the interferometric positioning has been unsuccessful, 1 is subtracted from ID2 and the process returns to step S106.
[0105] In step S111, based on the result of the interferometric positioning performed by the edge information calculation unit in step S109, ID1 is set as the first relative node ID 256, ID2 is set as the second relative node ID 257, and the relative distance 258 calculated by the interferometric positioning is set as the relative edge 252 to calculate edge information 25. After that, 1 is subtracted from ID2 and the process returns to step S106. [Edge DB] The edge DB 12 receives edge information 25 from the edge information calculation unit 6 and records it as edge DB information 27 representing edges 251 and 252 that configure the factor graph 23. Based on the edge information 25 received from the edge information calculation unit 6, the edge DB 12 records the isolated edge 251 and the relative edge 252 as the edge DB information 27.
[0106] FIG. 6 is a diagram showing an example of a data table of the single edge 251 recorded as the edge DB information 27 in the edge DB 12 according to the first embodiment.
[0107] As shown in FIG. 6, an independent edge 251 in the edge DB information 27 has an independent node ID 253 and an independent position 254 .
[0108] As shown in FIG. 7, the relative edge 252 of the edge DB information 27 has a first relative node ID 256 , a second relative node ID 257 , and a relative distance 258 .
[0109] The edge DB 12 adds the single edges 251 that configure the factor graph 23 by newly recording the single edges 251 described in the edge information 25 received from the edge information calculation unit 6 in the edge DB information 27. The edge DB 12 records the single edges 251 that configure the factor graph 23 in ascending order of the single node IDs 253 in the storage device 103 as the edge DB information 27.
[0110] 6 shows an example in which isolated edges 251 with isolated node IDs 253 ranging from 0 to 60 are recorded as edge DB information 27. If the isolated node ID 253 described in the edge information 25 received from the edge information calculation unit 6 has already been recorded in the edge DB information 27 as an isolated edge 251, the edge DB 12 does not newly record the isolated edge 251 of the received edge information 25 in the edge DB information 27.
[0111] When the single node ID 253 of a single edge 251 recorded as edge DB information 27 in the edge DB 12 is the same as the node ID 242 recorded as node DB information 26 in the node DB 7, the single node ID 253 and the node ID 242 indicate nodes 231 that construct the same factor graph 23.
[0112] FIG. 7 is a diagram showing an example of a data table of the relative edge 252 recorded as the edge DB information 27 in the edge DB 12 according to the first embodiment.
[0113] The edge DB 12 adds the relative edge 252 that constructs the factor graph 23 by newly recording the relative edge 252 described in the edge information 25 received from the edge information calculation unit 6 in the edge DB information 27 .
[0114] The edge DB 12 records the relative edges 252 constituting the factor graph 23 in ascending order of the first relative node ID 256 in the storage device 103 as edge DB information 27, and when the same first relative node ID 256 exists, the edge DB 12 records the relative edges 252 in ascending order of the second relative node ID 257 as edge DB information 27.
[0115] If the first relative node ID 256 and the second relative node ID 257 described in the edge information 25 received from the edge information calculation unit 6 have already been recorded in the edge DB information 27 as a relative edge 252, the edge DB 12 does not newly record the relative edge 252 of the received edge information 25 in the edge DB information 27.
[0116] If the single node ID 253 of a single edge 251 recorded as edge DB information 27 in the edge DB 12 is the same as the first relative node ID 256 or the second relative node ID 257 of a relative edge 252 recorded as edge DB information 27 in the edge DB 12, the single node ID 253, the first relative node ID 256, and the second relative node ID 257 indicate the same node 231.
[0117] The edge DB 12 is configured in a state where the recorded edge DB information 27 can always be referred to by the reliability information calculation unit 8, the factor graph editing unit 9, and the positioning calculation unit 10. When the edge DB 12 receives edge information 25 from the edge information calculation unit 6 and updates the edge DB information 27, the edge information calculation unit 6, the reliability information calculation unit 8, the factor graph editing unit 9, and the positioning calculation unit 10 can detect the update. The factor graph editing unit 9 can delete specified edge DB information 27 from the edge DB 12. [Reliability information calculation section] The reliability information calculation unit 8 calculates reliability information 28 representing the reliability of each node 231 constituting the factor graph 23 recorded in the node DB information 26, based on the node DB information 26 recorded in the node DB 7 and the edge DB information 27 recorded in the edge DB 12.
[0118] The reliability information calculation unit 8 determines that a node 231 to which many edges 251, 252 are connected is a node 231 with high reliability among the nodes 231 constituting the factor graph 23. In the optimization problem represented by the factor graph 23, the greater the number of edges 251, 252 connected to the node 231, the more accurate the positioning of the node position 243 associated with the node 231 is.
[0119] Since the factor graph 23 evaluates the relationship between the node positions 243 linked to two nodes 231 by the relative edge 252, the calculation accuracy of one node 231 affects the positioning accuracy of the other node 231. In the case of positioning by optimizing the factor graph 23, the more reliable nodes 231 there are, the more the positioning accuracy of the node positions 243 linked to all the nodes 231 constituting the factor graph 23 improves. Therefore, when deleting a node 231 from the factor graph 23, a decrease in the positioning accuracy due to the optimization of the factor graph 23 can be prevented by selecting a node with a low reliability and deleting it from the factor graph 23.
[0120] The reliability information calculation unit 8 operates when the reliability information calculation unit 8 detects that the edge DB information 27 recorded in the edge DB 12 has been updated, and calculates reliability information .
[0121] The reliability information 28 is information for the factor graph editing unit 9, which will be described later, to determine the reliability of each node 231 constituting the factor graph 23 described in the node DB information 26.
[0122] Based on the node DB information 26 and the edge DB information 27, the reliability information calculation unit 8 calculates the total number of independent edges 251 connected to each node 231 indicated by the node ID 242 recorded in the node DB information 26 as the number of independent edges 281.
[0123] Next, based on the node DB information 26 and the edge DB information 27, the reliability information calculation unit 8 calculates the total number of relative edges 252 connected to each node 231 indicated by the node ID 242 recorded in the node DB information 26 as the relative edge number 282.
[0124] Next, the reliability information calculation unit 8 calculates the total number of the independent edge count 281 and the relative edge count 282 connected to each node 231 indicated by the node ID 242 recorded in the node DB information 26 as the reliability 283.
[0125] FIG. 8 is a diagram showing an example of a data table of the reliability information 28 calculated by the reliability information calculation unit 8 in the first embodiment.
[0126] The reliability information calculation unit 8 links the number of independent edges 281, the number of relative edges 282, and the reliability 283 calculated based on the node DB information 26 and the edge DB information 27 to the node ID 242 to calculate them as reliability information 28. The reliability information calculation unit 8 outputs the reliability information 28 calculated based on the node DB information 26 and the edge DB information 27 to the factor graph editing unit 9. [Factor Graph Editorial Department] The factor graph editing unit 9 operates only when it acquires reliability information 28 from the reliability information calculation unit 8. The factor graph editing unit 9 selects a node 231 and edges 251, 252 to be deleted from the factor graph 23 based on the node DB 7, edge DB 12, and reliability information calculation unit 8, and deletes the node DB information 26 recorded in the node DB 7 and the edge DB information 27 recorded in the edge DB 12 corresponding to the selected node 231 and edges 251, 252.
[0127] When the number of node IDs 242 described in the node DB information 26 recorded in the node DB 7, that is, the number of nodes N1 which is the total number of nodes 231 constructing the factor graph 23, reaches a certain number or more, the factor graph editing unit 9 selects the node ID 242 of the node 231 having the smallest reliability 283 described in the reliability information 28, and deletes the node DB information 26 linked to the selected node ID 242.
[0128] When there are multiple nodes 231 with the smallest reliability 283 described in the reliability information 28, the factor graph editing unit 9 selects the node ID 242 with the smallest value among them, and deletes the node DB information 26 linked to the selected node ID 242.
[0129] When the factor graph editing unit 9 deletes the node DB information 26 linked to the node ID 242 selected based on the reliability information 28 from the node DB information 26, it deletes from the edge DB information 27 the single edge 251 in which the single node ID 253 identical to the selected node ID 242 is described.
[0130] When the factor graph editing unit 9 deletes the node DB information 26 linked to the node ID 242 selected based on the reliability information 28 from the node DB information 26, the factor graph editing unit 9 deletes from the edge DB information 27 information related to the relative edge 252 in which the same first relative node ID 256 or the same second relative node ID 257 as the selected node ID 242 is described.
[0131] FIG. 9 is a flowchart illustrating an example of a process of the factor graph editing unit 9 according to the first embodiment.
[0132] The processing in FIG. 9 is executed when the factor graph editing unit 9 acquires the reliability information 28 from the reliability information calculation unit 8, and is processing for selecting a node 231 to be deleted from the factor graph 23 based on the reliability information 28, deleting the node DB information 26 related to the node ID 242 linked to the selected node 231 from the node DB 7, and deleting the edge DB information 27 related to the edges 251, 252 connected to the node ID 242 linked to the selected node 231 from the edge DB 12.
[0133] In step S301, the total number of nodes 231 constituting the factor graph 23 is calculated by counting the number of node IDs 242 written in the node DB information 26 based on the node DB 7, and this is taken as the total number of nodes N_S.
[0134] In step S302, it is determined whether the total number of nodes N_S exceeds a total node number threshold N_MAX.
[0135] In step S302, if the total node number N_S exceeds the total node number threshold N_MAX, the process proceeds to step S303. On the other hand, in step S302, if the total node number N_S is equal to or less than the total node number threshold N_MAX, the process ends.
[0136] N_MAX may be determined based on, for example, the maximum total number of nodes N_S that allows the mobile unit information 29 to be calculated at a required processing speed in the positioning calculation unit 10 described later.
[0137] In step S303, the reliability information calculation unit 8 refers to data whose node ID 242 is 0 in the reliability information 28, and acquires the reliability 283 associated with the node ID 242 as T_2.
[0138] Thereafter, I_1 is set to 1 and I_2 is set to 0 in the node ID 242. I_1 and I_2 are variables that store the value of the node ID 242 to be temporarily referenced when executing steps S304 to S310 thereafter.
[0139] In this process, in order to select a node 231 to be deleted from among the nodes 231 that are older than a reference node ID threshold I_MAX, which will be described later, I_1 and I_2 are set to 1 and 0, respectively, in the node ID 242 here.
[0140] In step S304, the reliability information calculation unit 8 refers to data whose node ID 242 is I_1 written in the reliability information 28, and acquires the reliability 283 associated with the node ID 242 as T_1.
[0141] In step S305, it is determined whether T_2, which is the reliability 283 associated with the data of I_2 and whose node ID 242 is listed in the reliability information 28, exceeds T_1, which is the reliability 283 associated with the data of I_1 and whose node ID 242 is listed in the reliability information 28.
[0142] In step S305, if T_2 exceeds T_1, the value of T_1 is overwritten on T_2, and the value of I_1 is overwritten on I_2. As a result, the value of the node ID 242 of I_1, which has a low reliability 283, is overwritten on I_2. After that, 1 is added to the value of I_1, and the process proceeds to step S306.
[0143] On the other hand, if T_2 is equal to or less than T_1 in step S305, 1 is added to the value of I_1 and the process proceeds to step S306. As a result, the value of the node ID 242 of I_2, which has a low reliability 283, remains as I_2.
[0144] In step S306, it is determined whether the value of I_1 exceeds the reference node ID threshold I_MAX.
[0145] In step S306, if the value of I_1 is greater than the reference node ID threshold I_MAX, the process proceeds to step S307. On the other hand, in step S306, if the value of I_1 is equal to or less than the reference node ID threshold I_MAX, the process returns to step S304.
[0146] The reference node ID threshold I_MAX is a value that specifies the upper limit of the node ID 242 to be selected when the factor graph editing unit 9 selects a node 231 to be deleted from the nodes 231 constructing the factor graph 23 based on the reliability information 28. The method of determining the reference node ID threshold I_MAX may be, for example, based on the total number of nodes N_S calculated in step S301, by sorting the node times 241 described in the node DB information 26 in ascending order of time, and setting α% of the total number of nodes N_S from the top as candidates for the node 231 to be deleted by the factor graph editing unit 9. In this case, the calculation formula for I_MAX is given by the formula shown in Equation 3.
[0147]
number
[0148] As a result, the node 231 with the lowest reliability 283 is deleted from among the nodes 231 older than the reference node ID threshold I_MAX.
[0149] In step S308, node IDs 242 greater than I_2 are selected from the node DB information 26 based on the node DB 7, and all selected node IDs 242 are decremented by one.
[0150] In step S309, based on the edge DB 12, data whose single node ID 253 is I_2 is selected from the edge DB information 27, and the single edge 251 linked to the single node ID 253 is deleted from the edge DB information 27. Thereafter, based on the edge DB 12, a relative edge 252 whose first relative node ID 256 or second relative node ID 257 is I_2 is selected from the edge DB information 27, and the relative edge 252 linked to the first relative node ID 256 or the second relative node ID 257 is deleted from the edge DB information 27.
[0151] In step S310, an isolated edge 251 whose isolated node ID 253 exceeds I_2 is selected from the edge DB information 27 based on the edge DB 12, and all isolated node IDs 253 associated with the selected isolated edge 251 are decremented by 1. Thereafter, a relative edge 252 whose first relative node ID 256 or second relative node ID 257 exceeds I_2 is selected from the edge DB information 27 based on the edge DB 12, and all first relative node IDs 256 or second relative node IDs 257 associated with the selected relative edge 252 are decremented by 1, and the process ends. [Positioning calculation section] Based on the node DB 7 and the edge DB 12, the positioning calculation unit 10 constructs a plurality of nodes 231 from the node DB information 26 and a plurality of edges 251, 252 including an independent edge 251 and a relative edge 252 from the edge DB information 27, and constructs a factor graph 23 represented by the nodes 231 and the edges 251, 252 as a mathematical model.
[0152] The positioning calculation unit 10 formulates an optimization problem using the node positions 243 associated with each node 231 constructed from the node DB information 26 as optimization variables and constraint conditions created as mathematical models associated with each edge 251, 252 constructed from the edge DB information 27, and calculates mobile unit information 29 from the node positions 243 associated with each node 231 by solving the optimization problem.
[0153] The positioning calculation unit 10 calculates, as the mobile unit information 29, the node position 243 associated with the node 231 having the latest node time 241 from the node positions 243 associated with each node 231 calculated by solving the optimization problem.
[0154] The optimization problem that the positioning calculation unit 10 constructs based on the node DB7 and the edge DB12 is shown in Equation 4 and Equation 5.
[0155]
number
[0156]
number
[0157] Equation 5 shows the objective function F of the optimization problem formulated by the positioning calculation unit 10. The objective function F is a function with the optimization variable vector X as a variable, and outputs an evaluation value according to X. The positioning calculation unit 10 constructs the objective function F based on the node DB7 and the edge DB12.
[0158] Based on the edge DB information 27 recorded in the edge DB 12, the positioning calculation unit 10 uses the mathematical models shown in Equation 1 and Equation 2 of the isolated edge 251 and the relative edge 252 to construct an objective function F(X) that calculates isolated edge evaluation values from all isolated edges 251 and relative edge evaluation values from all relative edges 252 from the optimization variable vector X.
[0159] The positioning calculation unit 10 linearly combines the mathematical models shown in Equations 1 and 2 of the independent edge 251 and the relative edge 252 based on the edge DB information 27 recorded in the edge DB 12 to generate an objective function F(X).
[0160] When the positioning calculation unit 10 linearly combines the mathematical models shown in Equation 1 and Equation 2 of the isolated edge 251 and the relative edge 252 to create the objective function F(X), the positioning calculation unit 10 may create the objective function F after applying an appropriate weight to each edge 251, 252.
[0161] Finally, the positioning calculation unit 10 selects, by optimization calculation, the optimization variable vector X that minimizes the evaluation value of the objective function F shown in Equation 5. When selecting the optimization variable vector X that minimizes the objective function F, the positioning calculation unit 10 can use an optimization method such as the least squares method, simulated annealing, or genetic algorithm, with the node position 243 recorded in the node DB 7 as the node DB information 26 as the initial value.
[0162] The positioning calculation unit 10 calculates, by optimization calculation, an optimization variable vector X that minimizes an objective function F in an optimization problem related to a factor graph 23 expressed by nodes 231 and edges 251 and 252. The positioning calculation unit 10 regards as the mobile unit information 29 the node position 243 associated with the node 231 having the latest node time 241 included in the calculated optimization variable vector X.
[0163] In FIG. 4, Number 4, and Number 5, the node 231 with node ID 242 of 60 and node time 241 of 07:01:00 corresponds to the newest node 231, so the positioning calculation unit 10 sets the node position 243 linked to the node 231 with node ID 242 of 60 included in the calculated optimization variable vector X as the mobile unit information 29.
[0164] The positioning calculation unit 10 transmits the calculated mobile object information 29 to an external terminal. The external terminal is not limited in this embodiment, and for example, when this embodiment is used as a mobile object positioning system, a vehicle control module and an inertial sensor calibration module that require the position coordinates of the mobile object correspond to the external terminal.
[0165] Furthermore, based on the calculated optimization variable vector X, the positioning calculation unit 10 updates the node position 243 described in the node DB information 26 recorded in the node DB 7 to the value of the calculated optimization variable vector X. When the positioning calculation unit 10 updates the node DB information 26 recorded in the node DB 7, the edge information calculation unit 6 does not execute any processing. [Entire positioning system] Hereinafter, with reference to FIG. 10, a process in which the positioning system 1 receives the satellite signal 20 from the GNSS antenna 2 and calculates the mobile object information 29 will be described.
[0166] FIG. 10 is a flowchart illustrating an example of a process of the positioning system 1 according to the first embodiment.
[0167] The positioning system 1 operates and calculates mobile unit information 29 every time it receives a satellite signal 20 converted into a digital signal from the GNSS antenna 2 .
[0168] In step S401 , the GNSS antenna 2 receives satellite signals 20 from a plurality of positioning satellites 11 , A / D converts the received satellite signals 20 , and transmits the satellite signals 20 as digital signals to the sensor information analysis unit 3 .
[0169] In step S402, the sensor information analysis unit 3 calculates positioning information 21 based on the satellite signal 20 received from the GNSS antenna 2. The sensor information analysis unit 3 transmits the calculated positioning information 21 to the positioning information DB 4, the node information calculation unit 5, and the edge information calculation unit 6.
[0170] In step S403, the node information calculation unit 5 calculates the node information 24 based on the positioning information 21 received from the sensor information analysis unit 3, and transmits the node information 24 to the node DB 7.
[0171] In step S404, it is determined whether the node time 241 written in the node information 24 received by the node DB 7 from the node information calculation unit 5 is included in the node DB information 26 recorded in the node DB 7.
[0172] In step S404, if the node time 241 written in the node information 24 received by the node DB 7 from the node information calculation unit 5 is included in the node DB information 26 recorded in the node DB 7, the process proceeds to step S414.
[0173] On the other hand, in step S404, if the node time 241 described in the node information 24 received by the node DB 7 from the node information calculation unit 5 is not included in the node DB information 26 recorded in the node DB 7, the process proceeds to step S405.
[0174] In step S405, the node DB 5 determines the node ID 242 for the node information 24 received from the node information calculation unit 5, and records it as the node DB information 26.
[0175] In step S406, the edge information calculation unit 6 calculates edge information 25 and transmits it to the edge DB 12 by executing the processes of steps S101 to S111 shown in FIG. 5 based on the positioning information 21 received from the sensor information analysis unit 3, the positioning record information 22 received from the positioning information DB 4, and the node DB information 26 received from the node DB 5.
[0176] In step S 407 , the edge DB 12 records the edge information 25 received from the edge information calculation unit 6 as edge DB information 27 .
[0177] In step S408 , the reliability information calculation unit 8 calculates reliability information 28 based on the node DB information 26 recorded in the node DB 7 and the edge DB information 27 recorded in the edge DB 12 , and transmits it to the factor graph editing unit 9 .
[0178] In step S409, the factor graph editing unit 9 executes the processes of steps S301 and S302 shown in FIG. 9 based on the node DB information 26 recorded in the node DB 7, thereby determining whether to delete information from the node DB information 26 and the edge DB information 27.
[0179] In step S409, if the factor graph editing unit 9 deletes information from the node DB information 26 and the edge DB information 27, the process proceeds to step S410. On the other hand, in step S409, if the factor graph editing unit 9 does not delete information from the node DB information 26 and the edge DB information 27, the process proceeds to step S411.
[0180] 9 based on the node DB information 26 recorded in the node DB 7, the edge DB information 27 recorded in the edge DB 12, and the reliability information 28 acquired from the reliability information calculation unit 8, thereby deleting information related to the node 231 and the edges 251 and 252 selected from the node DB information 26 and the edge DB information 27. Then, the process returns to step S408.
[0181] In step S411, the positioning calculation unit 10 formulates an optimization problem for the factor graph 23 expressed by the node 231 and the edges 251 and 252 by constructing the optimization variable vector X shown in Equation 4 and the objective function F shown in Equation 5 based on the node DB information 26 recorded in the node DB 7 and the edge DB information 27 recorded in the edge DB 12.
[0182] In step S412, the positioning calculation unit 10 selects an optimization variable vector X that optimizes the objective function F for the optimization problem of the factor graph 23 formulated in step S411, calculates the node position 243 associated with the newest node 231 included in the optimization variable vector X as the mobile unit information 29, and transmits it to the external terminal.
[0183] In step S413, the positioning calculation unit 10 updates the node position 243 written in the node DB information 26 recorded in the node DB 7 based on the optimization variable vector X selected in step S413.
[0184] In step S414, the positioning information DB 4 records the positioning information 21 received from the sensor information analysis unit 3 as the positioning record information 22, and the process ends.
[0185] In the positioning system 1 of the first embodiment, a factor graph 23 represented by a node 231 and edges 251, 252 is constructed using a satellite signal 20 received by a GNSS antenna 2 from a positioning satellite 11, and the position coordinates of the GNSS antenna 2 are calculated as moving body information 29 by solving an optimization problem represented by the factor graph 23.
[0186] The positioning system 1 calculates the reliability 283 representing the contribution of each node 231 constituting the factor graph 23 to the positioning accuracy as reliability information 28. When the number of nodes 231 constituting the factor graph 23 becomes equal to or exceeds an allowable value and the positioning system 1 is unable to calculate the moving object information 29 in real time, the positioning system 1 selects the node 231 with the lowest reliability 283 from among the nodes 231 constituting the factor graph 23, and deletes the node 231 and the associated edges 251, 252 from the factor graph 23.
[0187] According to the first embodiment, it is possible to measure the position coordinates of the GNSS antenna 2 while reducing the calculation load without deteriorating the positioning accuracy.
[0188] The positioning system 1 of this embodiment can also be applied to a form in which, by using an inertial sensor or two or more GNSS antennas, attitude information of a moving body is calculated as moving body information 29. In that case, the attitude information is linked to the node 231, and edges 251 and 252 are determined as constraint conditions for the attitude information linked to each node 231, and the factor graph 23 is constructed. EXAMPLES
[0189] The positioning system of the second embodiment has the same configuration as that of the first embodiment, but differs from that of the first embodiment in the processing of the factor graph editing unit 9 and the positioning calculation unit 10. Only the differences from the first embodiment will be described below.
[0190] The second embodiment differs from the first embodiment in that the positioning calculation unit 10 calculates optimized time information T, which is the time required for calculating the moving body information 29 based on the node DB 7 and the edge DB 12, and the factor graph editing unit 9 selects a node 231 and edges 251, 252 to be deleted from the factor graph 23 based on the optimized time information T calculated by the positioning calculation unit 10, and deletes the node DB information 26 recorded in the node DB 7 and the edge DB information 27 recorded in the edge DB 12 corresponding to the node 231 and the edges 251, 252.
[0191] FIG. 11 is a block diagram illustrating an example of a software configuration of the positioning system 1 according to the second embodiment.
[0192] The positioning system 1 in FIG. 11 differs from FIG. 1A only in that the optimized time information T calculated by the positioning calculation unit 10 is output to the factor graph editing unit 9. The other configurations are the same as the software configurations of the positioning system 1 in the first embodiment shown in FIG. 1. [Positioning calculation section] The positioning calculation unit 10 constructs an optimization problem for the factor graph 23 based on the node DB 7 and the edge DB 12, and calculates, by solving the optimization problem, the time required to calculate the node position 243 associated with each node 231 as the mobile object information 29, as optimization time information T.
[0193] The positioning calculation unit 10 calculates the optimized time information T every time it calculates the moving body information 29, and outputs the calculated optimized time information T to the factor graph editing unit 9. The process in which the positioning calculation unit 10 outputs the optimized time information T to the factor graph editing unit 9 is executed immediately after step S412 in the flowchart of FIG. [Factor Graph Editorial Department] The factor graph editing unit 9 has previously received optimized time information T from the positioning calculation unit 10. When the optimized time information T is equal to or greater than a certain value, the factor graph editing unit 9 selects a node 231 and edges 251, 252 to be deleted from the factor graph 23, and deletes the node DB information 26 recorded in the node DB 7 and the edge DB information 27 recorded in the edge DB 12 corresponding to the selected node 231 and edges 251, 252.
[0194] The process steps of the factor graph editing unit 9 deleting the node DB information 26 and the edge DB information 27 will be described below with reference to a flowchart in FIG.
[0195] FIG. 12 is a flowchart illustrating an example of a process of the factor graph editing unit 9 according to the second embodiment.
[0196] The process in FIG. 12 differs from the flowchart in FIG. 9 in steps S311 and S312.
[0197] In step S311, it is determined whether the optimized time information T has been received from the positioning calculation unit 10 in the past. If it is determined in step S311 that the optimized time information T has been received from the positioning calculation unit 10 in the past, the process proceeds to step S312. On the other hand, if it is determined in step S311 that the optimized time information T has not been received from the positioning calculation unit 10 in the past, the process proceeds to step S302.
[0198] In step S312, it is determined whether the optimized time information T received from the positioning calculation unit 10 exceeds the optimized time threshold T_MAX. If the optimized time information T received from the positioning calculation unit 10 exceeds the optimized time threshold T_MAX in step S312, the process proceeds to step S303. On the other hand, if the optimized time information T received from the positioning calculation unit 10 is equal to or less than the optimized time threshold T_MAX in step S312, the process ends.
[0199] Regarding the method of determining N_MAX, for example, the time it takes from when the GNSS antenna 2 receives the satellite signal 20 until the positioning calculation unit 10 outputs the mobile unit information 29, that is, the processing time of the positioning system 1 including the optimization time information T, is considered to be appropriately determined by considering the processing time of the positioning system 1 required by the external terminal.
[0200] According to the second embodiment, the positioning system 1 enables the factor graph editing unit 9 to determine whether to delete the node DB information 26 recorded in the node DB 7 and the edge DB information 27 recorded in the edge DB 12 based on the processing time of the positioning system 1, and it becomes possible to calculate the moving object information 29 within the processing time required by the external terminal. EXAMPLES
[0201] The positioning system of the third embodiment has the same configuration as that of the first embodiment, but differs from that of the first embodiment in the processing of the factor graph editing unit 9. Only the differences from the first embodiment will be described below.
[0202] The only difference between the third embodiment and the first embodiment is that the factor graph editing unit 9 determines whether the factor graph 23 becomes an unconnected graph based on the node DB 7 and the edge DB 12, selects the node 231 and the edges 251 and 252 that do not cause the factor graph 23 to become an unconnected graph, and deletes them from the node DB information 26 recorded in the node DB 7 and the edge DB information 27 recorded in the edge DB 12. The other configurations are the same as the software configuration of the positioning system 1 in the first embodiment shown in FIG. 1A. [Factor Graph Editorial Department] 13A and 13B are diagrams for explaining a non-connected graph assumed in the third embodiment.
[0203] In FIG. 13A, nodes 231 to which node IDs 242 ranging from 0 to 3 are assigned in the factor graph 23 are connected by relative edges 252 .
[0204] FIG. 13B shows an example in which a node 231 having a node ID 242 of 1 and edges 251 and 252 linked to the node 231 having a node ID 242 of 1 are selected by the factor graph editing unit 9 from the factor graph 23 in FIG. 13A and deleted from the factor graph 23.
[0205] 13B, the node 231 with the node ID 242 of 0 is not connected by a relative edge 252 to the nodes 231 constituting the factor graph 23 with the node ID 242 of 2 or 3. A factor graph 23 in which there is a node 231 with no relative edge 252 connected thereto is called an unconnected graph.
[0206] When the factor graph 23 expressed by the node DB information 26 and the edge DB information 27 is a non-connected graph, the positioning calculation unit 10 cannot formulate an optimization problem capable of calculating the mobile object information 29.
[0207] Therefore, the factor graph editing unit 9 judges whether the factor graph 23 becomes an unconnected graph based on the node DB7 and the edge DB12, selects the node 231 and edges 251, 252 that do not cause the factor graph 23 to become an unconnected graph, and deletes them from the node DB information 26 recorded in the node DB7 and the edge DB information 27 recorded in the edge DB12.
[0208] When searching whether the factor graph 23 is a disconnected graph, the factor graph editing unit 9 can make the search more efficient by using a data structure such as a Union-find Tree.
[0209] The process procedure for the factor graph editing unit 9 to edit the node DB information 26 and the edge DB information 27 will be described below with reference to a flowchart in FIG.
[0210] 14 is a flowchart showing an example of the process of the factor graph editing unit 9 of the embodiment 3. The process of FIG. 14 differs from the flowchart of FIG. 9 in steps S313 to S316.
[0211] In step S313, all node IDs 242 recorded in list L are deleted. List L is a list of node IDs of nodes 231 created by factor graph editing unit 9, whose deletion will cause factor graph 23 to become a disconnected graph.
[0212] In step S314, it is determined whether I_1 is a node ID 242 registered in list L.
[0213] In step S314, if I_1 is the node ID 242 registered in list L, the node 231 whose node ID 242 value is I_1 and the edges 251, 252 linked to the node 231 are not deleted even if the reliability 283 is low. Therefore, the process of comparing the reliability 283 in steps S304 and S305 is not executed, and 1 is added to I_1, and the process proceeds to step S306.
[0214] On the other hand, if I_I is not a node ID 242 registered in the list L, the process proceeds to step S304.
[0215] In step S315, based on the node DB information 26 and the edge DB information 27, it is determined whether the factor graph 23 becomes a disconnected graph when the node 231 whose node ID 242 value is I_2 and the edges 251 and 252 linked to the node 231 are deleted.
[0216] In step S315, if the factor graph 23 does not become a disconnected graph when the node 231 and the edges 251 and 252 linked to the node 231 are deleted, the process proceeds to step S307.
[0217] On the other hand, in step S315, if deleting the node 231 and the edges 251 and 252 linked to the node 231 causes the factor graph 23 to become an unconnected graph, the process proceeds to step S316.
[0218] In step S316, the node ID 242 of I_2 is recorded in the list L, and the process returns to step S303.
[0219] According to the third embodiment, in the positioning system 1, the factor graph editing unit 9 can always select the nodes 231 and edges 251, 252 that do not cause the factor graph 23 to become a disconnected graph, and can delete them from the node DB information 26 recorded in the node DB 7 and the edge DB information 27 recorded in the edge DB 12, and the positioning calculation unit 10 can continuously calculate the moving body information 29.
[0220] The present invention is not limited to the above-described embodiments, and includes various modified examples. For example, the above-described embodiments have been described in detail to clearly explain the present invention, and the present invention is not necessarily limited to those including all of the configurations described. It is also possible to replace a part of the configuration of one embodiment with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment. It is also possible to add, delete, or replace a part of the configuration of each embodiment with another configuration. [Explanation of symbols]
[0221] 1 Positioning System 2 GNSS antennas 3. Sensor information analysis section 5 Node information calculation unit 6 Edge information calculation section 8 Reliability information calculation unit 9 Factor Graph Editorial Department 10 Positioning calculation unit
Claims
1. A positioning system for calculating moving object information of a moving object based on satellite signals from a plurality of positioning satellites, an antenna for receiving satellite signals from the plurality of positioning satellites in time series; a node information calculation unit that calculates a plurality of nodes in which the moving object information is an optimization variable based on the satellite signal; an edge information calculation unit that calculates a plurality of edges that constrain each of the plurality of nodes based on the satellite signal; a reliability information calculation unit that calculates a reliability for each of the plurality of nodes; a factor graph editing unit that deletes nodes and edges selected from among the plurality of nodes and the plurality of edges based on the reliability; a positioning calculation unit that constructs a factor graph based on the plurality of nodes and the plurality of edges and calculates the moving object information by optimizing the factor graph.
2. 2. The positioning system according to claim 1, A positioning system, wherein the reliability is the number of the edges that bind each of the nodes.
3. 3. The positioning system according to claim 2, The factor graph editing unit selects a node with the lowest reliability from among the plurality of nodes that are older than a predetermined threshold, and deletes the selected node and an edge that binds the selected node.
4. 3. The positioning system according to claim 2, The factor graph editing unit deletes nodes and edges selected from the plurality of nodes and the plurality of edges based on the reliability when the total number of the nodes exceeds a predetermined threshold.
5. 3. The positioning system according to claim 2, The mobile object information is a positioning system including location information of the mobile object.
6. 3. The positioning system according to claim 2, A positioning system in which the moving body information includes attitude information of the moving body.
7. 3. The positioning system according to claim 2, The positioning calculation unit calculates optimization time information, which is a processing time required to optimize the factor graph.
8. 8. The positioning system according to claim 7, The factor graph editing unit deletes nodes and edges selected from the plurality of nodes and the plurality of edges based on the reliability when the optimization time information exceeds a predetermined threshold.
9. 3. The positioning system according to claim 2, the factor graph editing unit deletes a node and an edge selected from the plurality of nodes and the plurality of edges based on the reliability, when the factor graph can be optimized even if the node and the edge are deleted.
10. A positioning method for calculating moving object information of a moving object based on satellite signals from a plurality of positioning satellites, comprising: receiving satellite signals from the plurality of positioning satellites in time series; Calculating a plurality of nodes using the moving object information as an optimization variable based on the satellite signal; Calculating a plurality of edges that bind each of the plurality of nodes based on the satellite signals; Calculating a reliability for each of the plurality of nodes; removing selected nodes and edges from among the plurality of nodes and the plurality of edges based on the reliability; A positioning method that constructs a factor graph based on the plurality of nodes and the plurality of edges, and calculates the moving object information by optimizing the factor graph.
Citation Information
Patent Citations
System and method for estimating position of moving body
JP2020067439A
