Parallel testing system and parallel testing method
The parallel test system addresses the limitation of general-purpose communication interfaces by using a management device to coordinate independent test devices over a LAN, allowing scalable and efficient parallel testing without additional IFs, thus overcoming equipment constraints.
Patent Information
- Application Number
- JP2023062674
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-07
- Publication Date
- 2024-10-18
AI Technical Summary
Conventional parallel testing systems face limitations due to the shortage of general-purpose communication interfaces (IFs) in test equipment, restricting the number of devices that can be tested in parallel.
A parallel test system comprising management device, test devices, and measurement systems, where each test device tests independently and communicates through a LAN, allowing expansion without additional general-purpose communication IFs, and utilizing a management device to coordinate and manage multiple test devices.
Enables parallel testing of an arbitrary number of devices without being limited by the number of general-purpose communication interfaces, reducing costs and equipment size while maintaining stable communication and efficient resource utilization.
Smart Images

Figure 2024149027000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a technique for testing a DUT in parallel, and more particularly, to a technique for testing a DUT in parallel using multiple test apparatuses. [Background technology]
[0002] Electronic components and the like are tested before being shipped. A device that undergoes such a test is called a device under test (DUT). A conventional test apparatus includes one or more measuring instruments for measuring the current or voltage of the DUT, and an apparatus for communicating with these measuring instruments. This apparatus is, for example, a personal computer. The apparatus is connected to the measuring instruments via a general-purpose communication IF (Interface). The general-purpose communication IF is, for example, a VME (VERSAmodule Eurocard bus) bus, a GPIB (General Purpose Interface Bus), etc.
[0003] Concerning parallel testing technology, for example, Japanese Patent Laid-Open Publication No. 2009-300248 (Patent Document 1) discloses a parallel testing system in which "a personal computer generates parallel testing programs P-1 to PN and transmits them to parallel testing devices 2-1 to 2-N, respectively, and then transmits test start signals C-1 to CN to the parallel testing devices 2-1 to 2-N, respectively. In response to this, the parallel testing devices 2-1 to 2-N execute the parallel testing programs P-1 to PN, respectively, and perform test processing on the DUT using measuring devices 3-1 to 3-N" (see [Abstract]). [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2009-300248 A Summary of the Invention [Problem to be solved by the invention]
[0005] According to the technology disclosed in Patent Document 1, it may be possible to perform parallel testing of DUTs. However, if the number of measuring instruments increases, there is a possibility that the general-purpose communication IF of the test equipment such as a personal computer will not be sufficient. Therefore, there is a need for a technology that allows parallel testing of DUTs without being limited by the number of general-purpose communication IFs of the test equipment.
[0006] The present disclosure has been made in view of the above-mentioned background. In one aspect, an object of the technology of the present disclosure is to provide a technology for performing parallel testing of DUTs without being limited by the number of general-purpose communication IFs of a test device. [Means for solving the problem]
[0007] According to an embodiment, a parallel test system is provided. The parallel test system includes one or more measurement systems used for testing DUTs, one or more test devices connected one-to-one to each of the one or more measurement systems, and a management device that manages the one or more test devices. The test management device transmits a test command to each of the one or more test devices. Each of the one or more test devices independently tests a test DUT based on the test command without communicating with other test devices. The test management device receives a test result from each of the one or more test devices. Effect of the Invention
[0008] According to an embodiment, it is possible to perform parallel testing of DUTs without being limited by the number of general-purpose communication IFs of a test device.
[0009] The above and other objects, features, aspects and advantages of the present disclosure will become apparent from the following detailed description of the disclosure taken in conjunction with the accompanying drawings. [Brief description of the drawings]
[0010] [Figure 1] 1 is a diagram showing an example of a configuration of a parallel testing system 10 according to the present embodiment. [Diagram 2] It is a diagram showing an example of the configuration of the management device 100 and the test device 110 according to the present embodiment. [Diagram 3] It is a diagram showing an example of a test procedure for the DUT 150 by the parallel test system 10. [Figure 4] It is a diagram showing an example of a communication sequence between the devices included in the parallel test system 10. [Diagram 5] It is a diagram showing an example of the configuration of the parallel test system 50 including the blackbody furnace 500 according to the present embodiment. [Figure 6] It is a diagram showing an example of the configuration of the parallel test system 60 including the blackbody furnace 500 and the measurement stage 600 according to the present embodiment. [Figure 7] It is a diagram showing an example of a test procedure for the DUT 150 using the blackbody furnace 500 by the parallel test system 50 and the parallel test system 60.
Embodiments for Carrying Out the Invention
[0011] Hereinafter, embodiments of the technical idea according to the present disclosure will be described with reference to the drawings. In the following description, the same parts are denoted by the same reference numerals. Their names and functions are also the same. Therefore, detailed descriptions thereof will not be repeated.
[0012] <A. Configuration of Parallel Test System> FIG. 1 is a diagram showing an example of the configuration of the parallel test system 10 according to the present embodiment. With reference to FIG. 1, the configuration of the parallel test system according to the present embodiment, the problems of parallel testing of the DUT, and the terms used in this specification will be described.
[0013] (a. System Configuration) The parallel test system 10 is a system for testing an arbitrary number of DUTs 150 in parallel. Hereinafter, each DUT will be described as DUTs 150A, 150B to 150N. When DUTs are collectively referred to, they will be described as DUTs 150. The parallel test system 10 includes a management device 100, one or more switches 105, one or more test devices 110, and one or more measurement systems 120. Each measurement system 120 includes one or more measuring instruments 122 and a DC power supply 124. The management device 100 and the one or more test devices 110 are connected via a first communication line 108. Moreover, the test devices 110, the measurement systems 120, and the DUTs 150 are connected via a second communication line 130.
[0014] Hereinafter, individual test devices will be described as test devices 110A, 110B to 110N, etc. Furthermore, when the test devices are referred to collectively, they will be described as test devices 110. Similarly, individual measurement systems will be described as measurement systems 120A, 120B to 120N, etc. Furthermore, when the measurement systems are referred to collectively, they will be described as measurement system 120. Similarly, individual measuring instruments will be described as measuring instruments 122A, 122B to 122N, etc. Furthermore, when the measuring instruments are referred to collectively, they will be described as measuring instrument 122. Similarly, individual second communication lines will be described as second communication lines 130A, 130B to 130N, etc. Furthermore, when the second communication lines are referred to collectively, they will be described as second communication lines 130.
[0015] The parallel test system 10 includes any number of test apparatuses 110 and any number of measurement systems 120. The management apparatus 100 may communicate with each of the multiple test apparatuses 110 via multiple switches 105. According to an embodiment, the parallel test system 10 may not include the switch 105. In this case, the management apparatus 100 and one or more test apparatuses 110 may be connected to each other via an external switch and / or router, etc.
[0016] The management device 100 transmits a test execution command to each of the one or more test devices 110. The management device 100 also receives a test execution result from each of the one or more test devices 110. The management device 100 generates a test record based on the received test execution result, and stores the test record in the storage 203 (see FIG. 2). The management device 100 may also transmit the test record to an external device. Furthermore, the management device 100 may monitor the operation timing of the test of each of the one or more test devices 110. For example, assume that there is a test item in which a plurality of DUTs 150 are tested simultaneously using a common test equipment. In this case, the management device 100 monitors whether each of the one or more test devices 110 has completed preparation for a test using the common test equipment. The management device 100 executes a test using the common test equipment based on the fact that each of the one or more test devices 110 has completed preparation for a test using the common test equipment.
[0017] According to one embodiment, the management device 100 may be a personal computer, a tablet, a smartphone, any other information processing device, or a combination thereof. According to another embodiment, the management device 100 may be a virtual machine, an instance, a container, or a combination thereof constructed on a cloud environment.
[0018] The switch 105 mediates communication between the management device 100 and each of the one or more test devices 110. According to an embodiment, the switch 105 may be a repeater hub, a switching hub, a router, or any other communication device. According to another embodiment, the switch 105 may be configured to be connectable to a wired network and / or a wireless network. Furthermore, according to another embodiment, the switch 105 may be used in combination with other switches.
[0019] The test apparatus 110 receives a test execution command from the management apparatus 100. The test apparatus 110 executes a test on the DUT 150 based on the execution command received from the management apparatus 100. Each of the one or more test apparatuses 110 is associated one-to-one with each of the one or more measurement systems 120. Each test apparatus 110 controls the measurement system 120 according to a procedure that is predetermined for each test, and tests the DUT 150. Also, each test apparatus 110 tests the DUT 150 independently of each other.
[0020] The measurement system 120 is a collection of one or more devices required for testing the DUT 150. As an example, the measurement system 120 may include one or more measuring instruments 122 and a DC power supply 124. According to an embodiment, the measurement system 120 may include an AC power supply (not shown). The measurement system 120 may also include a device for outputting some signal to the DUT 150. The measurement system 120 may output power and / or a signal to the DUT 150. The measurement system 120 may also receive a signal from the DUT 150 and transmit the signal to the test apparatus 110. According to an embodiment, the measurement system 120 may convert the format of the signal received from the DUT 150 and transmit the converted signal to the test apparatus 110. According to another embodiment, the measurement system 120 may perform any calculation process based on the signal received from the DUT 150 and transmit the result of the calculation process to the test apparatus 110.
[0021] The measuring instrument 122 reads a signal from the DUT 150. The measuring instrument 122 also transmits the read signal to the test apparatus 110. The DC power supply 124 supplies power to the DUT 150. The test apparatus 110 can perform function tests such as starting and stopping the DUT 150 by controlling the DC power supply 124. Similarly, the test apparatus 110 can perform function tests such as starting and stopping the DUT 150 by controlling the AC power supply.
[0022] The first communication line 108 connects the management device 100 and one or more test devices 110. The first communication line 108 also constitutes a LAN (Local Area Network). According to an embodiment, the first communication line 108 may be an Ethernet (registered trademark) cable. According to another embodiment, the first communication line 108 may be a wireless network that complies with the Wi-Fi (registered trademark) (Wireless Fidelity) standard. In this case, the switch 105 is, for example, a wireless router or the like. Furthermore, according to another embodiment, the first communication line 108 may be realized by a combination of a wired network and a wireless network.
[0023] The second communication line 130 is a general-purpose communication path or a general-purpose communication IF. The second communication line 130 is, for example, a VME bus or a GPIB. The second communication line 130 may also include a communication line of a Universal Serial Bus (USB). The second communication line 130 may be used to directly connect the test device 110 and the DUT 150. The second communication line 130 may also be used to connect the test device 110 and each measuring instrument 122. The second communication line 130 may also be used to connect the test device 110 and the DC power supply 124. The second communication line 130 may also be used to connect the measuring instrument 122 and the DUT 150. The second communication line 130 may also be used to connect the DC power supply 124 and the DUT 150.
[0024] For example, assume that the DUT 150 is a board for communicating with other devices. In this case, the test apparatus 110 communicates with the DUT 150 instead of the other devices via the second communication line 130. In this way, the test apparatus 110 can execute a function test of the DUT 150.
[0025] The test apparatus 110, the measuring instruments 122, the DC power supply 124, and the DUT 150 may be connected via one or more any number of second communication lines 130. The number of the second communication lines 130 may be determined based on the communication format or the number of input / output ports of the DUT 150. The communication format may be, for example, an Inter-Integrated Circuit (I2C), a Serial Peripheral Interface (SPI), or a Universal Asynchronous Receiver Transmitter (UART). According to an embodiment, the test apparatus 110 may be connected to the measurement system 120 and / or the DUT 150 via a conversion adapter for a GPIB terminal and a USB terminal. This allows the test apparatus 110 to use the USB terminal instead of the GPIB terminal. As a result, the test apparatus 110 may provide a sufficient number of communication ports (general-purpose communication IF) even when there are many measuring instruments 122. Similarly, the test apparatus 110 can be connected to the measurement system 120 and / or the DUT 150 via a conversion adapter between a VME bus terminal and a USB terminal.
[0026] (b. Challenges of Parallel Testing of DUTs) The test apparatus 110 is connected to the DUT 150 or the measurement system 120 via a general-purpose communication IF such as a VME bus and a GPIB. Therefore, there is a limit to the number of devices that can communicate with the test apparatus 110. Furthermore, expanding the test apparatus 110 to increase the number of general-purpose communication IFs increases the equipment cost. Furthermore, the test apparatus 110 may become larger in size. Furthermore, general-purpose communication IFs such as a VME bus and a GPIB cannot communicate with one device at a time. Therefore, there is a limit to the number of DUTs 150 that the test apparatus 110 can test in parallel.
[0027] Therefore, the parallel test system 10 according to the present embodiment has each test apparatus 110 test one DUT 150. The parallel test system 10 has the management device 100 manage one or more test apparatuses 110. In this way, the general-purpose communication IF of each test apparatus 110 is used only for testing a single DUT 150. As a result, regardless of the number of DUTs 150 to be tested, the general-purpose communication IF of each test apparatus 110 is not insufficient. A user can test any number of DUTs 150 in parallel by adding a test apparatus 110 to the parallel test system 10. The parallel test system 10 can reduce data collisions or communication waits on the general-purpose communication IF and realize stable communication between the test apparatus 110, the measurement system 120, and the DUTs 150.
[0028] As described above, in order to eliminate the limitation on the number of general-purpose communication IFs, the parallel test system 10 has the following configuration and functions. The parallel test system 10 includes one or more measurement systems 120 used to test the DUT 150. The parallel test system 10 also includes one or more test devices 110 connected one-to-one to each of the one or more measurement systems 120. The parallel test system 10 further includes a management device 100 that manages the one or more test devices 110. The management device 100 transmits a test command to each of the one or more test devices 110. Each of the one or more test devices 110 independently tests the DUT 150 based on the test command without communicating with the other test devices 110. The management device receives test results from each of the one or more test devices 110.
[0029] Moreover, each of the one or more measurement systems 120 and each of the one or more test devices 110 are connected by a general-purpose communication IF. Furthermore, the management device 100 and each of the one or more test devices 110 are connected via a LAN. That is, the test device 110 only needs to have a general-purpose communication IF for testing one DUT 150. Furthermore, the management device 100 can manage any number of test devices 110 via the LAN. A user can expand the parallel test system 10 by connecting the test device 110 to the LAN. As a result, a user can perform parallel testing of the DUTs 150 without worrying about the limit on the number of general-purpose communication IFs of the test device 110.
[0030] (c. Terms Used in This Specification) Next, the terms used in this specification will be explained.
[0031] In this specification, the term "system" includes a configuration consisting of one or more devices, and a server. The term also includes a virtual machine or a container constructed in a cloud environment, or a configuration consisting of at least a part of these. When the system consists of one device, the system may be read as the device.
[0032] In this specification, the term "device" refers to any information processing device such as a personal computer, a workstation, a server device, a tablet, a smartphone, etc. The device may also be a combination of these.
[0033] In this specification, a "measurement system" has a function required for measuring the DUT 150. The measurement system 120 is composed of at least one or more measuring instruments 122. The measurement system 120 may also include one or more DC power supplies 124 and / or one or more AC power supplies. Furthermore, the measurement system 120 may include any device required for measuring the DUT 150. As an example, the measurement system 120 may include a device that outputs a signal to the DUT 150 for a function test of the DUT 150. According to an embodiment, the measurement system 120 may be realized as a single device having the functions of multiple measuring instruments 122, DC power supplies 124, and / or any other device. According to another embodiment, the measurement system 120 may be a collection of multiple measuring instruments 122, DC power supplies 124, and / or any other device.
[0034] In this specification, the "instrument" may read a signal output by the DUT 150 and transmit the acquired signal to the test apparatus 110. According to an embodiment, the instrument 122 may include a device that outputs a signal to the DUT 150 for a functional test of the DUT 150.
[0035] In this specification, the "general-purpose communication IF" refers to a VME bus, a GPIB, etc. In this specification, the general-purpose communication IF refers to a bus, a communication path, or a terminal provided on an apparatus. For example, when it is expressed as a general-purpose communication IF provided in the test equipment 110, the general-purpose communication IF may refer to a terminal provided on the test equipment 110. Also, when it is expressed that the test equipment 110 and the DUT 150 communicate via a general-purpose communication IF, the general-purpose communication IF may refer to a terminal and a communication path.
[0036] FIG. 2 is a diagram showing an example of the configuration of the management device 100 and the test device 110 according to the present embodiment. The management device 100 and the test device 110 may not include part of the configuration shown in FIG. 2, if necessary. Conversely, the management device 100 and the test device 110 may include a configuration other than the configuration shown in FIG. 2, if necessary. The management device 100 and the test device 110 can realize the technology of the present disclosure by executing a program on the hardware shown in FIG. 2. The management device 100 and the test device 110 include a CPU (Central Processing Unit) 201, a memory 202, a storage 203, an external device IF 204, an input IF 205, an output IF 206, and a communication IF 207.
[0037] The CPU 201 can execute programs for implementing various functions of the management device 100 or the test device 110. The CPU 201 is, for example, configured with at least one integrated circuit. According to an embodiment, the management device 100 and the test device 110 may include at least one CPU, at least one GPU (Graphics Processing Unit), at least one FPGA (Field Programmable Gate Array), at least one ASIC (Application Specific Integrated Circuit), or a combination thereof.
[0038] The memory 202 stores programs executed by the CPU 201 and data referenced by the CPU 201. In one aspect, the memory 202 can be realized by a dynamic random access memory (DRAM), a static random access memory (SRAM), or the like.
[0039] Storage 203 is a non-volatile memory, and stores programs executed by CPU 201 and data referenced by CPU 201. In this case, CPU 201 executes programs read from storage 203 to memory 202, and references data read from storage 203 to memory 202. In one aspect, storage 203 can be realized by a hard disk drive (HDD), a solid state drive (SSD), an erasable programmable read only memory (EPROM), an electrically erasable programmable read only memory (EEPROM), a flash memory, or the like.
[0040] The external device IF 204 can be connected to any external device such as a printer, a scanner, an external HDD, etc. In one aspect, the external device IF 204 can be realized by a USB (Universal Serial Bus) terminal or the like.
[0041] The input IF 205 may be connected to any input device such as a keyboard, a mouse, a touch pad, a game pad, etc. In one aspect, the input IF 205 may be realized by a USB terminal, a PS / 2 terminal, a Bluetooth (registered trademark) module, or the like.
[0042] The output IF 206 can be connected to any output device such as a cathode ray tube display, a liquid crystal display, an organic EL (Electro-Luminescence) display, etc. In one aspect, the output IF 206 can be realized by a USB terminal, a D-sub terminal, a DVI (Digital Visual Interface) terminal, an HDMI (High-Definition Multimedia Interface) terminal, a DisplayPort terminal, etc.
[0043] The communication IF 207 is connected to other devices via a wired network or a wireless network. In one aspect, the communication IF 207 may be realized by a wired LAN port, a Wi-Fi module, or the like. In another aspect, the communication IF 207 may transmit and receive data using a communication protocol such as TCP / IP (Transmission Control Protocol / Internet Protocol) or UDP (User Datagram Protocol).
[0044] Fig. 3 is a diagram showing an example of a test procedure for the DUT 150 by the parallel test system 10. According to an embodiment, the CPU 201 may load a program for performing the processing of Fig. 3 from the storage 203 into the memory 202 and execute the program. In another aspect, a part or all of the processing may be realized as a combination of circuit elements configured to perform the processing.
[0045] The management device 100 stores programs and setting files for controlling each test device 110 in the storage 203. The test device 110 stores programs and setting files for testing the DUT 150 in the storage 203. The management device 100 and the test device 110 test the DUT 150 according to their respective programs.
[0046] In step S310, the management device 100 checks the status of each test device 110. More specifically, the management device 100 transmits a status confirmation message to each test device 110. Each test device 110 returns a response message indicating the status to the management device 100. The response message indicates, for example, the status of the test device 110, such as whether or not the test device 110 has completed preparation for the test. The management device 100 may execute the process of step S320 based on the fact that all test devices 110 are in a state in which the test can be started. According to an embodiment, the management device 100 may execute the process of step S320 even if some test devices 110 cannot start the test. In this case, the management device 100 may store an error log in the storage 203. In addition, the management device 100 may transmit error information related to the test device 110 that cannot start the test to a user terminal or the like. The management device 100 may execute the process of step S310 multiple times.
[0047] In step S320, the management device 100 transmits a test start command to each test device 110. Each test device 110 executes a process related to the test based on receiving the test start command. Each test device 110 is in a standby state until it receives the test start command. Each test device 110 executes the test of the DUT 150 independently without communicating with the other test devices 110.
[0048] In step S330, the management device 100 inquires of each test device 110 about the completion of the test. More specifically, the management device 100 periodically transmits a confirmation message of the completion of the test to each test device 110. When the test device 110 receives the confirmation message, it executes a communication interrupt process. The test device 110 returns a response message indicating the execution status of the test to the management device 100. The response message indicates, for example, that the test is ongoing, that the test is completed, that the test has been stopped due to an error, or any other arbitrary state.
[0049] As described above, the management device 100 periodically transmits a confirmation message of test completion to each test device 110. This allows the parallel test system 10 to continue operating as a whole even if some of the test devices 110 are stopped. Furthermore, by periodically communicating with each test device 110, the management device 100 can detect an abnormality in each test device 110 early without setting a long timeout time. This allows the management device 100 to stop the test device 110 having an abnormality and prevent the DUT 150 or the measurement system 120 from breaking down. According to an embodiment, each test device 110 may transmit a message indicating the execution status of the test to the management device 100 regardless of an inquiry from the management device 100. In this case, the management device 100 may determine that a test device 110 that does not transmit a message for a certain period of time has broken down.
[0050] In step S340, the management device 100 determines whether testing of all test devices 110 has been completed. If the management device 100 detects an abnormality in some of the test devices 110, it may determine whether testing of all remaining normal test devices 110 has been completed. If the management device 100 determines that testing of all test devices 110 has been completed (YES in step S340), it transfers control to step S350. If not (NO in step S340), the management device 100 transfers control to step S330.
[0051] In step S350, the management device 100 acquires result data from each test device 110. The result data is the result of the test of the DUT 150. More specifically, the management device 100 transmits a request message for the result data to each test device 110. The test device 110 that receives the request message returns the result data to the management device 100. The management device 100 stores the received result data in the storage 203.
[0052] After performing the process of this step, the management device 100 may start the next test. The next test may be a test different from the current test. Furthermore, the management device 100 may repeatedly execute the same test based on the fact that a new DUT 150 has been connected to each test device 110 and each measurement system 120. According to an embodiment, the DUT 150 may be manually connected to each test device 110 and each measurement system 120. According to another embodiment, the DUT 150 may be connected to each test device 110 and each measurement system 120 by a robot or the like. The parallel test system 10 may detect that the DUT 150 has been connected to each test device 110 and each measurement system 120 by a sensor (not shown) or the like.
[0053] 4 is a diagram showing an example of a communication sequence between the devices included in the parallel testing system 10. In the following description, steps S410A, and S410B to S410N indicate the same communication. When these are collectively referred to, they will be described as step S410. The same applies to the other steps.
[0054] In step S410, the management device 100 transmits a test start command to each test device 110. In step S420, each test device 110 transmits a response message to the test start command to the management device 100. The management device 100 may transmit the test start command again to a test device 110 that has not responded for a certain period of time. The communications in steps S410 and S420 correspond to the processing in step S320.
[0055] In step S430, the management device 100 transmits a confirmation message of test completion to each test device 110. The management device 100 may periodically execute the process of step S430. In step S440, each test device 110 returns a response message indicating the execution status of the test to the management device 100. The communications in steps S430 and S440 correspond to the process of step S330.
[0056] As described above, each test device 110 executes response processing based on receiving an instruction or message from the management device 100. As a result, the user can clearly separate and implement test processing and communication interrupt processing when implementing the program of the test device 110. This facilitates the development of the program of the test device 110, and the user can develop the program of the test device 110 in a short period of time. In addition, the programs installed in each test device 110 are common. Therefore, the user can develop the program of the test device 110 in an even shorter period of time.
[0057] The management device 100 has a setting file including the IP addresses, various settings, various histories, etc. of each test device 110. The management device 100 can send a test start instruction to each test device 110 by reading the setting file at startup.
[0058] As described above, the test device 110 is managed by the management device 100. By doing so, the test device 110 can test the DUT 150 independently of other test devices 110 using the measurement system 120. Each test device 110 and each measurement system 120 only need to have the minimum configuration necessary for testing one DUT 150. As a result, an increase in the overall cost and size of the parallel test system 10 is suppressed. In addition, the user can easily respond to changes in the number of tests of the DUT 150 by changing the number of each test device 110 and each measurement system 120.
[0059] <B. Configuration Example of Parallel Test System with Blackbody Furnace> FIG. 5 is a diagram showing an example of the configuration of a parallel test system 50 including a blackbody furnace 500 according to the present embodiment. The parallel test system 50 is different from the parallel test system 10 in that it includes a blackbody furnace 500. According to an embodiment, the parallel test system 50 may include a plurality of blackbody furnaces 500. The same components as those shown in FIG. 1 are denoted by the same reference numerals and will not be described repeatedly. In addition, the parallel test system 50 has all the functions of the parallel test system 10.
[0060] The blackbody furnace 500 is used for testing and calibrating a DUT using infrared rays. The blackbody furnace 500 has a space for storing a plurality of DUTs 150. The blackbody furnace 500 is also connected to the management device 100 via a communication line 510. According to one embodiment, the communication line 510 may be a general-purpose communication line (a communication line connected to a general-purpose communication IF). According to another embodiment, the communication line 510 may be a LAN cable or wireless.
[0061] The management device 100 can control the blackbody furnace 500 via the communication line 510. The management device 100 can also obtain status information of the blackbody furnace 500 from the blackbody furnace 500 via the communication line 510. The status information of the blackbody furnace 500 includes, for example, the temperature of the blackbody furnace 500. The management device 100 monitors the status (temperature) of the blackbody furnace 500 and the execution status of the test of each test apparatus 110. The management device 100 can determine an instruction to be sent to each test apparatus 110 based on the status of the blackbody furnace 500 and each test apparatus 110.
[0062] As an example, it is assumed that the management device 100 detects that the temperature of the blackbody furnace 500 is stable. Furthermore, it is assumed that the management device 100 detects that one or more test devices 110 have completed preparation for a test using the blackbody furnace 500. In this case, the management device 100 transmits an execution command for a test using the blackbody furnace 500 to the one or more test devices 110 that have completed preparation. The one or more test devices 110 that have completed preparation execute a test using the blackbody furnace 500 based on receiving the execution command.
[0063] According to an embodiment, the management device 100 may monitor whether all the test devices 110 have completed preparation for the test using the blackbody furnace 500. In this case, the management device 100 may send a command to execute the test using the blackbody furnace 500 to all the test devices 110 that have completed preparation. According to another embodiment, the management device 100 may monitor whether a certain number of the test devices 110 have completed preparation for the test using the blackbody furnace 500. For example, it is assumed that the blackbody furnace 500 can simultaneously store five DUTs 150. In this case, the management device 100 may send a command to execute the test using the blackbody furnace 500 to the five test devices 110 that have completed preparation.
[0064] The management device 100 can effectively utilize the space of the blackbody furnace 500 by managing the states of the blackbody furnace 500 and each test device 110. In other words, the management device 100 can improve the efficiency of parallel testing of the DUTs 150 by storing as many DUTs 150 as possible in the blackbody furnace 500 at one time.
[0065] The parallel test system 50 cannot test the DUT 150 using the blackbody furnace 500 until the temperature inside the blackbody furnace 500 stabilizes. Therefore, the management device 100 transmits a command to each test device 110 to execute another test until the temperature inside the blackbody furnace 500 stabilizes. In this way, the parallel test system 10 can effectively utilize the time until the temperature inside the blackbody furnace 500 stabilizes, and improve the efficiency of the parallel test of the DUT 150.
[0066] 5, the parallel test system 50 includes a black body furnace 500, but this is merely an example. According to an embodiment, the parallel test system 50 may include any test equipment used simultaneously for multiple DUTs 150, such as a thermostatic chamber. In this case, the management device 100 monitors the state of the test equipment and the execution status of the test of each test device 110. The management device 100 may determine an instruction to be sent to each test device 110 based on the state of the test equipment and each test device 110.
[0067] It is assumed that the management device 100 detects that the state of the test equipment has stabilized or that the test equipment has been prepared. Furthermore, it is assumed that the management device 100 detects that one or more test devices 110 have completed preparation for a test using the test equipment. In this case, the management device 100 transmits an instruction to execute a test using the test equipment to one or more test devices 110 that have completed preparation for a test. The management device 100 transmits an instruction to execute another test to each test device 110 until the state of the test equipment has stabilized. Alternatively, the management device 100 transmits an instruction to execute another test to each test device 110 until preparation for the test equipment is completed.
[0068] As described above, the parallel test system 50 includes the same components as those of the parallel test system 10, and further includes test equipment having space for storing a plurality of DUTs 150. The management device 100 is configured to be able to communicate with the test equipment. Based on the status of tests performed by the one or more test devices 110 and the status of the test equipment, the management device 100 determines commands to be sent to some or all of the one or more test devices 110.
[0069] As one example, the management device 100 transmits a command to execute a test without using test equipment to some or all of the one or more test devices 110 based on the state of the test equipment being unstable. As another example, the management device 100 transmits a command to execute a test using test equipment to some or all of the one or more test devices 110 based on the state of the test equipment being stable. With these configurations and functions, the parallel test system 50 can efficiently execute tests on multiple DUTs 150 using test equipment.
[0070] FIG. 6 is a diagram showing an example of a configuration of a parallel test system 60 including a black body furnace 500 and a measurement stage 600 according to the present embodiment. The parallel test system 60 differs from the parallel test system 10 in that the parallel test system 60 includes a black body furnace 500 and a measurement stage 600. According to an embodiment, the parallel test system 60 may include one or more black body furnaces 500 and one or more measurement stages 600. The same components as those shown in FIG. 1 and FIG. 5 are denoted by the same reference numerals and will not be described repeatedly. The parallel test system 60 includes all the functions of the parallel test system 50.
[0071] The measurement stage 600 is a stage on which a plurality of DUTs 150 are installed. Hereinafter, each measurement stage will be described as a measurement stage 600A, 600B, 600X, etc. Moreover, when the measurement stages are collectively referred to, they will be described as a measurement stage 600. The management device 100 is connected to one or more measurement stages 600 via a communication line 610. According to an embodiment, the communication line 610 may be a general-purpose communication line (a communication line connected to a general-purpose communication IF). According to another embodiment, the communication line 610 may be a LAN cable or wireless. Each measurement stage 600 may be connected to the management device 100 in a one-to-one relationship. Moreover, each measurement stage 600 may be connected to the management device 100 via a bus.
[0072] Each of the one or more measurement stages 600 is driven by a motor or the like. The management device 100 can move each measurement stage 600 by sending a command to a driver or the like of the motor that drives each measurement stage 600. The motor and the driver may be integrated with the measurement stage 600.
[0073] The management apparatus 100 can store all of the DUTs 150 on the measurement stage 600 in the blackbody furnace 500 by moving the measurement stage 600 into the blackbody furnace 500. In addition, the management apparatus 100 can remove all of the DUTs 150 on the measurement stage 600 from the blackbody furnace 500 by moving the measurement stage 600 out of the blackbody furnace 500.
[0074] As an example, the management device 100 moves the measurement stage 600A into the blackbody furnace 500 to test the DUT 150. When the test of all the DUTs 150 on the measurement stage 600A is completed, the management device 100 removes the measurement stage 600A from the blackbody furnace 500. Then, the management device 100 moves the measurement stage 600B into the blackbody furnace 500 to test the DUT 150. In this manner, the management device 100 may store each of the one or more measurement stages 600 in the blackbody furnace 500 in order. As a result, the management device 100 may perform tests using the blackbody furnace 500 on the multiple DUTs 150 one after another. The parallel test system 60 may perform the process described with reference to FIG. 5 at a higher speed by using the measurement stage 600.
[0075] As described above, the parallel testing system 60 includes the configuration of the parallel testing system 50, and further includes a measurement stage 600 capable of mounting a plurality of DUTs 150. The management device 100 is configured to be able to communicate with the measurement stage 600. Alternatively, the management device 100 moves the measurement stage 600 into the testing equipment based on the fact that the state of the testing equipment is stable. In this way, the parallel testing system 60 can more efficiently test a plurality of DUTs 150 using the testing equipment by using the measurement stage 600.
[0076] Fig. 7 is a diagram showing an example of a test procedure for the DUT 150 using the black body furnace 500 by the parallel test system 50 and the parallel test system 60. According to an embodiment, the CPU 201 may load a program for performing the processing of Fig. 7 from the storage 203 into the memory 202 and execute the program. In another aspect, a part or all of the processing may be realized as a combination of circuit elements configured to perform the processing.
[0077] In step S710, the management device 100 checks the status of each test device 110. More specifically, the management device 100 transmits a status check message to each test device 110. Each test device 110 returns a response message indicating its status to the management device 100.
[0078] In step S720, the management device 100 determines whether a test using the blackbody furnace 500 can be performed. As an example, the management device 100 determines whether the temperature of the blackbody furnace 500 is stable. In addition, the management device 100 determines whether one or more test devices 110 have completed preparation for a test using the blackbody furnace 500. The management device 100 may determine that a test using the blackbody furnace 500 can be performed based on the fact that both of these conditions are satisfied. If the management device 100 determines that a test using the blackbody furnace 500 can be performed (YES in step S720), the management device 100 transfers control to step S730. If not (NO in step S720), the management device 100 transfers control to step S750.
[0079] In step S730, the management device 100 executes a test using the blackbody furnace 500. At this time, a plurality of DUTs 150 are stored in the blackbody furnace 500. The parallel testing system 60 uses the measurement stage 600 to store a plurality of DUTs 150 in the blackbody furnace 500.
[0080] In step S740, the management device 100 acquires result data of the test of the DUT 150 using the blackbody furnace 500. As an example, the management device 100 transmits a message to each test device 110 requesting result data of the test of the DUT 150 using the blackbody furnace 500. Each test device 110 that receives the message returns the result data to the management device 100.
[0081] In step S750, the management device 100 transmits to each test apparatus 110 a command to start a test without using a blackbody furnace 500. Each test apparatus 110 starts a test of the DUT 150 without using a blackbody furnace 500 based on receiving the command to start.
[0082] In step S760, the management device 100 periodically transmits a message inquiring about the completion of the test to each test device 110. Each test device 110 returns a message including the execution status of the test (executing, error, completed, etc.) to the management device 100.
[0083] In step S770, the management device 100 determines whether or not testing has been completed for all of the test devices 110. If the management device 100 determines that testing has been completed for all of the test devices 110 (YES in step S770), the management device 100 transfers control to step S720. If not (NO in step S770), the management device 100 transfers control to step S760.
[0084] As described above, the parallel test systems 10, 50, and 60 according to the present embodiment manage each test apparatus 110 by the management apparatus 100. Each test apparatus 110 can test the DUT 150 independently of the other test apparatuses 110. This allows the parallel test systems 10, 50, and 60 to test multiple DUTs 150 in parallel. Furthermore, a user can expand the parallel test system 10 by connecting the test apparatus 110 to a LAN. As a result, a user can perform parallel testing of the DUTs 150 without worrying about the limit on the number of general-purpose communication IFs of the test apparatus 110. Furthermore, the parallel test systems 50 and 60 can simultaneously test multiple DUTs 150 using one blackbody furnace 500. This allows the efficiency of parallel testing of the DUTs 150 to be improved.
[0085] The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present disclosure is indicated by the claims, not by the above description, and is intended to include all modifications within the meaning and scope of the claims. In addition, the disclosure contents described in the embodiments and each modified example are intended to be implemented, as far as possible, either alone or in combination. [Explanation of symbols]
[0086] 10,50,60 Parallel test system, 100 Management device, 105 Switch, 108 First communication line, 110 Test device, 120 Measurement system, 122 Measuring instrument, 124 DC power supply, 130 Second communication line, 150 DUT, 201 CPU, 202 Memory, 203 Storage, 204 External device IF, 205 Input IF, 206 Output IF, 207 Communication IF, 500 Blackbody furnace, 510,610 Communication line, 600 Measurement stage.
Claims
1. one or more measurement systems used to test a DUT (Device Under Test); one or more test devices connected one-to-one to each of the one or more measurement systems; a management device for managing the one or more test devices, the management device transmits a test command to each of the one or more test devices; each of the one or more test devices independently tests the DUT based on the test command without communicating with other test devices; The management device receives test results from each of the one or more test devices.
2. each of the one or more measurement systems and each of the one or more test devices are connected by a general-purpose communication IF (Interface); 2. The parallel testing system according to claim 1, wherein the management device and each of the one or more testing devices are connected via a LAN (Local Area Network).
3. a test device having a space for storing a plurality of the DUTs; The management device includes: configured to be able to communicate with the test equipment; 3. The parallel test system according to claim 1, further comprising: a test device for testing one or more test devices that performs a test on the one or more test devices;
4. 4. The parallel test system of claim 3, wherein the management device sends a command to execute a test without using the test equipment to some or all of the one or more test devices based on the state of the test equipment being unstable.
5. 4. The parallel test system according to claim 3, wherein the management device transmits a command to execute a test using the test equipment to some or all of the one or more test devices based on the state of the test equipment being stable.
6. A measurement stage capable of mounting a plurality of the DUTs is further provided, The management device includes: configured to be able to communicate with the measurement stage; 4. The parallel testing system of claim 3, further comprising: a step of moving the metrology stage into the test equipment based on a state of the test equipment being stable.
7. 1. A method for parallel testing of a DUT, comprising: sending, by a management device, a test command for the DUT to one or more test devices; testing, by each of the one or more test devices, the DUT based on the test command, using one or more measurement systems used to test the DUT independently without communication with other test devices; receiving, by the management device, test results from each of the one or more test devices; A parallel testing method, wherein each of the one or more test devices is connected one-to-one to each of the one or more measurement systems.
8. each of the one or more measurement systems and each of the one or more test devices are connected by a general-purpose communication IF; 8. The parallel testing method according to claim 7, wherein the management device and each of the one or more test devices are connected via a LAN.
9. The management device is configured to be able to communicate with a test device having a space for storing a plurality of the DUTs; 9. The parallel testing method of claim 7, further comprising: determining, by the management device, instructions to send to some or all of the one or more test devices based on a status of testing by the one or more test devices and a status of the test equipment.
10. 10. The parallel testing method of claim 9, further comprising: transmitting, by the management device, an instruction to execute a test without using the test equipment to some or all of the one or more test devices based on the state of the test equipment being unstable.
11. 10. The parallel testing method of claim 9, further comprising: transmitting, by the management device, an instruction to execute a test using the test equipment to some or all of the one or more test devices based on the state of the test equipment being stable.
12. the management device is configured to be able to communicate with a measurement stage capable of mounting a plurality of the DUTs; 10. The parallel testing method of claim 9, further comprising: moving, by the management device, the measurement stage into the testing equipment based on a state of the testing equipment being stable.
Citation Information
Patent Citations
Parallel testing device
JP2009300248A
