Management computer system and management method for construction materials, and program

The construction materials management system centrally tracks materials using identification codes and alerts, addressing defect tracing and retention issues, ensuring quality and preventing deterioration.

JP2024150178APending Publication Date: 2024-10-23FUJIMORI SANGYO CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023063458
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-10
Publication Date
2024-10-23

AI Technical Summary

Technical Problem

Construction materials used in civil engineering and construction projects often suffer from quality defects that are difficult to trace back to their production or handling processes, and can deteriorate during storage or transportation, making it hard to identify the cause of defects and ensure they are within their quality retention period.

Method used

A construction materials management system that uses a computer system to centrally manage and track materials from production to application, employing material identification codes (barcodes or two-dimensional codes) and terminals to input, read, and store information in a database, with alerts for quality retention periods and reception errors.

Benefits of technology

Enables easier investigation of defect causes and ensures materials are within their quality retention period, preventing defects by centralizing management and tracing materials through the supply chain.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024150178000001_ABST
    Figure 2024150178000001_ABST
Patent Text Reader

Abstract

To provide a system that can centrally manage and trace construction materials from production to shipment, delivery, and application.SOLUTION: A construction material management computer system 10 accepts production information including material-specific information such as a product name and a model number of a produced construction material 2 from an information input terminal 4, in response thereto issues a material identification code for identifying the construction material 2 to a code acquisition terminal 4, and stores management information 14 including the production information and the material identification code in a database 12d. The issued material identification code is barcoded and attached to the construction material 2. The construction material management computer system 10 adds read information of the material identification code from a shipping side terminal 5 to the management information 14 as shipping information, adds read information of the material identification code from a shipment receiving side terminal 6 to the management information 14 as delivery information, and adds read information of the material identification code from an application side terminal 7 to the management information 14 as application information. The management information 14 is provided to a management information browsing terminal 8.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a system, a management method, and a program for managing construction materials used in civil engineering works such as tunnels, bridges, and roads, and in construction works such as buildings, and in particular to a management computer system that manages the production, shipment, delivery, and application of construction materials using a computer system. [Background technology]

[0002] The production and inventory of construction materials used in civil engineering and construction works are usually managed individually by manufacturers, contractors, etc. In the management system described in Patent Document 1, the types and quantities of materials used are calculated based on information on the progress of tunnel excavation, and then inventory quantities are calculated. Update the estimated stock of materials that are in stock. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2023-003212 A Summary of the Invention [Problem to be solved by the invention]

[0004] The presence or absence of quality defects in this type of construction material may become evident during quality inspections at the time of production or delivery, or may become evident during construction or after use after construction. However, even if a defect is discovered during or after construction, it is not easy to trace back to when and where the construction material was produced. In addition, even if the product is in good condition when produced, its quality may deteriorate due to improper handling during transportation or long-term storage in an outdoor exposed environment after delivery to the construction site. For example, construction materials such as steel pipes and H-beams, cement, and organic chemicals have a quality retention period during which they can maintain a certain level of quality, but there are many cases where they are stored beyond that period. In view of the above circumstances, the present invention aims to centrally manage and trace construction materials from production to shipment, delivery and application, and to facilitate investigation of the cause of quality defects found during or after construction, and to easily check whether construction materials have been stored beyond their quality retention period. [Means for solving the problem]

[0005] In order to solve the above problems, the system according to the present invention is a construction materials management computer system that manages the production, shipment, delivery, and application of construction materials for civil engineering or construction work, a production information receiving unit that receives production information including material identification information that identifies the produced construction materials from an information input terminal; a code issuing unit that issues a material identification code for identifying the construction material to a code acquisition terminal in response to receipt of the production information; a database for storing management information including the production information and the material identification code; a shipment reception processing unit that receives read information of the material identification code from a shipment side terminal and adds the read information to the management information in the database as shipment information; a delivery reception processing unit that receives read information of the material identification code from a receiving terminal and adds the read information to the management information in the database as delivery information; a use reception processing unit that receives read information of the material identification code from the use side terminal and adds the read information to the management information in the database as use information; a management information providing unit for providing the management information to a management information viewing terminal; The present invention is characterized by comprising:

[0006] The material identification information preferably includes the name, model number, or serial number of the construction material, and may include the production date of the construction material. The material identification information is input to an information input terminal. The information input terminal transmits the input material identification information to a construction material management computer system. The construction material management computer system accepts the material identification information and issues a material identification code to a code acquisition terminal. Preferably, the material identification code is represented by a bar code or a two-dimensional code. More preferably, the bar code or the two-dimensional code is printed by a code acquisition terminal and attached to the produced construction materials. The shipping side terminal, the receiving side terminal and the application side terminal have a bar code or two-dimensional code reading function, and can read the bar code or two-dimensional code, i.e., the material identification code, attached to the construction materials by the reading function. Any one of the information input terminal, the code acquisition terminal, the shipping side terminal, the receiving side terminal, and the application side terminal may also function as the management information viewing terminal. The information input terminal may also function as the code acquisition terminal. The information input terminal or the code acquisition terminal may also function as the shipping side terminal. The receiving terminal may also serve as the application terminal.

[0007] Preferably, the construction material management computer system further includes a period management unit that determines whether the elapsed period starting from the date of receipt of any of the production information, the shipping information, or the delivery information, or the production date included in the production information, is within a specified range or exceeds an allowable period, and when it is determined that the elapsed period is within a specified range or exceeds an allowable period, adds period alert information to the management information provided to the management information viewing terminal. The provision of period alert information may be executed when it is determined that the period is within a predetermined range or has exceeded the predetermined range, or may be executed in response to a request for viewing management information from the management information viewing terminal.

[0008] Preferably, the construction material management computer system further includes a reception order management unit which determines whether the shipping information has been received at the time of receiving the delivery information, or whether the delivery information or the shipping information has been received at the time of receiving the application information, and when it is determined that no information has been received, adds reception order error information to the management information provided to the management information viewing terminal. The reception order error information may be provided when it is determined that no reception has been made, or in response to a request to view management information from the management information viewing terminal.

[0009] The method according to the present invention is a method for managing the production, shipment, delivery, and application of construction materials for civil engineering or construction work by a construction materials management computer system, comprising: A step of receiving production information including material identification information for identifying the produced construction material from an information input terminal; issuing a material identification code for identifying the construction material to a code acquisition terminal in response to receipt of the production information; storing the production information and management information including the material identification code in a database; a step of receiving read information of the material identification code from a shipping side terminal and adding the read information to the management information in the database as shipping information; a step of receiving information on the read material identification code from a receiving side terminal and adding the information to the management information in the database as delivery information; receiving read information of the material identification code from a user terminal and adding the read information to the management information in the database as application information; providing the management information to a management information viewing terminal; The construction material management computer system is characterized by executing the above.

[0010] The program according to the present invention is a program for a construction materials management computer system that manages the production, shipment, delivery, and application of construction materials for civil engineering or construction work, A process of receiving production information including material identification information for identifying the produced construction material from an information input terminal; A process of issuing a material identification code for identifying the construction material to a code acquisition terminal in response to receipt of the production information; storing the production information and management information including the material identification code in a database; a process of receiving read information of the material identification code from a shipping side terminal and adding the read information to the management information in the database as shipping information; A process of receiving information on the read material identification code from a receiving terminal and adding the information to the management information in the database as delivery information; A process of receiving read information of the material identification code from a user terminal and adding the read information to the management information in the database as application information; providing the management information to a management information viewing terminal; The present invention is characterized in that the construction material management computer system executes the above. Effect of the Invention

[0011] According to the present invention, construction materials can be managed and traced in an integrated manner from production to shipment, delivery, and application. This makes it easier to investigate the cause of quality defects found during or after construction, and to check whether construction materials are in stock beyond their quality retention period. [Brief description of the drawings]

[0012] [Figure 1] FIG. 1 is a configuration diagram showing an overview of a construction material management system according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a block diagram showing the configuration of a construction material management computer system and each terminal that constitute the construction material management system. [Diagram 3] FIG. 3 is a table showing an example of the structure of management information in the database of the construction material management system. [Figure 4] FIG. 4 is a flow chart showing steps from production to delivery of construction materials in the construction materials management method by the construction materials management system. [Diagram 5] FIG. 5 is a flow chart showing steps from delivery to application in the construction materials management method using the construction materials management system. [Figure 6] FIG. 6 is a flow chart showing the steps of browsing management information in the construction materials management method using the construction materials management system. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] Hereinafter, one embodiment of the present invention will be described with reference to the drawings. FIG. 1 shows an overview of a construction material management system 1. The construction material management system 1 manages various construction materials 2 by tracing them from production to shipment, delivery, and application. As shown in FIG. 1, the construction in this embodiment is, for example, the construction of a mountain tunnel, and the construction materials 2 include, for example, rock bolts, long bolts for reinforcement, H-shaped steel for shoring and other steel materials 2a, cement 2b for lining, and organic chemicals 2c for filling materials. The steel materials 2a, cement 2b, organic chemicals 2c, etc. have a quality retention period because they will corrode or deteriorate due to rust or the like if they are stored for a long period of time. Powders such as cement 2b and fluids such as organic chemicals 2c are produced in a production factory 9 in a state where they are contained in containers such as bags, boxes, and cans, and are shipped and delivered to the tunnel construction site 3. A plurality of construction materials 2 of the same lot may be shipped and delivered together in one package.

[0014] A material identification code is assigned to the construction material 2. The material identification code may be assigned to each individual construction material 2 (to each container if the construction material is stored in a container), or may be assigned to each packaging unit or lot. The material identification code is represented by a barcode 31. A tag 30 on which the barcode 31 is printed is attached to the construction material 2.

[0015] As shown in Fig. 1, the construction material management system 1 includes an order receiving / producing side terminal 4, a shipping side terminal 5, a receiving side terminal 6, a user side terminal 7, a management information viewing terminal 8, and a construction material management computer system 10. The terminals 4 to 8 are each configured by a personal computer (PC), such as a desktop computer, a smartphone, or a tablet.

[0016] In detail, the order / production side terminal 4 is composed of a desktop computer of the order / production manager A of the construction material 2. The order / production manager A performs input and transmission processing of material production information, output and pasting of material identification code, etc., as well as receiving orders for the construction material 2, arranging for production, and managing the construction material 2. A plurality of people may share the role of the order / production manager A. The order / production side terminal 4 may be composed of a portable PC such as a smartphone or tablet, as well as a desktop computer. Preferably, the order / production side terminal 4 is equipped with peripheral devices such as an input device 4a such as a keyboard and an output device 4b such as a printer. The order / production side terminal 4 stores an order / production management program 4p. The order / production side terminal 4 functions as a material production information input unit 4c, a material production information transmission unit 4d, a material identification code receiving unit 4e, and a material identification code output unit 4f by the order / production management program 4p. The order receiving / production side terminal 4 serves both as an information input terminal and a code acquisition terminal. The order receiving / production side terminal 4 may be configured as two terminals, an information input terminal and a code acquisition terminal.

[0017] As shown in FIG. 1, the shipping terminal 5 is configured by a smartphone carried by the shipping person B, but it is not limited to this and may be configured by a tablet or a desktop computer. The shipping terminal 5 stores a shipping management program 5p. The shipping management program 5p causes the shipping terminal 5 to function as a shipping information input unit 5c and a shipping information transmission unit 5d for the construction materials 2. The shipping information input unit 5c includes a barcode reading application linked to the camera function of the shipping terminal 5.

[0018] As shown in Fig. 1, the receiving terminal 6 is configured as a smartphone carried by the delivery confirmation person C, but it is not limited to this and may be configured as a tablet or desktop computer. The receiving terminal 6 stores a receiving management program 6p. The receiving management program 6p causes the receiving terminal 6 to function as a delivery information input unit 6c and a delivery information transmission unit 6d for the construction materials 2. The delivery information input unit 6c includes a barcode reading application linked to the camera function of the receiving terminal 6.

[0019] As shown in FIG. 1, the application side terminal 7 is configured by a smartphone carried by the application person D, but it is not limited to this and may be configured by a tablet or desktop computer. The application side terminal 7 stores an application side management program 7p. The application side management program 7p causes the application side terminal 7 to function as an application information input unit 7c and an application information transmission unit 7d of the construction material 2. The application information input unit 7c includes a barcode reading application or a two-dimensional code reading application linked to the camera function of the application side terminal 7.

[0020] 1, the management information viewing terminal 8 is configured by a desktop computer of the management information viewer E, but is not limited to this and may be configured by a portable PC such as a smartphone or tablet. The management information viewer E is, for example, a construction manager, but the personnel A to D in charge of order receipt, production, shipping, delivery confirmation, and application can also be management information viewers E. The terminals 4 to 7 of the personnel A to D can also serve as the management information viewing terminal 8.

[0021] The management information viewing terminal 8 is equipped with software 8p for viewing the management information 14 of the construction material management system 1. The viewing software 8p enables the management information viewing terminal 8 to access the construction material management computer system 10, issue a request to view the management information 14, and display on its screen the management information 14 provided by the construction material management computer system 10. The viewing software 8p may be a general-purpose browser, or a dedicated browser for the system 1.

[0022] 1, the terminals 4 to 8 are communicatively connected to a construction material management computer system 10 via a communication network N. The communication network N may be a public communication network such as the Internet, a private communication network, or a VPN. The personnel A to D and the manager E are each issued an authentication code, and can access the construction material management computer system 10 by inputting the authentication code into a terminal.

[0023] As shown in Fig. 1, the construction material management computer system 10 is configured by a cloud computer, but is not limited to this and may be configured by a physical server. The construction material management computer system 10 includes a CPU 11, a storage unit 12, and a communication unit 13. The storage unit 12 stores a construction material management program 12p and a database 12d.

[0024] As shown in Figure 2, the construction materials management program 12p causes the construction materials management computer system 10 to execute processes as a production information receiving unit 21, a code issuing unit 22, a shipment receiving processing unit 23, a delivery receiving processing unit 24, an application receiving processing unit 25, a period management unit 26, a management information providing unit 27, a receiving order management unit 28, etc.

[0025] As shown in Fig. 1, the database 12d stores management information 14 for each construction material 2. As shown in Fig. 3, the management information 14 includes production information and material identification code of the construction material 2, as well as shipping information, delivery information, application information, and allowable period information, and may further include period alert information and reception order error information.

[0026] The production information is information received by the production information receiving unit 21 of the construction material management computer system 10 from the order receiving / producing side terminal 4, and includes material identification information that identifies the construction material 2 and the information on the reception date (material registration date), and may further include information on the production date of the construction material 2. The material registration date may be the production date. The material identification information includes the name, model number, serial number, etc. of the construction material 2.

[0027] The shipping information is read information of the material identification code received by the shipment reception processing unit 23 of the construction material management computer system 10 from the shipping side terminal 5, and includes information on the reception date (shipping date). The delivery information is read information of the material identification code received by the delivery reception processing unit 24 of the construction material management computer system 10 from the receiving side terminal 6, and includes information on the reception date (delivery date).

[0028] The application information is read information of the material identification code received by the application reception processing unit 25 of the construction material management computer system 10 from the application side terminal 7, and includes information on the reception date (application date). Each piece of information about the production date, material registration date, shipping date, delivery date, and application date of the construction material 2 may include time information in addition to the date.

[0029] The allowable period information is information on the allowable period (days or hours) from the starting date until the factory is applied to the construction work, and is preferably the period during which the construction material 2 can maintain the required quality. The allowable period is basically determined by the type of the construction material 2, but may be selectively set according to the storage environment of the construction material 2 at the construction site, etc. (outdoors, indoors, underground, etc.). The starting date of the allowable period is, for example, the shipping date, but is not limited to this, and may be the production date, the material registration date, or the delivery date.

[0030] The period alert information is information added by the period management unit 26 of the construction material management computer system 10, and includes "within specified" period alert information indicating that the period elapsed from the starting date has not yet reached the allowable period but is within the specified range of the allowable period, and "exceeding" period alert information indicating that the period elapsed from the starting date has already exceeded the allowable period.

[0031] The receiving order error information is information added by the receiving order management unit 28 of the construction material management computer system 10, and includes receiving order error information "at the time of delivery" indicating that the construction material management computer system 10 has received delivery information even though it has not received shipping information, and receiving order error information "at the time of application" indicating that application information has been received even though it has not received shipping information or delivery information.

[0032] As shown in the flow chart of FIG. 4, in the construction material management system 1, the construction materials 2 are managed as follows. The order / production manager A arranges for the production of the construction material 2 according to the order (product name, model number, serial number, quantity, specified delivery date, etc. of the construction material 2) received from the ordering person (not shown). In response, the construction material 2 is produced at the production factory 9 (100). An order receiving / production management person A starts the material production information input section 4c of the order receiving / production side terminal 4, and inputs production information such as material identification information for identifying the produced construction material 2 and the production date (step 101). The input operation of the production information may be considered as selecting the item of the produced construction material 2 from a list of order information registered in the order receiving / production side terminal 4. It is preferable that the construction material management system 1 also performs ordering and receiving management of the construction material 2. The input production information is transmitted by the material production information transmitting section 4d of the order receiving / producing terminal 4 to the construction material management computer system 10 via the communication network N (step 102).

[0033] In the construction material management computer system 10, the production information receiving unit 21 receives the production information of the construction material 2 (step 110). In response to this, the code issuing unit 22 issues a material identification code for identifying the construction material 2 (step 111). The issued material identification code is transmitted to the order receiving / production side terminal 4 via the communication network N (step 112). At the same time, management information 14 including the production information and the material identification code is created in the database 12d (step 113). The timing of inputting (step 101) and receiving (step 110) the production information may be any timing before the shipment of the construction materials 2, and is not limited to the time of production.

[0034] In the order receiving / production side terminal 4, the code receiving unit 4e receives the material identification code from the code issuing unit 22 of the construction material management computer system 10 (step 120). Next, the code output unit 4f expresses the received material identification code as a barcode 31 and prints it on a tag 30 by the output device 4b (step 121). The tag 30 may be paper, a resin sheet, or an adhesive sticker. The order receiving / production manager A attaches the tag 30 with the bar code 31 to the corresponding construction material 2 (step 129).

[0035] When there are a large number of construction materials, the barcode 31 may be attached to a production list or a delivery note, etc., and it may be possible to omit attaching a tag 30 to each construction material 2. The production list or the delivery note may be displayed on the screen of the terminals 4 to 7, etc., and the barcode 31 may be attached to it.

[0036] As shown in Fig. 4, when the produced construction materials 2 are shipped (step 130), the shipping person B activates the shipping information input unit 5c of the shipping side terminal 5 and reads the barcode 31 of the tag 30 attached to the construction materials 2 to be shipped (step 131). The read barcode 31 is decoded into a material identification code by the shipping information input unit 5c (step 132). The decoded material identification code, i.e., the read information of the material identification code, is transmitted by the shipping information transmission unit 5d to the construction material management computer system 10 via the communication network N (step 133). The transmitted information is provided with an information identification code indicating shipment.

[0037] In the construction material management computer system 10, the shipment reception processing unit 23 receives the read information (shipping information) of the material identification code from the shipping side terminal 5 via the communication network N (step 140). Next, the shipment reception processing unit 23 sets the reception date of the read information of the material identification code as the shipping date, and adds the shipping information including the shipping date to the management information 14 in the database 12d (step 141).

[0038] As shown in FIG. 1, the shipped construction materials 2 are delivered to the tunnel construction site 3 (step 150). As shown in Fig. 4, the delivery confirmation person C starts the delivery information input unit 6c of the receiving side terminal 6 and reads the barcode 31 of the tag 30 attached to the delivered construction material 2 (step 151). The read barcode 31 is decoded into a material identification code by the delivery information input unit 6c (step 152). The decoded material identification code, i.e., the read information of the material identification code, is transmitted by the delivery information transmission unit 6d to the construction material management computer system 10 via the communication network N (step 153). The transmitted information is provided with an information identification code indicating delivery.

[0039] In the construction material management computer system 10, the delivery reception processing unit 24 receives the read information of the material identification code (delivery information) from the receiving side terminal 6 via the communication network N (step 160). The delivery reception processing unit 24 sets the reception date of the read information of the material identification code as the delivery date, and adds the delivery information including the delivery date to the management information 14 in the database 12d (step 161).

[0040] Furthermore, the receiving order management unit 28 of the construction material management computer system 10 judges whether or not the shipment receiving process has been completed when the delivery receiving process unit 24 receives the read information of the material identification code (step 162). If it is judged not to have been completed ("no" in step 162), the receiving order management unit 28 adds the "delivery time" receiving order error information to the management information 14 in the database 12d (step 163). More preferably, the receiving order management unit 28 transmits the delivery time receiving order error information by e-mail or the like to the management information viewing terminal 8, the shipping side terminal 5, the receiving side terminal 6, etc. (step 164). This makes it possible to inform the construction manager E, the shipping person B, the delivery confirmation person C, etc. that the shipment receiving process for the delivered construction material 2 has not been completed. Incidentally, the terminals 5 and 6 in step 164 also serve as management information viewing terminals.

[0041] As shown in Fig. 1, the delivered construction materials 2 are stored in a material storage area 3b within the construction site 3, unless they are to be used immediately. The storage period may be from a few hours to a few days, from a few weeks to a few months, or even a few years.

[0042] As shown in FIG. 5, the period management unit 26 of the construction material management computer system 10 manages the elapsed period, for example, starting from the shipping date (step 170). The starting date is not limited to the shipping date, but may be the production date, the material registration date, or the delivery date. When the construction material 2 is stored, that is, the application information described below has not yet arrived, and the elapsed period is within a predetermined period of the allowable period ("yes" in step 171), the period management unit 26 adds "within a predetermined period" period alert information to the management information 14 in the database 12d (172). More preferably, the period management unit 26 transmits the "within a predetermined period" period alert information to the management information viewing terminal 8 or the application side terminal 7, etc., by e-mail or the like (step 173). This makes it possible to notify the construction manager E or the application person D that the quality retention period of the construction material 2 is about to expire. In addition, the application side terminal 7 in step 173 also serves as a management information viewing terminal.

[0043] As shown in FIG. 5, when the construction material 2 in the material storage area 3b is used for tunnel construction (step 180), the construction worker D activates the application information input unit 7c of the application side terminal 7 and reads the barcode 31 of the tag 30 attached to the construction material 2 to be used (step 181). The read barcode 31 is decoded into a material identification code by the application information input unit 7c (step 182). The decoded material identification code, i.e., the read information of the material identification code, is transmitted by the application information transmission unit 7d to the construction material management computer system 10 via the communication network N (step 183). The transmitted information is provided with an information identification code indicating the application.

[0044] In the construction material management computer system 10, the application reception processing unit 25 receives the read information of the material identification code (application information) from the application side terminal 7 via the communication network N (step 190). Next, the application reception processing unit 25 sets the reception date of the read information of the material identification code as the application date, and adds the application information including the application date to the management information 14 in the database 12d (step 191).

[0045] Furthermore, the period management unit 26 of the construction material management computer system 10 calculates, for example, the period elapsed from the shipping date to the application date (step 192) and adds the calculation result to the management information 14 in the database 12d (step 193). Furthermore, the period management unit 26 reads out the data of the allowable period in the management information 14 in the database 12d and judges whether the calculated elapsed period exceeds the allowable period (step 194). Then, if it is judged to be exceeded, it adds period alert information indicating "exceeded" to the management information 14 in the database 12d (step 195). More preferably, the period management unit 26 transmits the period alert information of "exceeded" by e-mail or the like to the management information viewing terminal 8 or the application side terminal 7 or the like (step 196). This makes it possible to notify the construction manager E and the construction worker D that the construction material 2 to be applied has exceeded its quality retention period. This makes it possible to prevent defects caused by dead stock from occurring.

[0046] Furthermore, the receiving order management unit 28 judges whether the shipment and delivery reception process has been completed when the application reception processing unit 25 receives the read information of the material identification code (step 197). If it is judged that the shipment and delivery reception process has not been completed, the receiving order management unit 28 adds the "application time" reception order error information to the management information viewing terminal 8, the shipping side terminal 5, the receiving side terminal 6, the application side terminal 7, etc. by e-mail or the like (step 199). This makes it possible to inform the construction manager E, the shipping person B, the delivery confirmation person C, the application person D, etc. that the shipment or delivery reception process of the construction material 2 to be applied has not been completed. Incidentally, the terminals 5 to 7 in step 199 also serve as management information viewing terminals.

[0047] As shown in FIG. 6, when a management information viewer E views the management information 14, he or she accesses the construction material management computer system 10 via the management information viewing terminal 8 and issues a request to view the management information 14 (step 201). In the construction material management computer system 10, in response to a viewing request from the management information viewing terminal 8 (step 210), the management information providing unit 27 provides the management information 14 to the management information viewing terminal 8 (step 211). As a result, the management information 14 is displayed on the screen of the management information viewing terminal 8, and can be viewed by the management information viewer E (step 220).

[0048] The provided management information 14 includes, for each construction material 2, material specific information such as the product name, model number, and serial number, as well as the material registration date or production date, shipping date, delivery date, application date, and the period elapsed from shipping to application, depending on the current state (status) of the construction material 2. Information on the shipping date, delivery date, application date, and period elapsed is not included in the management information 14 for construction materials 2 that have not yet been shipped, delivered, or applied.

[0049] Furthermore, in the case of construction materials 2 whose elapsed time is within a predetermined range or exceeds the allowable time, the management information 14 includes period alert information by the period management unit 26. This makes it possible to alert the management information viewer E. The period alert information may be displayed on the screen of the management information viewing terminal 8 in a conspicuous manner such as by marking, in a special color, flashing, or in bold, to alert the viewer E.

[0050] Furthermore, in the case of construction materials 2 that have been rejected by the receiving order management unit 28, receiving order error information is included in the management information 14. The receiving order error information may be displayed on the screen of the management information viewing terminal 8 in a conspicuous manner such as by marking, using a special color, flashing, or in bold to draw attention to the information.

[0051] In addition, when a viewing request is made from the management information viewing terminal 8, the period management unit 26 calculates the elapsed period and determines whether it is within a specified period or exceeds the allowable period, and if it is determined to be within the specified period or exceeds the allowable period, period alert information may be attached to the management information 14 to the management information viewing terminal 8. Similarly, when a viewing request is made from the management information viewing terminal 8, the reception order management unit 28 determines the reception order, and if a rejection is determined, reception order error information may be added to the management information 14 sent to the management information viewing terminal 8.

[0052] According to the construction material management system 1, construction materials 2 can be managed and traced in a unified manner from production to shipment, delivery, and application. Therefore, for example, when a defect is found in the quality of the construction materials 2 during or after construction, the cause of the defect can be investigated by referring to the management information 14. In other words, it becomes easier to determine whether the defect is due to the production process, during transportation, or after delivery. Alternatively, construction materials from the same production lot as the defective construction material can be tracked from the production information, etc., so as not to be used, or if they have already been used, it can be checked for similar defects. It is also easier to check whether construction materials have been stored beyond their quality retention period.

[0053] The present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the spirit of the present invention. For example, the construction work to be managed is not limited to tunnels, but may be civil engineering works such as bridges, roads, dams, and building construction works. The construction materials 2 may be construction materials as well as civil engineering materials. The material identification code may be represented by a two-dimensional code, an RFID, a magnetic card, etc., instead of the barcode 31. The input units 5c, 6c, and 7c of the terminals 5, 6, and 7 may have a two-dimensional code reading application linked to a camera function and may be configured to read the material identification code consisting of a two-dimensional code. A material identification code consisting of a bar code or a two-dimensional code may be added to the delivery note of the construction material. The delivery note is not limited to being issued on paper, but may be issued as a data file from the construction material management computer system 10 to the receiving side terminal 6, etc. The order receiving / production side terminal 4 may be divided into two terminals: an information input terminal and a code acquisition terminal. [Industrial Applicability]

[0054] The present invention can be applied to material management in civil engineering works such as tunnel construction. [Explanation of symbols]

[0055] A. Order and production manager B. Shipping Person C Delivery confirmation person D Application person E. Management Information Viewer 1 Construction materials management system 2. Construction materials 3. Construction Site 3b Material storage area 4. Order / production terminal (information input terminal, code acquisition terminal) 5. Shipping terminal 6 Receiving terminal 7 User terminal 8. Management information viewing terminal 10 Construction materials management computer system 12d Database 12p Construction materials management program 14 Management information 21 Production Information Reception Department 22 Code Issuance Department 23 Shipping Reception Processing Department 24 Delivery Reception Processing Section 25 Application reception processing section 26 Term Management Department 27 Management Information Provision Department 28 Reception Order Management Department 30 Tags 31 Barcode (material identification code)

Claims

1. A construction materials management computer system for managing the production, shipment, delivery, and application of construction materials for civil engineering or construction work, a production information receiving unit that receives production information including material identification information that identifies the produced construction materials from an information input terminal; a code issuing unit that issues a material identification code for identifying the construction material to a code acquisition terminal in response to receipt of the production information; a database for storing management information including the production information and the material identification code; a shipment reception processing unit that receives read information of the material identification code from a shipment side terminal and adds the read information to the management information in the database as shipment information; a delivery reception processing unit that receives read information of the material identification code from a receiving terminal and adds the read information to the management information in the database as delivery information; a use reception processing unit that receives read information of the material identification code from the use side terminal and adds the read information to the management information in the database as use information; a management information providing unit for providing the management information to a management information viewing terminal; A construction material management computer system comprising:

2. The construction materials management computer system of claim 1, further comprising a period management unit which determines whether the elapsed period starting from the date of receipt of any of the production information, the shipping information, or the delivery information, or the production date included in the production information, is within a specified range or exceeds an allowable period, and when it is determined that the elapsed period is within a specified range or exceeds an allowable period, adds period alert information to the management information provided to the management information viewing terminal.

3. The construction material management computer system of claim 1 or 2 further comprises a reception order management unit which determines whether the shipping information has been accepted at the time the delivery information is accepted, or whether the delivery information or the shipping information has been accepted at the time the application information is accepted, and when it is determined that no acceptance has been made, adds reception order error information to the management information provided to the management information viewing terminal.

4. A method for managing the production, shipment, delivery, and application of construction materials for civil engineering or construction work by a construction materials management computer system, comprising: A step of receiving production information including material identification information for identifying the produced construction material from an information input terminal; issuing a material identification code for identifying the construction material to a code acquisition terminal in response to receipt of the production information; storing the production information and management information including the material identification code in a database; a step of receiving read information of the material identification code from a shipping side terminal and adding the read information to the management information in the database as shipping information; a step of receiving information on the read material identification code from a receiving side terminal and adding the information to the management information in the database as delivery information; receiving read information of the material identification code from a user terminal and adding the read information to the management information in the database as application information; providing the management information to a management information viewing terminal; The construction material management computer system executes the construction material management method.

5. A program for a construction materials management computer system that manages the production, shipment, delivery, and application of construction materials for civil engineering or construction work, A process of receiving production information including material identification information for identifying the produced construction material from an information input terminal; A process of issuing a material identification code for identifying the construction material to a code acquisition terminal in response to receipt of the production information; storing the production information and management information including the material identification code in a database; a process of receiving read information of the material identification code from a shipping side terminal and adding the read information to the management information in the database as shipping information; A process of receiving information on the read material identification code from a receiving terminal and adding the information to the management information in the database as delivery information; A process of receiving read information of the material identification code from a user terminal and adding the read information to the management information in the database as application information; providing the management information to a management information viewing terminal; A program for causing the construction material management computer system to execute the above.

Citation Information

Patent Citations

  • Storage place management system, storage place management method, computer-readable recording medium having program recorded therein, and the program

    JP2004026478A

  • Material management system

    JP2006221529A

  • Commodity management apparatus, commodity management method and commodity management program

    JP2019028494A

  • Usage management method and construction management method for repair materials

    JP2022151311A

  • Support system, support method and program of stock management of tunnel construction material

    JP2023003212A