Management device, management method, and management program

By integrating load amounts and switching systems based on thresholds, the management device balances load distribution in redundant configurations, reducing failure probability and costs in redundant systems.

JP2024150194APending Publication Date: 2024-10-23FSAS TECH INC
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2023063481
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-10
Publication Date
2024-10-23

AI Technical Summary

Technical Problem

In redundant system configurations, uneven processing loads between active and standby systems can lead to increased failure probability in the system with higher load, reducing the operational lifespan and incurring unnecessary replacement costs.

Method used

A management device integrates load amounts over a predetermined period and switches systems between active and standby states based on a set threshold, ensuring balanced load distribution and reducing the probability of failure.

Benefits of technology

This approach extends the operational lifespan of redundant systems by evenly degrading systems, minimizing failure probability and replacement costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024150194000001_ABST
    Figure 2024150194000001_ABST
Patent Text Reader

Abstract

To reduce a probability of failures occurring in a plurality of systems having a redundant configuration.SOLUTION: A management device sets a switching threshold 41b based on an integrated value of a load amount for either a first system or a second system having a redundant configuration over a prescribed period of time when one of the systems is transitioned to an operating state and the other is transitioned to a halted state, and switches each of the first system and the second system from the operating state to the halted state or from the halted state to the operating state each time the integrated value of the load amount for the system in the operating state exceeds the switching threshold 41b.SELECTED DRAWING: Figure 7
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a management device, a management method, and a management program. [Background technology]

[0002] A method is known in which a management device manages systems (e.g., servers) that execute specific processes in a redundant configuration, thereby improving the overall availability of multiple systems by switching the operating status of the multiple systems between an active system and a standby system.

[0003] For example, as a first method, the management device operates one of the first system and the second system as an active system and stops the other as a standby system. When the management device detects a failure in the active system, it starts up the stopped second system to operate as the active system and has the second system take over the processing that was being performed by the first system, thereby realizing continuous operation of the redundantly configured systems.

[0004] In the first method, the second system remains in a standby state (e.g., powered off) and does not switch over to the operational system until a failure occurs in the first system. For this reason, in multiple systems, there is a high possibility that a failure will occur in the first system around the average period during which the servers can continue to operate. When a failure occurs in the first system, costs such as the introduction of a substitute machine and the cost of replacing the server will be incurred.

[0005] In order to suppress the expense associated with the occurrence of a failure and the loss of redundancy due to replacement work, a method (two methods) is known in which a management device switches the operation status of multiple systems between an active system and a standby system at predetermined intervals, thereby operating each of the multiple systems fairly in terms of time. For example, when a measurement value of a timer that measures the elapsed time from the start of operation or switching exceeds a threshold value (e.g., one year) and the multiple systems are switchable, the management device instructs each system to switch its operation status.

[0006] In the second method, the operating states of multiple systems are switched periodically without waiting for a failure to occur, thereby preventing imbalances in operating time between systems (deteriorating evenly). This makes it possible to extend the period from the start of operation until a system failure occurs, compared to the first method, and depending on the timing of the end of operation or the transition to a next-generation system, it is possible to reduce the costs associated with server failures. [Prior art documents] [Patent documents]

[0007] [Patent Document 1] JP 2013-011929 A [Patent Document 2] JP 2020-071840 A Summary of the Invention [Problem to be solved by the invention]

[0008] In the second method, if there is a difference in the processing load executed by the operational system between the period when the first system is the operational system and the period when the second system is the operational system, a bias in the degree of deterioration between the systems may occur. If such a bias exists, the probability of a failure occurring in the system with the larger processing load increases, and the period from the start of operation until a failure occurs in the system may be shorter than the period when the systems deteriorate evenly.

[0009] In one aspect, an object of the present invention is to reduce the probability of failure occurrence in a plurality of systems having a redundant configuration. [Means for solving the problem]

[0010] In one aspect, the management device may include a control unit. The control unit may set a switching threshold based on an integrated value of a load on one of a first system and a second system in a predetermined period when the one of the first system and the second system in a redundant configuration is transitioned to an operating state and the other to a stopped state. The control unit may also switch each of the first system and the second system from the operating state to the stopped state or from the stopped state to the operating state every time the integrated value of the load on the system in the operating state exceeds the switching threshold. Effect of the Invention

[0011] In one aspect, the present invention can reduce the probability of failures occurring in multiple systems having a redundant configuration. [Brief description of the drawings]

[0012] [Figure 1] 1 is a block diagram showing an example of a configuration of a redundant configuration system according to an embodiment; [Diagram 2] 2 is a block diagram showing an example of a hardware (HW) configuration of a computer that realizes the functions of a management server according to an embodiment. FIG. [Diagram 3] FIG. 11 is a diagram for explaining an example of switching timing of an operation state of a system according to an embodiment. [Figure 4] FIG. 2 is a block diagram showing an example of a software configuration of a redundant configuration system according to an embodiment. [Diagram 5] FIG. 11 is a diagram illustrating an example of server information. [Figure 6] 11 is a flowchart illustrating an example of the operation of a management server according to an embodiment. [Figure 7] FIG. 11 is a diagram for explaining an example of the operation of the management server; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. However, the embodiment described below is merely an example, and is not intended to exclude various modifications or application of techniques not specified below. For example, this embodiment can be modified in various ways without departing from the spirit of the invention. In the drawings used in the following description, parts with the same reference numerals represent the same or similar parts unless otherwise specified.

[0014] [A] Example of system configuration according to one embodiment 1 is a block diagram showing an example of a configuration of a redundant configuration system 1 according to an embodiment. The redundant configuration system 1 is an example of a system that provides a service of executing a predetermined process by an operational system among a plurality of systems configured in a redundant configuration.

[0015] As shown in FIG. 1, the redundant configuration system 1 may include, for example, a plurality of systems 2, a management server 4, a network (NW) switch 5, and a management NW switch 6.

[0016] The system 2 is a system that provides a predetermined service to a client computer connected to an external NW by executing a predetermined process. The system 2 may include one or more servers 3 (one in the example of FIG. 1).

[0017] In one embodiment, the multiple systems 2 may be two systems 2 in a redundant configuration (dual configuration) in which one operates as an active system and the other is stopped as a standby system. Hereinafter, when distinguishing between the two systems 2, they will be referred to as "system #0" and "system #1." System #0 is an example of a first system, and system #1 is an example of a second system.

[0018] The server 3 is an example of a processing device, information processing device, or computer that executes a predetermined process. Examples of the server 3 include various devices equipped with a processor, such as a server device, a PC, or a controller module (CM) of a storage device. Hereinafter, the server 3 equipped in the system #0 will be referred to as "server #0," and the server 3 equipped in the system #1 will be referred to as "server #1." Servers #0 and #1 may be configured redundantly with each other.

[0019] Here, "redundant configuration" may refer to a configuration in which multiple systems 2 (multiple servers 3) are configured so that if a failure occurs in one, the other can take over the task (predetermined processing) in place of the other. Therefore, the multiple systems 2 (multiple servers 3) in the redundant configuration do not necessarily need to have the same hardware and software, but only need to be able to execute the same processing (predetermined processing) with the same level of processing performance.

[0020] The management server 4 is an example of a management device, an information processing device, or a computer that manages the redundant configuration of a plurality of systems 2.

[0021] The NW switch 5 is a switch device that connects the external NW and each of the multiple servers 3 so that they can communicate with each other, and controls communication between the external NW and each of the multiple servers 3. For example, the NW switch 5 may be connected to each of the servers 3 via a communication path 5a, and connected to the external NW via a communication path 5b.

[0022] The communication paths 5a and 5b may be various networks. For example, one or both of the communication paths 5a and 5b may be a network (interconnect) compatible with a high-speed bus architecture such as Ethernet (registered trademark), PCIe (Peripheral Component Interconnect express), InfiniBand, Millinet, etc.

[0023] The management NW switch 6 is a switch device that connects the management server 4 and each of the multiple servers 3 so that they can communicate with each other, and controls communication between the management server 4 and each of the multiple servers 3. For example, the management NW switch 6 may be connected to each of the servers 3 via a communication path 6a, and connected to the management server 4 via a communication path 6b.

[0024] The communication paths 6a and 6b may be various networks. For example, one or both of the communication paths 6a and 6b may be a network similar to the communication paths 5a and 5b, or may be a network with a slower speed.

[0025] [B] Hardware configuration example The management server 4 according to an embodiment may be a virtual server (VM: Virtual Machine) or a physical server. The functions of the management server 4 may be realized by one computer or by two or more computers. Furthermore, at least a part of the functions of the management server 4 may be realized using HW (Hardware) resources and NW (Network) resources provided by a cloud environment.

[0026] 2 is a block diagram showing an example of a hardware (HW) configuration of a computer 10 that realizes the functions of the management server 4 according to an embodiment. When multiple computers are used as HW resources that realize the functions of the management server 4, each computer may have the HW configuration shown in FIG.

[0027] As shown in FIG. 2, the computer 10 may, as a HW configuration, illustratively include a processor 10a, a graphics processing unit 10b, a memory 10c, a storage unit 10d, an IF (Interface) unit 10e, an IO (Input / Output) unit 10f, and a reading unit 10g.

[0028] The processor 10a is an example of a processing unit that performs various controls and calculations. The processor 10a may be connected to each block in the computer 10 via a bus 10j so that they can communicate with each other. The processor 10a may be a multiprocessor including a plurality of processors, a multicore processor having a plurality of processor cores, or a configuration having a plurality of multicore processors.

[0029] The processor 10a may be, for example, an integrated circuit (IC) such as a CPU, an MPU, an APU, a DSP, an ASIC, or an FPGA. The processor 10a may be a combination of two or more of these integrated circuits. CPU is an abbreviation for Central Processing Unit, and MPU is an abbreviation for Micro Processing Unit. APU is an abbreviation for Accelerated Processing Unit. DSP is an abbreviation for Digital Signal Processor, ASIC is an abbreviation for Application Specific IC, and FPGA is an abbreviation for Field-Programmable Gate Array.

[0030] The graphics processing device 10b performs screen display control for an output device such as a monitor in the IO unit 10f. Examples of the graphics processing device 10b include various arithmetic processing devices, such as a GPU (Graphics Processing Unit), an APU, a DSP, an ASIC, an FPGA, or other integrated circuits (ICs).

[0031] The memory 10c is an example of HW that stores various data, programs, and other information. The memory 10c may be, for example, one or both of a volatile memory such as a dynamic random access memory (DRAM) and a non-volatile memory such as a persistent memory (PM).

[0032] The storage unit 10d is an example of HW that stores various data, programs, and other information. Examples of the storage unit 10d include various storage devices such as a magnetic disk device such as a hard disk drive (HDD), a semiconductor drive device such as a solid state drive (SSD), and a nonvolatile memory. Examples of the nonvolatile memory include a flash memory, a storage class memory (SCM), and a read only memory (ROM).

[0033] The storage unit 10d may store a program 10h (eg, a management program) that realizes all or part of the various functions of the computer 10.

[0034] For example, the processor 10a of the management server 4 can realize the function of the management server 4 (for example, the control unit 47 shown in FIG. 4) described later by expanding the program 10h stored in the storage unit 10d into the memory 10c and executing it.

[0035] The IF unit 10e is an example of a communication IF that controls the connection and communication between the management server 4 and the server 3. For example, the IF unit 10e may include an adapter that complies with a LAN (Local Area Network) such as Ethernet (registered trademark) or optical communication such as FC (Fibre Channel). The adapter may support one or both of wireless and wired communication methods.

[0036] 1 through the IF unit 10e, the communication paths 6a and 6b, and the management NW switch 6. The program 10h may be downloaded from a NW (e.g., an external NW) to the computer 10 through the communication IF and stored in the storage unit 10d.

[0037] The IO unit 10f may include one or both of an input device and an output device. Examples of the input device include a keyboard, a mouse, and a touch panel. Examples of the output device include a monitor, a projector, and a printer. The IO unit 10f may also include a touch panel in which the input device and the display device are integrated. The output device may be connected to the graphics processing device 10b.

[0038] The reading unit 10g is an example of a reader that reads out data or program information recorded on the recording medium 10i. The reading unit 10g may include a connection terminal or device to which the recording medium 10i can be connected or inserted. Examples of the reading unit 10g include an adapter that complies with USB (Universal Serial Bus) or the like, a drive device that accesses a recording disk, and a card reader that accesses a flash memory such as an SD card. The recording medium 10i may store a program 10h, and the reading unit 10g may read the program 10h from the recording medium 10i and store it in the storage unit 10d.

[0039] Examples of the recording medium 10i include non-transitory computer-readable recording media such as magnetic / optical disks and flash memories. Examples of the magnetic / optical disks include flexible disks, CDs (Compact Discs), DVDs (Digital Versatile Discs), Blu-ray Discs, and HVDs (Holographic Versatile Discs). Examples of the flash memory include semiconductor memories such as USB memories and SD cards.

[0040] The above-described HW configuration of the computer 10 is an example. Therefore, the HW in the computer 10 may be increased or decreased (for example, adding or deleting any block), divided, or integrated in any combination, or buses may be added or deleted, etc.

[0041] The computer that realizes the functions of the server 3 may have the same HW configuration as the computer 10 illustrated in Fig. 2. For example, the processor 10a of the server 3 can realize the functions of the server 3 (for example, the control unit 34 illustrated in Fig. 4) described later by expanding the program 10h stored in the storage unit 10d into the memory 10c and executing it.

[0042] The program 10h executed by the processor 10a of the server 3 may include, for example, a program used for managing the redundant configuration by the management server 4, as well as a program for executing predetermined processing for realizing the services provided by the system 2.

[0043] [C] Software configuration example First, a description will be given of an example of the processing of the redundant configuration system 1 according to an embodiment. In the redundant configuration system 1, the management server 4 executes, for example, the following processing (i) and (ii).

[0044] (i) The management server 4 sets a switching threshold based on the integrated load value of the operating system 2 over a specified period of time when one of the redundant systems #0 and #1 is transitioned to an operating state and the other is transitioned to a stopped state.

[0045] (ii) Each time the integrated value of the load on the system 2 in the operating state exceeds the switching threshold, the management server 4 switches each of the systems #0 and #1 from the operating state to the stopped state or from the stopped state to the operating state.

[0046] For example, the management server 4 may execute the above process (i) at the start of operation, such as when the redundant configuration system 1 is started up or when the configuration is changed, and may control the subsequent switching timing using the set switching threshold value.

[0047] The "operating state" may be, for example, a state in which the system 2 (server 3) is started in a state in which a predetermined process can be executed, and may be called an "active state." The "stopped state" may be, for example, a state in which the system 2 (server 3) is inactive and does not execute a predetermined process (standby state), and may be called a "standby state." The stopped state may include a cold standby state in which the system 2 is not operating due to the power supply of the server 3 being turned off, or may include a hot standby state in which the system 2 (server 3) is started in a state in which the load is smaller than that of the operating system 2.

[0048] For convenience, the current state of system 2 will be referred to as the "operating state / condition" below. Furthermore, when the operating state of system 2 is in operation, it will be referred to as the "active state" or simply "operating", and when the operating state of system 2 is in a stopped state, it will be referred to as the "standby state" or simply "stopped". Furthermore, a server 3 in an active state may be referred to as an operating server 3, and a server 3 in a standby state may be referred to as a stopped server 3.

[0049] In addition, in the following description, the expression "operating or stopping one of systems #0 and #1" may include the expression "stopping or operating the other of systems #0 and #1," and may mean switching the operational state of system 2.

[0050] According to the management server 4, the operating states of systems #0 and #1 are switched based on the integrated load of system 2 in the active state (operating side), so that systems #0 and #1 are subjected to a uniform or approximately uniform load during each period in which they are in the active state. This makes it possible to equalize the load between systems #0 and #1 during the operation period of redundant configuration system 1, in other words, to allow systems #0 and #1 to deteriorate evenly, thereby reducing the probability of failure occurring in each system 2.

[0051] Fig. 3 is a diagram for explaining an example of switching timing of the operating state of the system 2 according to an embodiment. Symbols A and B in Fig. 3 show switching timing of the first and second methods as a comparative example, and symbol C in Fig. 3 shows an example of switching timing of the system 2 according to an embodiment. Note that in Fig. 3, a section in which the system #0 is in the active state is shown by a diagonal line frame, a section in which the system #1 is in the active state is shown by a hatched frame, and a section in which the systems #0 and #1 are in the standby state is shown by a hollow frame.

[0052] 3, operation of the redundant configuration system 1 starts at timing t0, and ends at timing t8 (for example, transition to a next-generation redundant configuration system 1). The period from t0 to t8 may be several years to a dozen years.

[0053] The first method indicated by symbol A shows an example in which system #0 is operating at timing t0, a fault occurs in server #0 at timing t5 (see symbol A1), and system #1 switches from standby to active. At timing t5, server #0 is replaced, and system #0 after replacing server #0 goes into standby. Note that timings t0 to t5 are the average operating period of server 3. The average operating period is the average period during which server 3 can continue to operate, and may be, for example, the average product lifespan or the average period during which no faults occur when server 3 continues to operate.

[0054] In the second method shown by symbol B, system #0 is in operation at timing t0, and system #1 switches from standby to active at timing t1 after a predetermined period (e.g., one year) has elapsed. In the second method, the operational states of systems #0 and #1 alternate between operating and stopped at predetermined intervals.

[0055] For example, if the processing load of system #1 in the active state increases from the average during times t1 to t3, the degree of degradation of system #1 becomes greater than the average (see symbol B1). In this case, if a failure occurs in system #1 that became active at time t6 at time t7 (see symbol B2), system #0 switches from standby to active. At time t7, the server #1 is replaced, and the system #1 after the replacement of server #1 goes into standby state.

[0056] In this way, the cost of purchasing a replacement machine and the cost of operation are incurred for the failed server 3 at time t5 in the first method and at time t7 in the second method, prior to time t8 when operations end.

[0057] On the other hand, in the example shown by symbol C, the management server 4 operates the system #0 at timing t0, and at timing t1 after a predetermined period of time has elapsed, sets a switching threshold based on an integrated value of the load on the system #0 (for example, the processor of the server #0) (see symbol C1). Note that the predetermined period is assumed to be one year, the same as in the second method, but may be different.

[0058] After setting the switching threshold, the management server 4 switches the operation states of the systems #0 and #1 at timing t1, and operates the system #1. Here, as in the second method, it is assumed that the processing load of the system 2 in the active state increases from the average during the timings t1 to t3.

[0059] The switching threshold setting process and the initial switching process at the above-mentioned timings t0 to t1 are an example of a threshold setting phase.

[0060] The management server 4 detects at timing t2, which is before timing t3, that the integrated value of the load amount of system #1 has exceeded the switching threshold, switches the operation states of systems #0 and #1, and operates system #0. The management server 4 also detects at timing t4, which is before a predetermined period has elapsed from timing t2, that the integrated value of the load amount of system #0 has exceeded the switching threshold, switches the operation states of systems #0 and #1, and operates system #1.

[0061] Also, for example, assume that the processing load of system 2 in the active state drops below the average around timing t4 to t5. In this case, the management server 4 detects that the integrated value of the load of system #1 exceeds the switching threshold after a predetermined period has elapsed from timing t4, switches the operation states of systems #0 and #1, and operates system #0.

[0062] The switching process according to the switching threshold value after the above-mentioned timing t1 (for example, from t1 to t8) is an example of an operation state switching phase.

[0063] In this way, by switching the operation state of system 2 at a timing according to the integrated value of the load of system 2 in the active state, the management server 4 can average out the processing load and the degree of deterioration of systems #0 and #1, and reduce the probability of failure in system 2. In the example of Fig. 3, the occurrence of failures in system 2 can be suppressed from the start of operation of redundant system 1 (timing t0) to the end of operation (timing t8), and the lifespan of redundant system 1 can be extended compared to the first and second methods. In addition, the cost of purchasing a replacement machine for server 3 and the cost of operation can be suppressed.

[0064] Next, an example of a software configuration for implementing the processing of the redundant configuration system 1 will be described.

[0065] Fig. 4 is a block diagram showing an example of a software configuration of the redundant configuration system 1 according to an embodiment. As shown in Fig. 4, the server 3 may exemplarily include a server processing unit 31, a status information transmission unit 32, and a switching processing unit 33. The server processing unit 31, the status information transmission unit 32, and the switching processing unit 33 are examples of a control unit 34.

[0066] The server processing unit 31 executes a predetermined process for implementing a service provided by the system 2. For example, the server processing unit 31 executes a process according to a request received from a client computer connected to an external NW via the NW switch 5, and transmits a processing result to the client computer.

[0067] The status information transmission unit 32 transmits status information on the information of the server 3 to the management server 4. The status information may include load information and fault information.

[0068] For example, when the status information transmission unit 32 receives a load information acquisition request from the management server 4, it collects load information of the server 3 for a certain period of time, and transmits the status information including the load information to the management server 4 at the certain period of time. The certain period may be, for example, one hour to one day. In one embodiment, the certain period is one day. Note that the certain period may be a short time interval of several seconds to several tens of minutes, and the status information transmission unit 32 may transmit the status information including the load information to the management server 4 at the short time interval in approximately real time.

[0069] An example of the load information is the utilization rate of the processor 10a. The utilization rate is an example of the load amount. The state information transmission unit 32 may collect the utilization rates of the processor 10a from, for example, a system monitor (performance monitor) of an OS (Operating System) executed by the server 3, and transmit information on the utilization rates over a certain period of time to the management server 4. The information on the utilization rates over a certain period of time may be, for example, a set of utilization rates (multiple utilization rates) for each time interval at which the utilization rates are output from the system monitor, or may be an integral value of the set of these utilization rates.

[0070] Furthermore, the status information transmission unit 32 transmits fault information related to a fault that has occurred in the server 3 to the management server 4 by including the fault information in the status information. The fault information may be acquired, for example, from an application, an OS, a device driver, or hardware executed by the server 3.

[0071] When the switching processing unit 33 receives switching control information of the operation state from the management server 4, it transitions the operation state of the server 3 to the state (operating or stopped) indicated by the switching control information.

[0072] For example, if the switching control information indicates a stop, the switching processing unit 33 may send information regarding the ongoing processing to another server 3 that has transitioned from a standby state to an active state, and work with the OS to turn off the power of its own server 3 (e.g., shut it down).

[0073] Also, for example, when the switching processing unit 33 starts its own server 3 in response to a start-up instruction and receives switching control information indicating operation, the switching processing unit 33 may receive information regarding a process being executed by another server 3 from the other server 3 and take over the process being executed. The start-up instruction may include, for example, a start-up command (e.g., a packet or the like) for remotely starting the server 3. The IF unit 10e of the server 3 or a device for power supply control may start its own server 3 upon receiving the start-up command.

[0074] The process of switching the operation state of the server 3 by the switching processing unit 33 is not limited to the above-mentioned process, and may be realized by various known methods.

[0075] 4, the management server 4 may include, for example, a memory unit 41, a load calculation unit 42, a timer unit 43, a switching determination unit 44, a failure occurrence detection unit 45, and a switching execution unit 46. The load calculation unit 42, the timer unit 43, the switching determination unit 44, the failure occurrence detection unit 45, and the switching execution unit 46 are examples of a control unit 47.

[0076] The memory unit 41 is an example of a storage area, and stores various data used by the management server 4. The memory unit 41 may be realized, for example, by a storage area included in one or both of the memory 10c and the storage unit 10d illustrated in FIG.

[0077] 4, the memory unit 41 may be capable of storing, for example, server information 41a and switching load amount 41b. In the following description, the server information 41a is expressed in a table format, but is not limited thereto, and the server information 41a may be data in various formats including a DB (database) format.

[0078] Fig. 5 is a diagram showing an example of the server information 41a. As shown in Fig. 5, the server information 41a may include items such as "server name", "address", "operation status", "integrated load value", "presence or absence of failure", and "switchability".

[0079] "Server name" is the name of the server 3 provided in the redundant configuration system 1, and is an example of identification information. "Address" is the address of the server 3 accessible by the management server 4, and may be various addresses such as an IP (Internet Protocol) address or a MAC (Media Access Control) address. "Operational status" indicates the current operational status of the server 3, for example, an active status or a standby status.

[0080] "Load accumulation value" is the accumulated load value from when the server 3 transitioned to the active state to the present. "Failure occurrence" is information indicating whether a failure has occurred in the server 3. "Switchability" is information indicating whether the server 3 is switchable.

[0081] Returning to the explanation of Fig. 4, the load calculation unit 42 refers to the server information 41a, transmits a load information acquisition request to the address of the operating server 3, and receives the load information (status information) from the server 3. The acquisition request may be a request instructing the server 3 to transmit load information at regular intervals until the operational status is switched, or, in the case where the management server 4 monitors the server 3 at regular intervals, may be a request instructing the server 3 to transmit load information for the most recent regular period each time monitoring is performed. For example, the load calculation unit 42 may transmit the acquisition request at the timing of operation start or switching of the redundant configuration system 1.

[0082] The load calculation unit 42 stores the acquired integrated value of the load in the memory unit 41 in association with the operating server 3. For example, the load calculation unit 42 calculates an integrated value of the load from the load information received from the server 3, and adds (sets) the calculated integrated value to the integrated load value of the server information 41a. When the load information is a collection of utilization rates of the processor 10a, the load calculation unit 42 may calculate an integral value of the collection of utilization rates as the integrated load value. The integral value of the utilization rates of the processor 10a is an example of an integrated value of the load.

[0083] The load calculation unit 42 may acquire the load information in both the threshold setting phase and the operation state switching phase.

[0084] In the threshold setting phase, when the load calculation unit 42 is notified by the timer unit 43 that a predetermined period has elapsed, the load calculation unit 42 stores the integrated load value of the operating server 3 in the server information 41a as the switching load amount 41b in the memory unit 41. Note that, instead of the integrated load value of the operating server 3 at the time when the predetermined period has elapsed, the load calculation unit 42 may set a value obtained by adding a plus or minus margin to the integrated load value as the switching load amount 41b. Examples of the margin include several percent of the integrated load value, or an integrated load value of the server 3 for one to several days.

[0085] The timer unit 43 measures a predetermined period (e.g., one year) from the start timing of the threshold setting phase. For example, the timer unit 43 may start measuring time after the load calculation unit 42 transmits a load information acquisition request to the server 3 in the threshold setting phase, and notify the load calculation unit 42 and the switching determination unit 44 of the lapse of the predetermined period when the predetermined period has elapsed.

[0086] The switching determination unit 44 determines whether or not to switch the operation states of the multiple servers 3 in each of the threshold setting phase and the operation state switching phase.

[0087] For example, when no notification has been received from the timer unit 43 (when a predetermined period has not elapsed since the start of operation) or when the switching load amount 41b has not been set, the switching determination unit 44 determines that the current state is the threshold setting phase and waits for reception of a notification from the timer unit 43. Upon receiving a notification from the timer unit 43, the switching determination unit 44 determines that the operation state can be switched if all of the switchability of the multiple servers 3 in the server information 41a are "Yes", and issues an instruction to the switching execution unit 46 to switch the operation state.

[0088] Furthermore, if the switching determination unit 44 has already received a notification from the timer unit 43 or if the switching load amount 41b has already been set, it determines that the current state is the operation state switching phase, and compares the integrated load value of the operating server 3 in the server information 41a with the switching load amount 41b. If the comparison result shows that the integrated load value exceeds the switching load amount 41b and the switchability of the multiple servers 3 in the server information 41a is all "Yes", it determines that the operation state can be switched, and issues an instruction to the switching execution unit 46 to switch the operation state.

[0089] The switching determination unit 44 may update the value of whether or not switching is possible before referring to the server information 41a regarding whether or not switching is possible. The update of whether or not switching is possible is not limited to before referring to whether or not switching is possible, and may be performed periodically or when there is a change in the status of the server 3.

[0090] For example, the switching determination unit 44 may set the switching possibility to "yes" when there are few or no processes being executed on the operating server 3, or during a period when stopping the server 3 would have little impact on services, such as when the system 2 is stopped due to a regular (planned) power outage. The switching determination unit 44 may set the switching possibility to "no" during a period when there are many processes being executed on the operating server 3. Whether there are many processes being executed on the operating server 3 may be determined based on, for example, whether status information (e.g., most recent load information) received from the operating server 3 exceeds a predetermined threshold value or the like.

[0091] Furthermore, when referring to the switchability of the server information 41a, the switching determination unit 44 may transmit a start instruction to the stopped server 3, and if the stopped server 3 starts normally, may set the switchability of the stopped server 3 to "Yes". Furthermore, if the stopped server 3 does not start normally, the switching determination unit 44 may notify the failure occurrence detection unit 45 of the fault information.

[0092] When the failure occurrence detection unit 45 receives failure information from the server 3 or the switching determination unit 44, it sets information indicating that there is a failure (for example, "present") to the failure presence / absence field of the failed server 3 in the server information 41a. The failure occurrence detection unit 45 also notifies the administrator of the redundant configuration system 1 of the occurrence of a failure. Various known methods may be used to notify the administrator of the occurrence of a failure.

[0093] When the failed server 3 is in an active state, the failure occurrence detection unit 45 transmits a start instruction to the stopped server 3, and when the stopped server 3 starts normally, issues a switch instruction caused by the occurrence of the failure to the switch execution unit 46. At this time, the failure occurrence detection unit 45 may set the switchability of the stopped server 3 in the server information 41a to "Yes."

[0094] On the other hand, if the server 3 in which a failure has occurred is in standby state, or if failures have occurred in both the operating server 3 and the stopped server 3, the failure occurrence detection unit 45 sets the switchability of the stopped server 3 in the server information 41a to “no” and suppresses the issuance of a switching instruction to the switching execution unit 46.

[0095] When the switching execution unit 46 receives a switching instruction from the switching determination unit 44, it transmits switching control information to each of the multiple servers 3. For example, the switching execution unit 46 may transmit switching control information indicating operation to a stopped server 3 whose operation state is a standby state in the server information 41a, and transmit switching control information indicating stop to an operating server 3 whose operation state is an active state in the server information 41a. The stopped server 3 is activated by the transmission of an activation instruction by the switching determination unit 44. Therefore, by transmitting switching control information to each of the operating server 3 and the stopped server 3, it becomes possible to take over a predetermined process between the operating server 3 and the stopped server 3, and the predetermined process can be executed continuously (without interruption) before and after switching of the operation state.

[0096] When the operation state of each server 3 changes in response to the transmission of the switching control information, the switching execution unit 46 may update the operation state of the server information 41a. Also, the switching load amount 41b may initialize (for example, reset to 0) an integrated load value associated with a server 3 that has switched from an active state to a standby state in the server information 41a.

[0097] In addition, when the switching execution unit 46 receives a switching instruction due to the occurrence of a failure from the failure occurrence detection unit 45, it transmits switching control information to each of the multiple servers 3, in the same manner as when the switching execution unit 46 receives a switching instruction from the switching determination unit 44.

[0098] In addition, the switching execution unit 46 may arbitrate between the switching instruction from the switching determination unit 44 and the switching instruction from the fault occurrence detection unit 45, and if both are received at the same time (there is a conflict between the two), the transmission of switching control information in response to the switching instruction from the fault occurrence detection unit 45 may be given priority.

[0099] [D] Example of operation Next, an example of the operation of the redundant configuration system 1 (for example, the management server 4) according to one embodiment will be described. Fig. 6 is a flowchart for explaining an example of the operation of the management server 4 according to one embodiment, and Fig. 7 is a diagram for explaining an example of the operation of the management server 4.

[0100] The processing illustrated in FIG. 6 is the processing performed when operation of the redundant configuration system 1 is started and the load calculation unit 42 sends a request to obtain load information to the operating server 3, and may be executed periodically or each time the management server 4 receives status information from the operating server 3.

[0101] As illustrated in FIG. 6, the failure occurrence detection unit 45 determines whether or not a failure has occurred in the operating server 3 based on the status information received from the operating server 3 (step S1: process P1 in FIG. 7).

[0102] If a failure has occurred in the active server 3 (YES in step S1), the failure occurrence detection unit 45 transmits a start-up instruction to the stopped server 3, and after the stopped server 3 starts up normally, issues a switchover instruction caused by the failure to the switching execution unit 46 (process P2 in FIG. 7). Upon receiving the switchover instruction caused by the failure (process P3 in FIG. 7), the switching execution unit 46 transmits operation control information to each of the active server 3 and the stopped server 3 (process P4 in FIG. 7), thereby switching the operation state of each server 3 (step S2).

[0103] Furthermore, the failure occurrence detection unit 45 notifies the administrator of the redundant configuration system 1 of the failure information (step S3), and the process ends.

[0104] In step S1, if no failure has occurred in the operating server 3 (NO in step S1), the load calculation unit 42 determines whether or not load information has been acquired from the operating server 3 (step S4).

[0105] If the load information has not been acquired (NO in step S4), the process ends. If the load information has been acquired (YES in step S4), the load calculation unit 42 calculates an integral value of the load information (load factor of the operating server 3) for a predetermined period (step S5: process P5 in FIG. 7). For example, the load calculation unit 42 adds the calculated integral value to the integrated load value of the operating server 3 in the server information 41a.

[0106] The management server 4 judges whether or not the switching load amount 41b has been saved in the memory unit 41 (step S6). If the switching load amount 41b has not been saved in the memory unit 41 (NO in step S6), the current phase is the threshold setting phase. The load calculation unit 42 judges whether or not a predetermined period has elapsed since the start of operation (step S7), and if the predetermined period has not elapsed (NO in step S7), the process ends.

[0107] When a predetermined period of time has elapsed since the start of operation (YES in step S7), the timer unit 43 notifies the load calculation unit 42 that the predetermined period of time has elapsed (process P6 in FIG. 7). In this case, the load calculation unit 42 stores the integrated load value of the operating server 3 in the server information 41a as the switching load amount 41b in the memory unit 41 (step S8: process P7 in FIG. 7).

[0108] After a predetermined period of time has elapsed, the switching determination unit 44 performs a switching determination process. In step S9, the switching determination unit 44 refers to the server information 41a, starts the stopped server 3, and determines whether or not switching is possible (process P8 in FIG. 7).

[0109] The switching determination unit 44 issues a switching instruction to the switching execution unit 46 at a timing when switching is possible, for example, at a timing when the switchability of all the servers 3 in the server information 41a becomes "possible" (process P9 in FIG. 7).

[0110] When the switching execution unit 46 receives a switching instruction (processing P3 in FIG. 7), it sends operation control information to each of the active server 3 and the stopped server 3 (processing P4 in FIG. 7), thereby switching the operation state of each server 3 (step S10), and the processing ends.

[0111] In step S6, if the switching load amount 41b has been saved in the memory unit 41 (YES in step S6), the current operation state is the switching phase. The switching determination unit 44 determines whether the load accumulated value of the operating server 3 in the server information 41a is greater than the switching load amount 41b (step S11: process P8 in FIG. 7). If the load accumulated value is equal to or less than the switching load amount 41b (NO in step S11), the process ends.

[0112] If the load integrated value of the operating server 3 is greater than the switching load amount 41b (YES in step S11), the switching determination unit 44 issues a switching instruction to the switching execution unit 46 (process P9 in FIG. 7), and the process proceeds to step S9.

[0113] [E] Other The technology according to the embodiment described above can be modified and changed as follows.

[0114] For example, the software configurations of the server 3 and the management server 4 shown in FIG. 4 may be combined in any desired combination in each device, or may be divided into separate devices.

[0115] In addition, in the embodiment, the usage rate of the processor 10a of the server 3 is taken as an example of the load amount, but the load amount is not limited to this, and various indices that can be acquired from a system monitor of the server 3 may be used. For example, the load amount may be various indices that can estimate the degree of deterioration of each device included in the server 3, as follows: Utilization of processor 10a on server 3 The usage rate, usage amount, or number of writes of the memory unit 10d of the server 3 Network usage rate or communication volume of the IF unit 10e of the server 3

[0116] For example, the load calculation unit 42 may use a combination of two or more of the above-mentioned indices as the load amount. In this case, the load calculation unit 42 may calculate an integrated value, for example an integral value, for each index used as the load amount, and store the integrated load value for each index in the server information 41a. In addition, in the threshold setting phase, the load calculation unit 42 may store the integrated value for each index at the time when a predetermined period has elapsed since the start of operation in the memory unit 41 as each switching load amount 41b.

[0117] In the operational state switching phase, the switching determination unit 44 may compare the load accumulated value with the switching load amount 41b for each indicator, and perform a determination process as to whether or not switching is possible if the comparison result satisfies at least one of the following conditions (a) to (c):

[0118] (a) When the load accumulated value of at least one indicator exceeds the switching load amount 41b of the indicator. (b) When the number of indicators whose accumulated load values ​​exceed the switching load amount 41b exceeds a predetermined number, or when the ratio of the number of indicators whose accumulated load values ​​exceed the switching load amount 41b to the number of indicators used as load amounts exceeds a predetermined ratio. (c) When the load integrated value or the switching load amount 41b is weighted for each index, the above condition (a) or (b) is satisfied.

[0119] In this way, by using two or more types of indexes as the load amount, it is possible to appropriately determine whether or not to switch depending on the workload of the system 2, the configuration of the server 3, and the like.

[0120] In addition, in the embodiment, the switching load amount 41b set in the threshold setting phase does not change (is a constant value) in the operation state switching phase, but the present invention is not limited to this. When the server 3 operates in the active state, the probability of a failure occurring increases over time.

[0121] Therefore, the load calculation unit 42 may reduce the switching load amount 41b when the accumulated operation amount of the server 3 satisfies a predetermined condition in the threshold setting phase. The case where the accumulated operation amount satisfies the predetermined condition may be, for example, when the elapsed time from the threshold setting phase exceeds a predetermined time (which may be the same as or different from the predetermined period). Alternatively, the case where the accumulated operation amount satisfies the predetermined condition may be when the accumulated value of the load integrated value when any of the servers 3 operates in an active state exceeds a predetermined threshold. A plurality of predetermined times and a plurality of predetermined thresholds may be set, and in this case, the switching load amount 41b may be reduced at a plurality of timings.

[0122] The amount of reduction may be greater as the time elapsed since the start of operation becomes longer. For example, when reducing the switching load amount 41b, the load calculation unit 42 may reduce the switching load amount 41b in stages or according to a linear or nonlinear function.

[0123] This makes it possible to shorten the operating period of the server 3 in accordance with the degree of deterioration of the server 3, and further reduce the probability of a failure occurring in the server 3.

[0124] 4 may realize each processing function by a plurality of devices cooperating with each other via a network. As an example, the memory unit 41 may be a DB server, and the load calculation unit 42, the timer unit 43, the switching determination unit 44, the failure occurrence detection unit 45, and the switching execution unit 46 may be an application server or a Web server, etc. In this case, the DB server, the application server, and the Web server may cooperate with each other via a network to realize each processing function of the management server 4.

[0125] [F] Notes Regarding the above embodiment, the following supplementary notes are further disclosed.

[0126] (Appendix 1) setting a switching threshold based on an integrated value of a load on one of a first system and a second system in a predetermined period when one of the first system and the second system in a redundant configuration is transitioned to an operating state and the other is transitioned to a stopped state; switching each of the first system and the second system from the operating state to the stopped state or from the stopped state to the operating state every time an integrated value of the load amount of the system in the operating state exceeds the switching threshold. A management device comprising a control unit.

[0127] (Appendix 2) The control unit is acquiring the load amount from the system in an operating state at regular intervals; storing the acquired integrated value of the load amount in a memory in association with the system in the operating state; initializing the integrated value associated with the system that has been switched from the operating state to the stopped state by the switching process; 2. The management device of claim 1.

[0128] (Appendix 3) when the control unit sets the switching threshold, the control unit switches each of the first system and the second system from the operating state to the stopped state or from the stopped state to the operating state. 3. The management device according to claim 1 or 2.

[0129] (Appendix 4) the load amount is a utilization rate of a processor included in the system in the active state, the integrated value is an integral value of the utilization rate of the processor over the predetermined period of time; The management device according to any one of Supplementary Note 1 to Supplementary Note 3.

[0130] (Appendix 5) The loading amount includes a plurality of indices, The control unit is In the setting process, a switching threshold value is set for each of the plurality of indicators based on an integrated value of each of the plurality of indicators during the predetermined period; determining whether or not to perform the switching based on whether or not the integrated values ​​of the plurality of indicators of the system in the operating state exceed the switching threshold values ​​of the plurality of indicators in the switching process; The management device according to any one of Supplementary Note 1 to Supplementary Note 4.

[0131] (Appendix 6) The control unit reduces the switching threshold when a cumulative operation amount of the first system or the second system satisfies a predetermined condition. The management device according to any one of Supplementary Note 1 to Supplementary Note 5.

[0132] (Appendix 7) setting a switching threshold based on an integrated value of a load on one of a first system and a second system in a predetermined period when one of the first system and the second system in a redundant configuration is transitioned to an operating state and the other is transitioned to a stopped state; switching each of the first system and the second system from the operating state to the stopped state or from the stopped state to the operating state every time an integrated value of the load amount of the system in the operating state exceeds the switching threshold. A management method in which processing is carried out by a computer.

[0133] (Appendix 8) acquiring the load amount from the system in an operating state at regular intervals; storing the acquired integrated value of the load amount in a memory in association with the system in the operating state; initializing the integrated value associated with the system that has been switched from the operating state to the stopped state by the switching process; 8. The management method according to claim 7, wherein the processing is performed by a computer.

[0134] (Appendix 9) when the switching threshold is set, each of the first system and the second system is switched from the operating state to the stopped state, or from the stopped state to the operating state. 9. The management method according to claim 7 or 8, wherein the processing is executed by the computer.

[0135] (Appendix 10) the load amount is a utilization rate of a processor included in the system in the active state, the integrated value is an integral value of the utilization rate of the processor over the predetermined period of time; The management method according to any one of Supplementary Notes 7 to 9.

[0136] (Appendix 11) The loading amount includes a plurality of indices, The setting process includes a process of setting a switching threshold value for each of the plurality of indicators based on an integrated value of each of the plurality of indicators during the predetermined period; The switching process includes a process of determining whether or not to perform the switching based on whether or not an integrated value of each of the plurality of indicators of the system in the operating state exceeds a switching threshold value of each of the plurality of indicators. The management method according to any one of Supplementary Notes 7 to 10.

[0137] (Appendix 12) reducing the switching threshold when a cumulative operation amount of the first system or the second system satisfies a predetermined condition; The management method according to any one of claims 7 to 11, wherein the processing is executed by the computer.

[0138] (Appendix 13) setting a switching threshold based on an integrated value of a load on one of a first system and a second system in a predetermined period when one of the first system and the second system in a redundant configuration is transitioned to an operating state and the other is transitioned to a stopped state; switching each of the first system and the second system from the operating state to the stopped state or from the stopped state to the operating state every time an integrated value of the load amount of the system in the operating state exceeds the switching threshold. A management program that causes a computer to carry out processing.

[0139] (Appendix 14) acquiring the load amount from the system in an operating state at regular intervals; storing the acquired integrated value of the load amount in a memory in association with the system in the operating state; initializing the integrated value associated with the system that has been switched from the operating state to the stopped state by the switching process; 14. The management program of claim 13, which causes the computer to execute a process.

[0140] (Appendix 15) when the switching threshold is set, each of the first system and the second system is switched from the operating state to the stopped state, or from the stopped state to the operating state. 15. The management program according to claim 13 or 14, which causes the computer to execute a process.

[0141] (Appendix 16) the load amount is a utilization rate of a processor included in the system in the active state, the integrated value is an integral value of the utilization rate of the processor over the predetermined period of time; The management program according to any one of Supplementary Note 13 to Supplementary Note 15.

[0142] (Appendix 17) The loading amount includes a plurality of indices, The setting process includes a process of setting a switching threshold value for each of the plurality of indicators based on an integrated value of each of the plurality of indicators during the predetermined period, The switching process includes a process of determining whether or not to perform the switching based on whether or not an integrated value of each of the plurality of indicators of the system in the operating state exceeds a switching threshold value of each of the plurality of indicators. The management program according to any one of Supplementary Note 13 to Supplementary Note 16.

[0143] (Appendix 18) reducing the switching threshold when a cumulative operation amount of the first system or the second system satisfies a predetermined condition; The management program according to any one of claims 13 to 17, which causes the computer to execute a process. [Explanation of symbols]

[0144] 1 Redundant system 10. Computers 10a processor 10b Graphics Processing Unit 10c Memory 10d storage section 10e IF section 10f IO section 10g Reading unit 10h Program 10i Recording media 2. System 3 Server 31 Server processing unit 32 Status information transmission unit 33 Switching Processing Section 34,47 Control section 4 Management Server 41 Memory section 41a Server Information 41b Switching load 42 Load calculation section 43 Timer section 44 Switching decision unit 45 Fault occurrence detection unit 46 Switching Execution Unit 5 Network Switch 6 Management Network Switch

Claims

1. setting a switching threshold based on an integrated value of a load on one of a first system and a second system in a predetermined period when one of the first system and the second system in a redundant configuration is transitioned to an operating state and the other is transitioned to a stopped state; switching each of the first system and the second system from the operating state to the stopped state or from the stopped state to the operating state every time an integrated value of the load amount of the system in the operating state exceeds the switching threshold. A management device comprising a control unit.

2. The control unit is acquiring the load amount from the system in an operating state at regular intervals; storing the acquired integrated value of the load amount in a memory in association with the system in the operating state; initializing the integrated value associated with the system that has been switched from the operating state to the stopped state by the switching process; The management device according to claim 1 .

3. when the control unit sets the switching threshold, the control unit switches each of the first system and the second system from the operating state to the stopped state or from the stopped state to the operating state. The management device according to claim 1 or 2.

4. the load amount is a utilization rate of a processor included in the system in the active state, the integrated value is an integral value of the utilization rate of the processor over the predetermined period of time; The management device according to claim 1 or 2.

5. The loading amount includes a plurality of indices, The control unit is In the setting process, a switching threshold value is set for each of the plurality of indicators based on an integrated value of each of the plurality of indicators during the predetermined period; determining whether or not to perform the switching based on whether or not the integrated values ​​of the plurality of indicators of the system in the operating state exceed the switching threshold values ​​of the plurality of indicators in the switching process; The management device according to claim 1 or 2.

6. The control unit reduces the switching threshold when a cumulative operation amount of the first system or the second system satisfies a predetermined condition. The management device according to claim 1 or 2.

7. setting a switching threshold based on an integrated value of a load on one of a first system and a second system in a predetermined period when one of the first system and the second system in a redundant configuration is transitioned to an operating state and the other is transitioned to a stopped state; switching each of the first system and the second system from the operating state to the stopped state or from the stopped state to the operating state every time an integrated value of the load amount of the system in the operating state exceeds the switching threshold. A management method in which processing is carried out by a computer.

8. setting a switching threshold based on an integrated value of a load on one of a first system and a second system in a predetermined period when one of the first system and the second system in a redundant configuration is transitioned to an operating state and the other is transitioned to a stopped state; switching each of the first system and the second system from the operating state to the stopped state or from the stopped state to the operating state every time an integrated value of the load amount of the system in the operating state exceeds the switching threshold. A management program that causes a computer to carry out processing.

Citation Information

Patent Citations

  • System switch controller for duplex system

    JP1992362744A

  • Information processor set with multiple addresses

    JP1996036520A

  • Memory control device

    JP1998188584A

  • Logical computer system, and method and program for controlling configuration of logical computer system

    JP2004030363A

  • Communication system and control method for redundant configuration

    JP2013011929A