Information processing device, information processing method, and information processing program
The information processing device optimizes power supply equipment capacity in microgrids by minimizing costs and emissions over a planning period, addressing the challenge of extending the planning period by considering equipment introduction and removal.
Patent Information
- Application Number
- JP2023065760
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-13
- Publication Date
- 2024-10-25
AI Technical Summary
Existing methods for determining the capacity of power supply equipment in microgrids do not account for the introduction or removal of equipment during the operation planning period, making it difficult to extend the planning period beyond the service life of the equipment.
An information processing device that determines the capacity of power supply equipment by minimizing an objective function considering costs and greenhouse gas emissions, using a CPU to execute programs that adjust the capacity of generators, storage batteries, and renewable energy sources to meet power demand and emission constraints over a predetermined planning period.
The solution allows for extending the operation planning period of power supply equipment by considering the introduction and removal of equipment, optimizing costs and emissions, and ensuring compliance with power demand and emission limits.
Smart Images

Figure 2024151929000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to an information processing device, an information processing method, and an information processing program. [Background technology]
[0002] In recent years, there has been an increase in the construction of power supply systems (microgrids) that can supply power from distributed power supply facilities to consumer loads within a certain area during power outages in preparation for disasters such as earthquakes and typhoons.
[0003] When constructing a microgrid, it is necessary to determine the capacity of distributed power supply facilities, and a method for doing so is known (for example, Patent Document 1). [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2007-244127 A Summary of the Invention [Problem to be solved by the invention]
[0005] The invention described in Patent Document 1 does not take into consideration the introduction or abolition of power supply facilities during the period related to the operation plan of the power supply facilities. Therefore, for example, it is difficult to create an operation plan that covers a period that exceeds the useful life of the power supply facilities.
[0006] The present invention has been made in consideration of such problems, and aims to provide an information processing device that can extend the period related to an operation plan when determining capacity in the operation plan for a power supply facility. [Means for solving the problem]
[0007] One invention for achieving the above-mentioned object is an information processing device that determines the capacity of a target equipment for supplying power to a load connected to a microgrid during a specified planning period, the information processing device including: a processing unit that minimizes an objective function indicating the cost or greenhouse gas emissions incurred by supplying power to the load during the planning period, and decision variables being either the amount of power generated by the target equipment at each time of the planning period or the capacity of the target equipment during the planning period, and the amount of power purchased from an electricity retailer at each time; and a determination unit that determines the capacity of the target equipment for each unit period included in the planning period based on a processing result of the processing unit, the costs including a first cost of introducing the target equipment during the planning period, a second cost of operating the target equipment during the planning period, and a third cost to be paid to an electricity retailer during the planning period, and outputs the amount of power generated and the amount of power purchased that minimize the objective function with satisfying the electricity demand during the planning period as a first constraint condition.
[0008] Also, an information processing method for determining the capacity of a target equipment for supplying power to a load connected to a microgrid during a specified planning period, comprising: a step of an information processing device accepting the planning period; an objective function indicating the cost or greenhouse gas emissions incurred by supplying power to the load during the planning period, and either the power generation amount of the target equipment at each time of the planning period or the capacity of the target equipment during the planning period, and the amount of power purchased from an electricity retailer at each time, being decision variables; a step of minimizing the objective function; and a step of determining the capacity of the target equipment for each unit period included in the planning period based on the result of the minimizing step, wherein the costs include a first cost of introducing the target equipment during the planning period, a second cost of operating the target equipment during the planning period, and a third cost to be paid to the electricity retailer during the planning period, and in the minimizing step, the information processing method outputs the power generation amount and the power purchase amount that minimize the objective function with satisfying the power demand during the planning period as a first constraint condition.
[0009] Also, an information processing program for determining a capacity of a target facility for supplying power to a load connected to a microgrid during a specified planning period, the program including a computer and a processing unit configured to minimize an objective function indicating a cost or greenhouse gas emission amount incurred by supplying power to the load during the planning period, and either an amount of power generated by the target facility at each time of the planning period or the capacity of the target facility at the planning period, and an amount of power purchased from an electricity retailer at each time of the planning period, as decision variables; and a determination unit that determines a capacity of the target equipment for each unit period included in the planning period based on a processing result of the processing unit, wherein the costs include a first cost of introducing the target equipment in the planning period, a second cost of operating the target equipment in the planning period, and a third cost to be paid to an electricity retailer in the planning period, and the processing unit outputs the power generation amount and the power purchase amount that minimize the objective function with a first constraint condition being that the power demand in the planning period is satisfied. Other features of the present invention will become clear from the description in this specification. Effect of the Invention
[0010] According to the present invention, it is possible to provide an information processing device that can extend the period related to an operation plan when determining a capacity in an operation plan for a power supply facility. [Brief description of the drawings]
[0011] [Figure 1] FIG. 1 is a diagram for explaining a microgrid 1. [Diagram 2] FIG. 2 is a diagram illustrating a hardware configuration of an information processing device 2. [Diagram 3] FIG. 2 is a diagram for explaining a database stored in a storage device 203. [Figure 4] FIG. 13 is a diagram showing an example of an introduction price scenario DB 203b. [Diagram 5] FIG. 13 is a diagram showing an example of a power generation price scenario DB 203c. [Figure 6]FIG. 13 is a diagram showing an example of a power purchase price scenario DB 203d. [Figure 7] FIG. 13 is a diagram showing an example of a demand scenario DB 203e. [Figure 8] FIG. 13 is a diagram showing an example of a discharge amount scenario DB 203f. [Figure 9] FIG. 2 is a diagram showing functional blocks of an information processing device 2. [Figure 10] 1 is an example of the amount of electricity generated and the amount of electricity purchased on a representative day of a fiscal year m. [Figure 11] 1 is an example of the amount of electricity consumed on a representative day of a fiscal year. [Figure 12] FIG. 13 is a diagram showing an example of various costs for each fiscal year m. [Figure 13] FIG. 1 is a diagram showing an example of greenhouse gas emissions Em. [Figure 14] 10 is a flowchart illustrating a process flow up to when the information processing device 2 outputs the capacity of a target facility. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] At least the following points will become apparent from the description of this specification and the accompanying drawings. == Implementation form == Hereinafter, preferred embodiments of the present invention will be described with reference to the drawings. The same or equivalent components, members, etc. shown in each drawing are designated by the same reference numerals, and duplicated descriptions will be omitted as appropriate.
[0013] <<Microgrid 1>> The microgrid 1 is a power supply system capable of supplying power from distributed power supply facilities to consumer loads within a certain area in the event of a power outage, in preparation for the occurrence of a disaster such as an earthquake or a typhoon.
[0014] 1 is a diagram for explaining a microgrid 1 that is planned to be constructed using an information processing device 2 described later. In this embodiment, it is assumed that the microgrid 1 is planned to be constructed in an area A.
[0015] The microgrid 1 is composed of a distribution line 10, a distributed power supply facility 11 (target facility) connected to the distribution line 10, and a load 12. In Fig. 1, a generator 11a, a solar cell 11b, a wind power generator 11c, and a storage battery 11d are shown as the distributed power supply facility 11. The microgrid 1 is connected to a power system 3 via a circuit breaker 30 provided on the distribution line 10.
[0016] 1 also shows loads 12a, 12b, and 12c connected to the power distribution line 10 as consumer loads 12. The consumer includes equipment that consumes power supplied from the power distribution line 10. Examples of the consumer include facilities such as hospitals, factories, and schools.
[0017] Under normal circumstances, the circuit breaker 30 maintains a connected state, and power generated at a power plant (not shown) is supplied to the load 12 connected to the microgrid 1 via the power system 3.
[0018] On the other hand, when a disaster such as an earthquake or a typhoon occurs and the power supply from the power plant to the microgrid 1 via the power system 3 stops (power outage), the circuit breaker 30 goes into a disconnected state.
[0019] When the microgrid 1 is disconnected from the power system 3, the power supply facility 11 (the generator 11a, the solar cell 11b, the wind power generator 11c, and the storage battery 11d) supplies power to the load 12 via a predetermined start-up sequence.
[0020] <<Information processing device 2>> The information processing device 2 is a device that determines the capacity of the target facility for supplying power to the load 12 connected to the microgrid 1 during a predetermined planning period.
[0021] The planning period is a period that can be arbitrarily determined by a user (hereinafter, "user") of the information processing device 2. The planning period can be determined in units of several decades.
[0022] The planning period includes a plurality of unit periods. In this embodiment, the unit period is one year, which is one fiscal year from April to March of the following year.
[0023] The target facilities may include fuel-using generators, storage batteries, renewable energy power generation facilities, etc. The power supply facility 11 shown in Fig. 1 is an example of the target facilities, and is not limited to these.
[0024] Although details will be described later, the information processing device 2 determines the capacity of the target facility so as to minimize the cost or greenhouse gas emissions incurred by supplying power to the load 12 during the planning period under predetermined conditions.
[0025] The "cost" here includes the installation cost (corresponding to the "first cost"), the operating cost (corresponding to the "second cost"), and the electricity purchase cost (corresponding to the "third cost").
[0026] The introduction cost is the cost of introducing the target equipment during the planning period. Details will be described later, but the introduction cost is determined according to the capacity [kW] of the target equipment, the timing of introducing the target equipment, etc.
[0027] The operating cost is the cost of operating the target equipment during the planning period. As will be described in detail later, the operating cost is determined based on the fuel consumption characteristics of the target equipment, the amount of fuel used by the target equipment, the timing of introducing the target equipment, etc.
[0028] The power purchase cost is the cost to be paid to the power retailer during the planning period. As will be described in detail later, the power purchase cost is the sum of the basic fee and the metered fee paid to the power retailer.
[0029] The cost may take into consideration the case where the target equipment is disposed of, etc. In that case, the cost incurred in supplying power to the load 12 may be added with the cost expected to dispose of the target equipment, etc.
[0030] <Hardware configuration of information processing device 2> 2 is a diagram showing a hardware configuration of an information processing device 2 according to an embodiment of the present invention. The information processing device 2 is a computer having a CPU (Central Processing Unit) 200, a memory 201, a communication device 202, a storage device 203, an input device 204, an output device 205, and a recording medium reading device 206.
[0031] [CPU200] The CPU 200 executes programs (corresponding to "information processing programs") stored in the memory 201 and the storage device 203, thereby implementing various functions of the information processing device 2.
[0032] [Memory 201] The memory 201 is, for example, a RAM (Random-Access Memory) and is used as a temporary storage area for various programs, data, and the like.
[0033] [Communication device 202] The communication device 202 exchanges various programs and data with other computers via the network 5 .
[0034] [Storage device 203] The storage device 203 is a non-transitory (eg, non-volatile) storage device that stores various data to be executed or processed by the CPU 200.
[0035] The storage device 203 stores a plurality of databases used in the processing executed by the processing unit 212, which will be described later. The details of these databases will be described later.
[0036] [Input device 204] The input device 204 is a device that accepts commands and data input by a user, and includes an input interface such as a keyboard and a touch sensor that detects a touch position on a touch panel display.
[0037] [Output Device 205] The output device 205 is, for example, a display or a printer.
[0038] [Recording medium reader 206] The recording medium reader 206 reads various data such as programs and databases recorded on a recording medium 6 such as an SD card, a DVD, or a CD-ROM, and stores the data in the storage device 203 .
[0039] <Database> 3 is a diagram illustrating databases stored in the storage device 203. The storage device 203 stores databases such as a facility information DB 203a, an introduction price scenario DB 203b, a power generation price scenario DB 203c, a power purchase price scenario DB 203d, a demand scenario DB 203e, and an emission amount scenario DB 203f.
[0040] [Equipment information DB203a] The equipment information DB 203a is a database in which information on each target equipment is recorded. Here, the "information on the target equipment" includes, for example, the useful life. In addition, in the case of a power generation equipment that uses fuel, the type of fuel used, fuel consumption characteristics, etc. are included.
[0041] In the case of a photovoltaic power generation facility (solar cell), characteristics showing the relationship between the amount of solar radiation and the amount of power generated are included, while in the case of a wind power generation facility (wind turbine), characteristics showing the relationship between wind speed and the amount of power generated are included.
[0042] [Introduction price scenario DB203b] 4 is a diagram showing an example of the introduction price scenario DB 203b. The introduction price scenario DB 203b is a database for determining the introduction cost based on the target facility.
[0043] The introduction price scenario DB 203b in FIG. 4 includes the cost c required to newly introduce each target facility i (in this example, generators 1 to 3, storage batteries 1 and 2, solar cells 1 and 2, and wind power generators 1 and 2) by unit capacity in fiscal year m. 1imHowever, for storage batteries 1 and 2, the output installation cost (cost related to the power conditioning system (PCS) that controls the storage batteries, in units of "10,000 yen / kW") and capacity installation cost (cost related to the storage batteries themselves, in units of "10,000 yen / kWh") are recorded.
[0044] The subscript "i" is used to distinguish between multiple target facilities. The subscript "m" indicates the year, which in this example is any one of 2022 to 2050. These are the same throughout this specification.
[0045] [Power generation price scenario DB203c] 5 is a diagram showing an example of the power generation price scenario DB 203c. The power generation price scenario DB 203c is a database for determining the operation cost based on the amount of power generated by the target facility i.
[0046] The power generation price scenario DB 203c in FIG. 5 includes the cost f 2im are recorded (in this example, fuel costs 1 to 3).
[0047] Furthermore, the power generation price scenario DB 203c stores the fuel consumption characteristic p 2im is recorded (in this example, the fuel consumption characteristics of generators 1 to 3). The fuel consumption characteristics are the power that can be generated using a unit amount of fuel.
[0048] [Power purchase price scenario DB203d] 6 is a diagram showing an example of the power purchase price scenario DB 203d. The power purchase price scenario DB 203d is a database for determining the power purchase cost based on the amount of power purchased from a retailer. The power purchase cost includes a basic fee and a metered fee paid to the retailer.
[0049] The power purchase price scenario DB 203d in FIG. 6 includes a basic charge c 3jm 1 is recorded (FIG. 6(a)). The subscript “j” is used to identify the retailer. This will be the same throughout this specification.
[0050] In this case, "electricity" refers to the maximum amount of electricity purchased from retailer j in the previous year m-1. In other words, the basic fee for the year m is determined based on the maximum amount of electricity generated in the previous year m-1.
[0051] In addition, the electricity purchase price scenario DB203d includes a metered charge c required to purchase a unit amount of electricity from a retailer j at time n on a representative day of a year m. 3jmn 2 was recorded (Figure 6(b)).
[0052] The subscript "n" is used to identify the time in the representative day. In this embodiment, the time starts from 0:00 on the first calendar day and is discretized at intervals of 30 minutes. This is the same throughout this specification.
[0053] In this example, the usage charges are set differently in the summer and other seasons in one fiscal year.
[0054] [Demand Scenario DB203e] 7 is a diagram showing an example of the demand scenario DB 203e. The demand scenario DB 203e is a database in which a forecast of power demand is associated with each time n in a unit period.
[0055] The demand scenario DB203e includes the power demand D predicted at time n in year m. mn has been recorded.
[0056] [Emissions Scenario DB203f] 8 is a diagram showing an example of the emission scenario DB 203f. The emission scenario DB 203f is a database for determining the amount of greenhouse gas emissions based on the amount of power generated by the target facility or the amount of power purchased from retailers.
[0057] The item "Fuel 1-3" in the emission scenario DB203f contains the amount of carbon dioxide emissions e when generators 1-3 use a unit amount of fuel in fiscal year m. Fim Here, the subscript "F" indicates that this is the amount of emissions when a "unit amount of fuel" is used.
[0058] In addition, the item "Retailer 1 and 2" in the emission scenario DB203f contains the amount of carbon dioxide emission e when a unit amount of electricity is purchased and consumed from retailer 1 and 2 in fiscal year m. Yjm Here, the subscript "Y" indicates that the emissions are the amount of electricity purchased from a retailer and consumed.
[0059] In addition, the amount of carbon dioxide emissions e when a unit amount of fuel is used in the same target equipment i is Fim and the amount of carbon dioxide emitted when a unit of electricity is consumed e Xim Here, the subscript "X" indicates the amount of carbon dioxide emitted when a unit of electricity is consumed by the power generation of the target facility.
[0060] For example, for target equipment i (generators 1 to 3), the emissions e Fim The fuel consumption characteristic p 2im By dividing by e Xim can be converted to
[0061] In this embodiment, the greenhouse gas is limited to carbon dioxide, but other greenhouse gases may also be taken into consideration.
[0062] <Function blocks of information processing device 2> 9 is a diagram showing functional blocks of the information processing device 2. The information processing device 2 includes a reception unit 210, a reception unit 211, a processing unit 212, and a determination unit 213. Each of these functions is realized by the hardware of the information processing device 2 executing a predetermined program.
[0063] [Reception Department 210] The reception unit 210 receives a planning period from a user. The user can input, for example, the start and end of the planning period via the input device 204.
[0064] [Reception Department 211] The reception unit 211 (corresponding to the "reception unit") receives the greenhouse gas emission amount for the planning period from the user as a constraint condition (corresponding to the "second constraint condition").
[0065] The user inputs, via the input device 204, for example, the upper limit E of greenhouse gas emissions for each year m. cm At this time, the user inputs the upper limit E so that the amount of greenhouse gas emissions caused by the microgrid, for example, matches the amount of greenhouse gas absorption by the natural environment at the end of the planning period. cm can be entered.
[0066] [Processing section 212] The processing unit 212 minimizes an objective function C that indicates the cost incurred by supplying power to the load 12 during the planning period.
[0067] The objective function C is formally expressed as follows:
number
[0068] C1, C2, and C3 on the right side of Equation 1 are the introduction cost, operation cost, and electricity purchase cost, respectively.
[0069] The processing unit 212 calculates the power generation amount X of the target facility at each time of the planning period. imnand the amount of electricity purchased from retail businesses (corresponding to "electricity retail businesses") at each time, Y jmn The objective function C is minimized with the above as the decision variables. The details are explained below.
[0070] First, in this embodiment, the power generation amount X imn and purchased electricity amount Y jmn is the amount on a specific representative day of the year. The representative day may be any one day of the year, or may be a number of days selected for different seasons. In this embodiment, the representative day is one day.
[0071] First, the processing unit 212 uses the introduction price scenario information DB, the power generation price scenario DB 203c, the power purchase price scenario DB 203d, and the demand scenario DB 203e to set the objective function of Equation 1. The objective function C will be described in detail.
[0072] Implementation cost The introduction cost C1 in the first term on the right side of Equation 1 is the cost of introducing the target equipment during the planning period, as described above.
[0073] The introduction cost C1 is related to the target facility i and there is no contribution from retailer j. The introduction cost C1 is expressed by the following formula.
number
[0074] C on the right side of formula 2 1m is the cost of introducing the target equipment in fiscal year m, and C1 is the sum of m from 2022 to 2050. C 1m is expressed by the following equation.
number
[0075] Here, c on the right hand side 1im is the cost per unit capacity required to newly introduce (expand) the target equipment i in fiscal year m. imnis the power generation amount at time n on the representative day of year m of the target facility i. 1im is recorded in the introductory price scenario DB 203b of FIG.
[0076] Moreover, the term in the curly brackets on the right side of Equation 3 is the difference between the maximum power generation of the target facility i in year m (first term) and the maximum power generation of the target facility i in year m-1 (second term). In other words, the term in the curly brackets on the right side is the capacity that should be newly introduced (expanded) for the target facility i in year m.
[0077] In addition, if the value in the braces on the right side of Equation 3 is negative, c 1im is regarded as 0 (zero). In other words, this case corresponds to discarding part or all of the existing capacity of the target facility i. In this embodiment, it is regarded that no cost is required in such a case.
[0078] Operational costs The operating cost C2 in the second term on the right side of Equation 1 is the cost of operating the target equipment during the planning period, as described above.
[0079] The operating cost C2 is related to the equipment that requires fuel among the target facilities i. Therefore, there is no contribution from the renewable energy power generation facilities and retailers j to the operating cost C2.
[0080] The operating cost C2 is expressed by the following formula.
number
[0081] C on the right side of formula 4 2m is the cost of operating the target equipment in fiscal year m, and is expressed as follows:
number
[0082] As mentioned above, f 2imis the cost required for the target equipment i to use a unit amount of fuel in fiscal year m. Also, p 2im is the fuel consumption characteristic of the target facility i in the year m. These are recorded in the power generation price scenario DB 203c in FIG.
[0083] Power purchase costs The electricity purchase cost C3 in the third term on the right side of Equation 1 is the cost to be paid to the electricity retailer during the planning period, as described above.
[0084] The electricity purchase cost C2 is related to the retailer j, and there is no contribution from the target facility i. The electricity purchase cost C3 is expressed by the following formula.
number
[0085] C on the right side of Equation 6 3m is the cost to be paid to the electricity retailer in fiscal year m, and is expressed as follows:
number
[0086] The first term on the right side of Equation 7 is the cost related to the basic fee, and the second term is the cost related to the usage fee.
[0087] c in the first term on the right hand side 3jm 1 is the basic charge paid to retailer j per unit of electricity in fiscal year m. 3jmn 2 is the metered charge required to purchase a unit amount of power from a retailer j at time n on a representative day of a year m. These are recorded in the power purchase price scenario DB 203d in FIG.
[0088] In addition, on the right side of Equation 7, Y jmn is the electricity purchased from retailer j at time n on a representative day in fiscal year m.
[0089] Above, we have explained the specific function form of the objective function C. Next, we will explain the constraint conditions that the processing unit 212 takes into consideration when minimizing the objective function C.
[0090] ·Electricity demand constraints The processing unit 212 sets the satisfaction of the power demand in the planning period as a constraint condition (corresponding to the “first constraint condition”), and calculates a decision variable (power generation amount X imn and purchased electricity amount Y jmn The constraints at this time are specifically expressed as follows:
number
[0091] The left side of Equation 8 is the predicted power demand D at time n of year m. mn and are recorded in the demand scenario DB 203e in Fig. 7. The first term on the right side is the sum of the amounts of power generated by the target facilities i, and the second term is the sum of the amounts of power purchased from the retail businesses j.
[0092] ·Constraints on greenhouse gas emissions The processing unit 212 further uses the emission scenario DB 203 f to output the amount of power generation and the amount of power purchase that minimizes the objective function C under the constraint conditions accepted by the accepting unit 211 .
[0093] The constraint condition at this time is expressed by the following equation.
number
[0094] The left side of Equation 9 is the emission amount E for each fiscal year m received by the reception unit 211. cm The right-hand side is the decision variable X jmn and Y jmn The right-hand side is specifically expressed as follows:
number
[0095] The first term on the right-hand side of Equation 10 is the amount of carbon dioxide emissions resulting from the target facility i in fiscal year m, and the second term is the amount of carbon dioxide emissions resulting from electricity purchased from a retailer in fiscal year m.
[0096] e in the first term on the right side Fim is the amount of carbon dioxide emitted when the target equipment i uses a unit amount of fuel in fiscal year m. Yjm is the amount of carbon dioxide emission when a unit amount of electricity is purchased from a retailer j in a fiscal year m and consumed. These are recorded in the emission scenario DB 203f in FIG.
[0097] In the first term on the right side of Equation 10, F imn is the amount of fuel used by the target equipment i in fiscal year m. F imn and the amount of electricity generated by the target facility i in fiscal year m, X imn There is the following relationship:
number
[0098] p on the right hand side of number 11 2im is the fuel efficiency characteristic of the target equipment i in the year m. The fuel efficiency characteristic p 2im is recorded in the power generation price scenario DB 203c in FIG.
[0099] The processing unit 212 minimizes the objective function C (Equation 1) under the constraint conditions (Equations 8 and 9) described above. Then, the processing unit 212 outputs decision variables that minimize the objective function C.
[0100] Example of minimization result The following describes the results of minimizing the objective function C by the processing unit 212. Note that, as the target facility i, the generators 1 to 3, the storage batteries 1 and 2, the solar cells 1 and 2, and the wind power generators 1 and 2 shown in the introduction price scenario DB 203b in FIG.
[0101] However, in this embodiment, in order to simplify the explanation, only a part of these, target equipment i, will be considered. Specifically, the target equipment applied in this embodiment is assumed to be generators 1 and 2, a solar cell 1, and a wind power generator 1. In addition, in this embodiment, retailer j uses retailers 1 and 2.
[0102] FIG. 10 shows the power generation amount X on a representative day of a year m output from the processing unit 212. imn and purchased electricity amount Y jmn This is an example. The horizontal axis of this figure is fiscal year m, and the vertical axis is power [kW].
[0103] In addition, Fig. 10 shows the power demand D mn is further shown. Demand power D mn Due to the constraints in Equation 8, the amount of power generated X imn and purchased electricity amount Y jmn It can be seen that the sums for the subscripts i and j are the same.
[0104] Furthermore, in Figure 10, we can see that the proportion of renewable energy power generation facilities such as solar cells and wind power generators is likely to increase in the future. This is a result of the constraints on greenhouse gas emissions shown in Equation 9.
[0105] FIG. 11 shows the power generation amount X imn and purchased electricity amount Y jmn This is an example of the amount of power generated at each time n calculated based on the above. The horizontal axis of this figure is time n, and the vertical axis is the amount of power generated [kWh].
[0106] In addition, Fig. 11 shows the power demand D mn The amount of demand for electricity at each time n is calculated based on the amount of electricity generated x imn and purchased electricity amount Y jmn It can be seen that this agrees with the total amount of power at each time n calculated based on
[0107] In the above example, the decision variables are the power generation amount X of the target facility at each time during the planning period. imnHowever, this is not limited to this. imn Alternatively, the capacity of the target facility to be installed in each year m of the planning period may be used as the decision variable.
[0108] [Decision Unit 213] The determination unit 213 determines the capacity of the target facility i for each year m included in the planning period based on the processing result of the processing unit 212.
[0109] The determination unit 213 determines the capacity Cap of the target facility that can generate power equivalent to the maximum power generation amount on the representative day output by the processing unit 212. mi is determined for each fiscal year m.
[0110] In this embodiment, the determination unit 213 determines the power equivalent to the maximum value of the power generation amount on the representative day of the year m output by the processing unit 212 as the capacity Cap mi It is determined as follows (the following formula).
number
[0111] Capacity Cap of target facility i in fiscal year m mi Once this is determined, the implementation cost C 1m (Formula 3), Operating cost C 2m (Formula 5) and electricity purchase cost C 3m (Equation 7) is determined.
[0112] 12 is a diagram showing an example of various costs for each year m determined based on the capacity of the target facility. In this diagram, the horizontal axis is year m, and the vertical axis is cost [10,000 yen].
[0113] In addition, in this figure, the introduction costs and operating costs for generators 1 and 2 are shown together.
[0114] Figure 13 shows the estimated greenhouse gas emissions E mIn this figure, the horizontal axis is the fiscal year m, and the vertical axis is the amount of carbon dioxide emissions [kg-CO2].
[0115] In this figure, the upper limit E of the discharge amount, which is a constraint condition accepted by the acceptance unit 211, cm is also shown (solid line). In this example, the upper limit E cm is set to decrease monotonically into the future and to reach 0 at the end of the planning period (2050 in this example).
[0116] Calculated Emissions E m is the upper limit E cm In other words, it is expected that carbon dioxide emissions will be zero at the end of the planning period (2050 in this example).
[0117] <Processing up to outputting the capacity of the target equipment> 14 is a flowchart illustrating the flow of processing up to when the information processing device 2 outputs the capacity of the target facility. The processing up to when the capacity of the target facility is output includes steps S101 to S106.
[0118] First, in step S101, the reception unit 210 receives a planning period for the operation of the microgrid from a user.
[0119] In this embodiment, it is assumed that the user inputs, via the input device 204, 2022 as the start date and 2050 as the end date of the planning period.
[0120] Next, in step S102, the receiving unit 211 receives the greenhouse gas emission amount for the planning period from the user as a constraint condition.
[0121] The user inputs an upper limit E for each year m as a constraint on greenhouse gas emissions via the input device 204. cm Enter the E shown in Figure 13. cm (Solid line) is an example of the upper limit value entered here.
[0122] Next, in step S103, the processing unit 212 calculates an objective function C (Equation 1) that indicates the cost incurred by supplying power to the load 12 during the planning period as a function of the power generation amount X imn and purchased electricity amount Y jmn is the decision variable to be minimized.
[0123] At this time, the processing unit 212 receives the greenhouse gas emission amount E cm and satisfying the forecast of the power demand recorded in the demand scenario DB 203e are set as constraint conditions (Equations 8 and 9), and the objective function C is minimized.
[0124] Next, in step S104, the processing unit 212 calculates the decision variable (power generation amount X imn and purchased electricity amount Y jmn 10 shows the power generation amount X on a representative day of a year m output from the processing unit 212. imn and purchased electricity amount Y jmn This is an example.
[0125] Next, in step S105, the determination unit 213 determines the capacity of the target facility i for each year m included in the planning period based on the processing result of the processing unit 212.
[0126] In this embodiment, the determination unit 213 determines the power equivalent to the maximum value of the power generation amount on the representative day of the year m output by the processing unit 212 as the capacity Cap mi It is determined as follows.
[0127] Next, in step S106, the determination unit 213 determines the capacitance Cap mi Output.
[0128] Capacity Cap of target facility i in fiscal year m mi Once this is determined, the implementation cost C 1m Operational cost C 2m and electricity purchase cost C 3m is determined. Figure 12 shows the capacitance Cap miThis is an example of various costs for each fiscal year m determined based on the above.
[0129] Figure 13 shows the estimated greenhouse gas emissions E m FIG.
[0130] As described above, according to the information processing device 2 of the present embodiment, when determining the capacity in the operation plan of the power supply facility, it is possible to extend the period of the operation plan.
[0131] ==Summary== The information processing device 2 of the embodiment described above is an information processing device 2 that determines the capacity of a target facility for supplying power to a load 12 connected to a microgrid during a specified planning period, and includes: a reception unit 210 that receives the planning period; a processing unit 212 that minimizes the objective function, which is an objective function indicating the cost or greenhouse gas emissions incurred by supplying power to the load 12 during the planning period, and which is decision variables including either the power generation amount of the target facility at each time of the planning period or the capacity of the target facility during the planning period, and the power purchase amount from the electricity retailer at each time; and a determination unit 213 that determines the capacity of the target facility for each unit period included in the planning period based on the processing result of the processing unit 212, where the costs include a first cost of introducing the target facility during the planning period, a second cost of operating the target facility during the planning period, and a third cost to be paid to the electricity retailer during the planning period, and the processing unit 212 outputs the power generation amount and the power purchase amount that minimize the objective function with the first constraint being that the power demand during the planning period is satisfied.
[0132] According to this configuration, the introduction or abolition of the target equipment during the planning period is taken into consideration, so that the planning period can be extended when determining the capacity in the operation plan of the target equipment.
[0133] The information processing device 2 further includes a reception unit 211 that receives the greenhouse gas emission amount in the planning period as a second constraint condition, and a processing unit 212 outputs the power generation amount and the power purchase amount that minimize the objective function under the second constraint condition. With such a configuration, it is possible to make an operation plan for the target facility that can gradually reduce the greenhouse gas emission over the planning period.
[0134] In the above information processing device 2, the target facility may include a renewable energy power generation facility. With such a configuration, it is possible to make an operation plan for the target facility that can further reduce greenhouse gas emissions over the planning period.
[0135] In the above information processing device 2, the unit period may be one year, and the amount of generated electricity and the amount of purchased electricity may be the amount on a predetermined representative day of the year. With such a configuration, the cycle of the unit period coincides with the cycle of seasonal fluctuations, making it easier to plan the operation of the target facility.
[0136] In the information processing device 2, the determination unit 213 may determine, for each unit period, the capacity of the target equipment capable of generating power equivalent to the maximum power generation amount on the representative day output by the processing unit 212. With such a configuration, the amount of data to be handled can be reduced.
[0137] An information processing method of an embodiment is an information processing method for determining a capacity of a target equipment for supplying power to a load 12 connected to a microgrid during a specified planning period, the information processing device 2 includes a step of accepting the planning period, a step of minimizing the objective function, which is an objective function indicating the cost or greenhouse gas emissions incurred by supplying power to the load 12 during the planning period, and which is either the power generation amount of the target equipment at each time of the planning period or the capacity of the target equipment during the planning period, and the amount of power purchased from an electricity retailer at each time, as decision variables, and a step of determining the capacity of the target equipment for each unit period included in the planning period based on the result of the minimizing step, the costs including a first cost of introducing the target equipment during the planning period, a second cost of operating the target equipment during the planning period, and a third cost to be paid to the electricity retailer during the planning period, and in the minimizing step, the information processing device 2 outputs the power generation amount and power purchase amount that minimize the objective function with the first constraint being to satisfy the power demand during the planning period.
[0138] According to this method, the introduction or retirement of the target equipment during the planning period is taken into consideration, so that the planning period can be extended when determining the capacity in the operation plan of the target equipment.
[0139] An information processing program of an embodiment is an information processing program for determining a capacity of a target facility for supplying power to a load 12 connected to a microgrid during a specified planning period, and the information processing program includes a reception unit 210 that receives the planning period, and a computer that realizes an objective function indicating the cost or greenhouse gas emissions incurred by supplying power to the load 12 during the planning period, and a processing unit 212 that minimizes the objective function, and a determination unit 213 that determines the capacity of the target facility for each unit period included in the planning period based on a processing result of the processing unit 212, the costs including a first cost of introducing the target facility during the planning period, a second cost of operating the target facility during the planning period, and a third cost to be paid to the electricity retailer during the planning period, and the processing unit 212 outputs the power generation amount and the power purchase amount that minimize the objective function with satisfying the power demand during the planning period as a first constraint condition.
[0140] According to such a program, the introduction or retirement of the target equipment during the planning period is taken into consideration, so that the planning period can be extended when determining the capacity in the operation plan of the target equipment.
[0141] The above-mentioned embodiment is for the purpose of facilitating understanding of the present invention, and is not intended to limit the present invention. Furthermore, the present invention can be modified or improved without departing from the spirit of the present invention, and it goes without saying that the present invention includes equivalents thereof. [Explanation of symbols]
[0142] 1. Microgrid 10 Power Lines 11 Power supply equipment 12 Load 2. Information processing equipment 200 CPU 201 Memory 202 Communication equipment 203 Storage device 204 Input Device 205 Output Device 206 Recording medium reader 203a Equipment information DB 203b Introduction price scenario DB 203c Power generation price scenario DB 203d Power purchase price scenario DB 203e Demand scenario DB 203f Emissions scenario DB 210 Reception 211 Reception 212 Processing section 213 Decision Section 3 Power system 30. Crossing gate
Claims
1. An information processing device that determines a capacity of a target facility for supplying power to a load connected to a microgrid during a predetermined planning period, a processing unit which sets an objective function indicating a cost or a greenhouse gas emission amount caused by supplying power to the load during the planning period, and sets either an amount of power generated by the target equipment at each time of the planning period or the capacity of the target equipment at each time of the planning period, and an amount of power purchased from an electricity retailer at each time as decision variables, and minimizes the objective function; a determination unit that determines a capacity of the target equipment for each unit period included in the planning period based on a processing result of the processing unit; Including, The cost is: A first cost for introducing the target equipment during the planning period; A second cost of operating the target facility during the planning period; and and a third cost to be paid to an electricity retailer during the planning period, outputting the amount of power generation and the amount of power purchase that minimize the objective function under a first constraint condition of satisfying the power demand in the planning period; Information processing device.
2. 2. The information processing device according to claim 1, a reception unit that receives the greenhouse gas emissions during the planning period as a second constraint condition, The processing unit includes: outputting the power generation amount and the power purchase amount that minimize the objective function under the second constraint condition; Information processing device.
3. 2. The information processing device according to claim 1, The target facilities include renewable energy power generation facilities. Information processing device.
4. 2. The information processing device according to claim 1, The unit period is one year, The amount of electricity generated and the amount of electricity purchased are amounts on a predetermined representative day of a year. Information processing device.
5. 5. The information processing device according to claim 4, The determination unit is determining, for each unit period, a capacity of the target equipment capable of generating power equivalent to the maximum value of the power generation amount for the representative day output by the processing unit; Information processing device.
6. An information processing method for determining a capacity of a target facility for supplying power to a load connected to a microgrid during a predetermined planning period, comprising: An information processing device, an objective function indicating the cost or greenhouse gas emissions incurred by supplying power to the load during the planning period, and either the amount of power generated by the target equipment at each time of the planning period or the capacity of the target equipment at each time of the planning period, and the amount of power purchased from an electricity retailer at each time are set as decision variables, and the objective function is minimized; determining a capacity of the target facility for each unit period included in the planning period based on a result of the minimizing step; Including, The cost is: A first cost for introducing the target equipment during the planning period; A second cost of operating the target facility during the planning period; and and a third cost to be paid to an electricity retailer during the planning period, In the minimizing step, outputting the amount of power generation and the amount of power purchase that minimize the objective function under a first constraint condition of satisfying the power demand in the planning period; Information processing methods.
7. An information processing program for determining a capacity of a target facility for supplying power to a load connected to a microgrid during a predetermined planning period, On the computer, a processing unit which sets an objective function indicating a cost or a greenhouse gas emission amount caused by supplying power to the load during the planning period, and sets either an amount of power generated by the target equipment at each time of the planning period or the capacity of the target equipment at each time of the planning period, and an amount of power purchased from an electricity retailer at each time as decision variables, and minimizes the objective function; a determination unit that determines a capacity of the target equipment for each unit period included in the planning period based on a processing result of the processing unit; Realize this, The cost is: A first cost for introducing the target equipment during the planning period; A second cost of operating the target facility during the planning period; and and a third cost to be paid to an electricity retailer during the planning period, The processing unit includes: outputting the amount of power generation and the amount of power purchase that minimize the objective function under a first constraint condition of satisfying the power demand in the planning period; Information processing program.
Citation Information
Patent Citations
JP244127A