Encoding method, encoding apparatus, program, and recording medium for agricultural water-use facilities

The encoding method and device provide a standardized digital format for agricultural irrigation facilities by assigning unique codes to facility and waterway components, enabling efficient national database creation and information sharing.

JP2024152551APending Publication Date: 2024-10-25NAT AGRI & FOOD RES ORG
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023132022
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-14
Filing Date
2023-08-14
Publication Date
2024-10-25

AI Technical Summary

Technical Problem

Agricultural irrigation facilities are often located in complexly branched waterways, and the information on these waterways is created and stored using diverse and non-standardized methods, making it difficult to convert data into a common digital format for national databases.

Method used

An encoding method and device that assigns unique facility and waterway codes to agricultural irrigation facilities, allowing for the conversion of their configuration into a common digital format by analyzing connection relationships and encoding the route configuration using a linear notation system.

Benefits of technology

Enables the conversion of agricultural irrigation facilities into digital data in a common format, facilitating the creation of a national database and easy sharing of information.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024152551000001_ABST
    Figure 2024152551000001_ABST
Patent Text Reader

Abstract

To provide a method for converting the constitution of nationwide agricultural water-use facilities into digital data in a common form.SOLUTION: Provided is an information processing method that causes at least one processor to execute: an acquisition step (S11) of acquiring data that contains information indicating supplementary facilities of an agricultural water-use facility and information indicating a water channel between two supplementary facilities; an analysis step (S12) of analyzing a connection relationship between supplementary facilities and the water channel from data acquired by an acquisition unit; an encoding step (S13) of encoding a channel configuration of the agricultural water-use facility on the basis of the connection relationship analyzed by the analysis unit; wherein the encoding step (S13) includes: a step of assigning a facility code, which is a unique character string including one or more alphabetic characters, numbers, or symbols for each type, to the supplementary facility; a step of assigning a water channel code to a water channel, the water channel code being a unique character string including one or more alphabetic characters, numbers, or symbols for each type; and a step of arranging the facility code and the water channel code in a connection order of agricultural water-use facilities.SELECTED DRAWING: Figure 10
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an encoding method, an encoding device, a program, and a recording medium for an agricultural irrigation facility. [Background technology]

[0002] Based on the "Basic Policy for Reforms Toward the Realization of a Digital Society" approved by the Cabinet at the end of 2020, various initiatives are being implemented. For example, the Ministry of Agriculture, Forestry and Fisheries is planning to build a digital data platform for irrigation facilities. However, there are areas where even basic information required for maintenance, such as hydraulic profiles and plans, has not been digitized for irrigation facilities that are already in operation and maintained.

[0003] Furthermore, it is not easy to master CAD and geographic information applications for creating digital information on the locations and connections of irrigation facilities.In addition, since there are no common rules for describing the individual facilities and connections that make up irrigation facilities when displaying their locations and connections, even if digital drawings are created, it may be difficult to ensure consistency with digital drawings created by others.

[0004] For example, Patent Document 1 discloses a river section search method that enables automatic search of river sections. Specifically, river section line data within river basins nationwide is assigned regular river section IDs (e.g., numbers) that enable regular distinction of river name, river basin, upstream, downstream, and merging direction based on geographic information. Then, the regularity of the river section IDs is used to automatically search for river sections (extraction of all river sections in the upstream basin that flow into an arbitrary river section, and the downstream route of the river from an arbitrary river section to the sea). For example, the processing unit sets a reference river section ID that serves as a search standard, and classifies each river section ID as either "upstream" or "downstream" or "neither upstream nor downstream" from the reference river section ID based on each river section ID and the reference river section ID stored in the memory unit. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2005-316519 A Summary of the Invention [Problem to be solved by the invention]

[0006] In agricultural irrigation facilities, many facilities are located along waterways that branch in a complex manner, but the waterway information is created and stored by the operators who have jurisdiction over each waterway according to their own rules or methods. This makes it difficult to digitize the data based on common specifications, and therefore difficult to create a database. Even if we try to address this problem, there is no data notation method that can be commonly applied to waterways across the country, and the technology described in Patent Document 1 cannot be used.

[0007] One aspect of the present invention aims to provide a method for digitizing the configurations of irrigation and drainage facilities across the country in a common format. [Means for solving the problem]

[0008] In order to solve the above problems, an information processing method according to one embodiment of the present invention is an information processing method that causes at least one processor to execute an acquisition process for acquiring data including information indicating ancillary facilities of an agricultural irrigation facility and information indicating a waterway provided between two of the ancillary facilities, an analysis process for analyzing the connection relationship between the ancillary facilities and the waterway from the data acquired by the acquisition unit, and an encoding process for encoding the route configuration of the agricultural irrigation facility based on the connection relationship analyzed by the analysis unit, wherein the encoding process includes a step of assigning a facility code, which is a unique string of one or more alphabets, numbers, or symbols for each type, to the ancillary facilities, a step of assigning a waterway code, which is a unique string of one or more alphabets, numbers, or symbols for each type, to the waterway, and a step of arranging the facility code and the waterway code in the order of connection of the agricultural irrigation facilities.

[0009] In addition, an encoding device according to one embodiment of the present invention includes an acquisition unit that acquires data including information indicating ancillary facilities of an agricultural irrigation facility and information indicating a waterway located between two of the ancillary facilities, an analysis unit that analyzes the connection relationship between the ancillary facilities and the waterway from the data acquired by the acquisition unit, and an encoding unit that encodes the route configuration of the agricultural irrigation facility based on the connection relationship analyzed by the analysis unit.

[0010] The encoding device according to each aspect of the present invention may be realized by a computer. In this case, the encoding program of the encoding device that realizes the encoding device in a computer by causing the computer to operate as each part (software element) of the encoding device, and the computer-readable recording medium on which it is recorded, also fall within the scope of the present invention. Effect of the Invention

[0011] According to one aspect of the present invention, the configuration of agricultural irrigation facilities across the country can be digitized into a common format. [Brief description of the drawings]

[0012] [Figure 1] 1 is a table showing types of incidental facilities and symbols assigned thereto according to the first embodiment of the present invention. [Diagram 2] This is an example of a schematic diagram showing the connection relationship between the auxiliary facilities of an agricultural irrigation facility and a waterway. [Diagram 3] This is a table showing an example of the symbolic representation of the hydraulic facility with the configuration shown in Figure 2, and an example of information regarding the auxiliary equipment and waterway of the hydraulic facility. [Figure 4] FIG. 1 is a schematic diagram showing an example of a route configuration of an agricultural irrigation facility including a branch canal. [Diagram 5] FIG. 1 is a schematic diagram showing an example of a route configuration of a water facility including complex branch channels. [Figure 6] FIG. 1 is a schematic diagram showing an example of a route configuration of a water facility including a complex bypass. [Figure 7]FIG. 11 is a schematic diagram showing another example of a route configuration of a water utilization facility including a complex bypass. [Figure 8] FIG. 1 is a schematic diagram showing an example of a route configuration of a water facility including complex branches and bypasses. [Figure 9] FIG. 11 is a block diagram showing the configuration of an encoding device according to a second embodiment of the present invention. [Figure 10] 1 is a flowchart showing a flow of an information processing method S1 executed by at least one processor. [Figure 11] 13 is a flowchart showing a specific flow of the encoding process executed in step S13 of the information processing method S1. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] [Embodiment 1] An embodiment of the present invention will be described in detail below. A method for encoding the configuration (route configuration) of an irrigation facility in accordance with a predetermined rule will be described below. First, the terms related to the irrigation facility used in this embodiment will be described.

[0014] (Agricultural irrigation facilities) An agricultural irrigation facility refers to the entire water supply facility laid between the water source where agricultural water (hereinafter simply referred to as "water") is obtained and the final water supply destination. In this embodiment, the agricultural irrigation facility is classified into ancillary facilities and water channel facilities. In this embodiment, the water channel facility includes a pipeline facility and an open water channel facility, which are basically straight. Pipes that are not straight and have bends (i.e., have curved sections), branch pipes (T-shaped pipes, cross pipes, etc.), and dead-end pipes are classified as ancillary facilities rather than pipeline facilities. A pipeline facility is a water channel that is sealed watertight with circular, rectangular, or other piping. The material is any material, such as metal, concrete, or reinforced plastic. However, the concept described in this embodiment can be applied not only to pipeline facilities but also to open water channel facilities. An open water channel is a water channel with an open top. Ancillary facilities are facilities installed between water channels or at the start or end of an agricultural irrigation facility. Specific examples of ancillary facilities will be described later using a separate table. In the following, "agricultural irrigation facilities" will also be referred to simply as "irrigation facilities." Additionally, "waterway facilities" will also be referred to simply as "waterways."

[0015] (Main and branch canals) A waterway facility that conveys agricultural water from a water source to a water distribution facility is called a water supply channel, and a waterway facility that distributes water from a water distribution facility to a field is called a water distribution channel. A water supply channel is a main waterway, and a water distribution channel is a branch waterway. A water supply channel has an upstream end and a downstream end. A water distribution channel is connected to a water supply channel by branching or merging. When looking from the upstream end of a main waterway or a branch waterway to the downstream end, the right side is called the right bank side, and the left side is called the left bank side. Many water facilities are branched along the way. Water facilities at the branch end are called branch waterways. In the following explanation of the embodiment, a single route that connects a water facility from a start point to an end point is also called a main waterway, and a route branched from a main waterway is called a branch waterway. Unless otherwise specified, waterways that further branch from a branch waterway are also called branch waterways. When a main canal branches, it is up to the discretion of which of the branched canals to designate as the main canal and which as the branch canal. In the following, the "main canal" will be referred to simply as the "main line," and the "branch canal" will be referred to simply as the "branch." However, within a branch canal, no distinction is made between the main line and the branch canal at the branch.

[0016] (Coding of auxiliary facilities) Next, the coding of the ancillary facilities will be described. FIG. 1 is a table showing the types of ancillary facilities and the codes assigned thereto. The code is a character string consisting of one or more alphabets, numbers, or symbols, which is unique for each type. The specific code can be set arbitrarily. The code given to the ancillary facility is called a facility code. The facility code is a unique character string consisting of one or more alphabets, numbers, or symbols, which is assigned to the ancillary facility for each type of the ancillary facility. In this embodiment, for convenience, a code (character) consisting of only one character will be called a "code string" or a "character string". In the following, the code string (character string) is written in full-width characters, but it may be in half-width characters.

[0017] As shown in Figure 1, the ancillary facilities include pipelines (irregular pipes) other than straight pipelines. These are called water-passing facilities. As shown in the figure, water-passing facilities include, for example, T-shaped pipes, cross pipes, curved pipes, pipes that suddenly contract and expand, and dead-end pipes. Water-passing facilities are ancillary facilities used when connecting ancillary facilities other than water-passing facilities to waterways (straight pipes). The pairs of ancillary facility names and symbols shown in Figure 1 do not cover all of the ones in the real world, and new ones may be added as necessary.

[0018] Ancillary facilities other than water flow facilities include adjustment facilities, pressure regulating facilities, pump facilities, water distribution facilities, water metering facilities, ventilation facilities, protection facilities, management facilities, and other related facilities. Adjustment facilities are facilities that adjust the amount of water supplied or received. Pressure regulating facilities are facilities that adjust the water supply pressure. Pump facilities consist of pumps and their related facilities. Water distribution facilities are facilities that allocate water destinations. Water metering facilities are facilities that acquire the amount of water supplied and related information. Ventilation facilities are facilities that adjust the air pressure within water channels. Protection facilities are facilities that increase the safety of water facilities. Management facilities are facilities that manage water transmission and distribution.

[0019] (Waterway coding) As with the ancillary facilities, a code is assigned to each waterway (straight pipe), which is a unique character string consisting of one or more alphabets, numbers, or symbols (not shown). The code assigned to a waterway is called a waterway code. A waterway code is a unique character string consisting of one or more alphabets, numbers, or symbols assigned to each waterway type. Examples of waterway codes include "-", "=", and "#". "-" is a code indicating a straight pipe line having a flexible joint. A flexible joint is a joint structure that is inserted and fixed into the connected ancillary facility. "=" is a code indicating a straight pipe line having a rigid joint. A rigid joint is a joint structure that is fixed to the connected ancillary facility by welding or the like. "#" is a code indicating a straight pipe line having a chain joint. A chain joint is a joint structure that has a return structure. By definition, the waterway code is basically placed between the facility code and the facility code, but as described below, it can be omitted in some cases. In the following, the ancillary facilities and the waterway may be collectively referred to simply as the "facilities."

[0020] The facility codes and waterway codes mentioned above are merely examples, and different codes may be assigned. The classification of ancillary facilities and waterways mentioned above corresponds to the way in which straight pipes are represented on actual maps, with straight lines and other ancillary facilities represented by dots (circles). However, the classification method is not limited to the above, and classification may be based on a different approach.

[0021] (Schematic diagram of connections) Next, a method of expressing the connection relationship between ancillary facilities and waterways using a schematic diagram will be described. A schematic diagram can also be basic data for encoding the connection relationship using a facility code and a waterway code. As an example, a schematic diagram can express ancillary facilities as a circle including a code indicating the facility, and a waterway connecting two adjacent circles (ancillary facilities) as a straight line. This schematic diagram will be described below. When expressing in a schematic diagram, circles may be omitted for T-shaped pipes, curved pipes, or cross pipes, and T-shaped pipes may be expressed with a T-shaped line, and cross pipes may be expressed with a cross-shaped line.

[0022] When an ancillary facility is connected to an upstream ancillary facility and a downstream ancillary facility by a waterway, the facility is connected to the upstream ancillary facility and the downstream ancillary facility by two lines. In this case, the facility is said to have two lines. The number of lines an ancillary facility has is called its degree. For example, an ancillary facility with two lines is said to have degree 2. Examples of ancillary facilities with degree 2 include bent pipes, sudden contraction and expansion pipes, stand-type pressure regulating facilities, valve-adjustable pressure regulating facilities, pressure reducing valves, pumps, pressure tanks, flow meters, safety valves, sludge removal facilities, expansion and contraction flexible joints (special joints), anti-detachment joints, water control valves, and check valves.

[0023] Ancillary facilities where water branches off or joins are also called "branching and merging facilities." Branching and merging facilities correspond to facilities with three or more lines (i.e., a degree of three or more). Branching and merging facilities include, for example, T-shaped pipes, closed-type water division works, cross pipes, regulation ponds, farm ponds, stand-type pressure adjustment facilities, float-type pressure adjustment facilities, suction tanks, discharge tanks, stand-type water division works, and sludge removal facilities.

[0024] For example, two-way junctions include T-shaped pipes, closed-type diversion works, and sludge removal facilities, while three-way junctions include cross pipes. Other junctions do not have a set number of waterways that branch or merge.

[0025] Junctions and junctions can be classified according to the number of lines they have as follows: A junction facility with three lines (order 3): T-pipe, closed-type water distribution works, sludge removal facilities, etc. A junction facility with four lines (order 4): a cross pipe. Branching and confluence facilities with an indefinite number of lines (order undecided): Regulating ponds, farm ponds, float-type pressure regulating facilities, surge tanks, one-way surge tanks, suction tanks, discharge tanks, stand-type water distribution works, etc.

[0026] FIG. 2 is an example of the schematic diagram showing the connection between the auxiliary facilities of an agricultural irrigation facility and the waterway. In the example shown in FIG. 2, a main waterway from a pump P to a farm pond F and a branch waterway that branches off from the main waterway at a T-shaped pipe T and continues to a water faucet H via a curved pipe L are shown. As shown in the figure, the T-shaped pipe T and the curved pipe L are not explicitly shown, and the T-shaped pipe T is shown as a T-shaped line and the curved pipe L is shown as an L-shaped line, respectively. In addition, a straight waterway connects the pump P to the T-shaped pipe T, but the waterway is shown as a straight line. Straight waterways connect the T-shaped pipe T to the farm pond F, the T-shaped pipe T to the curved pipe L, and the curved pipe L to the curved pipe L, but the waterways are shown as straight lines.

[0027] There are two types of ancillary facilities: those that only connect to the upstream side, and those that only connect to downstream waterway facilities. Ancillary facilities that only connect to downstream waterway facilities are the starting points of agricultural irrigation facilities. Ancillary facilities that only connect to upstream facilities are the end points of agricultural irrigation facilities. The starting and ending points are the ends of the waterway, and are called "border points." Ancillary facilities that represent border points have one line. Ancillary facilities that have one line (degree 1) and represent border points include water hydrants, water hydrants (double as air valves), dead-end pipes, vent stands, air valves, water hammer buffer devices, dams, headworks, etc.

[0028] (Encoding rules for the connection relationships of irrigation and drainage facilities) Next, we will explain the rules for encoding and representing the configuration of irrigation facilities using facility codes and waterway codes. The configuration of irrigation facilities can be represented as a stack of connection relationships (connection information) that show how ancillary facilities and waterways are connected. Below, the notation system that encodes the overall connection relationships of irrigation facilities according to specific rules is referred to as the linear notation system for irrigation facilities, SIFILES (Simplified Irrigation Facilities Input Line Entry System).

[0029] The basic rule is to arrange the facility code and waterway code in the order in which the irrigation facilities are connected. Not only is the main waterway code, which is an arrangement of the facility code and waterway code of the main waterway, assigned to branch waterways, but also to the ancillary facilities and waterways contained in the entire branch waterway, with the facility code and waterway code arranged in the order of connection. Normally, the facility code and waterway code of the main waterway are arranged from upstream to downstream along the flow of the water. However, the waterway code may be omitted. In other words, even if the facility codes are written consecutively, this basically means that the waterway code between two facility codes is omitted. Note that if there are multiple branch waterways, there may be no main waterway.

[0030] The method of arranging the main channel code and the branch channel code will be described in detail below. In the following, the character string in which the facility code and the channel code are arranged will be referred to as a "(linear) notation formula" or simply as an "formula."

[0031] The branch canal code of the branch line branching off from the branching and merging facility is arranged after a unique character string consisting of one or more letters, numbers, or symbols indicating the presence of a branched irrigation facility. For example, parentheses "(" are used as a unique character string indicating the presence of a branched irrigation facility. In other words, the branch canal code is written after the parentheses "(", and the branch canal code is closed with a closing parentheses ")". The code string downstream of the main line is written after the closing parentheses ")". If the order of the ancillary facilities is considered as the direction of a digraph, the number of digraphs leaving the branching and merging is the out-degree, and the number of digraphs pointing towards the branching and merging is the in-degree. Also, one of the digraphs leaving the branching and merging is the main canal. Therefore, there are as many branch canals branching off as the out-degree -1, and the number of "()"s representing branch canals is also the out-degree -1.

[0032] When branches or merges, the order in which the branch line's ancillary facilities and the main line's ancillary facilities are described is as follows: the ancillary facilities on the branched waterway (branch line) side are described first, followed by the ancillary facilities on the main line. For example, if a water faucet H is connected to the branched waterway at a T-pipe (degree 3), and a farm pond F is connected to the main line, the number of "()"s is the outdegree -1, so there will be only one, and it will be described as T(H)F, with (H) on the branch line side and F on the main line side.

[0033] Figure 3 is a table showing examples of how the hydraulic facility with the configuration shown in Figure 2 is represented by a code, and an example of how to write information about the facility's ancillary facilities and waterways. An example of how the hydraulic facility with the configuration shown in Figure 2 is represented by a code using the above rules is shown in the top row of Figure 3. The main waterway in Figure 2 runs from pump P via T-shaped pipe T to farm pond F, so it is represented by the code "PTF." Meanwhile, branch waterway "LH" branches off from T-shaped pipe T, so the whole is written as "PT(LH)F." Note that Figure 3 also shows an example of how to write information about the ancillary facilities and waterways, but examples of how to write this information will be discussed later.

[0034] In the case of a cross pipe, unlike a two-way branch T pipe, it branches in three directions, but like a T pipe, the order of the following symbols is the ancillary facilities on the branch pipe side, followed by the ancillary facilities on the main pipe side. However, the order of the branches is from right to left when viewed from upstream, in terms of the direction in which they branch off from the main line. For example, if two branch lines are connected to a water hydrant and a farm pond is connected to the main line, it is written as C(H)(H)F, with the first (H) being the branch waterway that branches off to the right of the main line when viewed from upstream to downstream, and the second (H) being the branch waterway that branches off to the left. For other branching and merging facilities where the number of branches is not yet determined, the branching direction is from right to left according to the order in which the branches are written. However, in the case of a branch canal on the left bank, the branching direction is written in parentheses from the left canal to the right canal.

[0035] When a branch canal that branches off from a main canal rejoins the main canal, it is called a bypass. When describing a bypass, a subscript number is added after the symbol representing the terminal facility on the branch from the branching / merging facility to distinguish it from a simple branch.

[0036] The number of lines to which an ancillary facility can be connected (hereafter referred to as the number of lines) can be specified inside the symbols "[]". Therefore, an ancillary facility with multiple lines can also become a boundary point by writing "[]" immediately after the alphabet representing the facility and writing the number of lines as 1 inside the brackets, when it is located at a boundary point. However, the locations where "[]" can be written are not limited to the ends of the entire waterway that can become boundary points, but can be written at any location throughout the entire waterway, and the number of lines can be changed. For example, if a pump with two lines is to be set as an upstream boundary point, the number of lines can be changed to 1 by writing P[1].

[0037] When a branch waterway represents a pipeline or bypass, if the facility at the end of the branch waterway represents a boundary point, that is, if the last letter in the symbol "()" indicates a boundary point, the boundary point is not connected to the main line. The facility that represents the branch and junction in the branch waterway connects to the main line.

[0038] If the number of lines is specified in "[]" for ancillary facilities, the branch subscript number should be written immediately after the "[]".

[0039] When expressing a bypass, the subscript number representing the last ancillary facility in parentheses indicates that there is a detour channel (bypass) between facilities representing branching and merging with the same subscript number. In other words, the detour channel in parentheses of ancillary facilities with the same subscript number at their end indicates the branching at the branching and merging facility immediately before it, and the merging at the ancillary facility with the same subscript number. More specifically, the first is an ancillary facility connected to the beginning of the detour channel, and the second and subsequent are ancillary facilities connected to the end of the detour channel.

[0040] For example, the linear expression of a bypass channel composed of multiple bends L and a water control valve V is (LLLVLL1), and if the main line branches and merges at a T-junction, the linear expression of the bypass structure of the main line and branch line is T(LLLVLL1)T1.

[0041] In the above case, the second and subsequent ancillary facilities representing the branch and junction with the same subscript number are ancillary facilities connected to the end of the detour channel.

[0042] When describing a pipeline network or bypass, if there are two or more identical suffix numbers following a branch or junction facility, this indicates the existence of multiple detour channels.

[0043] When adding and connecting ancillary facilities to another ancillary facility, use an underscore "_" to connect them. For example, when installing a thrust block Bt on bend L, an underscore "_" is placed between the ancillary facility and the thrust block, writing "L_Bt." A thrust block is a block that fixes a pipeline, and is a facility that does not have a single line (or has 0 lines). In addition to thrust blocks, other facilities that do not have a single line include water level gauges, pressure gauges, and spillways.

[0044] (Import of hydraulic profile information) Also, the individual information of the waterway may be attribute items of the waterway and data of the attribute items arranged between character strings indicating the presence of the individual information. For example, the symbol "[]" may be used as a character string indicating the presence of the individual information. For example, in the case of a waterway having a flexible joint structure described with "-", the information of the waterway can be described as "-[Upstream planned height, soil cover, hydrostatic pressure, dynamic water pressure] pipe type, outer diameter [Downstream planned height, soil cover, hydrostatic pressure, dynamic water pressure]-" using the symbol "-" indicating a waterway having a flexible joint structure and the symbol "[]" indicating the presence of the individual information. Here, the planned height, soil cover, hydrostatic pressure, dynamic water pressure, and outer diameter are described as their respective numerical values. The units are as follows. Also, the pipe type is described with the following symbols. Planned height Unit: m Decimal points: 2 digits -Soil cover Unit: m Decimal points: 2 digits Hydrostatic pressure Unit: m Decimal points: 2 digits Dynamic water pressure Unit: m Decimal points: 2 digits Pipe types: SP (steel pipe), VP (PVC pipe), PE (polyethylene pipe), DCIP (ductile iron pipe), FRPM (reinforced plastic pipe), RC (concrete pipe), PC (precompressed pipe), ACP (asbestos pipe) Outer diameter Unit: mm (millimeter) Decimal places: 0 digits.

[0045] The above method of describing the individual information of waterways makes it easy to incorporate information described in hydraulic longitudinal sections, and thus makes it easy to build an integrated database that includes existing information.

[0046] Symbols may be omitted for channels with rigid joints. Symbols may not be omitted for channels with non-rigid joints (flexible and chain structures). For example, symbols may be abbreviated as follows: (1) When the waterway between the control valves is a flexible or chain structure "VV" (for flexible joints) or "V#V" (for chain joints) (2) When the waterway between the water control valves is a rigid joint "V=V" or "VV" (both for rigid structural joints).

[0047] Based on the above premise, specifically, for example, waterway information can be described as follows: (1) If the upper end of a pipe type vp with an outer diameter of 600 mm has a planned height of 80.00 m, soil cover of 1.00 m, static water pressure of 100.00 m, and dynamic water pressure of 90.00 m, and the lower end has a planned height of 78.00 m, soil cover of 1.00 m, static water pressure of 100.00 m, and dynamic water pressure of 98.00 m, then: V=[80,1,100,90]vp,600[78,1,100,98]=V It can be written as: (2) If you just want to express that the PVC pipe between the water control valves is a TS fitting, you can leave out the comma and write it as follows. V=[,,,]vp,[,,,]=V

[0048] A part of the string of characters for a certain group of irrigation facilities may be written using a substitution code and an identification number. For example, the notation for a certain group of irrigation facilities (such as an entire branch canal) can be replaced by using the substitution code "x" and adding an additional number (identification number) as necessary. "x" is a lower case letter, not an upper case letter. The replacement formula using the substitution code "x" is written on the line following the appearance of the letter "x". For example, if the two downstream branch canals branched off at a T-shaped pipe are replaced with "x1" and "x2", they can be written as the following notation: T(x1)x2 x1 :: …… (in "……" write the code showing the configuration of branch waterway 1) x2 :: …… (In "……" write the code showing the configuration of branch waterway 2) However, "::" indicates replacement. The use of such substitution symbols reduces the number of characters, which has the advantage that the structure is easier for users to understand when they look at the character string.

[0049] If the formula is long and you want to start a new line, write "+" at the end of the line and then start the new line. Write a period "." at the end of the formula to indicate the end of the formula for the water facility.

[0050] (Comments or information) Individual information about irrigation facilities (comments or information that are not symbols) may be written in the notation formula. The individual information may be written after a character string indicating the presence of the individual information. For example, when writing individual information on a single line, it is written after the character string " / / " indicating the presence of the individual information. If the individual information spans multiple lines, the individual information may be written on the line following " / *", and the end of the individual information may be indicated by adding "* / " to the line following the individual information. By writing attributes after the @ mark, information such as the project name, construction name, drawing name, drawing number, survey time, and designer name can be written in the individual information. A multi-line comment can be written, for example, as follows: / * @Project name Reiwa 〇〇〇〇Irrigation and drainage project @Project name XX trunk irrigation project @Drawing name XX main waterway @Drawing number 〇〇-〇〇 @Survey period: October 0, 2020 @Designer name 〇〇Construction * /

[0051] (Individual information on ancillary facilities and waterways) The individual information may include a facility code or waterway code with a character string indicating the presence of the individual information, an attribute item of the associated facility or waterway, and data of the attribute item. When an associated facility is specified in a formula, for example, the symbol "@" is placed before the associated facility. For example, when describing the attribute information of a pump P in the notation formula "PT(LH)F" representing a waterway shown in Figure 2, according to the RDF (Resource Description Framework) format, after describing "@PT(LH)F" as shown in Figure 3, information such as "water pressure 85m" and "amplitude 20m" can be described as the attribute information of the pump P, separated by a space character. Here, "water pressure" and "amplitude" are predicates when the pump "@PT(LH)F" is the subject, and "85m" and "20m" are objects. In RDF, the subject, predicate, and object are described separated by spaces. Similarly, when writing information about an accident in which water leaked from bent pipe L, as shown in Figure 3, on the line following "PT(@LH)F", write the attribute information of that bent pipe L as "Latitude? 36.067982", "Longitude? 140.1645315", "Accident? Accident 1", and "Photo? http: / / example.com / jiko1.jpg", separated by spaces, to write information about the accident, the location where the accident occurred, and photo data of the accident.

[0052] Also, when specifying a waterway in an expression, put two symbols "@@" where the waterway is. For example, in the expression "PT(LH)F" which represents the waterway shown in Figure 2, if you write "PT(@@LH)F" as shown in Figure 3, the waterway between the T-shaped pipe T and the bend pipe L will be specified. Then, if you write "Length 1m, Outer diameter 0.2m" after starting a new line, it will indicate that the length of the waterway between the T-shaped pipe T and the bend pipe L is 1m and the outer diameter is 0.2m. Also, if you write "PT(L@@H)F" in the expression, it will indicate that the waterway between the bend pipe L and the water tap H will be specified. Then, if you write "Length 0.5m, Outer diameter 0.2m" after starting a new line, it will indicate that the length of the waterway between the bend pipe L and the water tap H is 0.5m and the outer diameter is 0.2m. The above method of description is one of the methods of description that follow the RDF (Resource Description Framework) format, which is a method of describing target information.

[0053] By linking individual information to ancillary facilities or waterways in the above-described manner, the user can obtain not only the route configuration but also related information.

[0054] You may also give names to the ancillary facilities. In that case, add parentheses "< >" after the symbol of the ancillary facility and write the name inside the parentheses. For example, if you want to add the name "Farm Pond No. 10" to the farm pond at the end of the irrigation facility written as "T(H)F", you can write it as "T(H)F<Farm Pond No. 10>".

[0055] The linear representation of hydraulic facilities (SIFILES) can be searched and parsed by programming languages ​​and applications using regular expressions. The unique strings are also expressed in a text format that can be processed by a text editor. Thus, the hydraulic facilities can be encoded and decoded by a computer.

[0056] SIFILES can be classified into three levels, L, M, and F, depending on the amount of information they contain. These are written as SIFILES-L, SIFILES-M, and SIFILES-F. However, comments can be written at any level.

[0057] L is an abbreviation for Light, and is written with only the symbols for auxiliary facilities and the branch symbol "()". For example, when valves are connected to both downstream sides of a T-shaped pipe, L is the version that is written only as "T(V)V".

[0058] M is an abbreviation for Medium, and is a version in which the symbols for the flexible joint waterway and the chain joint waterway, "-" and "#", have been added to the L version. For example, when a valve is connected to a flexible joint waterway, M is the version written as "VV".

[0059] F stands for Full, and is a version that adds waterway information to the waterway symbol. For example, F is the version written as "V=[80,1,100,90]vp,600[78,1,100,98]=V".

[0060] The reason for providing three levels, SIFILES-L, SIFILES-M, and SIFILES-F, is to allow for ease of introduction when assembling information on hydraulic facilities and to accommodate a variety of uses. For example, when drawing a picture, you start by drawing the outline and then gradually add finer details. By gradually adding information in SIFILES-L, SIFILES-M, and SIFILES-F, you can describe the overall picture of a hydraulic facility in detail. SIFILES-L can be used when only information on the connection between ancillary facilities and canals is required or when expressing master data, SIFILES-M when the joint structure of a canal is required, and SIFILES-F when information equivalent to that of a hydraulic longitudinal section is required.

[0061] Below, we explain a schematic diagram of the route configuration of an irrigation facility and an example of a notation when it is coded. Figure 4 is a schematic diagram showing an example of the route configuration of an irrigation facility including a branch channel. The starting boundary point is pump P, and the end boundary point is farm pond F. Basically, the left side of the diagram is the upstream side and the right side is the downstream side. Also, the upper side of the diagram is the upstream side and the lower side is the downstream side. Note that pump P and farm pond F are marked with "[1]" to indicate that there is only one line (channel) connected to them. Also, the line indicating the channel is indicated by a thick solid line if the channel has a joint with a rigid structure, a dotted line if the channel has a joint with a flexible structure, and a thin solid line if the channel has a joint with a chain structure.

[0062] The route configuration shown in Figure 4 has a pump P[1] as a main waterway, and ancillary facilities such as a T-shaped pipe T, a T-shaped pipe T, a T-shaped pipe T, and a farm pond F. A branch waterway BC41 branches off from the T-shaped pipe T, which is first placed downstream of the pump P[1]. In addition, branch waterways also branch off from the second and third T-shaped pipes T, and each is connected to a dead-end pipe E.

[0063] The ancillary facilities included in branch channel BC41 include, from upstream, a curved pipe L, a T-shaped pipe T, and a water hydrant H, with the water hydrant H being the boundary point of the end point. In addition, branch channel BC42 branches off from the T-shaped pipe T of branch channel BC41. The ancillary facilities included in branch channel BC42 include a cross pipe C, a curved pipe L, a curved pipe L1, a T-shaped pipe T1, a curved pipe L2, a T-shaped pipe T2, and a water hydrant H, with the water hydrant H being the boundary point of the end point.

[0064] The notation formula for the irrigation facilities shown in Figure 4 can be written as follows by representing branch waterways BC41 and BC42 with the dummy symbol "(x1)" and branch waterway BC42 with the dummy symbol "(x2)". P[1]=T(x1)=T(#E)=T(#E)=F[1]. x1 :: #LLT (x2)#H x2 :: #C(#L#L1#)(#T1#L2#)-T2-H

[0065] If we write the above expression without using substitution symbols, the entire linear expression becomes: P[1]=T(#LLT (#C(#L#L1#)(#T1#L2#)-T2-H)#H)=T(#E)=T(#E)=F[1]. It can be written as:

[0066] FIG. 5 is a schematic diagram showing an example of the route configuration of a water facility including a complex branch channel. In the example shown in FIG. 5, the starting point is the headworks Hw and the end point is the farm pond F[1]. The main line runs from the headworks Hw to the farm pond F[1], and there are branch channels BC51 and BC52 on the right and left banks of the main line, respectively. Specifically, there are two T-shaped pipes T between the headworks Hw and the farm pond F[1], from which the branch channels BC51 and BC52 branch off, respectively. The configuration of the branch channels will not be described in detail.

[0067] The notation of the irrigation facilities shown in Figure 5 can be written as follows, with branch canal BC51 represented by the dummy code (x1) and branch canal BC52 represented by the dummy code (x2). Hw=T(x1)=T(x2)#F[1]. x1 :: (#T(#LT(-L#H)#L#H)#L#C(#L#T1(#E)#)(#C1#H) -L#T1(-)#H x2 :: #T(#L#LL#T3#H)#L3#

[0068] If we write the above expression without using substitution symbols, the entire linear expression becomes: Hw=T(#T(#LT(-L#H)#L#H)#L#C(#L#T1(#E)#)(#C1#H) -L#T1(-)#H)=T(#T(#L#LL#T3#H)#L3#)#F[1]. It can be written as:

[0069] Figure 6 is a schematic diagram showing an example of the route configuration of an agricultural irrigation facility including a complex bypass. In the example shown in Figure 6, the start point of the main line is the headworks Hw, and the end point is the farm pond F[1]. Between the headworks Hw and the farm pond F[1], there are two T-shaped pipes T, two T-shaped pipes T1, one T-shaped pipe T2, and one T-shaped pipe T3. A bypass BC61 is provided on the right bank of the main line, and a bypass BC62 is provided on the left bank of the main line.

[0070] The notation of the irrigation facilities shown in FIG. 6 can be written as follows, with the bypass BC61 represented by the dummy code (x1) and the bypass BC62 represented by the dummy code (x2). Hw=T(x1)=T1#T(x2)=T1#T2=T3#F[1]. x1 :: #L#T1(-T1(=L#V-L3=)#)# x2 :: #LV=L2#

[0071] If we write the above expression without using substitution symbols, the entire linear expression becomes: Hw=T(#L#T1(-T1(=L#V-L3=)#)#)=T1#T(#LV=L2#)=T1#T2=T3#F[1]. It can be written as:

[0072] FIG. 7 is a schematic diagram showing another example of the route configuration of a water facility including a complex bypass. In the example shown in FIG. 7, the start point of the main line is the pump P[1] and the end point is the farm pond F[1]. Between the pump P[1] and the farm pond F[1], there are a T-shaped pipe T, a T-shaped pipe T1, and a T-shaped pipe T4. A bypass BC71 is provided between the T-shaped pipe T and the T-shaped pipe T1. Furthermore, a branch waterway BC72 is provided from the T-shaped pipe T of the bypass BC71. Then, from the T-shaped pipe T3 of the branch waterway BC72, it merges with the T-shaped pipe T4 of the main waterway via a bent pipe L4.

[0073] The notation of the irrigation facilities shown in Figure 7 can be written as follows, with the bypass BC71 represented by the arithmetic sign (x1) and the branch waterway BC72 represented by the arithmetic sign (x2). P[1]=T(x1)=T1=T4=F[1]. x1 :: #LLT(x2)#V1# x2 :: #C(#L#L2#)(#T2#L3#)#T3-L4#

[0074] If we write the above expression without using substitution symbols, the entire linear expression becomes: P[1]=T(#LLT(#C(#L#L2#)(#T2#L3#)#T3-L4#)#V1#)=T1=T4=F[1]. It can be written as:

[0075] FIG. 8 is a schematic diagram showing an example of the route configuration of a water facility including complex branches and bypasses. In the example shown in FIG. 8, the main waterway is from the headworks Hw to the farm pond F[1], and the bypasses are branched out in a complex manner from the main waterway. Therefore, the bypasses are grouped as follows. The T-shaped pipe T, the cross pipe C1, the cross pipe C2, and the T-shaped pipe T3 connected to the T-shaped pipe T, the T-shaped pipe T1, the T-shaped pipe T2, and the T-shaped pipe T3 of the main waterway are set as branch waterways BC81, the T-shaped pipe T, the cross pipe C1, the cross pipe C2, and the T-shaped pipe T3 connected from the branch waterway BC81 are set as branch waterways BC82, the T-shaped pipe T, the cross pipe C1, the cross pipe C2, and the T-shaped pipe T3 connected from the branch waterway BC82 are set as branch waterways BC83, and the bend pipe L, the T-shaped pipe T1, the T-shaped pipe T2, and the bend pipe L3 connected from the branch waterway BC83 are set as branch waterways BC84.

[0076] The notation of the irrigation facilities shown in FIG. 8 can be written as follows, when bypass BC81 is represented by the arithmetic code (x1), bypass BC82 is represented by the arithmetic code (x2), bypass BC83 is represented by the arithmetic code (x3), and bypass BC84 is represented by the arithmetic code (x4). Hw=T(x1)=T1#T2#T3#F[1]. x1 :: #T(x2)#C1(-C2(#T3#)#)# x2 :: #T(x3)#C1(#C2(#T3#)=)= x3 :: #T(x4)#C1(=C2(#T3#)#)# x4 :: #L#T1(#T2(#L3#)#)#

[0077] If we write the above expression without using substitution symbols, the entire linear expression becomes: Hw=T(#T(#T(#T(#L#T1(#T2(#L3#)#)#)#C1(=C2(#T3#)#)#) + #C1(#C2(#T3#)=)=)#C1(-C2(#T3#)#)#)=T1#T2#T3#F[1]. It can be written as:

[0078] The coding method for irrigation facilities explained above provides a method for digitizing the configurations of irrigation facilities nationwide in a common format, making it easy to share information on irrigation facilities nationwide and to organize it into a database (master data).

[0079] [Embodiment 2] Other embodiments of the present invention will be described below. For ease of explanation, the same reference numerals are given to members having the same functions as those described in the above embodiment, and the description thereof will not be repeated.

[0080] (encoding device 1) 9 is a block diagram showing the configuration of the encoding device 1 according to this embodiment. The encoding device 1 is a device for encoding the configuration of ancillary facilities of a irrigation facility and a waterway using the encoding method described in embodiment 1. As shown in the figure, the encoding device 1 includes an acquisition unit 11, an analysis unit 12, an encoding unit 13, at least one processor 14, and a memory 15.

[0081] The acquisition unit 11 executes an acquisition process to acquire data including information indicating ancillary facilities of an irrigation facility and information indicating a waterway provided between two of the irrigation facilities. The method by which the acquisition unit 11 acquires the information indicating the irrigation facility and the waterway is not limited. For example, the acquisition unit 11 may acquire a character string entered in a text editor, may acquire data in which a connection relationship is reconstructed from position information when the route of an irrigation facility is entered in Google Earth or GIS software, or may acquire information in which the type of irrigation facility is added as an attribute to an adjacency matrix and a connectivity matrix in graph theory. In addition, map data or computer graphics data obtained by scanning a map on which symbols, signs, numbers, etc. indicating the irrigation facility and the waterway are written may be acquired.

[0082] Alternatively, the acquisition unit 11 may acquire by scanning graph data (schematic diagram) showing the connection relationship between the auxiliary facilities of the agricultural irrigation facility and the waterway as described in the first embodiment. The graph data acquired by the acquisition unit 11 may be, for example, image data in which the auxiliary facilities are represented by nodes (circles) and the waterway is represented by edges (line segments) connecting the nodes, or may be text data. The map data or graph data acquired by the acquisition unit 11 may be created by the user or may be existing data.

[0083] The analysis unit 12 executes an analysis process to analyze the connection relationship between the incidental facilities and the waterway from the data acquired by the acquisition unit 11. The connection relationship is, in other words, the relationship between adjacent incidental facilities and the waterway, or the relationship between adjacent incidental facilities and incidental facilities. The analysis unit 12 may perform the analysis using regular expressions or a function that processes character strings in a programming language. The analysis unit 12 may perform image analysis on the scan data to read symbols, signs, numbers, etc. indicating the incidental facilities and the waterway, and analyze the connection relationship between the incidental facilities and the waterway. The analysis unit 12 may also analyze the connection relationship between the incidental facilities and the waterway based on graph theory. The connection relationship of the waterway described by SIFILES is a simple graph in graph theory, and can be expressed as a planar graph. The connection relationship includes boundary points (start point, end point), connection order, branching, bypass, etc. Note that when encoding a group of agricultural irrigation facilities, there is one start point, but there may be multiple end points.

[0084] The encoding unit 13 executes an encoding process for encoding the route configuration of the irrigation facility based on the connection relationships analyzed by the analysis unit 12. The encoding unit 13 encodes the entire route configuration of the irrigation facility by stacking the relationships between adjacent ancillary facilities and waterways, or between adjacent ancillary facilities. The encoding method can use the method (rule) described in the first embodiment. In the encoding processing device, in an object-oriented language, an ancillary facility containing a connected waterway facility is designed as a class, and if the instance is stored in an array, an encoded entity can be constructed in memory. In addition, the connection relationships between ancillary facilities and between ancillary facilities and a waterway facility can be converted into matrices based on graph theory to construct an entity in memory, which can be used for numerical analysis in hydraulic analysis and statistical analysis. A database of encoded irrigation facilities can be constructed by inputting attribute information into an RDF database by specifying the facility with the encoded character string "@". The code string (character string) that indicates the route configuration of the water utilization facility generated by the encoding unit 13 is output by an output unit (not shown) to a display device such as a display, a printing device such as a printer, a storage device, etc. The code string can be decoded into a schematic diagram of a graph structure, etc., using a decoding program.

[0085] The processor 14 can be configured using at least one general-purpose processor such as a Micro Processing Unit (MPU) or a Central Processing Unit (CPU). The memory 15 may include a plurality of types of memory such as a Read Only Memory (ROM) or a Random Access Memory (RAM). The memory 15 may also include an internal or external memory such as a Hard Disk Drive (HDD) or a Solid State Drive (SSD). As an example, the processor 14 realizes the functions of the acquisition unit 11, the analysis unit 12, and the encoding unit 13 by expanding various control programs recorded in the ROM of the memory 15 into the RAM and executing them. The processor 14 may also include a dedicated processor configured with an Application Specific Integrated Circuit (ASIC), a Field Programmable Gate Array (FPGA), a Programmable Logic Device (PLD), or the like.

[0086] In addition, a program for decoding data encoded by the encoding device 1 into a graph structure such as the schematic diagram described above can be constructed using a known programming language such as Java (registered trademark), JavaScript (registered trademark), or Python.

[0087] (Information processing method) Next, a description will be given of an information processing method executed by the encoding device 1. Fig. 10 is a flowchart showing the flow of the information processing method S1 executed by at least one processor 14 included in the encoding device 1. As shown in the figure, the information processing method S1 includes steps S11 to S13.

[0088] Step S11 is a step in which the acquisition unit 11 acquires data including information indicating ancillary facilities of the irrigation facility and information indicating a waterway provided between two ancillary facilities. Step S12 is a step in which the analysis unit 12 analyzes the connection relationship between the ancillary facilities and the waterway from the data acquired by the acquisition unit 11. Step S13 is a step in which the encoding unit 13 encodes the route configuration of the irrigation facility based on the connection relationship analyzed by the analysis unit 12. Details of each step are as explained in the functions of each part of the encoding device 1 above.

[0089] Next, a specific flow of step S13 will be described. Fig. 11 is a flowchart showing a specific flow of the encoding process executed in step S13. As shown in Fig. 11, step S13 includes steps S131 to S133.

[0090] Step S131 is a step in which the encoding unit 13 assigns a facility code, which is a unique character string consisting of one or more alphabets, numbers, or symbols for each type, to the ancillary facility. Step S132 is a step in which the encoding unit 13 assigns a waterway code, which is a unique character string consisting of one or more alphabets, numbers, or symbols for each type, to the waterway. Step S133 is a step in which the encoding unit 13 arranges the facility code and the waterway code in the connection order of the irrigation facilities. The specific contents of the encoding process performed by step S13 are as described in embodiment 1 as the encoding rules for the connection relationships of irrigation facilities.

[0091] The coding device 1 for irrigation facilities and the information processing method (coding processing method) executed by the coding device 1 described above can provide a method for digitizing the configurations of irrigation facilities nationwide in a common format, making it easy to share information on irrigation facilities nationwide and to organize it into a database (master data).

[0092] [Software implementation example] The functions of the encoding device 1 (hereinafter referred to as the "device") are a program for causing a computer to function as the device, and can be realized by a program for causing a computer to function as each part of the device.

[0093] In this case, the device includes a computer having at least one control device (e.g., a processor) and at least one storage device (e.g., a memory) as hardware for executing the program. The control device and storage device execute the program to realize each function described in each of the above embodiments.

[0094] The program may be non-transitory and may be recorded in one or more computer-readable recording media. The recording media may or may not be included in the device. In the latter case, the program may be provided to the device via any wired or wireless transmission medium.

[0095] In addition, some or all of the functions of each of the above units may be realized by a logic circuit. For example, an integrated circuit in which a logic circuit that functions as each of the above control blocks is formed is also included in the scope of the present invention. In addition, the functions of each of the above control blocks may be realized by, for example, a quantum computer.

[0096] The present invention is not limited to the above-described embodiments, and various modifications are possible within the scope of the claims. Embodiments obtained by appropriately combining the technical means disclosed in different embodiments are also included in the technical scope of the present invention.

[0097] 〔summary〕 (Aspect 1) An information processing method that causes at least one processor to execute an acquisition process that acquires data including information indicating ancillary facilities of an agricultural irrigation facility and information indicating a waterway provided between two of the ancillary facilities, an analysis process that analyzes the connection relationship between the ancillary facilities and the waterway from the data, and an encoding process that encodes the route configuration of the agricultural irrigation facility based on the connection relationship, wherein the encoding process includes a step of assigning a facility code, which is a unique string of one or more alphabets, numbers, or symbols for each type, to the ancillary facilities, a step of assigning a waterway code, which is a unique string of one or more alphabets, numbers, or symbols for each type, to the waterways, and a step of arranging the facility code and the waterway code in the order of connection of the agricultural irrigation facilities.

[0098] (Aspect 2) An information processing method as described in aspect 1, in which, in the encoding process, a branch waterway code is assigned to the ancillary facilities and the waterways included in the entire branched agricultural irrigation facility, with the facility code and the waterway code arranged in connection order.

[0099] (Aspect 3) An information processing method according to aspect 2, in which the branch waterway code is arranged after a unique string of one or more letters, numbers, or symbols indicating the existence of the branched agricultural irrigation facility.

[0100] (Aspect 4) 4. The information processing method according to any one of aspects 1 to 3, wherein in the encoding process, a part of the irrigation facility is represented by an alternate code and an identification number.

[0101] (Aspect 5) 5. The information processing method according to any one of aspects 1 to 4, further comprising a step of assigning, in the encoding process, a character string indicating the presence of individual information of the irrigation facility.

[0102] (Aspect 6) An information processing method as described in aspect 5, wherein the individual information includes the facility code or the waterway code to which the character string indicating the presence of the individual information is attached, attribute items of the associated facility or the waterway, and data of the attribute items.

[0103] (Aspect 7) An information processing method according to aspect 5 or 6, wherein the individual information is attribute items of the waterway and data of the attribute items arranged between the character strings indicating the presence of the individual information.

[0104] (Aspect 8) 8. The information processing method according to any one of aspects 1 to 7, wherein the unique character string is expressed in a text format that can be processed by a text editor.

[0105] (Aspect 9) An encoding device comprising: an acquisition unit that acquires data including information indicating ancillary facilities of an irrigation facility and information indicating a waterway provided between two of the ancillary facilities; an analysis unit that analyzes the connection relationship between the ancillary facilities and the waterway from the data acquired by the acquisition unit; and an encoding unit that encodes the route configuration of the irrigation facility based on the connection relationship analyzed by the analysis unit.

[0106] (Aspect 10) The encoding device described in aspect 9, wherein the encoding unit executes steps including the steps of assigning a facility code to the ancillary facility, which is a unique string of one or more letters, numbers, or symbols for each type; assigning a waterway code to the waterway, which is a unique string of one or more letters, numbers, or symbols for each type; and arranging the facility code and the waterway code in the connection order of the agricultural irrigation facilities.

[0107] (Aspect 11) An encoding program for causing a computer to function as the encoding device described in aspect 9, the encoding program causing a computer to function as the acquisition unit, the analysis unit, and the encoding unit.

[0108] (Aspect 12) A non-transitory computer-readable recording medium having recorded thereon the encoding program according to embodiment 11. [Explanation of symbols]

[0109] 1...Encoding device 11…Acquisition part 12…Analysis department 13...Encoding section 14…Processor 15…Memory

Claims

1. At least one processor, An acquisition process for acquiring data including information indicating auxiliary facilities of an agricultural irrigation facility and information indicating a waterway provided between two of the auxiliary facilities; An analysis process for analyzing a connection relationship between the ancillary facilities and the waterway from the data; an encoding process for encoding a route configuration of the irrigation facility based on the connection relationship, The encoding process includes: A step of assigning a facility code, which is a unique character string consisting of one or more alphabets, numbers, or symbols, to each of the incidental facilities for each type; A step of assigning a waterway code, which is a unique character string consisting of one or more letters, numbers, or symbols, to each waterway for each type of waterway; and arranging the facility code and the waterway code in the order of connection of the irrigation facilities. Information processing methods.

2. 2. The information processing method according to claim 1, wherein in the encoding process, a branch waterway code is assigned to the ancillary facilities and the waterways included in the entire branched agricultural irrigation facility in the order of connection of the facility code and the waterway code.

3. 3. The information processing method according to claim 2, wherein the branch waterway code is arranged after a unique character string consisting of one or more letters, numbers, or symbols indicating the presence of the branched agricultural irrigation facility.

4. 2. The information processing method according to claim 1, wherein in said coding process, a part of said irrigation facilities is represented by a base code and an identification number.

5. The information processing method according to claim 1 , further comprising a step of assigning, in the encoding process, a character string indicating the presence of individual information of the irrigation facility.

6. The information processing method described in claim 5, wherein the individual information includes the facility code or the waterway code to which the character string indicating the presence of the individual information is attached, attribute items of the associated facility or the waterway, and data of the attribute items.

7. 6. The information processing method according to claim 5, wherein the individual information is attribute items of the waterway and data of the attribute items arranged between the character strings indicating the presence of the individual information.

8. The information processing method according to claim 5 , wherein the unique character string is expressed in a text format that can be processed by a text editor.

9. An acquisition unit that acquires data including information indicating auxiliary facilities of an agricultural irrigation facility and information indicating a waterway provided between two of the auxiliary facilities; an analysis unit that analyzes a connection relationship between the ancillary facilities and the waterway from the data acquired by the acquisition unit; an encoding unit that encodes a route configuration of the irrigation facility based on the connection relationship analyzed by the analysis unit; An encoding device comprising:

10. The encoding unit is A step of assigning a facility code, which is a unique character string consisting of one or more alphabets, numbers, or symbols, to each of the incidental facilities for each type; A step of assigning a waterway code, which is a unique character string consisting of one or more letters, numbers, or symbols, to each waterway for each type of waterway; The encoding device according to claim 9 , further comprising a step of: arranging the facility codes and the waterway codes in an order of connection of the irrigation facilities.

11. 10. An encoding program for causing a computer to function as the encoding device according to claim 9, the encoding program causing a computer to function as the acquisition unit, the analysis unit, and the encoding unit.

12. A non-transitory computer-readable recording medium having the encoding program according to claim 11 recorded thereon.

Citation Information

Patent Citations

  • River section retrieving method, river section retrieving program, and recording medium with its program recorded thereon

    JP2005316519A