Method of managing tapped transformer, server, program, and power supply management system
By selecting a target parameter and using a probability density function to estimate the usable period, the method addresses the limitations of existing tapped transformer management systems, providing accurate predictions for timely maintenance and operation adjustments.
Patent Information
- Application Number
- JP2023067100
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-17
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2043-04-17
AI Technical Summary
Existing methods for managing tapped transformers, such as those described in Japanese Patent Application Publication No. 2017-158341, do not accurately account for individual device differences and daily power system variations, making it difficult to predict when a tapped transformer will become unusable.
A method that selects a target parameter correlated with tap changes, predicts its future value, and uses a probability density function to estimate the usable period of the transformer, allowing for better management and timely replacement or operational adjustments.
Enables more accurate and efficient management of tapped transformers by predicting their usable lifespan and facilitating proactive maintenance.
Smart Images

Figure 2024153299000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a method for managing a tapped transformer, a server, a program, and a power management system. [Background technology]
[0002] Tapped transformers are used for voltage regulation in substations of power systems. Tapped transformers regulate voltage by tap changing. The more the number of tap changes increases, the more the tapped transformer tends to deteriorate. Therefore, a monitoring device is provided for the maintenance of tapped transformers. The monitoring device calculates the number of tap changes of the tapped transformer and displays the obtained number of tap changes. A power system operator (TSO: system operator) visually checks the number of tap changes displayed by the monitoring device periodically (for example, once every few months or once every six months) and replaces parts of the tapped transformer before the number of tap changes exceeds a predetermined number of changes for service life. An example of a system operator is a power company.
[0003] Japanese Patent Laid-Open Publication No. 2017-158341 (Patent Document 1) discloses a technique for calculating an equivalent number of possible operations of a tapped transformer and displaying the obtained equivalent number of possible operations. The equivalent number of possible operations is an amount equivalent to the remaining number of tap changes up to the number of times of durable changes. An operator (system operator) periodically checks the equivalent number of possible operations, and replaces a part of the tapped transformer (e.g., a changeover switch) when the displayed equivalent number of possible operations approaches 0 (zero). [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2017-158341 A Summary of the Invention [Problem to be solved by the invention]
[0005] In Patent Document 1, the formula "NIm = (Im 2 / 200000In 2 )×600000" or "NIm=(Im 2 / 100000In 2 ) x 700,000 to calculate the number of possible operations. In each formula, "NIm" is the number equivalent to the number of times mechanical deterioration has occurred due to electrical deterioration, "Im" is the load current at the mth switching, and "In" is the rated current. However, these formulas do not necessarily hold for all tapped transformers. Depending on the tapped transformer, the above formulas may not hold due to individual differences in the device.
[0006] In addition, the number of tap changes per day may vary depending on the daily conditions of the power system. Therefore, even if the technology described in Patent Document 1 is applied to a power management system equipped with a tapped transformer, it is difficult for a user to know how many more days the tapped transformer will remain in use before it becomes unusable.
[0007] Due to the factors described above, the technology described in Patent Document 1 may not be able to properly manage tapped transformers.
[0008] Therefore, a primary object of the present disclosure is to provide a tap transformer management method, a server, a program, and a power management system that facilitate appropriate management of tap transformers. [Means for solving the problem]
[0009] The management method for a tapped transformer disclosed herein includes selecting a target parameter that is correlated with the number of tap changes of the tapped transformer from among a plurality of parameters related to the power supplied from a power system to the tapped transformer, obtaining a predicted value of the target parameter for a future period, and obtaining a probability density function of the usable period of the tapped transformer using the predicted value of the target parameter.
[0010] The power management system disclosed herein includes one or more tapped transformers provided in a power system, and a server that manages the one or more tapped transformers. The server is configured to execute the following operations: selecting a target parameter that is correlated with the number of tap changes of the tapped transformer from among a plurality of parameters related to power supplied from the power system to the tapped transformer, obtaining a predicted value of the target parameter in a future period, and obtaining a probability density function of the usable period of the tapped transformer using the predicted value of the target parameter. Effect of the Invention
[0011] The present disclosure makes it easier to properly manage tapped transformers. [Brief description of the drawings]
[0012] [Figure 1] 1 is a diagram illustrating a schematic configuration of a power management system according to an embodiment of the present disclosure. [Diagram 2] 4 is a flowchart showing the steps of a tapped transformer management method according to an embodiment of the present disclosure. [Diagram 3] FIG. 2 illustrates historical data for a tapped transformer in accordance with an embodiment of the present disclosure. [Figure 4] 11A and 11B are diagrams for explaining clustering and target parameter selection according to an embodiment of the present disclosure. [Diagram 5] FIG. 11 is a diagram for explaining a process for acquiring a second probability density function in the embodiment of the present disclosure. [Figure 6] FIG. 11 is a diagram for explaining a process for acquiring a first probability density function from a second probability density function in the embodiment of the present disclosure. [Figure 7] 11 is a flowchart showing a first control using a first probability density function in the embodiment of the present disclosure. [Figure 8] 11 is a flowchart showing a second control using a first probability density function in the embodiment of the present disclosure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. In the following, the same or corresponding parts in the drawings are denoted by the same reference characters, and their description will not be repeated in principle.
[0014] Fig. 1 is a diagram showing a schematic configuration of a power supply management system according to this embodiment. As shown in Fig. 1, the power supply management system 1 includes a server 100, an HMI (Human Machine Interface) 210, a mobile terminal 220, transformers 10A-10C, monitoring devices 20A-20C, and power generation facilities 30A-30C. A power system that supplies power to each consumer (such as a house or a factory) is constructed by power plants (including the power generation facilities 30A-30C) and a power transmission and distribution network (including the transformers 10A-10C).
[0015] The server 100 is configured to be able to communicate with each of the monitoring devices 20A-20C via the cloud CL. The server 100 is configured to collect information on the transformers 10A, 10B, and 10C from the monitoring devices 20A, 20B, and 20C via the cloud CL. The communication system is not limited to the mode shown in FIG. 1. The server 100 may be connected to each of the monitoring devices 20A-20C via a communication network (for example, the Internet) without via the cloud CL. The connection mode may be either wired or wireless.
[0016] The server 100 includes a processor 110, a RAM (Random Access Memory) 120, and a storage device 130. An example of the processor 110 is a CPU (Central Processing Unit). The storage device 130 is configured to be able to retain stored information. In this embodiment, the processor 110 executes a program stored in the storage device 130 to perform various controls (for example, controls shown in FIG. 2, which will be described later). The number of processors included in the server 100 is arbitrary, and may be one or more.
[0017] The HMI 210 functions as an interface between a user and the server 100. The HMI 210 includes an input device and a display device. The display device is controlled by the server 100. The HMI 210 may include a touch panel display. The HMI 210 may further include a smart speaker that accepts voice input, or may include a display device that performs AR (augmented reality) display.
[0018] The mobile terminal 220 is a terminal that can be carried by a user (e.g., an administrator of a transformer with a tap). The mobile terminal 220 is configured to be able to communicate with the server 100. In this embodiment, a smartphone equipped with a touch panel display is adopted as the mobile terminal 220. A smartphone has a built-in computer and a speaker function. However, the present invention is not limited to this, and any mobile terminal can be adopted as the mobile terminal 220. For example, a laptop, a tablet terminal, a portable game machine, a wearable device (e.g., a smart watch, smart glasses, or smart gloves), an electronic key, and the like can also be adopted as the mobile terminal 220.
[0019] The transformers 10A to 10C are provided in a power transmission and distribution network for supplying a predetermined amount of power to consumers. The transformers 10A, 10B, and 10C receive power from the power generation facilities 30A, 30B, and 30C, respectively, via the power transmission network. Each of the transformers 10A to 10C reduces the voltage of the power (for example, power with a voltage of 66 kV) from the power generation facility side and outputs the reduced voltage power (for example, power with a voltage of 6.6 kV) to the consumer side. The reduced voltage power is sent to the consumer through the power distribution network. In this embodiment, the power generation facility 30A is a renewable energy power plant, the power generation facility 30B is a nuclear power plant, and the power generation facility 30C is a thermal power plant. The renewable energy power plant is configured to generate power using renewable energy (RE). Examples of the renewable energy power plant include a solar power plant, a wind power plant, a hydroelectric power plant, a geothermal power plant, and a biomass power plant. However, the present invention is not limited to this, and the power generation facilities 30A to 30C may be power plants using the same power generation method.
[0020] Each of the transformers 10A to 10C is an on-load tap changer (LTC). In this embodiment, the transformers 10A, 10B, and 10C have the same structure, and therefore, hereinafter, when there is no need to distinguish between them, they will be referred to as "transformer 10". In this embodiment, the transformer 10 is a vacuum valve type LTC. The LTC switches the winding connection (tap) for voltage adjustment (changing the turn ratio) in the transformer in operation. Specifically, the transformer 10 includes a changeover switch 11 that switches the energizing current while the transformer is in operation, and a tap selector 12 that is connected to the winding of the transformer. The changeover switch 11 includes a vacuum valve with a contact sealed in a vacuum container. The tap selector 12 selects a tap to be operated from a plurality of terminals (taps) connected to the winding of the transformer, and the changeover switch 11 switches the circuit to the selected tap in an energized state. The vacuum valve prevents localized heating caused by arcing when a live contact is opened. Note that it is not essential that the transformers 10A to 10C managed by the server 100 have the same structure, and these transformers may have different structures.
[0021] The monitoring devices 20A, 20B, and 20C are configured to monitor the transformers 10A, 10B, and 10C, respectively. In this embodiment, the monitoring devices 20A, 20B, and 20C have the same structure, and therefore, hereinafter, when there is no need to distinguish between them, they will be referred to as "monitoring devices 20". The monitoring devices 20 are installed near the corresponding transformers 10. The monitoring devices 20 include an input sensor 21 that detects parameters (such as voltage, current, phase, and frequency) related to the power supplied from the power system (power transmission network) to the transformer 10, an output sensor 22 that detects parameters (such as voltage, current, phase, and frequency) related to the power output from the transformer 10 to the consumer (power load) side, a counter 23 that measures the number of tap changes of the transformer 10, and a controller 25 that controls the transformer 10. The controller 25 may be a control circuit or a computer. The controller 25 is configured to be able to communicate with the server 100. The controller 25 controls the transformer 10 so that stable power having a predetermined voltage is supplied to the consumer side, for example, based on the detection results by the input sensor 21 and the output sensor 22. Hereinafter, parameters related to the power supplied from the power system to the transformer 10 are referred to as "system parameters". In addition, the values of the system parameters measured using the detection results by the input sensor 21 are referred to as "system measurement values". The controller 25 may calculate active power using the detection results by the input sensor 21 and the output sensor 22. The active power corresponds to an example of a system parameter, and the calculated active power value corresponds to an example of a system measurement value.
[0022] The monitoring device 20 sequentially uploads (transmits) data related to the corresponding transformer 10 to the cloud CL. In this embodiment, the monitoring device 20 measures (counts) the number of tap changes of the transformer 10, and records the obtained measurement value of the number of tap changes (first measurement value) in the cloud CL (storage device) in association with the measurement date. Specifically, as shown in FIG. 1, the monitoring devices 20A, 20B, and 20C record the measurement values Na, Nb, and Nc of the number of tap changes for the transformers 10A, 10B, and 10C, respectively, in the cloud CL. In addition, the monitoring device 20 measures a plurality of types of system parameters including voltage, current, phase, frequency, and active power, and records these system measurement values (second measurement values) in association with the measurement time in the cloud CL (storage device). 1, the monitoring devices 20A, 20B, and 20C record the measured values Ga, Gb, and Gc of the system parameters related to the transformers 10A, 10B, and 10C, respectively, in the cloud CL. The server 100 can download (receive) data related to each of the transformers 10A to 10C (including the measured values Na, Nb, and Nc and the measured values Ga, Gb, and Gc) from the cloud CL.
[0023] FIG. 2 is a flowchart showing the procedure of the method for managing a tapped transformer according to this embodiment. The series of processes shown in this flowchart are executed for each transformer managed by the server 100. Hereinafter, a transformer to be processed (for example, any one of the transformers 10A to 10C shown in FIG. 1) is referred to as a "target transformer". In this embodiment, when a predetermined usage period has elapsed since the server 100 started using the target transformer, the series of processes shown in FIG. 2 are executed, and thereafter, the series of processes shown in FIG. 2 are executed every time a predetermined unit period elapses. That is, the series of processes shown in FIG. 2 are periodically and repeatedly executed. In this embodiment, the usage period is one year, and the unit period is one month. However, these periods can be set arbitrarily.
[0024] As shown in FIG. 2, server 100 first acquires historical data of the target transformer for a past period (hereinafter referred to as the "evaluation period") in step S11. For example, if the target transformer is transformer 10A, the historical data of the target transformer includes the measurement values Na and Ga (FIG. 1) during the evaluation period. The evaluation period can be set arbitrarily. In this embodiment, the period going back a predetermined time (more specifically, six months) from the present time is set as the evaluation period. However, the length of the evaluation period is not limited to six months and can be changed as appropriate.
[0025] FIG. 3 is a diagram showing an example of the history data of the target transformer acquired in step S11. As shown in FIG. 3, the history data D10 of the target transformer in this embodiment includes daily measurement values of the number of tap changes of the target transformer and multiple system parameters during an evaluation period (the most recent six months). Each measurement value is linked to a date. These measurement values are measured by the monitoring device 20 and uploaded to the cloud CL. The server 100 acquires the history data D10 from the cloud CL. The multiple system parameters in the history data D10 include, for example, voltage, current, phase, frequency, and active power. Note that the history data of the target transformer acquired in step S11 is not limited to the example shown in FIG. 3. The data interval is not limited to one day and is arbitrary. For example, the data interval may be two days, and the average measurement value for the two days may be linked to the dates of the two days.
[0026] In the series of processes shown in Fig. 2, when the process of step S11 is executed, the process proceeds to step S12. In step S12, the server 100 sequentially assigns each system parameter in the history data D10, and sequentially performs clustering of data indicating a relationship between one system parameter and the number of tap changes. Next, in step S13, the server 100 selects a system parameter (hereinafter referred to as a "target parameter") that is mutually related to the number of tap changes of the target transformer from among multiple types of system parameters in the history data D10. Fig. 4 is a diagram for explaining the above clustering (step S12) and target parameter selection (step S13).
[0027] As shown in Fig. 4, in this embodiment, the server 100 assigns system parameters in the history data D10, for example, a first parameter, a second parameter, a third parameter, ... in order, and plots data indicating a relationship between the measured values of the system parameters and the measured value of the number of tap changes in one day on a coordinate plane. For example, the voltage, current, phase, ... of the power supplied from the power system to the target transformer correspond to the first parameter, the second parameter, the third parameter, ..., respectively. In this embodiment, a number of data corresponding to the number of days for six months is plotted.
[0028] In the example shown in Fig. 4, a first data group including a plurality of data indicating the relationship between the measured value of the first parameter and the measured value of the number of tap switchings is classified into three groups (clusters) by clustering. More specifically, the first data group is divided into data P11 belonging to the first cluster, data P12 belonging to the second cluster, and data P13 belonging to the third cluster. In the example shown in Fig. 4, the first data group is clearly divided into three clusters. Moreover, the first parameter and the number of tap switchings have a relationship in which the first parameter increases as the number of tap switchings increases. This means that there is a high correlation between the first parameter and the number of tap switchings.
[0029] In addition, the second data group, which includes multiple data showing the relationship between the measured value of the second parameter and the measured value of the number of tap changes, is also divided into data P21, P22, and P23 belonging to the first, second, and third clusters, respectively, by clustering. However, the second data group is not sufficiently divided into three clusters, and the relationship between the second parameter and the number of tap changes is unclear. This means that the correlation between the second parameter and the number of tap changes is low.
[0030] In step S13 of FIG. 2, the server 100 uses the result of the clustering as described above to select, as a target parameter, a system parameter having the highest correlation with the number of tap changes from among a plurality of types of system parameters in the history data D10. For example, the server 100 may determine that the correlation is higher as the cluster division is clearer. The server 100 may also determine that the correlation between the two is higher as the change in the system parameter with an increase in the number of tap changes is more uniform. For example, if the system parameter increases as the number of tap changes increases, the correlation between them is high. Also, if the system parameter decreases as the number of tap changes increases, the correlation between them is high. If the system parameter increases or decreases regardless of the trend of change in the number of tap changes, the correlation between them is low. Note that the number of clusters in the clustering is not limited to three and can be changed as appropriate.
[0031] In the series of processes shown in FIG. 2, when the process of step S13 is executed, the process proceeds to step S14. In step S14, the server 100 acquires a predicted value of the target parameter in a future period (hereinafter referred to as a "prediction period"). The server 100 may predict the value of the target parameter every day in the prediction period based on weather forecast information indicating daily weather conditions (e.g., weather, temperature, solar radiation intensity, and wind power) in the prediction period and target parameter history information indicating past values of the target parameter (e.g., values in the previous year of the prediction period). The server 100 may predict the demand amount of power consumed on the output side of the target transformer and predict the value of the target parameter based on the predicted demand amount. The server 100 may predict the amount of power generated on the input side of the target transformer and predict the value of the target parameter based on the predicted amount of power generated. The server 100 may use a prediction program optimized for each target transformer to predict the target parameter, or may use a trained model generated by machine learning of AI (artificial intelligence). Big data accumulated in the cloud CL may be used for learning the model. The prediction period can be set arbitrarily. In this embodiment, the prediction period is set to a period from the present time until a predetermined time (more specifically, six months) has elapsed. However, the length of the prediction period is not limited to six months and can be changed as appropriate.
[0032] Next, in step S15, the server 100 generates an estimation model that outputs the number of tap changes at a certain timing when the value of the target parameter at that timing is input. The server 100 may generate an estimation model (regression model) that defines the relationship between the target parameter and the number of tap changes by regression analysis using the history data D10. A high correlation between the target parameter and the number of tap changes makes it easier to obtain an estimation model with high accuracy. The generated estimation model is stored in the storage device 130, for example. Note that the estimation model is not limited to the regression model, and may be a learned model generated by machine learning of AI (artificial intelligence).
[0033] In the next step S16, the server 100 uses the generated estimation model to obtain a predicted value of the number of tap changes in the prediction period from the predicted value of the target parameter in the prediction period. Then, in step S17, the server 100 obtains a predetermined number of bootstrap samples by the bootstrap method for the predicted value of the number of tap changes in the prediction period. Then, in step S18, the server 100 uses the predetermined number of bootstrap samples to obtain a probability density function (second probability density function) of the number of tap changes per day in the future of the target transformer.
[0034] FIG. 5 is a diagram for explaining the process (steps S14 to S18) for acquiring the second probability density function. As shown in FIG. 5, in this embodiment, predicted data D21 of the target parameter is acquired in the above step S14. The predicted data D21 of the target parameter includes daily measurement values of the target parameter in the prediction period (next six months). The server 100 inputs the predicted data D21 of the target parameter to the estimation model 150 generated in step S15. As a result, predicted data D22 of the number of tap changes is output from the estimation model 150. The predicted data D22 of the number of tap changes includes daily measurement values of the number of tap changes in the prediction period (next six months). The server 100 randomly acquires 5000 bootstrap samples from the predicted data D22 of the number of tap changes by the bootstrap method, allowing 5000 overlaps. The server 100 obtains a probability density function L1 of the number of future tap changes per day for the target transformer by histogramming the average value of 5000 bootstrap samples.
[0035] In the series of processes shown in FIG. 2, when the process of step S18 is executed, the process proceeds to step S19. In step S19, the server 100 acquires a probability density function (first probability density function) of the number of usable days of the target transformer using the probability density function (second probability density function) of the number of tap changes per day acquired in the above step S18. FIG. 6 is a diagram for explaining the process (step S19) for acquiring the first probability density function. As shown in FIG. 6, in this embodiment, the server 100 converts the probability density function L1 of the number of future tap changes per day of the target transformer into a probability density function L2 of the number of usable days of the target transformer. The number of usable days is a usable period expressed in units of "days", and corresponds to an example of a usable period. The usable period of the target transformer corresponds to a period from the current number of tap changes of the target transformer to the number of tap changes reaching the number of durable changes due to future use of the target transformer. For example, if the current number of tap changes is 10,000, the number of durable changes is 200,000, and the number of tap changes per day is 10, the number of usable days of the target transformer is calculated as follows: "Number of usable days = (200,000 - 10,000) / 10 = 19,000 days." Since the number of tap changes per day of the target transformer and the number of usable days of the target transformer have this kind of relationship, the probability density function L2 can be obtained from the probability density function L1. If the probability density function L2 (first probability density function) is expressed as "f(x)" as a function of the number of usable days (x), formula (1) in Figure 6 is established. Therefore, the probability R that the number of usable days is between a and b days can be obtained by the definite integral of f(x) from a to b.
[0036] The probability density function L2 (first probability density function) of the number of available days of the target transformer may be used, for example, in the control described below.
[0037] Fig. 7 is a flowchart showing a first control using the probability density function L2 acquired by the series of processes shown in Fig. 2. The series of processes shown in this flowchart is executed by the server 100 every time a new probability density function L2 is acquired for the target transformer.
[0038] As shown in FIG. 7, in step S21, the server 100 first uses the latest probability density function L2 to determine the probability that the target transformer will become unusable within a future period (hereinafter referred to as the "replacement period"), and judges whether the obtained probability is equal to or greater than a first reference value (hereinafter referred to as "Th1"). When the number of tap changes of the target transformer reaches the number of durable changes, it means that the target transformer will become unusable. The replacement period can be set arbitrarily. In this embodiment, the period from the present time to the time when a predetermined time (more specifically, four weeks) has passed is set as the replacement period. However, the length of the replacement period is not limited to four weeks and can be changed as appropriate. Th1 can also be set arbitrarily. Th1 may be about 50%.
[0039] If the probability obtained in step S21 is less than Th1 (NO in step S21), the series of processes shown in Fig. 7 ends. On the other hand, if the probability obtained in step S21 is equal to or greater than Th1 (YES in step S21), the process proceeds to step S22.
[0040] In step S22, the server 100 uses the latest probability density function L2 to determine the probability that the target transformer will become unusable for each of a plurality of segments into which the replacement period is divided, and displays the obtained probability for each segment on the first display device (for example, the HMI 210 or the mobile terminal 220 shown in FIG. 1). In this embodiment, the replacement period (four weeks) is divided into four segments (first to fourth segments) of one week each. However, the number and length of the segments can be changed as appropriate. The number of segments may be two or three, or may be five or more.
[0041] The first display device displays, for example, a screen Sc1 in accordance with an instruction from the server 100. The screen Sc1 includes a display section M11 that displays identification information (for example, a unique number) of the target transformer, and a display section M12 that displays the probability of each category. By looking at the screen Sc1, the user can estimate how many more days the target transformer will be used before it becomes unusable. In the example shown in FIG. 7, the first display device displays a probability calculated based on the probability density function L2. However, this is not limited to the above, and the server 100 may cause the first display device to display the probability density function L2 itself, for example, in the form of a graph.
[0042] In the next step S23, the server 100 determines whether or not at least one of the probabilities of each category obtained in step S22 is equal to or greater than a second reference value (hereinafter, referred to as "Th2"). Th2 can be set arbitrarily. Th2 is, for example, a value lower than Th1. Th2 may be approximately 25%. If the probabilities of all categories are less than Th2 (NO in step S23), the series of processes shown in FIG. 7 ends. On the other hand, if the probability of any category is equal to or greater than Th2 (YES in step S23), the process proceeds to step S24.
[0043] In step S24, the server 100 requests the administrator to replace the target transformer. Specifically, the server 100 displays a message requesting replacement of the target transformer on the second display device (for example, the HMI 210 or the mobile terminal 220 shown in FIG. 1). The first display device and the second display device may be the same or different. The second display device displays, for example, a screen Sc2 in accordance with an instruction from the server 100. The screen Sc2 includes a display unit M21 that displays identification information of the target transformer and a display unit M22 that displays a message requesting replacement of the target transformer. The screen Sc2 (display unit M22) shown in FIG. 7 requests replacement of the target transformer by specifying a time. In the example shown in FIG. 7, the probability of the fourth division (October 22 to October 28) exceeds Th2. Therefore, the server 100 requests the administrator to replace the target transformer before the fourth division. This makes it easier to replace the target transformer before it becomes unusable. The method of requesting the exchange is not limited to the above, and may be, for example, a voice request.
[0044] Fig. 8 is a flowchart showing a second control using the probability density function L2 acquired by the series of processes shown in Fig. 2. The control shown in Fig. 8 is the same as the control shown in Fig. 7, except that step S24A is adopted instead of step S24.
[0045] In step S24A, the server 100 requests the controller 25 of the target transformer to restrict the operation of the target transformer. The server 100 may specify a time to request the operation restriction of the target transformer. The server 100 may determine a time to start the operation restriction based on the latest probability density function L2. The server 100 may determine the degree of the operation restriction based on the latest probability density function L2. The controller 25, upon receiving the request from the server 100, changes the control mode of the target transformer so that the number of tap changes of the target transformer is reduced compared to a state without restriction. The controller 25 may reduce the number of tap changes of the target transformer by, for example, lowering the sensitivity of the target transformer to voltage changes. Such an operation restriction can prevent the number of tap changes of the target transformer from reaching the endurance number of tap changes before the target transformer is replaced.
[0046] As described above, in the above embodiment, the server 100 obtains the probability density function (probability density function L2) of the number of usable days of the tapped transformer. The server 100 obtains the probability density function L2 for each tapped transformer, and therefore can obtain the probability density function L2 according to the individual characteristics of the tapped transformer. The server 100 then notifies the user of the obtained probability density function L2, or changes the control mode of the tapped transformer based on the obtained probability density function L2. Using the probability density function L2 in this way makes it easier to appropriately manage the tapped transformer.
[0047] The method for managing a tapped transformer according to this embodiment includes the processes shown in Fig. 2 and the processes shown in Fig. 7 or 8. Each of these processes is executed by a server 100 (computer). Specifically, each process is executed by one or more processors executing a program stored in one or more storage devices. However, each of these processes may be executed by hardware (electronic circuits) instead of software.
[0048] The process flows shown in Figures 2, 7, and 8 can be modified as appropriate. For example, the order of the processes may be changed or unnecessary steps may be omitted depending on the purpose. Furthermore, the content of any of the processes may be changed.
[0049] In the above embodiment, an LTC (on-load tap changing transformer) is used as the tapped transformer. However, the tapped transformer is not limited to an LTC, and may be a step voltage regulator (SVR). The server 100 may manage two or more types of tapped transformers (for example, an LTC and an SVR). The number of tapped transformers managed by the server 100 is arbitrary, and may be one.
[0050] In the above embodiment, one server 100 collects data related to the transformer and performs calculations to obtain the probability density distribution. However, this is not limited to the above, and a device for collecting data and a device for performing calculations may be provided separately.
[0051] In the above embodiment, an on-premise server is exemplified as the server 100 (see FIG. 1). However, the present invention is not limited to this, and functions of the server 100 (for example, functions related to the above data collection and calculation) may be implemented on the cloud by cloud computing. An estimation model may be implemented on the cloud. The estimation model may be updated successively by learning on the cloud.
[0052] In the present disclosure, within the scope of the disclosure, it is possible to combine the respective embodiments, and to modify or omit the respective embodiments as appropriate.
[0053] Various aspects of the present disclosure are summarized below as appendices.
[0054] (Appendix 1) Selecting a target parameter that is correlated with the number of tap changes of the tap transformer from among a plurality of parameters related to the power supplied from the power system to the tap transformer (for example, steps S12 and S13 of FIG. 2); Obtaining a forecast of the parameter of interest for a future time period (e.g., step S14 of FIG. 2); Obtaining a first probability density function of an available life of the tapped transformer using the predicted value of the target parameter (for example, steps S15 to S19 of FIG. 2); A method for managing tapped transformers, including:
[0055] The usable period of a tapped transformer may vary depending on the state of the power system, etc. Therefore, even if the accuracy of predicting the usable period of a tapped transformer is improved, there is still a possibility that the prediction will be wrong to some extent. If some work or control is performed based on the result of such a prediction, an unexpected situation may occur due to the prediction being wrong. Therefore, in the configuration of the above appendix 1, a probability density function (first probability density function) of the usable period of a tapped transformer is obtained. Since the first probability density function allows a user (person) or a computer to know in advance the probability that the prediction will be wrong, unexpected situations are less likely to occur. Therefore, by obtaining the first probability density function, it becomes easier to properly manage a tapped transformer.
[0056] The multiple types of parameters may include at least one of a current, a voltage, and an active power.
[0057] (Appendix 2) Selecting the target parameter comprises: Clustering data showing a relationship with the number of tap changes for each of the plurality of parameters (for example, step S12 in FIG. 2); Using the result of the clustering, a parameter having the highest correlation with the tap switching count is selected as the target parameter from among the plurality of parameters (for example, step S13 in FIG. 2); A method for managing a tapped transformer as described in Appendix 1, comprising:
[0058] According to the configuration of Supplementary Note 2 above, it becomes easier to select appropriate target parameters for each tapped transformer.
[0059] (Appendix 3) Obtaining the first probability density function includes: When a value of the target parameter at a certain timing is input, an estimation model is used to output the number of tap changes at that timing, and a predicted value of the number of tap changes in the future period is obtained from the predicted value of the target parameter in the future period (for example, step S16 of FIG. 2); Obtaining a second probability density function of the number of tap changes per day of the tapped transformer using the predicted number of tap changes (e.g., steps S17 and S18 of FIG. 2); Transforming the second probability density function into the first probability density function (e.g., step S19 of FIG. 2); A method for managing a transformer with taps according to appendix 1 or 2, comprising:
[0060] According to the configuration of Supplementary Note 3, it becomes easier to obtain an appropriate first probability density function for each tapped transformer.
[0061] (Appendix 4) Obtaining the second probability density function includes: Obtaining bootstrap samples for the predicted value of the tap switching count by a bootstrap method (for example, step S17 of FIG. 2); Obtaining the second probability density function using the bootstrap sample (e.g., step S18 of FIG. 2); A method for managing a transformer with taps as described in Appendix 3, comprising:
[0062] According to the configuration of Supplementary Note 4, the second probability density function can be easily and accurately obtained.
[0063] (Appendix 5) A server that executes the tapped transformer management method according to any one of appendices 1 to 4.
[0064] (Appendix 6) A program for causing a computer to execute the tapped transformer management method according to any one of appendixes 1 to 4.
[0065] The above server and program make it easier to properly execute the above-mentioned tapped transformer management method.
[0066] In one aspect, a server is provided that includes a storage device that stores the program and a processor that executes the program stored in the storage device. In another aspect, a server is provided that distributes the program.
[0067] (Appendix 7) A power management system comprising one or more tapped transformers provided in a power system and a server for managing the one or more tapped transformers, The server, selecting a target parameter that is correlated with a tap changing frequency of the tapped transformer from among a plurality of parameters related to the power supplied from the power system to the tapped transformer; obtaining a forecast of the parameter of interest for a future time period; obtaining a probability density function for a service life of the tapped transformer using the predicted values of the parameter of interest; A power management system configured to:
[0068] According to the power supply management system, similar to the above-mentioned method for managing a tapped transformer, by obtaining a probability density function of the usable period of the tapped transformer, it becomes easier to appropriately manage the tapped transformer.
[0069] (Appendix 8) 8. The power management system of claim 7, further comprising a display device that displays the probability density function or a probability calculated based on the probability density function.
[0070] In the configuration of Supplementary Note 8 above, by displaying the probability density function of the usable life of the tapped transformer or the probability calculated from this function, it becomes easier to accurately inform the user of how much longer the tapped transformer can be used before it becomes unusable.
[0071] (Appendix 9) the one or more tapped transformers include a plurality of on-load tap-changing transformers; The power management system further comprises a counter, a sensor, and a controller provided for each of the plurality of on-load tap-changing transformers; The counter is configured to measure a number of tap changes of the corresponding on-load tap-changing transformer; The sensors are configured to measure values of the plurality of parameters related to power supplied to the corresponding on-load tap-changing transformers; the controller is configured to use the measurements by the sensors to control corresponding on-load tap-changing transformers; the controller is configured to transmit a first measurement value that is a measurement value of the number of tap changes acquired by the counter and a second measurement value that is a measurement value of the plurality of types of parameters acquired by the sensor; 9. The power management system according to claim 7, wherein the server is configured to be able to receive the first measurement value and the second measurement value transmitted by the controller.
[0072] In the configuration of Supplementary Note 9, a controller provided for each on-load tap-changing transformer acquires the first and second measurement values and transmits the acquired first and second measurement values. The server can use the first and second measurement values to acquire a probability density function of the usable life of each tapped transformer. The configuration of Supplementary Note 9 makes it easier to manage multiple on-load tap-changing transformers individually.
[0073] The embodiments disclosed herein should be considered as illustrative and not restrictive in all respects. The scope of claims is defined by the claims, not the above description, and it is intended to include all modifications within the scope and meaning equivalent to the claims. [Explanation of symbols]
[0074] 1 Power management system, 10A, 10B, 10C Transformers, 11 Changeover switch, 12 Tap selector, 20A, 20B, 20C Monitoring device, 21 Input sensor, 22 Output sensor, 23 Counter, 25 Controller, 30A, 30B, 30C Power generation equipment, 100 Server, 110 Processor, 120 RAM, 130 Storage device, 150 Estimation model, 210 HMI, 220 Mobile terminal, CL Cloud.
Claims
1. selecting a target parameter that is correlated with a tap changing frequency of the tap transformer from among a plurality of parameters related to power supplied from a power grid to the tap transformer; obtaining a forecast of the parameter of interest for a future time period; obtaining a first probability density function of a useful life of the tapped transformer using the predicted value of the parameter of interest; A method for managing tapped transformers, including:
2. Selecting the target parameter comprises: performing clustering of data showing a relationship between each of the plurality of parameters and the number of tap changes; selecting, as the target parameter, a parameter having the highest correlation with the number of tap changes from among the plurality of parameters using a result of the clustering; The method for managing a tapped transformer according to claim 1 , comprising:
3. Obtaining the first probability density function comprises: obtaining a predicted value of the number of tap changes in a future period from the predicted value of the target parameter in the future period using an estimation model that outputs the number of tap changes in a certain timing when a value of the target parameter in the future period is input; using the predicted number of tap changes to obtain a second probability density function of the number of tap changes per day for the tapped transformer; transforming the second probability density function into the first probability density function; The method for managing a tapped transformer according to claim 1 , comprising:
4. Obtaining the second probability density function comprises: Obtaining a bootstrap sample for the predicted value of the number of tap changes by a bootstrap method; obtaining the second probability density function using the bootstrap sample; and The method for managing a tapped transformer according to claim 3, comprising:
5. A server that executes the tapped transformer management method according to any one of claims 1 to 4.
6. A program for causing a computer to execute the tapped transformer management method according to any one of claims 1 to 4.
7. A power management system comprising one or more tapped transformers provided in a power grid and a server for managing the one or more tapped transformers, The server, selecting a target parameter that is correlated with a tap changing frequency of the tapped transformer from among a plurality of parameters related to the power supplied from the power system to the tapped transformer; obtaining a forecast of the parameter of interest for a future time period; obtaining a probability density function for a service life of the tapped transformer using the predicted values of the parameter of interest; A power management system configured to:
8. The power management system according to claim 7 , further comprising a display device that displays the probability density function or a probability calculated based on the probability density function.
9. the one or more tapped transformers include a plurality of on-load tap-changing transformers; The power management system further comprises a counter, a sensor, and a controller provided for each of the plurality of on-load tap-changing transformers; The counter is configured to measure the number of tap changes of the corresponding on-load tap-changing transformer; The sensors are configured to measure values of the plurality of parameters related to power supplied to the corresponding on-load tap-changing transformers; the controller is configured to use the measurements by the sensors to control corresponding on-load tap-changing transformers; the controller is configured to transmit a first measurement value that is a measurement value of the number of tap changes acquired by the counter and a second measurement value that is a measurement value of the plurality of types of parameters acquired by the sensor; The power management system according to claim 7 , wherein the server is configured to be able to receive the first measured value and the second measured value transmitted by the controller.
Citation Information
Patent Citations
Tap planned value calculation method and determination method of tap command value using the same, control target value calculation method, and tap planned value calculation device, tap command value determination device, tap planned value calculation program
JP2014225947A
Unknown parameter estimation method, unknown parameter program, and unknown parameter estimation device
JP2015091217A
Voltage reactive power control system
JP2017046506A
Calculation method for operable time count corresponding amount of changeover switch, and calculation system
JP2017158341A
System voltage controller
JP2020068565A
