Structure of house
The house structure improves insulation and stabilizes joist support by using a cloth foundation with vertical and horizontal insulation materials and support hardware, addressing termite damage and sinking issues.
Patent Information
- Application Number
- JP2023067727
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-18
- Publication Date
- 2024-10-30
- Estimated Expiration
- 2043-04-18
AI Technical Summary
Existing house structures face challenges in improving insulation performance, particularly in areas where bundles are erected on concrete floors, and are susceptible to termite damage, leading to potential sinking of the earthen floor and bundles.
A house structure design featuring a cloth foundation with vertical and horizontal components, including vertical and horizontal insulation materials, bundles fixed to the concrete floor, and support hardware to horizontally support joists even when the bundles sink, while incorporating anti-termite measures.
Enhances heat insulation performance and stabilizes the support of joists by preventing sinking, even in the presence of termite damage, through a combination of insulation materials and support hardware.
Smart Images

Figure 2024154099000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a housing structure. [Background technology]
[0002] The following Patent Document 1 describes a foundation insulation structure for a house. This foundation insulation structure includes a continuous footing with a rising portion extending vertically, a concrete floor covering the ground surface on the indoor side of the continuous footing, and a foamed resin insulation material. The foamed resin insulation material includes a vertical portion extending along the rising portion of the continuous footing and a horizontal portion extending above the concrete floor. In addition, the house has a plurality of beams erected on the concrete floor, and these beams support the joists. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2013-194422 A Summary of the Invention [Problem to be solved by the invention]
[0004] In houses like those described above, it is difficult to cover the areas where the beams are installed on the concrete floor with foam resin-based insulation material, so there is room for further improvement in insulation performance.
[0005] It is also possible to place the foamed resin insulation below the concrete floor to prevent interference between the foamed resin insulation and the beams. However, this structure is prone to termite damage, such as termites forming tunnels inside the foamed resin insulation. Foamed resin insulation that has been damaged by termites cannot support a certain surface pressure, and the concrete floor and beams located above it may sink, causing the floor edge to drop.
[0006] The present invention was devised in consideration of the above-mentioned situation, and its main objective is to provide a housing structure that can improve insulation performance while supporting the joists horizontally even when the beams sink. [Means for solving the problem]
[0007] The present invention is a housing structure comprising a slab footing arranged along the periphery of the house and having a rising portion extending vertically, a first insulating material arranged along the rising portion of the slab footing and extending vertically, a concrete floor covering the ground surface on the indoor side of the slab footing, a second insulating material arranged between the concrete floor and the ground surface and on the rising portion side, a plurality of beams whose lower ends are fixed to the concrete floor and extend vertically, and joists supported by the upper ends of the beams, the beams including a first beam arranged on top of the second insulating material and comprising support hardware for horizontally supporting the joists supported by the first beam when the first beam sinks. Effect of the Invention
[0008] By adopting the above-mentioned configuration, the house structure of the present invention is able to improve the insulation performance while supporting the joists horizontally even when the beams sink. [Brief description of the drawings]
[0009] [Figure 1] FIG. 2 is a partial cross-sectional view showing the structure of the house of the present embodiment. [Diagram 2] FIG. 2 is a partially enlarged perspective view of the beams, joists and supporting hardware of FIG. 1. [Diagram 3] FIG. 3 is an enlarged view of the support hardware of FIG. 2. [Figure 4] FIG. 2 is a cross-sectional view illustrating a first step of a construction method for a house structure. [Diagram 5] A cross-sectional view illustrating a second step of the construction method for a house structure.
[0010] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. It should be understood that the drawings include exaggerated expressions and expressions different from the dimensional ratio of the actual structure in order to help understand the contents of the invention. Furthermore, the same or common elements are given the same reference numerals throughout the embodiments, and duplicated explanations are omitted. Furthermore, the specific configurations shown in the embodiments and drawings are for understanding the contents of the present invention, and the present invention is not limited to the specific configurations shown in the drawings.
[0011] [Housing structure] Fig. 1 is a partial cross-sectional view showing a structure 1 of a house H of this embodiment. In Fig. 1, a support metal fitting 8 is shown in color. The house H of this embodiment is exemplified as an industrialized house, but is not particularly limited thereto.
[0012] The structure 1 of the house H of this embodiment includes a slab 2, a first insulating material 3, a concrete floor 4, a second insulating material 5, a plurality of beams 6, joists 7, and supporting hardware 8.
[0013] [Strip Foundation] The continuous footing 2 of the present embodiment is disposed along the outer periphery of the house H. By such a continuous footing 2, an underfloor space 9 is defined in the house H. The continuous footing 2 is formed of, for example, reinforced concrete.
[0014] [Rising section] The continuous footing 2 of this embodiment has a rising portion 10 that extends vertically. The rising portion 10 of this embodiment protrudes from the external ground surface G1. Here, the external ground surface G1 is the upper surface of the land (ground 11) outside the house H (the outdoor 51 side relative to the continuous footing 2). The external ground surface G1 of this embodiment is specified as a ground line that serves as the reference for the vertical height of the house H. In addition, the rising portion 10 has an inward surface 10i that faces the underfloor space 9.
[0015] A base 12 is fixed to the rising portion 10 of this embodiment. The base 12 of this embodiment is fixed to an upper end 10t of the rising portion 10, and supports an outer wall 13 of the house H. In addition, the base 12 is provided with an inner surface 12i facing the indoors 50 side.
[0016] [Base part] The continuous footing 2 of this embodiment further has a base portion 15 extending horizontally below the external ground surface G1 of the house H (in the present example, in the ground 14). In this base portion 15, a rising portion 10 extends vertically from the center in the width direction. This forms the continuous footing 2 with a T-shaped cross section.
[0017] [First insulation material] The first insulation material 3 is for insulating the continuous footing 2. The first insulation material 3 is arranged along the rising portion 10 of the continuous footing 2 and extends vertically. This first insulation material 3 prevents heat from outside the house H from being transmitted through the continuous footing 2 to the underfloor space 9 and the concrete floor 4 described below.
[0018] The first insulating material 3 of this embodiment is disposed on the indoor 50 side of the rising portion 10. Such a first insulating material 3 can reduce the risk of termites forming an ant trail, for example, compared to a case where the first insulating material 3 is disposed on the outdoor 51 side. The first insulating material 3 of this embodiment extends vertically along the inward surface 10i of the rising portion 10.
[0019] The lower end 3u of the first insulating material 3 in this embodiment extends below the concrete floor 4 and terminates without reaching the base portion 15. A conventional insulating material may be used for the first insulating material 3. Examples of the insulating material include polystyrene foam, urethane foam, and phenol foam.
[0020] [Concrete floor] The concrete floor 4 is poured so as to cover the ground surface (subfloor ground surface G2) on the indoor 50 side of the continuous footing 2. As a result, the concrete floor 4 forms the bottom surface 9s of the underfloor space 9. Here, the subfloor ground surface G2 is the upper surface of the land (ground 11) within the underfloor space 9 (on the indoor 50 side of the continuous footing 2). The subfloor ground surface G2 in this embodiment is different from the external ground surface G1 and is not specified as a ground line.
[0021] The concrete floor 4 is cast above the base 15. Furthermore, the outer edge 4o of the concrete floor 4 (the outer edge facing the outdoors 51) is in contact with the first insulating material 3. As a result, the concrete floor 4 is disposed away from the rising portion 10, so that it is possible to more reliably prevent heat from the outside of the house H that is transmitted to the rising portion 10 from being transmitted to the concrete floor 4 or the underfloor space 9. The underfloor ground surface G2 is disposed above the base 15.
[0022] The concrete floor 4 in this embodiment extends toward the first insulating material 3 (the outer edge 4o of the concrete floor 4) with a substantially constant thickness W1. This type of concrete floor 4 has improved workability compared to, for example, a concrete floor (not shown) in which the thickness W1 gradually increases in a corbel shape toward the inward surface 10i. Furthermore, the amount of waste soil disposal that occurs when the subfloor ground surface G2 is excavated can be reduced. Note that the "substantially constant thickness W1" allows for errors in construction.
[0023] [Second insulation material] The second insulating material 5 is intended to insulate the continuous foundation 2, similar to the first insulating material 3. For the second insulating material 5, for example, an insulating material similar to the first insulating material 3 can be used.
[0024] The second insulating material 5 is disposed between the concrete floor 4 and the ground surface (underfloor ground surface G2) and on the rising portion 10 side. In this embodiment, the second insulating material 5 is disposed in a recess 16 formed in the underfloor ground surface G2. Such second insulating material 5 prevents heat from the outside of the house H from being transmitted to the underfloor space 9 via the slab 2 and the outer edge 4o side of the concrete floor 4. Furthermore, the second insulating material 5 can be disposed in an area requiring insulation without interfering with the beams 6. Therefore, the structure 1 of the house H of this embodiment can improve the insulation performance.
[0025] In this embodiment, the outer edge (the outer edge facing the outdoors 51) 5o of the second insulating material 5 is in contact with the first insulating material 3. The lower surface 5b (the upper surface of the recess 16) of the second insulating material 5 in this embodiment is set at approximately the same position as the lower end 3u of the first insulating material 3 in the up-down direction (vertical direction). This allows the first insulating material 3 and the second insulating material 5 to form a foundation insulating material 17 having an L-shaped cross section. This type of foundation insulating material 17 with an L-shaped cross section can effectively block heat from outside the house H that is transmitted through the continuous footing 2 and the concrete floor 4. Note that "approximately the same position" allows for construction errors.
[0026] [Multiple clumps] The multiple beams 6 are for supporting the joists 7. In this embodiment, multiple beams 6 are arranged in the underfloor space 9. In this embodiment, the joists 7 can be supported by the multiple beams 6. The distance W2 between adjacent beams 6, 6 in the longitudinal direction of the joists 7 is preferably, for example, 45 to 100 cm.
[0027] The multiple beams 6 extend vertically with their lower ends 6u fixed to the concrete floor 4. That is, the multiple beams 6 are fixed to the bottom surface 9s of the underfloor space 9.
[0028] 2 is a partially enlarged perspective view of the beams 6, joists 7, and support hardware 8 in FIG. 1. In this embodiment, each component including the beams 6, joists 7, and support hardware 8 may be specified on an orthogonal coordinate system consisting of an x-axis, a y-axis, and a z-axis perpendicular to the x-axis and y-axis. In this embodiment, the direction of the x-axis is set in the horizontal direction between the outdoor 51 side and the indoor 50 (underfloor space 9) side. The direction of the y-axis is set in the horizontal direction perpendicular to the direction of the x-axis. The direction of the z-axis is set in the vertical direction (height direction).
[0029] The bundle 6 of this embodiment is configured to include a leg portion 18, a receiving portion 19, and a screw shaft portion 20.
[0030] The leg portion 18 is for fixing the beam 6 to the concrete floor 4 (shown in FIG. 1). The leg portion 18 includes a fixing portion 21 and a shaft portion 22.
[0031] The fixing portion 21 is formed in a plate shape extending along the upper surface 4s (bottom surface 9s of the underfloor space 9) of the concrete floor 4 shown in FIG. 1, and spreads in the x-axis-y-axis plane. In this embodiment, the fixing portion 21 is formed in a rectangular shape when viewed from above, but is not particularly limited thereto, and may be formed in a circular shape when viewed from above, for example. The fixing portion 21 is also provided with a plurality of holes 23 penetrating in the thickness direction (the direction of the z-axis). For example, bolts 24 (shown in FIG. 1) are inserted into these holes 23, whereby the fixing portion 21 is fixed to the concrete floor 4.
[0032] The shaft portion 22 extends upward (in the direction of the z-axis) from the center of the fixed portion 21. A female screw portion (not shown) is provided on the upper end side of the shaft portion 22.
[0033] The receiving portion 19 is for receiving the underside 7u of the spur 7. In this embodiment, of the multiple bundles 6, in a first bundle 6a (described later), the receiving portion 19 receives the underside 7u of the spur 7 via a support metal fitting 8. This receiving portion 19 is provided on the upper end side of the bundle 6.
[0034] The receiving portion 19 of this embodiment is composed of a web 25 and a pair of flanges 26, 26, and is formed in a U-shape. The web 25 of this embodiment extends in a plane of the x-axis and y-axis. The pair of flanges 26, 26 of this embodiment extend in a plane intersecting the plane of the x-axis and z-axis. In addition, the pair of flanges 26, 26 extend upward from both ends of the web 25 in the y-axis direction so that the distance in the y-axis direction between the pair of flanges 26, 26 becomes larger (inversely tapered).
[0035] The screw shaft portion 20 is disposed between the leg portion 18 (shank portion 22) and the receiving portion 19 in the vertical direction (the direction of the z-axis). In this embodiment, the upper end of the screw shaft portion 20 is fixed to the receiving portion 19. Meanwhile, the lower end of the screw shaft portion 20 is provided with a male thread portion (not shown) that can be screwed into a female thread portion (not shown) of the shaft portion 22. By screwing this male thread portion into the female thread portion, the screw shaft portion 20 moves up and down (in the direction of the z-axis) relative to the shaft portion 22, and the height of the receiving portion 19 (bundle 6) fixed to the screw shaft portion 20 can be adjusted.
[0036] [First bunch] 1, the multiple bundles 6 of this embodiment include a first bundle 6a. The first bundle 6a is disposed on the second insulating material 5. In this embodiment, the first bundle 6a is disposed (fixed) above the area (the area on the rising portion 10 side) where the second insulating material 5 is disposed, via the concrete floor 4.
[0037] The first bundle 6a includes, at its upper end, the receiving portion 19 shown in Fig. 2. In this embodiment, the receiving portion 19 of the first bundle 6a receives the underside 7u of the end portion 7e (the end portion on the outdoor 51 side) of the siding 7.
[0038] [Second bunch] 1, the multiple bundles 6 of this embodiment further include a second bundle 6b in addition to the first bundle 6a. The second bundle 6b of this embodiment is a bundle 6 that is not disposed on the second insulating material 5, unlike the first bundle 6a.
[0039] The second beam 6b in this embodiment is fixed above an area where the second insulating material 5 is not arranged (i.e., an area away from the rising portion 10 toward the indoors 50 side with respect to the first beam 6a) via a concrete floor 4. As described above, the second beam 6b is configured to include the receiving portion 19 shown in FIG. 2 at its upper end. The second beam 6b in this embodiment receives the lower surface 7u of the joist 7 without a support metal fitting 8.
[0040] [Drawer] As shown in Fig. 1, the siding 7 is for supporting joists 27 and floor panels 28. In this embodiment, a plurality of sidings 7 are arranged in the underfloor space 9. These sidings 7 are supported at the upper ends of the beams 6. The sidings 7 in this embodiment are supported horizontally by the beams 6.
[0041] 2, the joists 7 are formed, for example, from steel square pipes, but are not particularly limited thereto, and may be formed, for example, from wooden square timber, etc. Also, the joists 7 in this embodiment are formed to have a hollow trapezoidal cross section, but are not limited thereto, and may be formed, for example, to have a rectangular cross section.
[0042] The joist 7 of this embodiment is configured to include an upper surface 7t, a lower surface 7u, and a pair of side surfaces 7s, 7s.
[0043] The upper surface 7t and the lower surface 7u of this embodiment extend in the x-axis-y-axis plane. As shown in FIG. 1, a joist 27 is fixed to the upper surface 7t. A floor panel 28 is fixed to this joist 27. As a result, the floor panel 28 is supported by the joists 7 via the joists 27. As shown in FIG. 2, the lower surface 7u is supported (fixed) by the receiving portion 19 of the first beam 6a via a support metal fitting 8 described later. The width of the lower surface 7u in the y-axis direction of this embodiment is formed smaller than the width of the upper surface 7t in the y-axis direction. Such a lower surface 7u allows the size of the receiving portion 19 of the beam 6 to be reduced (the width in the y-axis direction to be reduced).
[0044] The pair of side surfaces 7s, 7s connect the upper surface 7t and the lower surface 7u of the slat 7, respectively, and constitute surfaces corresponding to the legs of the trapezoid. The pair of side surfaces 7s, 7s in this embodiment spreads on a plane intersecting the x-axis-z-axis plane. Furthermore, the pair of side surfaces 7s, 7s extend from both ends of the lower surface 7u in the y-axis direction toward both ends of the upper surface 7t in the y-axis direction so that the distance in the y-axis direction between the pair of side surfaces 7s, 7s becomes larger (inversely tapered). As a result, the slat 7 is formed in an inverted trapezoid shape. The pair of side surfaces 7s, 7s in this embodiment are parallel to the flanges 26, 26 of the receiving portion 19.
[0045] [Support hardware] The support metal fittings 8 are for horizontally supporting the joists 7 supported by the first bundles 6a when the first bundles 6a sink. Note that "horizontal" allows for construction errors and the like. In this embodiment, among the multiple joists 7 arranged in the underfloor space 9, the joists 7 whose longitudinal direction is perpendicular to the inward surface 10i of the rising portion 10 of the slab 2 shown in FIG. 1 are supported by the support metal fittings 8. In this embodiment, one end 8a of the support metal fittings 8 is fixed to the rising portion 10 or the base 12 shown in FIG. 1. In this embodiment, a case in which one end 8a of the support metal fittings 8 is fixed to the base 12 is exemplified. On the other hand, the other end 8b side of the support metal fittings 8 is for supporting the joists 7 supported by the first bundles 6a from below when the first bundles 6a sink. The support metal fittings 8 in this embodiment are formed of steel, but are not particularly limited. In this embodiment, one end 8a of the support metal fitting 8 is arranged on the outdoor side 51 in the direction of the x-axis, and the other end 8b of the support metal fitting 8 is arranged on the indoor side 50 (underfloor space 9) in the direction of the x-axis.
[0046] Fig. 3 is an enlarged view of the support metal fitting 8 in Fig. 2. The support metal fitting 8 of this embodiment is configured to include a first member 29 and a second member 30.
[0047] [First member] The first member 29 of this embodiment is provided on one end 8a side of the support metal fitting 8. The first member 29 is configured to include a fixing portion 31, a horizontal portion 32, a reinforcing rib 33, and a vertical portion 34. Note that the first member 29 is not limited to this configuration, and for example, some of these members may be omitted or other members may be added.
[0048] The fixing portion 31 is for fixing the support metal fitting 8 to the base 12 (shown in FIG. 1). The fixing portion 31 in this embodiment is formed in a plate shape and spreads in the y-axis-z-axis plane. The fixing portion 31 includes an outer surface 31o facing the outdoors 51 and an inner surface 31i facing the indoors 50 in the x-axis direction. The fixing portion 31 in this embodiment is formed in a substantially rectangular shape when viewed from the front in the x-axis direction, but is not particularly limited thereto and may be formed in a circular shape, for example.
[0049] The fixing part 31 is provided with a pair of holes 35, 35 penetrating in the x-axis direction (between the outer surface 31o and the inner surface 31i). In this embodiment, for example, as shown in Fig. 1, a bolt 36 is inserted into the holes 35, 35 and screwed into the inner surface 12i of the base 12. This fixes one end 8a of the support metal fitting 8 to the base 12. As shown in Fig. 3, the pair of holes 35, 35 in this embodiment are spaced apart in the y-axis direction.
[0050] The horizontal portion 32 is formed in a plate shape and extends in the x-axis-y-axis plane. In this embodiment, the horizontal portion 32 is formed in a rectangular shape when viewed in a plan view from the z-axis direction, but is not limited to this.
[0051] The horizontal portion 32 of the present embodiment includes an upper surface 32t, a lower surface 32u, and a plurality of side surfaces 32s that connect the upper surface 32t and the lower surface 32u in the z-axis direction. The plurality of side surfaces 32s includes an outer side surface 32so that faces the outdoor side 51 and an inner side surface 32si that faces the indoor side 50 in the x-axis direction.
[0052] In this embodiment, the outer surface 32so of the horizontal portion 32 is fixed to the inner surface 31i of the fixed portion 31. The horizontal portion 32 extends horizontally from the outer surface 32so toward the inner surface 32si (toward the indoors 50). The outer surface 32so of this embodiment is fixed to the inner surface 31i of the fixed portion 31 below the center in the z-axis direction, but is not particularly limited thereto. In this embodiment, the inner surface 31i of the fixed portion 31 and the lower surface 32u of the horizontal portion 32 are perpendicular to each other.
[0053] The reinforcing rib 33 is intended to reinforce the fixation between the fixed portion 31 and the horizontal portion 32. The reinforcing rib 33 in this embodiment is formed in a plate shape and extends in the x-axis-z-axis plane.
[0054] The reinforcing rib 33 of this embodiment is formed in a right-angled triangle shape in a side view seen from the y-axis direction. The reinforcing rib 33 of this embodiment is configured to include a pair of side surfaces 33s, 33s and a plurality of end surfaces 33e that connect the side surfaces 33s, 33s in the y-axis direction. The plurality of end surfaces 33e include a first end surface 33e1 and a second end surface 33e2 that are perpendicular to each other. The first end surface 33e1 extends in the y-axis-z-axis plane. The second end surface 33e2 extends in the x-axis-y-axis plane.
[0055] The first end surface 33e1 is fixed to the inner surface 31i of the fixing portion 31. On the other hand, the second end surface 33e2 is fixed to the upper surface 32t of the horizontal portion 32. This allows the reinforcing rib 33 to reinforce the fixation between the fixing portion 31 and the horizontal portion 32, thereby improving the rigidity of the first member 29.
[0056] In this embodiment, the first end face 33e1 is fixed to the center in the y-axis direction (between the pair of holes 35, 35) on the inner surface 31i of the fixing portion 31. Furthermore, the second end face 33e2 is fixed to the center in the y-axis direction on the upper surface 32t of the horizontal portion 32. This allows the reinforcing rib 33 to reinforce the fixation between the fixing portion 31 and the horizontal portion 32 in a well-balanced manner in the y-axis direction.
[0057] The vertical portion 34 is for fixing the second member 30. In this embodiment, the vertical portion 34 is formed in a plate shape and spreads in the y-axis-z-axis plane. The vertical portion 34 includes an outer surface 34o facing the outdoors 51 in the x-axis direction, an inner surface 34i facing the indoors 50, and a plurality of side surfaces 34s connecting the outer surface 34o and the inner surface 34i in the x-axis direction. The plurality of side surfaces 34s includes an upper side surface 34st facing upward in the z-axis direction.
[0058] 2, the vertical portion 34 of this embodiment is formed in a trapezoidal shape (inverted trapezoidal shape) in a front view seen from the x-axis direction, similar to the cross section of the slat 7. The vertical portion 34 is not limited to this form, and for example, when the slat 7 is formed in a rectangular cross section, the vertical portion 34 may be formed in a rectangular cross section similar to the cross section of the slat 7.
[0059] As shown in FIG. 3, the vertical portion 34 of this embodiment has its upper side surface 34st fixed to the lower surface 32u of the horizontal portion 32. In this embodiment, the outer surface 34o of the vertical portion 34 and the lower surface 32u of the horizontal portion 32 are perpendicular to each other. As a result, a recess 37 is formed in the support metal 8, which is surrounded by the inner surface 31i of the fixing portion 31, the lower surface 32u of the horizontal portion 32, and the outer surface 34o of the vertical portion 34. As shown in FIG. 1, the upper end 37t of this recess 37 is located above the upper end 10t of the rising portion 10 of the slab 2 and the lower end 12u of the base 12. The upper end 3t side of the first insulating material 3 is fitted into this recess 37. This makes it possible to improve the insulating performance.
[0060] [Second member] 3, the second member 30 is for receiving the joist 7. The second member 30 in this embodiment is provided on the other end 8b side of the support metal fitting 8. The second member 30 in this embodiment is configured to include a bottom surface portion 38 and a pair of side surface portions 39, 39.
[0061] The bottom surface portion 38 of this embodiment is formed in a plate shape and spreads in the x-axis-y-axis plane. The bottom surface portion 38 of this embodiment is configured to include an upper surface 38t, a lower surface 38u, and a plurality of end surfaces 38e that connect the upper surface 38t and the lower surface 38u in the z-axis direction. The plurality of end surfaces 38e include a first end surface 38e1 facing the outdoor 51 in the x-axis direction, and a pair of second end surfaces 38e2, 38e2 arranged on both sides in the y-axis direction. In this embodiment, the first end surface 38e1 of the bottom surface portion 38 is fixed to the inner surface 34i of the vertical portion 34.
[0062] The pair of side portions 39, 39 in this embodiment are each formed in a plate shape and spread in a plane intersecting the x-axis-z-axis plane. Furthermore, the pair of side portions 39, 39 extend upward from the pair of second end faces 38e2, 38e2 of the bottom surface portion 38 so that the distance in the y-axis direction between the pair of side portions 39, 39 increases (inversely tapered). As a result, the second member 30 is formed in a U-shape with a widened tip when viewed from the front in the x-axis direction.
[0063] Each of the pair of side portions 39, 39 includes an inner surface 39i facing inward in the y-axis direction, an outer surface 39o facing outward in the y-axis direction, and an end surface 39e connecting the inner surface 39i and the outer surface 39o in the y-axis direction. The inner surfaces 39i, 39i are parallel to the pair of side surfaces 7s, 7s of the joist 7 shown in FIG. 2. The outer surfaces 39o, 39o are parallel to the pair of flanges 26, 26 of the receiving portion 19 of the first bundle 6a shown in FIG. 2. In this embodiment, the end surfaces 39e of the pair of side portions 39, 39 on the outdoor 51 side are fixed to the inner surface 34i of the vertical portion 34 and the inner surface 32si of the horizontal portion 32 in the x-axis direction.
[0064] In this manner, the second member 30 of the present embodiment is formed integrally with the bottom surface portion 38 and the pair of side surface portions 39, 39, and the bottom surface portion 38 and the pair of side surface portions 39, 39 are fixed to the vertical portion 34. This allows the rigidity of the second member 30 to be significantly improved compared to when the second member 30 is formed, for example, of only the bottom surface portion 38.
[0065] As shown in Fig. 1, the other end 8b side (second member 30) of the support hardware 8 in this embodiment is located between the receiving portion 19 of the first bundle 6a and the joist 7. At this time, the load of the joist 7 and the support hardware 8 is mainly supported by the first bundle 6a, and is not supported by the one end 8a of the support hardware 8 fixed to the foundation 12. As a result, during construction of the structure 1 of the house H, the height of the joist 7, etc. can be adjusted by the first bundle 6a and the second bundle 6b, and then the one end 8a of the support hardware 8 can be fixed to the foundation 12, so that the height of the joist 7, etc. can be easily adjusted.
[0066] In this embodiment, a bottom surface portion 38 (shown in FIG. 2) of a second member 30 of the support metal fitting 8 is placed on the web 25 (shown in FIG. 2) of the receiving portion 19 of the first bundle 6a, and further, a pair of side surfaces 39, 39 (shown in FIG. 2) of the second member 30 are placed on a pair of flanges 26, 26 (shown in FIG. 2) of the receiving portion 19. This allows the support metal fitting 8 (second member 30) to be stably supported by the first bundle 6a.
[0067] In this embodiment, the bottom surface 7u (shown in FIG. 2) of the spur 7 is placed on the bottom surface portion 38 (shown in FIG. 2) of the second member 30 of the support metal fitting 8, and the pair of side surfaces 7s, 7s (shown in FIG. 2) of the spur 7 are placed on the pair of side surface portions 39, 39 (shown in FIG. 2) of the second member 30. As a result, the spur 7 is stably supported by the first bundle 6a via the support metal fitting 8 (second member 30).
[0068] On the other hand, if termite damage occurs in the second insulating material 5 arranged below the first beam 6a, a cavity is formed inside the second insulating material 5 due to the termite tunnel formed by termites, and the second insulating material 5 no longer has a constant surface pressure. In this case, the part of the concrete floor 4 that receives the load of the first beam 6a sinks locally, and the first beam 6a arranged above it also sinks. In this way, even if the first beam 6a sinks, in this embodiment, the load of the beam 7 can be supported by the support metal 8 arranged between the first beam 6a and the beam 7. At this time, the load of the beam 7 and the support metal 8 is supported by one end 8a of the support metal 8 fixed to the foundation 12.
[0069] In this way, in the case where termite damage occurs in the second insulating material 5 and the concrete floor 4 and the first beam 6a sink in the structure 1 of the house H of this embodiment, the support metal fittings 8 can horizontally support the joists 7. Therefore, the structure 1 of the house H of this embodiment (shown in FIG. 1) can improve the insulating performance by the second insulating material 5, while supporting the joists 7 horizontally even when the first beam 6a sinks.
[0070] Furthermore, because one end 8a (fixing portion 31) of the support metal fitting 8 in this embodiment is fixed to the foundation 12, when the first bundle 6a sinks, the load of the joists 7 can be firmly supported by the slab 2 via the foundation 12. Therefore, even if the first bundle 6a sinks, the support metal fitting 8 can support the joists 7 more stably and horizontally.
[0071] Furthermore, in the present embodiment, the other end 8b side (second member 30) of the support metal 8 is located between the receiving portion 19 and the joist 7, so when the first bundle 6a sinks, it can instantly support the joist 7 in place of the first bundle 6a. Therefore, the support metal 8 can more reliably support the joist 7 horizontally. In addition, if termite damage occurs in the second insulation material 5 and the first bundle 6a sinks, and then termite damage occurs in the base 12 to which the one end 8a of the support metal 8 is fixed, the joist 7 may not be supported horizontally. Therefore, when the first bundle 6a sinks, it is preferable to quickly perform maintenance on the second insulation material 5, the concrete floor 4, and the first bundle 6a. This allows the joist 7 to be stably supported for a long period of time.
[0072] As shown in FIG. 1, the second insulation material 5 of this embodiment includes a first portion 40 located below the first beam 6a, and this first portion 40 is preferably an anti-termite insulation material. Such a first portion 40 makes it difficult for termite damage to occur, thereby suppressing the settlement of the concrete floor 4 and the first beam 6a as described above. This allows the joists 7 to be supported for a long period of time by the first beam 6a. The anti-termite insulation material is not particularly limited as long as it is capable of suppressing termite damage, but for example, the anti-termite insulation material "Optiform" (Optiform is a registered trademark) manufactured by Dainaga Corporation can be used.
[0073] The second insulating material 5 of this embodiment includes a second portion 42 that is continuous with the first portion 40 on the indoor 50 side. Since the second portion 42 is not located below the first beam 6a, even if termite damage occurs in the second portion 42 and the concrete floor 4 locally sinks, the impact on the support of the joists 7 is small. For this reason, the second portion 42 may be a non-termite-proof insulating material. Since such a non-termite-proof insulating material is less expensive than the termite-proof insulating material, it is possible to improve the insulating performance while keeping the cost low. As the non-termite-proof insulating material, an insulating material similar to the first insulating material 3 may be adopted. In addition, from the viewpoint of preventing termite damage to the second insulating material 5, a moisture-proof sheet (not shown) having anti-termite properties may be laid between the second insulating material 5 and the ground surface (underfloor ground surface G2). The anti-termite performance may be exhibited by, for example, containing a known agent having anti-termite function such as that described in a patent document (Japanese Patent No. 6130664) in the moisture-proof sheet.
[0074] [Construction method] [1st step] Next, a construction method for the structure 1 of the house H will be described. In the construction method of this embodiment, first, the slab 2, the first insulating material 3, and the second insulating material 5 are arranged, the concrete floor 4 is poured, and the studs 6 are arranged (first step S1). Fig. 4 is a cross-sectional view explaining the first step S1. Each step of the first step S1 will be explained in order: arrangement of the slab 2 (step S1-1), arrangement of the first insulating material 3 (step S1-2), arrangement of the second insulating material 5 (step S1-3), pouring the concrete floor 4 (step S1-4), and arrangement of the studs 6 (step S1-5).
[0075] Place Wall Foundation In the first step S1 of this embodiment, first, the slab 2 is placed (step S1-1). In this step S1-1, the base portion 15 and a part of the rising portion 10 are buried below the external ground surface G1 of the house H based on the same procedure as in the conventional method. As a result, in step S1-1, the slab 2 is formed, which includes the base portion 15 extending horizontally below the external ground surface G1 and the rising portion 10 extending vertically from the center of the width of the base portion 15. In step S1-1 of this embodiment, the slab 2 is placed along the outer periphery of the house H.
[0076] [Place 1st insulation] In the first step S1 of this embodiment, the first insulating material 3 is then placed (step S1-2). In this step S1-2, first, in order to form a recess 16 for burying the lower end 3u side of the first insulating material 3 and the second insulating material 5, for example, the inward surface 10i side of the rising portion 10 of the floor underground surface G2 is excavated. In this embodiment, the bottom surface 16d of the recess 16 is disposed above the base portion 15 of the slab 2.
[0077] In this embodiment, in step S1-4 described later, the floor concrete 4 is poured to a substantially constant thickness W1 as shown in Fig. 1, so there is no need to form a recess (not shown) that is required for pouring a conventional floor concrete whose thickness W1 gradually increases toward the inward surface 10i. This can reduce the amount of waste soil disposal that occurs when the floor ground surface G2 is excavated.
[0078] Next, in step S1-2, the first insulating material 3 is disposed along the inward surface 10i of the rising portion 10. At this time, the lower end 3u of the first insulating material 3 is brought into contact with the bottom surface 16d of the recess 16.
[0079] [Place second insulation] In the first step S1 of this embodiment, the second insulating material 5 is then placed (step S1-3). In step S1-3 of this embodiment, the second insulating material 5 is placed on the bottom surface 16d of the recess 16 of the underfloor ground surface G2. The second insulating material 5 of this embodiment includes a first portion 40 and a second portion 42. The first portion 40 is placed below the area in which the first bundle 6a is placed in step S1-5 described later. Meanwhile, the second portion 42 of the second insulating material 5 is placed continuously with the first portion 40 on the indoor 50 side. In order to prevent termite damage to the second insulating material 5, a moisture-proof sheet (not shown) having anti-termite properties may be laid between the second insulating material 5 and the ground surface (underfloor ground surface G2).
[0080] In this embodiment, the outer edge 5o (the outer edge facing the outdoors 51) of the second insulating material 5 is in contact with the first insulating material 3. This forms a foundation insulating material 17 with an L-shaped cross section, and can effectively block heat from the outside of the house H that is transmitted through the continuous footing 2 and the concrete floor 4.
[0081] [Pouring concrete floor] In the first step S1 of this embodiment, next, the concrete floor 4 is poured (step S1-4). In this step S1-4, the concrete floor 4 is poured so as to cover the ground surface (underfloor ground surface G2) on the indoor 50 side of the continuous footing 2. The outer edge (the outer edge facing the outdoor 51) 4o of the concrete floor 4 is in contact with the first insulating material 3. As a result, the concrete floor 4 is disposed away from the rising portion 10, so that it is possible to more reliably prevent heat from the outside of the house H that is transmitted to the rising portion 10 from being transmitted to the concrete floor 4 and the underfloor space 9.
[0082] Place Bundles In the construction method of this embodiment, next, a plurality of bundles 6 (first bundles 6a and second bundles 6b) are arranged (step S1-5). In this step S1-5, first, a plurality of bundles 6 are arranged along an area where joists 7 (shown in FIG. 5) are planned to be arranged. Then, these bundles 6 are fixed to the concrete floor 4.
[0083] In this embodiment, among the multiple bundles 6, the bundle 6 fixed above the region where the second insulating material 5 is arranged (the region on the rising portion 10 side) is identified as the first bundle 6a. Furthermore, the bundle 6 fixed in the region where the second insulating material 5 is not arranged (i.e., the region away from the rising portion 10 toward the indoors 50 side with respect to the first bundle 6a) is identified as the second bundle 6b. As shown in FIG. 1, the first bundle 6a and the second bundle 6b are arranged at adjacent positions in the longitudinal direction of the siding 7 (shown in FIG. 5).
[0084] [Second process] Next, in the construction method of this embodiment, the support metal fittings 8 and joists 7 are arranged, and the support metal fittings 8 are fixed to the base 12 (second step S2). Fig. 5 is a cross-sectional view explaining the second step. In Fig. 5, the support metal fittings 8 are shown in color.
[0085] [Place support brackets] In the second step S2 of this embodiment, first, the support metal 8 is placed (step S2-1). In this step S2-1, the bottom surface portion 38 and the pair of side surfaces 39, 39 of the second member 30 of the support metal 8 are placed on the web 25 and the pair of flanges 26, 26 of the receiving portion 19 of the first bundle 6a shown in Fig. 2. As a result, the support metal 8 (second member 30) is stably placed on the first bundle 6a, as shown in Fig. 5.
[0086] [Place joists] Next, in the second step S2 of this embodiment, the spur 7 is placed (step S2-2). In this step S2-2, in the support metal 8 placed on the first bundle 6a, the lower surface 7u and the pair of side surfaces 7s, 7s of the spur 7 are placed on the bottom surface portion 38 and the pair of side surfaces 39, 39 of the second member 30 shown in FIG. 2. This makes it possible to position the other end 8b side of the support metal 8 between the receiving portion 19 of the first bundle 6a and the spur 7. At the same time, as shown in FIG. 5, the lower surface 7u and the pair of side surfaces 7s, 7s of the spur 7 shown in FIG. 2 are placed on the web 25 and the pair of flanges 26, 26 (not shown) of the receiving portion 19 of the second bundle 6b. This causes the spur 7 to be supported by the first bundle 6a via the support metal 8 (second member 30), and further supported by the second bundle 6b.
[0087] [Adjust the height of the first and second bundles] Next, in the second step S2 of this embodiment, the heights of the first bundle 6a and the second bundle 6b are adjusted so that the slats 7 are horizontal at a predetermined height (step S2-3). In this step S2-3, the screw shaft portion 20 of each of the first bundle 6a and the second bundle 6b is moved up and down (in the direction of the z-axis) relative to the shaft portion 22 to adjust the height of the receiving portion 19 (the first bundle 6a and the second bundle 6b) fixed to the screw shaft portion 20. This allows the height and level of the slats 7 to be adjusted.
[0088] [Fix the support bracket to the base] Next, in the second step S2 of this embodiment, the support metal fitting 8 is fixed to the base 12 (step S2-4). In this step S2-4, a bolt 36 is inserted into a pair of holes 35, 35 (shown in FIG. 2) of the fixing portion 31 of the support metal fitting 8, and screwed into the inner surface 12i (shown in FIG. 1) of the base 12. As a result, one end 8a of the support metal fitting 8 is fixed (tightened) to the base 12.
[0089] In this manner, in the construction method of this embodiment, the height and level of the joists 7 are adjusted by adjusting the heights of the first and second beams 6a and 6b prior to fixing the support metal fittings 8. This makes it easy to adjust the height and level of the joists 7.
[0090] In the construction method of this embodiment, the structure 1 of the house H shown in Fig. 1 is formed by the first step S1 and the second step S2. In the structure 1 of the house H, as described above, it is possible to improve the thermal insulation performance and to support the joists 7 horizontally even when the first beams 6a sink.
[0091] Although a particularly preferred embodiment of the present invention has been described in detail above, the present invention is not limited to the illustrated embodiment and can be modified and carried out in various forms.
[0092] [Note] The present invention includes the following aspects.
[0093] [Invention 1] A residential structure, A continuous foundation is arranged along the outer periphery of the house and has a rising portion extending vertically; A first insulation material arranged along the rising portion of the slab and extending vertically; A concrete floor covering the ground surface on the indoor side of the spread foundation; A second insulating material is disposed between the concrete floor and the ground surface and on the rising portion side; A plurality of beams whose lower ends are fixed to the concrete floor and extend vertically; A joist supported on the upper end side of the bundle, the bundle includes a first bundle disposed on the second insulation; A support metal fitting is provided for horizontally supporting the joists supported by the first bundle when the first bundle sinks. Housing structure. [Invention 2] The structure of a house described in Invention 1, wherein one end of the support hardware is fixed to the rising portion or a base fixed to the rising portion, and the other end supports from below the joist supported by the first beam. [Invention 3] The first bundle includes a receiving portion on its upper end side that receives the lower surface of the slat, A house structure as described in Invention 2, wherein the other end side of the support metal fitting is positioned between the receiving portion and the joist. [Invention 4] the second insulation includes a first portion located below the first bundle; 4. A house structure according to any one of claims 1 to 3, wherein the first portion is an anti-termite insulation material. [Invention 5] The second insulation material includes a second portion continuous with an indoor side of the first portion, The structure of a house as described in invention 4, wherein the second part is a non-anti-termite insulation material. [Invention 6] A house structure described in any one of present inventions 1 to 5, wherein the first insulation material is arranged on the indoor side of the raised portion, and the outer edge of the concrete floor is in contact with the first insulation material. [Invention 7] The structure of a house as described in claim 6, wherein the outer edge of the second insulation material is in contact with the first insulation material. [Explanation of symbols]
[0094] 1. Housing structure 2. Strip foundation 3. First insulation material 4. Concrete floor 5 Second insulation material 6 bundles 6a First bundle 6u bottom end 7. Overhang 8 Support hardware 10 Rising section 50 Indoor H Housing G2 ground surface
Claims
1. A residential structure, A continuous foundation is arranged along the outer periphery of the house and has a rising portion extending vertically; A first insulating material is disposed along the rising portion of the slab and extends vertically; A concrete floor covering the ground surface on the indoor side of the spread foundation; A second insulating material is disposed between the concrete floor and the ground surface and on the rising portion side; A plurality of beams whose lower ends are fixed to the concrete floor and extend vertically; A joist supported on the upper end side of the bundle, the bundle includes a first bundle disposed on the second insulation; a support metal fitting for horizontally supporting the joists supported by the first bundle when the first bundle sinks; Housing structure.
2. The structure of a house as described in claim 1, wherein one end of the support hardware is fixed to the rising portion or a base fixed to the rising portion, and the other end supports the joist supported by the first bundle from below.
3. The first bundle includes a receiving portion on an upper end side thereof for receiving a lower surface of the joist, The structure of claim 2 , wherein the other end of the support metal is located between the receiving portion and the joist.
4. the second insulation includes a first portion located below the first bundle; The housing construction of claim 1 , wherein the first portion is an anti-termite insulation material.
5. The second insulation material includes a second portion continuous with an indoor side of the first portion, The housing construction of claim 4, wherein the second portion is a non-termite resistant insulation material.
6. The structure of a house described in any one of claims 1 to 5, wherein the first insulation material is arranged on the indoor side of the rising portion, and the outer edge of the concrete floor is in contact with the first insulation material.
7. The structure of a house as described in claim 6 , wherein an outer edge of the second insulation material is in contact with the first insulation material.
Citation Information
Patent Citations
Termite prevention structure for building
JP2000054516A
Election construction of steel sleeper and sleeper supporting metal fittings
JP2000080746A
Wooden joist bracket and its execution method
JP2000273999A
Termite-proof structure and termite-proof construction method for building