Server and operation system

The server optimizes operation plans for mobile objects to avoid conflicts and efficiently utilize limited resources, enhancing operational efficiency by adjusting routes and energy replenishment points, addressing inefficiencies in existing systems.

JP2024155331AActive Publication Date: 2024-10-31TOYOTA JIDOSHA KK
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023069975
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-21
Publication Date
2024-10-31
Estimated Expiration
2043-04-21

AI Technical Summary

Technical Problem

Existing operation systems, such as described in Japanese Patent Application Publication No. 2023-012203, do not adequately address the relationship between operation efficiency and operation resources, leading to inefficiencies due to increased operational resources like energy replenishment points, particularly in high-cost urban areas, and are prone to conflicts among moving objects at these points.

Method used

A server manages multiple mobile objects, determining operation plans that avoid conflicts at energy replenishment points by adjusting routes, stay periods, or energy replenishment points, prioritizing energy-efficient and low-risk plans to enhance operational efficiency while minimizing resource usage.

Benefits of technology

The system effectively increases operation efficiency by optimizing the use of limited resources and reducing conflicts, ensuring smooth operation of multiple mobile objects without excessive resource expansion, particularly in urban areas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024155331000001_ABST
    Figure 2024155331000001_ABST
Patent Text Reader

Abstract

To facilitate enhancement of operation efficiency while suppressing an increase in the amount of operation resource.SOLUTION: A server that manages a plurality of mobile objects is configured to determine an operation plan for each one of the plurality of mobile objects, and to instruct the mobile object to perform operation in accordance with the determined operation plan. Each operation plan includes a plan related to energy supply for operation. The server is configured to determine whether or not a conflict in which a plurality of mobile object perform energy supply at the same timing in the same location will occur on the basis of the operation plans, and if it is determined that a conflict will occur, to change the operation plan for at least one of the plurality of conflicting mobile objects so that the conflict is avoided.SELECTED DRAWING: Figure 6
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a server and an operating system. [Background technology]

[0002] Japanese Patent Application Laid-Open No. 2023-012203 (Patent Document 1) discloses an operation system that can prevent a shortage of power for running an electric bus caused by a decrease in the full charge capacity of the battery. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2023-012203 A Summary of the Invention [Problem to be solved by the invention]

[0004] In the operation system described in Patent Document 1, operation efficiency can be improved by increasing the number of operating sections in the operation plan or by increasing the amount of tasks in the operating sections. In Patent Document 1, the transportation of people corresponds to a task, and the transportation amount (i.e., the number of people) corresponds to the task amount. The section in the operation plan where a moving object (e.g., the bus described in Patent Document 1) is performing a task corresponds to the operating section. The operating section is, for example, the section from the task start point to the task end point.

[0005] However, Patent Document 1 does not mention anything about the relationship between operation efficiency and operation resources. Operation efficiency can be expressed as the value obtained by dividing the task amount by the operation resource amount (=task amount / operation resource amount). Operation resources are resources necessary for operation. Examples of operation resources include mobile objects, energy for operating mobile objects, and energy supply points. The more operational resources there are, the lower the operation efficiency becomes, so the technology described in Patent Document 1 does not necessarily result in sufficient operation efficiency. There is still room for improvement in the technology described in Patent Document 1.

[0006] The present disclosure has been made to solve the above-mentioned problems, and its purpose is to make it easier to increase operation efficiency while suppressing an increase in the amount of operation resources. [Means for solving the problem]

[0007] According to an embodiment of the first aspect of the present disclosure, there is provided a server as described below. (Article 1) The server is configured to manage a plurality of moving bodies. The server is configured to determine an operation plan for each of the plurality of moving bodies, and to instruct each of the plurality of moving bodies to operate in accordance with the determined operation plan. The operation plan includes a plan regarding energy replenishment for operation. The server is configured to determine, based on the operation plan, whether or not a conflict will occur between the plurality of moving bodies refueling at the same location and at the same time, and, if it is determined that a conflict will occur, to modify the operation plan of at least one of the competing plurality of moving bodies so as to avoid the conflict.

[0008] Since mobile objects consume energy during operation, it is necessary to systematically replenish the energy of mobile objects in order to operate continuously. Energy replenishment points are one of the operational resources. Increasing the number of energy replenishment points makes it easier to increase the amount of tasks. However, if the number of energy replenishment points is increased too much, the deterioration of operational efficiency due to the increase in energy replenishment points will have a greater impact than the improvement in operational efficiency due to the increase in task volume, and operational efficiency will actually worsen. In particular, increasing the number of energy replenishment points in areas with high land prices (e.g., urban areas) will result in a deterioration in operational efficiency (= task volume / operational resource price) from an economic perspective. For this reason, in order to increase operational efficiency, it is desirable for multiple mobile objects to effectively utilize the limited number of energy replenishment points.

[0009] However, in an operation system with few available energy recharge points, it is easy for multiple moving bodies to compete with each other at the energy recharge points (i.e., multiple moving bodies staying at the same energy recharge point at the same time). Even if operation plans for each of the multiple moving bodies are set so that no competition occurs, competition may occur depending on the situation on the day (the day) on which the operation plans are executed. In this regard, when it is determined that a competition will occur based on the operation plans, the server changes at least one operation plan of the multiple competing moving bodies so as to avoid the competition. Therefore, the server can determine an operation plan so as to avoid the competition depending on, for example, the situation on the day. This enables multiple moving bodies to effectively utilize the limited energy recharge points. In this way, the server makes it easier to improve operation efficiency by making multiple moving bodies cooperate in non-operating sections. According to the server, it is easier to improve operation efficiency while suppressing an increase in the amount of operation resources.

[0010] The mobile object may be an electric vehicle (hereinafter also referred to as "xEV") that uses electricity as all or part of its power source, or may be an internal combustion engine vehicle. Examples of xEV include BEV (electric vehicle), PHEV (plug-in hybrid vehicle), HEV (hybrid vehicle), and FCEV (fuel cell vehicle).

[0011] The server described in the above paragraph 1 may have the configuration described in any one of paragraphs 2 to 6 below.

[0012] (Clause 2) The server described in clause 1 further has the following feature. The operation plan includes an energy replenishment point and a stay period at the energy replenishment point. Before instructing each of the multiple moving bodies to operate, if the server determines based on the operation plan that a leading first moving body and a following second moving body will compete at the energy replenishment point and the remaining energy of the first moving body at the competition occurrence time predicted from the operation plan is greater than a reference amount, the server changes the stay period of the first moving body at the energy replenishment point so that the first moving body departs from the energy replenishment point at the competition occurrence time.

[0013] According to the above configuration, it becomes easier to appropriately avoid conflicts without changing the routes of the first and second moving bodies.

[0014] (Clause 3) The server according to clause 1 or 2 further has the following feature: Before instructing each of the multiple moving bodies to operate, when it is determined based on the operation plan that a leading first moving body and a following second moving body will compete at the energy replenishment point and the remaining energy of the first moving body at the time of competition occurrence predicted from the operation plan is less than a reference amount, the server changes the stay period of the first moving body at the energy replenishment point so that the first moving body departs from the energy replenishment point at a timing when the remaining energy of the first moving body reaches the reference amount.

[0015] According to the above configuration, it becomes easier to appropriately avoid conflicts without changing the routes of the first and second moving bodies, while suppressing the first moving body from running out of energy.

[0016] (4) The server according to any one of the first to third aspects further has the following feature: The server is configured to change an energy replenishment point for at least one operation plan of a competing plurality of moving objects so as to avoid the conflict.

[0017] According to the above configuration, one method for avoiding conflicts is to change the route.

[0018] (Item 5) The server according to any one of items 1 to 4 further has the following feature: When there are multiple operation plans that can avoid conflicts, the server is configured to select an operation plan with the lowest risk of running out of energy from among the multiple operation plans.

[0019] According to the above configuration, it is easy to improve operation efficiency while suppressing the occurrence of an energy shortage. The server may change an arbitration protocol for conflict avoidance so as to reduce the risk of an energy shortage.

[0020] (Item 6) The server according to any one of items 1 to 5 further has the following feature: When there are multiple operation plans that can avoid conflicts, the server is configured to select the most energy-efficient operation plan from among the multiple operation plans.

[0021] According to the above configuration, it is easy to improve the operation efficiency while suppressing an increase in energy required for operating the mobile object. The server may change an arbitration protocol for conflict avoidance so as to improve energy efficiency.

[0022] The server may use any of the conflict avoidance methods described in the above items 2 to 6 depending on the situation.

[0023] According to an embodiment of the second aspect of the present disclosure, there is provided a transportation system as described below. (Clause 7) The operating system includes the server according to any one of clauses 1 to 6, and a plurality of moving objects that receive instructions from the server.

[0024] In the above-mentioned operation system, the server makes it easier to increase operation efficiency while suppressing an increase in the amount of operation resources.

[0025] (Item 8) The operation system described in item 7 further has the following features. The multiple moving bodies include a third moving body and a fourth moving body. Each of the third moving body and the fourth moving body is an autonomous vehicle. The third moving body, which has been instructed to operate according to an operation plan including a schedule in which the third moving body and the fourth moving body are to be switched at an energy supply point, departs from the energy supply point when the fourth moving body approaches while staying at the energy supply point.

[0026] According to the above configuration, it becomes easier for the fourth moving body to enter the energy supply point just at the same time as the third moving body leaves the energy supply point. Automated driving makes it easier to accurately control the driving conditions compared to manual driving by a driver. Effect of the Invention

[0027] According to the present disclosure, it becomes easier to increase operation efficiency while suppressing an increase in the amount of operation resources. [Brief description of the drawings]

[0028] [Figure 1] 1 is a diagram showing a schematic configuration of a vehicle according to an embodiment of the present disclosure. [Diagram 2] FIG. 2 is a diagram showing details of a control system for the vehicle shown in FIG. [Diagram 3] 1 is a diagram for explaining an operation plan held by a server in a transportation system according to an embodiment of the present disclosure. FIG. [Figure 4] FIG. 13 is a diagram showing a task request screen employed in the operation system according to the embodiment of the present disclosure. [Diagram 5] 1 is a flowchart showing a process related to task reservation in a running method according to an embodiment of the present disclosure. [Figure 6] 11 is a flowchart showing a process for executing a task according to a reserved operation plan in a operation method according to an embodiment of the present disclosure. [Figure 7] 1 is a diagram for explaining a specific example of a vehicle operation plan that can be adopted in a transportation system according to an embodiment of the present disclosure. [Figure 8] FIG. 1 is a diagram for explaining a conflict avoidance technique according to an embodiment of the present disclosure. [Figure 9] 11 is a flowchart showing a process for executing a task according to an operation plan requested on that day in the operation method according to the embodiment of the present disclosure. [Figure 10] 1 is a flowchart showing an example of automatic driving control executed by a vehicle during energy refueling in a driving method according to an embodiment of the present disclosure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0029] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the drawings. In the drawings, the same or corresponding parts are designated by the same reference characters and their description will not be repeated.

[0030] Fig. 1 is a diagram showing a schematic configuration of a vehicle according to an embodiment of the present disclosure. With reference to Fig. 1, a vehicle 1 includes an autonomous driving kit (hereinafter, referred to as an "Autonomous Driving Kit (ADK)") 200 and a vehicle platform (hereinafter, referred to as a "Vehicle Platform (VP)") 2.

[0031] The VP2 includes a base vehicle 100 and a vehicle control interface box (hereinafter, referred to as a "VCIB (Vehicle Control Interface Box)") 111. By adding the VCIB 111 to the base vehicle 100, the VP2 to which the ADK200 can be attached and detached is formed. Then, the vehicle 1 is completed by attaching the ADK200 to the VP2. The VCIB 111 may communicate with the ADK200 through an in-vehicle network such as a Controller Area Network (CAN). Note that while the base vehicle 100 and the ADK200 are shown in separate positions in FIG. 1, the ADK200 is actually attached to the base vehicle 100. In this embodiment, the ADK200 is attached to the roof top of the base vehicle 100. However, the attachment position of the ADK200 can be changed as appropriate.

[0032] The base vehicle 100 is, for example, a commercially available xEV (electric vehicle). In this embodiment, a BEV (electric vehicle) is adopted as the base vehicle 100. However, the present invention is not limited to this, and the base vehicle 100 may be an xEV (HEV, PHEV, FCEV, etc.) other than a BEV. The number of wheels provided on the base vehicle 100 is, for example, four wheels. However, the present invention is not limited to this, and the number of wheels may be three wheels or five or more wheels.

[0033] The control system of the base vehicle 100 includes, in addition to the integrated control manager 115, various systems and various sensors for controlling the base vehicle 100. The integrated control manager 115 integrates and controls various systems related to the operation of the base vehicle 100 based on signals (sensor detection signals) from various sensors included in the base vehicle 100.

[0034] In this embodiment, the integrated control manager 115 includes a control device 150. The control device 150 includes a processor 151, a RAM (Random Access Memory) 152, and a storage device 153. For example, a CPU (Central Processing Unit) can be used as the processor 151. The RAM 152 functions as a working memory that temporarily stores data processed by the processor 151. The storage device 153 is configured to be able to save stored information. The storage device 153 may include a ROM (Read Only Memory) and a rewritable non-volatile memory. In addition to programs, information used in the programs (for example, maps, formulas, and various parameters) is stored in the storage device 153. In this embodiment, various vehicle controls (for example, automatic driving control following instructions from the ADK 200) are executed by the processor 151 executing the programs stored in the storage device 153. However, these processes may be executed by dedicated hardware (electronic circuits) instead of software. The number of processors included in the control device 150 is arbitrary, and a processor may be prepared for each predetermined control.

[0035] The base vehicle 100 includes a brake system 121, a steering system 122, a powertrain system 123, an active safety system 125, and a body system 126. These systems are integrated and controlled by an integrated control manager 115. In this embodiment, each system includes a computer. The computer for each system communicates with the integrated control manager 115 through an in-vehicle network (e.g., CAN). Hereinafter, the computer included in each system is referred to as an "ECU (Electronic Control Unit)."

[0036] The brake system 121 includes a brake device provided on each wheel of the base vehicle 100 and an ECU that controls the brake device. In this embodiment, a hydraulic disc brake device is adopted as the brake device. The base vehicle 100 includes wheel speed sensors 127A and 127B. The wheel speed sensor 127A is provided on the front wheels of the base vehicle 100 and detects the rotation speed of the front wheels. The wheel speed sensor 127B is provided on the rear wheels of the base vehicle 100 and detects the rotation speed of the rear wheels. The ECU of the brake system 121 outputs the rotation direction and rotation speed of each wheel detected by the wheel speed sensors 127A and 127B to the integrated control manager 115. The integrated control manager 115 may obtain the traveling speed (vehicle speed) of the vehicle 1 based on the detection signals of the wheel speed sensors 127A and 127B.

[0037] The steering system 122 includes a steering device of the base vehicle 100 and an ECU that controls the steering device. The steering device includes, for example, a rack-and-pinion type EPS (Electric Power Steering) that allows the steering angle to be adjusted by an actuator. The base vehicle 100 is equipped with a pinion angle sensor 128. The pinion angle sensor 128 detects the rotation angle (pinion angle) of a pinion gear connected to a rotating shaft of an actuator that constitutes the steering device. The ECU of the steering system 122 outputs the pinion angle detected by the pinion angle sensor 128 to the integrated control manager 115.

[0038] The powertrain system 123 includes an EPB (Electric Parking Brake) provided on at least one of the wheels of the base vehicle 100, a P-Lock device provided on the transmission of the base vehicle 100, a shift device configured to be able to select a shift range, a drive source of the base vehicle 100, and an ECU that controls each device included in the powertrain system 123. The EPB is provided separately from the above-mentioned braking device and fixes the wheels by an electric actuator. The P-Lock device mechanically fixes the rotational position of the output shaft of the transmission by, for example, a parking lock pole that can be driven by an actuator. Although details will be described later, in this embodiment, a motor that receives power from a battery is used as the drive source of the base vehicle 100. The ECU of the powertrain system 123 outputs to the integrated control manager 115 the presence or absence of fixation by the EPB and the P-Lock device, the shift range selected by the shift device, and the respective states of the battery and the motor (see FIG. 3 described later).

[0039] The active safety system 125 includes an ECU that determines the possibility of a collision for the vehicle 1 that is traveling. The base vehicle 100 includes a camera 129A and radar sensors 129B, 129C that detect the surrounding conditions including the front and rear of the vehicle 1. The ECU of the active safety system 125 determines whether or not there is a possibility of a collision using signals received from the camera 129A and the radar sensors 129B, 129C. When the active safety system 125 determines that there is a possibility of a collision, the integrated control manager 115 outputs a braking command to the brake system 121 to increase the braking force of the vehicle 1. The base vehicle 100 according to this embodiment includes the active safety system 125 from the initial stage (at the time of shipment). However, the present invention is not limited to this, and an active safety system that can be retrofitted to the base vehicle may be adopted.

[0040] The body system 126 includes body system parts (e.g., a turn signal, a horn, and a wiper) and an ECU that controls the body system parts. In the manual mode, the ECU of the body system 126 controls the body system parts according to a user operation, and in the autonomous mode, the ECU controls the body system parts according to a command received from the ADK 200 via the VCIB 111 and the integrated control manager 115.

[0041] The vehicle 1 is configured to be capable of automatic driving. The VCIB 111 functions as a vehicle control interface. When the vehicle 1 runs in an automatic driving mode, the integrated control manager 115 and the ADK 200 exchange signals with each other via the VCIB 111, and the integrated control manager 115 executes driving control in an autonomous mode (i.e., automatic driving control) according to an instruction from the ADK 200. The ADK 200 can also be removed from the base vehicle 100. Even when the ADK 200 is removed, the base vehicle 100 can run by itself by driving the user. When the base vehicle 100 runs by itself, the control system of the base vehicle 100 executes driving control in a manual mode (i.e., driving control according to a user operation). The integrated control manager 115 may switch between the autonomous mode and the manual mode according to an instruction from the vehicle manager or the server 500.

[0042] In this embodiment, the ADK200 exchanges signals with the VCIB111 according to an API (Application Program Interface) that defines each signal to be communicated. The ADK200 is configured to process various signals defined by the API. For example, the ADK200 creates a driving plan for the vehicle 1, and outputs various commands to the VCIB111 according to the API, requesting control for driving the vehicle 1 according to the created driving plan. The control device 150 of the integrated control manager 115 sequentially transmits various signals (e.g., sensor signals or status signals) indicating the state of the base vehicle 100 detected in the control system of the base vehicle 100 to the ADK200 via the VCIB111. The VCIB111 converts signals between the ADK200 and the base vehicle 100, thereby enabling the base vehicle 100 (integrated control manager 115) to control the vehicle according to commands from the ADK200.

[0043] The base vehicle 100 further includes a communication device 130. The communication device 130 includes various communication I / Fs (interfaces). The control device 150 is configured to communicate with a device (e.g., a server 500 described later) outside the vehicle 1 through the communication device 130. The communication device 130 includes a wireless communication device (e.g., a DCM (Data Communication Module)) that can access a mobile communication network (telematics).

[0044] The mobile terminal UT is a terminal carried by a user who uses the vehicle 1. In this embodiment, a smartphone equipped with a touch panel display is adopted as the mobile terminal UT. However, the present invention is not limited to this, and any mobile terminal can be adopted as the mobile terminal UT, and a laptop, a tablet terminal, a wearable device (e.g., a smart watch or smart glasses), or an electronic key can also be adopted.

[0045] The vehicle 1 described above may be employed as one of the components of a Mobility as a Service (MaaS) system. The MaaS system includes, for example, a Mobility Service Platform (MSPF). The MSPF is a unified platform to which various mobility services (for example, various mobility services provided by ride-sharing operators, car-sharing operators, insurance companies, rental car operators, taxi operators, etc.) are connected. The server 500 is a computer that manages and publishes information for mobility services in the MSPF. The server 500 manages information on various types of mobility and provides information (for example, APIs and information on cooperation between mobilities) in response to requests from operators. An operator providing a service can use various functions provided by the MSPF using the APIs published on the MSPF. For example, APIs required for the development of an ADK are published on the MSPF.

[0046] The server 500 includes a processor 501, a RAM 502, a storage device 503, and an HMI (Human Machine Interface) 504. The storage device 503 is configured to be able to save stored information. In addition to programs, the storage device 503 stores information used by the programs (e.g., maps, formulas, and various parameters). The HMI 504 includes an input device and a display device. The HMI 504 may be a touch panel display. The HMI 504 may include a smart speaker that accepts voice input.

[0047] Fig. 2 is a diagram showing details of the control system of the vehicle 1. Referring to Fig. 2 together with Fig. 1, the ADK 200 includes an autonomous driving system (hereinafter, referred to as "ADS (Autonomous Driving System)") 202 for autonomously driving the vehicle 1. The ADS 202 includes a computer 210, an HMI 230, a recognition sensor 260, an attitude sensor 270, and a sensor cleaner 290.

[0048] The computer 210 includes a processor and a storage device that stores autonomous driving software using the API, and is configured to be executable by the processor. The autonomous driving software executes control related to autonomous driving. The autonomous driving software may be updated sequentially by OTA (Over The Air). The computer 210 further includes calculation modules 210A and 210B.

[0049] The HMI 230 is a device for exchanging information between the user and the computer 210. The HMI 230 includes an input device and a notification device. Through the HMI 230, the user can give instructions or requests to the computer 210, and change the values ​​of parameters (limited to those that are permitted to be changed) used in the autonomous driving software. The HMI 230 may be a touch panel display that combines the functions of both an input device and a notification device.

[0050] The recognition sensor 260 includes various sensors that acquire information for recognizing the external environment of the vehicle 1 (hereinafter, also referred to as "environmental information"). The recognition sensor 260 acquires the environmental information of the vehicle 1 and outputs it to the computer 210. The environmental information is used for automatic driving control. In this embodiment, the recognition sensor 260 includes a camera that captures the surroundings (including the front and rear) of the vehicle 1, and an obstacle detector (e.g., millimeter wave radar and / or lidar) that detects obstacles by electromagnetic waves or sound waves. The computer 210 can recognize, for example, people, objects (other vehicles, pillars, guardrails, etc.) and lines on the road (e.g., center lines) that are present within a recognizable range from the vehicle 1, using the environmental information received from the recognition sensor 260. For recognition, artificial intelligence (AI) or an image processing processor may be used.

[0051] The attitude sensor 270 acquires information on the attitude of the vehicle 1 (hereinafter, also referred to as "attitude information") and outputs it to the computer 210. The attitude sensor 270 includes various sensors that detect the acceleration, angular velocity, and position of the vehicle 1. In this embodiment, the attitude sensor 270 includes an IMU (Inertial Measurement Unit) and a positioning sensor. The IMU detects the acceleration in each of the forward / rearward, left / right, and up / down directions of the vehicle 1, and the angular velocity in each of the roll direction, pitch direction, and yaw direction of the vehicle 1. The positioning sensor detects the position of the vehicle 1 using a positioning system such as a GPS (Global Positioning System). In the fields of automobiles and aircraft, a technique for measuring the attitude with high accuracy by combining an IMU and a positioning sensor is known. The computer 210 may measure the attitude of the vehicle 1 from the attitude information, for example, by using such a known technique.

[0052] The sensor cleaner 290 is a device that removes dirt from a sensor (e.g., the recognition sensor 260) that is exposed to the outside air outside the vehicle. For example, the sensor cleaner 290 may be configured to clean the lens of a camera and the emission port of an obstacle detector using a cleaning liquid and a wiper.

[0053] In vehicle 1, certain functions (e.g., braking, steering, and vehicle immobilization) are provided with redundancy to improve safety. The control system of base vehicle 100 includes multiple systems that achieve equivalent functions. Specifically, brake system 121 includes brake systems 121A and 121B. Steering system 122 includes steering systems 122A and 122B. Powertrain system 123 includes EPB system 123A and P-Lock system 123B. Each system includes an ECU. Even if an abnormality occurs in one of the multiple systems that achieve the equivalent function, the function in question works normally in vehicle 1 because the other operates normally.

[0054] The VCIB 111 includes VCIB 111A and VCIB 111B. Each of the VCIB 111A and 111B includes a computer. The computation modules 210A and 210B of the computer 210 are configured to be able to communicate with the computers of the VCIB 111A and 111B, respectively. The VCIB 111 and VCIB 111B are connected to be able to communicate with each other. Each of the VCIB 111A and 111B can operate independently, and even if an abnormality occurs in one of them, the VCIB 111 operates normally as the other operates normally. Both the VCIB 111A and 111B are connected to the above-mentioned systems via the integrated control manager 115. However, as shown in FIG. 2, the connection destinations of the VCIB 111A and VCIB 111B are partially different.

[0055] In this embodiment, there is no redundancy in the function of accelerating the vehicle 1. The powertrain system 123 includes a propulsion system 123C as a system for accelerating the vehicle 1.

[0056] Fig. 3 is a diagram for explaining a configuration of a propulsion system of the vehicle 1 and an example of an operation plan held by the server 500. With reference to Fig. 3 together with Figs. 1 and 2, the vehicle 1 includes a motor generator (MG) 20, an ECU 21, a power control unit (PCU) 22, a braking device 30, a brake sensor 30a, an on-board sensor 40, a battery 160, a battery management system (BMS) 161, a charger 162, an inlet 163, a navigation system (hereinafter also referred to as "NAVI") 170, a reader 180, and driving wheels W. The MG 20, the ECU 21, and the PCU 22 are included in a propulsion system 123C. The braking device 30 and the brake sensor 30a are included in a brake system 121 (Fig. 1).

[0057] The battery 160 supplies power to the propulsion system 123C. A known vehicle power storage device (such as a liquid secondary battery, an all-solid-state secondary battery, or a battery pack) can be used as the battery 160. Examples of the vehicle secondary battery include a lithium ion battery and a nickel metal hydride battery.

[0058] The battery 160 is provided with a BMS 161. The BMS 161 includes various sensors that detect the state of the battery 160 (for example, voltage, current, and temperature), and outputs the detection results to the integrated control manager 115. The control device 150 can acquire the state of the battery 160 (for example, temperature, current, voltage, and SOC) based on the output signal from the BMS 161. The SOC (State Of Charge) indicates the remaining amount of charge, and is, for example, the ratio of the current amount of charge to the amount of charge in a fully charged state, expressed as 0 to 100%.

[0059] The vehicle 1 is configured to be capable of charging using power supplied from outside the vehicle (external power source) (hereinafter also referred to as "external charging"). The external charging performed by the vehicle 1 is contact charging (plug-in charging) using power supplied from EVSE (Electric Vehicle Supply Equipment). The inlet 163 is configured to be connectable to a connector of a charging cable of the EVSE (external power source). The charger 162 converts power input to the inlet 163 from outside the vehicle into power suitable for charging the battery 160. The charger 162 is, for example, an on-board charger including at least one of a DC / DC converter and an inverter. Note that the external charging is not limited to plug-in charging and may be non-contact charging.

[0060] The propulsion system 123C generates driving force for the vehicle 1 to travel by using electric power stored in the battery 160. The MG 20 is, for example, a three-phase AC motor generator. The PCU 22 includes, for example, an inverter, a converter, and a relay. The PCU 22 is controlled by the ECU 21. The relay is configured to switch between connection and disconnection of an electric path from the battery 160 to the MG 20. The relay is closed (connected) when the vehicle 1 is traveling.

[0061] The MG 20 is driven by the PCU 22 to rotate the drive wheels W of the vehicle 1. The MG 20 also generates regenerative power and supplies the generated power to the battery 160. The PCU 22 drives the MG 20 using the power supplied from the battery 160. The vehicle 1 may be equipped with any number of motors (MG 20) for running, and may be one, two, or three or more. The motor for running may be an in-wheel motor. Although FIG. 3 shows only one drive wheel W, the number and drive system of the drive wheels W in the vehicle 1 are arbitrary. The drive system of the vehicle 1 may be any of front-wheel drive, rear-wheel drive, and four-wheel drive.

[0062] Each wheel (including the drive wheels W) of the vehicle 1 is provided with a braking device 30 and a brake sensor 30a that detects the braking force applied to the wheel by the braking device 30. The brake sensor 30a may be a hydraulic sensor that detects the hydraulic pressure applied to the brake pad (or the wheel cylinder). The braking forces for each wheel detected by the four brake sensors 30a are output to the integrated control manager 115.

[0063] The occupancy sensor 40 is configured to detect whether or not a person (e.g., a passenger) is present in the vehicle 1. More specifically, the occupancy sensor 40 acquires information for recognizing the interior environment of the vehicle 1, and outputs the acquired information to the integrated control manager 115. The occupancy sensor 40 includes, for example, at least one of a camera and an infrared sensor facing the interior of the vehicle. The occupancy sensor 40 may further include at least one of a seating sensor and a seat belt sensor. The control device 150 can determine whether the vehicle 1 is occupied / unoccupied based on the output of the occupancy sensor 40.

[0064] NAVI 170 includes a touch panel display, a positioning sensor, and a storage device (none of which are shown). The storage device stores map information. NAVI 170 is configured to display the position of vehicle 1 on the map in real time. NAVI 170 is configured to perform route search to find an optimal route (e.g., the shortest route) from the current location of vehicle 1 to the destination by referring to the map information. NAVI 170 may successively update the map information by OTA.

[0065] The reader 180 is configured to read predetermined identification information from an image. More specifically, the reader 180 captures an image, extracts a predetermined code from the image, and performs a decoding process. The code extracted from the image is converted into predetermined identification information by the decoding process. The reader 180 then outputs the identification information read from the image to the integrated control manager 115. However, the reading method of the reader 180 is not limited to the above and is arbitrary. For example, the reader 180 may be an RFID (Radio Frequency Identification) reader. The reader 180 may be provided so that it can be used by a user outside the vehicle.

[0066] The vehicle 1 according to this embodiment is an autonomous vehicle. The vehicle 1 provides a service by autonomous driving without a driver. In other words, there is no vehicle manager in the vehicle 1. Basically, only service users get in the vehicle 1, and when all the service users get off, the vehicle 1 becomes unmanned.

[0067] The server 500 can identify the user who is using the vehicle 1 based on the information from the vehicle 1. The server 500 manages information (user information) about each user registered in the storage device 503. Identification information (user ID) for identifying the user is assigned to each user, and the server 500 manages the user information by distinguishing them by the user ID. In this embodiment, each user registered in the server 500 carries a mobile terminal UT. The user information includes personal information (such as name, address, age, service usage history, etc.) and the address of the mobile terminal UT carried by the user. The server 500 may manage service usage fees for each user.

[0068] Application software (hereinafter, referred to as "mobile app") for using the transportation service provided by the server 500 is installed in the mobile terminal UT. The mobile terminal UT requests a task (transportation) from the server 500, and when it receives an acceptance reply from the server 500 (for example, see S103 in Figs. 5 and 9 described later), it becomes possible to display a code issued by the server 500. When a user holds the mobile terminal UT displaying the code over the reader 180 of the vehicle 1, the control device 150 identifies the user based on information from the mobile terminal UT, and executes processing for executing the requested task (transportation) (for example, control of opening and closing the doors of the vehicle 1, and control of driving according to an operation plan).

[0069] The operation system according to this embodiment includes a server 500 and a plurality of vehicles 1 having the configuration shown in Figs. 1 to 3. The plurality of vehicles 1 are registered in the server 500. Each vehicle registered in the server 500 may function as a robotaxi vehicle. The server 500 generates an operation plan for each of the plurality of vehicles 1 and stores the generated operation plan in a storage device 503. Identification information (vehicle ID) for identifying the vehicle is assigned to each vehicle, and the server 500 manages information about each vehicle (including the operation plan) by distinguishing them by the vehicle ID. The server 500 instructs each of the plurality of vehicles 1 to operate in accordance with the operation plan stored in the storage device 503.

[0070] The operation plan stored in the storage device 503 includes a type of task (e.g., transportation of people or transportation of luggage), task start information indicating a start point and start time of the task, task end information indicating a finish point and end time of the task, pre-task movement information indicating a route and driving conditions for the vehicle to move to the task start point before the task starts, task in-progress movement information indicating a route and driving conditions for the vehicle to move from the task start point to the task end point during task execution, and supply information indicating a plan regarding energy supply for operation. The supply information indicates an energy supply point, which is a place where the vehicle will supply energy, and a stay period, which is a period during which the vehicle will stay at the energy supply point. For a vehicle that is predicted to have sufficient energy remaining after the task ends, the supply information may indicate that the location and period of energy supply are not set, that is, that the vehicle will not supply energy after the task ends. In an operation plan in which multiple tasks are set, the task type, pre-task movement information, task start information, task in-progress movement information, task end information, and supply information are stored in the storage device 503 in a manner that distinguishes between each task.

[0071] The initial operation plan of a vehicle includes only non-operating sections. Then, an operating section is added to the operation plan of the vehicle by assigning a task requested by a user (service user) to the vehicle (see Figs. 5 and 9 described below). In this embodiment, an operating section corresponds to a section in the operation plan where the vehicle is performing a task (see Fig. 7 described below). Also, a non-operating section is a section in the operation plan that is not an operating section (see Fig. 7 described below).

[0072] The storage device 503 further stores information indicating the current status of each vehicle registered in the server 500 (e.g., location, vehicle speed, remaining energy, and whether or not there are passengers). The server 500 sequentially receives information indicating the current status of each registered vehicle (e.g., detection results of various on-board sensors) from the vehicle. Furthermore, the storage device 503 may further store specification information of each vehicle registered in the server 500. In this embodiment, each vehicle registered in the server 500 corresponds to the vehicle 1 (see Figures 1 to 3) having the above-mentioned configuration.

[0073] The server 500 accepts a task request from a user terminal (for example, a mobile terminal UT). FIG. 4 is a diagram showing an example of a screen (task request screen) for a user to request a task (transportation) from the server 500. Referring to FIG. 4, the screen Sc1 is displayed, for example, by a touch panel display of the mobile terminal UT. The screen Sc1 includes a map M10, a display section P101 (for example, an icon) indicating a task start point, a display section M1 (for example, a text box) indicating a task start date and time, a display section P102 (for example, an icon) indicating a task end point, a display section M2 (for example, a text box) indicating a task end date and time, an operation section M11 (for example, a check box or a radio button) for a user to input a type of task, and an operation section M12 (for example, a button) for a user to request a task from the server 500.

[0074] A user can display a desired map M10 on the mobile terminal UT by touch panel operation (e.g., scrolling). A user can also zoom in / out on the map M10 by touch panel operation (e.g., pinch in / pinch out). A user can specify any position on the map M10 by tapping on the displayed map M10. A user can specify a task start point and a task end point by such touch panel operation (tapping). Display units P101 and P102 show the task start point and task end point, respectively, specified by the user on the map M10. In addition, a user can input a task start date and time and a task end date and time into the mobile terminal UT by touch panel operation (e.g., touch keyboard operation) or voice input. Display units M1 and M2 show the task start date and time and task end date and time input by the user, respectively. An operation unit M11 accepts input of, for example, a transportation object (person / baggage). When the user operates operation unit M12, a task having contents specified by display units P101, P102, M1, M2 and operation unit M11 is requested from the mobile terminal UT to the server 500. Specifically, the mobile terminal UT transmits to the server 500 a first task request signal indicating the user ID, the type of task input by operation unit M11 (e.g., transporting a person or baggage), task start information indicated by display units P101, M1, and task end information indicated by display units P102, M2.

[0075] 4 may be changed as appropriate. For example, the operation unit M11 may further receive an input of a task amount (for example, the number of people or the amount of luggage). The first task request signal may further indicate the task amount.

[0076] A user can reserve a task in the server 500 by requesting the task from the server 500 by using the mobile terminal UT on or before the day before the day the operation plan is executed. In the example shown in FIG. 4, the task start date shown in the display unit M1 corresponds to the day the operation plan is executed. The server 500 accepts task requests from each of a plurality of registered users. Each user requests a task using a mobile terminal UT (see FIG. 4). When the server 500 receives the above-mentioned first task request signal from the mobile terminal UT, the server 500 executes a series of processes shown in FIG. 5, which will be described below, for the user corresponding to the mobile terminal UT. Each time the server 500 receives a task request from any of the registered users, the server 500 executes a series of processes shown in FIG. 5 for the user. FIG. 5 is a flowchart showing a process related to task reservation. "S" in the flowchart means a step.

[0077] 1 to 3 and FIG. 5, in S101, the server 500 acquires the operation plan of each registered vehicle. Specifically, the processor 501 reads out the operation plan of each vehicle from the storage device 503. In the following S102, the server 500 judges whether or not any vehicle can execute the task requested by the first task request signal based on the operation plan of each vehicle and the contents of the task indicated by the first task request signal (e.g., task start information and task end information). For example, the server 500 checks the operation plan of each registered vehicle, and judges that the requested task can be executed if there is a vehicle that can add an operating section for executing the requested task, and judges that the requested task cannot be executed if there is no vehicle that can add an operating section for executing the requested task. The server 500 may judge whether or not the vehicle can execute the requested task based on the position and state (e.g., remaining energy) of the vehicle at the task start time in addition to the operation plan of the vehicle. The server 500 may predict the position and state of the vehicle at the task start time based on the driving history and operation plan of the vehicle.

[0078] If it is determined that none of the vehicles can execute the requested task (NO in S102), the server 500 requests the mobile terminal UT (the terminal of the user who requested the task) to change the task in S105. When the process of S105 is executed, the series of processes shown in FIG. 5 ends. The user who is requested to change the task may, for example, display the screen Sc1 shown in FIG. 4 on the mobile terminal UT, change the content of the task by operating the mobile terminal UT, and re-request the changed task from the server 500. The server 500 which receives the re-request restarts the series of processes shown in FIG. 5.

[0079] If it is determined that any of the vehicles can perform the requested task (YES in S102), in S103, the server 500 determines a vehicle (hereinafter also referred to as a "target vehicle") that will perform the requested task from among the multiple registered vehicles 1, and returns an approval signal to the mobile terminal UT (the terminal of the user who requested the task) indicating that the requested task will be performed.

[0080] The server 500 determines, based on the operation plan of each registered vehicle, a vehicle that can add an operating section for performing the requested task as the target vehicle. If there are multiple applicable vehicles, the server 500 may select a vehicle that is suitable for the requested task based on at least one of the vehicle performance, the vehicle position at the task start time, and the vehicle state (e.g., remaining energy) at the task start time.

[0081] When the process of S103 is executed, the process proceeds to S104. In S104, the server 500 determines an operation plan for the target vehicle and updates the operation plan for each registered vehicle. Specifically, in S104, the server 500 executes, for example, S104A to S104C in FIG. 5. In S104A, the server 500 adds an operating section for executing the task to the operation plan of the target vehicle to which the task is assigned, so as not to compete with other vehicles. Furthermore, the server 500 evaluates the energy running out risk of the target vehicle with respect to the operation plan of the target vehicle to which the operating section has been added. The energy running out risk with respect to the operation plan of the target vehicle indicates the possibility (e.g., probability) that the target vehicle will run out of energy (e.g., run out of electricity) during the execution of the operation plan. In S104B, the server 500 determines whether the energy running out risk with respect to the operation plan of the target vehicle is higher than a predetermined reference level based on the result of the above evaluation. For example, the server 500 predicts the transition of the remaining energy of the target vehicle over the entire operation period, and if the remaining energy of the target vehicle falls below a predetermined energy lower limit even temporarily during the operation period, it determines that the risk of running out of energy is higher than the reference level, and if the remaining energy of the target vehicle is equal to or higher than the energy lower limit throughout the entire operation period, it determines that the risk of running out of energy is lower than the reference level. The remaining energy of the vehicle 1 is expressed, for example, by the SOC of the battery 160. If the risk of running out of energy regarding the operation plan of the target vehicle is higher than the reference level (YES in S104B), the server 500 further adds an energy replenishment point and its stay period before the start of a task in the operation plan of the target vehicle or after the end of the task in S104C. At this time, the server 500 sets the energy replenishment point and its stay period so that no contention occurs at the replenishment point. Contention at the replenishment point is an event in which multiple vehicles replenish energy at the same place at the same time. On the other hand, if the energy shortage risk regarding the operation plan of the target vehicle is lower than the reference level (NO in S104B), the energy replenishment point is not added to the operation plan of the target vehicle.

[0082] In S104, the server 500 may determine an operation plan for the target vehicle so that the target vehicle performs the task while complying with traffic regulations, conflicts at the supply points are avoided, and the risk of the target vehicle running out of energy is lower than a reference level. The operation plan determined in S104 is stored in the storage device 503. However, the operation plan determined here may be changed before operation instructions are issued (see S14 in FIG. 6 described later).

[0083] The process of S104 reserves a task in the server 500. When a predetermined time arrives on the day (the day the operation plan is executed), the server 500 for which the task has been reserved executes a series of processes shown in FIG. 6, which will be described below. The predetermined time may be a predetermined start time (for example, 5:00 a.m.). Alternatively, the server 500 may determine the predetermined time based on the operation plan of each vehicle so that the earliest reserved task can be executed.

[0084] Fig. 6 is a flowchart showing a process for executing a task according to a reserved operation plan. With reference to Fig. 6 together with Figs. 1 to 3, in S11, the server 500 acquires an operation plan for each registered vehicle (see Fig. 3), vehicle information indicating the current status of each registered vehicle, and operation information indicating the predicted operation status for today (the latest predicted information at the present time). The vehicle information may indicate the current location and remaining energy of the vehicle. The operation information may indicate the traffic congestion status for each road and the weather status (for example, weather such as sunny / cloudy / rainy / snowy, and temperature).

[0085] In S12, based on the operation plan, vehicle information, and operation information acquired in S11, the server 500 determines whether or not a conflict will occur at the supply point if it instructs each vehicle registered in the server 500 to operate in accordance with the operation plan.

[0086] If it is determined that the above-mentioned conflict does not occur in the operation plan acquired in S11 (i.e., the operation plan of each vehicle stored in the storage device 503 at the start of the series of processes shown in FIG. 6) (NO in S12), the server 500 determines in S13 not to change the operation plan (operation plan determination). An operation plan is determined for each target vehicle to which a task is assigned (see FIG. 5).

[0087] On the other hand, when it is determined that the above-mentioned conflict occurs in the operation plans acquired in S11 (YES in S12), the server 500 changes at least one operation plan of the competing multiple target vehicles in S14 so as to avoid the conflict. Since the possibility of three or more target vehicles competing at one energy refueling point is low, the following describes a case where two target vehicles compete at one energy refueling point. In the following description, of the two competing target vehicles, the vehicle that is predicted to arrive at the energy refueling point first according to the operation plan is referred to as the "preceding vehicle," and the vehicle that is predicted to arrive at the energy refueling point later according to the operation plan is referred to as the "following vehicle." When the preceding vehicle and the following vehicle move according to their respective operation plans, the following vehicle arrives at the energy refueling point while the preceding vehicle is staying at the energy refueling point.

[0088] In S14, the server 500 executes, for example, S14A to S14D in FIG. 6. In S14A, the server 500 searches for an operation plan of the following vehicle that satisfies all of the following requirements: the risk of running out of energy is lower than a predetermined reference level (first requirement), the above conflict can be avoided (second requirement), and the assigned task can be accomplished (third requirement), and in S14B, the server 500 judges whether or not an operation plan of the following vehicle that satisfies all of the above first to third requirements has been found. The reference level used here may be the same as or different from the reference level used in S104B in FIG. 5. The server 500 may judge whether or not the operation plan of the following vehicle satisfies all of the above first to third requirements by changing, for example, at least one of the route and the driving conditions. The server 500 may avoid the conflict by, for example, changing the route of the following vehicle so that the following vehicle refuels at an energy refueling point different from the energy refueling point where the conflict occurs (i.e., changing the energy refueling point of the following vehicle). In addition, the server 500 may avoid the conflict by, for example, changing the driving conditions or route of the following vehicle so that the following vehicle arrives at the energy refueling point after the leading vehicle has completed refueling at the energy refueling point. In the operation plan of the following vehicle, the following vehicle can delay the arrival time of the following vehicle at the energy refueling point by slowing down the vehicle speed, stopping on the route, or changing the route to a detour or loop route.

[0089] When an operation plan for the following vehicle that satisfies all of the above first to third requirements is found (YES in S14B), the server 500 determines the operation plan as the operation plan for the following vehicle in S14C. The determined operation plan is stored in the storage device 503 as the operation plan for the following vehicle (see FIG. 3). Here, when multiple operation plans for the following vehicle that satisfy all of the above first to third requirements are found, the server 500 selects, for example, from among those operation plans, an operation plan with the lowest risk of running out of energy. In other words, the server 500 selects, from among multiple operation plans for the following vehicles, an operation plan with the lowest risk of the following vehicle running out of remaining energy.

[0090] However, the above is not limited, and when a plurality of operation plans of the following vehicle that satisfy all of the above first to third requirements are found, the server 500 may select the most energy-efficient operation plan from among the operation plans. The server 500 may calculate the energy efficiency of the operation plan using the driving conditions (vehicle speed, driving time, etc.) and route (driving distance, elevation difference, etc.) indicated by the operation plan. The server 500 may further use at least one of the traffic congestion situation and the weather situation on the day the operation plan is executed to calculate the energy efficiency of the operation plan. For example, the longer the driving time, the greater the energy consumption. In an autonomous vehicle traveling, a large amount of energy is consumed by sensing for traveling (operation of the autonomous driving system). In addition, the energy consumption (electricity cost) due to traveling changes depending on the vehicle speed. Energy consumption due to friction and resistance during traveling tends to be greater at high speeds than at low speeds. In addition, energy consumption due to sensing (operation of the autonomous driving system) per unit time also tends to be greater at high speeds than at low speeds. This is because the faster the vehicle is, the farther it is necessary to sense. However, the travel time (time to reach the destination) is longer at low speeds than at high speeds, and the longer the travel time, the greater the energy consumption due to sensing.

[0091] On the other hand, if an operation plan of the following vehicle that satisfies all of the above first to third requirements is not found (NO in S14B), the server 500 changes the operation plan of the preceding vehicle in S14D so as to avoid the conflict.

[0092] For example, when the remaining energy amount of the leading vehicle at the conflict occurrence time predicted from the operation plans of each vehicle is less than a predetermined reference amount, the server 500 changes both the operation plan of the leading vehicle and the operation plan of the following vehicle. Specifically, the server 500 changes the operation plans of the leading vehicle and the following vehicle so that the leading vehicle departs from the energy replenishment point and the following vehicle arrives at the energy replenishment point at the timing when the remaining energy amount of the leading vehicle reaches the predetermined reference amount by energy replenishment (charging). In this case, the server 500 advances the departure time (end of stay period) of the leading vehicle and delays the arrival time (start of stay period) of the following vehicle with respect to the energy replenishment point. The server 500 may set the reference amount based on the operation plan of the leading vehicle so that the leading vehicle can perform the assigned task.

[0093] On the other hand, if the remaining energy amount of the preceding vehicle at the conflict occurrence time predicted from the operation plans of each vehicle is greater than the above-mentioned predetermined reference amount, the server 500 changes the stay period of the preceding vehicle at the energy refueling point so that the preceding vehicle departs from the energy refueling point at the above-mentioned conflict occurrence time. In this case, the server 500 advances the departure time (end of the stay period) of the preceding vehicle with respect to the energy refueling point, but does not change the stay period of the following vehicle.

[0094] When three or more vehicles compete at one energy supply point, an operation plan that satisfies all of the first to third requirements for each of the competing vehicles may be searched for. If no corresponding operation plan is found, the server 500 may raise the reference level of the first requirement. The lower the above-mentioned energy lower limit value, the higher the reference level of the first requirement.

[0095] When the operation plan of each target vehicle is finalized through S13 or S14, the server 500 instructs each target vehicle to operate in accordance with the operation plan in S15. Upon receiving the instruction from the server 500, each target vehicle performs operation in accordance with the operation plan by automatic driving. In this way, the requested task is executed. In this manner, the server 500 is configured to generate an operation plan for each of the multiple vehicles 1 and instruct each of the multiple vehicles 1 to operate in accordance with the generated operation plan.

[0096] Fig. 7 is a diagram for explaining an example of an operation plan for vehicle 1A. Vehicle 1A corresponds to a target vehicle. The operation plan shown in Fig. 7 includes a start position P0 and its departure time T1, a start point P1 of a first task, a start time T2 of the first task, an end point P2 of the first task, an end time T3 of the first task, a supply point P3, a stay period at the supply point P3 (time T4 to time T5), a start point P4 of a second task, and a start time T6 of the second task.

[0097] In the example shown in Fig. 7, the position of vehicle 1A at the start of the operation plan corresponds to start position P0. If the type of the requested first task is transportation of a person, the location and time where the person gets on vehicle 1A correspond to start point P1 and start time T2, respectively, and the location and time where the person gets off vehicle 1A correspond to end point P2 and end time T3, respectively. If the type of the requested first task is transportation of luggage, the location and time where the luggage is loaded onto vehicle 1A correspond to start point P1 and start time T2, respectively, and the location and time where the luggage loaded on vehicle 1A is unloaded from vehicle 1A correspond to end point P2 and end time T3, respectively. The type of the first task, start point P1, end point P2, start time T2, and end time T3 are specified by a first task request signal (see Fig. 4). The server 500 may set the start time T2 and the end time T3 a predetermined time (estimated travel time) earlier than the scheduled departure time of the vehicle at the start point P1 and the end point P2, taking into account the time (travel time) required for boarding / loading and disembarking / unloading.

[0098] The recharge point P3 corresponds to a location (energy recharge point) where the vehicle 1A recharges energy for the second task after executing the first task. The energy recharge of the vehicle 1A is, for example, plug-in charging of the battery 160. The stay period at the recharge point P3 corresponds to the period from time T4 when the vehicle 1A arrives at the recharge point P3 to time T5 when the vehicle 1A departs from the recharge point P3.

[0099] The operation plan shown in FIG. 7 further includes a route Rt1 (a first route to a first task start point) and its driving condition Td1 (a first driving condition), a route Rt2 (a second route from a first task start point to a first task end point) and its driving condition Td2 (a second driving condition), a route Rt3 (a third route from a first task end point to an energy supply point) and its driving condition Td3 (a third driving condition), and a route Rt4 (a fourth route from an energy supply point to a second task start point) and its driving condition Td4 (a fourth driving condition). Each driving condition includes, for example, a vehicle speed. However, the driving condition is not limited to the vehicle speed, and each driving condition may indicate more detailed conditions related to driving (such as the number of stops and the number of loops).

[0100] The operation plan includes a first non-operating section (a section from the starting position to the starting point of the first task), a first operating section (a section from the starting point of the first task to the end point of the first task), a second non-operating section (a section from the end point of the first task to the starting point of the second task), and a second operating section (a section from the start point of the second task to the end point of the second task). Although the operation plan for executing the second task is omitted in Fig. 7, an operation plan is set for the second task following the first task in a manner similar to that of the first task described above.

[0101] FIG. 8 is a diagram for explaining the conflict avoidance method in this embodiment. If it is determined in S12 of FIG. 6 that the vehicle 1A does not conflict with other vehicles in the operation plan of the vehicle 1A, the operation plan is finalized in the following S13. On the other hand, if it is determined in S12 of FIG. 6 that the vehicle 1A conflicts with other vehicles in the operation plan of the vehicle 1A, a search for an operation plan is executed in the following S14A. The operation plan shown in FIG. 8 is an operation plan of the vehicle 1A that satisfies the first and third requirements, found by the search in S14A. In detail, the first and third requirements are satisfied by setting any one of the recharge points P3B, P3C, and P3D as an energy recharge point (corresponding to the recharge point P3 shown in FIG. 7) in the operation plan of the vehicle 1A. If no conflict occurs at at least one of the recharge points P3B, P3C, and P3D, the second requirement is also satisfied, and therefore, in S14C of FIG. 6, a recharge point that does not cause a conflict is determined as an energy recharge point. When there are multiple recharge points that do not cause a conflict, the server 500 selects one of the recharge points according to, for example, a selection criterion described later. The conflict is avoided by changing the energy recharge point (changing the route).

[0102] When the server 500 determines based on the operation plans of the vehicles 1A-1D that the vehicle 1A will compete with the vehicles 1B, 1C, and 1D (preceding vehicles) at the resupply points P3B, P3C, and P3D, respectively, in S14D of Fig. 6, it selects one resupply point from among the resupply points P3B, P3C, and P3D and changes the operation plan of the preceding vehicle so as to avoid the competition. When the stay period of the vehicle 1A at the resupply points P3B, P3C, and P3D at least partially overlaps with the stay period of the vehicles 1B, 1C, and 1D, respectively, a competition occurs. The server 500 selects one resupply point from among the resupply points P3B, P3C, and P3D according to, for example, a selection criterion described below.

[0103] The selection criteria (rules for selecting a recharge point) in this embodiment will be described. When the energy running out risk of the vehicle 1A is equal to or higher than a predetermined level, the server 500 may select a recharge point that will have the lowest energy running out risk of the vehicle 1A. For example, the recharge point P3D closest to the end point P2 of the first task may be selected. When the energy running out risk of the vehicle 1A is less than the predetermined level and the remaining energy amount of the preceding vehicle at the time of the conflict predicted from the operation plan of each vehicle is less than a predetermined amount, the server 500 may select a recharge point that will have the largest remaining energy amount of the preceding vehicle at the predicted time of the conflict. When the energy running out risk of the vehicle 1A is less than the predetermined level and the remaining energy amount of the preceding vehicle at the time of the conflict predicted from the operation plan is equal to or higher than the predetermined amount, the server 500 may select a recharge point that will have the best energy efficiency of the vehicle 1A. For example, the recharge point P3B that exists on a route that will have the least energy consumption for the vehicle 1A to move from the end point P2 of the first task to the start point P4 of the second task may be selected.

[0104] FIG. 9 is a flowchart showing a process for executing a task according to an operation plan requested on the day. In detail, a user can also request a task from the server 500 on the task execution date (the day) using the mobile terminal UT (see FIG. 4). When a user requests a task whose start date is today from the server 500 by setting the task start date (display section M1) to today on the screen Sc1 shown in FIG. 4 and operating the operation section M12, the mobile terminal UT transmits a second task request signal to the server 500. The second task request signal basically indicates information equivalent to the first task request signal, but the task start date indicated by the second task request signal is today (task request date). When the server 500 receives the second task request signal from the mobile terminal UT, the server 500 executes a series of processes shown in FIG. 9, which will be described below, for the user corresponding to the mobile terminal UT. Every time the server 500 receives a task request from any registered user, the server 500 executes a series of processes shown in FIG. 9 for that user.

[0105] 1 to 3 and FIG. 9, in S101A, server 500 acquires the operation plan and current status (e.g., position and remaining energy) of each registered vehicle. In S102A, server 500 determines whether any vehicle can execute the task requested by the second task request signal based on the operation plan and current status of each vehicle and the content of the task indicated by the second task request signal (e.g., task start information and task end information). For example, server 500 checks the operation plan and current status of each registered vehicle, and determines that the requested task can be executed if there is a vehicle that can add an operating section for executing the requested task, and determines that the requested task cannot be executed if there is no vehicle that can add an operating section for executing the requested task.

[0106] If it is determined that the requested task cannot be executed (NO in S102A), the server 500 executes the process of S105. S105 in FIG. 9 is a process equivalent to S105 in FIG. 5. On the other hand, if it is determined that the requested task can be executed (YES in S102A), the server 500 executes the processes from S103 onwards (S103, S104, S11 to S15). S103, S104, and S11 to S15 in FIG. 9 are processes equivalent to S103, S104 in FIG. 5 and S11 to S15 in FIG. 6, respectively. As a result, on the day when the server 500 receives the task request, operation is performed in accordance with the operation plan (the operation plan determined in S13 or S14), and the requested task is executed.

[0107] As described above, the server 500 according to this embodiment is configured to manage a plurality of vehicles 1. The server 500 determines an operation plan for each of the plurality of vehicles 1, and instructs each of the plurality of vehicles 1 to operate according to the determined operation plan (S15 in FIG. 6 and FIG. 9). The operation plan includes a plan regarding energy replenishment for operation (see FIG. 7). The server 500 determines whether or not a conflict occurs between the plurality of vehicles 1 recharging energy at the same location at the same time based on the operation plan (S12 in FIG. 6 and FIG. 9). When it is determined that a conflict occurs, the server 500 changes at least one operation plan of the plurality of competing vehicles 1 so as to avoid the conflict (S14 in FIG. 6 and FIG. 9). In this way, the server 500 causes a plurality of moving bodies (for example, the vehicles 1) to cooperate in a non-operating section (energy replenishment section), thereby making it possible to improve operation efficiency while avoiding conflict in a operation system with few available energy replenishment points. According to the server 500 having the above configuration, it becomes easier to improve operation efficiency while suppressing an increase in the amount of operation resources.

[0108] Based on the operation instruction from the server 500 (S15 in FIG. 6 and FIG. 9), the vehicle 1 in the automatic driving according to the operation plan may execute a series of processes shown in FIG. 10 described below during energy refueling at the energy refueling point. FIG. 10 is a flowchart showing an example of the automatic driving control executed by the vehicle 1 during energy refueling. In this example, a schedule (replacement schedule) for swapping between the preceding vehicle and the following vehicle may be set at each energy refueling point included in the operation plan. The operation plan including the energy refueling point at which the swap schedule is set indicates the time (replacement time) at which the two vehicles swap and the identification information (vehicle ID) of each of the swapping vehicles for the energy refueling point. In the operation plan, the time (scheduled arrival time) at which the following vehicle arrives at a certain energy refueling point and the time (scheduled departure time) at which the preceding vehicle departs from the energy refueling point match, which means that a swap schedule is set at the energy refueling point. In FIG. 10, the vehicle 1B is refueling (e.g., plug-in charging of the battery 160) at the refueling point P3. The vehicle 1B is the preceding vehicle. The following vehicle is the vehicle 1A. The series of processes shown in Fig. 10 is executed by, for example, the control device 150 (Fig. 3) of the vehicle 1B.

[0109] 1 to 3, in S201, vehicle 1B determines whether or not a swap schedule is set for resupply point P3 in the operation plan of vehicle 1B. If a swap schedule is not set for resupply point P3 (NO in S201), vehicle 1B determines whether or not the scheduled departure time for resupply point P3 indicated in the operation plan of vehicle 1B has arrived (NO in S202). While the scheduled departure time for resupply point P3 has not arrived (NO in S202), vehicle 1B repeats the processes of S201 and S202 while resupplying with energy at resupply point P3. Then, when the scheduled departure time for resupply point P3 arrives (YES in S202), vehicle 1B departs from resupply point P3 by automatic driving in S206.

[0110] If a swap schedule is set for the supply point P3 (YES in S201), vehicle 1B determines in S203 whether the current time is within a predetermined possible departure period. The possible departure period is determined based on the scheduled departure time from the supply point P3 indicated in the operation plan of vehicle 1B. The possible departure period may include, for example, a first possible departure period and a second possible departure period set before and after the scheduled departure time. The first possible departure period is the period from the start time of the possible departure period to the scheduled departure time. The second possible departure period is the period from the scheduled departure time to the end time of the possible departure period.

[0111] If the current time is not within the possible departure period (NO in S203), the process returns to S201. Therefore, vehicle 1B does not depart from supply point P3 until the start time of the possible departure period arrives. If the current time is within the possible departure period (YES in S203), vehicle 1B determines in S204 whether the end time of the possible departure period has arrived. If the end time of the possible departure period has not arrived (NO in S204), vehicle 1B determines in S205 whether the following vehicle (vehicle 1A) has approached the supply point P3.

[0112] When vehicle 1A approaches resupply point P3 (for example, when it approaches resupply point P3 to within a predetermined distance), it may transmit a departure request signal including its own vehicle's vehicle ID to vehicle 1B via wireless communication. Vehicle 1B may determine whether vehicle 1A has approached resupply point P3 based on the signal from vehicle 1A. For example, vehicle 1B determines that vehicle 1A is not approaching resupply point P3 while it does not receive a departure request signal. Vehicle 1B determines that vehicle 1A (the following vehicle that will replace vehicle 1A at resupply point P3) has approached resupply point P3 when the vehicle ID indicated in the received departure request signal matches the vehicle ID of the following vehicle indicated in the operation plan.

[0113] If vehicle 1A is not approaching resupply point P3 (NO in S205), the process returns to S201. Vehicle 1B waits for the arrival of vehicle 1A during the departure possible period. Then, when vehicle 1A approaches resupply point P3 (YES in S205), vehicle 1B departs from resupply point P3 by automatic driving in S206. Then, vehicle 1A enters resupply point P3. As a result, vehicle 1A and vehicle 1B are switched at resupply point P3. Even if vehicle 1A does not arrive at resupply point P3 within the departure possible period due to being delayed from the operation plan, and the end time of the departure possible period arrives before vehicle 1A arrives at resupply point P3 (YES in S204), vehicle 1B departs from resupply point P3 by automatic driving in S206. However, in this case, the planned exchange of vehicles 1A and 1B is not executed.

[0114] As described above, in the example shown in FIG. 10, when the vehicle 1B, which is instructed to operate according to an operation plan including a schedule in which the vehicle 1B (third moving body) and the vehicle 1A (fourth moving body) are to be replaced at the resupply point P3, is resupplying energy at the resupply point P3 and the vehicle 1A approaches the resupply point P3, the vehicle 1B departs from the resupply point P3. With this configuration, the vehicle 1A is likely to enter the resupply point P3 just at the timing when the vehicle 1B leaves the resupply point P3. By the preceding vehicle 1B and the following vehicle 1A replacing each other at the resupply point P3 (not leaving the resupply point P3 empty), it is possible to prevent the resupply point P3 from being filled by another vehicle (for example, a vehicle unrelated to the operation plan) after the preceding vehicle 1B leaves the resupply point P3 (i.e., the following vehicle 1A cannot use the resupply point P3). Regardless of whether another vehicle has the right to use the resupply point P3, if a space is available, the other vehicle may use the space.

[0115] In the above embodiment, a robotaxi vehicle without a driver is exemplified as the vehicle 1. When the robotaxi vehicle receives an operation instruction from the server 500 (S15 in Figs. 6 and 9), it performs operation according to the operation plan by automatic driving. However, the vehicle 1 is not limited to a robotaxi vehicle. The vehicle 1 may be configured so that the driver performs operation according to the operation plan. For example, when the vehicle 1 receives an operation instruction from the server 500, the content of the operation instruction may be displayed on the in-vehicle HMI (e.g., NAVI 170). The driver may perform operation according to the operation plan while checking the operation plan on the in-vehicle HMI. However, it is easier to accurately perform automatic driving to travel at the vehicle speed specified by the server 500 than manual driving.

[0116] The configuration of the vehicle is not limited to the configuration described in the above embodiment (see Figs. 1 to 3). The base vehicle may have an autonomous driving function without any retrofitting. The level of autonomous driving may be fully autonomous (level 5) or conditionally autonomous (e.g., level 4). The configuration of the vehicle may be appropriately changed to a configuration dedicated to unmanned driving. For example, a vehicle dedicated to unmanned driving may not be equipped with parts (such as a steering wheel) for a person to operate the vehicle. The vehicle may be configured to be capable of contactless charging.

[0117] In the above embodiment, the vehicles receiving instructions from the server 500 have the same configuration. However, the present invention is not limited to this, and the vehicles managed by the server 500 may have different configurations. The vehicles may include at least one of an xEV (HEV, PHEV) equipped with an internal combustion engine, an FCEV, and an internal combustion engine vehicle not equipped with an electric motor for running, instead of or in addition to a BEV not equipped with an internal combustion engine. The vehicles are not limited to passenger cars, and may be buses or trucks. The vehicles may be multi-purpose vehicles customized according to the user's purpose of use. Instead of or in addition to a vehicle, a moving body other than a vehicle (such as a railroad car, a ship, an airplane, a walking robot, a robot cleaner, a drone, or a space probe) may be adopted. The moving body may be configured to be remotely controlled. The energy supply point may be any location where a moving body can replenish energy.

[0118] The task is not limited to the above-mentioned transportation. The task may be any task that can be performed by a mobile object, and may be, for example, a mobile store, a mobile office, or a mobile hospital (medical task).

[0119] The above-described embodiment and each of the modified examples may be implemented in any combination. The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The technical scope of the present disclosure is defined by the claims, not by the description of the embodiments described above, and is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]

[0120] 1, 1A, 1B, 1C, 1D vehicle, 2 VP, 100 base vehicle, 102 control system, 115 integrated control manager, 130 communication device, 150 control device, 160 battery, 170 NAVI, 200 ADK, 202 ADS, 210 computer, 500 server, UT mobile terminal.

Claims

1. A server for managing a plurality of mobile objects, the server is configured to determine an operation plan for each of the plurality of moving bodies and instruct each of the plurality of moving bodies to operate in accordance with the determined operation plan; The operation plan includes a plan regarding energy supply for operation, The server, determining whether or not a conflict occurs between the plurality of moving bodies for refueling at the same time and at the same place based on the operation plan; When it is determined that the conflict will occur, modifying the operation plan of at least one of the plurality of moving objects in a conflicting manner so as to avoid the conflict; A server configured to run

2. The operation plan includes an energy refueling point and a duration of stay at the energy refueling point, The server according to claim 1, wherein before instructing each of the multiple moving bodies to operate, if it is determined based on the operation plan that a leading first moving body and a following second moving body will compete at the energy replenishment point, and if the remaining energy of the first moving body at the time of competition predicted from the operation plan is greater than a reference amount, the server changes the stay period of the first moving body at the energy replenishment point so that the first moving body departs from the energy replenishment point at the time of competition.

3. The server of claim 2, wherein before instructing each of the multiple moving bodies to operate, if it is determined based on the operation plan that the first moving body and the second moving body will compete at the energy replenishment point and the remaining energy amount of the first moving body at the time the competition occurs is less than the reference amount, the server changes the stay period of the first moving body at the energy replenishment point so that the first moving body departs from the energy replenishment point at the time the remaining energy amount of the first moving body reaches the reference amount.

4. The server according to claim 1 , wherein the server is configured to change the energy replenishment points for at least one of the operation plans of the plurality of competing moving objects so as to avoid the conflict.

5. The server according to claim 1 , wherein, when there are a plurality of operation plans capable of avoiding the conflict, the server is configured to select an operation plan having a lowest risk of running out of energy from among the plurality of operation plans.

6. The server according to claim 1 , wherein, when there are a plurality of operation plans capable of avoiding the conflict, the server is configured to select the most energy-efficient operation plan from among the plurality of operation plans.

7. 7. A navigation system comprising: a server according to claim 1; and the plurality of moving objects receiving instructions from the server.

8. the plurality of moving bodies include a third moving body and a fourth moving body, each of the third moving body and the fourth moving body is an autonomous vehicle; The operation system described in claim 7, wherein the third moving body, which is instructed to operate according to the operation plan including a schedule in which the third moving body and the fourth moving body are to be switched at an energy replenishment point, departs from the energy replenishment point when the fourth moving body approaches while staying at the energy replenishment point.

Citation Information

Patent Citations

  • Bus operation management system, server, and bus operation management method

    JP2023012203A