Cutting device, cutting method and program

The cutting device addresses the inefficiency of single-area cutting by dividing the cutting area into equal-length regions, allowing simultaneous movement of two cutting means to reduce time and prevent line mismatches, improving cutting efficiency and quality.

JP2024157129APending Publication Date: 2024-11-07ACS ENG TECH
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023071276
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-25
Publication Date
2024-11-07

AI Technical Summary

Technical Problem

Existing cutting devices with two moving mechanisms can only cut material in one area at a time, significantly increasing the cutting time, and there is a risk of mechanical interference and mismatched cut lines.

Method used

A cutting device with two moving means that divide the cutting area into two regions of equal length, controlled to move in opposite directions along the cut line, preventing interference and ensuring equal line lengths to reduce cutting time and improve quality.

Benefits of technology

The device reduces cutting time by nearly half and prevents mismatched cut lines by controlling the movement of two cutting means along equal-length regions, enhancing cutting efficiency and precision.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024157129000001_ABST
    Figure 2024157129000001_ABST
Patent Text Reader

Abstract

To provide a cutting device, a cutting method and a program which can make a cutting time much shorter than before.SOLUTION: In a cutting device 1, in a state where a region occupied by a cut line L in a material W is partitioned by a central boundary schedule line CL into a first region A1 and a second region A2 and a length of the cut line L included in the first region A1 is nearly equal to a length of the cut line L included in the second region A2, control means 5 sends, to first moving means 3, a command to move first cutting means S along the cut line L from a first end part E1 in the first region A1 towards the central boundary schedule line CL, and sends, to second moving means 4, a command to move second cutting means S along the cut line L from the central boundary schedule line CL towards a second end part E2 in the second region A2.SELECTED DRAWING: Figure 5
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a cutting device, a cutting method, and a program for cutting a material placed on a base. [Background technology]

[0002] As an apparatus for cutting a material placed on a base, Patent Document 1 discloses a machining apparatus that includes a first moving mechanism for moving a first machining head and a second moving mechanism for moving a second machining head.

[0003] In the device of Patent Document 1, in order to prevent the first moving mechanism and the second moving mechanism from colliding (mechanical interference) when they are moved, the area in which the material is cut is divided into three (first working area, second working area, and third working area) as shown in FIG. 8 of the same document. Here, the first working area is an area in which the first working head is moved by the first moving mechanism to cut the material, and the second working area is an area in which the second working head is moved by the second moving mechanism to cut the material. The first working area and the second working area are in ranges in which no mechanical interference occurs between the first moving mechanism and the second moving mechanism even if they move simultaneously. The third working area is an area excluding the first working area and the second working area, and is an area in which the material is cut by the first moving mechanism or the second moving mechanism after the material is cut in the first working area and the second working area.

[0004] In this way, by dividing the area in which the material is cut into a first working area, a second working area, and a third working area, cutting of the material can be performed in the first working area while simultaneously cutting of the material in the second working area, thereby shortening the time it takes to cut the material. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] Patent No. 4425677 Summary of the Invention [Problem to be solved by the invention]

[0006] However, in the device of Patent Document 1, although cutting of material can be performed simultaneously in the first machining area and the second machining area, subsequent cutting in the third machining area can only be performed by either the first moving mechanism or the second moving mechanism. In other words, although the device of Patent Document 1 is equipped with two moving mechanisms for moving two machining heads respectively, it does not mean that the cutting time can be nearly half the time required when one machining head is moved by one moving mechanism.

[0007] In view of the above, an object of the present invention is to provide a cutting device, a cutting method, and a program that can further shorten the cutting time compared to conventional methods. [Means for solving the problem]

[0008] The present invention is a cutting device for cutting a material placed on a base, comprising first moving means for moving a first cutting means relative to the base, second moving means for moving a second cutting means relative to the base at approximately the same speed as the first moving means, and control means for sending commands to the first moving means and the second moving means to move the first cutting means and the second cutting means along a cut line to cut the material into a predetermined shape, wherein, in a state in which an area of ​​the material occupied by the cut line is divided into a first area and a second area by a planned central boundary line, and the length of the cut line included in the first area and the length of the cut line included in the second area are approximately the same, the control means sends a command to the first moving means to move the first cutting means along the cut line from a first end portion opposite the planned central boundary line in the first area toward the planned central boundary line, and sends a command to the second moving means to move the second cutting means along the cut line from the planned central boundary line toward a second end portion opposite the planned central boundary line in the second area.

[0009] In such a cutting device, it is preferable that the cut line includes at least one envelope portion, and the control means comprises: a boundary planned line setting means for setting the position of the central boundary planned line so that the length of the cut line included in the first region and the length of the cut line included in the second region are approximately the same, and the envelope portion does not intersect with the central boundary planned line and the envelope portion is included in either the first region or the second region; a cutting order setting means for setting the order of cutting the envelope portions in the first region to be in the order from the first end portion to the second end portion, and for setting the order of cutting the envelope portions in the second region to be in the order from the first end portion to the second end portion; and a command means for sending a command to the first moving means to move the first cutting means along the cut line in the order set by the cutting order setting means, and sending a command to the second moving means to move the second cutting means along the cut line in the order set by the cutting order setting means.

[0010] The present invention also provides a cutting method for cutting a material placed on a base, comprising the steps of: a control means for sending a command to the first moving means and the second moving means to move the first cutting means and the second cutting means along a cut line to cut the material into a predetermined shape, wherein an area of ​​the material occupied by the cut line is divided into a first area and a second area by a planned central boundary line, and the length of the cut line included in the first area and the length of the cut line included in the second area are approximately the same, the control means sending a command to the first moving means to move the first cutting means along the cut line from a first end portion opposite the planned central boundary line in the first area toward the planned central boundary line, and sending a command to the second moving means to move the second cutting means along the cut line from the planned central boundary line toward a second end portion opposite the planned central boundary line in the second area.

[0011] The present invention also relates to a program for a cutting device that is executed by a computer and cuts a material placed on a base, the cutting device comprising: a first moving means for moving a first cutting means relative to the base; a second moving means for moving a second cutting means relative to the base at substantially the same speed as the first moving means; and a control means for sending a command to the first moving means and the second moving means to move the first cutting means and the second cutting means along a cut line to cut the material into a predetermined shape, wherein an area of ​​the material occupied by the cut line is divided into a first area and a second area by a planned central boundary line; and The control means is also a program that causes a computer to execute the following steps: when the length of the cut line included in the first area and the length of the cut line included in the second area are approximately the same, the control means sends a command to the first moving means to move the first cutting means along the cut line from a first end portion opposite the planned central boundary line in the first area toward the planned central boundary line, and sends a command to the second moving means to move the second cutting means along the cut line from the planned central boundary line toward a second end portion opposite the planned central boundary line in the second area. Effect of the Invention

[0012] In the cutting device of the present invention, as described above, when the length of the cut line included in the first area and the length of the cut line included in the second area are approximately the same, the control means sends a command to the first moving means to move the first cutting means from the first end toward the planned central boundary line, and sends a command to the second moving means to move the second cutting means from the planned central boundary line toward the second end, thereby preventing collision between the first moving means and the second moving means when cutting the material and reducing the cutting time to nearly half compared to when one cutting means is moved by one moving mechanism.

[0013] However, when the cut line includes an envelope portion, if this envelope portion spans both the first region and the second region, there is a risk that the cut line will not match the boundary between the portion cut by the first cutting means and the portion cut by the second cutting means. In contrast, according to the cutting device having the boundary planned line setting means, the cutting order setting means, and the command means as described above, the envelope portion can be cut by only either the first cutting means or the second cutting means, so that such a mismatch of the cut lines can be prevented and the cutting quality can be improved. [Brief description of the drawings]

[0014] [Figure 1] 1 is a plan view showing a schematic diagram of an embodiment of a cutting device according to the present invention; [Diagram 2] 2 is a schematic side view of the first moving means of FIG. 1; FIG. [Diagram 3] 2 is a schematic front view of the first moving means of FIG. 1; FIG. [Figure 4] FIG. 2 is a block diagram of a cutting device. [Diagram 5] FIG. 2 is a plan view of the material with cut lines. [Figure 6] 11 is an explanatory diagram of a method for checking the dispersion state of a cut line included in a first region and a cut line included in a second region. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0015] Hereinafter, an embodiment of a cutting device, a cutting method, and a program according to the present invention will be described with reference to the drawings. The cutting device 1 of this embodiment shown in Fig. 1 cuts a material W with a cutting blade S shown in Fig. 2 and Fig. 3. First, the material W and the cutting blade S will be described.

[0016] In this embodiment, the material W is rectangular in plan view and formed into a flat plate. The shape of the material W shown in the figure is an example, and is not limited thereto. The material W may be made of various materials, such as paper products such as cardboard, thin synthetic resin or metal plates, and relatively thick polyethylene or foam materials. The material W in this embodiment is cut along the cut line L shown in FIG. 5. The cut line L is composed of a plurality of envelope parts LE (envelope parts LEa, LEb, LEj, in this embodiment) that are closed lines of simple closed curves whose starting points and ending points coincide with each other and do not intersect with themselves along the way, such as the illustrated circle, ellipse, square, and rectangle, and a plurality of release parts LR (envelope parts LRa, LRb in this embodiment) that are open lines whose starting points and ending points are separated from each other, such as the illustrated wavy line. The shape, length, position, and the like of the cut line L shown in the figure are an example, and can be changed as appropriate. Moreover, the cut line L may be composed of only the envelope portion LE, or may be composed of only the release portion LR.

[0017] The cutting blade S is flat as shown in Figures 2 and 3, and a cutting edge S2 for cutting the material W is provided on the side edge of the extending surface S1 which is flat as shown in Figure 3. The cutting blade S is detachable from the holder 29 described below, and various cutting blades S can be attached, such as a long cutting blade having a relatively long length from the part held by the holder 29 to the cutting edge S3 at the tip, a short cutting blade, a double-edged blade in which the cutting edge S2 is provided on both sides of the extending surface S1, or a single-edged blade in which the cutting edge S2 is provided on only one side.

[0018] Next, the illustrated cutting device 1 will be described. The cutting device 1 of this embodiment includes a base 2, a first moving means 3, and a second moving means 4. The first moving means 3 and the second moving means 4 hold the above-mentioned cutting blade S. Note that, although the cutting blades S held by the first moving means 3 and the second moving means 4 of this embodiment are the same, different cutting blades S may be used by the first moving means 3 and the second moving means 4. The cutting blade S held by the first moving means 3 corresponds to the "first cutting means" in this specification, and the cutting blade S held by the second moving means 4 corresponds to the "second cutting means" in this specification.

[0019] The base 2 is used to place the material W thereon, and in this embodiment, the surface on which the material W is placed extends parallel to the XY plane of the XYZ orthogonal coordinate system shown in Fig. 1. In this embodiment, the XY plane extends in the horizontal direction, and the Z direction is the height direction. The θ direction is the direction going around the Z axis as shown in Fig. 3, and the α direction is the direction going around the X axis as shown in Fig. 2.

[0020] The surface of the base 2 is provided with suction holes (not shown) for suctioning and holding the material W by negative pressure. The base 2 is also provided with auxiliary equipment for connecting to a power source, an air source, etc. for driving various means provided in the cutting device 1, as well as a control means 5 (see FIG. 4) for controlling the cutting device 1. The control means 5 is embodied by a computer such as a PLC (programmable logic controller) or a PC (personal computer). Note that a program for controlling the operation of the cutting device 1 is stored in an internal storage device of the computer or an external storage device connected thereto (hereinafter referred to as storage means 6), and the control means 5 controls the operation of the cutting device 1 based on this program. The storage means 6 also stores information about the cut line L, and the control means 5 reads out information about the cut line L stored in the storage means 6, moves the first moving means 3 and the second moving means 4 based on this information, and cuts the material W with the cutting blade S held by the first moving means 3 and the cutting blade S held by the second moving means 4.

[0021] As shown in Fig. 4, the control means 5 of this embodiment includes a boundary planned line setting means 5a, a dispersion confirmation means 5b, a cutting order setting means 5c, and a command means 5d. The details of the boundary planned line setting means 5a, the dispersion confirmation means 5b, the cutting order setting means 5c, and the command means 5d will be described later.

[0022] The first moving means 3 has a function of moving the cutting blade S held by the first moving means 3 relative to the base 2. The first moving means 3 in this embodiment can move the cutting blade S in the X direction, Y direction, Z direction, θ direction, and α direction relative to the base 2. The second moving means 4 has a function of moving the cutting blade S held by the second moving means 4 relative to the base 2, and in this embodiment, has a function of moving the cutting blade S held by the first moving means 3 in the X direction, Y direction, Z direction, θ direction, and α direction. Note that the configuration of the second moving means 4 in this embodiment is the same as that of the first moving means 3 shown in the figure, so a detailed description of the second moving means 4 will be omitted.

[0023] The first moving means 3 of this embodiment includes a pair of Y-axis rails (not shown) extending in the Y direction and spaced apart from the base 2 in the X direction, a Y-axis nut (not shown) sliding on the Y-axis rails, an X-axis frame 10 (see FIG. 2) held by the Y-axis nut, a pair of X-axis rails 11 extending in the X direction and spaced apart from the X-axis frame 10 in the Z direction, an X-axis nut 12 sliding on the X-axis rails 11, and an X-axis moving base 13 held by the X-axis nut 12. The first moving means 3 also includes a driving means (not shown) for moving the X-axis frame 10 and the X-axis moving base 13. The driving means of this embodiment is a servo motor, but other motors (such as a stepping motor) may also be used. The linear motion mechanism used in the first moving means 3 is not limited to the above-mentioned combination of rails and nuts, and may be a mechanism using a timing belt and pulley, a mechanism using a ball screw, or a mechanism using a rack and pinion.

[0024] The first moving means 3 also includes a pair of Z-axis rails 14 extending in the Z direction and spaced apart in the X direction from the X-axis moving base 13, a Z-axis nut 15 that slides on the Z-axis rails 14, a Z-axis moving base 16 held by the Z-axis nut 15, a Z-axis motor 17, and a ball screw 18 that moves the Z-axis moving base 16 by rotating the Z-axis motor 17.

[0025] The first moving means 3 further includes a pair of bearings 19 spaced apart in the Z direction, a θ rotating shaft 20 rotatably supported by the bearings 19, a θ axis base 21 (see Figure 3) held by the θ rotating shaft 20, a θ axis pulley 22 attached to the θ rotating shaft 20, and a θ axis motor 23 that rotates the θ axis pulley 22 via a timing belt.

[0026] The first moving means 3 also includes an α rotation shaft 24 rotatably supported on the θ axis base 21 as shown in Figure 3, an α axis pulley 25 attached to the α rotation shaft 24, an α axis motor 26 that rotates the α axis pulley 25 via a timing belt as shown in Figure 2, a spline case 27 that rotates together with the α rotation shaft 24, a spline shaft 28 that is movable forward and backward relative to the spline case 27, and a holder 29 that is provided at the tip of the spline shaft 28 and holds the cutting blade S.

[0027] Furthermore, the first moving means 3 is provided with a vibration means for vibrating the cutting blade S in its longitudinal direction, and a material pressing means for pressing down the material W when the material W is cut by the cutting blade S.

[0028] The vibration means of this embodiment includes a crank 30 connected to the rear end of the spline shaft 28, an eccentric cam shaft 31 that is rotatably supported and moves the crank 30 back and forth, a vibration-imparting pulley 32 attached to the eccentric cam shaft 31, and a vibration-imparting motor 33 that rotates the vibration-imparting pulley 32 via a belt (timing belt). That is, when the eccentric cam shaft 31 is rotated by the vibration-imparting motor 33, the crank 30 vibrates with the amplitude of the eccentricity, and as a result, the spline shaft 28 to which the holder 29 is attached also vibrates, so that the cutting blade S held by the holder 29 can be vibrated along the longitudinal direction.

[0029] The material pressing means includes a pressing plate 34 provided near the cutting blade S, a guide 35 that supports the pressing plate 34 movably in the Z direction, and an elastic body 36 for pressing the pressing plate 34 against the material W.

[0030] Next, an example of a cutting method for cutting the material W using the cutting device 1 will be described, in which the cutting blade S is moved along the cut line L shown in FIG.

[0031] When cutting the material W, the control means 5 reads out information about the cut line L stored in the storage means 6, and identifies the area (entire area A) occupied by the cut line L on the material W. In this embodiment, the entire area A is located at the center of the material W in the X direction and the center of the material W in the Y direction, but may be located at a position offset from the material W.

[0032] Next, the control means 5 sets a planned central boundary line CL by the planned boundary line setting means 5a, and divides the entire region A into a first region A1 and a second region A2. In this embodiment, the planned central boundary line CL basically extends in the X direction, and divides the entire region A so that the first region A1 and the second region A2 are arranged side by side in the Y direction. Here, the planned boundary line setting means 5a sets the planned central boundary line CL so that the length of the cut line L included in the first region A1 and the length of the cut line L included in the second region A2 are substantially the same. Here, "setting so that the length of the cut line L included in the first region A1 and the length of the cut line L included in the second region A2 are substantially the same" means that the difference between the length of the cut line L included in the first region A1 and the length of the cut line L included in the second region A2 divided by the length of the cut line L included in the first region A1 is equal to or less than a predetermined value, and as an example, means the case where it is equal to or less than 10%.

[0033] The boundary planned line setting means 5a also has a function of setting the central boundary planned line CL so that the envelope portion LE does not intersect with the central boundary planned line CL and the envelope portion LE is included in either the first area A1 or the second area A2.

[0034] In the case where the cut line L is as shown in Fig. 5, the boundary planned line setting means 5a of this embodiment first calculates the length of all the cut lines L (envelope portion LE and open portion LR) included in the entire region A, and provisionally sets the length to be half at the central boundary planned line CL extending linearly in the X direction, thereby provisionally dividing the entire region A into a first region A1 and a second region A2. If the provisionally set central boundary planned line CL intersects with the envelope portion LE, a part of the central boundary planned line CL can be moved in the +Y direction or -Y direction as shown in Fig. 5 so that the central boundary planned line CL does not intersect with the envelope portion LE (see the envelope portion LEf, envelope portion LEg, and envelope portion LEj in Fig. 5). Whether to move a part of the central boundary planned line CL in the +Y direction or the -Y direction is determined under the condition that the difference between the length of the cut line L included in the provisionally divided first region A1 and the length of the cut line L included in the provisionally divided second region A2 is as small as possible.

[0035] Here, depending on the size or shape of the envelope portion LE, the amount of movement of a part of the central boundary scheduled line CL in the +Y direction or the -Y direction may become large, and the difference between the length of the cut line L included in the first region A1 and the length of the cut line L included in the second region A2 may exceed a predetermined value, and the length of the cut line L included in the first region A1 and the length of the cut line L included in the second region A2 may be substantially different. In this case, there is a risk that the effect of shortening the cutting time described later may not be sufficiently obtained. On the other hand, if priority is given to keeping the difference between the length of the cut line L included in the first region A1 and the length of the cut line L included in the second region A2 within a predetermined value, the central boundary scheduled line CL may cross the envelope portion LE. In this case, the effect of preventing the mismatch of the cut lines described later will be lost. In view of this point, the boundary scheduled line setting means 5a may be configured to select which of the effect of shortening the cutting time and the effect of preventing the mismatch of the cut line L to be prioritized (it may be possible to select each time, or it may be possible to select either one in advance), and the central boundary scheduled line CL may be determined according to the selection. That is, when priority is given to the effect of shortening the cutting time, for example, the planned central boundary line CL is set to extend linearly in the X direction.

[0036] The boundary scheduled line setting means 5a may have a function of setting the central boundary scheduled line CL so as not to intersect with the open portion LR included in the cut line L. In this case, the boundary scheduled line setting means 5a may be configured to select which of the effect of shortening the cutting time and the effect of preventing the mismatch of the cut line L is to be prioritized when setting the central boundary scheduled line CL so as not to intersect with the open portion LR included in the cut line L (they may be configured to be able to select each time, or may be selected in advance), and the central boundary scheduled line CL may be determined according to the selection. The boundary scheduled line setting means 5a of this embodiment has a function of setting the central boundary scheduled line CL so as not to intersect with the open portion LR included in the cut line L, and a function of determining the central boundary scheduled line CL by prioritizing the effect of shortening the cutting time over the effect of preventing the mismatch of the cut lines. Note that the open portion LRa and the open portion LRb constituting the open portion LR shown in FIG. 5 are both extended long in the Y direction, so even if a part of the central boundary scheduled line CL is moved in the +Y direction or the -Y direction, the central boundary scheduled line CL will intersect with the open portion LRa and the open portion LRb. For this reason, the boundary planned line setting means 5a of this embodiment sets the position where the central boundary planned line CL intersects with the released portions LRa and LRb at a point where the lengths of the released portions LRa and LRb are approximately half.

[0037] In this embodiment, the boundary planned line setting means 5a sets the central boundary planned line CL to divide the entire area A into the first area A1 and the second area A2, but the division into the first area A1 and the second area A2 may be performed by, for example, an operator. When the operator divides the entire area A into the first area A1 and the second area A2, the central boundary planned line CL is set so that the length of the cut line L is approximately half and so that it does not intersect with the envelope portion LEa, the envelope portion LEb,.... Then, it is sufficient to store in the storage means 6 that the first area A1 includes the envelope portion LEa, the envelope portion LEb, the envelope portion LEc, the envelope portion LEd..., the envelope portion LEh..., and the left part of the released portion LRa and the released portion LRb in FIG. 5, and the second area A2 includes the envelope portion LEe, the envelope portion LEf, the envelope portion LEg, the envelope portion LEj..., and the right part of the released portion LRa and the released portion LRb in FIG. 5.

[0038] Here, the end portion facing the planned central boundary line CL in the first region A1 is referred to as the first end portion E1, and the end portion facing the planned central boundary line CL in the second region A2 is referred to as the second end portion E2. As shown in Fig. 5, the first end portion E1 in this embodiment is an end portion extending in the X direction in the first region A1 facing the planned central boundary line CL, which basically extends in the X direction. As shown in Fig. 5, the second end portion E2 is an end portion extending in the X direction in the second region A2 facing the planned central boundary line CL, which basically extends in the X direction.

[0039] Incidentally, even if the length of the cut line L included in the first region A1 and the length of the cut line L included in the second region A2 are substantially the same, if the distribution state of the cut line L is different, the first moving means 3 and the second moving means 4 may collide. For example, when the cut lines L are circular envelope portions LE of the same size arranged as shown in FIG. 6(a), the number of envelope portions LE included in the first region A1 and the number of envelope portions LE included in the second region A2 are equal, so the length of the cut line L included in the first region A1 and the length of the cut line L included in the second region A2 are the same. However, since the envelope portions LE are arranged in the Y direction in the first region A1 so as to cover the entire area of ​​the first region A1, and are arranged in the X direction near the central boundary planned line CL in the second region A2, the second moving means 4 cutting the envelope portions LE in the second region A2 stays near the central boundary planned line CL, while the first moving means 3 cutting the envelope portions LE in the first region A1 approaches the central boundary planned line CL, so that the first moving means 3 and the second moving means 4 may collide.

[0040] In order to prevent such a collision between the first moving means 3 and the second moving means 4, the control means 5 of this embodiment checks the dispersion state of the cut line L included in the first region A1 and the cut line L included in the second region A2 by the dispersion checking means 5b, and judges whether or not to cut the material W. Specifically, as shown in Fig. 6(a), the dispersion checking means 5b divides the first region A1 into a plurality of first region parts from the first end E1 toward the planned central boundary line CL (in this embodiment, it is divided into four parts: the first region first part A1-1, the first region second part A1-2, the first region third part A1-3, and the first region fourth part A1-4), and divides the second region A2 into a plurality of second region parts in the same manner as the first region parts from the planned central boundary line CL toward the second end E2 (in this embodiment, it is divided into four parts: the second region first part A2-1, the second region second part A2-2, the second region third part A2-3, and the second region fourth part A2-4). Here, dividing the first region A1 into a plurality of second region portions in the same manner as the first region portions means that the number of the first region A1 divided into a plurality of first region portions is the same as the number of the second region A2 divided into a plurality of second region portions, and the first region portions in the order from the first end E1 toward the planned central boundary line CL and the second region portions in the order from the planned central boundary line CL toward the second end E2 are equal in width. That is, in Fig. 6(a), the first region A1 and the second region A2 are both divided into four as described above, and the number of the first region first portion A1-1 and the second region first portion A2-1 are equal in width (Y direction length), the first region second portion A1-2 and the second region second portion A2-2 are equal in width, the first region third portion A1-3 and the second region third portion A2-3 are equal in width, and the first region fourth portion A1-4 and the second region fourth portion A2-4 are equal in width.

[0041] The dispersion checking means 5b calculates the length of the cutline L included in each of the first region portions and the length of the cutline L included in each of the second region portions, and checks whether the ratio of the difference in the cutline L between the corresponding first region portion and the second region portion is equal to or less than a predetermined value. That is, in the example shown in Fig. 6(a), the dispersion checking means 5b calculates the length of the cutline L included in each of the first region first portion A1-1, the first region second portion A1-2, the first region third portion A1-3, and the first region fourth portion A1-4, and also calculates the length of the cutline L included in the second region first portion A2-1, the second region second portion A2-2, the second region third portion A2-3, and the second region fourth portion A2-4. Then, it is confirmed whether the difference between the length of the cut line L included in the first portion A1-1 of the first region and the length of the cut line L included in the first portion A2-1 of the second region corresponding to the first portion A1-1 of the first region is divided by the length of the cut line L included in the first portion A1-1 of the first region (or the length of the cut line L included in the first portion A2-1 of the second region) to determine whether it is equal to or less than a predetermined value. Then, the same confirmation is performed for the second portion A1-2 of the first region and the second portion A2-2 of the second region, the third portion A1-3 of the first region and the third portion A2-3 of the second region, and the fourth portion A1-4 of the first region and the fourth portion A2-4 of the second region, so that the distribution state of the cut line L included in the first region A1 and the cut line L included in the second region A2 can be confirmed. In the example shown in FIG. 6(a), the ratio of the difference in the cut line L between the first portion A1-1 of the first region and the first portion A2-1 of the second region is large, and is also large in other portions, so that the control means 5 stops cutting the material W with the cutting device 1. This makes it possible to prevent a collision between the first moving means 3 and the second moving means 4. A collision between the first moving means 3 and the second moving means 4 can occur when the first moving means 3 approaches while the second moving means 4 is staying near the planned central boundary line CL. In other words, even if the ratio of the difference in the cut lines L between the first area portion and the second area portion becomes large away from the planned central boundary line CL, it is unlikely to lead to a collision between the first moving means 3 and the second moving means 4, so the ratio of the difference in the cut lines L described above may be checked only near the planned central boundary line CL.

[0042] On the other hand, in the example shown in Figure 6 (b), the ratio of the difference between the cut line L in the first part A1-1 of the first region and the first part A2-1 of the second region is below a predetermined value, and the same is true for other parts, so the control means 5 continues cutting the material W with the cutting device 1 as described below.

[0043] Next, the control means 5 sets, by the cutting order setting means 5c, the order of cutting the envelope portion LE in the first region A1 to be from the first end E1 to the second end E2, and sets the order of cutting the envelope portion LE in the second region A2 to be from the first end E1 to the second end E2.

[0044] The first area A1 shown in FIG. 5 includes envelope portion LEa, envelope portion LEb, envelope portion LEc, envelope portion LEd..., envelope portion LEh.... Here, the envelope portion LEd has a line closest to the first end E1, followed by envelope portion LEa, followed by envelope portion LEb, followed by envelope portion LEc..., and then envelope portion LEh. Therefore, the cutting order setting means 5c sets the order of cutting the envelope portions LE in the first area A1 to be envelope portion LEd, envelope portion LEa, envelope portion LEb, envelope portion LEc..., envelope portion LEh.... The second area A2 includes envelope portion LEe, envelope portion LEf, envelope portion LEg, envelope portion LEj.... Here, the line closest to the first end E1 is the envelope portion LEf, followed by the envelope portion LEj, followed by the envelope portion LEe, followed by the envelope portion LEg. Therefore, the cutting order setting means 5c sets the order for cutting the envelope portions LE in the second area A2 to be the envelope portion LEf, envelope portion LEj, envelope portion LEe, envelope portion LEg, .

[0045] It is preferable that the cutting order setting means 5c is provided with a function for setting the order of cutting the envelope portions LE in the first region A1 including the released portions LR in the first region A1, and for setting the order of cutting the envelope portions LE in the second region A2 including the released portions LR in the second region A2. The order of cutting the envelope portions LE in the first region A1 and the order of cutting the envelope portions LE in the second region A2 may be determined by an operator and stored in the storage means 6.

[0046] Next, the control means 5 issues a command to the first moving means 3 to move the cutting blade S held by the first moving means 3 along the cut line L from the first end E1 toward the central boundary planned line CL, and also issues a command to the second moving means 4 to move the cutting blade S held by the second moving means 4 along the cut line L from the central boundary planned line CL toward the second end E2. Here, the control means 5 issues a command to move the second moving means 4 at approximately the same speed as the first moving means 3. Note that approximately the same speed means, for example, that the difference between the speed of the first moving means 3 and the speed of the second moving means 4 divided by the speed of the first moving means 3 is equal to or less than a predetermined value, and as an example, means that the difference is equal to or less than 10%. In this embodiment, as described above, the order of cutting the envelope portion LE in the first region A1 is set in the order from the first end E1 toward the second end E2, and the order of cutting the envelope portion LE in the second region A2 is set in the order from the first end E1 toward the second end E2. In addition, the command means 5d provided in the control means 5 is configured to send a command to the first moving means 3 to move the cutting blade S held by the first moving means 3 along the cut line L in the order set by the cutting order setting means 5c, and to send a command to the second moving means 4 to move the cutting blade S held by the second moving means 4 along the cut line L in the order set by the cutting order setting means 5c.

[0047] When a command is sent from the command means 5d in this manner, in the first region A1, the cutting blade S held by the first moving means 3 starts cutting from the envelope portion LE close to the first end E1, and in the second region A2, the cutting blade S held by the second moving means 4 starts cutting from the envelope portion LE close to the central boundary planned line CL. That is, the first moving means 3 and the second moving means 4 start cutting the material W with a gap in the Y direction, and since both of them basically move in the same direction (+Y direction), the first moving means 3 and the second moving means 4 do not collide when cutting the material W. In addition, since the length of the cut line L included in the first region A1 and the length of the cut line L included in the second region A2 are approximately the same, according to the cutting device 1 of this embodiment, the cutting time can be reduced to nearly half compared to the case where one cutting blade is moved by one moving mechanism. Furthermore, since one envelope portion LE is cut only by the cutting blade S held by the first moving means 3 or the cutting blade S held by the second moving means 4, the above-mentioned inconsistency of the cut lines can be prevented and the cutting quality can be improved.

[0048] Although one embodiment of the present invention has been described above, the present invention is not limited to the specific embodiment, and various modifications and changes are possible within the scope of the spirit of the present invention described in the claims unless otherwise specifically limited in the above description. For example, the configuration of the above-mentioned embodiment can be appropriately added or deleted, and the configuration of one embodiment can be applied to another embodiment. Furthermore, the effects of the above-mentioned embodiment are merely examples of the effects resulting from the present invention, and do not mean that the effects of the present invention are limited to the above-mentioned effects.

[0049] For example, the configuration of the first moving means 3 shown in FIG. 2 and FIG. 3 is merely an example, and the first cutting means and the second cutting means may be moved in other configurations. [Explanation of symbols]

[0050] 1: Cutting device 2: Bass 3: First means of transportation 4:Second transportation means 5: Control means 5a: Boundary planned line setting means 5b: Dispersion confirmation means 5c: Cutting order setting means 5d: Command means A1: First area A2: Second area CL: Central boundary planned line E1: First end E2: Second end L: Cutting line LE: Envelope part S: Cutting blade (first cutting means, second cutting means) W: Material

Claims

1. A cutting device for cutting a material placed on a base, comprising: a first moving means for moving a first cutting means relative to the base; a second moving means for moving the second cutting means relative to the base at substantially the same speed as the first moving means; a control means for sending a command to the first moving means and the second moving means to move the first cutting means and the second cutting means along a cut line to cut the material into a predetermined shape; In a state in which an area occupied by the cut line in the material is divided into a first area and a second area by a planned central boundary line, and the length of the cut line included in the first area and the length of the cut line included in the second area are substantially the same, The control means A cutting device that sends a command to the first moving means to move the first cutting means along the cut line from a first end portion opposite the planned central boundary line in the first area toward the planned central boundary line, and sends a command to the second moving means to move the second cutting means along the cut line from the planned central boundary line toward a second end portion opposite the planned central boundary line in the second area.

2. The cut line includes at least one envelope portion, The control means a boundary planned line setting means for setting a position of the central boundary planned line so that a length of the cut line included in the first region and a length of the cut line included in the second region are substantially the same, and the envelope portion and the central boundary planned line do not intersect, and the envelope portion is included in either the first region or the second region; a cutting order setting means for setting an order in which the envelope portion in the first region is cut in a sequence from the first end portion to the second end portion, and for setting an order in which the envelope portion in the second region is cut in a sequence from the first end portion to the second end portion; 2. The cutting device as described in claim 1, further comprising: a command means for sending a command to the first moving means to move the first cutting means along the cut line in the order set by the cutting order setting means, and a command means for sending a command to the second moving means to move the second cutting means along the cut line in the order set by the cutting order setting means.

3. A cutting method for cutting a material placed on a base, comprising the steps of: a first moving means for moving a first cutting means relative to the base; a second moving means for moving the second cutting means relative to the base at substantially the same speed as the first moving means; a control means for sending a command to the first moving means and the second moving means to move the first cutting means and the second cutting means along a cut line to cut the material into a predetermined shape; In a state in which an area occupied by the cut line in the material is divided into a first area and a second area by a planned central boundary line, and the length of the cut line included in the first area and the length of the cut line included in the second area are substantially the same, The control means A cutting method comprising the steps of: sending a command to the first moving means to move the first cutting means along the cut line from a first end portion opposite the planned central boundary line in the first region toward the planned central boundary line; and sending a command to the second moving means to move the second cutting means along the cut line from the planned central boundary line toward a second end portion opposite the planned central boundary line in the second region.

4. A program for a cutting device that is executed on a computer and cuts a material placed on a base, comprising: The cutting device is a first moving means for moving a first cutting means relative to the base; a second moving means for moving the second cutting means relative to the base at substantially the same speed as the first moving means; a control means for sending a command to the first moving means and the second moving means to move the first cutting means and the second cutting means along a cut line to cut the material into a predetermined shape; In a state in which an area occupied by the cut line in the material is divided into a first area and a second area by a planned central boundary line, and the length of the cut line included in the first area and the length of the cut line included in the second area are substantially the same, The control means A program that causes a computer to execute the following steps: send an instruction to the first moving means to move the first cutting means along the cut line from a first end portion opposite the planned central boundary line in the first area toward the planned central boundary line; and send an instruction to the second moving means to move the second cutting means along the cut line from the planned central boundary line toward a second end portion opposite the planned central boundary line in the second area.

Citation Information

Patent Citations

  • Machine tools, manufacturing methods, and manufacturing programs

    JP4425677B2