Eaves structure

The eave structure with a frame of pillars and beam members distributes load to pillars, addressing the risk of structural failure from large solar panels, enabling larger installations.

JP2024157439APending Publication Date: 2024-11-07SEKISUI CHEMICAL CO LTD

Patent Information

Application Number
JP2023071809
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-25
Publication Date
2024-11-07

AI Technical Summary

Technical Problem

The increased load on ceiling beams due to larger solar panels in eave structures poses a risk of structural failure, as the cantilevered design may not adequately support the additional weight.

Method used

An eave structure is designed with a frame comprising pillars, lower and upper beams, and horizontal first and second beam members that distribute the load to the pillars, reducing the stress on the ceiling beams.

Benefits of technology

This configuration effectively distributes the load, preventing excessive stress on the ceiling beams and allowing for larger solar panel installations without structural compromise.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024157439000001_ABST
    Figure 2024157439000001_ABST
Patent Text Reader

Abstract

To provide eaves structure that can restrain generation of over loading in an upper beam of a building unit.SOLUTION: Eaves structure 1 comprises a pair of first beam materials 10 each protruding to a horizontal direction from one end toward the other end and disposed spaced apart to a width direction of a building unit 100, and a second beam material 20 bridged between the other ends of the first beam materials 10. Each of the pair of first beam materials 10 is erected to a column material 100 at one end sides and is fixed to an outside surface 102a of an upper beam 102.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a eaves structure, and more particularly to a eaves structure provided on a building unit having a framework formed by pillars, floor beams, and ceiling beams. [Background technology]

[0002] In recent years, the use of power generation facilities using renewable energy, especially photovoltaic power generation facilities (solar panels), has been encouraged, and in this situation, solar panels are being installed on the roofs of buildings. When installing solar panels on the roofs of buildings, the roof angle is adjusted to efficiently generate solar power.

[0003] For example, Patent Document 1 discloses a building on which solar panels are installed. In Patent Document 1, a roof is attached to the main body of the building so that it partially overhangs the building to form an eaves portion, and the solar panels are installed at an angle so that they slope downward toward the tip of the eaves portion (the eaves side). [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2017-44038 A Summary of the Invention [Problem to be solved by the invention]

[0005] Incidentally, the eaves portion on which the solar panel is installed has a cantilever structure that extends horizontally from the ceiling beam (upper beam) that supports it. Therefore, the load of the solar panel is transferred to the ceiling beam via the eaves portion. However, if the depth dimension of the eaves portion is increased in accordance with an increase in the size of the solar panel, the load acting on the ceiling beam increases, and there is a risk that the ceiling beam will not be able to withstand the load.

[0006] Therefore, an object of the present invention is to provide a eave structure that can prevent excessive load from occurring on the upper beam of a building unit. [Means for solving the problem]

[0007] In response to the above problems, the present invention provides an eaves structure in which a framework is formed by column materials at the four corners, lower beams connecting the lower ends of the column materials, and upper beams connecting the upper ends of the column materials, the eaves structure comprising a pair of first beam materials each protruding horizontally from one end to the other and arranged at a distance in the width direction of the building unit, and a second beam material spanning between the other ends of the first beam materials, each of the pair of first beam materials being spanned on the column materials at one end side and fixed to the outer surface of the upper beam. Effect of the Invention

[0008] According to the present invention, the above-mentioned configuration makes it possible to prevent excessive load from being placed on the upper beam of the building unit. [Brief description of the drawings]

[0009] [Figure 1] 1 is a perspective view showing a schematic configuration of an entire unit building in which an eave structure according to an embodiment of the present invention is provided. [Diagram 2] FIG. 2 is a perspective view of a eaves structure and a building unit according to an embodiment of the present invention. [Diagram 3] 1 is an enlarged perspective view showing a main part of the joint between the eaves structure and the building unit according to an embodiment of the present invention; FIG. [Figure 4] FIG. 4 is a side view of the first beam. [Diagram 5] 4 is a partially enlarged view showing the joint between the first beam material and the ceiling beam. FIG. [Figure 6] 4 is a partial enlarged view showing the joint between the first beam and the pillar. FIG. [Figure 7] 13 is a diagram to explain how loads acting on the eaves structure and building units are transmitted. FIG. [Figure 8]This is a cross-sectional view showing the main parts of a building equipped with a eaves structure. [Figure 9] FIG. 1 is a diagram showing solar panels installed on a roof. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] Hereinafter, a description will be given of an eaves structure (hereinafter simply referred to as "eaves structure") provided in a building unit according to an embodiment of the present invention with reference to the drawings. Fig. 1 is a perspective view showing a schematic configuration of the entire unit building in which the eaves structure is provided.

[0011] As shown in FIG. 1, a building 200, which is a unit building, is configured with a building body 200a formed by combining a plurality of building units 100, and a roof 201 on top of the building body 200a.

[0012] The building 200 is a building that can be constructed in a short period of time by transporting the building units 100, which have been manufactured in advance in a factory, to a construction site and assembling them at the construction site. The building units 100 are approximately rectangular parallelepiped-shaped. The building units 100 are, for example, made of steel.

[0013] The roof 201 is installed approximately horizontally so as to cover at least the entire upper surface of the building body 200a. The roof 201 may be installed with a required drainage slope. Solar cell panels 300 are attached to the roof 201. The roof 201 is, for example, a folded plate roof, and a plurality of solar cell panels 300 are fixed to the roof 201 by fastening brackets (not shown) or the like.

[0014] The solar cell panel 300 is a panel-shaped power generating device that generates power using sunlight. There are various types of solar cell panels 300, but for example, a CIS module may be used. A CIS module is a compound semiconductor solar cell that uses three elements, copper (Cu), indium (In), and selenium (Se), as main raw materials. The solar cell panel 300 is substantially rectangular in plan view, and is installed on the upper surface of the roof 201.

[0015] Fig. 2 is a perspective view of the eaves structure 1 and the building unit 100 according to the embodiment of the present invention. As shown in Fig. 2, the building unit 100 is a structure having a substantially rectangular parallelepiped shape. The building unit 100 has a box-shaped framework formed as a structural body by pillars 101 arranged at the four corners, ceiling beams (upper beams) 102 as beams that are placed between the upper ends of the pillars 101, and floor beams (lower beams) 103 as beams that are placed between the lower ends of the pillars 101.

[0016] For example, the pillars 101 are rectangular steel pipes, and the ceiling beams 102 and floor beams 103 are formed of channel steel members having a generally U-shaped cross section. The pillars 101 are welded to the ceiling beams 102 and floor beams 103. In short, the building unit 100 is a box-frame rigid frame structure in which all corners are welded.

[0017] The pillars 101 of the building unit 100 are connected to the ceiling beams 102 and floor beams 103 via metal joint pieces 104 (connecting members). In this case, the joint pieces 104 are fixed by welding to the side of the pillars 101. The ceiling beams 102 and floor beams 103 are formed, for example, from channel steel material that is roughly U-shaped in cross section, and the ends of the ceiling beams 102 and the floor beams 103 are respectively connected to the joint pieces 104 by welding or bolts (rigid or semi-rigid joints). The pillars 101 are of a square cylindrical shape.

[0018] In the following description, the X direction refers to the direction along which the eaves structure 1 protrudes from the building unit 100, the Y direction refers to the direction perpendicular to the X direction in the horizontal direction, and the Z direction refers to the vertical direction perpendicular to both the X direction and the Y direction.

[0019] As shown in Fig. 2, the building unit 100 is provided with an eaves structure 1 so as to protrude to one side. The eaves structure 1 is formed in a U-shape in a plan view, and is attached so as to protrude horizontally (in the X direction in Fig. 2) from the upper part of the building unit 100.

[0020] The eaves structure 1 is configured to have a pair of first beams 10 and a second beam 20 that is bridged between the other ends of the first beams 10. The eaves structure 1 is fixed in a state in which it sandwiches a ceiling beam 102 from the outside in the width direction (Y direction in FIG. 2).

[0021] The pair of first beam materials 10 each protrude horizontally (X direction in FIG. 2) from the ceiling beam 102 and are arranged at an interval in the width direction (Y direction in FIG. 2) of the building unit 100. Each of the pair of first beam materials 10 protrudes the same length from the ceiling beam 102 along the extension direction of the ceiling beam 102 from one end side to the other end side.

[0022] Fig. 3 is an enlarged perspective view showing a main part of a joint between the eaves structure 1 and the building unit 100. As shown in Fig. 3, the first beam 10 is joined to a pillar 101 and a ceiling beam 102 at one end side.

[0023] 4 is a side view of the first beam 10. The first beam 10 is configured to have a web 11 and an upper flange 12 and a lower flange 13 provided at the upper and lower ends of the web 11. The web 11 and the upper flange 12 are both provided over the entire length of the first beam 10 in the longitudinal direction. The vertical dimension of the web 11 may be approximately the same as or slightly larger than the height of the ceiling beam 102.

[0024] The lower flange 13 is provided on only a portion of the longitudinal direction on the lower side of the first beam 10. That is, the lower flange 13 is provided in the longitudinal direction in a range excluding the distance D from one end side. The range of the distance D is not particularly limited and may be determined appropriately taking into consideration the protruding dimension of the eaves structure 1 from the building unit 100. That is, the length obtained by subtracting the distance D from the total length of the first beam 10 corresponds to the protruding dimension of the eaves structure 1 protruding from the building unit 100. The end on one end side of the lower flange 13 is designated as the end 13a.

[0025] The first beam material 10 has an interference avoidance area 10a where no lower flange 13 is provided, and a protruding area 10b where a lower flange 13 is provided. The interference avoidance area 10a is formed in an L-shape in cross section, and the protruding area 10b is formed in a U-shape in cross section.

[0026] As shown in Fig. 3, when the eaves structure 1 is attached to the building unit 100, the interference avoidance area 10a is fixed to a ceiling beam 102 extending in the same direction as the first beam 10, with the interference avoidance area 10a partially covering the column material 101. Because the interference avoidance area 10a is not provided with a lower flange 13, the first beam material 10 and the column material 101, and the first beam material 10 and the ceiling beam 102 do not interfere with each other, and gaps can be eliminated between the web 11 and the column material 101, and between the web 11 and the ceiling beam 102.

[0027] In addition, since the protruding region 10b is provided with the lower flange 13, for example, when the eaves structure 1 is moved toward the building unit 100, the end portion 13a abuts against the column material 101, causing interference between the protruding region 10b and the ceiling beam 102, suppressing movement of the first beam material 10 toward the building unit 100. As a result, when the eaves structure 1 is attached to the building unit 100, the protruding region 10b is provided to protrude from the ceiling beam 102.

[0028] As shown in FIG. 2, the second beam 20 is a linearly extending member arranged to span between the other ends of the pair of first beams 10. The second beam 20 extends horizontally (Y direction) to connect the ends of the pair of first beams 10. The second beam 20 is formed from the same material as the first beam 10. The first beam 10 and the second beam 20 are fixed together by, for example, welding, but are not limited to this. A plurality of tight frames 14 are provided on the upper side of the second beam 20.

[0029] An example of a joining mode between the eaves structure 1 according to the embodiment and the building unit 100 will be described with reference to Fig. 5 and Fig. 6. Fig. 5 is a partial enlarged view showing the joining portion between the first beam material 10 and the ceiling beam 102, and Fig. 6 is a partial enlarged view showing the joining portion between the first beam material 10 and the column material 101.

[0030] 5 is a diagram showing the joining state between the first beam material 10 and the ceiling beam 102. When the eaves structure 1 is attached to the building unit 100, the extension directions (X direction in the figure) of the first beam material 10 and the ceiling beam 102 coincide with each other, and the first beam material 10 is located outside the ceiling beam 102. The outer surface 102a of the ceiling beam 102 faces the web 11.

[0031] The first beam material 10 and the ceiling beam 102 are joined by a first joining structure 30. The first joining structure 30 is composed of a base plate 31 and a first bolt 32 inserted into the base plate 31. The base plate 31 is a flat steel plate, and is fixed to the outer surface at one end of the web 11 by, for example, welding.

[0032] The base plate 31, web 11, and ceiling beam 102 are arranged in this order in the width direction of the building unit 100. Through holes (not shown) through which the first bolts 32 pass are formed in the base plate 31, web 11, and ceiling beam 102, and each of the four first bolts 32 is inserted into these through holes and screwed into nuts (not shown) provided on the inside of the ceiling beam 102. In this way, the first beam material 10 and the ceiling beam 102 are bolted together and integrated.

[0033] The joining of the first beam material 10 and the ceiling beam 102 is not limited to bolt joining. For example, without providing either the base plate 31 or the first bolt 32, the web 11 and the outer surface 102a may be joined directly by welding.

[0034] 6 is a diagram showing a joining state between the first beam 10 and the pillar 101. When the eaves structure 1 is attached to the building unit 100, the extension direction of the first beam 10 (depth direction of the paper) and the extension direction of the pillar 101 (Z direction in the figure) are perpendicular to each other, and the first beam 10 is installed in a state where it is supported by the pillar 101 from below (erected state).

[0035] The surface of the pillar 101 facing the second beam 20 is the facing surface 101a, and the surface on the upper end side is the upper surface 101b. An upper flange 12 is placed on the upper surface 101b, and the first beam 10 is supported (installed) by the pillar 101 from below.

[0036] The first beam 10 and the pillar 101 are joined by a second joint structure 40. The second joint structure 40 is composed of a mounting bracket 41 and a second bolt 42. The mounting bracket 41 is composed of a front plate 41a and a side plate 41b, and is formed into an L-shape when viewed from above, with the front plate 41a and the side plate 41b bent at a right angle. The front plate 41a and the side plate 41b are, for example, flat steel plates.

[0037] The front plate 41a is fixed to the opposing surface 101a. Specifically, the front plate 41a has through holes through which the four second bolts 42 pass, and each of the second bolts 42 is inserted into these through holes and screwed into the pillar material 101 to be fixed.

[0038] The side plate 41b is fixed to the web 11. Specifically, the side plate 41b is joined to the web 11 by, for example, welding, and the side plate 41b and the web 11 are fixed face to face.

[0039] The front plate 41a and the opposing surface 101a may be fixed to each other by welding instead of by bolting, and the side plate 41b and the web 11 may be fixed to each other by bolting instead of by welding.

[0040] As described above, the first beam 10 and the column 101, and the first beam 10 and the ceiling beam 102 are rigidly joined together. This allows the eaves structure 1 to be fixed to the building unit 100 in both the extension direction of the first beam 10 (X direction in the figure) and the direction perpendicular to the extension direction of the first beam 10 (Y direction in the figure).

[0041] 7 is a diagram for explaining how a load acting on the eaves structure 1 and the building unit 100 is transmitted. When a load acts on the eaves structure 1 from above, the load acting on the first beam 10 is transmitted to the column 101 joined to the first beam 10. That is, the load acting on the first beam 10 is transmitted along the horizontal direction, and then dropped downward along the column 101.

[0042] Furthermore, the load acting on the second beam 20 is transmitted to the first beam 10 joined to the second beam 20, and then transmitted to the column 101 joined to the first beam 10. That is, the load acting on the second beam 20 is dispersed in the left-right direction along the extension direction of the second beam 20, and then dropped downward along the column 101 via the first beam 10.

[0043] The load from above and from the eaves structure 1 is also partially transmitted to the ceiling beams (eaves beams) 102 located on the eaves structure 1 side among the ceiling beams 102, where it is dispersed in the left-right direction and then dropped downward along the pillar material 101 (see the dashed arrows in Figure 7). The thickness of the various arrows in Figure 7 reflects the magnitude of the load acting on each member.

[0044] In this way, most of the load acting on the eaves structure 1 is transferred to the joint between the column material 101 and the first beam material 10, which is located upstream of the load transfer path, rather than the joint between the ceiling beam 102 and the first beam material 10, which is located downstream of the load transfer path. Therefore, unlike a so-called "cantilever beam" state in which most of the load acts on the ceiling beam (eaves beam) 102 located on the eaves structure 1 side of the ceiling beam 102, it is possible to prevent excessive load from acting on the ceiling beam 102. Therefore, the eaves structure 1 can withstand large loads.

[0045] 8 is a cross-sectional view showing a main part of a building equipped with an eaves structure 1 according to an embodiment. The eaves structure 1 is provided so as to protrude from an exterior wall 71 of a building 200 from the eaves base side toward the eaves tip side. The eaves structure 1 has a first beam 10 joined to a pillar 101 via a first joint structure 30, and a second beam 20 provided at the tip side of the first beam 10. The first beam 10 extends in the X direction (left-right direction on the paper) so as to protrude from the pillar 101, and the second beam 20 extends in a direction perpendicular to the first beam 10 (depth direction on the paper).

[0046] An eaves ceiling panel 72 is attached to the lower side of the first beam 10. An eaves arm 74 extending almost horizontally toward the eaves end is attached to the side of the second beam 20 via a fixing device 73. An eaves gutter 76 is installed above the eaves arm 74 via an eaves gutter receiving bracket 75.

[0047] The eaves gutter 76 is installed below the underwater end of the roof 201, and extends in a direction perpendicular to the plane of the paper along the building main body 200a. A parapet or other such decorative cover 77 is attached to the tip of the eaves arm 74 via an attachment member (not shown) so as to cover the outside of the eaves gutter 76. An eaves cover 78 is installed between the top of the eaves gutter cover 77 and the vicinity of the underwater end of the roof 201.

[0048] Fig. 9 is a diagram showing a state in which the solar cell panel 300 is installed on the roof 201. As shown in Fig. 9, the solar cell panel 300 is supported by the roof 201, which serves as a support. Note that the solar cell panel 300 may be supported directly by the tight frame 14 instead of the roof 201.

[0049] Thus, the eaves structure 1 according to the embodiment includes a pair of first beams 10 each protruding horizontally from one end to the other end and arranged at a distance in the width direction of the building unit 100, and a second beam 20 bridged between the other ends of the first beams 10, and each of the pair of first beams 10 is installed on a column 101 at one end and fixed to the outer surface 102a of the ceiling beam (upper beam) 102. This allows most of the load acting on the second beam 20 to be transmitted to the column 101. Therefore, even if the projection dimension of the eaves structure 1 projecting from the building unit 100 is increased, it is possible to avoid excessive load acting on the ceiling beam 102.

[0050] Moreover, each of the pair of first beams 10 is fixed at one end to an opposing surface 101a of the pillar 101 that faces the second beam 20 by a bolt. This allows the first beam 10 to be firmly fixed to the pillar 101. Therefore, the load acting on the second beam 20 can be reliably transmitted to the pillar 101.

[0051] In addition, a support portion is provided for supporting the solar cell panel 300. This allows the solar cell panel 300 to be installed up to the tip of the eaves structure 1, and the size of the solar cell panel 300 installed on the roof 201 can be increased.

[0052] Each embodiment of the present invention has been described in detail above with reference to the drawings, but the specific configuration is not limited to these embodiments, and design changes that do not deviate from the gist of the present invention are included in the present invention. [Explanation of symbols]

[0053] 1 Eaves structure 10 First Beam 20 Second Beam 100 Building Units 101 Pillar material 101a Opposite surface 102 Ceiling beam (upper beam) 102a External surface 103 Floor beam (lower beam) 300 solar panels

Claims

1. A eaves structure in which a framework is formed by four corner pillars, lower beams connecting the lower ends of the pillars, and upper beams connecting the upper ends of the pillars, The eaves structure is a pair of first beam members each protruding horizontally from one end to the other end and arranged at a distance in the width direction of the building unit; A second beam material is provided between the other ends of the first beam materials, A eave structure characterized in that each of the pair of first beam members is mounted on the pillar member at one end side and fixed to the outer surface of the upper beam.

2. The canopy structure according to claim 1, A eaves structure characterized in that each of the pair of first beams is fixed by a bolt at the one end side to the opposing surface of the column that faces the second beam.

3. The canopy structure according to claim 1 or 2, An eave structure characterized in that a support portion is provided on which a solar panel is supported.

Citation Information

Patent Citations

  • Eave soffit panel, eave soffit structure, building and eave soffit panel installing method

    JP2017044038A

Cited By

  • Adjustment methods in modular buildings

    JP2026142161A