A corrugated cardboard scaffold with interlocking box frames addresses the challenges of indoor high-altitude work by offering lightweight, stable, and easily assembled support, suitable for indoor construction with minimal environmental impact.
Patent Information
- Application Number
- JP2023068832
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-19
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2043-04-19
AI Technical Summary
Existing scaffolding solutions for indoor high-altitude work are bulky, heavy, difficult to transport, require specialized skills for assembly, and lack sufficient strength and stability to withstand vibrations and loads, making them impractical for indoor construction needs.
A prefabricated scaffold made of corrugated cardboard with interlocking box frames and connecting elements, allowing easy assembly and disassembly without tools, ensuring stability and load capacity through corrugated cardboard's structural integrity and frictional engagement, enabling compact storage and transportation.
The scaffold provides lightweight, portable, and stable support for indoor high-altitude work, allowing quick setup and teardown by non-specialized personnel, withstanding loads and vibrations, and minimizing environmental impact through recyclability.
Smart Images

Figure 2024157570000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a work scaffold made of cardboard that is easy to assemble, lightweight, and highly portable, and is suitable for working at height indoors. [Background technology]
[0002] Even if a worker stretches his / her hands upward, it is difficult to reach anything that is more than 2m high. Therefore, even when working indoors at high altitudes, it is often preferable to set up a temporary scaffold and have the worker work on the scaffold for work efficiency.
[0003] In this regard, from the viewpoint of workability and safety, temporary scaffolding made of steel pipes such as frame scaffolding, single pipe scaffolding, wedge fastening scaffolding, etc. are used outdoors. For example, in the case of wedge fastening scaffolding, steel pipes with fastening parts are used as vertical supports (building sites), these vertical supports are erected at intervals, horizontal members and diagonal members with fastening parts are fastened with wedges to the fastening parts of the vertical supports, and a work floor (cloth frame with floor) is appropriately attached to create a scaffold on which workers can walk.
[0004] Construction scaffolding is easy to assemble and portable, allowing it to be erected around the perimeter of a structure according to the site, but while it is heavy and sturdy as it is made of steel pipes, it needs to be handled carefully so as not to damage the surroundings during demolition work, etc. In addition, to ensure the safety of the work, a work supervisor is required for the assembly of scaffolding at sites above a certain height, and specialized workers are required for demolition or modification work.
[0005] Now, in indoor construction work, not only the side walls and floors but the entire indoor space including the ceiling are the subject of work, and the working area is often large. Therefore, when working on the indoor ceiling one by one, it is not easy to handle the work using only a stepladder. Repeatedly climbing up and down and moving around each time is not only inefficient and cumbersome, but also makes it unsafe if you try to work too hard on a stepladder.
[0006] Therefore, even in indoor construction, there are times when scaffolding suitable for sequentially working on the entire room is required. Indoors, the height of the scaffolding itself is often low, but in indoors where the work area is large, it is not desirable to use steel pipe scaffolding similar to that used outdoors. Steel pipe scaffolding is dangerous to assemble, disassemble, or change unless performed by experienced workers, and indoor workers are not familiar with such construction. This means that in addition to the interior construction contractor, it is necessary to arrange for a scaffolding craftsman separately for each interior construction work, which results in additional costs and manpower.
[0007] In addition, even if an interior construction contractor tried to transport steel scaffolding themselves, it would be difficult to load steel scaffolding in addition to the materials and tools that are already loaded onto the construction vehicle, so they would need to borrow the equipment and supplies from the contractor in charge of setting up the scaffolding and leave it to them to handle everything from transportation to installation, assembly, and dismantling.
[0008] In addition, if steel components are used, the route to the interior must be protected and cured to prevent damage to the walls and equipment inside the building during installation and transportation before use, and scaffolding must be set up more carefully than outdoors. Also, heavy items must be carried upstairs by elevator, but since there is a limit to the size of the elevator car, it is not easy to carry long or large items inside the building.
[0009] Furthermore, unlike indoor construction work before occupancy in a newly constructed building, when renovation or repair work is carried out, desks, furniture, and other fixtures and fittings are already placed inside the room, and construction work, including scaffolding installation and dismantling, needs to be carried out quickly and in a short period of time without moving or damaging these, so scaffolding that can be easily transported, assembled, and dismantled is desired.
[0010] Therefore, a scaffolding has been proposed for use in construction work on the ceiling above an obstacle installed inside a building, which is characterized by comprising a number of support members that are installed with the obstacle in between and are made up of a combination of a number of block- or box-shaped members each made of lightweight material, and a floor member that is spanned between the upper parts of the support members and straddles the obstacle (see Patent Document 1). [Prior art documents] [Patent documents]
[0011] [Patent Document 1] JP 2011-80333 A Summary of the Invention [Problem to be solved by the invention]
[0012] When stacking blocks or boxes to form legs as in Patent Document 1, polystyrene foam is used as the block for the legs in the specific embodiment, but these blocks cannot be folded, so they remain bulky at this size when transported. Also, the polystyrene foam block is filled with material because it needs to be strong enough to withstand the weight of a person standing on it, and each block is a solid rectangular parallelepiped measuring 900mm x 1800mm x 450mm and weighing about 20kg, so the block is heavy and difficult to carry by one person.
[0013] Although Patent Document 1 does not provide any specific examples, if blocks are replaced with boxes, boxes each 900 mm x 1800 mm x 450 mm in size are not strong enough. If boxes are used, small boxes that are less likely to be crushed would probably have to be used, but if boxes are lined up vertically and horizontally, they will not be able to withstand the load shifts and shaking caused by people working on them. Even if they are lined up, the boxes will collapse and fall apart when a person stands on them, so they are not practical for use as scaffolding.
[0014] Furthermore, when arranging boxes side by side or stacking them, they need to be firmly fixed to each other, but a separate means of connecting the boxes vertically and horizontally must be prepared, which is time-consuming, and there is no concrete indication of how this can be achieved. It is said that the flooring and beams (fiber-reinforced plastic pipes) placed on the leg blocks are detachably fixed with fixing screws, and that the legs and flooring are simply hung across each other or fixed with bands, but it is only assumed that the blocks will be stacked with a weight of 20 kg. However, when people actually work on them and walk around while working, shaking and vibrations will occur, so the concept is based on the idea that they are simply hung across each other without being fixed, and it cannot be said that practical consideration has been sufficiently considered.
[0015] In addition, the blocks and boxes on the legs are large and bulky. If instead of blocks, a six-sided box with upper and lower bases were to be used, it would be difficult to make the box longer and taller because people would have to stand on it, and if it were necessary to increase the number of boxes stacked up and down and left and right, the amount of work would increase. If the boxes were foldable, the number of steps and procedures for assembling and disassembling the boxes would become complicated and cumbersome, and the labor required for constructing scaffolding would increase, taking even more time. If used at an indoor renovation site, the construction work would be done outside of working hours, such as late at night, so the construction of scaffolding must be as short as possible, and it would need to be assembled in, for example, about 10 to 15 minutes. It is not realistic to assemble and fold the boxes, which will increase in number, as disassembly, due to time constraints, and it was practically difficult to introduce.
[0016] The problem to be solved by the present invention is to provide a prefabricated indoor high-altitude work scaffold that is suitable for indoor high-altitude work, is lightweight and highly portable, has a compact structure that can be stored and loaded into an elevator, is easy to assemble and disassemble, can be quickly installed and moved, is made of a material that does not damage the surroundings even if excessive protection is not required for the room, and has a structure that has substantial strength and load capacity to withstand vibrations caused by workers' work activities. Also, to provide a scaffold that requires less disposal costs when it is disposed of. [Means for solving the problem]
[0017] After much deliberation, the inventors came up with the idea of providing a prefabricated scaffold for indoor high-altitude work that uses cardboard, particularly double-sided or quadruple-sided corrugated cardboard, as a lightweight material that is less likely to damage the surrounding area when brought indoors, and that can be easily disassembled and assembled using simple fixing means that do not require screws, such as fitting, interlocking, or inserting connecting members, thereby providing a scaffold that can be stored without taking up too much space while still ensuring a sufficient practical load-bearing capacity.
[0018] Therefore, the first means for solving the problems of the present invention is a prefabricated scaffold for indoor high-altitude work made of cardboard, which has left and right legs and a floor plate part above the legs, The leg portion has a base plate having a guide protrusion on an upper surface thereof and a plurality of box frames arranged side by side. The box frames are stacked in one or more layers on the base plate, The box frame is a foldable rectangular box frame made of four standing wall corrugated cardboard pieces connected in an annular shape, and the standing wall corrugated cardboard pieces are used as standing walls, and the lower ends of the standing walls are fitted into the guide protrusions so as to abut against the guide protrusions and are placed on the base plate. The floor panel section is a prefabricated scaffold for indoor high-altitude work, characterized in that it comprises a bridging floor panel section that is placed between the legs and left and right extending floor panel sections that are placed on the legs, and each of the bridging floor panel section and the extending floor panel section comprises a three-dimensional reinforcement section that has an upper plane and a longitudinal through cavity with openings at the left and right ends below the upper plane, and the bridging floor panel section and the extending floor panel section are connected by inserting connecting column members into the through cavity.
[0019] That is, a plurality of foldable box frames arranged side by side, each formed into a rectangle by four-sided upright wall corrugated cardboard pieces connected in an annular shape, are stacked in one or more layers on a base plate having guide protrusions on the upper surface thereof so that the guide protrusions come into contact with the base plate, and the left and right legs are stacked in one or more layers. The bridging floor plate section is placed between the legs, and the left and right extended floor plate sections are placed on the legs, and are connected to each other. The bridging floor plate section is composed of an upper flat surface and a three-dimensional reinforcement section with a longitudinal through-hole with openings at the left and right ends inside the upper flat surface and the longitudinal through-holes inside the upper flat surface and the extended floor plate sections are connected to each other by inserting connecting column members into the through-holes. It is a prefabricated scaffold for indoor high-altitude work made of cardboard.
[0020] The second means is the prefabricated scaffold for indoor high-altitude work described in the first means, characterized in that the multiple box frame bodies are juxtaposed by abutting the opposing vertical-wall cardboard pieces on the long sides of the rectangle among the four vertical-wall cardboard pieces that make up one box frame body with the vertical-wall cardboard pieces on the long sides of the rectangle of adjacent box frame bodies, and the vertical-wall cardboard pieces on the short sides of the multiple box frame bodies are arranged linearly in sequence in the short-side direction.
[0021] The third means is a prefabricated scaffold for indoor high-altitude work described in the second means, characterized in that the cardboard piece for the vertical wall on the short side of the box frame body has a claw portion that protrudes from the outer surface of the rectangle at one vertical side edge and a notch portion that is recessed from the outer surface at the other vertical side edge, and multiple box frame bodies are arranged sequentially in the short side direction with the claw portion of each box frame body engaging with the notch portion of an adjacent box frame body.
[0022] The fourth means is a prefabricated scaffold for indoor high-altitude work described in any one of the first to third means, characterized in that the cardboard pieces for the vertical walls on the short sides of the rectangular box frame are reinforced load-bearing walls made by stacking multiple sheets of cardboard.
[0023] The fifth means is a prefabricated scaffold for indoor high-altitude work described in any one of the first to fourth means, characterized in that the three-dimensional reinforcement part has a trapezoidal corrugated shape in the cross-sectional shape around the through cavity.
[0024] This is a prefabricated scaffold for indoor high-altitude work, as described in any one of the first to fifth means, further characterized in that a covering supplementary plate is placed and fixed on the upper flat surface of the floor board portion.
[0025] The present invention is a prefabricated scaffold for indoor high-altitude work described in any one of the first to sixth means, characterized in that when the box frame bodies are stacked in multiple stages, connecting horizontal plates are sandwiched between the box frame bodies, and guide protrusions are arranged on the upper and lower planes of the connecting horizontal plates at the points where they come into contact with the cardboard pieces for the vertical walls.
[0026] This is a prefabricated scaffold for indoor high-altitude work according to any one of the first to seventh means, characterized in that the cardboard is double-sided cardboard or quadruple-sided cardboard. Effect of the Invention
[0027] The present invention is a work scaffold suitable for indoor high-altitude work. That is, since the material is cardboard, the strength is ensured by the corrugated core and liner, but the scaffold is hollow and lightweight, and therefore has excellent portability. Because it is made of paper and is less likely to damage the surrounding area without the need for excessive protection compared to steel pipes, it is easier to protect the room and equipment when carrying it indoors, and it can be carried in smoothly in a short amount of time. In addition, it can be stored in a size that can be loaded into an elevator and can be stored in the loading space of a commercial van, so interior decorators can carry it around like a stepladder.
[0028] In addition, because of its simple structure, it can be easily installed and dismantled without requiring specialized knowledge or high level of expertise or excessive skill. By following the procedure of fitting together the pieces, arranging them side by side, stacking them, and inserting the supports, anyone can intuitively install and dismantle the scaffolding without using screws or tools, so it can be installed and dismantled in a short time, making it ideal for interior construction work where working time is often limited.
[0029] And because the corrugated cardboard box frames are in contact with each other for a long distance in the height direction with the tabs and notches fitting together, friction sufficiently restricts their movement. Therefore, in addition to being strong enough to withstand a load of 250 kg or more over a span of 1800 mm when placed still, the floorboards can also withstand vibrations caused by people moving on the floorboards, so compared to simply stacking blocks or boxes side by side, they have practical strength that is resistant to shaking and has excellent practicality.
[0030] In addition, because the scaffolding is lightweight, the entire scaffolding can be slid in parallel by pulling the base plates of both legs at the same time. Since the entire scaffolding can be slid and moved without dismantling, work can be carried out smoothly without interruption, which increases the time that can be devoted to construction within a limited time, resulting in high work efficiency.
[0031] In addition, since the scaffolding of the present invention is made of cardboard, it can be recycled as waste paper when it is disposed of after its useful life, so the environmental impact is small. On the other hand, if it is made of composite materials, it cannot be recycled unless it is separated, and if it contains plastic, it becomes industrial waste, so the disposal costs increase and cannot be ignored. Since the strength of the scaffolding is secured only by cardboard, recycling is easy. [Brief description of the drawings]
[0032] [Figure 1] FIG. 1 is an overall view of a scaffold according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a schematic diagram of an assembled scaffold according to an embodiment of the present invention, showing how a covering supplement plate is placed. [Diagram 3] FIG. 3 shows the base plate of the leg. [Figure 4] FIG. 4 is a diagram showing how the box frames are fitted into the guide protrusions on the base plate of the legs and arranged side by side in the short side direction. [Diagram 5] FIG. 5 is a diagram showing how the box frames are arranged side by side with their tabs and notches meshing with each other to prevent misalignment. [Figure 6] This is an enlarged explanatory diagram of the engagement of the claw portion and the notch portion in Fig. 5. Fig. (a) shows that the claw portion and the notch portion are engaged to prevent the claw portion and the notch portion from swinging back and forth and left and right. Fig. (b) shows the state before the claw portion and the notch portion are engaged. [Figure 7] FIG. 7 is an explanatory diagram showing (a) the state in which the box frame is folded, and (b) the external appearance of the box frame. [Figure 8] Fig. 8(a) is an explanatory diagram showing a connecting horizontal plate that connects the box frame bodies to each other, Fig. 8(b) is an explanatory diagram of stacked box frame bodies, and Fig. 8(c) is a diagram showing that the box frame body is likely to rock and tilt if a connecting horizontal plate is not used. [Figure 9] FIG. 9 shows the bridge deck section. [Figure 10] This shows the three-dimensional reinforcement part below the bridging deck part in Figure 9, where (a) is the end cross section and (b) is the BB cross section of the middle part. [Figure 11] FIG. 11 is an explanatory diagram showing the extended floor panel portion. [Figure 12] Figure 12 is an explanatory diagram showing how the floor panel sections are connected, with extended floor panel sections on both sides of the central bridging floor panel section, and connecting column members being inserted through the through cavities in the three-dimensional reinforcement section. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0033] Below, referring to the drawings as appropriate, an example of a prefabricated indoor high-altitude work scaffold (1) made of cardboard and equipped with a floor plate (3) above the left and right legs (2, 2) will be described, in which the left and right legs (2, 2) are placed on a base plate (4) in parallel with four box frame bodies (6) in the short side direction (22), and the box frame bodies (6) are stacked in two layers via a connecting horizontal plate (24). Generally, a scaffold is required to have a span of 1800 mm and a load capacity of 250 kg or more, so the scaffold (1) of the present invention will be described as an example of a configuration that can provide a similar span and load capacity. In the following example, the span (distance across the ground) is 1800 mm, and the height above the ground is 18,000 mm. The overall size of the scaffolding is 1200mm wide (4 units of 300mm short side width of the leg box frame), 3000mm long, and 1800mm high (800mm high per step of the box frame, 200mm thick floorboard). It should be noted that the examples are merely illustrative and the present invention is not limited to these examples.
[0034] (About cardboard) Corrugated board is made by bonding a front liner and a back liner to both sides of a corrugated core (cardboard), and the grooves that define the thickness of this corrugated board are called flutes. Flutes are indicated by symbols such as A (5 mm), C (4 mm), and B (3 mm) depending on their width, and double-sided corrugated board with double flutes is available in types such as AA, BA, and BC. Quadruple-sided corrugated board with triple flutes is available in type AAA. AA and AAA types of corrugated board can be suitably used in the present invention, and a load capacity of 250 kg can be achieved over a span of 1800 mm.
[0035] (A: About the basal plate) The base plate (4) is 600 mm x 1200 mm in size, and four units of box frames (6) with short sides (21) of 300 mm and long sides (20) of 600 mm are arranged side by side on the base plate (4). Guide protrusions (5) with a width of 10 mm and a length of 250 mm or 500 mm are appropriately arranged on the upper flat surface of the base plate (4) so that they can abut against the lower end of the rectangular inner peripheral vertical wall (8) of the box frames (6). Therefore, by simply placing the box frames (6) on the base plate (4) so that they stick out, they are integrated with the base plate (4) by the guide protrusions (5) so that they can be easily attached and detached.
[0036] Four units of the box frame (6) are arranged side by side on the base plate (4), so that the guide protrusions (5, 5) that come into contact with the standing walls (8, 8) of adjacent units are arranged in two rows on the upper surface of the base plate (4). As a result, the lower ends of the standing walls (8, 8) are fitted so as to be clamped between the two guide protrusions (5, 5), so that the standing walls come into tight surface contact with each other as if they were reinforced load-bearing walls.
[0037] The base plate (6) can be placed directly on the floor at the position of the left and right legs, but if the floor is made of a material with high friction such as carpet, it will be difficult for the scaffold to slide, so it is also possible to lay a smooth sheet or thin plastic plate between the base plate (6) and the floor before laying it down. The entire scaffold can be moved by pulling the sheet or thin plastic plate placed under the base plate (6), reducing friction and allowing it to slide without disassembly.
[0038] (B: About the box frame) The box frame (6) has, for example, short sides (21) of 300 mm, long sides (20) of 600 mm, and a height of 800 mm. The height can be 500 mm instead of 800 mm. If it is stacked in two 800 mm layers, a total height of 1800 mm can be achieved with the 200 mm floor plate. Also, if 800 mm + 500 mm is used, the scaffolding height can be 1500 mm.
[0039] The box frame (6) is made by connecting four pieces of cardboard for the vertical walls (7) in a ring shape; when folded flat, it can be transported without taking up much space; when expanded into a rectangle to form a box frame, it becomes a square prism with vertical walls (8); by arranging several of these units side by side and stacking them in several layers, it is possible to create legs (2) that ensure strength and width.
[0040] By using the vertical wall corrugated cardboard pieces (7) in an orientation that exposes the corrugated cross section of the core material in the vertical direction, the core material can transmit the vertical load from top to bottom without buckling. If the corrugated cross section of the core material is exposed at the left and right ends, the cardboard is likely to buckle along the gaps in the corrugated sheet, so it is preferable to use the corrugated cross section of the core material of the cardboard as a vertical wall (8).
[0041] Among the vertical wall corrugated cardboard pieces (7) on the four sides of the box frame (6), one of the vertical wall corrugated cardboard pieces (7) on the short side (21) of the rectangle abuts against the trapezoidal bottom of the trapezoidal corrugated three-dimensional reinforcement part (12) at the bottom of both ends of the bridging floor board part (9). Thus, the load of the 1800 mm span of the bridging floor board part (9) is mainly supported by the vertical wall corrugated cardboard pieces (7) on the short side (21) directly below both ends of the bridging floor board part (9). By arranging four units of the box frame body (6) with a width of 300 mm, the vertical wall corrugated cardboard pieces (7) on the long side (20) perpendicular to the vertical wall corrugated cardboard pieces (7) on the short side (21) are integrated by surface contact with the adjacent box frame body (6), and they can function as a reinforced load-bearing wall as a double vertical wall (8) just by arranging them side by side in a simple manner. The upright walls (8) of the long sides (20) are disposed opposite each other at intervals of 300 mm, so that they can function satisfactorily as the internal framework of the leg portion (2).
[0042] The standing wall corrugated cardboard pieces (7) on the short sides (21) of the box frame (6) directly receive the load from both ends of the bridging floor plate (9), so they may be doubled up and glued together to form a reinforced load-bearing wall (23). By forming the reinforced load-bearing wall (23), the standing wall (8) of the leg (2) will not buckle, and the load-bearing capacity can be fully secured.
[0043] The four box frames (6) arranged consecutively in the short side direction (22) are preferably not completely rectangular at the four corners, but have a notch (19) and a protruding claw (18) at the end of the short side. That is, one side end of the standing wall (8) of the standing wall corrugated cardboard piece (7) of the short side (21) is notched (19), and the other side end is a claw (18) that protrudes beyond the rectangle. Then, the claw (18) of the box frame (6) adjacent to the notch (19) fits together. Since a large friction is generated at this fitting portion, the shaking of the box frame bodies (6) is restricted and they become difficult to move. Therefore, the leg (2) does not easily swing in the width direction (short side direction, i.e., short side direction) of the scaffold (1). Since the swinging of the leg (2) is largely suppressed by this fitting, the scaffold becomes stable and does not easily swing even when a worker standing on the scaffold walks on it.
[0044] On the other hand, if the boxes are simply stacked in two layers, they will not be able to follow the shaking or vibrations that occur when the workers are walking around while working, and will be vulnerable to shaking. If the boxes and blocks are not secured in place, the shaking will be too much and the blocks will become unusable. The vertical walls of adjacent blocks can also be overlapped in a cross shape with upper and lower slits, but even if the interlocking seems strong, the load will be concentrated at the crossing points as the blocks are used for a while due to shaking, and the paper will gradually loosen, so if the blocks are fitted with slits at the top and bottom, it cannot be said that they are sufficient for long-term use. Therefore, it is better to cut out the side edges of the short sides and fit them over the entire side edges to increase the contact surface and suppress the friction, which will be more resistant to loads in the long term than if the load is concentrated at the crossing points.
[0045] In addition, because the notches and claws fit together, the orientation of the box frame (6) is automatically determined, allowing for intuitive assembly. As shown in Figure 6, when the boxes are fitted together, they overlap in a complex manner, so that surface contact is affected by any movement in either direction, making it difficult for the boxes to sway in either direction.
[0046] Now, in double-sided and triple-double-sided corrugated board, the position of the corrugated board of the core is not aligned for each flute during manufacturing, and the direction of the waves is often different.As a result, when trying to bend along the corrugated board of the core, the bending occurs using the gaps between the waves, so for a 5 mm flute, depending on the position of the waves of the core, there will be an error of about several millimeters in the bending point.
[0047] Therefore, it is possible to bend the box frame (6) along the wavy lines of the flutes, but this would result in an error of several millimeters in the size of the box frame (6). The guide projections (4) on the top surface of the base plate (4) or on the top and bottom surfaces of the connecting horizontal plate (24) are fitted to the top and bottom ends of the vertical walls (8) of the box frame (6) so that they come into contact with each other, and because multiple box frame bodies (6) are arranged in parallel in the short side direction (22), if there is an error of about 5 mm, it will be necessary to make on-site adjustments when fitting them together, making assembly difficult. Of course, it is possible to make it easier to assemble by specifying the orientation and position of all the adjacent box frame bodies in advance with numbers and symbols, but the strictness of the order and orientation makes assembly more complicated.
[0048] Therefore, when connecting the four upright wall pieces (7) in a ring shape to form a rectangle to form the box frame (6), in addition to making the folds bendable by forming a crease, it is advisable to attach a liner paperboard to the connecting parts to make them bendable. By attaching the same paperboard (cardboard) as the corrugated cardboard, it is possible to recover the cardboard as waste paper without having to separate it when discarding it. It is also possible to half-cut the cardboard at a shallow depth so that only the outer liner remains, and then connect the cardboard in a ring shape to make it bendable at the cut parts.
[0049] (C About connecting horizontal plates) The height of the box frame body (6) is 800 mm or 500 mm, so the desired height can be obtained by stacking them in multiple stages. If four units of the box frame body (6) were simply placed on top of four units of the box frame body (6) arranged side by side, they would shift due to vibration, so horizontal connecting plates (24) are placed between the lower and upper box frame bodies (6) as joints. The horizontal connecting plates have protrusions similar to the guide protrusions (5) of the base plate (4) on their upper and lower surfaces. The guide protrusions (5) come into contact with the upper and lower ends of the vertical walls (8) of the box frame body (6) and are appropriately clamped, so that the box frame bodies (6) are held as if they were integrated. The ends of the box frame bodies are fitted into the connecting horizontal plate (24) and the guide protrusions (5) of the base plate (4), and multiple box frame bodies (6) can be integrated together without tools simply by engaging them in this manner, and the entire body becomes integrated as if it were a rigid body, and the overall shape can be maintained, thereby reducing the shaking of the legs (2) and making the structure more stable.
[0050] (D. Regarding bridge deck sections) The bridging floor panel section (9) is the central part of the floor panel section (3), and is integrated with the left and right extension floor panel sections (10) by inserting the connecting column members (14). The floor panel section (3) has an upper plane (11) for workers to walk on (a covering supplementary plate (15) may be further arranged on the upper plane), and a three-dimensional reinforcement section (12) below the upper plane (11). The bridging floor panel section (9) is 2000 mm long and 600 mm wide. The span between the legs is 1800 mm, and the load capacity is 250 kg or more. When the span is 1800 mm, 100 mm at both ends of the bridging floor panel section (9) is placed on each of the legs (2, 2). The lower trapezoidal base part (and the bottom panel directly below it) of the trapezoidal corrugated three-dimensional reinforcement section (12) is placed on the leg section (2).
[0051] The trapezoidal corrugated three-dimensional reinforcement (12) is a folded-plate roof-shaped reinforcement member with trapezoidal wave-shaped openings at the ends crossing the span, which is arranged from end to end so as to support the entire lower area of the bridge floor plate (9). The members of this three-dimensional reinforcement are made of double-sided corrugated board or quadruple-sided corrugated board. In addition, the three-dimensional reinforcement (12) may be further reinforced by providing a bottom plate (25) below the trapezoid at both ends.
[0052] The trapezoidal corrugated shape is suitable because it can adequately withstand a load of 250 kg or more without excessively increasing the weight. It is also suitable because it can disperse and support the load appropriately without causing damage or disintegration due to excessive load concentration in one area. Of course, the three-dimensional reinforcement portion (12) can be a three-dimensional structure that can reinforce and support the upper flat surface (11) from below so that it does not bend under the load, and it is not essential that the end shape is trapezoidal wave-shaped. There is no limit to the shape as long as it is something like a rib, and the form is not limited to a trapezoidal corrugated shape.
[0053] Because the center of the lower part of the three-dimensional reinforcement part (12) flexes under load, simply attaching the bottom plate (25) to the entire lower area of the three-dimensional reinforcement part (12) makes the connection between the lower end of the trapezoid and the bottom plate (25) prone to deformation and damage. Therefore, it is desirable to provide vertical wall ends (26) at the four corners of both ends of the three-dimensional reinforcement part (12) to reinforce the area between the bottom plate (25) and the upper flat surface (11), and to further reinforce the vertical walls as load-bearing walls made of multiple overlapping sheets of cardboard.
[0054] (E. Regarding the extension floor panel section) The extended floor panel section (10) is 500 mm long and 600 mm wide, and has a three-dimensional reinforcement section (12) below the upper flat surface (11). A bottom panel (25) is provided as a reinforcement below the trapezoid, and a vertical wall end section (26) is provided between the bottom panel and the upper flat surface (11). The inside of the trapezoid (inverted trapezoid) is a through cavity (13), and a connecting column member (14) made of cardboard is inserted from this through cavity (13) toward the through cavity (13) of the bridging floor panel section (9). This integrates the floor panel sections (3), making it less likely to shake and allowing for stable walking.
[0055] (F Regarding connecting columns) When people walk on the floorboards (3), they sway and vibrate. To prevent this, a square pillar (total length 600 mm) made of thickly layered corrugated boards is inserted into the through-hole of the floorboards. The height of the square pillar is approximately equal to the height of the trapezoidal through-hole. This strengthens the connection, improving the rigidity of the upper floorboards and reducing swaying. Even in the event of lateral swaying, the floorboards (3) connected together by these connecting pillars (14) are prevented from coming loose and collapsing, making it easier to ensure safety.
[0056] In other words, the bridging deck section (9) and the extension deck section (10) are simply placed on the legs and integrated by inserting the connecting column members (14) so that they will not fall off, making assembly and disassembly easy.
[0057] (G Covering replacement plate) The upper flat surface (11) of the floor plate portion (3) is 600 mm wide, i.e., the width is enough to place two box frames (6) side by side. Therefore, when four box frames are placed side by side, two floor plates (3) are placed side by side. The number of box frames can be increased in increments of two according to the width of the floor plate portion. If the width is 1200 mm, four box frames are placed side by side, if the width is 1800 mm, six box frames are placed side by side, if the width is 2400 mm, eight box frames are placed side by side in the short side direction, and two, three, or four floor plates are placed side by side on top of them. A covering refill plate (15) may be placed on the upper flat surface (11) of the floor plate portion. In this way, the covering refill plate (15) can be replaced at an appropriate time since it will wear out due to countless footprints of the worker on the surface of the cardboard. The covering refill plate can be attached and engaged to the upper flat surface (11) in a removable manner. Since no strong shearing force is applied to the covering refill plate, there are no particular limitations on the fastening means, and a wide range of means can be selected in consideration of workability.
[0058] (assembly) Now, using the above-mentioned parts A to G, the scaffolding (1) can be assembled to the desired width and height. Disassembly can be carried out by the reverse procedure of assembly. Since it is made of cardboard, it can be assembled simply by fitting, placing, and inserting the parts together, so workers do not need any special tools, and it is easy to handle without being highly complicated and requiring skill. Therefore, the interior decorator can load it into his own car, bring it in by himself using the elevator when working, and assemble it in the following procedure.
[0059] A. Place the base plate (4) shown in Figure 3 on the floor where you want to install the leg (2). A. As shown in Figures 4 and 7, the folded box frame body (6) is expanded into a rectangle on the base plate (4) and is then fitted in line with the guide projections (5) and arranged side by side. As shown in Figures 5 and 6, the box frame body (6) engages with the tabs (18) and notches (19) of the adjacent box frame body (6). C. The connecting horizontal plate (24) is fitted onto the juxtaposed box frames (6) along the guide protrusions (5) to form an integrated unit, and the second box frame (6) is fitted into the box frames along the guide protrusions (5) to form the legs (2). As shown in Fig. 8(b), the box frames (6) in two rows and four columns are fitted into the base plate (4) and connecting horizontal plate (24) with their claws (18) and notches (19) engaged, to form the integrated legs (2). d. Place the two bridging floor panels (9) side by side with their ends (16) between the left and right legs (2), and insert the protrusions (27) into the upper part of the legs to fit them into the box frame. E. Place two extension floor panels (10) on each of the left and right legs (2) side by side, and insert the protrusions (27) into the upper part of the legs to fit them into the box frame. (c) As shown in Figure 12, the floor panel sections (3) are integrated by sequentially inserting four connecting column members (14) from the trapezoidal (inverted trapezoidal) through-holes (13) of the left and right extension floor panel sections (10) toward the through-hole (13) of the bridging floor panel section (9). (g) Place three covering filler plates (15) on the upper flat surface (11) of the floor panel portion (3) and attach them to the upper flat surface (11) by attaching them so that they can be removed.
[0060] After use, it can be disassembled in the reverse order of A to K, the box frame can be folded, loaded onto a dolly, taken out by elevator, and carried into the worker's car. This scaffolding (1) is not disposable, but can be used repeatedly, and can be assembled and disassembled at multiple sites. Furthermore, as will be explained below, it is possible to combine it in different heights and widths depending on the site, giving it the flexibility to be adapted to a variety of sites.
[0061] The basic combination has four rows of box frames. By adding two rows of box frames to the basic combination, an even number such as 6, 8, or 10, the width of the legs can be increased, and the working space can be increased. Since this is done simply by arranging the frames in parallel, there is no effect on the strength, and it is only a variation in width. The height can be changed by using a single box frame or stacking multiple boxes with horizontal connecting plates. Also, by providing a variety of box frame heights, it is possible to realize the desired height by combining them, so if box frame heights of 800mm and 500mm are available, scaffolding heights of 700, 1000, 1500, and 1800mm can be realized. Since desks are generally 700mm high, if the desk is 1000mm high, it will be possible to avoid moving the desk. If the furniture on the desk is also to be removed, a height of 1800mm would ensure that the bottom edge of the floor is 1600mm high, allowing interior construction work to proceed without moving the desk.
[0062] (About load capacity) As a load-bearing test, a steel weight was added little by little near the center of the bridging deck (9) of the assembled scaffold (1), and the condition of the scaffold was checked after about 30 minutes. This test was conducted to confirm that the bridging deck (9) satisfied the general load-bearing requirement of 250 kg or more at the center of the span. Even when loads of 250 kg and 400 kg were applied, the bridging deck (9) deflected by about 10 mm, but did not buckle or bend, and it was confirmed that the vertical wall (8) of the box frame (6) of the leg (2) did not buckle and maintained its shape. Furthermore, it was confirmed that the bridging deck (9) could hold its shape for more than 30 minutes even with a load of 530 kg, which is more than double the target load-bearing capacity of 250 kg, although the center of the bridging deck bent downward and the trapezoidal rib of the three-dimensional reinforcement was distorted.
[0063] It was also confirmed that even when workers walked and worked on the scaffolding shown in the examples, shaking was suppressed and work could be carried out safely. [Industrial Applicability]
[0064] To provide a scaffolding according to the present invention, which can be quickly assembled, installed and disassembled by an interior decorator himself for use in high-altitude work in an indoor space, and which can be transported by being loaded onto the interior decorator's personal car, so that it can be used by anyone, even if the person is not a specialist in scaffolding. [Explanation of symbols]
[0065] 1. Prefabricated indoor scaffolding for high-altitude work 2 legs 3 Floorboard section 4 Basal plate 5 Guide protrusion 6 Box Frame 7. Cardboard pieces for vertical walls 8. Standing Wall 9 Bridge floor plate section 10 Extended floor plate section 11 Upper plane 12 Three-dimensional reinforcement section 13 Through Hollow 14 Column material for connection 15 Covering filler plate 16 End 17 Vertical side 18 Claw section (engagement section) 19 Notch 20 Long side 21 Short Side 22 Short side direction (short side direction) 23 Reinforced load-bearing wall 24 Connected horizontal plate 25 Bottom plate 26 Vertical wall end 27 Protrusion 28 Trapezoidal corrugation
Claims
1. A prefabricated indoor high-altitude work scaffold (1) made of cardboard, comprising left and right legs (2) and a floor plate (3) above the legs (2, 2), The leg (2) has: The device has a base plate (4) having a guide protrusion (5) on its upper surface, and a number of box frames (6) arranged side by side. The box frame (6) is stacked in one or more layers on the base plate (4), The box frame (6) is a foldable box frame (6) formed into a rectangle by four standing wall corrugated cardboard pieces (7) connected in an annular shape, and the standing wall corrugated cardboard pieces (7) serve as standing walls (8), and the lower ends of the standing walls (8) are fitted into the guide projections (5) so as to abut against the guide projections (5) and are placed on the base plate (4). The floor panel section (3) is made up of a bridging floor panel section (9) placed between the legs (2, 2) and left and right extension floor panel sections (10, 10) placed on the legs (2), The bridging floor panel section (9) and the extension floor panel section (10) each comprise an upper plane (11) and a three-dimensional reinforcement section (12) provided with a longitudinal through-hole (13) with openings at the left and right ends (16) below the upper plane (11). The bridging floor panel portion (9) and the extension floor panel portion (10) are connected by inserting a connecting column member (14) into the through cavity (13); A prefabricated scaffold for indoor high-altitude work (1).
2. The juxtaposition of the multiple box frame bodies (6) is characterized in that, among the four vertical-wall cardboard pieces (7) constituting one box frame body (6), the opposing vertical-wall cardboard pieces (7) on the long side (20) of the rectangle are abutted against each other on the long sides (20) of the rectangle of adjacent box frame bodies (6), and the vertical-wall cardboard pieces (7) on the short sides (21) of the multiple box frame bodies (6) are arranged linearly in sequence in the short side direction (22).
3. The prefabricated scaffold for indoor high-altitude work (1) as described in claim 2, characterized in that the vertical wall cardboard piece (7) on the short side of the box frame body (6) has a claw portion (18) that protrudes from the rectangular outer surface of one vertical side edge (17) and a notch portion (19) that is recessed from the outer surface of the other vertical side edge, and multiple box frame bodies (6) are sequentially arranged side by side in the short side direction (22) while the claw portion (18) of one box frame body (6) engages with the notch portion (19) of an adjacent box frame body.
4. The prefabricated indoor high-altitude work scaffold (1) described in claim 1, characterized in that the vertical wall cardboard piece (7) on the rectangular short side (21) of the box frame body (6) is a reinforced load-bearing wall (23) made of multiple sheets of cardboard stacked on top of each other.
5. The prefabricated indoor high-altitude work scaffold (1) according to claim 1, characterized in that the three-dimensional reinforcement portion (12) has a peripheral cross-sectional shape of a through cavity (13) that is a trapezoidal corrugated shape.
6. The prefabricated indoor high-altitude work scaffold (1) according to claim 1, further characterized in that a covering supplementary plate (15) is placed and fixed on the upper plane (11) of the floor plate portion (3).
7. In the case where the box frames (6) are stacked in a plurality of stages, a connecting horizontal plate (24) is sandwiched between the box frames (6), The prefabricated indoor high-altitude work scaffold (1) according to claim 1, characterized in that guide protrusions (5) are provided on the upper and lower planes of the connecting horizontal plate (24) at the points where they abut against the vertical wall cardboard pieces (7).
8. The prefabricated scaffold (1) for indoor high-altitude work according to claim 1, characterized in that the corrugated board is double-sided corrugated board or quadruple-sided corrugated board.
Citation Information
Patent Citations
Scaffold, method of installing scaffold, and method of renewing scaffold
JP2011080333A