Secondary battery manufacturing method

The method addresses the issue of uncontrolled voltage drops in secondary batteries by measuring temperature and adjusting load based on temperature and voltage, ensuring consistent and efficient voltage drop management.

JP2024162427AInactive Publication Date: 2024-11-21TOYOTA BATTERY CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023077919
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-10
Publication Date
2024-11-21
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing methods for adjusting voltage drop in secondary batteries do not account for the measured temperature of the battery, leading to inconsistent and uncontrolled voltage drops.

Method used

A method for manufacturing secondary batteries that involves temperature measurement, load application from the thickness direction, and load adjustment based on temperature and voltage measurements to achieve desired voltage drop amounts.

Benefits of technology

The method allows for precise adjustment of voltage drop based on temperature and voltage conditions, reducing variations and shortening the self-discharge time by optimizing load application.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024162427000001_ABST
    Figure 2024162427000001_ABST
Patent Text Reader

Abstract

To provide a secondary battery manufacturing method capable of adjusting the amount of voltage drop of a secondary battery on the basis of the measured temperature of a secondary battery.SOLUTION: A manufacturing method of a secondary battery 1 includes a temperature measurement step S3 of measuring the temperature of the secondary battery after initial charging, a restraint step S5 of applying a predetermined load to the secondary battery 1 from the thickness direction of the secondary battery 1, and a load adjustment step S7 of adjusting the load applied to the secondary battery 1 from the thickness direction. In the load adjustment step S7, when the measured temperature of the secondary battery 1 is equal to or higher than a predetermined upper limit temperature, the load applied to the secondary battery 1 is made smaller than the predetermined load.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a method for manufacturing a secondary battery. [Background technology]

[0002] Currently, secondary batteries such as lithium-ion batteries are used in electric vehicles, hybrid vehicles, plug-in hybrid vehicles, etc. Various techniques have been proposed to adjust the amount of voltage drop due to self-discharge of such secondary batteries.

[0003] As an example of a technology for adjusting the amount of voltage drop in a secondary battery, Patent Document 1 discloses a voltage adjustment method for an electricity storage device, which includes a voltage change step of pressing the electricity storage device with a first load and changing the load applied to the electricity storage device to change the component voltage from the first component voltage. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2022-131056 A Summary of the Invention [Problem to be solved by the invention]

[0005] However, the voltage adjustment method disclosed in Patent Document 1 has a problem in that it is not possible to adjust the amount of voltage drop in the secondary battery based on the measured temperature of the secondary battery.

[0006] The present disclosure is made to solve such problems, and has an object to provide a method for manufacturing a secondary battery that is capable of adjusting the amount of voltage drop in the secondary battery based on the measured temperature of the secondary battery. [Means for solving the problem]

[0007] A method for producing a secondary battery according to an embodiment includes the steps of: a temperature measurement step of measuring a temperature of the secondary battery after an initial charge; a restraining step of applying a predetermined load to the secondary battery in a thickness direction of the secondary battery; a load adjusting step of adjusting a load applied to the secondary battery in a thickness direction, In the load adjusting step, if the temperature of the secondary battery measured in the temperature measuring step is equal to or higher than a predetermined upper limit temperature, the load applied to the secondary battery is made smaller than the predetermined load.

[0008] A method for producing a secondary battery according to another embodiment includes the steps of: a temperature measurement step of measuring a temperature of the secondary battery after an initial charge; a restraining step of applying a predetermined load to the secondary battery in a thickness direction of the secondary battery; a load adjusting step of adjusting a load applied to the secondary battery in a thickness direction, In the load adjusting step, if the temperature of the secondary battery measured in the temperature measuring step is equal to or lower than a predetermined lower limit temperature, the load applied to the secondary battery is made larger than the predetermined load.

[0009] A method for producing a secondary battery according to another embodiment includes the steps of: a temperature measurement step of measuring a temperature of the secondary battery after an initial charge; a restraining step of applying a predetermined load to the secondary battery in a thickness direction of the secondary battery; a load adjusting step of adjusting a load applied to the secondary battery in a thickness direction, In the load adjustment process, if the measured temperature of the secondary battery measured in the temperature measurement process is equal to or higher than a predetermined upper limit temperature, the load applied to the secondary battery is reduced, and if the measured temperature of the secondary battery is equal to or lower than a predetermined lower limit temperature, the load applied to the secondary battery is increased above the predetermined load.

[0010] The method further includes a voltage measuring step of measuring a voltage of the secondary battery after the restraining step, In the load adjustment process, when the measured temperature of the secondary battery is below an upper limit temperature and exceeds a predetermined lower limit temperature, and the measured voltage of the secondary battery measured in the voltage measurement process is equal to or higher than a predetermined upper limit voltage, the load applied to the secondary battery may be made greater than the predetermined load.

[0011] Furthermore, the method further includes a voltage measuring step of measuring a voltage of the secondary battery after the restraining step, In the load adjustment process, when the measured temperature of the secondary battery is lower than an upper limit temperature and exceeds a predetermined lower limit temperature, and the measured voltage of the secondary battery measured in the voltage measurement process is equal to or lower than a predetermined lower limit voltage, the load applied to the secondary battery may be made smaller than the predetermined load.

[0012] Furthermore, the method further includes a voltage measuring step of measuring a voltage of the secondary battery after the restraining step, In the load adjustment process, When the measured temperature of the secondary battery is lower than the upper limit temperature and exceeds a predetermined lower limit temperature, and the measured voltage of the secondary battery measured in the voltage measurement step is equal to or higher than a predetermined upper limit voltage, the load applied to the secondary battery is increased; When the measured temperature of the secondary battery is below the upper limit temperature and above the lower limit temperature, and the measured voltage of the secondary battery is below a predetermined lower limit voltage, the load applied to the secondary battery may be made smaller than the predetermined load.

[0013] Furthermore, the method further includes a voltage measuring step of measuring a voltage of the secondary battery after the restraining step, In the load adjustment step, when the measured temperature of the secondary battery is equal to or higher than a predetermined upper limit temperature, When the measured voltage of the secondary battery measured in the voltage measuring step is equal to or lower than a predetermined lower limit voltage, the load applied to the secondary battery is set to a first load which is smaller than the predetermined load; When the measured voltage of the secondary battery exceeds a predetermined lower limit voltage and is less than a predetermined upper limit voltage, the load applied to the secondary battery may be set to a second load that is smaller than the predetermined load and larger than the first load.

[0014] Furthermore, in the load adjustment process, when the measured temperature of the secondary battery is equal to or higher than a predetermined upper limit temperature and the measured voltage of the secondary battery is equal to or higher than an upper limit voltage, the load applied to the secondary battery may be set to a third load that is smaller than the predetermined load and larger than the second load.

[0015] Furthermore, the method further includes a voltage measuring step of measuring a voltage of the secondary battery after the restraining step, In the load adjustment step, when the measured temperature of the secondary battery is equal to or lower than a predetermined lower limit temperature, When the measured voltage of the secondary battery measured in the voltage measuring step is equal to or higher than a predetermined upper limit voltage, the load applied to the secondary battery is changed to a fourth load that is greater than the predetermined load; When the measured voltage of the secondary battery is less than a predetermined upper limit voltage and exceeds a predetermined lower limit voltage, the load applied to the secondary battery may be set to a fifth load that is greater than the predetermined load and less than the fourth load.

[0016] Furthermore, in the load adjustment process, when the measured temperature of the secondary battery is equal to or lower than a predetermined lower limit temperature and the measured voltage of the secondary battery is equal to or lower than a lower limit voltage, the load applied to the secondary battery may be set to a sixth load that is greater than the predetermined load and less than the fifth load. Effect of the Invention

[0017] The present disclosure makes it possible to provide a method for manufacturing a secondary battery capable of adjusting the amount of voltage drop in the secondary battery based on the measured temperature of the secondary battery. [Brief description of the drawings]

[0018] [Figure 1] FIG. 1 is a diagram illustrating an example of a secondary battery according to the present disclosure. [Diagram 2] 4 is a flowchart showing a method for manufacturing a secondary battery according to the present disclosure. [Diagram 3] 13 is a flowchart showing details of a load adjusting step S7 according to the first embodiment. [Figure 4] FIG. 4 is a diagram showing an example of a default upper limit temperature and a default lower limit temperature according to the first embodiment. [Diagram 5] FIG. 4 is a diagram showing an example of a preset upper limit voltage and a preset lower limit voltage according to the first embodiment. [Figure 6] 5 is a diagram showing an example of a desired voltage change and an estimated voltage change of a secondary battery from the end of an aging process to the time of product shipment according to the first embodiment. FIG. [Figure 7] 10 is a diagram showing another example of a desired voltage change and an estimated voltage change of the secondary battery from the end of the aging process to the time of product shipment according to the first embodiment. FIG. [Figure 8] 13 is a flowchart showing details of a load adjusting step S7 according to the second embodiment. [Figure 9] 13 is a flowchart showing details of a load adjusting step S7 according to the second embodiment. [Figure 10] 13 is a flowchart showing details of a load adjusting step S7 according to the second embodiment. [Figure 11] 13 is a diagram showing an example of a desired voltage change and an estimated voltage change of a secondary battery from the end of an aging process to the time of product shipment according to the second embodiment. FIG. [Figure 12] 13 is a diagram showing another example of a desired voltage change and an estimated voltage change of a secondary battery from the end of an aging process to the time of product shipment according to the second embodiment. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] <First embodiment> Hereinafter, an embodiment according to the present disclosure will be described with reference to the drawings. Fig. 1 is a diagram showing an example of a secondary battery 1 according to the present disclosure. The secondary battery 1 includes a battery case 2 and an electrode assembly (not shown) housed in the battery case 2. The width direction shown in the drawing indicates the width direction of the secondary battery 1 and the electrode assembly. Also, the thickness direction indicates the thickness direction of the secondary battery 1 and the electrode assembly.

[0020] 2 is a diagram showing a method for manufacturing a secondary battery according to an embodiment. The method for manufacturing a secondary battery 1 includes an initial charging step S1, an aging treatment step S2, a temperature measurement step S3, a forced cooling step S4, a restraining step S5, a first voltage measurement step S6, a load adjustment step S7, a second voltage measurement step S8, and a self-discharge determination step S9.

[0021] The initial charging step S1 is a step of initially charging the secondary battery 1. Specifically, the secondary battery 1 is charged to a predetermined voltage value at room temperature (e.g., 5 to 35°C). The predetermined voltage value is preferably a voltage value that can be exhibited when the SOC (State of Charge) of the secondary battery 1 is 80% or more of the fully charged state.

[0022] The aging treatment step S2 is a step of performing an aging treatment on the initially charged secondary battery 1. For example, in the aging treatment, the secondary battery 1 is placed in a space at a predetermined room temperature (e.g., 60° C.) for a predetermined time (e.g., about 24 hours).

[0023] The temperature measurement step S3 is a step of measuring the temperature of the secondary battery 1 that has been subjected to the aging process after the initial charge. For example, the temperature of the secondary battery 1 is measured at the end of the aging process. Note that the temperature of the secondary battery 1 may also be measured during the aging process.

[0024] The forced cooling step S4 is a step of cooling the secondary battery 1 after the aging process is completed. For example, the secondary battery 1 is cooled using a fan or the like in a room temperature environment.

[0025] The restraining step S5 is a step of applying a predetermined load to the secondary battery 1 in the thickness direction of the secondary battery 1. In the restraining step S5, a pressure member capable of adjusting the load or the like can be used to apply the predetermined load to the secondary battery 1. In the case of a battery pack constituted by multiple secondary batteries 1, the predetermined load is applied to each secondary battery 1 individually.

[0026] The first voltage measurement step S6 is a step of measuring the voltage of the secondary battery 1 in the state in which a load is applied in the restraint step S5.

[0027] The load adjustment step S7 is a step of adjusting the load applied to the secondary battery 1 in the restraint step S5. In the load adjustment step S7, the load applied to the secondary battery 1 can be adjusted using a pressure member or the like capable of adjusting the load. In the case of a battery pack composed of multiple secondary batteries 1, the load applied to each secondary battery 1 is adjusted individually.

[0028] The second voltage measurement step S8 is a step of measuring the voltage of the secondary battery 1 after the load adjustment step S7.

[0029] The self-discharge determination process S9 is a process for determining the amount of self-discharge of the secondary battery 1, which corresponds to the difference between the measured voltages obtained in the first voltage measurement process S6 and the second voltage measurement process S8, based on these measured voltages.

[0030] 3 is a flowchart showing details of the load adjusting step S7 according to the first embodiment. In step S10, it is determined whether the measured temperature of the secondary battery 1 obtained in the temperature measuring step S3 is equal to or higher than a predetermined upper limit temperature.

[0031] The predetermined upper limit temperature can be set based on the standard deviation of the measured temperatures of the multiple secondary batteries 1 manufactured. For example, as shown in FIG. 4, a temperature equivalent to +1σ of the average temperature of the measured temperatures of the multiple secondary batteries 1 manufactured can be set as the predetermined upper limit temperature. Note that the rated upper limit temperature shown in FIG. 4 is the maximum temperature allowed for the secondary battery 1. Also, the rated lower limit temperature shown in FIG. 4 is the minimum temperature allowed for the secondary battery 1.

[0032] If the measured temperature of the secondary battery 1 is equal to or higher than the predetermined upper limit temperature (YES), in step S11, the load applied to the secondary battery 1 is made smaller than the predetermined load applied in the restraining step S5. On the other hand, if the measured temperature of the secondary battery 1 is lower than the predetermined upper limit temperature (NO), in step S12, it is determined whether the measured temperature of the secondary battery 1 is equal to or lower than the predetermined lower limit temperature.

[0033] The predetermined lower limit temperature can be set based on the standard deviation of the measured temperatures of the manufactured secondary batteries 1. For example, as shown in Fig. 4, a temperature equivalent to -1σ of the average temperature of the measured temperatures of the manufactured secondary batteries 1 can be set as the predetermined lower limit temperature.

[0034] If the measured temperature of the secondary battery 1 is equal to or lower than the predetermined lower limit temperature (YES), in step S13, the load applied to the secondary battery 1 is made greater than the predetermined load applied in the restraint step S5.

[0035] On the other hand, if the measured temperature of the secondary battery 1 exceeds the predetermined lower limit temperature (NO), in step S14, it is determined whether the measured voltage of the secondary battery 1 obtained in the first voltage measurement step S6 is equal to or higher than the predetermined upper limit voltage.

[0036] The predetermined upper limit voltage can be set based on the standard deviation of the measured voltages of a plurality of secondary batteries 1 manufactured. For example, as shown in FIG. 5, a voltage equivalent to +1σ of the average temperature of the measured voltages of a plurality of secondary batteries 1 manufactured can be set as the predetermined upper limit voltage. Note that the rated upper limit voltage shown in FIG. 5 is the maximum voltage allowed for the secondary battery 1. Also, the rated lower limit voltage shown in FIG. 5 is the minimum voltage allowed for the secondary battery 1.

[0037] If the measured voltage of the secondary battery 1 is equal to or higher than the predetermined upper limit voltage (YES), in step S13, the load applied to the secondary battery 1 is made larger than the predetermined load applied in the restraining step S5. On the other hand, if the measured voltage of the secondary battery 1 is lower than the predetermined upper limit voltage (NO), in step S15, it is determined whether the measured voltage of the secondary battery 1 is equal to or lower than the predetermined lower limit voltage.

[0038] The predetermined lower limit voltage can be set based on the standard deviation of the measured voltages of a plurality of manufactured secondary batteries 1. For example, as shown in Fig. 5, a voltage equivalent to -1σ of the average temperature of the measured voltages of a plurality of manufactured secondary batteries 1 can be set as the predetermined lower limit voltage.

[0039] If the measured voltage of the secondary battery 1 is equal to or lower than the predetermined lower limit voltage (YES), in step S16, the load applied to the secondary battery 1 is made smaller than the predetermined load applied in the restraint step S5. On the other hand, if the measured voltage of the secondary battery 1 exceeds the predetermined lower limit voltage (NO), the load applied to the secondary battery 1 is not changed.

[0040] As described above, the manufacturing method for the secondary battery 1 according to the first embodiment includes a temperature measurement step S3 for measuring the temperature of the secondary battery 1 after initial charging, a restraint step S5 for applying a predetermined load to the secondary battery 1 in the thickness direction of the secondary battery 1, and a load adjustment step S7 for adjusting the load applied to the secondary battery 1 in the thickness direction. In the load adjustment step S7, when the measured temperature of the secondary battery 1 is equal to or higher than a predetermined upper limit temperature, the load applied to the secondary battery 1 is made smaller than the predetermined load.

[0041] A secondary battery 1 whose measured temperature at the end of the aging treatment is equal to or higher than the predetermined upper limit temperature tends to have a smaller voltage drop thereafter, compared to a secondary battery 1 whose measured temperature is lower than the predetermined upper limit temperature. This is believed to be because the formation of a coating on the negative electrode plate caused by the active material during the aging treatment is accelerated at high temperatures. Therefore, when the measured temperature of the secondary battery 1 is equal to or higher than the predetermined upper limit temperature, in other words, as shown in FIG. 6, for example, the estimated voltage drop ΔV of the secondary battery 1 from the end of the aging treatment to the time of product shipment is ES is the reference desired voltage drop ΔV ST If it is estimated that the load applied to the secondary battery 1 will be smaller than the predetermined load, the load applied to the secondary battery 1 is made smaller than the predetermined load.

[0042] As a result, the amount of electrolyte permeating into the electrode body increases, and the reaction area between the active material and the salt such as lithium salt contained in the electrolyte increases, so the voltage drop of the secondary battery 1 increases, and the voltage drop of the secondary battery 1 is increased to the desired voltage drop amount ΔV ST Therefore, when a large number of secondary batteries 1 are manufactured, the variation in the amount of voltage drop of these secondary batteries 1 can be suppressed. As a result, in the aging treatment step S2, the task of changing the arrangement position of the secondary batteries 1 in order to suppress the variation in the amount of voltage drop of the secondary batteries 1 can be omitted. Furthermore, by suppressing the variation in the amount of voltage drop, the number of days of self-discharge required to suppress the variation in the amount of voltage drop of the secondary batteries 1 can be shortened, and the lead time can be shortened.

[0043] In the first embodiment, in the load adjustment step S7, when the measured temperature of the secondary battery 1 is equal to or lower than the predetermined lower limit temperature, the load applied to the secondary battery 1 is made larger than the predetermined load. A secondary battery 1 whose measured temperature at the end of the aging treatment is equal to or lower than the predetermined lower limit temperature tends to have a larger voltage drop thereafter compared to a secondary battery 1 whose measured temperature exceeds the predetermined lower limit temperature. This is considered to be because the formation of a coating on the negative electrode plate caused by the active material during the aging treatment is suppressed at low temperatures. Therefore, when the measured temperature of the secondary battery 1 is lower than the predetermined lower limit temperature, in other words, as shown in FIG. 7, the estimated voltage drop ΔV of the secondary battery 1 from the end of the aging treatment to the time of product shipment is ES is the desired voltage drop ΔV ST If it is estimated that the load applied to the secondary battery 1 will be greater than the predetermined load, the load applied to the secondary battery 1 is increased from the predetermined load. This reduces the amount of electrolyte solution permeating into the electrode body, and reduces the reaction area between the salt contained in the electrolyte solution and the active material, thereby reducing the amount of voltage drop in the secondary battery 1. ST It can be.

[0044] Furthermore, in the first embodiment, in the load adjustment process S7, when the measured temperature of the secondary battery 1 is less than the predetermined upper limit temperature and exceeds the predetermined lower limit temperature, and the measured voltage of the secondary battery 1 is equal to or greater than the predetermined upper limit voltage, the load applied to the secondary battery 1 is made greater than the predetermined load.

[0045] A secondary battery 1 whose measured voltage is equal to or higher than a predetermined upper limit voltage tends to have a larger voltage drop than a secondary battery 1 whose measured voltage is lower than the predetermined upper limit voltage. This is thought to be because the formation of a coating on the negative plate caused by the active material during the aging treatment is not stable, and the coating continues to be formed even after the aging treatment. Therefore, when the measured voltage of the secondary battery 1 is equal to or higher than a predetermined upper limit voltage, in other words, as shown in FIG. 7, the estimated voltage drop ΔV of the secondary battery 1 from the end of the aging treatment to the time of product shipment is ESIf it is estimated that the load applied to the secondary battery 1 will be large, the load applied to the secondary battery 1 is increased to a value greater than the predetermined load. This reduces the amount of voltage drop in the secondary battery 1, and the amount of voltage drop in the secondary battery 1 is adjusted to the desired voltage drop amount ΔV ST It can be.

[0046] Furthermore, in the first embodiment, in the load adjustment process S7, when the measured temperature of the secondary battery 1 is below a predetermined upper limit temperature and exceeds a predetermined lower limit temperature, and the measured voltage of the secondary battery 1 is below a predetermined lower limit voltage, the load applied to the secondary battery 1 is made smaller than the predetermined load.

[0047] A secondary battery 1 whose measured voltage is equal to or lower than the predetermined lower limit voltage tends to have a smaller voltage drop amount than a secondary battery 1 whose measured voltage exceeds the predetermined lower limit voltage. This is believed to be due to the promotion of the formation of a coating on the negative electrode plate caused by the active material during the aging treatment. Therefore, when the measured voltage of the secondary battery 1 is equal to or lower than the predetermined lower limit voltage, in other words, as shown in FIG. 6, the estimated voltage drop amount ΔV ES If it is estimated that the load applied to the secondary battery 1 will be smaller than the predetermined load, the load applied to the secondary battery 1 is made smaller than the predetermined load. This increases the voltage drop amount of the secondary battery 1, and the voltage drop amount of the secondary battery 1 is set to the desired voltage drop amount ΔV ST It can be.

[0048] <Second embodiment> In the second embodiment, the load applied to the secondary battery 1 can be changed for each of various conditions. Below, differences from the first embodiment will be described.

[0049] 8 to 10 are flow charts showing details of the load adjustment step S7 according to the second embodiment. In step S20, it is determined whether the measured temperature of the secondary battery 1 obtained in the temperature measurement step S3 is equal to or higher than a predetermined upper limit temperature. If the measured temperature of the secondary battery 1 is equal to or higher than the predetermined upper limit temperature (YES), in step S21, it is determined whether the measured voltage of the secondary battery 1 obtained in the first voltage measurement step S6 is equal to or lower than a predetermined lower limit voltage. If the measured voltage of the secondary battery 1 is equal to or lower than the predetermined lower limit voltage (YES), in step S22, the load applied to the secondary battery 1 is set to a first load that is smaller than the predetermined load applied in the restraint step S5.

[0050] On the other hand, if the measured voltage of the secondary battery 1 exceeds the predetermined lower limit voltage in step S21 (NO), it is determined in step S23 whether the measured voltage of the secondary battery 1 is less than the predetermined upper limit voltage. If the measured voltage of the secondary battery 1 is less than the predetermined upper limit voltage (YES), in step S24, the load applied to the secondary battery 1 is set to a second load that is less than the predetermined load applied in the restraint step S5 and greater than the first load.

[0051] On the other hand, if the measured voltage of the secondary battery 1 in step S23 is equal to or higher than the predetermined upper limit voltage (NO), in step S25, the load applied to the secondary battery 1 is set to a third load that is smaller than the predetermined load applied in the restraint step S5 and larger than the second load.

[0052] If the measured temperature of the secondary battery 1 is less than the predetermined upper limit temperature in step S20 (NO), it is determined in step S26 whether the measured temperature of the secondary battery 1 is equal to or less than the predetermined lower limit temperature. If the measured temperature of the secondary battery 1 is equal to or less than the predetermined lower limit temperature (YES), it is determined in step S27 whether the measured voltage of the secondary battery 1 is equal to or greater than the upper limit voltage. If the measured voltage of the secondary battery 1 is equal to or greater than the upper limit voltage (YES), the load applied to the secondary battery 1 is set to a fourth load in step S28 that is greater than the predetermined load applied in the restraint step S5.

[0053] On the other hand, if the measured voltage of the secondary battery 1 is less than the upper limit voltage in step S27 (NO), it is determined in step S29 whether the measured voltage of the secondary battery 1 exceeds the lower limit voltage. If the measured voltage of the secondary battery 1 exceeds the lower limit voltage (YES), in step S30, the load applied to the secondary battery 1 is set to a fifth load that is greater than the predetermined load applied in the restraint step S5 and less than the fourth load.

[0054] On the other hand, if the measured voltage of the secondary battery 1 is equal to or lower than the lower limit voltage (NO), in step S31, the load applied to the secondary battery 1 is set to a sixth load that is greater than the predetermined load applied in the restraint step S5 and less than the fifth load.

[0055] If the measured temperature of the secondary battery 1 exceeds the lower limit temperature in step S20 (NO), it is determined in step S32 whether the measured voltage of the secondary battery 1 is equal to or higher than a predetermined upper limit voltage. If the measured voltage of the secondary battery 1 is equal to or higher than the predetermined upper limit voltage (YES), the load applied to the secondary battery 1 is made greater than the predetermined load applied in the restraint step S5 in step S33. On the other hand, if the measured voltage of the secondary battery 1 is less than the predetermined upper limit voltage (NO), it is determined in step S34 whether the measured voltage of the secondary battery 1 is equal to or lower than a predetermined lower limit voltage.

[0056] If the measured voltage of the secondary battery 1 is equal to or lower than the predetermined lower limit voltage (YES), in step S35, the load applied to the secondary battery 1 is made smaller than the predetermined load applied in the restraint step S5. On the other hand, if the measured voltage of the secondary battery 1 exceeds the predetermined lower limit voltage (NO), the load applied to the secondary battery 1 is not changed.

[0057] As described above, in the second embodiment, when the measured temperature of the secondary battery 1 is equal to or higher than the predetermined upper limit temperature, and the measured voltage of the secondary battery 1 is equal to or lower than the predetermined lower limit voltage, the load applied to the secondary battery 1 is set to a first load that is smaller than the predetermined load. In other words, based on both the measured temperature and measured voltage of the secondary battery 1, the amount of voltage drop of the secondary battery 1 is set to a desired voltage drop amount ΔV STWhen it is estimated that the load applied to the secondary battery 1 will be smaller than the load (hereinafter referred to as the "first case"), the load applied to the secondary battery 1 is set to the first load.

[0058] On the other hand, when the measured temperature of the secondary battery 1 is equal to or higher than the predetermined upper limit temperature, and the measured voltage of the secondary battery 1 exceeds the predetermined lower limit voltage and is lower than the predetermined upper limit voltage, the load applied to the secondary battery 1 is set to a second load that is smaller than the predetermined load and larger than the first load. In other words, based on the result of the measurement of the temperature of the secondary battery 1, the voltage drop amount of the secondary battery 1 is set to a desired voltage drop amount ΔV ST On the other hand, based on the result of the measurement of the voltage of the secondary battery 1, the voltage drop amount of the secondary battery 1 is estimated to be smaller than the desired voltage drop amount ΔV ST When it is estimated that the load applied to the secondary battery 1 will be approximately the same as the load applied to the secondary battery 1 (hereinafter referred to as the "second case"), the load applied to the secondary battery 1 is set to the second load.

[0059] 11 is a diagram showing an example of a desired voltage change and an estimated voltage change of a secondary battery from the end of the aging process to the time of product shipment according to the second embodiment. In the first case, the estimated voltage drop amount ΔV ES1 (hereinafter, "first estimated voltage drop amount ΔV ES1 ") is the desired voltage drop ΔV ST Therefore, as shown in FIG. 11, the second estimated voltage drop amount ΔV ES2 Therefore, in the first case, the load applied to the secondary battery 1 is set to a first load that is smaller than the predetermined load and smaller than the second load, thereby increasing the amount of electrolyte that permeates into the electrode body and increasing the amount of voltage drop compared to the second case. As a result, in the first case, the amount of voltage drop of the secondary battery 1 is increased to a desired voltage drop amount ΔV ST It can be.

[0060] On the other hand, in the second case, the estimated voltage drop amount ΔV in the second case is calculated based only on the result of the measured temperature of the secondary battery 1. ES2 (hereinafter, "second estimated voltage drop amount ΔV ES2") is the desired voltage drop ΔV ST Therefore, as shown in FIG. 11, the first estimated voltage drop amount ΔV ES1 Therefore, in the second case, the load applied to the secondary battery 1 is set to a second load that is smaller than the predetermined load and larger than the first load, thereby reducing the amount of electrolyte that permeates into the electrode body and reducing the amount of voltage drop compared to the first case. As a result, in the second case, the amount of voltage drop of the secondary battery 1 is reduced to a desired voltage drop amount ΔV ST In this way, by selecting the load to be applied to the secondary battery 1 according to the magnitude of the estimated voltage drop amount of the secondary battery 1, the voltage drop amount of the secondary battery 1 can be controlled to the desired voltage drop amount ΔV ST It can be.

[0061] In the second embodiment, when the measured temperature of the secondary battery 1 is equal to or higher than the predetermined upper limit temperature, and the measured voltage of the secondary battery 1 is equal to or higher than the upper limit voltage, the load applied to the secondary battery 1 is set to a third load that is smaller than the predetermined load and larger than the second load. In other words, based on the result of the measurement of the temperature of the secondary battery 1, the voltage drop amount of the secondary battery 1 is set to a desired voltage drop amount ΔV ST On the other hand, based on the result of the measurement of the voltage of the secondary battery 1, the voltage drop amount of the secondary battery 1 is estimated to be smaller than the desired voltage drop amount ΔV ST If it is estimated to be greater than 1 (hereinafter referred to as the "third case"), the load applied to the secondary battery 1 is set to the third load. In this way, if there is a discrepancy between the estimation result of the voltage drop amount based on the measured temperature of the secondary battery 1 and the estimation result of the voltage drop amount based on the measured voltage, the estimation result based on the measured temperature, which has a greater effect on the voltage drop amount, is given priority.

[0062] In the third case, the voltage drop amount based on the result of the measurement of the temperature of the secondary battery 1 is the desired voltage drop amount ΔV ST On the other hand, the voltage drop amount based on the result of the measurement of the voltage of the secondary battery 1 is estimated to be smaller than ΔV ST Therefore, the estimated voltage drop in the third case is ΔV ES3 (Hereinafter, the third estimated voltage drop amount ΔVES3 ") is calculated as the first estimated voltage drop amount ΔV ES1 and the second estimated voltage drop amount ΔV ES2 Therefore, in the third case, the load applied to the secondary battery 1 is set to a third load that is smaller than the predetermined load and larger than the second load, thereby reducing the amount of electrolyte that permeates into the electrode body and reducing the amount of voltage drop compared to the first and second cases. As a result, in the third case, the amount of voltage drop of the secondary battery 1 is reduced to a desired voltage drop amount ΔV ST In this way, by selecting the load to be applied to the secondary battery 1 according to the magnitude of the estimated voltage drop amount of the secondary battery 1, the voltage drop amount of the secondary battery 1 can be controlled to the desired voltage drop amount ΔV ST It can be.

[0063] Furthermore, in the second embodiment, when the measured temperature of the secondary battery 1 is equal to or lower than the predetermined lower limit temperature, and the measured voltage of the secondary battery 1 is equal to or higher than the predetermined upper limit voltage, the load applied to the secondary battery 1 is set to a fourth load that is greater than the predetermined load. In other words, based on both the measured temperature and measured voltage of the secondary battery 1, the voltage drop amount of the secondary battery 1 is set to a desired voltage drop amount ΔV ST If it is estimated that the load applied to the secondary battery 1 will be greater than 1 (hereinafter referred to as the "fourth case"), the load applied to the secondary battery 1 is set to a fourth load.

[0064] On the other hand, when the measured temperature of the secondary battery 1 is equal to or lower than the predetermined lower limit temperature, and the measured voltage of the secondary battery 1 is lower than the predetermined upper limit voltage and exceeds the predetermined lower limit voltage, the load applied to the secondary battery 1 is set to a fifth load that is larger than the predetermined load and smaller than the fourth load. In other words, the voltage drop amount of the secondary battery 1 based on the result of the measured temperature of the secondary battery 1 is set to a desired voltage drop amount ΔV ST On the other hand, the voltage drop amount of the secondary battery 1 based on the result of the measurement of the voltage of the secondary battery 1 is estimated to be larger than the desired voltage drop amount ΔV ST If it is estimated that the load applied to the secondary battery 1 is approximately the same as the load applied to the secondary battery 1 (hereinafter referred to as the "fifth case"), the load applied to the secondary battery 1 is set to a fifth load.

[0065] 12 is a diagram showing another example of the desired voltage change and the estimated voltage change of the secondary battery from the end of the aging process to the time of product shipment according to the second embodiment. In the fourth case, the estimated voltage drop amount ΔV ES4 (Hereinafter, the fourth estimated voltage drop amount ΔV ES4 ") is the desired voltage drop ΔV ST Therefore, the estimated voltage drop ΔV ES4 As shown in FIG. 12, the fifth estimated voltage drop amount ΔV ES5 On the other hand, in the fifth case, the estimated voltage drop amount ΔV in the fifth case is estimated based only on the result of the measurement of the temperature of the secondary battery 1. ES5 (hereinafter, "the fifth estimated voltage drop amount ΔV ES5 " ), the desired voltage drop ΔV ST Therefore, the fifth estimated voltage drop amount ΔV ES5 As shown in FIG. 12, the fourth estimated voltage drop amount ΔV ES4 Therefore, by selecting the load to be applied to the secondary battery 1 according to the magnitude of the estimated voltage drop amount of the secondary battery 1, the voltage drop amount of the secondary battery 1 can be controlled to a desired voltage drop amount ΔV ST It can be.

[0066] Specifically, in the fourth case, the load applied to the secondary battery 1 is set to a fourth load that is greater than the predetermined load and greater than the fifth load, so that the voltage drop amount of the secondary battery 1 is set to a desired voltage drop amount ΔV ST In the fifth case, the load applied to the secondary battery 1 is set to a fifth load that is larger than the predetermined load and smaller than the fourth load, so that the voltage drop amount of the secondary battery 1 can be set to a desired voltage drop amount ΔV ST It can be.

[0067] Furthermore, in the second embodiment, when the measured temperature of the secondary battery 1 is equal to or lower than the predetermined lower limit temperature, and the measured voltage of the secondary battery 1 is equal to or lower than the lower limit voltage, the load applied to the secondary battery 1 is set to a sixth load that is greater than the predetermined load and less than the fifth load. In other words, depending on the result of the measurement of the temperature of the secondary battery 1, the voltage drop amount of the secondary battery 1 is set to a desired voltage drop amount ΔV ST On the other hand, the voltage drop amount of the secondary battery 1 is estimated to be larger than the desired voltage drop amount ΔV ST If it is estimated that the load applied to the secondary battery 1 will be smaller than the load (hereinafter referred to as the "sixth case"), the load applied to the secondary battery 1 is set to a sixth load.

[0068] In the sixth case, the voltage drop amount based on the result of the measurement of the temperature of the secondary battery 1 is equal to the desired voltage drop amount ΔV ST On the other hand, the voltage drop amount based on the measurement voltage of the secondary battery 1 is estimated to be ΔV ST Therefore, the estimated voltage drop amount ΔV in the sixth case is estimated to be smaller than ES6 (hereinafter, "6th estimated voltage drop amount ΔV ES6 ") is calculated as the fourth estimated voltage drop amount ΔV ES4 and the fifth estimated voltage drop ΔV ES5 Therefore, in the sixth case, the load applied to the secondary battery 1 is set to a sixth load that is larger than the predetermined load and smaller than the fifth load, so that the voltage drop amount of the secondary battery 1 is reduced to a desired voltage drop amount ΔV ST It can be.

[0069] The present invention is not limited to the above-described embodiment, and can be modified as appropriate without departing from the spirit and scope of the present invention. [Explanation of symbols]

[0070] 1 Secondary battery 2 battery case S1 Initial charging process S2 Aging process S3 Temperature measurement process S4 Forced cooling process S5 restraint process S6 First voltage measurement process S7 Load adjustment process S8 Second voltage measurement process S9 Self-discharge judgment process

Claims

1. A method for manufacturing a secondary battery, comprising: a temperature measuring step of measuring a temperature of the secondary battery after an initial charge; a restraining step of applying a predetermined load to the secondary battery in a thickness direction of the secondary battery; a load adjusting step of adjusting a load applied to the secondary battery from the thickness direction, In the load adjustment step, when the temperature of the secondary battery measured in the temperature measurement step is equal to or higher than a predetermined upper limit temperature, a load applied to the secondary battery is reduced to be smaller than the predetermined load. A method for manufacturing a secondary battery.

2. A method for manufacturing a secondary battery, comprising: a temperature measuring step of measuring a temperature of the secondary battery after an initial charge; a restraining step of applying a predetermined load to the secondary battery in a thickness direction of the secondary battery; a load adjusting step of adjusting a load applied to the secondary battery from the thickness direction, In the load adjustment step, when the temperature of the secondary battery measured in the temperature measurement step is equal to or lower than a predetermined lower limit temperature, a load applied to the secondary battery is increased to be greater than the predetermined load. A method for manufacturing a secondary battery.

3. A method for manufacturing a secondary battery, comprising the steps of: a temperature measuring step of measuring a temperature of the secondary battery after an initial charge; a restraining step of applying a predetermined load to the secondary battery in a thickness direction of the secondary battery; a load adjusting step of adjusting a load applied to the secondary battery from the thickness direction, In the load adjustment step, when the measured temperature of the secondary battery measured in the temperature measurement step is equal to or higher than a predetermined upper limit temperature, the load applied to the secondary battery is reduced, and when the measured temperature of the secondary battery is equal to or lower than a predetermined lower limit temperature, the load applied to the secondary battery is increased to be greater than the predetermined load. A method for manufacturing a secondary battery.

4. The method further includes a voltage measuring step of measuring a voltage of the secondary battery after the restraining step, The method for manufacturing a secondary battery according to any one of claims 1 to 3, wherein in the load adjustment process, when the measured temperature of the secondary battery is lower than the upper limit temperature and exceeds a predetermined lower limit temperature, and when the measured voltage of the secondary battery measured in the voltage measurement process is equal to or higher than a predetermined upper limit voltage, the load applied to the secondary battery is made larger than the predetermined load.

5. The method further includes a voltage measuring step of measuring a voltage of the secondary battery after the restraining step, The method for manufacturing a secondary battery according to any one of claims 1 to 3, wherein in the load adjustment process, when the measured temperature of the secondary battery is lower than the upper limit temperature and exceeds a predetermined lower limit temperature, and when the measured voltage of the secondary battery measured in the voltage measurement process is equal to or lower than a predetermined lower limit voltage, the load applied to the secondary battery is made smaller than the predetermined load.

6. The method further includes a voltage measuring step of measuring a voltage of the secondary battery after the restraining step, In the load adjusting step, When the measured temperature of the secondary battery is lower than the upper limit temperature and exceeds a predetermined lower limit temperature, and when the measured voltage of the secondary battery measured in the voltage measurement step is equal to or higher than a predetermined upper limit voltage, a load applied to the secondary battery is increased; 4. The method for manufacturing a secondary battery according to claim 1, wherein, when the measured temperature of the secondary battery is lower than the upper limit temperature and exceeds the lower limit temperature, and when the measured voltage of the secondary battery is equal to or lower than a predetermined lower limit voltage, a load applied to the secondary battery is made smaller than the predetermined load.

7. The method further includes a voltage measuring step of measuring a voltage of the secondary battery after the restraining step, In the load adjustment step, when the measured temperature of the secondary battery is equal to or higher than the predetermined upper limit temperature, when the measured voltage of the secondary battery measured in the voltage measuring step is equal to or lower than a predetermined lower limit voltage, a load applied to the secondary battery is set to a first load which is smaller than the predetermined load; 4. The method for manufacturing a secondary battery according to claim 1, wherein, when the measured voltage of the secondary battery exceeds the predetermined lower limit voltage and is less than a predetermined upper limit voltage, a load applied to the secondary battery is set to a second load that is smaller than the predetermined load and larger than the first load.

8. 8. The method for manufacturing a secondary battery according to claim 7, wherein in the load adjustment process, when the measured temperature of the secondary battery is equal to or higher than the predetermined upper limit temperature and the measured voltage of the secondary battery is equal to or higher than the upper limit voltage, the load applied to the secondary battery is set to a third load that is smaller than the predetermined load and larger than the second load.

9. The method further includes a voltage measuring step of measuring a voltage of the secondary battery after the restraining step, In the load adjustment step, when the measured temperature of the secondary battery is equal to or lower than the predetermined lower limit temperature, when the measured voltage of the secondary battery measured in the voltage measuring step is equal to or higher than a predetermined upper limit voltage, a load applied to the secondary battery is set to a fourth load that is greater than the predetermined load; 4. The method for manufacturing a secondary battery according to claim 1, wherein, when the measured voltage of the secondary battery is less than the predetermined upper limit voltage and exceeds a predetermined lower limit voltage, a load applied to the secondary battery is set to a fifth load that is greater than the predetermined load and less than the fourth load.

10. 10. The method for manufacturing a secondary battery according to claim 9, wherein in the load adjustment process, when the measured temperature of the secondary battery is equal to or lower than the predetermined lower limit temperature and the measured voltage of the secondary battery is equal to or lower than the lower limit voltage, the load applied to the secondary battery is set to a sixth load that is greater than the predetermined load and less than the fifth load.

Citation Information

Patent Citations

  • Method for adjusting device voltage of power storage device

    JP2022131056A