Power demand / supply system

The electric power supply and demand system addresses power variation challenges in manufacturing systems by integrating vehicle batteries and central storage batteries with a control unit, enhancing power balance and estimation accuracy.

JP2024162440AActive Publication Date: 2024-11-21TOYOTA JIDOSHA KK

Patent Information

Application Number
JP2023077943
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-10
Publication Date
2024-11-21
Estimated Expiration
2043-05-10

AI Technical Summary

Technical Problem

Manufacturing systems face challenges in managing variations in power consumption and supply, particularly with the integration of renewable energy sources, without adequate consideration for the secondary batteries installed in vehicles being manufactured.

Method used

An electric power supply and demand system that utilizes on-vehicle secondary batteries, a central storage battery, and power generation equipment to manage power distribution within a factory, including a control unit to adjust charging rates based on production and consumption changes.

Benefits of technology

The system efficiently balances power supply and demand by utilizing vehicle-mounted batteries as energy resources, improving accuracy in power estimation and reducing the risk of power imbalances.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024162440000001_ABST
    Figure 2024162440000001_ABST
Patent Text Reader

Abstract

To provide a power demand / supply system which can efficiently adjust demand / supply balance of electric power in a factory.SOLUTION: A power demand / supply system used in a factory manufacturing a vehicle comprises: an on-vehicle secondary battery which is mounted on a vehicle capable of traveling in the factory through remote control in a manufacturing process in the factory; a central rechargeable battery which can supply appliances in the factory with electric power; a charger which can supply electric power accumulated in the central rechargeable battery to the on-vehicle secondary battery; a power incoming device which can supply electric power accumulated in the on-vehicle secondary battery to the central rechargeable battery; and a power generation facility which is equipped in the factory to be capable of supplying electric power generated in the power generation facility to the central rechargeable battery.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to an electric power supply and demand system. [Background technology]

[0002] For example, Patent Document 1 discloses a vehicle driving method in a manufacturing system for manufacturing vehicles, in which a vehicle is driven by remote control from the end of an assembly line of the manufacturing system to a parking lot of the manufacturing system. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Special Publication No. 2017-538619 Summary of the Invention [Problem to be solved by the invention]

[0004] In a manufacturing system, fluctuations in power consumption due to load and fluctuations in the supply and demand of renewable energy may occur. No technology has been considered that can realize the supply and demand of power in the entire manufacturing system, including the secondary batteries installed in the vehicles being manufactured. [Means for solving the problem]

[0005] The present disclosure can be realized in the following forms.

[0006] (1) According to one aspect of the present disclosure, there is provided an electric power supply and demand system for use in a factory that manufactures vehicles, the electric power supply and demand system including: an on-board secondary battery mounted on the vehicle that can run within the factory by remote control during a manufacturing process at the factory; a central storage battery capable of supplying electric power to equipment at the factory; a charging device capable of supplying electric power stored in the central storage battery to the on-board secondary battery; a power receiving device capable of supplying electric power stored in the on-board secondary battery to the central storage battery; and a power generation facility provided at the factory that can supply electric power generated by the power generation facility to the central storage battery. According to this type of electricity supply and demand system, by utilizing the on-board secondary batteries installed in vehicles during the manufacturing process as an energy resource that can supply and demand electricity to a central storage battery, a system capable of supplying and demanding electricity throughout the entire factory can be realized. (2) The electricity supply and demand system of the above embodiment may further include a control unit that acquires trends in the amount of electricity generated by the power generation equipment and the amount of electricity consumed by the central storage battery, and determines a target charging rate for the central storage battery using the acquired trends in the amount of electricity generated by the power generation equipment and the amount of electricity consumed by the central storage battery. According to this type of power supply and demand system, the provision of a control unit makes it possible to adjust the balance between power supply and demand in the entire factory. (3) In the electricity supply and demand system according to the above aspect, the control unit may determine the target charging rate of the central storage battery by using a change in the number of vehicles produced in the factory. According to this type of power supply and demand system, the accuracy of estimating power supply and demand can be improved by determining the number of vehicle-mounted secondary batteries whose charging rates are easy to adjust during the manufacturing process. (4) In the above-described electricity supply and demand system, the control unit may prompt charging of the vehicle-mounted secondary battery from the charging device when the charging rate of the central storage battery is equal to or higher than a predetermined upper limit value or is predicted to be equal to or higher than the upper limit value. According to this type of power supply and demand system, the on-board secondary battery, whose charging rate is easily adjusted during the manufacturing process, is preferentially used as an energy resource, thereby making it possible to more efficiently adjust the power supply and demand balance in the factory. (5) In the above-described electricity supply and demand system, the control unit may prompt charging of the central storage battery from the vehicle secondary battery via the power receiving device when the charging rate of the central storage battery is below a predetermined lower limit value or is predicted to be below the lower limit value. According to this type of power supply and demand system, the on-board secondary battery, whose charging rate is easily adjusted during the manufacturing process, is preferentially used as an energy resource, thereby making it possible to more efficiently adjust the power supply and demand balance in the factory. The present disclosure can also be realized in various forms other than a power supply system, such as a power supply and demand adjustment device, a remote automatic driving system, a power demand adjustment method, a charging method for a central storage battery, a server, a vehicle manufacturing method, a charging device, a control method for a charging device, a computer program for implementing the control method, a non-transitory recording medium on which the computer program is recorded, and the like. [Brief description of the drawings]

[0007] [Figure 1] 1 is an explanatory diagram showing a schematic configuration of an electricity supply and demand system according to a first embodiment of the present disclosure. [Diagram 2] FIG. 2 is an explanatory diagram showing the configuration of a remote control device and a vehicle. [Diagram 3] 4 is a flowchart showing a processing routine of power supply and demand adjustment processing. [Figure 4] FIG. 4 is an explanatory diagram showing an example of a change in the charging rate of a central battery; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0008] A. First embodiment: 1 is an explanatory diagram showing a schematic configuration of an electricity supply and demand system 800 according to a first embodiment of the present disclosure. The electricity supply and demand system 800 manages the supply and demand of electricity for a factory FC that manufactures vehicles 100. The vehicles 100 are, for example, passenger cars, trucks, buses, and construction vehicles. The electricity supply and demand system 800 includes energy resources including a central storage battery 80, a power generation facility 90 capable of charging the central storage battery 80, a battery 120 mounted on the vehicle 100, and a charging device 200 capable of charging the battery 120.

[0009] The central storage battery 80 supplies and demands electric power to and from each energy resource inside and outside the factory FC. The central storage battery 80 is an industrial storage battery, and may be, for example, a lithium-ion battery or a sodium-sulfur battery. The battery 120 is, for example, a rechargeable in-vehicle secondary battery such as a lithium-ion battery or a nickel-metal hydride battery. The battery 120 stores electric power and the like used for running the vehicle 100. The battery 120 may further include an auxiliary battery having a low voltage capable of supplying electric power to the auxiliary devices of the vehicle 100. The central storage battery 80 may be charged by electric power and the like purchased from, for example, a power generation facility 90 and an operator OS outside the factory FC. The operator OS may be, for example, an operator S1 that retails electricity, a renewable energy power generation operator S2, a general consumer S3, and the like.

[0010] The power generation equipment 90 generates electricity that can be used in the factory FC. The power generation equipment 90 may be, for example, a power generation equipment that uses renewable energy such as solar power, wind power, geothermal power, small and medium-sized hydraulic power, biomass, etc. The power generation equipment 90 may further include a generator that uses fossil energy such as petroleum, coal, and natural gas. The power generated by the power generation equipment 90 is supplied to the central storage battery 80.

[0011] The charging device 200 supplies the power supplied from the central storage battery 80 to the battery 120 of the vehicle 100. In the example of FIG. 1, the charging device 200 includes a non-contact charging device 200A that performs power transmission using magnetic resonance coupling, and a contact charging device 200B that connects a power supply connector to the vehicle 100 to charge. The charging device 200 may be configured as either a non-contact type or a contact type. In this embodiment, the charging device 200A is laid on the path RT of the vehicle 100 as described later, and can receive power transmitted from the battery 120 of the vehicle 100 in a non-contact manner and supply it to the central storage battery 80. By providing equipment capable of transmitting and receiving power on the path RT of the vehicle 100, it becomes easy to use the battery 120 of the vehicle 100 during travel to adjust power supply and demand. In the supply and demand of electric power between the vehicle 100 and the charging device 200, it is preferable that the contact-type charging device 200B having a high power transmission efficiency is used in preference to the non-contact-type charging device 200A in terms of suppressing power loss. In the supply and demand of electric power between the vehicle 100 and the charging device 200A, it is preferable that power transmission when the vehicle 100 is stopped is prioritized over power transmission when the vehicle 100 is moving in terms of suppressing power loss. However, in this case, it is preferable that this is performed on the premise that there is no impact on the productivity of the vehicle 100. The charging device 200A may be configured to perform only one of charging from the central storage battery 80 to the battery 120 and charging from the battery 120 to the central storage battery 80.

[0012] As shown in FIG. 1, the power supply and demand system 800 may further include an auxiliary storage battery 82 as an energy resource. The auxiliary storage battery 82 is provided for each process or each building in the manufacturing process of the factory FC. The auxiliary storage battery 82 is electrically connected to the central storage battery 80, and supplies the power received from the central storage battery 80 to each process, etc. When the charging rate (SOC: State Of Charge) of the central storage battery 80 becomes higher than a predetermined charging rate, power is set to be supplied from the central storage battery 80 to the auxiliary storage battery 82 in order to suppress deterioration of the central storage battery 80 and avoid full charging. When the charging rate of the central storage battery 80 becomes lower than the predetermined charging rate, power is supplied from the auxiliary storage battery 82 to the central storage battery 80 in order to suppress deterioration of the central storage battery 80. In other words, the auxiliary storage battery 82 has a function of mitigating excess or deficiency in the charging rate of the central storage battery 80. The central storage battery 80 and the auxiliary storage battery 82 may be a single battery or any number of batteries equal to or greater than two.

[0013] The power supply and demand system 800 may further include a power supply and demand adjustment device 600, a remote control device 300, a process management device 400, and a charging device management device 500. The process management device 400 manages manufacturing information of each process in the manufacturing process of the factory FC, the amount of power consumed in each process, and the like. The "manufacturing information" is, for example, the operation plan of the factory FC, the number of products in process, the number of products being processed, and the planned number of products to be manufactured per unit period. The charging device management device 500 controls the transmission and reception of power by the charging device 200, and manages the amount of power related to the transmission and reception of power by the charging device 200, and the like.

[0014] The remote control device 300 transports the vehicle 100 in the manufacturing process within the factory FC by automatically driving the vehicle 100 through remote control. Transporting the vehicle 100 using automatic driving through remote control is also called "self-driving transport."

[0015] As shown in the lower part of FIG. 1, the factory FC is equipped with a front-end process 50, a back-end process 60, and a road RT for the vehicle 100. The road RT is a transport section for the vehicle 100 between each process, or a section for transporting the completed vehicle 100 to a shipping area PA where the completed vehicle 100 waits for shipment. Each process may be located across multiple locations. "The vehicle 100 travels within the factory FC" includes cases where the vehicle 100 travels on public roads, not limited to private roads, to move between processes in multiple locations.

[0016] The upstream process 50 and downstream process 60 are various processes that belong to the manufacturing process of the vehicle 100. The upstream process 50 is, for example, an assembly process in which vehicle parts such as the battery 120 are attached to the vehicle body. The downstream process 60 is, for example, an inspection process for the vehicle 100. After the downstream process 60, the vehicle 100 is completed as a product. The completed vehicles 100 are driven by remote control to a shipping area PA, and are shipped to the shipping destination corresponding to each vehicle 100.

[0017] 2 is an explanatory diagram showing the configuration of the remote control device 300 and the vehicle 100. The vehicle 100 includes a vehicle communication unit 190, a motor 140, a battery 120, an ECU (Electronic Control Unit) 180, a power receiving device, and a power transmitting device. The vehicle communication unit 190 performs wireless communication with devices outside the vehicle 100, such as the remote control device 300 connected to a network 72, via an access point 70 in a factory FC. The vehicle communication unit 190 may transmit information such as the charging rate of the battery 120 to the charging device 200, the remote control device 300, and the like.

[0018] The power receiving device includes a power receiving circuit 150, a power receiver 152, and a power receiving resonant circuit 154. The power receiver 152 is a power supply inlet or the like corresponding to a power supply connector of the charging device 200B. The power receiving resonant circuit 154 is equipped with a power receiving coil and a power receiving resonant capacitor, not shown. The power receiving circuit 150 is a rectifier, a DC / DC converter, or the like. When AC power is supplied from the power receiver 152 or the power receiving resonant circuit 154, the power receiving circuit 150 converts the supplied AC power into DC power by the rectifier. The converted DC power is supplied to the battery 120 via the DC / DC converter.

[0019] The power transmitting device includes a power transmitting circuit 160 and a power transmitting resonant circuit 164. The power transmitting circuit 160 is an inverter or the like. The power transmitting circuit 160 converts DC power supplied from the battery 120 into AC power of an operating frequency and supplies the AC power to the power transmitting resonant circuit 164. The power transmitting circuit 160 may include a rectifier circuit, a filter circuit, and the like. The power transmitting resonant circuit 164 includes a power transmitting coil and a power transmitting resonant capacitor, which are not shown.

[0020] The charging device 200A includes a power transmitting device 250A and a power receiving device 260A. The power transmitting device 250A includes a power transmitting resonant circuit 254 and a power transmitting circuit 250, and the power receiving device 260A includes a power receiving resonant circuit 264 and a power receiving circuit 260. The power transmitting circuit 250 is an inverter or the like. The power receiving circuit 260 is a rectifier, a DC / DC converter, or the like. The power receiving resonant circuit 264 includes a power receiving coil and a power receiving resonant capacitor, which are not shown. The power transmitting resonant circuit 254 includes a power transmitting coil and a power transmitting resonant capacitor, which are not shown. When AC power is supplied from the power receiving resonant circuit 264, the power receiving circuit 260 converts the supplied AC power into DC power by a rectifier. The converted DC power is supplied to the central storage battery 80 via a DC / DC converter.

[0021] The power transmitting resonant circuit 254 and the power receiving resonant circuit 264 of the charging device 200A are continuously arranged over the entirety of the path RT. When the power transmitting resonant circuit 254 and the power receiving resonant circuit 154 of the vehicle 100 face each other, an induced electromotive force is generated in the power receiving resonant circuit 154. When the power receiving resonant circuit 264 and the power transmitting resonant circuit 164 of the vehicle 100 face each other, an induced electromotive force is generated in the power receiving resonant circuit 264. In this embodiment, the power transmitting circuit 250 and the power receiving circuit 260 are controlled by the charging device management device 500. The exchange of power between the battery 120 and the charging device 200A is controlled by the charging device management device 500.

[0022] The motor 140 is, for example, an AC synchronous motor, and functions as an electric motor and a generator. When the motor 140 functions as an electric motor, the motor 140 is driven by the electric power stored in the battery 120 as a power source. The output of the motor 140 is transmitted to the wheels via a reduction gear and an axle. When the vehicle 100 decelerates, the motor 140 functions as a generator that utilizes the rotation of the wheels, and generates regenerative power. When the electric power supplied from the charging device 200 to the power receiving device and the regenerative power generated by the motor 140 are supplied to the battery 120, the battery 120 is charged, and the SOC of the battery 120 increases. A PCU (Power Control Unit) having an inverter, a boost converter, and a DC / DC converter may be connected between the battery 120 and the motor 140.

[0023] The ECU 180 is mounted on the vehicle 100 and executes various controls of the vehicle 100. The ECU 180 includes a memory such as an HDD, an optical recording medium, and a semiconductor memory, and a CPU as a central processing unit. The CPU executes various computer programs stored in the memory to realize functions such as a driving control unit that executes driving control of the vehicle 100. The "driving control" is, for example, the adjustment of acceleration, speed, and steering angle. In the remote control, the ECU 180 controls each actuator mounted on the vehicle 100 according to a control signal of the remote control received from the remote control device 300 via the vehicle communication unit 190. The ECU 180 also calculates the charging rate of the battery 120 using, for example, the cell voltage, current, temperature, and the like of the battery 120.

[0024] The remote control device 300 includes a CPU 310 as a central processing unit, a storage device 320, and a remote communication unit 390. These are connected to each other via an internal bus, an interface circuit, etc. The remote communication unit 390 communicates with the vehicle 100, the power supply and demand adjustment device 600, etc. via the network 72.

[0025] The storage device 320 is, for example, a RAM, a ROM, an HDD (hard disk drive), an SSD (solid state drive), etc. When the computer program stored in the storage device 320 is executed by the CPU 310, the CPU 310 functions as a remote control unit 312 and a charging rate acquisition unit 314. However, some or all of these functions may be configured by hardware circuits. The charging rate acquisition unit 314 acquires the charging rate of the battery 120 from the vehicle 100. The acquired charging rate of the battery 120 is output to the power supply and demand adjustment device 600.

[0026] The remote control unit 312 transmits a control signal to the vehicle 100 via the remote communication unit 390, requesting remote control of the vehicle 100. When the vehicle 100 receives the request for remote control, the driving control is realized by the ECU 180, and as a result, the vehicle 100 runs automatically. The remote control unit 312 causes the ECU 180 to execute driving control of the vehicle 100 while analyzing an image of the vehicle 100 acquired by a camera CA arranged in the factory FC. The remote control unit 312 adjusts the relative position of the vehicle 100 with respect to a target route preset on the road RT through image analysis, thereby causing the vehicle 100 to run along the target route.

[0027] Returning to FIG. 1, the power supply and demand adjustment device 600 manages the energy resources in the factory FC and the business operator OS, and manages the supply and demand of power in the factory FC. The power supply and demand adjustment device 600 can also be called an aggregator. The power supply and demand adjustment device 600 includes a CPU 610 as a central processing unit, a storage device 620 such as a RAM, a ROM, a HDD, and an SSD, and a communication unit 690 having a wireless communication function. These are connected to each other via an internal bus or an interface circuit. The communication unit 690 is a communication device for communicating with external devices such as the vehicle 100, the power generation facility 90, the remote control device 300, the process management device 400, and the charging device management device 500. The CPU 610 executes a program stored in the storage device 620 to realize some or all of the functions of the control unit 612 and the like.

[0028] The control unit 612 adjusts the supply and demand of electricity in the factory FC by managing the energy resources. The supply and demand of electricity in the factory FC includes, for example, the amount of electricity purchased from the business operator OS, the amount of electricity generated by the power generation equipment 90, and the amount of electricity consumed by the central storage battery 80. Specifically, the control unit 612 acquires the transition of the supply and demand of electricity by each energy resource. The control unit 612 determines a target charging rate of the central storage battery 80 so as to avoid an imbalance in the acquired transition of the electricity supply and demand. The control unit 612 controls each energy resource to realize the determined target charging rate.

[0029] For example, a machine learning model using a neural network (NN) can be used to predict the power supply and demand. For example, a model suitable for time series analysis using past data is used as the machine learning model. For example, a model having an architecture such as a recurrent neural network (RNN), a convolutional neural network (CNN), a general regression neural network, or a random forest is suitable for predicting the power supply and demand. In this embodiment, a learning model having an RNN with a recurrent structure such as a long short-term memory (LSTM) capable of long-term time series analysis is adopted. The machine learning model stored in the storage device 620 is a trained model that uses past power supply and demand data by energy resources as training data. As a training method for the neural network, a support vector machine (SVM) or an error backpropagation method is preferably used. In addition, prediction of power supply and demand is not limited to machine learning, and various methods such as regression analysis such as multiple regression analysis and multivariate analysis may be used.

[0030] The control unit 612 predicts, for example, the amount of power generated per unit time in a solar power generation device of the power generation facility 90. In this case, the amount of power generated per unit time in the solar power generation device is set as a dependent variable. Solar radiation intensity, which time of day (24 hours), solar altitude, binary data indicating whether it is daytime or not, weather information such as weather and temperature, etc. are set as independent variables. Note that the solar altitude is the angle to the sun measured with the horizon direction at an angle of zero degrees and the zenith at an angle of 90 degrees. The control unit 612 determines the target charging rate of the central storage battery 80 using the transition of the predicted amount of power generated.

[0031] The control unit 612 may further determine the target charging rate of the central storage battery 80 by predicting a transition in the power consumption of the central storage battery 80 using the manufacturing information. The control unit 612 may determine the target charging rate of the central storage battery 80 by predicting a transition in the power consumption of the central storage battery 80 using, for example, a transition in the number of vehicles 100 produced in the factory FC. The transition in the number of vehicles 100 produced can be acquired using manufacturing information of each process acquired from the process management device 400 and the number of orders for the vehicles 100. When the number of vehicles 100 produced is large, the amount of power consumed in each process and each vehicle 100 may be larger than when the number of vehicles 100 produced is small. In addition, when the number of vehicles 100 produced is large, the number of batteries 120 in the factory FC increases, and the total amount of power in the factory FC may increase. Therefore, by using the transition in the number of vehicles 100 produced, the prediction accuracy of the transition in the charging rate of the central storage battery 80 can be improved.

[0032] The control unit 612 may further determine the target charging rate of the central storage battery 80 using the manufacturing status of the factory FC. The "manufacturing status" refers to the deviation of the actual manufacturing time from the target manufacturing time. The "target manufacturing time" is the target value of the manufacturing time required to process one vehicle 100. The target manufacturing time is sometimes called the "takt time." If the manufacturing is delayed, the amount of power consumed in each process or each vehicle 100 may be greater than usual. By using the manufacturing status of each process, the accuracy of prediction of the transition of the charging rate of the central storage battery 80 can be improved.

[0033] The control unit 612 may further use a transition of the amount of power received from outside the factory FC, such as the business operator OS, to determine the target charging rate of the central storage battery 80. The control unit 612 may use a power generation failure in the business operator OS, such as an accident, or an abnormality in power transmission between energy resources to determine the target charging rate of the central storage battery 80.

[0034] 3 is a flowchart showing a processing routine of the power supply and demand adjustment process in this embodiment. This flow is started, for example, when the power supply and demand adjustment device 600 is turned on, or at a predetermined timing for adjusting the power supply and demand. This flow may be repeatedly executed at predetermined time intervals, for example, every hour or every day.

[0035] In step S10, the transition of the charging rate of the central battery 80 per unit time is predicted. In step S20, it is confirmed whether the charging rate of the central battery 80 is within a predetermined reference range including a predetermined reference value within the unit time. If it is within the reference range (S20: within reference range), the control unit 612 controls each energy resource so that the power consumption of the central battery 80 is equal to the reference value.

[0036] Fig. 4 is an explanatory diagram showing an example of the transition of the charging rate of the central storage battery 80. As shown in Fig. 4, the charging rate of the central storage battery 80 is provided with an upper limit value USL, a lower limit value LSL, and a reference value CP that are set in advance for managing the charging rate of the central storage battery 80. The range from the lower limit value LSL to the upper limit value USL is the reference range.

[0037] 4, when the charging rate of the central battery 80 is equal to or higher than the upper limit USL of the reference range or is predicted to be equal to or higher than the upper limit USL (S20: equal to or higher than upper limit), the control unit 612 transitions the process to step S60. In step S60, the control unit 612 increases the demand for power stored in the central battery 80 in order to reduce the charging rate of the central battery 80. As a result, it is possible to suppress or prevent the charging rate of the central battery 80 from becoming equal to or higher than the upper limit USL.

[0038] In order to increase the demand for the power stored in the central battery 80, the control unit 612 executes, for example, at least one of the following processes. (1) A process of charging the battery 120 from the central storage battery 80 via the charging device 200A. In this case, however, it is preferable to prevent the SOC of the battery 120 from falling within the degradation range of the battery 120. (2) A process of running each vehicle 100 in a running method that removes restrictions that suppress power consumption of the battery 120. Examples of restrictions that suppress power consumption of the battery 120 include restrictions on the acceleration and speed of the vehicle 100, and restrictions on the number of starts and stops. (3) A process for increasing the amount of charge from the central battery 80 to the auxiliary battery 82, or a process for increasing the amount of power consumed by the auxiliary battery 82. (4) A process to remove restrictions on power consumption by loads within a factory FC, such as air conditioning, lighting, and production equipment. (5) Processing to reduce the amount of electricity purchased from the operator OS.

[0039] For example, when the solar radiation intensity is stronger than usual in a certain time period, the amount of power generated by the photovoltaic power generation device as the power generation facility 90 increases. Therefore, it is predicted that the amount of power stored in the central storage battery 80 will be higher than the reference value, such as from time t1 to time t2 in FIG. 4. In this case, the control unit 612 increases the demand for power stored in the central storage battery 80, for example, to lower the target charging rate of the central storage battery 80. Specifically, the control unit 612 increases the amount of power supplied from the central storage battery 80 to the auxiliary storage battery 82 and the amount of power supplied from the charging device 200 to the battery 120 of the vehicle 100 in that time period. As a result, the target charging rate of the central storage battery 80 in that time period can be brought closer to the reference value.

[0040] 4, when the charging rate of the central battery 80 is equal to or lower than the lower limit LSL of the reference range or is predicted to become equal to or lower than the lower limit LSL (S20: lower limit or lower), the control unit 612 transitions the process to step S40. In step S40, the control unit 612 reduces the demand for power stored in the central battery 80 in order to increase the charging rate of the central battery 80. As a result, it is possible to suppress or prevent the charging rate of the central battery 80 from becoming equal to or lower than the lower limit LSL.

[0041] In order to reduce the demand for the power stored in the central battery 80, the control unit 612 executes, for example, at least one of the following processes. (1) A process of charging the central storage battery 80 from the battery 120 via the charging device 200A. In this case, however, it is preferable to prevent the SOC of the battery 120 from falling within the degradation range of the battery 120. In addition, it is preferable to limit the supply of power from the battery 120 to the central storage battery 80 so that it is executed only under predetermined conditions. Examples of the predetermined conditions include a case where the amount of power generated by the power generation facility 90 or the amount of power supplied from the business entity OS outside the factory FC is predicted to be equal to or less than a predetermined amount of power. By configuring in this way, it is possible to suppress or prevent the occurrence of a power shortage during self-propelled transport of the vehicle 100. (2) A process of running each vehicle 100 in a running method that reduces power consumption of the battery 120. Examples of running methods that reduce power consumption of the battery 120 include reducing the acceleration and vehicle speed of the vehicle 100, and reducing the number of starts and stops of the vehicle 100. (3) Processing to suppress power consumption of the auxiliary storage battery 82. (4) Processing to reduce power consumption by equipment for each process within a factory FC, such as air conditioning, lighting, and production equipment. (5) A process for increasing the amount of electricity purchased from the operator OS.

[0042] For example, when the control unit 612 acquires weather information indicating that it will rain in a predetermined time period, such as from time t3 to time t4 shown in FIG. 4, the amount of power generated by the photovoltaic power generation device as the power generation facility 90 is reduced. Therefore, it is predicted that the amount of power stored in the central storage battery 80 will be lower than the reference value, such as from time t3 to time t4 in FIG. 4. In this case, the control unit 612 may determine the target charging rate so that the charging rate of the central storage battery 80 is high in advance in the period from time t1 to time t2, which is before the time period. In the example of FIG. 4, the charging rate of the central storage battery 80 may be set not to be lowered in the region D1. In this case, it is possible to prevent the amount of power stored in the central storage battery 80 from being lower than the reference value without adjusting the charging rate of the central storage battery 80 in the region D2.

[0043] Furthermore, the control unit 612 may cause each energy resource to, for example, increase the amount of power purchased from the carrier OS, supply excess power stored in the battery 120 of the vehicle 100 to the central storage battery 80, and suppress power consumption of the battery 120 due to self-propelled transport, such as reducing the traveling speed of the vehicle 100, so that the charging rate of the central storage battery 80 becomes higher than a reference value. In this case, when the charging rate of the battery 120 when the charging rate of the central storage battery 80 is lower than the reference value is compared with the charging rate of the battery 120 when the charging rate of the central storage battery 80 is higher than the reference value, the charging rate of the battery 120 when the charging rate of the central storage battery 80 is higher than the reference value is higher.

[0044] In step S70, the control unit 612 checks whether or not prediction of the transition of the charging rate of the central battery 80 during a predetermined period has been completed. If the prediction has not been completed (S70: NO), the control unit 612 returns the process to step S10. If the prediction for the predetermined period has been completed (S70: YES), this flow ends.

[0045] As described above, the power supply and demand system 800 of the present embodiment includes the battery 120 mounted on the vehicle 100 capable of traveling in the factory FC by remote control, the central storage battery 80 capable of supplying power to the equipment of the factory FC, the charging device 200 capable of supplying the power stored in the central storage battery 80 to the battery 120, the power receiving device 260A capable of supplying the power stored in the battery 120 to the central storage battery 80, and the power generation equipment 90 capable of supplying generated power to at least the central storage battery 80. By utilizing the battery 120 mounted on the vehicle 100 as a product as an energy resource capable of supplying and demanding power to the central storage battery 80, the supply and demand balance of power in the factory FC can be efficiently adjusted. The battery 120 mounted on the vehicle 100 as a product is a so-called new product, and is suitable for use in adjusting the charging rate. In addition, if the number of vehicles 100 manufactured increases, the number of batteries 120 also increases, and the range of energy resources is expanded, thereby making it possible to more efficiently adjust the supply and demand balance.

[0046] The power supply and demand system 800 of the present embodiment further includes a control unit 612 that determines a target charging rate of the central storage battery 80 by using a change in the amount of power generated by the power generation equipment 90 and a change in the amount of power consumed by the central storage battery 80. By providing the control unit 612, it is possible to integrate energy resources and adjust the power supply and demand balance in the entire factory FC.

[0047] According to the electricity supply and demand system 800 of this embodiment, the control unit 612 determines the target charging rate of the central storage battery 80 by using the transition of the number of vehicles 100 produced in the factory FC. The charging rate of the batteries 120 that have just been installed in the newly manufactured vehicles 100 is easy to adjust and is suitable as an energy resource. By using the number of batteries 120 that are suitable as an energy resource, the estimation accuracy of the electricity supply and demand can be improved.

[0048] According to the electric power supply and demand system 800 of the present embodiment, the control unit 612 prompts the charging device 200 to charge the battery 120 when the charging rate of the central storage battery 80 is equal to or higher than a predetermined upper limit USL or is predicted to be equal to or higher than the upper limit USL. By preferentially using the battery 120, which is suitable as an energy resource, as an energy resource, the supply and demand balance of electric power in the factory FC can be efficiently adjusted. In addition, a shortage in the charging rate of the battery 120 of the vehicle 100 can be suppressed or prevented, and a malfunction in which the vehicle 100 runs out of power during self-propelled transport can be suppressed or prevented.

[0049] According to the power supply and demand system 800 of the present embodiment, when the charging rate of the central storage battery 80 is equal to or lower than a predetermined lower limit value LSL or is predicted to be equal to or lower than the lower limit value LSL, the control unit 612 prompts charging of the central storage battery 80 from the battery 120 via the charging device 200A. By preferentially using the battery 120, which is suitable as an energy resource, as an energy resource, the power supply and demand balance of the factory FC can be efficiently adjusted.

[0050] B. Other embodiments: (B1) In the above embodiment, an example was shown in which the power supply and demand adjustment device 600 includes the control unit 612, and the control unit 612 determines the target charging rate of the central storage battery 80. In contrast, the control unit 612 does not necessarily have to be included. In this case, for example, an operator who checks the transition of the amount of power generated by the power generation equipment 90 and the transition of the amount of power consumed by the central storage battery 80 can manually adjust the target charging rate of the central storage battery 80.

[0051] (B2) The vehicle 100 may have a configuration capable of moving by remote control. For example, the vehicle 100 may be in the form of a platform having the configuration described below. Specifically, the vehicle 100 may have a configuration for performing the functions of "running," "turning," and "stopping" by remote control. That is, the "vehicle 100 capable of moving by remote control" may not have at least some of the interior parts such as the driver's seat and dashboard attached, may not have at least some of the exterior parts such as the bumper and fender attached, and may not have a body shell attached. In this case, the remaining parts such as the body shell may be attached to the vehicle 100 before the vehicle 100 is shipped from the factory, or the remaining parts such as the body shell may be attached to the vehicle 100 after the vehicle 100 is shipped from the factory in a state in which the remaining parts such as the body shell are not attached to the vehicle 100.

[0052] (B3) All or a part of the functions of the power supply and demand adjustment device 600, such as the control device 612, may be provided in at least one of the remote control device 300, the process management device 400, and the charging device management device 500. Furthermore, all or a part of the functions of the remote control device 300, such as the remote control device 312 and the charging rate acquisition unit 314, may be provided in the power supply and demand adjustment device 600. All or a part of the functions of the process management device 400 and the charging device management device 500 may be provided in the power supply and demand adjustment device 600.

[0053] (B4) In the above embodiment, examples have been shown in which the vehicle 100 is a passenger car, a truck, a bus, a construction vehicle, and the like. In contrast, the vehicle 100 may further include various automobiles such as two-wheeled vehicles and four-wheeled vehicles, trains, and the like. In addition, the vehicle 100 may be various moving bodies other than the vehicle 100. A "moving body" means an object that can move. Moving bodies include ships, aircraft, robots, linear motor cars, and the like. In this case, the expressions "vehicle" and "car" in this disclosure can be appropriately replaced with "moving body", and the expression "running" can be appropriately replaced with "moving".

[0054] (B5) In the above embodiment, an example was shown in which the control unit 612 determines the target charging rate of the central storage battery 80. However, the control unit 612 may determine the target charging rate of the central storage battery 80 by determining information equivalent to the charging rate of the battery 120, such as the amount of power, electric capacity, electric quantity stored in the battery 120, the cell voltage, and the cell current of the battery 120, instead of only the charging rate.

[0055] The control and the method described in the present disclosure may be realized by a special-purpose computer provided by configuring a processor and a memory programmed to execute one or more functions embodied in a computer program. Alternatively, the control unit and the method described in the present disclosure may be realized by a special-purpose computer provided by configuring a processor with one or more dedicated hardware logic circuits. Alternatively, the control unit and the method described in the present disclosure may be realized by one or more special-purpose computers configured by a combination of a processor and a memory programmed to execute one or more functions and a processor configured with one or more hardware logic circuits. In addition, the computer program may be stored in a computer-readable non-transitory tangible recording medium as instructions executed by a computer.

[0056] The present disclosure is not limited to the above-mentioned embodiment, and can be realized in various configurations without departing from the spirit of the present disclosure. For example, the technical features in the embodiments corresponding to the technical features in each aspect described in the Summary of the Invention column can be appropriately replaced or combined to solve some or all of the above-mentioned problems or to achieve some or all of the above-mentioned effects. Furthermore, if the technical feature is not described as essential in this specification, it can be appropriately deleted. [Explanation of symbols]

[0057] 50...pre-process, 60...post-process, 70...access point, 72...network, 80...central storage battery, 82...auxiliary storage battery, 90...power generation equipment, 100...vehicle, 120...battery, 140...motor, 150...receiving circuit, 152...receiver, 154...receiving resonant circuit, 160...transmitting circuit, 164...transmitting resonant circuit, 180...ECU, 190...vehicle communication unit, 200, 200A, 200B...charging device, 250...transmitting circuit, 250A...transmitting device A, 254...transmitting resonant circuit, 260...receiving circuit, 260A...receiving device device, 264... power receiving resonance circuit, 300... remote control device, 310... CPU, 312... remote control unit, 314... charging rate acquisition unit, 320... storage device, 390... remote communication unit, 400... process management device, 500... charging device management device, 600... power supply and demand adjustment device, 610... CPU, 612... control unit, 620... storage device, 690... communication unit, 800... power supply and demand system, CA... camera, FC... factory, OS... business operator, PA... shipping area, RT... track, S1... business operator, S2... renewable energy power generation business operator, S3... general consumer

Claims

1. An electric power supply and demand system for use in a vehicle manufacturing factory, an in-vehicle secondary battery that is mounted on the vehicle that can travel within the factory by remote control during a manufacturing process in the factory; a central storage battery capable of supplying power to the equipment of the factory; a charging device capable of supplying the electric power stored in the central storage battery to the vehicle-mounted secondary battery; a power receiving device capable of supplying the power stored in the vehicle-mounted secondary battery to the central storage battery; A power generation facility provided in the factory, the power generation facility being capable of supplying electric power generated by the power generation facility to the central storage battery. Electricity supply and demand system.

2. The power supply and demand system according to claim 1, further comprising a control unit that acquires a trend in the amount of power generated by the power generation facility and a trend in the amount of power consumed by the central storage battery, and determines a target charging rate for the central storage battery using the acquired trend in the amount of power generated by the power generation facility and the trend in the amount of power consumed by the central storage battery.

3. The power supply and demand system according to claim 2 , wherein the control unit determines the target charging rate of the central storage battery by using a change in the number of vehicles produced in the factory.

4. 3. The power supply and demand system according to claim 2, wherein the control unit prompts charging of the vehicle-mounted secondary battery from the charging device when the charging rate of the central storage battery is equal to or higher than a predetermined upper limit value or is predicted to be equal to or higher than the upper limit value.

5. The power supply and demand system according to claim 2, the control unit, when the charging rate of the central storage battery is equal to or lower than a predetermined lower limit value or is predicted to be equal to or lower than the lower limit value, prompts charging of the central storage battery from the in-vehicle secondary battery via the power receiving device. Electricity supply and demand system.

Citation Information

Patent Citations

  • Electric power supply system

    JP2012175791A

  • Electric power management system

    JP2012196028A

  • Charge / discharge device

    JP2016005389A

  • Manufacturing method for vehicle

    JP2020100179A

  • Charging and discharging system

    JP2021016243A

Cited By

  • Charging system

    JP2026111084A

  • Charging system

    JP7743597B1