Management method of safety diagnosis work for building and worker terminal installed with program for executing method thereof

The worker terminal associates photographic data with building plans to enhance building safety diagnosis efficiency by sharing and automating report generation, addressing inefficiencies in existing methods.

JP2024162988AInactive Publication Date: 2024-11-21HANSTYLE ENG CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2023215343
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-09
Filing Date
2023-12-21
Publication Date
2024-11-21
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing building safety diagnosis methods face inefficiencies due to difficulties in accurately recording photographing positions and directions, and integrating photos and work information from multiple workers, leading to reduced work efficiency and cumbersome report compilation.

Method used

A worker terminal that stores photographic position and direction information with work icons on building plans, allowing workers to share and compile photos and information automatically, generating comprehensive safety diagnosis reports.

Benefits of technology

Improves work efficiency by enabling workers to access and integrate photos and information from others, facilitating automatic report generation and enhancing collaboration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024162988000001_ABST
    Figure 2024162988000001_ABST
Patent Text Reader

Abstract

To provide a management method of safety diagnosis work for a building and a worker terminal installed with a program for executing the management method of safety diagnosis work for a building.SOLUTION: The present invention is achieved through the processes of: receiving input of information on the story number of a safety diagnosis target building; generating a stratified work area for safety diagnosis collaboration of a plurality of workers based on the information on the story number of the safety diagnosis target building; respectively storing a stratified drawing of the safety diagnosis target building in the stratified work area; and uploading the stratified work area in which the stratified drawing is stored to a management server. By storing a photographed picture and related work information in association with a work icon for displaying a photographing position and photographing direction information of the worker on a drawing image such as a plan view of each story, the worker can check the photographed picture and the related work information of another worker who performs the safety diagnosis together in the same building through the worker terminal, thereby improving efficiency of a safety diagnosis work.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for managing safety diagnosis work for buildings and a worker terminal having a program installed thereon to execute the method for managing safety diagnosis work for buildings. More specifically, the present invention relates to a method for managing safety diagnosis work for buildings and a worker terminal having a program installed thereon to execute the method for managing safety diagnosis work for buildings, which can improve the efficiency of safety diagnosis work by storing the photographs and related work information of the worker by associating them with a work icon displayed on a drawing image such as a floor plan of each floor and storing the photographs and related work information of the worker, and which not only improves the efficiency of safety diagnosis work by allowing a worker to check, through the worker terminal, the photographs and related work information of other workers who are performing safety diagnosis together on the same building, but also automatically consolidates the work results of multiple workers and automatically generates a safety diagnosis report. [Background technology]

[0002] Typically, when conducting safety inspections to detect signs of building deterioration such as cracks, workers visit the building to be inspected and, while holding a floor plan of the building by floor, move around the building, photographing areas to be inspected, such as areas where cracks have developed in walls.

[0003] In this way, the worker moves around each floor of the building, takes dozens of photos, and then creates a building diagnosis report. In this process, the worker generally writes down the position and direction of the worker who took each photo on the floor plan of each floor.

[0004] Meanwhile, in order to indicate the photographing position and direction on each floor plan in the process of creating a building diagnostic report, the worker must move around the building in advance, photograph the parts to be inspected, and record the photographing position and direction for each photo. However, due to various on-site conditions at the diagnostic site, it is often difficult to take photographs and record them accurately.

[0005] Furthermore, when multiple workers are working on the safety diagnosis of such a building, it is difficult for them to check each other's photos and work information, which reduces the efficiency of the safety diagnosis work. Furthermore, when creating a safety diagnosis report later, the photos and work information of the multiple workers must be collected and organized one by one, which is inefficient. Summary of the Invention [Problem to be solved by the invention]

[0006] Therefore, the object of the present invention is to provide a building safety diagnosis work management method and a worker terminal having a program installed thereon for executing the building safety diagnosis work management method, which not only improves the efficiency of safety diagnosis work by storing the worker's shooting position and shooting direction information in association with the photograph and related work information displayed on a drawing image such as a floor plan of each floor, but also enables a worker to check through the worker terminal the photographs and related work information of other workers who are performing safety diagnosis on the same building, thereby automatically consolidating the work results of multiple workers and automatically generating a safety diagnosis report.

[0007] The problems to be solved by the present invention are not limited to the problems mentioned above, but include other technical problems that can be clearly understood by a person having ordinary skill in the art to which the present invention pertains from the following description. [Means for solving the problem]

[0008] In order to achieve the above-mentioned object, the present invention provides a method for managing safety diagnosis work for buildings, comprising: (a) a step in which a worker terminal receives input of floor number information of a building to be diagnosed for safety; (b) a step in which the worker terminal generates a floor-by-floor work area for safety diagnosis collaboration among multiple workers based on the floor number information of the building to be diagnosed for safety; and (c) a step in which the worker terminal individually stores floor-by-floor drawings of the building to be diagnosed for safety in the floor-by-floor work area.

[0009] Preferably, the method further includes a step (d) of the worker terminal uploading the layered work area in which the layered drawing is stored to a management server.

[0010] The method further includes: (e) a step of the worker terminal generating a work icon at a position on the layered drawing selected by the worker; and (f) a step of the worker terminal activating a camera module provided on the worker terminal when the pointing direction of the generated work icon is selected by the worker.

[0011] The method further includes (g) a step in which the worker terminal stores a photograph taken by the camera module in association with the task icon.

[0012] The method further includes (h) a step in which the worker terminal receives input of classification information of the photographs.

[0013] The method further includes the step of (i) outputting, by the worker terminal, a request for input of additional explanatory information corresponding to the classification information.

[0014] The method further includes (j) a step in which the worker terminal stores work information including the classification information and the additional explanation information in association with the work icon.

[0015] The method further includes (k) a step in which the worker terminal uploads the layered drawing from which the work icon has been generated to the management server.

[0016] The method further includes a step of (1) transmitting, from the operator terminal, to the management server, an invitation message to other operators who will jointly conduct a safety diagnosis in the stratified work area. The method further includes (m) a step of receiving, by the worker terminal, input of setting information related to the work authority of the cooperator.

[0017] The method further includes a step (n) of receiving, by the worker terminal, from the management server, the layered drawing that has been updated by further generating the work icon by the collaborator terminal.

[0018] The method further includes (o) receiving, by the worker terminal, an input of filtering criterion information regarding the work icon included in the layered drawing updated by the work of the collaborator.

[0019] The method further includes (p) the step of the worker terminal generating a safety diagnosis report for the building based on the updated floor plan.

[0020] Meanwhile, the worker terminal according to the present invention is characterized in that a program for executing the building safety diagnosis work management method is installed. Effect of the Invention

[0021] According to the present invention, the efficiency of safety diagnosis work can be improved by storing the photographing position and direction information of a worker taking photographs while moving within each floor space of a building for safety diagnosis in association with the photographed photograph and related work information in a work icon displayed on a drawing image such as a floor plan of each floor.

[0022] In addition, according to the present invention, workers can check, through their worker terminals, photographs taken by other workers who are performing safety diagnosis on the same building, as well as related work information, thereby improving the efficiency of safety diagnosis work.

[0023] Furthermore, according to the present invention, the work results of a plurality of workers who perform a safety diagnosis together can be automatically compiled and a safety diagnosis report can be automatically generated.

[0024] The effects of the present invention are not limited to the effects described above, but include other effects that can be clearly understood by a person having ordinary skill in the art to which the present invention pertains from the following description. [Brief description of the drawings]

[0025] [Figure 1] 1 is a flow chart illustrating a process of executing a building safety diagnosis work management method according to an embodiment of the present invention. [Diagram 2] 11A and 11B are diagrams illustrating screen states displayed on a worker terminal according to each execution stage of a building safety diagnosis work management method according to an embodiment of the present invention. [Diagram 3] FIG. 11 is a diagram similarly showing another screen state. [Figure 4] FIG. 11 is a diagram similarly showing another screen state. [Diagram 5] FIG. 11 is a diagram similarly showing another screen state. [Figure 6] FIG. 11 is a diagram similarly showing another screen state. [Figure 7] FIG. 11 is a diagram similarly showing another screen state. [Figure 8] FIG. 11 is a diagram similarly showing another screen state. [Figure 9] FIG. 11 is a diagram similarly showing another screen state. [Figure 10] FIG. 11 is a diagram similarly showing another screen state. [Figure 11] FIG. 11 is a diagram similarly showing another screen state. [Figure 12] FIG. 11 is a diagram similarly showing another screen state. [Figure 13] FIG. 11 is a diagram similarly showing another screen state. [Figure 14] FIG. 11 is a diagram similarly showing another screen state. [Figure 15] FIG. 11 is a diagram similarly showing another screen state. [Figure 16] FIG. 11 is a diagram similarly showing another screen state. [Figure 17] FIG. 11 is a diagram similarly showing another screen state. [Figure 18] FIG. 11 is a diagram similarly showing another screen state. [Figure 19] FIG. 11 is a diagram similarly showing another screen state. [Figure 20] FIG. 11 is a diagram similarly showing another screen state. [Figure 21]1 is a configuration diagram of a building safety diagnosis management system according to one embodiment of the present invention. BEST MODE FOR CARRYING OUT THEINVENTION

[0026] The present invention will be described in more detail below with reference to the accompanying drawings. It should be noted that the same components in the drawings are denoted by the same reference numerals whenever possible. Furthermore, descriptions of known functions and configurations that may unnecessarily obscure the gist of the present invention will be omitted.

[0027] 1 is a flow chart illustrating a process of executing a method for managing safety diagnosis work for a building according to an embodiment of the present invention. Hereinafter, the process of executing a method for managing safety diagnosis work for a building according to an embodiment of the present invention will be described with reference to FIG. 1.

[0028] Meanwhile, notwithstanding the definition of the term in the relevant laws and regulations, in this specification, "safety diagnosis" is defined to include a comprehensive management action for a building, such as periodic inspection and supervision of the building.

[0029] A building safety diagnostic worker who has a worker terminal 100 such as a smartphone installed with an application program for executing the building safety diagnostic work management method according to the present invention first selects "Project" "Create" on the execution screen of the application program as shown in Fig. 2. Next, as shown in Fig. 3, project information such as the project name, project description, project image, information on the number of basement floors of the building (e.g., 2 basement floors) and information on the number of aboveground floors (e.g., 5 aboveground floors) can be input (S110).

[0030] As a result, the worker terminal 100 generates each layered work area for safety diagnosis collaboration among a plurality of workers as shown in FIGS. 4 and 5 based on the project information input by the worker.

[0031] On the other hand, when implementing the present invention, the worker can select the “Add Floor” item as shown in FIG. 5 and input the name of the floor to be added (e.g., multi-story, rooftop floor), so that the worker terminal 100 can further generate a work area for the added floor.

[0032] Thereafter, when the worker selects each floor work area shown in Figures 4 and 5 and then selects a floor plan or other floor drawing for that floor that is already stored in the worker terminal 100, the worker terminal 100 associates the floor plan of the building to be safety diagnosed with each floor work area and stores it (S120), as shown in Figure 6.

[0033] On the other hand, when a worker selects the “Synchronize” button displayed in each layered work area, the layered work area selected by the worker and the layered drawing image stored in association with it can be uploaded to the management server 200.

[0034] The layered work area uploaded to the management server 200 and the associated layered drawing images stored in this manner can be downloaded to the terminals 300 of collaborators (i.e., other workers) who have been granted permission to participate in the project, thereby supporting the diagnostic work carried out jointly by the worker and collaborators on that layer.

[0035] In addition, according to the present invention, workers can individually decide whether or not to perform each level of safety inspection work collaboratively by individually selecting "synchronization" for each level of work area of ​​the building.

[0036] On the other hand, when a worker who wishes to perform a safety diagnosis on a specific floor (for example, the second basement floor) of a building to be diagnosed with safety selects a drawing of that floor by touching it on the screen of the worker terminal 100 shown in FIG. 6, the drawing of that floor can be output across the entire screen of the worker terminal 100 together with icon type information, icon generation selection items, and icon filtering selection items, as shown in FIG. 7.

[0037] As a result, when a worker touches the icon type information shown in FIG. 7, the icon type information is changed to an arrow shape as shown in FIG. 8, allowing the worker to select the type of work icon to be generated thereafter.

[0038] This allows the worker to select between generating a work icon that includes directional information in the form of an arrow that is the same as the worker's line of sight, and generating a work icon that does not include any directional information.

[0039] Thereafter, when the worker touches the icon generation selection item shown in FIG. 8 and then touches and selects the worker's current position, which is the position where the safety diagnosis is progressing on that layer, on the drawing image of FIG. 8, the worker terminal 100 generates a work icon at that position as shown in FIG. 9.

[0040] Specifically, the numerical information included in the work icon generated as shown in Fig. 9 indicates the order of icon generation in the layer (i.e., the order of work), and the color information of the work icon is identification information for identifying the worker among multiple workers working together in the layer. Note that the arrow direction (pointing direction) information in the work icon means information on the direction the worker is looking for diagnosis (i.e., the shooting direction of the worker's terminal).

[0041] Meanwhile, the worker can then touch the work icon shown in FIG. 9 and drag it clockwise or counterclockwise to modify the arrow direction and length in the work icon as shown in FIG. 10 to match the worker's actual line of sight.

[0042] In addition, when implementing the present invention, when the worker has completed correcting or selecting the arrow direction and length (i.e., when the worker removes his / her finger from the screen of the worker terminal after dragging), the worker terminal 100 can activate a camera module equipped therein to guide the worker to take a photograph of the inspection target area (e.g., a wall) in the worker's line of sight (S130).

[0043] In this way, when a worker takes a picture of an inspection target area in his / her line of sight, the worker terminal 100 can store the photograph in association with the work icon in question as shown in FIG. 11 (S140).

[0044] Meanwhile, in carrying out the present invention, an operator can primarily select and input classification information of the photograph (e.g., current condition, damage, measurement) as shown in FIG. 11, and can also secondarily select and input detailed classification information of the primarily selected classification information (S150).

[0045] In other words, when the primary classification information of the photograph is selected as "current condition," the secondary classification information can be precisely selected from "external view" and "internal view," and when the primary classification information of the photograph is selected as "damage," the secondary classification information can be precisely selected from "crack," "detachment," "water leakage," and "other."

[0046] Furthermore, in implementing the present invention, if "crack" is selected as the secondary classification information, it is also possible to precisely select tertiary classification information from among "crack" and "gaps", if "detachment" is selected as the secondary classification information, it is also possible to precisely select tertiary classification information from among "peeling / flaking", "cross-sectional defect", "exposed rebar / corrosion" and "detached finishing material", and if "leakage" is selected as the secondary classification information, it is also possible to precisely select tertiary classification information from among "leakage" and "leakage marks".

[0047] Meanwhile, the worker terminal 100 may output, on the screen of the worker terminal 100, a request for input of additional explanation items of the worker that are determined based on the classification information input by the worker as described above.

[0048] For example, if the primary classification information input by the worker for the captured photograph is "damage," the secondary classification information is "crack," and the tertiary classification information is also "crack," the worker terminal 100 will sequentially output a "request to input component name" requesting the selection of one of slab, girder, column, wall, masonry wall, ceiling, or floor, a "request to input crack type" requesting the selection of one of vertical, horizontal, diagonal, bending, shear, diagonal crack, reticulation, plaster, finishing material, heterogeneous material, or joint, and a "request to input crack standards," thereby allowing the worker to input related additional explanatory information that is requested in association with the classification information input by the worker.

[0049] For this purpose, it is preferable that the worker terminal 100 stores a request for input of additional explanation items that should be output according to the classification information selected by the worker as described above in association with each of the primary, secondary, and tertiary classification information.

[0050] Meanwhile, the worker terminal 100 can store the photograph-related task information including the classification information and the additional explanation information input by the worker in association with the task icon.

[0051] Thereafter, the worker can select the “Synchronize” button displayed in the work area of ​​the layer as shown in FIG. 12 to upload the layered work area selected by the worker, the layered drawing image stored in association with it, the work icon stored in association with the drawing image, the photograph stored in association with the work icon, and the work information to the management server 200.

[0052] In this way, the layered work area uploaded to the management server 200 and the layered drawings and work information uploaded therewith are downloaded to the collaborator terminal 300 that has been given the authority to participate in the project, thereby supporting the work performed jointly by the worker and collaborators on that layer.

[0053] Specifically, when a worker selects the “Team Member Management” item shown in FIG. 12 and enters the participant’s phone number as shown in FIG. 13, the worker terminal 100 can generate a participant invitation message to invite the project participant and send this to the management server 200.

[0054] Therefore, the management server 200 can send an invitation acceptance request message including link information for downloading the application program of the present invention to a terminal 300 such as the participant's smartphone based on the participant's telephone number included in the invitation message.

[0055] When a collaborator invited to participate in the project accepts the invitation, the collaborator can access the information uploaded to the management server 200 through his / her terminal 300 as described above. As a result, the worker can manage a list of all collaborators (team member list) who have joined the project as shown in Fig. 14 (S160).

[0056] Specifically, the worker who created the project has authority as the "owner." Such a project "owner" can freely select the authority of each collaborator as shown in Fig. 14 ("Remove from team," "Designate owner," "Designate administrator," or "Designate team member" items), and the worker terminal 100 can set the authority of each collaborator individually according to the owner's selection information for each collaborator's authority.

[0057] In this manner, multiple collaborators participating in the project independently perform the safety diagnosis work as described above in steps S130 to S150 through their respective terminals 300 such as smartphones, and the same upload procedure as the upload procedure to the management server 200 in the worker terminal 100 as described above is independently performed in each collaborator terminal 300, so that updates of each layered drawing in response to simultaneous work by multiple collaborators are performed in real time by the management server 200 (S170).

[0058] As a result, the management server 200 assigns numbers to the work icons in sequence according to the upload order of each work icon in the layered drawing, as shown in Fig. 15. Also, to enable identification of each worker, color information assigned individually to each worker is assigned to the work icon.

[0059] In this way, each worker can receive and check the layered drawing including multiple work icons that are updated in an integrated manner by the management server 200 through his / her own terminal 100, 300. By touching the icon filtering selection item shown in FIG. 15, each worker can request the worker terminal 100 to perform a filtering process to select the work icons displayed on the screen of the terminal 100, 300 (S180).

[0060] Specifically, by touching the icon filtering selection item shown in FIG. 15, the filter selection items displayed as in FIG. 16 are largely divided into photo classification (photo type) information selection items and participant list selection items.

[0061] As a result, when a worker selects a specific participant as filtering criteria information after selecting a participant list selection item, the worker terminal 100 selects only the work icons uploaded by the selected participant and outputs them as shown in Fig. 17. Therefore, the worker can check the photographs and related work information of the participant he or she selected by touching and selecting the work icon.

[0062] Furthermore, as shown in Fig. 18, after the worker selects the photo classification (photo type) information selection item from the filter selection items, the worker selects the first, second, or third classification information (e.g., damage, falling off, etc.) as the filtering reference information, and the worker terminal 100 selects only the work icons for which classification information matching the classification information selected by the worker is stored in association with work information, and outputs them as shown in Fig. 19. Therefore, the worker can check the photographs and related work information that match the classification information selected by the worker by touching and selecting the work icon.

[0063] On the other hand, in carrying out the present invention, the worker can select a specific participant from the participant list selection item as the first filtering criterion information, and also successively select the first, second, and third classification information from the photo classification (photo type) information selection item as the second filtering criterion information. In this case, the worker terminal 100 can select and output only the task icons that satisfy both the first filtering criterion information and the second filtering criterion information.

[0064] In carrying out the present invention, the operator can select each layered work area as shown in FIG. 20, and then change the relative positions of each layered work area upward or downward.

[0065] In addition, in carrying out the present invention, when an operator selects each layer work area as shown in FIG. 20 and then selects “Layer Report Preview”, the operator terminal 100 can generate a layer safety diagnosis report including information on the work icon generation position in the drawing of the layer, the photographs stored in association with each work icon, and the associated work information.

[0066] In addition, in carrying out the present invention, a worker can select between a "horizontal view" mode and a "vertical view" mode of a drawing by inputting setting information of an application program. According to such setting information, the worker terminal 100 can support the visibility of the drawing according to the worker's selection by selectively executing the drawing horizontal view mode or the vertical view mode as shown in Figs. 7 to 11.

[0067] In addition, in carrying out the present invention, it is preferable that the application program has a function of backing up the safety diagnosis report and all the information input or generated during the safety diagnosis process as described above to a storage device such as a PC or server designated by the worker, so that the backup data can be submitted collectively to a supervisory agency in the future for evaluating the qualification conditions of the company to which the worker belongs.

[0068] In addition, in implementing the present invention, a program for executing the building safety diagnosis work management method of the present invention can be installed in the worker terminal 100 of the present invention, recorded on various computer-readable recording media, or stored in a server that transfers the program via a network.

[0069] In addition, the program according to the present invention may be distributed among computer systems connected via a network, and computer readable code may be stored and executed in a distributed manner. Furthermore, functional programs, codes, and code segments for implementing the present invention may be easily understood by those skilled in the art to which the present invention pertains.

[0070] It should be noted that the order of steps S110-S180 in the present invention is merely an example and is not limited thereto, that is, the order of steps S110-S180 may be changed, and some of the steps may be performed simultaneously or deleted.

[0071] The terms used in the present invention are merely used to describe certain embodiments and are not intended to limit the present invention. A singular expression includes a plural expression unless the context clearly indicates otherwise. In this application, the terms "include" or "have" are intended to specify the presence of features, numbers, steps, operations, components, parts, or combinations thereof described in the specification, and should be understood not to preclude the presence or addition of one or more other features, numbers, steps, operations, components, parts, or combinations thereof.

[0072] Although the preferred embodiments and application examples of the present invention have been illustrated and described above, the present invention is not limited to the specific embodiments and application examples described above, and it goes without saying that various modifications can be made by a person having ordinary skill in the art to which the invention pertains without departing from the gist of the present invention as claimed in the claims, and such modifications should not be understood individually from the technical ideas and perspectives of the present invention. [Industrial Applicability]

[0073] The present invention is recognized to have industrial applicability in the field of building safety diagnosis work management. [Explanation of symbols]

[0074] 100... worker terminal, 200... management server, 300... collaborator terminal

Claims

1. (a) receiving, by an operator terminal, input of floor number information of a building to be safety diagnosed; (b) the worker terminal generates a layered work area for safety diagnosis collaboration among a plurality of workers based on the number of layers information of the building to be diagnosed; (c) the worker terminal individually stores a floor plan of the safety diagnosis target building in the floor plan work area; (d) receiving, by the worker terminal, input of primary classification information selected by the worker for the photographed photograph and secondary classification information which is classification information that can be finely selected based on the primary classification information; (e) a step in which the worker terminal outputs a request for input of additional explanation items determined based on the primary classification information and the secondary classification information; (f) generating a participant invitation message by the worker terminal based on the participant telephone number input by the worker; (g) the worker terminal sending the participant invitation message to the management server so that the management server can send an invitation acceptance request message to the participant terminal based on the participant's telephone number; (h) receiving, by the worker terminal, input of setting information regarding the authority of the participant; and (i) A method for managing safety diagnosis work for buildings, characterized in that the worker terminal receives input of filter selection item information for selecting work icons generated by the safety diagnosis work of the worker and the participants, the filter selection item information including each selection information for the primary classification information and the secondary classification information, and participant selection information.

2. (j) The building safety diagnosis work management method described in claim 1, further comprising a step in which the worker terminal selects and outputs work icons that satisfy both first filtering criteria information including the participant selection information and second filtering criteria information including each selection information for the primary classification information and the secondary classification information.

3. After the step (c) and before the step (d), A step in which the worker terminal uploads the layered work area in which the layered drawing is stored to the management server; A step in which the worker terminal generates the work icon at a position on the layered drawing selected by the worker; and The building safety diagnosis work management method according to claim 1, further comprising a step of activating a camera module provided on the worker terminal when the direction of the generated work icon is selected by the worker.

4. 4. A worker terminal having installed thereon a program for executing the building safety diagnosis work management method according to claim 1.

Citation Information

Patent Citations

  • Work management system

    JP2005351681A

  • Earthquake damage measuring system and earthquake damage measuring method

    JP2008281435A

  • Structure inspection support system

    JP2019057192A

  • Building diagnosis support system

    JP2021005293A

  • Construction support cloud system and program

    JP2021192135A